HomeMy WebLinkAbout2023-06-28 - Board of Directors Meeting Agenda PacketYorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS SPECIAL MEETING
Wednesday, June 28, 2023, 8:00 AM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
Brett R. Barbre, President
Trudi DesRoches, Vice President
Phil Hawkins, Director
Tom Lindsey, Director
J. Wayne Miller, PhD, Director
4. PUBLIC COMMENTS
Any individual wishing to address the Board (or Committee) is requested to identify themselves and state
the matter on which they wish to comment. If the matter is on the agenda, the Chair will recognize the
individual for their comment when the item is considered. No action will be taken on matters not listed on
the agenda. Comments are limited to three minutes and must be related to matters of public interest
within the jurisdiction of the Water District. (GC 54954.3)
5. TOUR OF YLWD CAPITAL IMPROVEMENT PROJECTS
The Board of Directors will be visiting Capital Improvement Projects throughout the District from 8:00
a.m. to approximately 11:00 a.m. Interested parties can follow the group in their personal vehicles and
may be required to wear protective equipment, which the District will provide, at some locations.
Questions regarding the tour can be directed to the Board Secretary at 714-701-3020.
6. ADJOURNMENT
The next regular Board meeting is scheduled Thursday, July 6, 2023 at 3:00 p.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meetina
Non-exempt materials related to open session agenda items that are distributed to a majority of the Board of
Directors (or Committee Members) less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's Administrative building located at 1717 E Miraloma Ave, Placentia
CA 92870 during regular business hours. When practical, these materials will also be posted on the District's
website at https://ylwd.com/. (GC 54957.5)
Accommodations for the Disabled
Requests for disability -related modifications or accommodations, including auxiliary aids or services, required for
participation in the above -posted meeting should be directed to the Board Secretary at (714) 701-3020 at least 24
hours in advance. (GC 54954.2(a))
Page 1 of 1
BACKUP MATERIALS DISTRIBUTED LESS THAN 72 HOURS PRIOR TO THE MEETING
Girran Peak V
IF
Rd xr
Olinda .411110C
-✓ti
YV Fa nc h Pa tk. 18 SEWER SYSTEM & REPLACEMENT
ik 21 142.0 0" 0—
• 4f
_Gilman Pea'k
?t6,CHINO HILLS
Brea Sports, Carbon Canyon fikOn Rd f 16 N, -Lno It C
Park Regonal Park
Chino Chino Hills
HMIs San Juan Hill Sin to Park
State Park
T e g r a p h Canyon
W a t r
it Canyon Rd C'n
Yn 0
A
-------- & YLWD HELICOPTER HYDRANT
0 ---------------------- A q*�
I I* TIMBER RIDGE BPS'
4OF a: -0
91 GOLDEN AVE WATERLINE
George) O It
Q
(och Parik 4.1
'- y \\
Union C Bastanchury Rd 1010",
Bastarxhury
4W it,
Uop -
00
0 80 IMPERIAL WATERLINE
x 0 0 �i
0 2 'a orrnte Dr 14 0 GREEN CREST LIFT STATION
r U LL M 9 4
rk u 17-
0
1j n 0
CD rAPr AO%
Far rk Yorba Lindal"
7 MAIN STREET
F--7.1- Linda Wva
ArfoynPark > >
Llrda Blvd SEWER REPLACEMENT,, il,! L13 4t " 13 0 LOWER HIDDEN HILLS PRSS
=5-
41 -0 4�1 12 0 HIDDEN HILLS BPS deo
A' z
and Cy Travis
Ranch 160
j Eastsidt Fj'k
6 *MOUNTAIN VIEW Youth Community j
T of Park
Par k WATERLINE REPLACEMENT,
Alta V, WATER LINE REPLACEMENT country va\omas 0
--ko CAMINO DE BRYANT AREA
Club Buena Vista Ave Yu,bo Linda :asen lie la Sy f
country Club 15 WSITE &-SECURITY PHASE I
x Shapell Santa
Park 0 UPGRADES
x Brush
0
'I Vista St 0 -anyon Park Burlington%
h,, '7/_ a
17 ie BNSF'CROSSING IN
WEIR-CANYON I a A r? a C a n y 0 n
L, S%Zl 6
\6
mr,
0 rc, �--.Mw—1 ra%, i-a P,
? q alley Feathery:z 'j"b' D, 10 \ zl� Feathe,ly - - � �Q ta A �na���
Ni Yorba All,
Regional
Region
-04 Af-0odj Park
WAN e■ Ah"Ood Channel "Orangeth -7/7" 91
50MSFarlvnrkl rn union Lan a\
5
Anaheim CROSSING
Yorbe Ar
Lake v VETERAN'S VILLAGE------___ Park
-<
Cb 91 01 'r- t?
