Loading...
HomeMy WebLinkAbout2009-07-02 - Planning-Engineering-Operations Committee Meeting Agenda PacketYorba Linda Water District AGENDA YORBA LINDA WATER DISTRICT PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING Thursday, July 2, 2009, 4:00 PM 1717 E Miraloma Ave, Placentia CA 92870 COMMITTEE STAFF Director William R. Mills, Chair Ken Vecchiarelli, General Manager Director Paul R. Armstrong Steve Conklin, Engineering Manager Lee Cory, Operations Manager Ken Mendum, Ops Superintendent John DeCriscio, Chief Plant Operator PUBLIC COMMENTS Any individual wishing to address the committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. 2. ACTION CALENDAR This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee action. 2.1. Award Engineering Services for the Highland Booster Pump Station Replacement Project Recommendation: That the Committee recommend that the Board of Directors authorize the President and Secretary to execute a Professional Services Agreement with MWH, in the amount not to exceed $469,593, to provide Engineering Design and Construction Phase Services for the Highland Booster Pump Station Replacement Project. 2.2. Award of Construction Contract for Lakeview Sewer Lift Station Rehabilitation Project Recommendation: Based on the June 30 bid opening, staff will provide findings and make a recommendation for award of the construction contract for the Lakeview Sewer Lift Station Rehabilitation Project at the Committee meeting. 3. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 3.1. Potential Recycled Water Project 3.2. June Monthly and FY2008/09 Final Groundwater Production and Purchased Water Report (To be provided at the meeting.) 3.3. Monthly Preventative Maintenance Program Report (To be provided at the meeting.) 3.4. Monthly MWDOC Managers Meeting Summary Report (To be provided at the meeting.) 3.5. Monthly OC Groundwater Producers Meeting Summary Report 3.6. Status Report on Proposed Casino Ridge Project, Tract 16488 3.7. Status Report on Capital Projects in Progress 3.8. Future Agenda Items and Staff Tasks 4. ADJOURNMENT 4.1. The next regular meeting of the Planning- Engineering- Operations Committee will be held August 6, 2009 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internet website accessible at http: / /www.ylwd.com /. Accommodations for the Disabled Any person may make a request for a disability - related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. AGENDA REPORT Meeting Date: July 2, 2009 To: Planning-Engineering- Operations Committee Budgeted Total Budget: Cost Estimate: Funding Source: ITEM NO. 2.1 Yes $5.5 M $450,000 Water Revenue Bond From: Ken Vecchiarelli, General Account No: 101 -2700 Manager Job No: J- 200814 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: No Prepared By: Hank Samaripa, Project CEQA Compliance: N/A Engineer Subject: Award Engineering Services for the Highland Booster Pump Station Replacement Project SUMMARY: As part of the District's plans to maximize the full potential of its groundwater production capabilities to its service area, the District solicited proposals from several consultants for Engineering Design and Construction Phase Services to replace and expand the Highland Booster Pump Station (BPS). Staff received four consultant proposals for the project. Following an evaluation, staff recommends award to MWH for a fee not to exceed $469,593. STAFF RECOMMENDATION: That the Committee recommend that the Board of Directors authorize the President and Secretary to execute a Professional Services Agreement with MWH, in the amount not to exceed $469,593, to provide Engineering Design and Construction Phase Services for the Highland Booster Pump Station Replacement Project. DISCUSSION: The District solicited proposals from six firms for engineering design and construction phase services for a new, larger pump station with a capacity of 18,000 gpm. The design must consider continued operation of the existing Highland Booster Pump Station during construction of the new facility and appurtenances. A committee of three District engineering staff members individually reviewed all four proposals, and evaluated and scored each one based on technical presentation, staff qualifications and experience. Following the technical evaluation and ranking, the committee met to discuss the proposals and to open the separately provided envelope from each firm with their proposed fee for services. The combined evaluation score and proposed