Loading...
HomeMy WebLinkAbout2019-01-24 - YLWD-MWDOC-OCWD Interagency Committee Meeting Minutes Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held January 24, 2019 at 4:00 p.m. 1 MINUTES OF THE YORBA LINDA WATER DISTRICT INTERAGENCY COMMITTEE MEETING WITH MWDOC AND OCWD Thursday, January 24, 2019, 4:00 P.M. 1717 E Miraloma Ave, Placentia CA 92870 1. CALL TO ORDER The meeting was called to order at 4:00 p.m. 2. ROLL CALL YLWD COMMITTEE MEMBERS YLWD STAFF Brooke Jones, President John DeCriscio, Operations Manager Phil Hawkins, Vice President Rosanne Weston, Engineering Manager MWDOC COMMITTEE MEMBER MWDOC STAFF Brett R. Barbre, President Rob Hunter, General Manager OCWD COMMITTEE MEMBER OCWD STAFF Roger Yoh, Director Mike Markus, General Manager 3. PUBLIC AND COMMENTS None. 4. DISCUSSION ITEMS 4.1. MWD Water Supply Conditions and Outlook MWD has about 2.5 AF storage and may end above 2.5 AF if rainfall conditions continue. Rainfall for this year was 10.12 inches to date and the annual average is about 13 inches. Prado Dam is full and slow releases are being made behind the dam. 4.2. Condition of OCWD Groundwater Basin, Water Purchased for Recharge, and In-Lieu Recharge OCWD purchased 40,000 AF this year of the 65,000 that is purchased annually from MWD by end of June. 4.3. PFOS/PFOA Testing and Mitigation Certification of OCWD’s laboratory to test PFOS/PFOA is expected in February. A PFOS/PFOA Producers workgroup meeting will be held on February 20, 2019. A SAWPA PFOS/PFOA workgroup meeting will be Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held January 24, 2019 at 4:00 p.m. 2 held later that day with WWTP dischargers, regulatory agencies, laboratories and potentially affected producers. 4.4. Huntington Beach Desalination Project The permit from the regional board is expected to be issued by the end of the year and it will go to Coastal Commission the first quarter of next year. OCWD will need to build pipelines to transport the water from the project fence line to its facilities. OCWD has been meeting with various cities to ascertain if there is interest in purchasing the water. OCWD may elect to inject the water into the groundwater basin and would then increase the BPP to around 80% or more. 4.5. MNWD Groundwater Basin Storage Proposal Moulton Niguel Water District (MNWD) is paying for the feasibility study, which can be used as a guide to evaluate storage arrangements with other parties. This program has to be a benefit to all groundwater producers. The majority of producers are in opposition to this proposal and have expressed their concerns to OCWD and MWDOC. 4.6. California WaterFix Project Studies are progressing and all permits may be issued soon. Design of the two tunnels is proceeding and the project is expected to be online in 15 years. 4.7. North and South Basin Projects North Basin: OCWD requested an NPL listing for a designation as a Superfund site. By the end of 2019, the site may be listed. OCWD is still meeting with Northrop (one of the major PRPs) and hopes to settle with them. South Basin: Negotiations with PRPs are proceeding. A judge and trial date have been set. OCWD has settled with some of the smaller PRPs and is hopeful in settling with about one doze PRPs. 4.8. YLWD Well Projects Well 22: 100% plans for well equipping are being finalized and construction is expected to commence early this year. Clarification with Fish and Wildlife has been requested regarding restrictions for construction during bird nesting periods (a 6-month window). One year is needed to construct improvements. Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held January 24, 2019 at 4:00 p.m. 3 Well 23: YLWD met with Chris Olsen and Daniel Park (OCWD) in December and walked potential well sites at the Warner Basin. YLWD submitted an exhibit showing optional locations for Well 23. 4.9. Future Agenda Items OCWD Budget Update 5. ADJOURNMENT 5.1. The meeting was adjourned at 5:04 p.m. RPW