HomeMy WebLinkAbout2009-11-05 - Planning-Engineering-Operations Committee Meeting Agenda Packet2.
Yorba Lind
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Thursday, November 5, 2009, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE
Director William R. Mills, Chair
Director Paul R. Armstrong
Director Michael J. Beverage, Alternate
STAFF
Pat Grady, Assistant General Manager
Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
2.1. Proposed Casino Ridge Project, Tract 16488
Recommendation: Following review by Staff of the final report and documentation to
be provided by the King Family representatives, Staff will provide recommendations
to the Committee.
2.2. Terms and Conditions for Sewer and Water Service with Hadi Atail, Parcel Map 2007-
196
Recommendation: That the Planning- Engineering- Operations Committee
recommend the Board of Directors approve the Terms and Conditions for Sewer
and Water Service with Hadi Atail for a three -lot residential development, Parcel
Map 2007 -196, Job No. 200919.
2.3. Terms and Conditions for Water Service with Placentia -Yorba Linda Unified School
District (PYLUSD)
Recommendation: That the Planning- Engineering- Operations Committee
recommend the Board of Directors approve the Terms and Conditions for Water
Service with PYLUSD for the new library and classroom facilities at Van Buren
Elementary School, Job No. 200918.
3. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
3.1. Monthly Groundwater Production and Purchased Water Report
3.2. Monthly Preventative Maintenance Program Report
3.3. Monthly Groundwater Producers Meeting Report
3.4. Status Report on Capital Projects in Progress
3.5. Future Agenda Items and Staff Tasks
4. ADJOURNMENT
4.1. The next regular meeting of the Planning- Engineering- Operations Committee will be held
December 3, 2009 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
November 5, 2009
Planning-Engineering-
Operations Committee
Pat Grady, Assistant General
Manager
Steve Conklin, Engineering
Manager
Steve Conklin, Engineering
Manager
Budgeted
Dept:
Reviewed by Legal:
Proposed Casino Ridge Project, Tract 16488
ITEM NO. 2.1
N/A
Engineering
N/A
At the August 2009 PEO Meeting, there was a presentation by representatives of the King Family
and a discussion with the Committee regarding water pressure for fire service and residential
needs, and meeting water storage requirements for the proposed 11 -lot development. At the
conclusion of the discussion, the Committee asked that Staff continue to work on these items with
the King Family representatives and to return at a later date to the Committee with new proposed
actions for consideration.
The King Family representatives have prepared new information in response to the above and
asked to make a presentation at the November PEO Committee, per the attached letter of October
26. Staff reviewed their preliminary information and believe that it and the expanded report that they
plan to bring to the Committee is worthy of consideration and discussion. Note that only preliminary
information has been provided to Staff to date. A final report with supporting documentation has
been promised by the family representatives for Staff and the PEO Committee.
STAFF RECOMMENDATION:
Following review by Staff of the final report and documentation to be provided by the King Family
representatives, Staff will provide recommendations to the Committee.
DISCUSSION:
As presented at the August PEO Meeting, the proposed 11 -lot development is located at the
northerly extension of Casino Ridge Road, in the District's 613 Zone, as shown on the attached
maps. The Zone is fed from Chino Hills Reservoir with a high -water elevation of 1300 ft. The highest
lots in the development have a pad elevation of 1200 ft. A hydraulic analysis was completed in July
2008, which indicated that there is sufficient fire flow under the modeled conditions with a 12 -inch
pipeline loop installed from San Antonio Road. However, the study found insufficient operating
pressures under average day, max day, and peak -hour demand conditions. The study
recommended household pumps be installed at each residence to increase normal service
condition pressures. The pumps would be installed by the home builder and maintained by the
homeowner.
At the August meeting, Staff reported that the one -half million gallon capacity of the Chino Hills
Reservoir is fully committed to meeting the needs of existing development in the 613 Zone, and that
there is no unused capacity available for the proposed Casino Ridge development. As an
alternative means to meet storage needs, it was suggested that conservation in lieu of storage be
investigated. It was suggested that this might be in the form of identifying landscape and park areas
in the reservoir service areas where "smart timers" and other water conservation measures could be
added to achieve the desired conservation.
This approach has been investigated by the family representatives and their consultant. They are
preparing a summary report with findings and recommendations to present to the PEO Committee.
Staff has requested copies of the report for its review prior to the PEO presentation.
ATTACHMENTS:
Nam. Description: Type:
Casino Ridge Ltr 260ct09.pdf Casino Ridge Ltr Backup Material
Casino Ridge Maps.pdf Casino Ridge Maps Backup Material
Casino Ridge Project.pdf Casino Ridge Proposal Backup Material
Gordon Thomson
Yorba Linda outpost Development, LLC
Email: broker .gordonthomson.com Direct Tel: (714) 222 7578 Website: www.casinoridge• net
Fax: (714) 693 1950
18431 Yorba Linda Blvd. Yorba Linda, CA 92886
October 26, 2009
Mr. Ken Vacchiarelli
Yorba Linda Water District
1717 E. Miraloma Ave.
Placentia, CA 92870
Subject: King FamilyNorba Linda Outpost development, LLC project
Dear Mr. Vacchiarelli,
As you know we are working feverishly toward resolving the Districts concerns regarding the gravity fed issues,
reserve storage, fire flow and the individual booster pumps at the project.
As to the 7 day storage requirements, per the instructions given by the board members at our last PEO hearing
to investigate conservation in lieu of storage, our water conservation experts have been working diligently with
the City Parks and Landscape Assessment Districts to identify areas were the use of smart timers would have
the desirous effect of conserving water.
We have learned that the parks neighboring the project are already utilizing smart timers and other water
conservation measures, however we have been able to identify areas within zones 5 & 6 maintained by the
landscape district that we can generate sufficient savings by converting to smart controllers and other
conservation systems to satisfy the storage requirement (see attached draft report)
Fire flow and gravity fed pressure to the site has been satisfied (and confirmed by the RBF report) by the loop
system.
Although the project has adequate water pressure for fire flow purposes, like many existing residences within
the District's territory, it requires the use of private pumps for a good shower and the pleasure of the owners.
The Kings have developed several solutions to both address disclosure concerns within the Project and tools
to assist the District in disclosure and cost shifting outside of the project. We now seek affirmation that these
solutions will be acceptable and pleasing to the Committee and respectively request to be placed on the
November agenda of the PEO hearing
We feel that Staff and the Kings are working harmoniously to resolve these issues, but seek Committee
affirmation that such solutions fulfill the terms and conditions for water service before we undertake the
contractual agreements and inherent therein.
Sincerely
Gordon Thomson
CC: Andrew King
Robert King
Mark Guitheus
wilt
•88
IIM,�r'Y MFP
NO SOLE
4
. ` 1
07'r
8 4.
[l
e lj
0 •; 3
�,' YORBA LINDA
A. r WATER DISTRICT
!F s
EL
f
F -
x.
,'•
cP .
"� ��� � Fair + i - ��'• .. 4 ,�� Lt :.
_ a
��Ctj room ea
' �,� t'li�" +�,�„d'► r, � yam,' � r'� � e `?_ .F� s#
o ,{
rt. �
Orr
3
k
r5,` 11f+.r °e
-'1
� � ry, �•t
�r•l +��
�
l
. 'r. opt. t'
N_ �
.t;
y�
•
s. T
aGj S�
�
y+ S,
n4`
Hawk Eye -
+F
es
eFk` r, $ d
�4' 'dye' }
r
'= Saddle Ridge
rye
a °�r �s'�`
Jr-
•��T�'
t•
Legend
Proposed Pipes
Existing Pipes
Proposed Development
OArea (Casino Ridge
Community Expansion)
Chino Hills Reservoir
300 150 0 300
Feet
YCrN
FIGURE I
Su : €ogle Aenat 2007
4 :1MdMA1010604- MCasrw_f{Idgeaeca IMM9 dJ
i
• King Family Proposal
To YLWD PEO Committee
I
•
District Consultant (RBF)
Fire Report/Adequate Pressure
2 Loop System Engineering Plan
3 I Household Pump Exhibit
10.3.3 from 2005 Master Plan
4 Emergency Storage
Water Conservation
Investigation Report
10.4 1.2 from 2005 Master Plan
Storage Analysis Discussion
3.4.2 from 2005 Master Plan
Improvement District 1
. For Pump Maintenance
8 Responsibility and
Metal Plate Exhibit
King Family / Yorba Linda Outpost Development, LLC
November 2, 2009
Yorba Linda Water District PEO Hearing
On July 29, 200 the Yorba Linda Water District issued TERMS AND CONDITIONS FOR
WATER SERVI E for the King's project located at the end of Casino Ridge Road in Yorba
Linda.
A PEO Committee Hearing was held at District offices on July 30, 2009, at which time
discussions were entered into regarding several points of concern:
1 OCFA & YLWD fire flow requirements
2. Individual y owned & maintained household booster pumps.
3. Emergen y storage reserves
Fire Flow: Wen the Terms and Conditions for this project were originally approved in 2003,
the only real issuo was the individual household pumps due to potential low domestic pressure.
The criteria for construction at that time, was that the building pads must be 100 feet below the
1300 elevation associated with the reservoir The 2005 Master Plan redefined the methodology
and criteria for ca culating the resultant pressures thus resulting in the King Family proposing to
add a loop system at considerable cost to their development so as to meet the gravity -fed fire
flow requirements. Consultants were hired by YLWD to study the effects of installation of a
Loop System conpecting the existing 12 inch pipeline to the project with the system in San
Antonio Road,
Conclusion: RB� Consultants determined in their report that such a loop system will provide
sufficient pressure to meet fire flow requirements, augmenting fire protection to the existing San
Antonio project. l 1991 YLWD had accepted two (2) easements from Lyon Warmington
Associates and G eg and Pamela Sporrer for these purposes, and the Kings will install this
exceptionally exp `nsive Loop System and provide the necessary additional easements. (See
full report in EXHI IT A.)
Household Pum a : Although the project meets the pressure requirements for fire flow
purposes, the RB, report notes "slightly low pressure under normal operating conditions (the
pressure at pad - levels are 36.1 to 37.6 psi). Like many existing residences within the District's
territory, the King roject requires the use of pumps for a good shower and the pleasure of the
owners. The RBF �eport suggests household pumps as a solution. Staff has indicated that
because of engineering design and project specific limitations, that individual household pumps
are preferable to a'single large pump. Although like many existing residences within the
District's territory, the use of private pumps is needed for the convenience of the owners, the
District is concerned about the perception that the District may be held responsible for their
maintenance.
Conclusion: he Kings have developed several solutions to both address disclosure concerns
within the Projea and tools to assist the District in disclosure and cost shifting outside of the
project.
1 Attorney for the King Family have produced substantially improved disclosures that
when re riled with the deeds give explicit and precise notice that it is the responsibility
of the horneowners and not YLWD to maintain and replace their own individual pumps.
(See EX IIBIT B)
2. A stamped metal plate will be proximately installed in the pump enclosure
(See EXHIBIT C)
3. King Farr�ily will contribute to modifying the District's billing software to remind all
househol s with privately owned pumps of their responsibility to maintain, repair and
replace t ese pumps.
Emergency Sto a Reserves: Recognizing the lack of gravity fed storage capacity in the
existing Chino Hillis Reservoir and the difficulty of obtaining land to build to expand the reservoir
(Item 10.4.1 of the 2005 Master Plan), the Committee encouraged the Kings to research
altematives to a ditional gravity fed storage, including water conservation. Here the goal was to
offset, by conse ation methods, the 7 day ADD and 1 day MDD requirement for emergency
storage.
Conclusion: The Kings have worked extensively with Staff to determine a fair and accurate
estimate of the li ely water use attributable to the project. The Kings have hired
irrigation/landscaoe consultants to investigate water conservation measures to offset by
conservation the Requirements for Emergency Water Storage in accordance with the 2005
Master Plan.
1 It as estimated by the King's experts that the required off -set would be 113,102
gallons
2. Ca sultants hired by the Kings immediately set out to calculate the savings within
the project by upgrading the planned irrigation system to a "gold" system of
l arn c ontrollers with weather monitoring devices and flow sensors. The results
g a projected 35% savings of 392,124 gallons per year or 32,677 gallons
kly
3. W next investigated all City parks within zone 1300 (68) to see where savings
c uld be had, after much work it was discovered that the City Parks District had
f al eady upgraded the local parks with smart timers resulting in an estimated
I sings of approximately 2.7 million gallons per year
4. We next investigated the City Landscape Management Assessment District
(LMAD) which could significantly benefit from water conservation measures.