fee for each firm are as follows: Firm Evaluation Score Proposed Fee MWH 13.34 $469,593 AECOM 12.11 $524,379 Civiltec 11.22 $487,680 Tetra Tech 10.67 $332,030 Based on proposal presentation, staff qualifications, experience and relative fee for services, staff recommends award to MWH for $469,593.00. PRIOR RELEVANT BOARD ACTION(S): On October 2, 2008, the Committee discussed the need for the Highland Booster Pump Station Replacement /Expansion project prior to proceeding with expansion of the Palm Avenue Booster Pump Station Project. Combined with new groundwater well production facilities, the Highland BPS is the most critical facility in the District's CIP Program for achieving gains in groundwater Basin Production Percentages. On February 12, 2009 the Board of Directors approved the Highland Booster Pump Station Feasibility Study for preparation by Tetra Tech. Meeting Date To From: Presented By: Prepared By: Subject SUMMARY: AGENDA REPORT July 2, 2009 Planning- Engineering- Operations Committee Budgeted: Total Budget: Cost Estimate: Funding Source: Ken Vecchiarelli, General Manager Account No: Job No: Steve Conklin, Engineering Dept: Manager Reviewed by Legal Hank Samaripa, Project Engineer CEQA Compliance: ITEM NO. 2.2 Yes $250,000 $225,000 Water Revenue Bond 202 -2700 J- 200905 Engineering No Exempt Award of Construction Contract for Lakeview Sewer Lift Station Rehabilitation Project The bidding period for the Lakeview Sewer Lift Station Rehabilitation Project was extended to June 30, 2009 to provide clarification for the bidders. Bids will be opened and evaluated by staff. Findings and recommendations for contract award will be present to the PEO Committee on July 2. The Engineer's Estimate of construction cost is $204,000. STAFF RECOMMENDATION: Based on the June 30 bid opening, staff will provide findings and make a recommendation for award of the construction contract for the Lakeview Sewer Lift Station Rehabilitation Project at the Committee meeting. DISCUSSION: The Lakeview Sewer Lift Station Rehabilitation Project will provide new pumps and control systems for the District's 33 -year old sewer lift station. The new larger chopper pumps and controls will provide for better reliability and lower overall maintenance costs. A Notice Inviting Bids was advertised in the local newspapers and the District engineering staff has sold over 30 sets of plans and specs. The latest addendum has extended the bid date by four days to Tuesday June 30, 2009. PRIOR RELEVANT BOARD ACTION(S): The Board previously approved the Lakeview Sewer Lift Station Rehabilitation project in the FY2007 -2012 Capital Improvement Program in May 2005. On May 14, 2009, the Board of Directors authorize the President and Secretary to execute the Amendment to Professional Services Agreement to Tetra Tech Consultants in the amount of $19,960 which allowed the completion of the Lakeview Sewer Lift Station plans and specifications and for engineering services during construction. AGENDA REPORT Meeting Date: July 2, 2009 To: Planning-Engineering- Operations Committee From: Ken Vecchiarelli, General Manager Presented By: Steve Conklin, Engineering Manager Prepared By: Steve Conklin, Engineering Manager Subject: Potential Recycled Water Project SUMMARY: Budgeted Dept: ITEM NO. 3.1 No Engineering Reviewed by Legal: N/A CEQA Compliance: N/A At its June 2009 meeting, the PEO Committee provided information on a wastewater package treatment process for small -scale water recycling projects, and discussed this proposed concept with staff. As a follow up, staff obtained information on a project in design for the City of Anaheim, which is attached for further discussion. ATTACHMENTS: Recycled Wtr Prom Mtg Min 15Jun09.pdf Description: Type: Recycled Water Project Meeting Memc Backup Material aYorba Linda Water District MEETING MINUTES PROJECT: Potential Recycled Water Project PROJECT NUMBER: N/A MEETING DATE: June 15, 2009 SUBJECT: Briefing on Proposed Anaheim Project MINUTES PREPARED BY: Steve Conklin ATTENDEES: YLWD: Ken Vecchiarelli, Lee Cory, John DeCriscio, Steve Conklin MWH: Michael Moore The City of Anaheim is planning to construct a recycled water project for irrigation of greenbelts in the vicinity of City Hall, as both a demonstration and a water - saving project. The City selected Montgomery Watson Harza (MWH) to prepare the design plans and CEQA documentation. Michael Moore of MWH offered to brief District staff on the Anaheim project, because of