Loading...
HomeMy WebLinkAbout2005-02-17 - Planning-Engineering-Operations Committee Meeting MinutesITEM NO. 9Ck MINUTES OF THE APPROVED BY THE BOARD OF DIRECTORS YORBA LINDA WATER DISTRICT OF THEYORSA LINDA WATER DISTRICT PLAN NING-ENGINERING-OPERATIONS COMMITTEE MAR 1 February 17, 2005 - 4:00 p.m. 13Y... A meeting of the Planning-Engineering-Operations Committee was called to order by Committee Chairman Paul Armstrong at 4:00 p.m. The meeting was held at the District Headquarters, 4622 Plumosa Drive, Yorba Linda. DIRECTQRS PRESE VT STAFF PRESENT Paul R. Armstrong, C lair Michael A. Payne, General Manager John Summerfield Ken Vecchiarelli, Asst. General Manager Lee Cory, Operations Manager ACTION ITEMS 1. Bastanchury Reservoir and Booster Station Site Optimization Plan. Recommendation: The Planning-Engineering-Operations Committee discussed staff's report and will recommend to the Board of Directors at their regular meeting on February 24, 2005, that the General Manager execute a Consultants Agreement with Parsons for preparation of a Feasibility Study and Basis of Design Report. 2. Sewer Flow Monitoring Services. Recommendation: The Planning-Engineering-Operations Committee discuss staff's report and will recommend to the Board of Directors at their regular meeting on February 24, 2005, that the General Manager be authorized to execute a professional services contract with ADS Environmental Services to install temporary flow meters and prepare a sewer flow analysis report on the District's sewer system. INFORMATION ITEMS 3. Water Master Plan Update. Mr. Vecchiarelli reported a draft plan will be presented at the next Planning-Engineering-Operations Committee meeting on March 3, 2005. 4. Sewer Overflow Follow Up Report. Mr. Cory reported on a meeting held with representatives of the Santa Ana Regional Water Quality Control Board regarding a sewer spill that occurred on January 9, 2005. 5. Status report on In-lieu Water Supply Operations. Mr. Cory and Mr. Vecchiarelli reported on the status of in-lieu productions for December and January. Mr. Cory also reported on the planned shutdown of the Robert B. Deimer Filtration Plant March 7-11, 2005. 6. Highland Reservoir Site Slope Failures. Mr. Cory and Mr. Vecchiarelli reported on slope erosion and surface slope failures at the Highland Reservoir site. The Committee discussed an action plan to mitigate further erosion. The Committee Adjourned at 5:15 p.m.