Th; results are attached as exhibit "Proposed Water Conservation Measures"
I This solution could save over 1 million gallons per year, or 87,000 gallons per
w ek. When combined with the projected on -site savings, this option is
ca culated to exceed the emergency storage requirement by almost 7,000
ga Ions per week.
5. In discussions with LMAD Director Bruce Carlton it was revealed that the City
Co ncil is set to approve upgrading the LMAD systems citywide, once enacted
his could result in a potential savings of over 6 Million gallons year or 7 day
►avings of 115,000 gallons in zone 6B.
BACKUP RELt BILITY: While conservation is a laudable goal it does not adequately address
the core issue o Emergency Storage as there would be no place to store the conserved water.
Emergency Storage is described in section 10.3.3 of the 2005 Master Plan as a dedicated
source of water hat can be used as a backup supply in the event a major supply is interrupted,
such as in the a ent of a major earthquake.
Section 10.4.1. of the 2005 Master Plan recommends that the District purchase a portable
pump to ser it a backup that would allow District staff to quickly respond to an emergency.
To the extent that water conservation measures do not adequately offset the gravity fed
requirements, th King Family seeks confirmation that payment for their share of a portable
pump will fulfill at remaining requirements for gravity fed storage.
PROPOSAL:
The City Parks District has recently achieved a high level of water conservation within the King's
zone area and th:on LMAD is apparently poised to follow suit. These actions, combined with the
on -site con serva methods at the King project will result in millions of gallons of water being
conserved, all of �hich more than offsets the use of this eleven (11) lot subdivision, one which
has paid its shar of the general obligation bonds of Improvement District 1 (ID -1) since its
inception in 19787 The purpose of which (ID-1) was for the construction of production, storage,
and transmission facilities for water
(a) The Kings seek Committee approval that the individual pump option, when combined
with clear isclosures, metal plates and assistance with District software, is acceptable
to the Dist 'ct and provides a tangible benefit both to the owners of the lots and to the
District in esolving an ongoing District wide problem.
(b) The Kings�seek Committee approval that the above conservation measures more than
offset the �torage requirement for project, fulfilling the "gravity fed" storage requirement
for the prood. In obtaining this confirmation, the Kings stand by, willing to further assist
the Distri by the following methods:
1. The Kings could contribute a fair and proportionate share of a Portable Pump to support
the singleource water system. This option Supports the recommendations outlined in
the appro ;ed RBF report, the 2005 Water Master Plan and 2008 Certificates of
Participations. This Portable Booster Pump can even enhance fire protection during
times of emergencies by providing a backup of water service when the Timber Ridge
Booster St tion is down for routine repairs and maintenance.
2. Alternative y, The Kings contribute a fair and proportionate share of the LMAD's costs
of converti g to smart timers in the areas listed in the Proposed Water Conservation
Measurer I port providing cost savings to the city
(c) The Kin�s seek Committee approval that, having fulfilled these requirements, and the
requirements contained in the Terms and Conditions, that the Committee will support
water service at the project without imposition of further conditions.
We welcome th� input and consideration of the Staff and Committee as to these issues.
The King Family
t
E
e
S
l
F
.T &YYAaT�iN irtk
f.� Gaa L.t1
r
TFKt aaeowc' a
X .a ea.arwa mx,
� ,�/ recwo .nooewexa rww. +rrwar,.�
Hate
MIlO1AU 15501 & 16186
.m T &A Awrm `(
X92\
Iix)IRYnAF nFVFi_nPMPNT
�t
� 1
�l
A.
Si.JPE LJINDSCak!°� I.ECiENi%
Lea L°1
0
usxv.v
. ..a....o ...mod �...�
wn i ._ w.ea ax.va. as f,n,�o..a wu
.araL ran ewaan,ar �. , uea w ea.r.l a.� ac�ea �
rvi.t ratty e�m . �e®.rto era. tr. a» �cacs I
.eaww "`roe I
+m+� wN +ao si» u r vans .caa
uo+a,uro w«ew
rvewe meer,urn .wan an w..,ma +cua
d � 41 pryyp.�4T
/J 40CAT.Or+
x
.i x
jw
LLJ
W 4
z�
o �
U W
a
3
F
5 �
r � 6
e
i
pl! i
01
f
W'� i'1
�l
FBF
CONSULTING
MEMORANDUM
To: Ken Vecchiarelli, Yorba Linda Water District
From: Michael Moore, R8F Consulting
Date: September 5, 2008
Subject: Casino Ridge Community -- Looped System Hydraulic Analysis
Introduction
Yorba Linda Water District (YLWD) has received a notice from King's Family Trust of their
intention to develop eleven (11) new residential lots in the existing Casino Ridge community.
The new development area would be at the end of Casing Ridge Road and include lots with pad
elevations up to 1,200 feet above mean sea level (amyl). Currently the Casino Ridge
community is served domestic water by a 12 -inch pipeline that extends to the end of Casino
Ridge Road (see Figure 1). Yorba Linda Water District has contracted RBF Consenting to
perform hydraulic analysis to determine whether adequate water service pressure and fire
protection will be provided to the proposed development. Analysis completed in July 2008
found insufficient pressure for nominal and emergency fire flow conditions and recommended
either looped piping or installation of a fire pump system.
Objective
This study is prepared to summarize hydraulic analysis determining the benefit to normal
operating and fire flow pressures to the new Casino Ridge development area with a looped 12-
inch system, The study is based recommended pressure criteria (tank level and static elevation
difference) for hydraulic analyses.
Background
Yorba Linda Water District's Zone 68 system provides water service to the Casino Ridge
community. Zone 68 is supplied water by the Timber Ridge Booster Pump Station and the
Chino Hills Reservoir (HWL = 1,300 ft amsl). In the 2005 Domestic Water System Master Plan
several areas of inadequate pressure were identified for YLWD. The areas were studied in
further depth in the Zone Reconfiguration Study for Areas 1, 2 and 3 prepared by RBF
Consulting (March 12, 2008). Both analyses were based on minimum pressures of 40 psi
(normal operating conditions) and 20 psi (fire flow conditions) per pages 2 -10 and 2 -11 of the
2005 Domestic Water System Master Plan. However, for this study it is understood that the
District seeks a recommendation for more detailed criteria to ensure low pressure conditions are
prevented in this new development area.
H•lPdata11D1060431Adminlreporls %Casino Ridge Exp Hyd AnalysisrevOcto&doc
Existing Pressure Criteria
Yorba Linda Water District's applicable pressure criteria are provided on pages 2 -10 and 2 -11 of
the 2005 Domestic Water System Master Plan.
2. The water system shall be capable of providing the minimum fire Now as
determined in this master plan with a minimum residual pressure of 20 psi.
3. The water system shall be capable of providing at least 40 psi to the service
connections for the following demand periods. average day, maximum day, and
peak hour.
Fire Flow Critera
Fire flow requirements for YLWD are shown in Table 1.5 of the 2005 Domestic Water System
Master Plan. A 1,500 gpm fire flow was simulated for the planned single family residential area.
Evaluation
The HzONet model developed for the 2005 Domestic Water System Master Plan and as
modified by RBF Consulting for the Zone Reconfiguration Study for Areas 1, 2 and 3 was used
for hydraulic analysis evaluation. The new development area would require approximately 400
feet of new pipeline, and add service connections up to elevation 1,200 ft amsl. The hydraulic
analysis simulated the addition of 11 dwelling units being served by extending the existing 12-
inch pipeline into the proposed development area.
Demand
The demand added to new node (ID 6872) representing the proposed development is as
summarized in Table 1.
Table 1- Demand by Scenario
Scenario
Node
Demand
(gpm)
Average Day Demand
6872
4.8
Maximum Day Demand
6872
7.1
Maximum Day Demand + Fire Flow
6872
1,500.0
Peak Hour Demand
6872
12.1
Service Pressure Standard
It is recommended that Yorba Linda Water District consider the adoption of the following
standard to ensure adequate service pressure and fire protection for new developments.
Tank Level: Half (1/2) full
IStatic Elevation Difference (Tank Level — Lot Elevation): Minimum of 125 feet
H: IPdatak10106043 %AdminlrepoolMr —asino Ridge Exp Hyd AnalysisrevOctftdoc
Previous Analysis
Analysis was completed in July 2008 for the Casino Ridge development water service that:
Determined insufficient pressure (normal conditions < 40 psi and fire flow < 20 psi) when
served from the existing system.
• Recommended two options for increasing pressure:
1) A fire pump and back -up generator is installed for protecting all 11 lots, and installing
household pumps to increase normal service condition pressure.
2) Looping the 12 -inch pipeline system serving the development, and installing
household pumps to increase normal service condition pressure.
Current Analysis
In August 2008. Yorba Linda Water District requested RBF analyze the benefit of looping the
12 -inch pipeline to the proposed development area with connection the system in San Antonio
Road (see Figure 1). This 'revised' configuration would add a pipeline crossing undeveloped
land, and require establishment of a new pipeline easement to YLWD. The benefit of the
looped pipe configuration was analyzed using the hydraulic model. The results show sufficient
pressure for emergency / fire flow conditions, and slightly low pressure under normal operating
conditions. A summary of the results is provided in Table 2.
Table 2 — Revised Results
Scenario
Tank-
Leven
HGL
11
Highest
Pod' ft
Pressure
i _
Gmter. Than-
Check Value?
Result.
Avera a Day Demand
1/2 Full
1,286.8
1,200.0
37.6
40 psi
No
Maximum Day Demand
1/2 Full
1,286.7
1,200.0
37.5
40 psi
No
Peak Hour Demand
1/2 Full
1,283.4
1,200.0
38.1
40 psi
No
MOD + FF 1,500 m
1/2 Full 1
1,247.1 1
1,200.0 1
20.4
1 20 psi
Yes
Conclusion
The results show that sufficient fire flow is provided to pads up to 1,200 feet. However, normal
condition operation pressure is not 40 psi (calculated at pad - level). This issue could either be
resolved by installing household pumps for each proposed lot, or by lowering the highest pad of
the development.
If you have any questions regarding this memorandum, please contact me at (949) 855 -5763 or
Corey Hess at (949) 855 -3655.
cc: Corey Hess, RBF Consulting
File
IH: 1Pdatal1U106043 Wdminlreporls\Cas +no Ridge Exp Hyd MalysisrevOctXdoc
>r i-
s,, F i.�. '� ! � -k•1�. �! �L� _ .i..�� r yr.
Joe
ft
�\ � � • x+01 Oar^
AXL
worjJ ,�) ;� r I'�.,•� � ��`� � ` ' ` -�x � .ter �., � '�� , k" ....� �" I. V ,f / `
1.6� rte
�r
ih;.n CIS }il - 'li';. •L , ...�.., _ Pit 7 T r1..✓ __ �Y - �� C
dr
= = � JIM .
far
ff
a- �CRITICAL MOUE
»a ,sx: IV
• a
n
` roof
ffrf i �
`\ Q MIN
`O p
•
O /
O �
O O O
• A
s °
a • s • e
o r
• • arf �
� • f
a fs
O
O
® • O
ws ■ w■ ■� ■ oa.n.w�.ew VORBA LINDA WATER DIS RICT
■ ° ■ • ••••• w*»uNt�oawawr EXISTING SYSTEM — ZONE 68
mow.► .aa�.m+ MODEL. SCHCUATIC
GQN ®ULTIN[I Gaaali]�i.s1u0a1.1apta•�wi�ati'
Existing System Under Average Day Demands REVISED
Junction Report
ID
Demand m
Elevation Oft)
Head ft
Pressure si
3214
7.59
905
1,286.99
165.52
3215
7.59
935
1,287.01
152.53
3216
7.59
886
1,286.99
173.75
3217
30.06
875
1,286.98
178.51
3218
7.59
903
1,286.98
166.38
3219
7.59
927
1,286.99
155.99
3220
7.59
948
1,287.07
146.92
3221
7.59
959
1,287.13
142.18
3222
7.59
944
1,286.97
148.61
3223
0
981
1,287.23
132.69
3224
7.59
997
1,287.23
125.76
32.