the District's interest in looking at a similar project in the District's service area. The Anaheim project is planned as a 100,000 gallons- per -day plant, with half of that capacity in each of two phases. They plan to have the first -half operational in the fall of 2010. The entire treatment plant will be contained in a fully - enclosed building within a 40 ft x 60 ft footprint, with water - holding and treatment in the lower level and mechanical equipment, pumps and microfiltration membranes in the upper level. The building is sized to accommodate equipment for both phases, using the Membrane Bioreactor (MBR) treatment process. The preliminary estimated cost for construction is $3.5 million for the first phase (50,000 gpd or approximately 56 acre -ft per year) and $6.0 million total for expansion to twice that capacity, approximately 112 AF /yr. Note that this cost is for construction only, and does not include continuing O &M and power costs. Anaheim plans to outsource the O &M rather than using City staff. Anaheim will be pursuing grant funding, MWD subsidy, and other means to offset capital and operating costs. As a worst case, if there is no offset funding for construction and the City sold 20 -year bonds at 4 %, the bond repayment cost would be $258,000 /year on $3.5 million. If the first -phase plant operated at its capacity of 56 AF /year, the unit cost of water would be $4,599 /AF. If the plant is expanded to 112 AF /year at a total construction cost of $6.0 million, the unit cost of water would be $3,942/AF. Assume that the cost of labor, chemicals and power might add another $200 /AF to the unit cost. Therefore, the combined unit cost for the project at full capacity might be in the range of $4,142/AF. If grants and subsidies are obtained that reduce the unit cost by 25 %, the unit cost would be approximately $3,100 /AF. For comparative purposes, the projected cost of MWD full - service treated water in January 2010 is $701 /AF for Tier 1 and $811 /AF for Tier 2 water. Averaging the two tiers, the cost of MWD water will be $756/AF. Assuming that the cost of MWD water increases 5% annually in cost, the cost in 20 years will be approximately $2000 /AF. This cost for MWD water is still significantly less than the projected cost of the recycled water at $3100 /AF, unless additional offsets are obtained by the City to reduce the cost of treating and delivering the recycled water. However, this cursory analysis does not include other factors such as the value of a new, uninterrupted water source. If the Board wants staff to pursue the feasibility of a similar project in the Yorba Linda area, we understand that grant funding for water recycling projects is available from the State Water Resources Control Board's "Water Recycling Funding Program." For facility planning grants, the program guidelines indicate that grants are available to cover 50% of eligible costs for a planning study up to $75,000. AGENDA REPORT Meeting Date: July 2, 2009 ITEM NO. 3.2 Subject: June Monthly and FY2008/09 Final Groundwater Production and Purchased Water Report (To be provided at the meeting.) ATTACHMENTS: Description: YLWD Monthly GW Production and Purchased Water Report.doc Production and Purchased Water Report YLWD SOURCE WATER SUMMARY Fiscal Year 2008 -09 Allowable GW (YTD) 12,160.6 (AF) CUP Obligation FY 2008-0° 2,166.0 (AF) Monthly CUP Pumping (AF) - (AF) YTD CUP Pumping (AF) 2,637.6 (AF) 121.8% GROUNDWATER PERCENTAGE 85.0% 80.0% 75.0% MONTH LY GW ( %) 70.0% YTD GW ( %) 65.0% BPP GOAL 52.0% 60.0% -CUPADJ GOAL 60.0% 55.0% 50.0% Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun - 08 08 08 08 08 08 09 09 09 09 09 09 Month GW (AF) IMPORT (AF) TOTAL DEMAND (AF) MONTHLY GW ( %) YTD GW ( %) BUDGET (Demand Est.) (AF) DELTA (%) MONTH Jul -08 Aug -08 1,636.2 1,170.0 2,706.2 66.7% 66.7% 2,997.8 -9.8% 1,610.9 1,112.0 2,722.9 69.2% 68.0% 2,949.4 -7.7% Sep -08 Oct -08 Nov -08 1,481.3 974.4 2,466.7 60.3% 68.7% 2,687.8 -6.1% 1,473.7 916.6 2,390.3 61.7% 69.4% 2,182.8 9.6% 1,170.1 766.2 1,926.3 60.7% 69.6% 1,724.3 11.7% Dec -08 747.4 369.1 1,106.6 67.6% 60.3% 1,661.1 -28.7% Jan -09 Feb -09 Mar -09 1,011.3 469.2 1,470.6 68.8% 61.1% 1,362.6 8.7% 772.6 193.4 966.9 80.0% 62.3% 1,293.9 -26.4% 1,170.9 369.6 1,630.4 76.6% 63.6% 1,633.3 -0.2% Apr -09 May -09 Jun -09 1,343.6 664.8 1,898.3 70.8% 64.2% 1,917.9 -1.0% 1,416.1 796.1 2,211.2 64.0% 64.2% 2,636.8 -12.8% 1,233.6 800.1 2,033.6 60.7% 63.9% 2,842.6 FYTD 14,966.6 8,461.4 23,416.9 63.9% 26,470.0 -8.1% Allowable GW (YTD) 12,160.6 (AF) CUP Obligation FY 2008-0° 2,166.0 (AF) Monthly CUP Pumping (AF) - (AF) YTD CUP Pumping (AF) 2,637.6 (AF) 121.8% GROUNDWATER PERCENTAGE 85.0% 80.0% 75.0% MONTH LY GW ( %) 70.0% YTD GW ( %) 65.0% BPP GOAL 52.0% 60.0% -CUPADJ GOAL 60.0% 55.0% 50.0% Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun - 08 08 08 08 08 08 09 09 09 09 09 09 Month WATER SUPPLY FY 2008 -2009 June 2009 Water Supply CUP 0.0% IMPORT 39.3% GW 60.7% 2008 -2009 YT D Water Supply YTD CUP Achieved 121.8% of 2,166 AF Obligation IMPORT 36.1% CUP 11.3% GW 52.6% GWBPP GOAL 52.0% 3500 o 2500 -. 