E Miraloma A tival
---------------
3'10 WELL REHABPie P.
410 RESILIENCY IMPROVEMENTS
Ronald
Reagan
Park
0 WELLI 22 CL
E
to 91
ik• Ganyorl
Orange 2 •0 WELL 2T/ --si Gao
Dr
County es-RivSi
k?t
Peralta
Anaheim ell Canyon pe`j C4,)
Med Ctr Park Santa Ana SA
'u
hn
em
Gypsum
C tr
Canyon
Sa` art P1
Hi Ole
Riverdale AveJ; Deer Canyon Park YLWD HQ
M It 0 CIP PROJECTS
Imperial Anaheim
0 0.25 0.5 1 Miles
Park Hills .0
Golf Course ACTIVE CONSTRUCTION
DISCLAIMER:
This map represents a visual aid intended to assist Public Utility Department personnel
YO RBA LINDA WATER DISTRICT with the management of Water & Wastewater System Facilities. Data provided herein is Jun 2023 YLWD CIP PROJECTS
not a guarantee of actual field conditions nor a substitute for record drawings and
field verification.
Well 22 Equipping
J-2009-22 #22
Project Description
Location: Fee Ana St. South of La Palma Ave., Anaheim, CA
Description: • In FY2018, the District completed drilling Well No.
22 and in FY2020 the plans and specifications for
equipping the well were completed.
• Project was put on hold until PFAS WTP
completed.
• Design modified due to hydraulic changes of
plant.
• Improvements include 2,500 gpm vertical turbine
pumping unit and 350 hp premium efficiency
motor.
• Contractor is Pascal & Ludwig.
Financial Status Potential Risks
Proiect Budaet
Prior Years CIP:
$1,090,555
FY 2022-2023 CIP: +
$2,035,456
FY 2023-2024 CIP: +
$5,000
Total Project Budget: _
$3,131,011
Total Expended
(through 6/30/23):
$3,043,454
Total Funds Remaining: _
$87,557
Expenditure Breakdown:
Labor & Outside Services:
Construction Expenditure: +
$330,120
$2,713,334
Total Expended = $3,043,454
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Proiected Comp. Date:
Notice of Comp. Date:
Funding
Work Completed:
Project Status On Track
4/11/2022
1/11/2023
7/31/2023
TBD
Bond Proceeds
•Planning, Design, and Drilling (100%)
•Construction was awarded
•Discharge Pipeline (99%)
•Sitework (100%)
•Mechanical (99%)
•Onsite Electrical (98%)
•Offsite Electrical (100%)
Work to be completed: •Discharge Pipeline (1%)
•Mechanical 0%)
•Onsite Electrical (2%)
Issues:
•Rain and material delays
•Revenue Bond Drawdown Deadline of July 28, 2025.
•Reviewing claim received on 6/27/2023 from
pipeline subcontractor.
Well 23 Drilling & Equipping
J-2019-23
Project Description
Location: La Palma Ave., Anaheim, CA
Description: • Project on hold pending completion of new Well
22 and water quality results, and Water Master
Plan.
• Well will increase District's overall groundwater
pumping capacity.T
• District's desired capacity is 3,000 gpm to
replace the lost capacity at Well 7 and
abandoned Well 15.
Project Budget
Prior Years CIP:
FY 2022-2023 CIP: +
FY 2023-2024 CIP: +
Total Project Budget: _
Total Expended
(through 6/30/23): -
Total Funds Remaining: _
Financial Status r Delayed
$11,440
$2,063
$0
$13,503
$13,503
$0
Expenditure Breakdown:
Labor & Outside $13,503
Services:
Construction
+ $0
Expenditure:
Total Expended = $13,503
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Actual Comp. Date:
Notice of Comp. Date:
Funding Source:
Work Completed:
Project Status
TBD
6/30/2024
TBD
TBD
Bond Proceeds
•Negotiations with OCWD for well siting and
pipeline easements (In Planning Phase)
Work to be completed: •Planning, Design, Construction
Issues:
• Hold for Water Master Plan and Well 22 Water Quality Data
•Project is currently not budgeted for FY23-24
Well Rehabilitation Project
J-2022-41 & J-2022-42
Project Description
Location: Well Sites throughout the District
Description: • Asset Management Plant includes measures to
extend useful life of each well, improve efficiency
and address capacity issues.
• Wells are being evaluated for improvements.
• Minor improvements completed on Wells 7 and
12 by PFAS WTP contractor.
• Well 20 improvements being completed by
General Pump.
