HomeMy WebLinkAbout2023-05-25 - Board of Directors Meeting Agenda PacketYorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS SPECIAL MEETING
Thursday, May 25, 2023, 3:00 PM
1717 E Miraloma Ave, Placentia CA 92870
1. PARTICIPATION INSTRUCTIONS
This meeting will be held in person. For public convenience, the meeting can also be accessed via
internet-based service or telephone as indicated below. For questions regarding participation, please call
the Board Secretary at (714) 701-3020.
Computer/Mobile Device: https://us06web.zoom.us/i/81325285052
Telephone: (669) 444-9171 or (669) 900-6833
Meeting ID: 813 2528 5052
2. CALL TO ORDER
3. PLEDGE OF ALLEGIANCE
4. ROLL CALL
Brett R. Barbre, President
Trudi DesRoches, Vice President
Phil Hawkins, Director
Tom Lindsey, Director
J. Wayne Miller, PhD, Director
5. AB 2449 TELECONFERENCE REQUESTS
6. PUBLIC COMMENTS
Any individual wishing to address the Board (or Committee) is requested to identify themselves and state
the matter on which they wish to comment. If the matter is on the agenda, the Chair will recognize the
individual for their comment when the item is considered. No action will be taken on matters not listed on
the agenda. Comments are limited to three minutes and must be related to matters of public interest
within the jurisdiction of the Water District. (GC 54954.3)
7. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action
of the Board (or Committee) at the meeting, such as technical presentations, drafts of proposed policies,
or similar items for which staff is seeking advice and counsel. Time permitting, it is generally in the
District's interest to discuss these more complex matters at one meeting and consider formal action at
another meeting. This portion of the agenda may also include items for information only.
7.1. Draft Operating Budget for Fiscal Year 2023-24
8. ADJOURNMENT
8.1. The next regular Board meeting is scheduled Thursday, June 1, 2023 at 3:00
p.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting-
Non-exempt
eetingNon-exempt materials related to open session agenda items that are distributed to a majority of the Board of
Directors (or Committee Members) less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's Administrative building located at 1717 E Miraloma Ave, Placentia
Page 1 of 20
CA 92870 during regular business hours. When practical, these materials will also be posted on the District's
website at https://ylwd.com/. (GC 54957.5)
Accommodations for the Disabled
Requests for disability -related modifications or accommodations, including auxiliary aids or services, required for
participation in the above -posted meeting should be directed to the Board Secretary at (714) 701-3020 at least 24
hours in advance. (GC 54954.2(a))
Page 2 of 20
Yorba Linda
Water District
AGENDA REPORT
MEETING DATE: May 25, 2023
TO: Board of Directors
FROM: Mark Toy, General Manager
STAFF CONTACTS: Delia Lugo, Finance Manager
Sophia Phuong, Accounting Supervisor
Paige Appel, Budget Analyst
SUBJECT: Draft Operating Budget for Fiscal Year 2023-24
SUMMARY:
Staff will present and discuss the draft FY 2023-24 Operating Budget.
ATTACHMENTS:
1. Slide Deck - Draft Budget for FY23-24
ITEM NO. 7.1.
Page 3 of 20
aYorba Linda
Water District
�via6N�� �soV
Water a
Page 4 of 20
Overview
• Salary Related Expenses
• Debt Service
• Summary of FY2023-24 Budget
• CIP
Page 5 of 20
Y . L
W
Salary Related
Expenses
05/25/2023
9WL
Salary Related Expenses
2021 Rate Study Assumptions
Salary Related - Water
Salary Related - Sewer
FY2021-22 FY2022-23 FY2023-24
$10,969,179
MMIMMI
$12,847,163
Salaries & Related Expenses Detail
Salaries
Fringe Benefits
Mandatory Benefits
Prior Year
FY2021-22
$11,846,713
2,028,223
$13,874,936
Projected
FYE2022-23
$12,794,450
�
$14,984,930
Budget
FY2023-24
$ 7,627,773 $ 7,905,923 $ 9,010,016
1,586,840 2,257,590 2,151,211
1,801,607 2,338,473 2,662,648
$11,016,220 $12,501,986 $13,823,875
Variance from Assumptions
Rate Study Assumptions
Variance
$ (1,830,943) $ (1,372,950) $ (1,161,055)
-14% -10% -8%
Note: Salary Related Expenses totals do not include actual or anticipated capitalized labor for proper comparison to the
2021 Rate Study Assumptions.
Salary related expenses for FY24 does not include potential increases from labor negotiations but do include an
adjustment to the median as result of the Compensation Study.
05/25/2023
YL
W
ervice
05/25/2023
9WL
Debt Service Ratio For Water Fund
2021 Rate Study Assumptions
FY2021-22
Debt Service $ 2,728,919
Ratio 2.14
Per Policy 2.25
Historic & Future
Debt Service
Ratio
Per Policy
Prior Year
FY2021-22
$ 2,728,919
2.51
2.25
Variance from Assumptions
Rate Study Assumptions 0.37
Variance % 17%
FY2022-23
$ 3,107,326
2.98
2.25
Projected
FYE2022-23
$ 3,165,564
2.92
2.25
FY2023-24
$ 3,491,620
3.12
2.25
Budget
FY2023-24
$ 4,134,219
(0.06) (0.41)
-2% -13%
2.71
2.25
Page 9 of 20
Debt Coverage Analysis
FY2023-24 Proposed Rates
- 9% Increase from Prior Year + Pass -Through of $0.31 on Commodity Rate.