2000 U- Q w E >° 1500 111I1I11 500 Total Water Use 00 0 o�' 00 6 Q� �oP 6 d, ,oP Qo 616 d, 6 (ZP oo �6 d, 6b �oo�'�o�' �6�o� 00 6 (Z ' e 6 (Z ' 00 Month 06-07 GvV Monthly Average Mean Temperature (OF) 08-09 GVV 65.1 67.4 626 .2 55.0 55.4 00 0 o�' 00 6 Q� �oP 6 d, ,oP Qo 616 d, 6 (ZP oo �6 d, 6b �oo�'�o�' �6�o� 00 6 (Z ' e 6 (Z ' 00 Month 26,000 24,000 22,000 20,000 18,000 16,000 UL a 14,000 Q E c 12,000 10,000 I -A-Budgeted Total GW + Import I Actual Total GW + Import PISA 2008 -2009 YTD Water Supply Aug -08 Sep -08 Oct -08 Nov -08 Dec -08 Jan -09 Feb -09 Mar -09 Apr -09 May -09 Jun -09 Month ITEM NO. 3.3 AGENDA REPORT Meeting Date: July 2, 2009 Subject: Monthly Preventative Maintenance Program Report (To be provided at the meeting.) ATTACHMENTS: Description: Type: 2008 -09 fiscal.xls PM Report Report(s) 2008 -09 overview.doc PM Report Summary Report(s) ITEM PM PROGRAM FISCAL 2008/2009 JUL I AUG I SEP I OCT I NOV I DEC I JAN I FEB I MAR I APR I MAY I JUN Percent of target 8% 1 17% 1 26% 1 33% 1 42% 1 50% 1 58% 1 67% 1 76% 1 83% 1 92% HYDRANTS (3,859) Target; all hydrants to be serviced annually. INSPECTED THIS MONTH 220 6661 3921 192 66 1861 3641 4631 2201 611 7181 343 INSPECTED THIS YEAR 220 7761 1,1681 1,360 1,426 1,612 1 1,976 1 2,429 1 2,649 1 2,700 1 3,418 1 3,761 % OF TOTAL 5.7% 20.1%1 30.3%1 35.2% 36.9% 41.8%1 61.2%1 62.9%1 68.6%1 70.0%1 88.6% VALVES (10,000/2= 5,000) Target; all valves to be operated every two years OPERATED THIS MONTH 329 4361 3401 6921 90 306 3811 6141 429 1 997 1 566 1 312 OPERATED THIS YEAR 329 7641 1,1041 1,6961 1,786 2,092 2,4731 2,987 1 3,416 1 4,413 1 4,979 1 5,291 % OF TOTAL 6.6% 16.3%1 22.1%1 33.9%1 35.7% 41.8% 49.6%1 69.7%1 68.3%1 88.3%1 99.6% DEAD ENDS (487x2 =974) Target; all dead ends to be flushed twice each year. FLUSHED THIS MONTH 0 01 01 4871 0 0 01 01 01 4871 01 0 FLUSHED THIS YEAR 0 01 01 4871 487 487 4871 4871 4871 9741 9741 974 % OF TOTAL 0.0% 0.0% 0%1 50% 50% 50% 50% 50% 60%1 100% 100% AIR VACS (309) Target; all air /vacs to be serviced annually. INSPECTED THIS MONTH 21 1101 161 5 3 01 71 11 1321 1801 01 0 INSPECTED THIS YEAR 21 1311 1461 151 154 1641 1611 1621 2941 4741 4741 474 % OF TOTAL 6.4% 42.4%1 47.3%1 48.9% 49.8% 49.8%1 62.1%1 62.4%1 96.2%1 163.4%1 153.4% SEWER CLEANING (802,560) Target; all sewers to be cleaned annually. CLEANED THIS MONTH 679643 539264 429684 669673 289173 459040 399180 219649 1 369860 1 529823 1 279437 1 859989 CLEANED THIS YEAR 679643 1209907 1639591 2309264 2589437 3039477 3429657 3649306 1 4019166 1 4539989 1 4819426 1 5679415 % OF TOTAL 8.4% 15.1% 20.4%1 28.7% 32.2% 37.8%1 42.7%1 46.4%1 60.0%1 66.6%1 60.0% SEWER TELEVISING (160,512) Target; all sewers to be televised every 5 years. TELEVISED THIS MONTH 229584 169528 69174 129493 99423 149196 219857 109302 369359 289159 129796 79507 TELEVISED THIS YEAR 229584 399112 459286 579779 679202 819398 1039255 1139557 1499916 1789075 1909871 1989378 % OF TOTAL 14.10% 24.4% 28.2% 36.0%1 41.9% 50.7% 64.3% 70.8% 93.4% 110.9%1 118.9% This is an overview of the Preventative Maintenance Program for fiscal 2008 -09. Fire Hydrant Servicing. Servicing fell 98 units short of the target. This will be made up quickly and will have no effect on next year's total. We have begun a new recording system but cannot finalize it until we get copies of the new system maps. We are in the process of looking into the feasibility of capturing water flushed during maintenance procedures. Valve Operation and Maintenance. We operated just over 5,000 valves which keeps us on course for a two year cycle time. We did not operate enough to reduce the cycle time so it will remain at two years. Dead End flushing. Dead ends were flushed twice during the year as planned. It came to my attention that a lot of the dead ends have inoperable flushing devices and are being flushed at the nearest hydrant. This is something we will work on to make sure we can flush at the very end of the line. As with hydrants, we are looking at capturing the water flushed from dead ends. Air Vacs. All were serviced this fiscal year. We are still finding air vacs we didn't know we had so upgrading our records is ongoing. Sewer Cleaning. We cleaned 665,000 feet of sewer lines this year which is 138,000 feet short of meeting our goal of cleaning every year. I have pushed back the sewer cleaning schedule to 18 months for the next fiscal year. The new schedule will give us a target of approx. 