Project Budget
Prior Years CIP:
FY 2022-2023 CIP: +
FY 2023-2024 CIP: +
Total Project Budget: _
Total Expended
(through 6/30/23): -
Total Funds Remaining: _
Expenditure Breakdown
Labor & Outside
Services:
Construction
Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Proiected Comp. Date:
Notice of Comp. Date:
Bonds Comp. Deadline:
Work Completed:
ez
Financial Status
$0
$40,288
$368,000
$408,288
$61,062
$347,226
$61,062
_ $61,062
Project Status
N/A
45473
6/30/2024
Bond Proceeds + PAY -GO
On Track
•Well 7 CLAVAL replacement (100%)
•Well 12 CLAVAL replacement (100%)
•Well 20 Pump Design (100%)
•Well 20 Pump Installation to be completed August
Work to be completed: 2023
•Two additional wells to be rehabilitated in
FY23-24
Issues:
• Well 20 rehabilitation delayed due to material lead times.
Resiliency Improvements to District
Facilities (AWIA)
Project Description
Location: YLWD Headquarters and various locations
Description: • Improvements are needed at multiple facilities to
improve resiliency from threats such as wildfires,
earthquakes, and power outages.
• Completed: Waterless fire suppression system
installed in the Records and Server rooms in the the
District's Administration Building.
• Well 10 to be connected to the Headquarters'
emergency backup generator.
Financial Status r
Project Budaet
Prior Years CIP:
$0
FY 2022-2023 CIP: +
$130,000
FY 2023-2024 CIP: +
$0
Total Project Budget: _
$130,000
Total Expended
(through 6/30/23): -
$112,923
Total Funds Remaining: _
$17,077
Expenditure Breakdown:
Labor & Outside $112,923
Services:
Construction + $0
Expenditure:
Total Expended = $112,923
(through 6/30/23):
Project Status
On Track
Notice to Proceed: N/A
Initial Comp. Date: 6/30/2023
Projected Comp. Date: 7/31/2023
Notice of Comp. Date:
Bonds Comp. Deadline: Bond Proceeds
•Fire suppression system for Server Room and
Work Completed: Records Room completed
• Well 10 backup Generator in progress
Work to be completed: -Well 10 connection to Headquarters' Backup
Generator
Issues:
•Scope Hold for WMP - Back-up Generators - Lakeview BPS and Yorba
Linda BPS (Not included in Budget)
BNSF Crossing -Veterans Way and S.
Highland
J-2021-36
7 - .
Project Description
Location: Veterans Way/S. Highland Ave and Orangethorpe
Ave Placentia, CA
Description: • District currently has one 18" line on Lakeview Ave
that is the only feed to our service area on the
south side of the BNSF railroad.
• Waterline will provide water supply redundancy
for nearly 200 customers south of Orangethorpe
Ave.
• Includes installation of 840 feet of 12 -inch
waterline that will cross the BNSF ROW and OC
Flood Control District Atwood Channel south of
Veterans Way at Veterans Village and
abandonment of existing, out of service waterline
that crosses the Orange County Flood Control
District Atwood Channel, south of Veterans Way.
• Contractor is Big Ben, Inc.
Project Budget
Prior Years CIP:
FY 2022-2023 CIP:
FY 2023-2024 CIP:
Total Project Budget:
Total Expended
(through 6/30/23):
Total Funds Remaining
Financial Status On Track
$90,222
+ $631,305
+ $1,176,061
$1,897,589
$815,346
$1,082,243
Expenditure Breakdown
Labor & Outside Services:
$290,346
Construction
$525,000
Expenditure:
Total Expended
$815,346
(through 6/30/23):
Project Status
Notice to Proceed:
3/16/2023
Initial Comp. Date:
8/17/2023
Projected Comp. Date:
11/l/2023
Notice of Comp. Date:
TBD
Funding Source:
Bond Proceeds
-Planning & Design (100%)
-Waterline horizontal and vertical alignments
revised due to conflict with existing gas lines.
Work Completed:
-Jack and Bore under BNSF ROW (80%)
-Pipeline Installation At
Orangethorpe/Highland Intersection (0%)
-Pipeline Installation Over Atwood Channel
(40%)
-Jack and Bore under BNSF ROW (20%)
Work to be completed: -Pipeline Installation At
Orangethorpe/Highland Intersection (100%)
-Pipeline Installation Over Atwood Channel
(60%)
Issues:
-Conflict with existing utilities
-Impact on the cost/schedule to be determined
-Delays due to long permit processing time from BNSF and material delays
-Revenue Bond Drawdown Deadline of July 28, 2025
Mountain View Waterline Replacement
J-2022-48
Project Description
Location: Mountain View Ave between Los Altos Dr. and Ohio
Street, Yorba Linda CA
Description: -Asset Management Plant includes rehabilitation of
Mountain View Avenue.
