Loading...
HomeMy WebLinkAbout2005-06-02 - Planning-Engineering-Operations Committee Meeting MinutesITEM NO. d MINUTES OF THE APPROVED BY THE BOARD OF DIRECTORS YORBA LINDA WATER DISTRICT OF THE YORBA LINDA WATER DISTRICT PLANNING-ENGINERING-OPERATIONS COMMITTEE JUN 0 11005 June 2, 2005 - 4:00 p.m. ~l I BY, A meeting of the Planning-Engineering-Operations Committee was called to order by Committee Chairman Paul Armstrong at 4:10 p.m. The meeting was held at the District Headquarters, 4622 Plumosa Drive, Yorba Linda. DIRE gTORS PRESENT Paul Armstrong, Chair John Summerfield STAFF PRESENT Michael A. Payne, General Manager Ken Vecchiarelli, Asst. General Manager Lee Cory, Operations Manager Bill Moorhead, Senior Project Engineer VISITORS PRE-5kNT Brian Frame, Toll brothers ACTION ITEMS 1. 2005 Water Master Plan Update. The Committee discussed the final draft of the 2005 Domestic Water System Master Plan prepared by Carollo Engineers. The Committee recommended providing the Executive Summary Chapter to the full board for their review and consideration in accepting the plan. Mr. Moorhead left the meeting at 4:30 p.m. 2. Proposed Upgrades to the District's Telephone System. Mr. Payne pulled this item for further consideration and action at a later date. Still under consideration is whether the U.S. General Services Administration (GSA) purchasing program will allow the District to get the best pricing for the equipment and labor required to install the system upgrades. Mr. Payne left the meeting following this discussion. STANDING ITEMS 3. Bastanchury Booster Station and Reservoir site plan. Mr. Vecchiarelli reported on the status of the engineering investigations and geotechnical studies for the proposed project. He also reported that Toll Brothers was seeking additional lot releases in Village 3, while Parsons Engineering completes the site optimization and rough grading plan. Staff will prepare a report for the Board's consideration on this matter later in June. Mr. Frame left the meeting following this discussion. INFORMATION ITEMS 4. In-lieu Production Report. Mr. Vecchiarelli presented a summary chart identifying the groundwater, import and in-lieu production for May 2005 and year to date totals. The Committee Adjourned at 5:45 p.m.