Loading...
HomeMy WebLinkAbout2014-11-25 - YLWD-MWDOC-OCWD Joint Agency Committee Meeting MinutesMINUTES OF THE YORBA LINDA WATER DISTRICT JOINT AGENCY COMMITTEE MEETING WITH MWDOC AND OCWD Tuesday, November 25, 2014, 4:00 p.m. 1717 E Miraloma Ave, Placentia CA 92870 1. CALL TO ORDER 2. 3. 4. The November 25, 2014 meeting of the Yorba Linda Water District's Joint Agency Committee with MWDOC and OCWD was called to order at 4:00 p.m. The meeting was held in the Admin Conference Room at the District's Administration Building located at 1717 East Miraloma Avenue in Placentia, California 92870. ROLL CALL YLWD COMMITTEE MEMBERS Director Robert R. Kiley Director Michael J. Beverage MWDOC COMMITTEE MEMBER Director Brett Barbre OCWD COMMITTEE MEMBER Director Roger Yoh PUBLIC COMMENTS None. DISCUSSION ITEMS YLWD STAFF Marc Marcantonio, General Manager Steve Conklin, Engineering Manager Damon Micalizzi, Public Information Mgr MWDOC STAFF Rob Hunter, General Manager OCWD STAFF Mike Markus, General Manager 4.1. Status of State Water Resources Control Board's ( SWRCB) Drought Response Mandate and Projection for Greater Conservation Mr. Hunter reported that, given the continuing drought conditions, the SWRCB may mandate at its next meeting that retail water providers move to the next higher stage of water conservation. 4.2. MWDOC Member Agencies Response to Drought and Turf Replacement Rebate Program Mr. Hunter reported that member agencies are continuing to call for conservation, and that the turf rebate program is proving very successful. MWDOC has received 2441 applications for single - family homes and 285 applications for commercial sites, with a combined total of 6.8 million sq ft of turf removal. MWD's budget for program funding for FY 2014/15 is $15.3 million. 1 4.3. MWD Water Supply Conditions and Outlook Director Barbre reported that conditions remain the same, with storage volume in all reservoirs at less than 50% of capacity. 4.4. Projections for MWD Water Allocation With the continuing drought conditions, Mr. Hunter reported that it is likely that MWD's Board will approve an allocation program in early 2015. MWDOC is participating with other MWD agencies and MWD staff on the Water Supply Allocation Plan. A meeting of MWDOC member agencies is scheduled for Dec 9 on the proposed plan and its elements. 4.5. Status of MWDOC's OC Water Reliability Investigation Mr. Hunter reported that the first meeting of the Study Workgroup for the above (including staff from YLWD) took place on November 20, 2014 with MWDOC's consultant for the project, CDM Smith. Monthly meetings of the Workgroup are planned for January thru August 2015, with a draft report due in October. 4.6. OCWD Groundwater Basin Condition and Outlook for Basin Production Percentage and Replenishment Assessment Mr. Markus reported that the groundwater basin overdraft is approximately 400,000 AF. He noted that unless there is a lot of rain in the next few weeks, OCWD staff will recommend to its Board that it authorize the BPP be cut from 72 to 70% for the reminder of FY 2014 -15, and that it consider reducing the BPP to the range of 60% for FY 2015 -16. Mr. Markus indicated that staff will be recommending an RA in the range of $350 for FY 2015 -16, with the expansion of GWRS coming on line. 4.7. Status of OCWD North and South Basin Cleanup Projects Mr. Markus reported no new developments on these projects and related court cases. 4.8. Huntington Beach Desalination Project, OCWD Meetings with Water Retailers and Next Steps Mr. Markus reported that on November 12, 2014, there was a combined meeting of the Groundwater Producers, OCWD directors and representatives from South Orange County water agencies to discuss the above proposed project. Local groups and individuals were also invited and attended the meeting. There is a following meeting planned for December 10, 2014 for continuing discussion. 4.9. Potential Projects for the Water Bond and Outlook for Bay Delta Conservation Plan Mr. Hunter reported that MWDOC is preparing a list of potential projects provided by its member agencies (including two well projects proposed by YLWD) for consideration for funding under the newly approved water bond. It was noted that it will be several months before the State has the 2 process in place for project applications and funding requirements. Mr. Markus noted that OCWD is preparing its list of projects for bond funding. 4.10. YLWD Well Projects and Proposal for Dual -Use Mr. Conklin reported that YLWD is preparing design plans for its Well 21 Project adjacent to OCWD's Conrock Basin. YLWD is also beginning preliminary planning for its proposed Well 22 Project adjacent to OCWD's Huckleberry Basin. He noted that there was a recent meeting at the Well 21 site between OCWD and YLWD staff to discuss the potential turnout from the Well 21 discharge pipeline for water service for landscape irrigation for OCWD at its Warner Basin facility along La Palma. 4.11. Future Agenda Items None. 5. ADJOURNMENT 5.1. The meeting was adjourned at 5:36 p.m. The next YLWD /MWDOC /OCWD Joint Agency Committee meeting is scheduled to be held Tuesday, January 27, 2015 at 4:00 p.m. SC 3