Loading...
HomeMy WebLinkAbout2007-11-15 - Building Ad Hoc Committee Meeting MinutesITEM NO. 1D,A MINUTES OF THE YORBA LINDA WATER DISTRICT BUILDING AD HOC COMMITTEE MEETING November 15, 2007 A meeting of the Building Ad Hoc Committee was called to order by Committee Chair John W. Summerfield at 4:00 p.m. The meeting was held at the Richfield Plant located at 913 S. Richfield Road, Placentia. There were no public visitors at this meeting. DIRECTORS PRESENT: STAFF PRESENT: Director John W. Summerfield, Chair Kenneth Vecchiarelli, Asst. General Manager Director Michael J. Beverage Hank Samaripa, Project Engineer DISCUSSION ITEMS: 1. Project Status. Mr. Samaripa presented an update of the construction progress and led a discussion regarding the details of the building entry, appearance and security issues. The Committee members visited the construction site and were led on a walk-through of the building interior. During this tour, the Committee discussed details of the Boardroom and public access areas. The Committee made several suggestions to staff including continuing the wrought iron fencing without the low block wall and block pilasters into the site for security purposes and not to pursue an expensive audio visual system for the board and training rooms at this time. 2. Initial Knoll Furniture Proposal. Following the building tour, the Committee reviewed the proposal for furniture (approximately $800,000) and noted that it fell close to the middle of the range estimated in the budget which was between $500,000 and $1 M. The Committee recommended staff prepare a budget status report update for the project to include current projections for total cost of construction. 3. Plumosa Property Disposition. The Committee briefly discussed the timing issues and scope for an appraisal of the Plumosa property. INFORMATION ITEMS: 4. Miraloma Storm Drain completed. The storm drain project is completed and the on site drains will be connected to this new system. 5. Edison Power Poles Relocated. Three new poles have been set by Southern California Edison and there power lines have been relocated. Anaheim Power is scheduled to relocate their power lines later this month. 6. Miraloma/Richfield Street Improvements-Scheduled to start January 2, 2008. ADJOURNMENT: The Committee adjourned at 5:30 p.m. The next Building Ad Hoc Committee meeting is scheduled for December 20, 2007.