• Existing waterline has high Consequence of
Failure and Likelihood of Failure scores due to age
(1930s), pipe material (cast iron), frequent pipe
breaks, and location.
• Project includes replacement of 1,200 feet of 10 -
inch waterline.
-Contractor is GCI.
Project Budget
Prior Years CIP:
FY 2022-2023 CIP: +
FY 2023-2024 CIP: +
Total Project Budget: _
Total Expended
(through 6/30/23): -
Total Funds Remaining: _
Financial Status L
$0
$150,000
$650,227
$800,227
$217,493
$582,734
On Track
Expenditure Breakdown:
Labor & Outside
$34,993
Services:
Construction
+ $182,500
Expenditure:
Total Expended
= $217,493
(through 6/30/23):
Project Status On Track
Notice to Proceed:
4/27/2023
Initial Comp. Date:
6/30/2024
Projected Comp. Date:
9/13/2023
Notice of Comp. Date:
TBD
Funding Source:
Bond Proceeds
-Design 100%
-Contractor mobilized on 6/19/2023. Material
Work Completed:
procurement (80%), Surveying (100%), Pipe
installation (0%), Miscellaneous installations and
abandonments (0%)
-Pipe installation (100%), Miscellaneous
Work to be completed: installations and abandonments (100%)
Issues:
-The project was moved up to replace projects on hold pending
completion of Water Master Plan
-Construction is now behind original schedule due to CoYL permit
processing time and contractor's struggles with finding an acceptable
staging area
-The staging area was acquired but contractor was not allowed to start
using it until 6/19/23
Main Street Sewer Replacement
J2020 -63S
f __ OUNOA STREET
i
a L
MAIN STREET
71
Project Description
Location: Main Street, Yorba Linda, CA
Description: • Existing sewer near Main Street in Downtown
Yorba Linda is in very poor condition, can not be
adequately cleaned and monitored by District,
and is not compliant with pipe size standards.
• Project includes replacement of 465 LF of 6 -inch
sewer with 8 -inch sewer line.
• District will utilize a combination of open trench
and pipe bursting.
• Perpetual construction easements and access
license to be acquired from City of Yorba Linda for
constructing and maintaining the replacement
sewer.
Proiect Budget
Prior Years CIP:
FY 2022-2023 CIP:
FY 2023-2024 CIP:
Total Project Cost:
Total Expended
(through 6/30/23):
Total Funds Remaining:
Expenditure Breakdown:
Financial Status r
$29,231
+ $14,468
+ $552,530
_ $596,229
- $40,247
_ $555,981
Labor & Outside Services: $40,247
Construction Expenditure: $0
Total Expended $40,247
(through 6/30/23):
On Track
__]L�Project Status otentia�Rls
Notice to Proceed: TBD
Initial Comp. Date: TBD
Projected Comp. Date: FY2023-2024
Notice of Comp. Date: TBD
Funding Source: PAY -GO
Work Completed: •Design 95%
•Construction 0%
• (In Design Phase)
Work to be completed: • Easement & License procurement
•Final Design
•Construction
Issues:
•YLWD is negotiating easements/license
•These are needed before the project is bid
•Encroachments must be cleared from YLWD existing and proposed
easements
Imperial Highway Waterline
J-2021-46
Project Description
Location: Imperial Highway between Eureka Ave. and
Bastanchury Rd. Yorba Linda, CA
Description: -Asset Management Plant includes rehabilitation
of Imperial Highway waterline from Bastanchury
Road to Eureka Avenue.
• Existing waterline has high Consequence of
Failure and Likelihood of Failure scores due to age,
pipe diameter size and location.
• Project includes rehabilitation of 3,600 feet of 18 -
inch steel water main (installed in 1936), 1,100 feet
of 16 -inch cast iron water main (installed in 1925),
900 feet of 14 -inch cast iron water main (installed in
1941), and replacing 4" waterline (installed in 1951)
with new 8" waterline.
