Loading...
HomeMy WebLinkAbout1999-03-17 - Planning-Engineering-Operations Committee Meeting MinutesDATE: TO: FROM: SUBJECT: • AGENDA REPORT March 25, 1999 President and Members of the Board Planning- Engineering- Operations Committee 0 ITEM NO. it Summary Minutes of the Planning- Engineering- Operations Committee Meeting The Planning- Engineering- Operations Committee held a meeting on March 17, 1999. Present were Directors Paul Armstrong, Brett Barbre and staff members William Robertson, Chuck Gray, Ken Vecchiarelli, and Lee Cory. The committee discussed the following items. 1. Fieldstone Development., Ken Vecchiarelli, Engineering Manager, reported on proposed amendments to the terms and conditions for water service for the Fieldstone project on Richfield Road at Mariposa. The discussion centered about whether to allow Fieldstone to construct a 24 -inch bypass pipeline on the District's existing 26 -inch Zone 1 transmission main. An agenda considering this matter is presented for action by the Board of Directors within this agenda package. 2. Well No. 11 Rehabilitation. Ken Vecchiarelli, Engineering Manager, reported on engineering proposals received to design a new pump, motor, flow control valves, and metering, telemetry, and electrical services for well No. 11. An agenda considering this matter is presented for action by the Board of Directors within this agenda package. 3. Other. The committee conducted a general discussion on the District's 36 -inch Richfield Road pipeline replacement project and the Edgecliff/West Vale water service relocation project. iz �z