530,000 feet per year. In the first six months of this year we have cleaned 264,000 feet of mains which puts us on target for this total. I have added two people to the Collections crew, both of whom have collections experience, and they will be there for the full fiscal year. This will give us continuity, and should increase the footage in both cleaning and televising. CCTV of Sewer Mains. The initial target of televising the complete system every five years can now be revised. That target of 160,000 feet per year was met and exceeded (198,378 feet)and we can set a new target of a four year cycle. This will give us a target of 200,000 feet per year, a number we almost achieved this year. At present we estimate we have televised 25% of the total system. AGENDA REPORT Meeting Date: July 2, 2009 ITEM NO. 3.5 Subject: Monthly OC Groundwater Producers Meeting Summary Report ATTACHMENTS: Description: Type: GWProducer Mtg Notes 10June09.doc OC GW Producers Mtg Report Report(s) ML MEMORANDUM DATE: June 10, 2009 TO: Ken Vecchiarelli, General Manager FROM: Steve Conklin, Engineering Manager John DeCriscio, Chief Plant Operator COPY: Pat Grady, Assistant General Manager Lee Cory, Operations Manager SUBJECT: Groundwater Producers Meeting, June 10, 2009 John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on June 10 at OCWD. Items presented and discussed included the following: 1. Groundwater Management Plan Update. Greg Woodside of OCWD noted that review comments on the Draft Groundwater Management Plan (GWMP) Update 2009 are due by June 24. The document will be adopted by the OCWD Board on July 15. The GWMP is a State - mandated plan which must be completed is order to receive grant funds from the State for groundwater- related projects. 2. Long -Term Facilities Plan. Copies of the final version of the report were handed out. It was noted that the plan does not bind the District to proceed with any particular project, but it lists 19 "Priority Projects" that may be pursued. The Plan will be received and filed by the Board July 15, and the Board will authorize filing a CEQA Notice of Exemption. 3. Update on Warner Basin Hopkins Development Study. Mike Markus of OCWD reported that the District has an agreement with Hopkins Development Company that provides Hopkins with exclusive rights to examine development options around Warner Basin. That agreement will be extended at the June 17 Board meeting for another six months. Hopkins is looking at options for commercial and residential development around the perimeter of Warner Basin, including potential construction of platforms on piers over the water at the edge of the basin. Any plans proposed by Hopkins would need to identify and provide mitigation for any lost recharge capacity at the basin. This is only a preliminary study and would require full review and approval by OCWD before proceeding. 4. FY 2010 -11 BPP Projections. As requested by the Producers, John Kennedy of OCWD presented preliminary projections for the BPP for the next Fiscal Year, for planning purposes. He indicated that the BPP may be in the range of 54% to 56% depending on weather conditions. He noted that the amount of basin recharge is heavily dependent on the base flow in the river, and that it has been less in recent years, an indication of less rainfall and greater reuse upstream. It was also noted that a decreasing BPP will require an increase in the RA to meet the budget. 5. Potential Loss of Ad Valorem property tax —Prop 1A. Mike Markus reported that it is still an unknown if or how much property tax revenue may be borrowed by the State from county agencies or special districts. The latter may be special targets due to their ability to raise rates to offset revenue losses. 