• Contractor is TE Roberts.
r,
Financial Status On Track
Proiect Budget
Prior Years CIP:
$1,273
FY 2022-2023 CIP:
+ $26,780
FY 2023-2024 CIP:
+ $2,928,546
Total Project Budget:
_ $2,956,600
Total Expended
(through 6/30/23):
- $28,635
Total Funds Remaining:
_ $2,927,966
Expenditure Breakdown:
Labor & Outside
$28,635
Services:
Construction
+ $0
Expenditure:
Total Expended
= $28,635
(through 6/30/23):
Project Status On Track
Notice to Proceed:
6/14/2023
Initial Comp. Date:
6/30/2024
Proiected Comp. Date: 12/30/2023
Notice of Comp. Date: TBD
Bonds Comp. Deadline: Bond Proceeds
-Design (100%)
Work Completed: -Surveying (1000)
-Construction (0%)
-Construction to commence in August 2023
• 18" Flexible Liner (0%)
Work to be completed: • 16" Flexible Liner (0%)
• 14" Flexible Liner (0%)
•8" PVC C900 Waterline (0%)
Issues:
-Project was moved up to replace projects on hold pending completion of
Water Master Plan
-Mobilization scheduled for first week of August 2023
Golden Ave Waterline
J-2022-38
Project Description
Location: Golden Avenue, Placentia, CA
Description: • The City of Placentia will be constructing a
bridge on Golden Avenue across the Carbon
Canyon Creek.
• Construction of bridge provides opportunity to
District to install a new waterline to loop water
system and provide water supply resiliency,
• Project includes installation of 300 LF of 8 -inch
PVC C900 waterline to connect to existing 8 -inch
waterline east of Carbon Canyon Creek with
existing 8 -inch waterline on California Street that is
west of Carbon Canyon Creek.
Financial Status
Project Budget
Prior Years CIP: $0
FY 2022-2023 CIP: + $4,536
FY 2023-2024 CIP: + $305,498
Total Project Budget: _ $310,034
Total Expended
(through 6/30/23): + $1,585
Total Funds Remaining: = $308,449
Expenditure Breakdown
Labor & Outside
Services:
Construction
Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Projected Comp. Date:
Notice of Comp. Date:
Funding Source:
$1,585
$0
$1,585
Project Status
TBD
6/30/2023
6/30/2024
TBD
Bond Proceeds
Potential Risks
Potential Risks
-Planning and coordination with City of
Work Completed: Placentia (80%)•Design (0%)
-Construction (0%)
• (In Design Phase)
Work to be completed: -Design (100%).Construction (100%)
Issues:
• Design underway - Hold for City of Placentia funding until December 2023
• Need to coordinate phasing of our project with their Bridge construction
project
MWDSC & YLWD Helicopter Hydrant
J-2022-29 Project Budget Financial Status L On Track
Project Description
Location: Robert B. Diemer Water Treatment Plant
Description: • Joint project with MWDSC to install Helicopter
Hydrant at the Robert B. Diemer Water Plant.
• Improvements include a 15 -foot by 8 -foot open
top water holding tank; source water piping
connections; a storm drain system; auxiliary fire
hydrant; electric power and data connections;
level control; SCADA integration control system;
utilities; concrete platform; tank overflow manifold
and gutter; solar panel and battery for back-up;
tank lights for night operation; a helicopter
landing pad; grading and drainage
improvements; rock for dust control and
maintenance access.
• US Forest Service $500,000 earmark funding.
• YLWD funding $200,000 and MWDSC remaining
budget of approximately $313,250 (not -to -exceed
$480.000) .
Prior Years CIP:
$0
FY 2022-2023 CIP: +
$11,001
FY 2023-2025 CIP: +
$1,002,249
Total Project Cost: -
$1,013,250
Total Expended
(through 6/30/23): _
$11,001
Total Funds Remaining: -
$1,002,249
Expenditure Breakdown:
Labor & Outside Services:
Construction Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Projected Comp. Date:
Notice of Comp. Date:
Funding Source:
Work Completed:
Work to be completed:
$11,001
$0
$11,001
Project Status
N/A
6/30/2024
12/1/2024
TBD
Grant ($500,000) + Captial Reserves (YLWD
$200,000) + MWD ($313,250)
•Draft MOU completed
•Statement of Work completed
•Planning and Preliminary Design underway
•Project extension approved by US Forest
Service for March 31, 2025
•Feb -Nov. 2023 - Design
•Sept. 2023 -Jan. 2024 - Procurement
•Nov. 2023 -Oct. 2024 - Construction
•Nov. -Dec. 2024 - Close -Out.
Issues:
•MOU between YLWD and MWD to be executed.
Timber Ridge Booster Pump
J-2020-37
Project Description
Location: 3727 Fairmont Blvd. at Timber Ridge Rd., Yorba
Linda, CA
Description: • Existing station had a pump with a natural gas
engine over 35 years old that was beyond its useful
life with no replacement parts. Additional capacity
and site security measures needed.
• Existing Booster Pump Station being replaced
with a new, upgraded Booster Pump Station
adjacent to existing.
-Improvements include a pump station building,
three pumps, a natural gas generator, a flow
meter, electrical, instrumentation, a perimeter wall
and other site security improvements.
• Casino Ridge developer (Yorba Linda Outpost
Development Company) has provided funding for
capacity improvements.