1,019.00
1,287.23
116.22
3226
7.59
960
1,287.24
141.79
3227
0
1,019.00
1,287.30
116.25
3228
0
1,060.00
1,287.40
98.53
3229
0
1,189.00
1,287.64
42.74
3230
0
1,269.00
1,287.79
8.14
3231
11.56
911
1,286.86
162.86
3232
7.59
917
1,286.88
160.27
3233
7.59
942
1,286.90
149.44
3234
7.59
918
1,288.86
159.83
3235
7.59
921
1,286.85
158.52
3236
7.59
932
1.286.85
153.76
3237
7.59
923
1,286.85
157,66
3241
0
882
1,286.86
175.43
3250
0
811
1,286.98
206.24
4406
0
811
1,286.98
206.24
4418
0
882
1,286.86
175.43
4420
0
811
1,286.98
206.24
6267
7.27
860
1,286.84
184.95
6268
0
763
1,286.85
226.98
6269
3.64
870
1,286.84
180.62
6270
3.64
912
1,286.84
162.42
6271
9.31
936
1,286.83
152.02
6272
7.27
910
1,286.83
163.28
6273
3.64
882
1,286.83
175.41
6274
3.64
918
1,286.83
159.82
6275
3.64
996
1,286.84
126.02
6277
3.64
991
1,286.84
128.19
6278
0
1.130,00
1,286.84
67.96
6279
0
882
1,286.86
175.43
6280
3.64
1,055.00
1,286.84
100.46
6281
33.93
923
1,286.83
157.65
J91055
0
811.00
1,286.98
206.24
6872
4.75
1,200.00
1,286.84
37,63
h:pdata/10106043 /calcs /Results - Kings FT.xls
x(st( tem Under Avers a Day Demands INEMSED
Pipe R® oft
ID
From Node
To Node
Le th R
D(ameter to
Roughness
Flow
Y
Headtotps tt
18740
321$
32f 7
330.62
8
130
7.59
0.05
0
18745
3217
3216
342,33
12
130
-77.47
022
0.01
18750
3216
3214
277.04
12
130
85.06
0.24
0.01
t8T55
3214
3215
471.75
12
130
-100.23
028
0.02
18760L
3214
3219
420.41
8
130
7.59
0.05
0
18765
3215
3220
301.2
12
130
260.45
014
0.06
18770
3220
3221
26157
12
130
- 268.04
0.78
0.06
18775
3215
3222
224.31
10
130
152.64
0.62
0.04
f 8780
3221
3228
439.33
12
130
-275.62
0.78
0.1
18785
3226
3223
220.62
8
130
15.17
0.1
0
18790
3223
32224
156.78
8
130
15.17
0.1
0
18795
3224
3225
373.77
8
130
7.59
0.05
0
18800
3226
3227
243.84
12
130
- 298.38
0.85
0.07
18810
3227
3228
358.9t
12
130
- 298.38
0.85
0. t
18815
3228
3229
885
12
130
- 298.38
0.85
0.24
18820
3229
3230
570
12
130
- 296 -38
0.85
0.15
R50131
3230
85013
145
12
130
- 298.38
0.85
0.04
18830
3222
3233
427.83
10
130
145.08
0.59
0.07
18835
3233
3232
301.82
12
130
137.47
0.39
0.02
18840
3232
3231
206.93
12
130
129.89
0.37
0.01
18845
3231
3234
246.61
12
130
69.37
0.2
0
18850
3234
3235
379
12
130
81.78
0.l8
0.01
18855
3235
3238
236.23
12
130
46.61
0.13
0
18860
3235
3237
219.54
6
130
7.59
OAS
0
18880
6279
3231
84.05
12
130
-48.95
0.14
0
18945
J91055
3217
632.64
12
130
-39.82
0. t 1
0
26220
4420
44Q6
80.2
36
130
177.01
0.08
0
26295
3241
4418
83.4
38
130
0
Of
0
28305
J91066
4420
90.47
36
130
177.02
0.06
0
28272
6266
6267
786
12
130
48.95
0.14
0.01
282771
6287
6269
130
8
130
7.27
0.05
0
28282
6289
6270
490
8
130
3.64
0.02
0
28292
6281
8271
811,04
12
130
0.48
0
0
28297
6271
6272
220
8
130
14.54
0.09
Q
28302
6272
6273
260
8
130
3.64
0.02
0
28307
6272
6274
660
8
130
3.64
0,02
0
28312
6271
6275
685
12
130
-23.37
0.07
0
28317
6275
8277
685
8
130
3.64
0.02
0
28322
6280
8278
710.53
12
130
-34.28
0.1
0
28327
3241
6279
83.34
12
130
0
0
0
28332
6279
62628
1,873.00
12
130
48.95
0.14
0.02
28337
6275
6280
639.66
12
130
-30.65
0.09
0
28342L
6267
6281
607.72
12
130
34.41
0.1
0
20011D
8361 t t
3250
190.12
99
150
t37.2
0,01
0
200141)
1 @36112
3250
110.1
99
150
0
0
0
200160
636113
3250
107.54
99
150
0
0
0
200170
8F'8114
3250
190.6
99
150
0
0
0
250 t 711
3241
V4312
75.72
99
ISO
0
0
0
2501SU
4420
V4322
1
99
150
0
0
0
50006U
4106
V4321
68.13
99
150
177.01
0.01
0
50023U
4418
V4311
716.75
99
150
0
0
0
PS6111
3250
J910SS
152.85
361
1301
137.2
0.04
0
31512
6278
6872
400
12l
134
-3428
0.1
0
31514
3236
6872
1,175.81
12
130
39.03
0,11
0.01
h:pdaw 101060431cakm/Results - Kings FT x(s
Existing System Under 'Maximum Day demands REVISED
Junction Report
10
Demand
Elevation ft
Head
Pressure (psi)
3214
11.22
905
1,286.99
165.52
3215
11.22
935
1,286.97
152.51
3216
11.22
886
1,287.01
173.76
3217
44.48
875
1,287.03
178.53
3218
11.22
903
1,287.03
166,4
3219
11.22
927
1,286.99
155.98
3220
11.22
948
1,286.99
146.89
3221
11.22
959
1,287.01
142.13
3222
11.22
944
1,286.88
148.57
3223
0
981
1,287.05
132.61
3224
11.22
997
1,287.05
125.68
3225
1122
1,019.00
1,287.05
116.14
3226
11.22
960
1,287.05
141.71
3227
0
1,019.00
1,287.08
116.16
3228
0
1,060.00
1,287,13
98.42
3229
0
1,189.00
1,287-24
42.57
3230
0
1,269.00
1,287.31
7.93
3231
17.11
911
1,286.65
162.77
3232
11.22
917
1,286.68
160.18
3233
11.22
942
1,286.72
149.37
3234
11.22
918
1,286.64
159.73
3235
11.22
921
1,286.63
158.43
3236
1122
932
1,286.62
153.66
3237
11.22
923
1,286.63
157.56
3241
0
882
1,286.65
175.33
3250
0
811
1,287.10
206.3
4406
0
811
1,287.10
206.3
4418
0
882
1,286.65
175,33
4420
0
811
1,287.10
206.3
6267
10.77
860
1.286.59
184.84
6268
0
763
1,286.61
226.88
6269
5.38
870
1,288.59
180.51
5270
5.38
912
1,286.59
162.31
6271
13.79
936
1,286.59
151.91
6272
10.77
910
1,286.5
163.17
6273
5.38
882
1,286.58
175.31
6274
5.38
918
1,286.58
159.71
6275
5.38
996
1,288.59
125.91
6277
5.38
991
1,286.59
128.08
6278
0
1,130.00
1,286.60
67.85
6279
0
882
1,286.65
175.33
6280
5.38
1,055.00
1,286.59
100.35
6281
50.21
923
1,286.59
157.54
J91065
0
811.00
1,287.10
206.3
6872
71
1,200.00
1,286.60
37.53
h:pdata110106043 /caics/Resuits - Kings FT.As
tem Under Maadmum Day Demands J REVISED
_Misting
Pipe Report
to
From Node
To Node
Len ft
Diameter in
Roughness
Flow m
Velocity f fs
Headtoss tt
18740
3218
3217
330.62
8
i30
-11,22
0.07
0
18745
3217
3216
342.33
12
130
136.69
0.39
0.02
18750
3216
3214
277.04
12
130
125.47
0.36
0.02
18755
3214
3215
471,75
12
130
103.03
0.29
0.02
187601
3214
3219
420.4 t
8
130
11.22
0.07
p
18785
3215
3220
301.2
12
f30
- 141.21
0.4
0.02
18770
3220
3221
283.57
12
130
- 152.43
0.43
0.02
18775
32 i 5
3222
224.31
10
130
233.02
0.95
0.09
18780
3221
3226
439.33
12
130
- 183.85
0.48
044
18785
3226
3223
220.62
8
130
22.44
0.14
0
18790
3223
3224
156.76
8
130
22.44
D.14
0
18795
3224
3225
373.77
81
130
11.22
0,07
0
18800
3226
3227
243.84
12
130
- 197.31
O.S6
0.03
18810
3227
3228
358.91
12
130
- 197.31
0.56
0.04
18815
3228
3229
885
12
130
- 197.31
0.56
0111
f882O
3229
3230
570
12
130
- 197.31
0.56
0.07
85013
3230
R5013
145
12
130
- 197.31
0.56
0.02
18830
3222
3233
427.83
10
i30
221.8
0.91
0.18
18833
3233
3232
301.82
12
130
210,57
0.8
0.04
18840
3232
3231
206.93
12
130
199.35
0,57
0.03
18845
3231
3234
246.61
12
130
107,66
0,31
0.01
18850
3234
3235
379
12
130
98.44
0,27
0.01
18855
3235
3236
236.23
12
130
74
0.21
0
18880
3235
3237
219,54
8
130
11.22
0.07
0
18880
6279
3231
84.05
12
130
-74.58
0,21
0
18945
J91055
3217
632.64
12
130
192.4
0.55
0.08
26220
4420
4406
80.2
36
130
261.98
0.08
0
26295
3241
4418
83.4
38
130
0
0
0
28305
J91055
4420
90.47
36
130
261.98
0.08
0
28272
6268
6267
786
12
130
74.57
0.21
0.02
28277
8287
6289
f 3O
8
130
10.77
0.07
0
28282
6289
6270
490
8
130
5.38
0.03
0
28292
6281
8271
811.04
12
130
2.83
0.01
0
28297
6271
6272
220
8
130
21.53
0.14
0
28302
6272
6273
260
B
130
5.38
0.03
0
28307
6272
6274
660
8
130
5.38
0.03
0
28312
8271
5275
685
12
130
-32.49
0.09
0
28317
6275
6277
685
8
130
5.38
0.03
0
28322
6280
6278
710.53
12
130
-48,64
0.14
0.01
16327
3241
6279
83.34
12
130
0
at
0
26332
6279
6268
1873.00
12
130
74.57
0,21
O.D4
237
83
6275
8280
639.66
12
130
43.25
0.12
0
28342
6267
6281
607.72
12
130
53.04
0,15
0.01
200110
BP6111
3250
190, t2
99
150
133.52
0.01
0
200140
SP6f 12
3250
110.1
99
1501
320.87
0.011
0
200160
SP6`1131
3250
107-541-
99
150
0
O
0
200170
SPS114
3250
190.6
99
15O
D
O
0
25017U
3241
V4312
75,72
99
150
0
0
0
2501BU
4420
V4322
1
99
150
0
0
0
50006U
4406
V432fl
68.13
99
150
261.98
0.01
0
50023U
4418
V4311
76.75
99
150
0
0
0
PS6111
3250
J91055
152.85
38
130
454.38
0,14
0
315121
6278
6872
4001
UP
130
-48.84
0.14
0
315141
3236
6872
1, 175.811
121
130
62.78
0.18
0.02
h•pdata/1 0 1 0604 31calcs/Results - Kings FT As
-Existing System tinder Max Da + Fire Flow Demand REVISED
Junction Re ort
ID
Demand m
Elevation ft
Head ft
Pressure (psi)
3214
11.22
905
1,267.27
156.97
3215
11.22
935
1,267.23
143.96
3216
11.22
886
1,267.30
16522
3217
44.48
875
1,267,34
170
3218
11.22
903
1,267.34
157.87
3219
11.22
927
1,267,27
147.44
3220
11.22
948
1,269.03
139.1
3221
11.22
959
1,270.62
135.03
3222
