Loading...
HomeMy WebLinkAbout2014-03-25 - YLWD-MWDOC-OCWD Joint Agency Committee Meeting MinutesMINUTES OF THE YORBA LINDA WATER DISTRICT JOINT AGENCY COMMITTEE MEETING WITH MWDOC AND OCWD Tuesday, March 25, 2014, 4:00 p.m. 1717 E Miraloma Ave, Placentia CA 92870 1. CALL TO ORDER The March 25, 2014 meeting of the Yorba Linda Water District's Joint Agency Committee with MWDOC and OCWD was called to order at 4:00 p.m. The meeting was held in the Admin Conference Room at the District's Administration Building located at 1717 East Miraloma Avenue in Placentia, California 92870. :Zo7 I wq_141 YLWD COMMITTEE MEMBERS Director Robert R. Kiley Director Michael J. Beverage MWDOC COMMITTEE MEMBER Director Brett Barbre OCWD COMMITTEE MEMBER Director Roger Yoh 3. PUBLIC COMMENTS None. 4. DISCUSSION ITEMS YLWD STAFF Steve Conklin, Acting General Manager MWDOC STAFF Rob Hunter, General Manager OCWD STAFF John Kennedy, Asst General Manager 4.1. MWD Water Supply Conditions and Outlook Director Barbre reported that the MWD water supply conditions are as previously indicated: in good condition for southern California because of the planning and projects completed over the last 15 years, including storage, recycling and conservation. 4.2. MWDOC Draft Budget The budget for FY 2014/15 is in draft form and is undergoing review by the member agencies and the MWDOC committees. 4.3. OCWD Basin Conditions and Outlook Mr. Kennedy reported that the basin is expected to be drawn down to an overdraft of about 322,000 AF by June 2014. In FY 2014/15, OCWD's budget includes the purchase of 65,000 AF of MWD water for recharge. OCWD anticipates that with that recharge and other, including GWRS, the basin is expected to remain at the same overdraft condition at the end of the next FY. 4.4. OCWD Draft Budget The budget for FY 2014/15 is in draft form and is undergoing review. Included in the budget is funding for water purchase, as noted above, as well as for construction of the 30 mgd expansion of the GWRS Plant. 4.5. Call by MWD for CUP Water from OC Groundwater Basin Mr. Kennedy reported that MWD has 48,000 AF of water in the OC Basin, and has requested that extraction of the water begin April 1, 2014 under the CUP. He indicated that MWD will probably continue the call for extraction until its storage account is depleted. 4.6. Huntington Beach Ocean Desalination Project Director Yoh reported that OCWD's Board will be considering issuing an RFP to hire a financial consultant to review the estimates by OCWD and by Poseidon as to the construction cost and the operating cost for the project. The goal will be to determine the range of probability for these cost estimates. There was a discussion in the meeting as to how this type project fits in with other water supply development projects that could be pursued, and at what cost. 4.7. Consolidation of OCWD and MWDOC There was no new information to report. Representatives for the two agencies continue to meet, but infrequently. 4.8. OCWD Annexation The issue will be considered by LAFCO at its May 2014 meeting. According to Mr. Kennedy, approval is anticipated, which would result in the newly annexed areas able to be served groundwater in accord with the BPP to be established by the OCWD Board in April 2014. 4.9. Status of OCWD Groundwater Basin Cleanup Projects Nothing new to report. 4.10. YLWD Well Project Mr. Conklin reported that the Well 21 pilot hole has been completed to bedrock at 725 ft below grade and zone testing performed. Work to follow will include drilling out the well to full diameter and setting the perforated well casing. Work is expected to be complete by May 2014. Design work is in progress for the well- equipping facilities. 4.11. Future Agenda Items None. 5. ADJOURNMENT 5.1. The meeting was adjourned at 4:45 p.m. The next YLWD /MWDOC /OCWD Joint Agency Committee meeting is scheduled to be held Tuesday, May 27, 2014 at 4:00 p.m. 2