• Contractor is Pacific Hydrotech
Financial Status
Proiect Budget
Prior Years CIP: $399,749
FY 2022-2023 CIP: + $875,117
FY 2023-2024 CIP: + $4,591,297
Total Project Budget: _ $5,866,163
Total Expended
(through 6/30/23): - $1,219,359
Total Funds Remaining: _ $4,646,803
Expenditure Breakdown:
Labor & Outside
Services:
Construction
Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Proiected Comp. Date:
Notice of Comp. Date:
Bonds Comp. Deadline:
Work Completed:
Work to be completed:
$503,170
+ $716,189
_ $1,219,359
Project Status
1/30/2023
2/24/2024
7/1/2024
On Track
LOn Track
TBD
Bond Proceeds
-Design (100%)
• Project awarded
-Construction commenced May 2023
-Demolition Phase 1 (100%)
-Pump Barrels and suction header (100%)
-Retaining Wall Grading (75%)
-New pump station building and equipment
• Walls and gate
• Demolition of existing station
Issues:
-Material delays
-Revenue Bond Drawdown Deadline of July 28, 2025
Hidden Hills Booster Pump Station
J-2020-20
Project Description
Location: 5130 1/2 Hidden Hills Rd., Yorba Linda, CA
Description: • Cielo Vista Developer required to upgrade (fund
53.5%) capacity of existing pump station and
District funded additional improvements (fund
46.5%)
• District's scope includes a security gate,
perimeter fence, retaining wall, natural gas backup
generator, replacement flowmeter, and additional
paving for site access.
• The natural gas backup generator may be used
in the event of a power outage or electrical power
planned shutdown, and will provide increased
reliability during fires in the nearby wildfire -prone
areas.
• Contractor is Pacific Hydrotech.
Financial Status On Track
Project Budget
Prior Years CIP:
$100,874
FY 2022-2023 CIP: +
$1,134,470
FY 2023-2024 CIP: +
$207,573
Total Project Budget: _
$1,442,916
Total Expended
TBD
(through 6/30/23): +
$1,153,274
Total Funds Remaining: _
$289,642
Expenditure Breakdown
Labor & Outside
Services: $276,765
Construction + $876,509
Expenditure:
Total Expended = $1,153,274
(through 6/30/23):
Project Status On Track
Notice to Proceed:
6/13/2022
Initial Comp. Date:
3/1/2023
Projected Comp. Date:
9/1/2023
Notice of Comp. Date:
TBD
Bonds Comp. Deadline:
Bond Proceeds
.Design (100%),
• Project was awarded
Work Completed:
-Installation of New Pumps (95%)
-Site Work & Fencing (90%)
-Electrical (50%)
-Back-up Generator (90%).
-New Booster Pump (5%)
Work to be completed:
-Site Work & Fencing (10%)
• Electrical (50%)
-and Back-up Generator (10%).
Issues:
-Rain and material delays
-Revenue Bond Drawdown Deadline of July 28, 2025
PRS Rehabilitation Project - Lower
Hidden Hills PRS
J-2023-06
Project Description
Location: Hidden Hills Road, Yorba Linda, CA
Description: -Lower Hidden Hills PRS recently failed and had
significant corrosion and unsafe vault hatch
panels.
• The PRS is being replaced via change order to
the Hidden Hills BPS project.
• Contractor is Pacific Hydrotech.
Proiect Budget
Prior Years CIP:
FY 2022-2023 CIP: +
FY 2023-2024 CIP: +
Total Project Budget: _
Total Expended
(through 6/30/23): -
Total Funds Remaining: _
Financial Status I
$0
$299,856
$215,144
$515,000
$315,258
$199,742
Expenditure Breakdown:
Labor & Outside
Services: $6,656
Construction
+ $308,602
Expenditure:
Total Expended = $315,258
(through 6/30/23):
Project Status
On Track
Notice to Proceed:
4/6/2023
Initial Comp. Date:
8/31/2023
Proiected Comp. Date:
8/31/2023
Notice of Comp. Date:
TBD
Bonds Comp. Deadline:
Bond Proceeds
• Design (100%)
-Change order executed to Hidden Hills
Booster Pump Station Project Contractor
Work Completed:
• Pre -Construction (95%)
-Construction (5%)
-Materials delivered - pipe, valves, fittings are
being bolted up and pre -assembled
• Pre -Construction (5%)
-Construction (95%)
Work to be completed:
-Install Vault
-Install Piping, Valves, Fittings, etc
-Abandon existing PRS
Issues:
None
Green Crest Lift Station Rehabilitation
J-2023-17
Project Description
Location: Green Crest Drive, Yorba Linda, CA
Description: • Project includes installation of a new wet well,
wet well and valve vault access hatches, two
new pumps, a level monitor, piping and
appurtenances, a flow meter, an electrical
control panel and conduit.