6. OCWD Long -Term Variable -Rate Debt Program. Mike Markus reported that due to changes in the credit market a recommendation will be made to the Board to convert the District's $120 million in variable -rate debt to fixed -rate debt. 7. Other. a. OCWD is completing take of 18,000 AF of Met full - service water for recharge in Anaheim Lake this month. b. Urban Water Management Plan updates are required this year. OCWD will be providing the long -term projections required for the report. c. The new OCSD Steven Anderson sewer lift station is in start-up testing, which will allow more water to OCWD for increased GWRS production. d. OCWD is recommending award of design of GWRS expansion to Black & Veatch at the next Board meeting. e. It was reported that Laguna Beach County Water District is studying a project with the City of Garden Grove, where they would jointly pay for nitrate treatment for GG Well 28, which produces approximately 5,000 AF /yr. Laguna Beach through a paper transfer would have rights to its court- mandated 2,025 AF /yr of groundwater. More will be reported next month by Garden Grove staff. f. Met has officially requested its remaining CUP water from the basin for 2009 -10. YLWD's commitment will be approx 2,000 AF, as in prior years. This will be the last of the program unless Met recharges more water into the basin. John Kennedy indicated that they are requiring that Met provide water for surface water recharge before allowing Met to initiate another CUP. Meeting Date: To: From: Presented By: Prepared By: Subject: SUMMARY: AGENDA REPORT July 2, 2009 Planning-Engineering- Operations Committee Ken Vecchiarelli, General Manager Steve Conklin, Engineering Manager Steve Conklin, Engineering Manager Budgeted Dept: Reviewed by Legal: ITEM NO. 3.6 N/A Engineering N/A Status Report on Proposed Casino Ridge Project, Tract 16488 In a transmittal dated April 20, 2009, representatives for the King Family Trust requested terms and conditions for water service for a proposed 11 -lot development at the northerly extension of Casino Ridge Road, identified as Tract 16488. Discussions regarding development of these lots dates back to 2003, when terms and conditions were approved and then expired in six months for lack of action. More recently, there were meetings in early 2008 on the matter that included representatives from the City of Yorba Linda, the District and the King Family Trust. This was followed by the April 20, 2009 request noted above. Staff will update the Committee on the issues related to water service for the proposed development. DISCUSSION: The proposed 11 -lot development is located at the northerly extension of Casino Ridge Road, in the District's 6B Zone. The Zone is fed from Chino Hills Reservoir with a high -water elevation of 1300 ft. The highest lots in the development have a pad elevation of 1200 ft. A hydraulic analysis was completed in July 2008 for the proposed development. The conclusion of the analysis was that there is sufficient fire flow under the modeled conditions with a 12 -inch pipeline loop installed from San Antonio Road. Furthermore, the study found insufficient operating pressures under average day, max day, and peak -hour demand conditions. The study recommended household pumps be installed at each residence to increase normal service condition pressures. Based on the above analysis and recommendations, the developer returned with the formal request for water service terms and conditions on April 20, 2009. The District's response was provided in a letter dated June 1, 2009, which is attached. District staff met with representatives for the project on June 4 to discuss the project and water supply issues, and the District's concerns were reiterated in an email dated June 15, 2009, which is attached. Thereafter, representatives for the project arranged for a meeting with the City of Yorba Linda on June 22, which included District staff. At the meeting, issues were discussed that had to be addressed before the project could be approved for development. The water supply and pressure issues were the most substantial. It was noted in the meeting that these issues are still being addressed. With the above as background, staff is bringing this issue to the Committee for discussion and direction. ATTACHMENTS: a Description: Type: Casino Ridge Resp Ltr 1Jun09.pdf Casino Ridge Ltr 1June09 Backup Material Casino Ridge Resp E- mail _15Jun09.pdf Casino Ridge Resp E -mail 15Jun09 Backup Material Yvrba Linda Water District Reliable and Trusted Service for More Than 100 Years June 1, 2009 Mr. Fred Cornwell PCA Engineering, Inc. 18551 Von Karman Avenue, Suite 140 Irvine, CA 92612 