1 1.22
944
1,263.40
138.4
3223
0
981
1,273.31
126.66
3224
11.22
997
1,273-31
t 19.72
3225
11.22
1,019.00
1,273.30
110.19
3226
11.22
960
1,273.31
135.76
3227
0
1,019.00
1,274.86
110.87
3228
0
1,060.00
1,277.15
94.09
3229
0
1,189.00
1,282.78
40.63
3230
0
1,269.00
1,286.41
7.54
3231
17.11
911
1,252.71
148.06
3232
11.22
917
1,254.12
146.07
3233
11.22
942
1,256.19
136.14
3234
11.22
918
1,252.00
144.72
3235
11.22
921
1,250.92
142.95
3236
11.22
932
1,25027
137.91
3237
11.22
923
1,250.92
142.09
3241
0
882
1,252.63
160.59
3250
0
811
1,267,46
197 -78
4406
0
811
1,267.46
197.78
4418
0
862
1,252.63
160.59
4420
0
811
1,267.46
197.78
6267
10.77
860
1,249.96
168.97
6268
0
763
1,250.75
211.34
6269
5.38
870
1,249.96
164.64
6270
5.38
912
1,249.96
146.44
6271
13.79
936
1,248.75
135.51
6272
10.77
910
1,248.75
146.78
6273
5.38
882
1,248.75
156.91
6274
5.38
918
1,248.75
143.31
6275
5.38
996
1,248.27
109.3 t
6277
5.38
991
1,248.27
111.47
6278
0
1,130.00
1247.37
50.86
6279
0
882
1,252.63
160.59
6280
5.38
1,055.00
1,247.84
83.56
6281
50.21
923
1,249,39
14145
J91055
0.00
811.00
1,267.46
197.78
6872
1,50710
1,200.00
1,247111
20.41
h-pdata110106043 /calcs /Results - Kings FT.As
h,pdafa/10106043 /caics/Resulls - Kings FT,xls
Existing ft stem Under Peak Hour Demand REVISED
Junction Report
ID
Demand m
Elevation ft
Head ft
Pressure si
3214
19.34
905
1,284.30
164.35
3215
19.34
935
1,284.33
151.37
3216
19.34
886
1,284.29
172.58
3217
76.66
875
1,284.28
177.34
3218
19.34
903
1,284.27
165.2
3219
19.34
927
1,284.29
154.82
3220
19.34
948
1,284.60
145.85
3221
19.34
959
1,284.84
141.19
3222
19.34
944
1,284-09
147.36
3223
0
981
1,285.26
131.84
3224
1934
997
1,285.25
124,9
3225
19.34
1,019.00
1,285-25
115.36
3226
19.34
960
1,285.27
140.94
3227
0
1,019,00
1,285.55
115.5
3228
0
1,060.00
1,285.97
97.91
3229
0
1,189.00
1,287.00
42.46
3230
0
1,269.00
1,287,66
8.09
3231
29.48
911
1,283.50
161.4
3232
19.34
917
1,283.57
158.83
3233
19.34
942
1,283.68
146.05
3234
19,34
918
1,283.47
158.36
3235
19.34
921
1,283.44
157.05
3236
19.34
932
1,283.43
152.27
3237
19.34
923
1,283.44
156.18
3241
0
882
1,283.49
173.97
3250
0
811
1,284.28
205.07
4406
0
811
1,284.27
205.07
4418
0
882
1,283.49
173.97
4420
0
811
1,284.27
205.07
6267
18.54
860
1,283.35
183.44
6268
0
763
1,283.39
225.49
6269
9.27
870
1,283.35
179.1
6270
9.27
912
1,283.35
160.91
6271
23.75
936
1,283.33
150.5
6272
18.54
910
1,283.32
161.76
6273
9.27
882
1,283.32
173.89
6274
9.27
918
1,283.32
158.29
6275
9.27
996
1,263.34
124.51
6277
9.27
991
1,283.34
126.67
6278
0
1,130.00
1,28338
66.46
6279
0
882
1,283.49
173.97
6280
9.27
1,055.00
1,283.36
98.95
6281
86.51
923
1,283.33
156.13
J91055
of
811.00
1,284.28
205.07
6872
12.121
1,200.00
1,283.39
36.13
h:pdata/10106043 /caics /Results - Kings FT.xfs
-Isting symem Un Peak Hcur Demand IR EVISED
ID
From Node
To Nod®
Len
Olsmster M
Rou l meas
Flow
V
ills
keadtoss R
18740
3218
3217
330.62
6 t 30
-19,34
0,12
D
18745
3217,
3216
342.33
12
130
-93.28
0.28
0.01
18750
3218
3214
277.04
12
130
- 112.62
0.32
0.01
18755
3214
3215
471.75
12
130
-151.3
0.43
0.04
18760
3214
3219
420.41
8 130
19.34
0.12
0.01
18765
3215
3220
301.2
12
130
- 559.88
1,59
! 8770
3220
3221
263.57
12
130
- 579.22
1.84
,26
0.24
18775
3215
3222
224.31
10
f 30
389.23
1.59
0.24
18780
3221
3228
439.33
12
130
- 598.58
1.7
0.43
18785
3228
3223
220.62
8 130
38.68
0.25
0.01
18790
3223
3224
158.76
8
130
38.68
0.25
0,01
18795
3224
3225
373.77
8
130
f9.34
0.12
0
18800
3228
3227
243.84
12
130
- 636.58
1.88
0.28
18810
3227
3228
358.91
12
130
- 658.58
1.88
0.42
18815
3228
3229
885
12
130
- 656.58
1.86
1.03
18820
3229
3230
570
12
130
- 658,58
1,86
0.88
R5013
3230
R5013
145
1
12
130
-656,58
1.86
0
188 30
3222
3233
427.83
10
130
369.89
1.51
0.42
18835
3233
3232
301.82
12
130
350.55
0.99
0.11
18840
3232
3231
206.93
t2
130
331,21
0.94
0.07
188451-
3231
334
246.61
12
130
176.9
0.5
0.03
18850
3234
3235
379
f2
130
157.56
0.45
0.03
18855
3235
3236
238.23
12
f30
118.88
0.34
0.01
18860
3235
3237
219.54
8
130
19.34
0.f2
18880
6279
3231
84.05
12
130
- 124.83
0,35
Of
18945
J91055
3217
632.64
12
730
2.72
0.011
0
28220
4420
4408
80.2
36
130
451.41
0.141,
0
26295
3241
4418
83.4
36
130
0
0
0
26305
J91055
4420
90.47
36
130
451.41
0.14
0
26172
6268
8287
786
12
130
124.83
0.35
0.04
28277
626T
6269
130
8
130
18.54
0.12
0
28282
6269
6270
490
8
130
9.27
0.06
0
28292
6281
6271
8 t 1.04
12
130
1.23
0
0
28297
627!
8272
220
81
130
37,09
0.24
0.01
26302
6272
8273
280
6
130
9.27
0.06
0
28307
6272
6274
660
8
130
9.27
0,08
0
28312
8271
6275
685
12
130
-59.8
0.1 T
0.01
28317
6275
6277
685
8
130
9.27
0.06
0
28322
6280
8278
710.53
12
13Q
-87.41
0.25
0.02
28327
3241
6279
83.34
12
130
0
0
p
28332
6279
8268
1,873.00
! 2
130
124.63
0,35
0. t
28337
6275
8280
639.66
12
130
-78.14
0.22
0:01
28342
6267
6281
607.72
121
1301
87.74
0.25
0.02
200110
BP6111
3250
190.12
991
isol
133.41
0.01
0
200144
gP6 t f 2
325Q
110.1
99
1501
320.72
0.01
0
200160
SM113
3250
TO 554
99
150
0
0
20017D
SPS114
3250
190.6
99
150
0
0
0
2501TU
3241
V4312
75.72
99
150
0
0
p
0
2501SU
4420
V4322
!
99
15Q
0
0
50006U
44061
V4321
68.13
99
150
d5t.41
0.02
0
0
500230
4418
V431f
fo.f 31
0
0
PS6111
32501
J91055
152.861-
38
130
454.14
0.1-4
0
0
31512
3151d
62781
Z94R
6872
co -r-I
4001
..ter e.
121
_
1301
7.4t
0.25
0.01
I:1u 99.53
h:pdata/f 0106043 /calcWRssuits - Kings FT.xls
OMMKRAL NoYEa
f a — . AT10 x �av a TK AL .4AOTa IT AI aa'a R
Pt CO" .rt TrM.TA a t C A PON I& W RAT, ®-Ta l•Yl K ATTIO W x
.Tw.4 Yt V a1 a CN W m
6 pM[f aA8 096 YO .411L OMOL a94 1.! A4 10TA70. ar.L a p1a9eI6
F M TTfi 9Trm
• lPT6
TO .M mpnycto TTIC TO K alfaf Ta a•a OF 9aa
\a ins ALTTw TTMO iRa W l• .Tf TMTOL7a ra ow""W4T v
11 r ewtir
=,=M QAO DaMt1 tm :: "10
, T" Ar R peM•r pT4oa .16 2,13T
aL — " R
M K �a r X01.[ T'M
Tl •08094'•9 m ttw a T4aM wr_ gum
TS l® a.L` 1AATT6 r9M w TJTHf aT m1 — I. A4TTTeA+M 9a tm v
\AI T>oA K.44R
to IT, II rIr MI IrI•L0 R IWflaw 6TNOMM 4rOT aalDarT IR .ATI TT'Ir.R
R M 91Y or TO4A IA6A
R lOeCti9R 4clw a >AT.nn aTTU a mmm R x C.{ ass IT..0 A4
tl/•a018 R 1a OTR 0�
R Dr MAT 1— �T W IM-10 U" LaWAI APPLO AT x wr R 0 T m
a R AI uraff m —TT ITS W A.a.l pwT wmr
11 ALL u1saw DA.1ar .a. M a•aL TIaT9T a IK.a . L.r- 'L.MIT
a 1 mM rw "=° am KAav 99LL L 1Ma9� R
a coo -C�bir t m ft." K 1@qm R x C'm SM O� AT 9a .gL1 9
Ta .ara AT. ryiaeon orT TMTMpafM .Tama K m.d1C1{p TTTTtr i x TTaMTT. TI
2"a4 Puma To M WTi1CT9T O x ll1 a4Ta$
m M•SlmOAC9rlKft Aa Ki W WL 9iWtL aOaCTK 09 mm IO 10
w M V b B(Clm LK rmw 9..9 uTpla LOCAUM V — 1� T MT
a .Ears awl K WFTa f0 AIT0..ia ATaA TTJa F III im Wa IN RATK fe4
mlaaDaUa4 11TYaADT TTaI aam K x TaaW aIAaT.
u nmf �vaTT�'TYa'Y 9q 19(T�IAR ipTW �� 9.0p
I' I/ 1� T{pATO�
RATL K
TTtO ®R K •etaval .Tat.o tl A ®� F ,T9 IC�
IA, TrMIt ltrba r. Graff alma 91aL K 1TI® Ai9 MAfAan6 b x •.R P
oT. eo wd .are m ai aw.cml�i arMiK�
m T4TQ 4 T>aOW40 mmR AIO l.' 106 v 11/I Wj�A9 Ylyn {*0 K
a1R0a0 9.r r aO.AB Aa QaeBi F A KY9T a M AfitR[ �S
AAfT.Mil 4 lIB IIYR R x prr fI TEA TAIeA pt0 TTOr T� A KIK'BTgTp1
Tt m x AOp9ACf a TaIT5algTa v x Iat l9T a 9aIRM o IKT.awaMK v
AR tATataDOi aOm ATl v �iTTa TIIDOT x 180 v a. TTTear, x
0919TH ®9 ��1 W TiQ ALL Pa .6AY4WI la•9 W IiK'I na VW11
LT8 ae1 d K TYf IiTA a Tlla ./i9
a TaMTC irT�Tgn¢ Tr4T ro fLr49ocH9u ®Aa w1R 00reTLeq. 9T.L
A.aT9. x als.acmM a am altlMa TA9 m um.L Iva•.. TTew x
4010 f8 AOWiaa fd WiM � Opa♦1TI�OpT •OTdO �® p Aa
a x 1..L o aaMAm 4fa K A9M.T 409..T.L Apr K Au.p TIT. ALL OT-..
ITDaORafa Mr[ @�I _at/µ TOT.e AIL OTTdO AIO W a .L IIM�Ifa[
aP Da.LY6 aL yp �eRAO TAd DDaI.IK w41m7T LR
T
�oQ
�QCac�� rDcm3c1 Em
WATER r0olm8
Oa aT4 aWm1 s a K n x .\o4Tm ALL wm eTerd TTes OATL
fAW� y LAa � >I Tlr M ar4trcts 4 w7oT
L >•! aal>aI aT..� 01M i`Wl a T�0 m TARTT. M Emma wR TT-
eTTeT OT MMr Af (f1Q IMIX Do
a714MY1 KM YAIOrb Pa�af'lo O Ol
• •D Q ill LTlrniO�lKM fSlY We KRAL
K1r4Ra 4® AT A K.l. W-fEOf abtTOe AT b ow TO x Glum
L — am e40 f9Aa R a MDOT • tOTilMAr OWL K Alaimo aboum" T1AT x
�>a ala Tta TTY Al K /TOR IOaAabi .1D OaaT R BR •9aCT
` 1 r .rat � MIT KK%W VAIIUo 48 NbaLO Or. C l ML NOW jM MMMM i16°LftIR°"0".