- $35 million of Debt (Acquired in FY2022-23)
- The District is meeting the policy debt coverage.
- The District does not meet the target reserve balance in the budgeted year FY2023-24.
The District will meet the target reserve balances by FY2024-25.
Water Revenue Adjustments & Debt Coverage
10.0% 5.00x
8.0%
c
v
E 6.0%
v 4.0%
a
Cr
2.0%
0.0%
FY 2024 FY 2025 FY 2026 FY 2027
FY 2028
3.00x
c�
0.0ox
O Water Rev Adjustments Water Debt Coverage (excl. LOC)
• Min Debt Coverage - 1.25x • Alert Coverage
Policy Debt Coverage - 2.25x
05/25/2023
$90
o $80
$70
$60
a, $50
v $40
$30
Cr
$20
$10
$0
Projected Ending Balances (excl Debt Proceeds)
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
Unrestricted Ending Balances Target Balances
• Min Targets • Alert Balances
Y . L
W
Summary of
FY2O23-24 Budget
05/25/2023
9WL
Proposed FY2023-24 Budget Summary
Production:
• Total Demand 19,227
• Ground Water 77%
Revenue*
Import Water 23
• Water - The pass-through on commodity rate is projected to
generate approximately $2.1 M in revenue.
Proposed Rates:
• Water - 9% adjustment for all water rates with a $0.31 Pass-
through on Commodity Rate
• The $0.31 Pass-through includes Power ($0.15), Fixed Water
Costs ($0.07), and Groundwater & Import water Costs ($0.09)
• Sewer - 15% adjustment for all sewer rates
• The cost change on an average customer (20 units) bill will be
an increase of $16.80 on the customer's monthly bill and a total
monthly cost of $17.73 (including Capital Finance Charge).
Page 12 of 20
Proposed FY2023-24
Budget Summary Cont.
Expenses:
• Variable Costs are based on demand total of 19,227AF with
a 77% Groundwater and 23% Import water. Total cost of
groundwater is $13M and import water is $7M.
• Changes have been made to Salary Related Expenses to
account for the results from the FY2022-23 Compensation
Study Report.
Debt Coverage:
• Projected Debt Service $4,134,219 (Principle & Interest) for
FY2023-24
• Debt coverage ratio 2.71
• Per Policy 2.25
Capital Improvement Projects:
• The CIP will
only be 1
year until the Water
Master Plan is
completed
to ensure
proper prioritization
of each project.
Page 13 of 20
Groundwater 16
s
Imported Water 9¢
05/25/2023
'ater Fix
osts 4¢
1
ersonnel
ervices 24¢ rM: -per �tin
Power &
Pumping
AL:
Supplies & Services 19¢
9WL
Depreciation 17¢
YL
w
Summary of
FY2023-24 Budget
Financials
05/25/2023
9WL
Financial Summary -Consolidated
Expenses
Prior Year
Projected
Revenue
FY2021-22
FYE2022-23
Revenue (Operating)
$ 43,01 1,492
$ 42,797,751
Revenue (Non -Operating)
2,510,962
4,405,474
Total Revenue
$ 45,522,454
$ 47,203,225
Rafe Study Assumptions
$ 43, 727,333
6,297,722
$ 46,560,875
Variance %
4%
1
Expenses
Expenses (Operating):
Variable Costs
$
20,603,385
Salary Related Expenses
11,016,220
(Less Capitalized Labor)
-
Supplies & Services
6,297,722
Expenses (Non -Operating)
1,270,454
Total Expenses
$
39,187,781
Rate Study Assumptions
$
39,170,380
Variance %
0%
Net Position Before Capital Contributions &
Depreciation
$
6,334,673
Capital Contributions
289,612
Depreciation
7,935,696
Total Net Income (Loss)
$
(1,311,411)
$ 15,832,394
12,501,986
8,644,747
2,483,934
$ 39,463,061
$ 38,222,320
3%
$
7,740,164
Budget
FY2023-24
$ 51,463,692
4,086,254
$ 55,549,946
$ 50, 720, 658
10%
$ 19,891,169
13,823,875
(408,000)
10,489,766
2,623,044
$ 46,419,854
$ 40,330,198
15%
$ 9,130,092
25,466,436 -
9,038,130 9,379,000
$ 24,168,470 $ (248,908)
Page 16 of 20
Financial Summary -Water
Expenses
Expenses (Operating):
Variable Costs
Prior Year
Projected
Budget
Revenue
FY2021-22
FYE2022-23
FY2023-24
Revenue (Operating)
$ 39,619,594
$ 39,270,910
$ 47,396,018
Revenue (Non -Operating)
2,389,764
4,174,224
3,901,619
Total Revenue
$ 42,009,358