Subject: Request for Water Service Terms and Conditions, Casino Ridge (King Property) Dear Mr. Cornwell: This is in response to your submittal dated April 20, 2009 regarding the above. The District has reviewed the plans, tract map and water study provided with your transmittal. As you may recall, in May 2003 the District approved terms and conditions for water service for 11 lots at the north end of Casino Ridge Road, as Tract 16488. However, that expired late in 2003 due to lack of action in six months. Since that time conditions relating to service approval have changed considerably. The first change relates to water storage requirements which have been increased, based on the 2005 Water Master Plan adopted by the District. Specifically, that document requires seven average- -day's storage for emergencies, one day's storage for operational needs, plus sufficient storage to meet the flow requirement for a residential fire. The seven -day storage requirement was imposed on all water providers that get supply from the imported system. The fire flow requirement is established by the Orange County Fire Authority. Concerning a second change, the industry has adopted a dynamic-flow calculation criteria in place of the previous static -head standard of 100 feet elevation differential between the elevation of water storage and the highest home pad. New development in this area will need to address the water supply situation under the current standards. Regarding water storage, the existing storage for this zone is fully committed to meeting the above- described storage needs for existing development. Accordingly, any new development would need developer- provided storage facilities meeting the above criteria, for both storage and service pressure. The District will require the developer for this project or any other future developer to run new dynamic -flow calculations and to address any shortages that exist in the infrastructure. It is the responsibility of the owner or developer to confirm with the Orange County Fire Authority whether the District's existing facilities are of adequate size, capacity and pressure to satisfy the fire flow requirements, and to confirm what improvements are necessary to meet those requirements. Any such improvements must be planned, designed and constructed in coordination with the District. If you have any questions, or if we can be of additional assistance, please advise. Sincao rl, n , Engineering Manager 1717 E. Miraloma Avenue Placentia, CA 92870 714 -701 -3000 714-701 -3058 Fax Steve Conklin From: Steve Conklin Sent: Monday, June 15, 2009 4:16 PM To: 'Fred Cornwell' Cc: Michael Payne; Mark Guithues; broker @gordonthomson.com; Ken Vecchiarelli Subject: RE: Tract 16488, Casino Ridge Hi Fred, As we discussed in our June 4 meeting, the [district has both water supply and water pressure concerns with the proposed project. Re water supply, it was noted that the storage for the zone is already fully committed to existing, users. Accordingly, the developer of Tract 16488 would need to provide additional storage or would need to develop off -sets to reduce existing demand on that storage, as means to potentially accommodate the storage needed for the new tract. Re water pressurkO., it was noted that the Sept 2008 study indicated that, with developer - provided pipeline imprrvemerts, it may be possible to meet fire flow requirements, but would need to be confirmed through the Fire Authority. To meet pressure requirements at the planned homes, it appears that the developer would need to provide individual booster pumps at each sitc_ Further, it would be necessary for the developer to provide a Declaration of Restrsrtive Covenants as part of the sales documents for each site, which would remain as a document requiring acknowledgement and consent for each successive owner. The means to achieve the demand off -sets and any proposed improvements would be subject to review and approval of the District, with all costs paid far by the developer. If you have any questions, please call. Regards, Steve Conklin, P.E. Engineering Manager Yorba Linda Water District ..... .... _ ... From: Fred Cornwell [mailto :fcornwell@pca1.net] Sent: Thursday, June 11, 2009 5:29 PM To: Ken Vecchiarelli; Steve Conklin Cc: Michael Payne; Mark Guithues; broker @gordonthomson.com Subject: FW: Tract 16488, Casino Ridge Ken / Steve — Please review item # 2 of Matt's e-mail. Can you please respond with your thoughts? Thanks, Fred