• New electrical cabinet will allow lift station to be
connected to a portable backup emergency
generator.
• District received congressionally directed
spending of up to $300,000 with at least 20%
match by the District.
Proiect Budaet
Prior Years CIP:
FY 2022-2023 CIP: +
FY 2023-2024 CIP: +
Total Project Budget: _
Total Expended
(through 6/30/23): -
Total Funds Remaining: _
Expenditure Breakdown:
Labor & Outside Services:
Construction Expenditure: +
Total Expended _
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Proiected COMM Date:
Notice of Comp. Date:
Funding Source:
Work Completed:
Work to be completed:
Financial Status
$0
$0
$900,000
Potential Risks
$900,000 (YLWD Only)
$226
$899,774
$226
$226
Project Status Fror On Track
TBD
TBD
FY2023-2024
TBD
Grant ($300,000) + PAY -GO ($900,000)
-Preparation of scope of work and draft NEPA
documents
-Planning, Design
-Construction
-Grant Reporting
Issues:
-Based on detailed condition assessment, pump station will be replaced. This
will increase the scope and YLWD's Cost Share from $400,000 to $900,000.
Site and Security Upgrades at District
Facilities (AWIA)
Project Description
Location: Facilities throughout the District
Description: • As part of the Bioterrorism Act of 2002 and
America's Water Infrastructure Act of 2018 (AWIA),
the District needs to make upgrades for cyber
security and terrorist threat protection at all
facilities.
• Completed: Security fencing at Bryant Ranch
Reservoir
• Additional site security measures to be
implemented at Highland, Valley View, Little
Canyon, Lakeview, and Elk Mountain Reservoirs;
Box Canyon, Paso Fino, and Yorba Linda Booster
Pump Stations; and Well 21 and Well 22.
• Work being implemented by Operations staff.
Financial Status 0 On Track
Project Budget
Prior Years CIP:
$0
FY 2022-2023 CIP: +
$357,968
FY 2023-2024 CIP: +
$0
Total Project Budget: _
$357,968
Total Expended
(through 6/30/23): -
$177,712
Total Funds Remaining: _
$180,255
Expenditure Breakdown:
Labor & Outside
$177,712
Services:
Construction
+
$0
Expenditure:
Total Expended =
$177,712
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Actual Comp. Date:
Notice of Comp. Date:
Bonds Comp. Deadline:
Project Status
N/A
6/30/2023
6/30/2025
Bond Proceeds + PAY -GO
-Completed work includes: Bryant Ranch fencing,
Security Infrastrucure (cameras) for Valley View,
Work Completed: Gardenia, Chino Hills, Spring View, and Little
Canyon
-Completed in FY 22/23: Lakeview, Well 21, Paso
Fino, Yorba Linda Booster.
Work to be completed: • Remaining work includes: security
cameras/systems at Highland, Box Canyon, and
Well 22 and card reader system.
Issues:
-Fencing projects to be scheduled or Funding to be reallocated to Water
Master Plan projects
Camino De Bryant Area DIP Waterline Replacement -Phase 1
J-2023-24
Location:
Description:
Project Description
Camino De Bryant area - DIP replacement
• Approximately 4,400 LF of Ductile Iron Pipes in
high-pressure areas and with history of leaks have
been prioritized for Phase 1
Financial Status r On Track
Proiect Budaet
Prior Years CIP:
$0
FY 2022-2023 CIP: +
$0
FY 2023-2024 CIP: +
$2,600,000
Total Project Budget: _
$2,600,000
Total Expended
(through 6/30/23): -
$0
Total Funds Remaining: _
$2,600,000
Expenditure Breakdown:
Labor & Outside Services: $0
Construction Expenditure: + $0
Total Expended
(through 6/30/23): $0
Project Status
Notice to Proceed: TBD
Initial Comp. Date: 6/30/2025
Proiected Comp. Date: 6/30/2024
Notice of Comp. Date: TBD
Funding Source: Bond Proceeds
Work Completed: -In Planning Phase
-Planning
Work to be completed: -Design
-Construction
Issues:
-None
On Track
BNSF Crossing -Weir Canyon/YL Blvd
J-2021-02
Location:
Description:
Project Description
Yorba Linda Blvd. at Esperanza Rd. Yorba Linda,
CA
• Project has been completed.
• BNSF notified District that railroad tracks would
be modified at the Yorba Linda Boulevard
Crossing and District needed to relocate existing
waterlines that cross tracks.