$ 43,445,134
$ 51,297,637
Rafe Study Assumptions
$ 40, 519, 621
$ 42, 892, 602
$ 46, 516, 980
Variance %
4%
1%
10%
Expenses
Expenses (Operating):
Variable Costs
$ 20,603,385
$ 15,832,394
$ 19,891,169
Salary Related Expenses
9,230,304
10,481,360
11,488,469
(Less Capitalized Labor)
-
-
(367,200)
Supplies & Services
5,31 1,474
7,489,166
9,070,383
Expenses (Non -Operating)
1,251,753
2,480,657
2,616,744
Total Expenses
$ 36,396,916
$ 36,283,577
$ 42,699,565
Rate Study Assumptions $ 36,113,679 $ 34,994,157 $ 36,918,084
Variance % 1% 4% 16%
Net Position Before Capital Contributions &
Depreciation $ 5,612,442 $ 7,161,557 $ 8,598,072
Capital Contributions
176,963
25,050,300
-
Depreciation
6,442,545
7,524,955
7,690,000
Total Net Income (Loss)
$ (653,140)
$ 24,686,902
$ 908,072
Debt Service
$ 2,728,919
$ 3,165,564
$ 4,134,219
Ratio
2.51
2.92
2.71
Per Policy
2.25
2.25
2.25
Financial Summary -Sewer
Expenses
Expenses (Operating):
Salary Related Expenses
Prior Year
Projected
Budget
Revenue
FY2021-22
FYE2022-23
FY2023-24
Revenue (Operating)
$ 3,391,898
$ 3,526,841
$ 4,067,674
Revenue (Non -Operating)
121,198
231,250
184,635
Total Revenue
$ 3,513,096
$ 3,758,091
$ 4,252,309
Rafe Study Assumptions
$ 3,207,712
$ 3,668,273
$ 4,203,678
Variance %
10%
2%
1
Expenses
Expenses (Operating):
Salary Related Expenses
$
1,785,916
$
2,020,626
$
2,335,406
(Less Capitalized Labor)
-
-
(40,800)
Supplies & Services
986,248
1,155,581
1,419,383
Expenses (Non -Operating)
18,701
3,277
6,300
Total Revenue
$
2,790,865
$
3,179,484
$
3,720,289
Rate Study Assumptions
$
3,056,701
$
3,228,163
$
3,412,114
Variance %
-9%
-2%
9%
Net Position Before Capital Contributions &
Depreciation
$
722,231
$
578,607
$
532,020
Capital Contributions
112,649
416,136
-
Depreciation
1,493,151
1,513,175
1,689,000
Total Net Income (Loss)
$
(658,271)
$
(518,432)
$
(1,156,980)
Page 18 of 20
YL
W
05/25/2023
Capital
Improvement
Plan
9WL
CIP YE Projected FY2022-23 & FY2023-24 Budget
PROJECT NAME
BNSF Crossing -Veterans Way and S. Highland
BNSF Crossing -Weir Canyon / YL Blvd
Golden Ave Waterline
Hidden Hills BPS Upgrades
Imperial Waterline Improvement
Mountain View Waterline Replacement
PRS Rehabilitation Project *Based on AMP & Asset Scores
Resiliency Improvements to District Facilities (AWIA)
Site and Security Upgrades at District Facilities (AWIA)
Timber Ridge BPS Pump Replacement
Waterline Replacement *Based on AMP & Leak History
Well 22 Equipping
Well 23 Drilling & Equipping
Well Rehabilitation Project
Total Water CIP
Green Crest Lift Station Rehab
Main Street Sewer Replacement
Sewer System Rehabilitation and Replacement Project
Total Sewer CIP
CIP Total
CAPITAL OUTLAY
MWDSC & YLWD Heli -hydrant
Vehicle Replacement
Security Improvements/Modifications
YE Projected
FY2022-23
471,305
227,873
4,536
1,133,405
16,994
201,289
200,000
87,305
357,968
1,256,780
2,035,456
2,063
210,288
6,205,262
14,468
14,468
Budgeted
FY2023-24
Presented on 4/20/23
$ 1,336,061 $
$ 6,219,730 $
YE Projected
FY2022-23
1,164,874
Outlay Total$ 1,164,874 $
305,498
208,638
2,938,333
598,938
300,000
4,209,634
2,600,000
5,000
396,000
12,898,102
400,000
552,530
508,875
1,461,405
14,359,507 $
Budgeted
FY2023-24
200,000
480,000
50,000
730,000
Revised Budgeted
FY2023-24
1,336,061
305,498
255,131
2,938,333
598,938
300,000
4,209,634
2,600,000
5,000
396,000
12,944,595
400,000
552,530
508,875
1,461,405
14,406,000
Budgeted
FY2023-24
200,000
480,000
50,000
730,000
Grand Total $ 7,384,604 $ 15,089,507 $ 15,136,000
*Grant amount to be awarded. Green Crest Lift Station Rehab will be awarded $300,000 and MWDSC & YLWD Heli -hydrant will
be awarded $500,000. Each project cost listed represents YLWD's portion of the cost.
Page 20 of 20