From: Matt Bennett [ mailto :mbennett@yorba- linda,org] Sent: Friday, June 05, 2009 4:48 PM To: Fred Cornwell Cc: broker @gordonthomson.com; pmeng @willdan.com; David Knell; Mark Guithues; Mary Busch; Mark Stowell Subject: RE: Tract 15488, Casino Ridge Fred, I met with Peter yesterday to review the map, improvement plans, and Engineer's estimates. I understand that you want to see this map to go to Council as soon as possible and we will work with you towards that goal. Please see ITEM NO. 3.7 AGENDA REPORT Meeting Date: July 2, 2009 Subject: Status Report on Capital Projects in Progress ATTACHMENTS: Description: Type: CIP Rept July09.pdf CIP Report dated July 1, 09 Backup Material CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: July 1, 2009 IN CONSTRUCTION Project Current Status Next Actions Comments 1 Zone 3 & 4 Trans Pipelines, Reach 5 Pipeline complete and in Completion of punch- list Pipeline is in operation. However, Budget: $1,700,000 Job No. 200421 operation. items, such as air- release project completion is subject to Project Contact: Joe Polimino valves and valve cans, await Shapell finishing the road and Planned Completion Date: 2nd Qtr 2009 completion of road by the parkway construction. developer. 2 Lakeview Reservoir Budget: $11,500,000 Job No. 200704 Project Contact: Joe Polimino Planned Completion Date: May 2009 3 Highland Reservoir Budget: $11,200,000 Job No. 200309 Project Contact: Leon de los Reyes Planned Completion Date: July 2010 5 Zone 4C Reconfiguration The planned construction Budget: $1,500,000 Job No.200710 completion date for the pipeline and Project Contact: Joe Polimino the upgraded pressure reducing Planned Completion Date: Dec 2009 station is December 2009. (no change) 6 Hidden Hills Res & Santiago BPS Anticipated completion July 2010. Budget: $7,000,000 Job No.200028 (no change) Project Contact: Joe Polimino Planned Completion Date: July 2010 7 Lakeview Site Improvements Current Status Next Actions Comments 1 Budget: $150,000 Job No. TBD Project Contact: Hank Samaripa Planned Completion Date: TBD IN DESIGN Project Current Status Next Actions Comments 1 New Wells 20 & 21 Budget: $2,000,000 Job No.200711 Project Contact: Leon de los Reyes Planned Completion Date: TBD 2 OC -51 Connection Upgrade MWD currently reviewing MWD prepares preliminary MWD will prepare design and will Budget: $242,000 Job No. 200815 hydraulic impact of the design report, project direct construction, with District's Project Contact: Leon de los Reyes upgrade with staff; ongoing management plan, and cost review and approval before Planned Completion Date: Early 2010 exchange of information. estimate proceeding with each phase. 3 Lakeview Sewer Lift Sta Upgrades Budget: $200,000 Job No. 200905 Project Contact: Hank Samaripa Planned Completion Date: Sep 2009 IN PLANNING CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING 1. Zone 5 (1000) Booster Station ($1,080,000) 2. Fairmont Booster Station Reconfiguration ($400,000) 3. Foxtail Drive Pipeline ($245,000) 4. Elk Mountain Reservoir Site Improvements ($300,000) 5. Fire Flow Improvements - -Via Sereno and Ohio ($125,000) Project Current Status Next Actions Comments 1 Highland Booster Station Upgrade Budget: $7,000,000 Job No. 200814 Project Contact: Hank Samaripa Planned Completion Date: Mid 2011 2 Fairmont Site Improvements Agreement approved by Contact S &S for preliminary Present schedule to Operations and Budget: $300,000 (YLWD share) Board. kickoff meeting to establish Production departments. Job No. 200803 schedule. Project Contact: Hank Samaripa Planned Completion Date: TBD 3 Irrigation Water Study Preliminary application Continuing to look at options Waiting for info on status of grant Budget: $TBD Job No. 200807 submitted for grant funding. for development of non - potable funding application. Project Contact: Steve Conklin and recycled water use options. Planned Completion Date: TBD 4 Anaheim Intertie Conn Imprvmts Per 2004 Agreement, all Budget: $250,000 (YLWD Share) improvement costs will be equally Job No. 200906 shared. District will take lead on Project Contact: Hank Samaripa having design plans prepared. Planned Completion Date: TBD CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING 1. Zone 5 (1000) Booster Station ($1,080,000) 2. Fairmont Booster Station Reconfiguration ($400,000) 3. Foxtail Drive Pipeline ($245,000) 4. Elk Mountain Reservoir Site Improvements ($300,000) 5. Fire Flow Improvements - -Via Sereno and Ohio ($125,000)