• One crossing for an intertie with City of Anaheim
was abandoned (under maintenance, not CIP).
• Second crossing was an 18" waterline that
served as the sole water supply for the SAVI Ranch
area.
• District relocated the 18" waterline adjacent to
the current alignment.
• 258 linear feet of 18" CML&C, and 137 linear feet
of 28" steel casing.
• Contractor was Big Ben, Inc.
Financial Status On Track
Project Budget Completed
Prior Years CIP:
$1,060,562
FY 2022-2023 CIP: +
$227,873
FY 2023-2024 CIP: +
$0
Total Project Budget: _
$1,288,435
Total Expended
(through 6/30/23): _
$1,288,435
Total Funds Remaining: _
$0
Expenditure Breakdown
Labor & Outside
Services:
Construction
Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Actual Comp. Date:
Notice of Comp. Date:
Funding Source:
Work Completed:
$269,487
+ $1,018,948
_ $1,288,435
Project Status
2/28/2022
6/12/2022
9/16/2022
10/25/2022
Bond Proceeds
• 100% complete
•Project has been closed
Work to be completed: •N/A
Issues:
•Project was completed behind schedule due to
lead time on the material.
Completed
Sewer System Rehabilitation and
Replacement Project
Project Description
Location: Sewer Lines throughout the District
Description: • Project is part of the District's continuing
Rehabilitation & Replacement (R&R) Program to
replace aging infrastructure.
• Operations and Engineering work together to
identify sewer lines requiring
rehabilitation/replacement.
• 6,650 linear feet of sewer mains and I I manholes
have been identified for FY23-24 for lining that will
be cast and cured in place.
Proiect Budget
Prior Years CIP:
FY 2022-2023 CIP:
FY 2023-2024 CIP:
Total Project Cost:
Total Expended
(through 6/30/23):
Total Funds Remaining:
Expenditure Breakdown:
Labor & Outside Services:
Construction Expenditure:
Total Expended
(through 6/30/23):
Notice to Proceed:
Initial Comp. Date:
Proiected Comp. Date:
Notice of Comp. Date:
Bonds Comp. Deadline:
Work Completed:
Work to be completed:
Issues:
-Complete FY23-24
Financial Status
$0
+ $0
+ $508,875
$508,875
- $0
$508,875
Project Status
TBD
TBD
FY2023-2024
TBD
PAY -GO
• Not Started
-Planning
• Design
• Construction
$0
$0
$0
On Track
Section 219: Environmental Infrastructure Program
Section 219 of the Water Resources Development Act of 1992
What the Corps of Engineers Can Do:
The Environmental Infrastructure Program, also known as Section 219 of the 1992 Water Resources Development Act
(WRDA), as amended, authorizes the Corps to assist non -Federal interests in carrying out water -related environmental
infrastructure and resource protection and development projects. Such assistance may be in the form of technical,
planning, and/or design assistance for water supply and storage, treatment and distribution systems; and wastewater
treatment systems including treatment plants.
Restrictions:
Projects must be specifically named by Congress in the authorizing language for this program. Procurement of design
services shall be obtained from private sources, unless —the services provided require the use of new technologies
unavailable from the private sector, or Solicitation or Request for Proposal fails to attract two or more bids.
Charges for Assistance:
The non -Federal sponsor's share is 25 percent of total design costs or total project costs. The non -Federal sponsor is
responsible for providing all lands, easements, rights-of-way, and relocations (LERR) required for the project and
for obtaining any necessary permits. The non -Federal sponsor will receive credit for the value of such LERRs
and the cost of obtaining permits toward its share of total project costs, but not to exceed 25 percent of total
project costs. In addition, the non -Federal sponsor will receive credit toward its share of total design
costs or total project costs, as applicable, for the reasonable costs of design work it completes prior
to entering into an agreement with the Government. The non -Federal sponsor will be responsible
for 100 percent of the operation, maintenance, repair, rehabilitation, and replacement costs
associated with a completed construction project. y
• r
Responsibility of Project Sponsor:
Formal assurance in the form of a Project Partnership Agreement must be executed
with the project sponsor. The project sponsor must normally agree to the
following:
• Provide without cost to the United States all Lands, Easements.
Rights-of-way, Relocations, and Disposal areas (LEF
necessary for the construction and subsequent main
the project.
• Maintain and operate the project after completion wit
cost to the United States.
• Assume responsibility for all costs in excess of the
Federal cost limitation of $5,000,000.
• If the value of the sponsor's land contribution above
does not equal or exceed 35 percent of the project
cost, provide cash or work -in-kind contributions to
make the sponsor's total contribution equal to 35
percent.
How to Request Assistance:
Send a letter to the Louisville District.