7 a DIAL •9814 x roD d i a rOq Aa Taa1n OWL K• TT•M•r M i
Ma 8v x TY9TID T.4t 9M/TR Na i T4al am..aam WRIT TaIAOT
OT AIL laaaf AM rd� 9MMM
` 4 m .4 Wr Nor Q 9V00HE 8flw R.A.• a TO8 184 m �1CCa M9
IL K a otuw l MDR a/al K e.TAYip . sP4a A•TmT W Au nc rmaAaT
a.T. == m T. — aAi FIO IM Taylaa
10. � AL � TISIWAIM ll LL wY 9 A 1. IF 0 FE" UtObCT.
R FMM W W Trml P9�a 00 CMI a v an C wi aK eoilB lda
ti OD .RR a a Oa9FLTr0 OTILL K A" ro memo 6.f.e1 a16 6=-Pm W
m9ACao � rTaor r.®ri TLa1 •a ateaa wr s TTa AO• am oseelaoa
.a9. OMfTK 9nopTls�wTi K nonri Tfax r 1r Awma aw ®. x me r
Y �1�lKMTLKIV�:IM A �A a � msR� j8. rrli v SK
ti as i 10 °IT" T mms 90 IMTTT 11,L w+MU°Oma ae.w r otm&T. r°m w
n.a® •Tram
a mw ar.L K TTWoo TOM A T Ttucuaa WGAI.M or Au Tlr✓0DL atrl >aWa
.a oww— VI®8 d Mft ML Ea caw= n TIa AT>OCr aAr4 Ambe'ITT f
ATYA. W= f008 4 K M v naTi
Tl 1.1R.caT W TTTer u�41oTo Rata ALTIrt n '— "Lp CML T.y4
Il�r ImA.M t! (YJ Plle MrT TT0 TO 9lAWMIL
TI All tats OTAM a MMULLM 1T0 6 4 1PAWAna MOOT 91Q1a
to Au w® 8TTt1a Ip LATTrr�Ai C9eagY MO q.RLL naao .WL Nkc
4aM® TO4aK •a.mT[ eAawa mTaT[ TP sT1T1r+m •.Tale a-a
Ta Y 18 iaata Al.TKa AM wP010. p \� WML K mm YMI .rTM4� R
A �L9 1610 l 4 U. , . W4 Orlr
m Ma. a to M =ATOR 9aa OWL a Tog® .rT • Y AM x W ..ft TD no
r T1L AI>at1nT. 9aKTa .Rt14 R M CROK O..Tr NM AWROW" M MEALL A f9[
eAalwO ere®I q9 awAU atl A 2TTT9i 9aa r.K •A.ya elaar, Tq
01 .. p MOST • Fa
T wrioT 4�1I TtiK TC —TV v o99
R —Tib {Aa
a � • .OTO[ A —Tram RO'1Q
Sfax 9LtA V —�Lpef
�— TTaI a 9R� f —yy ¢ w�aei
�ID1aV1 R —.BT al[t1
er8� M —d tQS CRr
Mme. >. —ww^M
19iAagTC rA4 Na--N1pT QiY.
IMM
A4 tliaAm fleTOf aa0
pp D mums TIpT
Tml. 1•nT[ _Tii vomoa
OTT; —Ma9G• S OEM
IaR� IKaWv 4� i I 1.. IYlaf lWr1
Mal aawTTK ate► TTR � TI�Sl1 r.ATw� /1 �
QITTACI` AIR K9 Rr
ltnAq na-rrI
• Tad
M Tel
%rec LTY MAP
4 RJai
�110T�4� TO CON77�Aw.G.rTKO� �R
rlTb r r �.� rw.g r •r Aa1I�r TTT�rDy
a� AI. Wa !r✓•A a1i A.A r M .L AAMr. !on•r
M Ati .T r e.�l Ar . rT.MI r � ra r T.4•re
M TTA m dr TTT}TL eTT11.a Y T•a4 Papa tiT r Ar e•}Tr
r .owe. e. t.r1.1 r w rr.rrr al� Ts.. T4TTbe
ei r r Trr,r y • �a Tour TT+.a II.T
T.bA r oA.r M r aMA b w
•°�.I Ts���w off. ,�..re �•M.L�a�rA w
ATM1T HOTi�
1T>=119i ALT ,:O at awpDlcr OAOa ALO/TQ A OWU4Tf
89LL at FM V" M.Lof i.m Ke0lmp0pr1T mLDCgQMw LN
T� 49" m\Yl TTart•+ 1- 10PAi>D -a \'A T90 a909A OAVa
Imm TIT, Ma
:OSSA, XAWUAL �.
New as l r
rni ��a�11Y0aK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - -- - - - - - - - -
FAIRMON
.m
swe
gem LW . SW
E6TMTE OF MANTUM
J
t' i
G9�P1{� 8GJ18
tsts�
ser AM
A T aes+rra
DESCRO"Ot
Ttt
a
new. 'r or W-M aoa N Mbm PM TL■C
•
t
•m•L 00 M@ to ® ®mm .r _20
J_
■ w n -,/r 'a m em
■tr u W to as I&M m
e
i■wi /r ILL a una am
•
amtu tA� :aJts R
a
ts,•M eapr ■m
J
YIe,JIJ /i Mss ■ mu— JY ,L■R R rM ■ ay
u m m
a
e
tsvu m 10 YLf■ w.
i
M
pn1 R R t ,l■G M
#MU r Ulf■ M _M Jm
i
Ia
1■�■J CVltl mm mm No M r Y m M •
u
aem.. r ory —orm m■: a . w ,a■a. dm +-� rr
•WKL 3r Me Mmum Imam —M am aU
1
b
FtfJLL _'m ■, AR WAY M ME
>•
r
POOu r or ra wm ■m
u
J
t' i
G9�P1{� 8GJ18
tsts�
ser AM
A T aes+rra
mvimw
a
v■rnr rsreoeew■erasi.n.o -w a'/war
•
aim moear■weremsrrrwrw -s
I r11L/C I b qk tr■■rmrs QTZ'W 07 ZUS3� IDOL i7
tr � iue. :.5. � � rs �ATmt �1lOYO®IT PLUM �tm w rr .. ■ •
w=. — -- -- ATM R4w ltTA7fi
T ` PRW rs wm+ a wnMx1
PAW FS Oa CL WAhx
ia
wwa rivusa sr.aio s...l...
BO a 62 43 64
I
I
no
i I 11
1
w rA v r a r ..ra aar. a� DROPILE �SC^LES
Yten � - e•
WATERLINE "A"
1 0♦ 7� ael .q R�a� ,P .Ly .R N
a A,41 w0 reetO.P Yiaa .R M
v oa .un m
v/r .a .aaa Ioo.
i er..�pi elea�,p iip .� .-n
awu Ills ,.hawt 1.a76ea 10 YLaa R -0 . RV
MAU Ir Q no .O .Lap M
M NrR I I 19 dal 1&00. .e.
.UN1L Y EEO"I wtm m "M Y&.S S.l M . a-r
r coma mumoa. eu.a . MU IY 4a0. fp M . a.r
r MR m a0 ww" ." pa I &@ a0 MI
��AA V.." !q JJY m
I� o
lie
1._,
L •s ,�
PROP. FS OVER CL WATT
PROP FS OVER CL WATER I
-- Sao---
10 It
PROP. FS TM CL WAMM
PLOY FS OVO CL
I
PROP. FS OVER CL WATER
a
SGLLES
PADAB=
-9611:
T )
PA04=0
------------
QF
ILL POO=
I k
MR
GSAFM BC"
OE—:KRAL w pa v�m m
fE.-"r
taw &so m 1La m -o WATERLINE OW
w=mmv� m . I
W wrwftl —4 -w I& m
.,J. o., I =M v or IrOMM& 1.3w".& aim
im
no Emma
n*v
ITT
Goulds Pumps
AquaBoost` II
Variable Speed Constant Pressure Systems
BAQUAB 1
Residential and
Commercial Water Systems
l 1”
7 GPM systems
RGOULDS PUMPS
Goulds Pumps is a brand of ITT Corporation.
www.goulds.com
Engineered for life
Think of it as "Cruise Control" for your pump!
The AquaBoost II is available with a range of
flow rates to handle homes with up to four
baths, irrigation, filtration and fire suppression
systems. light commercial applications up to
100 GPM at 45 PSI boost The AquaBoost II is
available as either a separate controller or as part
of a complete pump package with everything
you need to plumb it to a domestic water line.
S", C E
+ The AquaBoost Advantage
V
a
1
0 Flow + 0 Flow +
Wiral home water pressure �fie A�gLwdoost malmr up the
drops when demand Is high. jom acz etarrt mpowpnernisee
FEATURES
The AquaBoost II variable Speed pump control-
ler and complete booster package kits, provide
-3 �onrwrew.ns �., „u �r
an economical answer for municipal water
district customers with low water pressure. Both
domestic and light commercial applications can
{
benefit. As water use increases, the AquaBoost II
r
o°
changes pump speed to maintain pressure. Large
1
supply tanks are eliminated, and less wear and
'
tear on your pump and motor.
l 1”
7 GPM systems
RGOULDS PUMPS
Goulds Pumps is a brand of ITT Corporation.
www.goulds.com
Engineered for life
Think of it as "Cruise Control" for your pump!
The AquaBoost II is available with a range of
flow rates to handle homes with up to four
baths, irrigation, filtration and fire suppression
systems. light commercial applications up to
100 GPM at 45 PSI boost The AquaBoost II is
available as either a separate controller or as part
of a complete pump package with everything
you need to plumb it to a domestic water line.
S", C E
+ The AquaBoost Advantage
V
a
1
0 Flow + 0 Flow +
Wiral home water pressure �fie A�gLwdoost malmr up the
drops when demand Is high. jom acz etarrt mpowpnernisee
I I
ITT
COMPONENTS
GOULDS PUMPS
Residential and Commercial Water Systems
*1AB2 — 4.2 Amp, 208 -230 V, single phase
input, 1 HP AquaBoost II variable speed control-
ler, wall mount set, transducer, pre - wired. (Pump
and tank not included.)
*1AB2LB1035 —1 HP AquaBoost II controller,
wall mount set, LB stainless steel jet pump,
transducer, V6P tank, pressure gauge, discharge
tee. Controller is pre -wired to the pump. Flows to
15 GPM.
2AB2 — 6.9 Amp, 208 -230 V, single phase
input, 2 HP AquaBoost II variable speed control-
ler, wall mount set, transducer, pre- wired. (Pump
and tank not included.)
2AB21 MCI F2132 — 2 HP AquaBoost II control-
ler, wall mount set, MCC cast iron / stainless steel
pump, transducer, V6P (2 gal.) tank and pressure
gauge. Controller is pre - wired. Flows to 27 GPM.
2A621 MCI G2A2 — 2 H P AquaBoost II control-
ler, wall mount kit, MCC cast iron / stainless steel
pump, transducer, V6P (2 gal.) tank and pressure
gauge. Controller is pre -wired. Flows to 32 GPM.
A CAUTION AquaBoost System CANNOT be
set above 80 psi, for the total
discharge pressure (suction plus discharge).
*1AB21 HM1 E2D0 —1 HP AquaBoost II con-
troller, wall mount kit, HMS stainless steel pump,
transducer, V6P (2 gal.) tank and discharge pipe
tee. Controller is pre- wined. Flows to 20 GPM.
*IAB22HMIE2DO —1 HP AquaBoost II
controller, wall mount kit, HMS stainless steel
pump, transducer, V6P (2 gal.) tank, pressure
gauge and discharge pipe tee. Controller is
pre - wired. Flows to 30 GPM.
2AB22HM1 F2E0 — 2 HP AquaBoost 11 control-
ler, wall mount kit HMS stainless steel pump,
transducer, V6P (2 gal.) tank, pressure gauge and
discharge pipe tee. Controller is pre-wired. Flows
to 30 GPM.
3A62LCBI H2D0 — 3 HP AquaBoost II
controller, wall mount kit, LCB stainless steel
pump, transducer, V6P (2 gal.) tank, pressure
gauge and discharge pipe tee. Controller is
pre - wired. Flows to 50 GPM.
2AB22MC1 ON — 2 HP AquaBoost II
controller, wall mount kit, MCC cast iron/stainless
steel impeller pump, pressure transducer,
V6P (2 gal.) tank, pressure gauge, 1 IN' bronze
discharge tank tee. Controller and motor are
pre- wired. Flows to 80 GPM.
**5AB22MC1J2K2 — 5 HP AquaBoost II
controller, wall mount, MCC cast iron/stainless
impeller pump, pressure transducer, pressure
gauge, 1' /4" bronze tank tee, controller and
motor are pre - wired. Flows to 100 GPM.
**5AB2LCCIJ2D0 — 5 HP AquaBoost 11
controller, wall mount, LCC stainless steel pump,
pressure transducer, pressure gauge, 11/4" bronze
tank tee, controller and motor are pre- wired.
Flows to 70 GPM.
* 1 HP available in 115 volt models.
** Tank not included.
0
ITT
GOULDS PUMPS
Residential and Commercial Water Systems
AQUABOOST 11 SYSTEM SELECTION
PSI
BOOST
2 -10
GPM
20
GPM
30
GPM
40
GPM
50
GPM
60
GPM
70
GPM
80
GPM
90
GPM
100
GPM
20
1
3
3
5
5
9
9
9
10
10
25
1
3
3
6
9
9
9
10
10
10
30
1
3
3
6
9
10
10
10
1 10
10
35
1
3
3
6
6
10
10
10
10
10
40
1
3
3
6
7
10
10
10
10
10
45
1
3
3
6
8
10
10
1 10
10
10
50
1
3
4
7
8
10
10
10
10
55
1
3
4
7
8
10
10
60
1
4
7
8
8
65
2
4
7
8
8
70
2
4
8
8
75
4
4
8
80
4
*1
1AB2LB1035 (1 HP, stainless steel pump, l" discharge, 1' /a" suction)
*2
1 AB21 HM1 E2DO (1 HP, stainless steel pump, l" discharge, 11/4" suction)
*3
1AB22HMIE2DO (1 HP, stainless steel pump, 1" discharge, 11/4 "suction)
4
2AB22HM1 F2 E0 (1'/: HP stainless steel pump, 1" discharge, 11/4" suction)
5
1 2AB21 MCI F2B2 (11/: HP, cast iron pump, 1" discharge, 11/4" suction)
6
2AB21 MC1 G2A2 (2 HP cast iron pump, l" discharge, 11/4" suction)
7
3AB2LC81 H2D0 (3 HP stainless steel pump, 1 "discharge, 11/4" suction)
8
5AB2LCC1J2D0 (5 HP, stainless steel pump, 1" discharge, 1Y :" suction)
9
2AB22MCI G2D2 (2 HP, cast iron pump, 11/4" discharge, 1'h" suction)
10
5AB22MCIJ2K2 (5 HP cast iron pump, 11/4" discharge, 1'A" suction)
* 1 HP available in 11 S volt input models. See Price Pages.
Items # 8 and # 10 do not include tank. Recommend at least 13 gallon volume bladder tank.
NOTE: PSI is boosting pressure, NOT total system pressure.
3
0
ITT
GOULDS PUMPS
Residential and Commercial Water Systems
AQWWOOST CONTROLLER FEATURES
Input Power"- 208 -230V ±15 °k, single phase
(controller only)
Output Power — Up to 230V three phase (based on
input voltage). Motor rated for
208 -230V, ±10%.
Maximum Output Current -- 4.2 amps –1AB2 (1 HP)
— 6.9 amps – 2AB2 (2 HP)
Input Controls — Up and down buttons to set pressure.
Signal Lights — Power on, pump running, inverter
stopped, pump stopped, standby, Wttslerrors.
Electrical Efficiency — Over 95% at full load
Protection Against — Short circuit, under voltage,
overload, motor temperature, dead heading, run out
suction loss, sensor fault, bound pump, over voltage,
static discharge. Nate: Suction loWrun out is set for
minimum 10 psi at discharge!
Ambient Temperature — 34° F to 104° F
Maximum Humidity — 95% at 104° F, non - condensing
Air Pollution — Avoid mounting in areas with exces-
sive dust, adds, corrosives and salts.
Approvals — & ( E
Controller Enclosure — Outdoor, NEMA 3R, IP 43
(Rain - tight)
Mounting — Wall mount with mounting hardware.
Cooling — Convection with cast aluminum heat sink.
— 3 HP 5 HP with temp. fan.
Transducer— 0.5 - 4.5 VDC with 5 VDC power supply,
100 psi range, 804nch 3 -wire shielded cable.
Input Wire — 5 feet of 14,10 or 8 gauge cable.
Depending on site, cable is pre -wired to controller and
motor conduit box.
Output Wire —10 feet of 14 gauge cable. Cable is pre -
wired to controller and pump motor (when provided).
`Low input voltage may affect motor operation.
1 AB2 (114 30)
2A62 450
(8.38) (57.15)
33 2.25
Cl
(29 534) (232 56)
9.16
j'- - 65
(157.90)
6.22
(81.28)
3.20
35 36) I
533 llJ
(9906) I
3.90 _I (2590% 10Z (293)
0
,q %d
Tight (148
PRESSURE RANGE
Nominal Range — Field adjustable from 20 - 80 psi, total system pressure.
AWARNING DO NOT SET REQUIRED SYSTEM PRESSURE ABOVE 80 PSI. SEVERE DAMAGE TO
PLUMBING COULD RESULT PLUMB RELIEF VALVE OUTSIDE OR DRAIN.
<& ITT
GOULDS PUMPS
Residential and Commercial Water Systems
SUGGESTED AQUABOOST INSTALLATION FOR MUNICIPAL WATER SYSTEM
Home Supply Water Main
Check Valves
Circuit Breaker Isolation Valve
Aqua Boost Control
Disconnect
Figure 1
Tank Gauge Relief
f Unions �
s!
Check Valves
To Drain -.
Ia
SUGGESTED AQUABOOST INSTALLATION FOR WELL PUMP SYSTEM
Home Supply Well supply
Check Valves
Circuit Breaker Isolation Valve
AquaBoost Control Atmospheric
Storage Tank
Disconnect+i . .- Unions
Figure 1
Tank Gauge..._..__ Relief
�t
Check Valves
To Drain -.a.
5
Jl
Fol
ITT
METERS
x
g
0
0
MEtr:RS
0
x
0
Q
O
so
0L 0
FEET
150
140
130
120
110
100
90
80
TO
60
50
40
30
20
10'.
0
GOULDS PUMPS
Residential and Commercial Water Systems
► .
= =
=
=I
�:w�%�.
'
iii
+�..I
iii=====_.
iii=
man
IA ==xmul■lr
...-=.:=5.'==.=i
dd, 'M_____mo_
r��
====___
=g
i
ii
iiroun
immumii
i
0 5 10 15 20 - -- 25 — 30 u S GPM
t 1 , i i r # ,
0 f 2 3 4 5 6 7 4whr
CAPACITY
0 2 3 4 5 mtfir
CArAQIY (Q1
6
Indicates
1 MCt F280
pump with
53/4" diameter
impeger.
NOTE:
Operation
beyond
pictured range.
may overload
m0miler and
cause
shutdown.
n4v
ITT
METERS PSI FEET
90
so-
loo-
90-
60
80
D 50 70
O 40 60
~ So
30 40
20 30
20
f
10
o
0 0
GOULDS PUMPS
Residential and Commercial Water Systems
■Cil� ■ ■��i ■ ■ ■ ■ ■O■■
■■■■■■■■■ ■■■ Ell
MEMEM 00
OEM
ME
N'NMMMMM ■ ■� \_ ■� I ■■■
■J■■■ ■ri ■■■
U > IV ID AU L] ]V ]13 4u Ul OYM
1 I 1 1 1 I 1 1 I 1 1
0 1 2 3 4 5 6 7 8 9 .11hr 10
CAPACITY
01 Curve represents pump model 1HM1E2D0.
® Curve represents pump model 2HM1 E200.
OO Curve represents pump model 2HMIF2E0.
7
60
W
20
a
i
g
r**..
ITT
Ff10
200
190
180
170
z 160
0-150
0 140
130
v 120
110
100
Q 90
g 80
0 70
60
50
40
30
10
10
0
FEET
42
88
84
80
76
= 72
t 68
64
60
x 56
V 52
48
> 44
a 40
36
0 32
~ 28
24
20
16
12
8
4
GOULDS PUMPS
Residential and Commercial Water Systems
i f 1 1 1 1 i I 1_ 1
0 4 8 12 16 20 24 28 32 36 40 44 48 62 56 60 US GPM
CAPACrlY
3550 RPM MCC Stainless Steel Variable Speed
Constant Pressure System
MODEL: 2AB22MC1G2D2
2 STAGE PUMP
4.62' DIAM. IMP.
3150
2625
.1775
I 1 ! ! I.. I 1 L 1 I f I I I I f L_ I, I I I L i
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 US GPM
CAPACITY
NOTE: Curves indicate boost pressure.
a
n4v
ITT
FEET
140
130
110
0 110
n 100
90
v
80
70
v
60
50
40
30
20
10
FEET
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0
1775
GOULDS PUMPS
Residential and Commercial Water Systems
Constant Pressure System
MODEL SAB22MC112K2
2 STAGE PUMP
59.3%
EFF
L L i A i i r i i L i I_ i i i
0 10 20 30 40 50 60 70 80 90 100 110 120 130 US GPM
CAPACITY
3550 RPM
3150
52.7%
2625
1775
LC Stainless Steel Variable Speed
Constant Pressure System
MODEL: SAB2LCC1J2D0
2 STAGE PUMP
5.19• DIAM. IMP.
1 I 1 I I I I I l I 1 i L I I 1 1 I I l I 11
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Us GPM
CAPACITY
NOTE: Curves indicate boost pressure.
9
<& ITT
DIMENSIONS
GOULDS PUMPS
Residential and Commercial Water Systems
LB PUMP (LB1035) WITH TANK AND TEE
Capacities — to 15 GPM
Rotation — Right hand clockwise, viewed
from motor end
Materials — 304 stainless steel casing
Noryl impeller
Motor --- 1 HP ODE Three Phase,
208- 230/460V
Overload protection, starters, heaters not required
Dimensions are in inches.
Pipe Connections —1 x 1'/4 NPT
Maximum temperature of Water -1200 F
NOTE: Tank Liquid Temperature limit is 1200 F
Pump Liquid Temperature Limit is 1400 F
Maximum System Working Pressure — 85 psi
Seal — Carbon / Silicon Carbide / EPR
Approximate Packaged Shipping Weight — SS lbs.
10
2.78 14.43
�° NPT PLUG
PRESSURE GAUGE
PO RT �, NPT V6P TANK
✓ W NPT
VSDUCER
NPT
DISL?IARGE
1
NPT MALE
�9T FEMALE
18.43
1h - 14 NPSM CONDOR
SUCTION
1 '/a' NPT
CONNECTION GDP MOTORS
FEMALE
14.31
i
--
._.------- -._..0
.-6310
` 10 (12 GA7
100—
p
&09
Approximate Packaged Shipping Weight — SS lbs.
10
Lam,
ITT
GOULDS PUMPS
Residential and Commercial Water Systems
DIMENSIONS
MCC PUMP (I MCI G2A2 AND 1 MCI F282) WITH TANK AND TEE
Capacity — to 32 GPM (1 MC1 G2A2)
— to 27 GPM (1 MC1 1`2132)
Rotation — Right hand clockwise, viewed
from motor end
Materials — Cast iron casing
316 stainless steel impeller
Motor — 1'/2 HP ODP Three Phase,
208- 230/46OV
— 2 HP ODP Three Phase,
208- 23O/46OV
Overload protection, starters; heaters not required
Dimensions are in inches.
I
6 25
_
450
— 1A" NPT
DRAIN PLUG
6.75
TRANSDUCER
PORT +h' NPT
Pipe Connections —1 x 1'/4 NPT
Maximum Temperature of Water —1200 F
NOTE: Tank Liquid Temperature Limit is 120° F
Pump Liquid Temperature Limit is 2120 F
Maximum System Working Pressure — 85 psi
Seal — Carbon / Silicon Carbide / EPR
I
+A" NPT PLUG �,� 2.00 I—
DISCHARGE
1' NPT MALE
W NPT FEMALE
1987
1 . wrnorr- )
1 +/�- NPT
FEMALE
15 75
Approximate Packaged Shipping Weight — 75 lbs.
11
7S
4.58
PRESSURE GAUGE VGPTANK
PORT Vi' NPT f _3/a' NPt
T2.22 �
+A • 14 NPSM CONDUIT
CONNECTION ODP MOTORS
— — - - -- ---- 6310
67S
10 (12 GA)
4 SLOTS LENGTHWISE
.34 X SO LONG
<& ITT
DIMENSIONS
GOULDS PUMPS
Residential and Commercial Water Systems
HMS PUMPS (1 HMtE2DQ, 2HM1 E2DO)
A
Capacities — to 20 GPM (1 HM)
Pipe Connections —1 x 11/4 NPT
to 38 GPM (2HM4/2HM5)
Maximum Temperature of Water -1200 F
Rotation — Right hand clockwise, viewed
NOTE: Tank liquid Temperature Limit is 1200 F
from motor end
Pump liquid Temperature limit is 2120 F
Materials — 316L stainless steel for all liquid
Maximum System Working Pressure — 85 psi
handling components
Seal — Carbon / Silicon Carbide / EPR
Motor — 1 HP ODP Three Phase,208- 230/460V (1 HM12HM4)
— 1.5 HP, ODP Three Phase,208- 230/460V (2HMS5)
Overload protection, starters, heaters not required. Dimensions are in inches.
—
PRESSURE GAUGE
PORT 1/4' NPT
V6P TANK
3/4' NF7
TRANSDUCER 1/2" NF
PORT 1/4" NPT PLUG
�-- DISCHARGE
1 ° NPT MALE
16.75 3/4" NPT FEMALE
I MAX FILL PLUG
1212
t 50
AQUABOOST
A
0
MAX
MOUNTING
1AB22HM1E2D0
4,94
10.75
11.62
View B
1AB21HM1E2D0
1/2 14 NPSM
10.75
CONDUIT
View
CONNECTION
�— L 4 94
ODP MOTORS
4e• NPT
View
UCTION 7,25
4 SLOTS LENGTHWISE
34 X 72 ON CENTER
RUG
AQUABOOST
A
L
C
MOUNTING
1AB22HM1E2D0
5.75
10.75
11.62
View B
1AB21HM1E2D0
5.75
10.75
1112
View
2AB22HMIF2E0
6.73
11.75
11.62
View
12
Approximate Packaged Shipping Weight — 551bs.
'i:'. �'`y r tr.,��-i'p� �'ZJ,` .y3R?�?r',��' 'air ."'!;'.,..i �•�1.., �. uP;i � ?.'1 ;� '�''''r ��!srs� „.'i)
40 criteria, the largest volume of water required for fire fighting was identified within each
pressure zone (based on the land use in that zone and the flow rates and durations from
Table 7.3). The resulting fire flow volumes are shown in Table 10.1
Table 10.1 Storage Requirements for Fire Storage
2005 Domestic Water System Master Plan
Yorba Linda Water District
Minimum Flow
Required Fire
Required Duration
Storage
-.. ..
Single Family Residential 1,500
2
0.18
Multi- Family Residential 2,500
2
0.30
Commercial 2,500
3
0.45
Public Facilities /Schools 3,500
3
0.63
Industrial 5,000
4
1.20
Hospital (Linda Vista) 5,000
4
1.20
the District's common practice is to maintain sufficient fire flow storage within each pressure
zone to fight one fire in each zone simultaneously Therefore, fire flow storage from a
reservoir in an upper zone was not credited to lower zones unless the lower zone had no
other storage available. The lowest fire flow volume, 0.18 MG, is the result of a 1,500 gpm
fire for a duration of 2 hours (single - family residential land use). A fire flow of 5,000 gpm for
a duration of 4 hours resulted in the largest volume of 1.20 MG (industrial land use or a
hospital).
During discussions with the District on storage required to fight fire, it was noted that the
District does not intend to provide storage to fight brush or wild fires. it was also noted that
the volume of water required to fight fires of this type is significantly beyond the capacity of
the District to provide. Therefore, the storage requirements identified in this Master Plan
Report do not include any allocation for fighting brush fires or wild fires.
10.3.3 Emergency Storage
Emergency storage is a dedicated source of water that can be used as a backup supply in
the event a major supply is interrupted. This can be provided by water from a second
independent source, by water stored in reservoirs, or a combination of both. The District
has built a significant amount of redundancy into the distribution system, both in terms of
supply sources and power supplies for wells and booster stations. Therefore, numerous
Iscenarios could be considered to evaluate the necessary emergency storage. For example,
a major earthquake could cause a loss of a MWD pipeline and a system -wide loss of
electricity, or it could cause the loss of one -half of the District's wells and a system -wide
loss of the natural gas supply. However, it may not be realistic or feasible to plan for a loss
of all sources of supply and simultaneous losses of all electricity and natural gas supplies.
H ICIienAYorbaLinda SAO%M6853AOOtiRptUasterPlan1ChIO doe
1
In addition, the appropriate criteria used to determine the emergency storage requirements
may vary from one zone to another. For example, in an isolated zone with only one source
of supply (e.g., one booster station, one PRV, or one well), it may be realistic to plan for a
7 -day period with no water coming into the zone; however, in a zone with a significant
amount of redundancy, this scenario may not be realistic.
On June 23, 2004, the District and Carollo Engineers (Carollo) conducted a workshop to
evaluate the alternative emergency scenarios for use in the District's storage analysis. A
number of potential scenarios were presented for consideration. Following the workshop,
the District staff reviewed these scenarios and established a set of criteria to use as a basis
for establishing the emergency storage requirements for each zone.
District staff established the following criteria by determining the realistic emergency
scenarios that may occur District -wide or within any pressure zone:
District -Wide Emergencies:
- The loss of all MWD supplies and loss of the two largest wells for 7 days of
average day demands (ADD).
- The loss of all groundwater supplies for 7 days of ADD.
- The loss of electricity for 2 days of maximum day demands (MDD).
0 - The loss of natural gas for 2 days of MDD.
Pressure Zone Specific Emergencies:
Zones with only one supply source lose this source for 5 days of ADD
Zones with multiple supply sources lose the largest source for 5 days of ADD.
Zones with multiple supply sources lose the two largest sources for 3 days of
ADD.
The emergency storage required for each pressure zone was based on the most severe of
the criteria identified above.
10.4 STORAGE ANALYSIS
A complex spreadsheet model was developed to analyze the the District's storage
requirements on a zone -by -zone basis. This spreadsheet model provides the capability to
analyze ADD and MDD demand periods, existing and future years, various supply
alternatives, and numerous emergency scenarios. Based on the demands within each zone
and the supplies and booster facilities that are operating, the model calculates the water
used within each zone, the water pumped into and out of the zone, and the water that
enters and leaves the zone through pressure reducing stations. The movement of water
between zones is controlled by the demand within each zone and the physical limitations of
H: 1ClientlYorbaLinde_ SAOW16853AO0 1RptlMasterPlanlChlO doc
the existing pumps and valves. The model then determines the amount of operational, fire
flow, and emergency storage required by zone. The emergency storage requirement is
based on the selected emergency scenario and the duration of the event (e.g., 7 average
days, 3 maximum days, etc.). The total required storage is then compared to the existing
storage requirements, and the storage deficit or excess within each zone is presented.
Using the storage analysis model, analyses were conducted for the years 2005, 2010, and
2020 for the emergency scenarios presented in Section 10.3.3. These studies included
upgrades currently planned for the the District system. The following improvements are
included in the storage analysis model for the planning years listed below:
2005 Improvements:
A second Bastanchury Booster Pumping Station (BPS) will be constructed. The
pumps will have a capacity of 2,000 gpm (electric pumps) and a backup
capacity of 1,400 gpm (natural gas pump). This project is scheduled for late
2006.
Highland BPS capacity increased from 3,200 gpm to 5,200 gpm (electric
pumps).
• 2010 Improvements:
- Zones 780 -1 (4A), 780 -2 (4B), and 780 -3 (4C) are hydraulically connected.
- OC -51 capacity increases from 10 cfs to 22 cfs.
- Well 19 is operational.
- Highland BPS capacity increases from 5,200 gpm to 7,200 gpm (electric
pumps).
- Palm Avenue BPS capacity increases from 1,250 gpm to 3,000 gpm (electric
pumps).
- Pacific Holding BPS is operational with a capacity of 146 gpm.
- A new 8.0 MG buried concrete reservoir is built to replace the existing steel
tanks at Bastanchury Reservoir This project is estimated to occur in 2007 An
additional 4.0 MG buried concrete reservoir will be operational by 2010.
- The Quarterhorse Reservoir Expansion is complete, increasing the total storage
volume from 3.75 MG to 7.25 MG.
- The original Bastanchury BPS is replaced, increasing the capacity from 800
gpm to 2,000 gpm (electric pumps), and decreasing the backup capacity from
1,500 gpm to 1,400 gpm (natural gas pumps).
f 0 2020 Improvements:
- Pacific Holding BPS capacity increases from 146 gpm to 605 gpm.
H.V CbentlYorbaLinda _SAOW16653A001Rpt1MaslerPlanlCh 1 0.doc
Water Conservation Investigation Report
For-
King Family/Yorba Linda Outpost Development, LLC
Tract 16488, Yorba Linda, California
October 26, 2009
The purpose of this report is to investigate the possibility of creating water savings through
permanent water conservation measures to offset requirements by Yorba Linda Water District
for emergency water storage.
The first step is to determine accurate estimates of the water use in question. Based upon the 2005
"Domestic Water System Master Plan ", the 1978 "Water Master Plan" the site area of 20.01 acres
would have a water usage of 1.5 acre -feet per acre per year
However since a great portion of the Project is non - irrigated slope area, a more accurate measure
would be to take these same parameters and separate out the "non- irrigated" areas and assign an
accurate value to the areas that actually would have a water usage.
The following is our water usage calculation:
KING TRACT 16488: (Total Site = 871,607 sq.ft. / 20.01 Acres)
The 20.01 acres consists of the following:
• 6.55 acres (285,450 sq. ft.) of irrigated common areas and
"Zone B" Fuel Modification area slopes
• 3.41 acres (148,500 sq. ft.) of Lots 1 -11 actual "Pad" areas
• = 9.96 acres irrigated
• 10.05 acres of non - irrigated undisturbed hillside area
(Deed restrictions will be imposed on Lot 1 -11 to eliminate Irrigation, on this 10.05 acre
slope area)
9.96 acres irrigated X 1.5 = 14.94 acre -feet X 325,851 = 4,868,213 gallons per year
13,337 gallons daily
YLWD storage requirements:
• 7 days Average Daily Demand @ 13,337.56 x 7 = 93,362 gallons
• + 1 day Maximum Daily Demand (ADD X 1 48) = 19,739 gallons
Total required storage = 113,102 gallons
=ITY OF BREA
CHINO HILLS STATE PARK
ST. CLAIR / S & S -PROPERTY
OF PLACENTIA
CITY OF ANAHE=IM
wwE-1
29@' -320'
am-3 rs-n
011-970,
am-2
321' -450'
216E -5 rD -28
871' -1065'
2611E -3
4S1' -S:D'
am -6
901' -12m,
M11e -3 10 -2
320' -580'
0 26UE -6 r6 -2t
781' - 11015'
26M 4
581' -610'
® 200E-6 ro -2o
I%V A275'
MK-S m -1
01' -900'
YQRBA LINDA WATER DISTRICT
zone Boundaries
The storage needs for the District are summarized in Tables 10.2, 10.3, and 10.4 on the
following pages for the years 2005, 2010, and 2020, respectively. A brief discussion of the
storage analysis for each pressure zone is presented in the sections, which follow the
Storage Analysis Tables.
10.4.1 Storage Analysis Discussion
10.4.1.1 Zone 1390 (6C)
This pressure zone does not currently have a storage reservoir. However, this is the area
that will be served by the proposed Hidden Hills Reservoir (scheduled for construction
before 2010). The storage analysis for 2005 identifies a need for 0.18 MG for fire storage,
0.37 MG for operational storage, and 1.26 MG for emergency storage. The total storage
needed in Zone 1390 is about 1.81 MG. The storage required for 2020 is only slightly
higher, The storage needs identified for Zone 1390 (6C) also include the needs for
Zone 1133 (6D). It is recommended that the proposed Hidden Hills Reservoir be
constructed with a nominal volume of 2.0 MG to serve Zones 1390 (6C) and 1133 (6D).
10.4.1.2 Zone 1300 (6B)
This pressure zone is currently served by the Chino Hills Reservoir. The volume of the
existing storage facility is 0.50 MG. Storage from this zone is also used to supply
Zone 1160 (6A). The storage analysis for all three study periods identifies a need for
0.18 MG for fire storage, 0.74 MG for operational storage, and 2.50 MG for emergency
storage. The total storage identified as required is 3.42 MG. This results in a deficit of
2.92 MG. However, due to the difficulty in obtaining land to expand the existing reservoir, it
is recommended that the District purchase a portable pump to serve as a backup to the
existing Timber Ridge Booster Station, reallocate the existing storage in Chino Hills to
provide all of the fire storage needed, and split the remainder between operational storage
and emergency storage. The portable pump should be capable of pumping MDD for 2020
(334 gpm) from Zone 1000 (513) to Zone 1300 (613). The storage should be reallocated as
follows: 0.18 MG for fire storage, 0.16 MG for operational storage, and 0.16 MG for
emergency storage. Based on the estimated 2020 demands, this will provide about
11.8 hours of ADD and 8.0 hours during MDD. Maintaining a portable pump ready for use
will enable the District staff to quickly respond to an emergency.
10.4.1.3 Zone 1300 (6E)
This area is the proposed development area known as Pacific Holding. It is currently
undeveloped, and therefore, it has no storage needs for 2005. By 2010, it is expected that
the area will be partially developed. The storage needs for 2010 are shown in Table 10.3 as
1.1 MG. By the year 2020, the storage needs increase to 4.0 MG. It may be possible to
reduce the required volume through the addition of a redundant booster station. However,
without additional information and firm development plans, this is a reasonable estimate of
. the required storage for this proposed development,
H:\Clienl\YorbaLinda—SAOM6853AOD\Rpt\MasterPIan lCh 10.doc
The Board of Directors approved the annexation of ID Nos. 1 and 2 in May and June of
1978, respectively. In June 1978, voters in both Improvement Districts authorized issuance
of general obligation bonds to finance construction of production, storage, and
transmission, or "backbone" facilities. To date, ID No. 1 has issued two series of general
obligation bonds and one series of refunding bonds. ID No. 2 has issued three series of
general obligation bonds and two series of refunding bonds.
3.4.1 Western Service Area
The WSA covers approximately 5,800 acres of the older section of the District lying
generally between Valencia Avenue in the City of Placentia and Fairmont Boulevard in the
City of Yorba Linda. This land has been under development since the establishment of the
Yorba Linda Water Company in 1909. It is approximately 95 percent developed. Remaining
open land will be developed with in -fill projects consisting primarily of single- family
dwellings.
3.4.2 Improvement District Number 1
ID No. 1 covers approximately 4,300 acres. This area lies generally east of
Fairmont Boulevard, north of Esperanza Road and west of Hidden Hills Road. It was
formed in June 1978 by a vote of the electorate living in the area at the time. The sole
purpose of ID No. 1 was to define an area of benefit and use general obligation bonds to
finance construction of production, storage, and transmission facilities for this area.
Construction of homes began in late 1978 with the first occupancies beginning in the spring
of 1979.
3.4.3 Improvement District Number 2
ID No. 2 covers approximately 3,500 acres, generally east of Hidden Hills Road and north
of the Santa Ana River, and extends to the Orange /San Bernardino County Line. ID No. 2
was also formed in June 1978 by a vote of the electorate living in the area at the time. The
sole purpose of ID No. 2 was to define an area of benefit and use general obligation bonds
to finance construction of production, storage and transmission facilities for this area.
Construction of homes began in 1981, with the first occupancies beginning in the spring of
1982.
3.4.4 Annexations
During the upcoming 5 -year period, the District anticipates annexation and development of
properties owned by Shapell Industries, Inc. These developments will be annexed into the
Western Service Area. These properties are within the District's sphere of influence
established by the Orange County Local Agency Formation Commission. Each annexation
is carefully analyzed to ensure the development pays its own way without subsidy from
existing customers. Annexations to the District will be processed and administered in
accordance with established District policies. The proposed annexation area is shown in
H:% ClientlYorbaLinda _SAOVV16663AOOIRpllMasterPla n1Ch03.doc
Table 8.9 Estimated Costs for Recommended Facilities to Improve Operations
2005 Domestic Water System Master Plan
Yorba Linda Water District
11 Construct a Zone 5 booster station to 1,650 gpm BPS $690,000
pump 1,650 gpm from Zone 920 (5A) 1,500 If of 12" pipe 270.000
into Zone 1000 (58). Also requires $960,000
1,500 If of 12" pipe to provide water
from Quarterhorse Reservoir near
Fairmont Booster Station.
Total Estimated Costs $24,133,000 1
Notes:
(1) Estimated Project Costs are based on February 2005 dollars and include estimated
engineering, legal, and administrative costs and a contingency.
8.8.4 Development Driven Facilities
Most of the remaining undeveloped lands left in the District's service area are along the
north edge in the higher pressure zones. Most of the facilities required to provide water
service to these proposed development projects is either already in place or will be
constructed by the developer when the project is built. This. primarily involves the
construction of pipelines and in some cases additional storage facilities. One exception to
this is the Pacific Holding Development.
The Pacific Holding Development (Murdock Property) does not have existing storage or
pumping capacity to utilize. However, since this proposed development project is within
Improvement District No. 1, the District is obligated to provide backbone facilities. Based on
the projected water demands for this development, 409 -gpm ADD and 605 -gpm MDD, a
4.0 -MG reservoir, a 900 -gpm booster station, and about 10,000 feet of 12 -inch backbone
transmission main will be required. The estimated project costs for the booster station are
$436,000. The pipeline is estimated to have a project cost of $1.8 million. The project costs
for the proposed reservoir are estimated at $6.0 million (see Chapter 10 for cost
assumptions). Table 8.10 summarizes these development driven facility costs.
H:IClientYorbaLi nda _SAOVVM53A00%R ptlMasterPlan1ChO8. doc
I'
(This language will also be included in the Notice of Annexation to Association's Declaration
of Covenants, Conditions and Restrictions and Reservation of Easements (California law
now requires a seller to provide such documents to a buyer). The Kings also agree to add the
above language as a stand alone addendum to their Purchase and Sale Agreement — Each buyer
will be required to initial the Addendum, a copy of which can be provided to the District.)
Recording Requested By and
When Recorded Return To:
Yorba Linda Water District
PO Box 309
Yorba Linda, CA 92885
This certifies that this Declaration of Restrictive Covenants
is presented for recording under the provisions of California
Government Code Section 6103 by the Yorba Linda Water
District in performance of and official service thereof.
Secretary SPACE ABOVE THIS LINE FOR RECORDER'S USE
DISCLOSURE
AND DECLARATION OF RESTRICTIONS
REGARDING WATER SERVICE
This Disclosure and Declaration of Restrictions regarding water service is entered is entered between
YORBA LINDA WATER DISTRICT ( "YLWD "), a local public agency, created and operating under
authority of Division 12 of the California Water Code and YORBA LINDA OUTPOST
DEVELOPMENT, LLC, ( "Yorba") owner of certain real property located at Tract No. 16488, Yorba
Linda, California 92886 (hereinafter referred to as "Subject Property" or "Burdened Property "), and
which is more particularly described on EXHIBIT A:
DISCLOSURE
Low Water Pressure: This Lot has been developed on top of a hill, in a location where there is low
ambient water pressure. Water pressure for irrigation or other domestic purposes, although legally
sufficient, may not be considered suitable by the Owner of a Lot for particular purposes and
preferences. Yorba hereby restricts construction of a residence on a Lot within the Subject Property
absent installation and maintenance of an operable water pressure booster pump.
THE YORBA LINDA WATER DISTRICT IS NOT RESPONSIBLE FOR THE
INSTALLATION, REPAIR OR REPLACEMENT OF THE WATER PRESSURE PUMP ON
THIS LOT OR FOR THE LOW WATER PRESSURE RESULTING IF SUCH PUMP FAILS
TO OPERATE.
DECLARATION OF RESTRICTIONS
1) Running with the Land. This Agreement constitutes a covenant running with the land pursuant
to California Civil Code Section 1468 and binds all successive owners ( "Successor Owners ") of the
Subject Property, burdens the Subject Property and any easements located thereon and benefits the
YLWD and any successor entity of the YLWD.
2) Installation of Pressure Booster Pumps. Each Successor Owner, as part of construction of a
residence on a Lot within the Subject Property, is required to install a private water pressure pump to
supplement water pressure within the residence and irrigation serving the residence. Yorba or
Successor Owners may install, maintain or replace any Pumps or other facilities which are
convenient or necessary, as determined at the sole discretion of Successor Owner.
2) Specification of Water Pressure Booster Pump. The water pump installed must be superior to
the WIDGET 1000 (YLWD can specify pump curves, models, manufactures, pressures, etc.) or its
equivalent.)
3) Ownership and Maintenance. This water pressure pump is privately owned by the Successor
Owner. Each Successor Owner, and their successors in interest, is solely responsible for the
maintenance, repair and replacement of the water pressure pump installed on this Lot. Successor
Owner accept full responsibility for the maintenance, upkeep and repair of any and all such facilities
to be installed, and shall not at any time call upon YLWD to perform any such maintenance, upkeep
or repair.
4) Fire Protection. Yorba or Successor Owners using increased water pressure from the Pumps on
each of the lots contained on the Subject Property for any purpose or the purpose of supporting
private residential fire suppression systems mandated by the OCFA accept full responsibility for the
maintenance, upkeep and repair of any and all such facilities necessary for such purposes.
5) No Representations or Warranties. YLWD has not performed any tests, evaluations or surveys
of any kind to determine if the facilities installed by Successor Owner, including but not limited to
the pumps, are appropriate for their intended purpose. YLWD makes no representations, either
express or implied, regarding the propriety of using Pumps or any other facilities on the Subject
Property.
6) Hold Harmless. Yorba and Successor Owner agree that YLWD shall be held harmless from and
against any and all liability, claims, judgments, suits, or demands for damages to person or property
arising out of, resulting from, or relating to Pumps or facilities installed by Successor Owner for the
purpose of increasing water pressure on the Subject Property, regardless of use, as provided by
California Government Code Sections 810, et. seq., including, but not limited to California
Government Code Sections 850.4 and 850.2.
7) Covenant Not to Sue. YLWD further desires from Yorba, and all Successor Owners, an
agreement and covenant not to sue YLWD for any claim, injury or occurrence related to water
pressure, Successor Owner installed Pumps, the condition of fire protection or fire fighting
equipment or facilities, or for any injury caused in fighting fires or any injury resulting from the
failure to provide or maintain sufficient personnel, equipment or other fire protection facilities.
2
Yorba and all Successor Owners hereby covenant and agree that Yorba, and all Successor Owners of
the Subject Property will not sue or litigate any claim, or claims, of any nature or description, against
YLWD, for or on account of any injuries or damages which they have, or may thereafter have, on
account of water pressure, maintenance, upkeep and repair of the Pumps, or any use thereof or
aforementioned, and does hereby covenant and agree to hold YLWD and all of them harmless from
any liability, claims, demands, costs, attorney fees, charges, and expense incident to any such claim
or claims, or the injuries sustained as a result thereof.
8) Not A Waiver. It is further agreed, that Yorba, and all Successor Owners, do not in any manner
or respect waive or relinquish any claim, or claims, against any other persons, firms, or corporations,
than are herein specifically named, and it is further understood by Yorba, and all Successor Owners,
that YLWD does not in any manner, or to any extent, admit any liability or responsibility for the
abovementioned use of water pressure, maintenance, upkeep and repair of the Pumps, or any use
thereof, or the consequences thereof, and that the execution of this document shall not be in any
manner construed contrary to the provisions of this paragraph as herein specified.
APPROVED AS TO FORM: YORBA LINDA WATER DISTRICT:
Arthur G. Kidmati William R. Mills, President
General Counsel to YLWD
Yorba Linda Outpost Development, LLC
a California limited liability company
Andrew King, Manager
Secretary
EXHIBIT A
Lots 1 through 11 of Tract No. 16488, in the City of Yorba Linda, County of
' Orange, State of California, as per Map recorded as Instrument No.
in Book _, pages _ through _ of Miscellaneous
' Maps.
:I
J
o 0
IMPORTANT NOTICE
DO NOT REMOVE
This water pressure pump is privately owned by the homeowner it
benefits. Without this water pressure pump, the owner of this residence
will likely suffer from low water pressure.
Maintenance, repair, and replacement of this pump, and any related
hardware, is solely the responsibility of the homeowner.
The Yorba Linda Water District is NOT responsible for maintenance,
repair or replacement of this water pressure pump, or for the low water
pressure resulting if such pump fails to operate.
ISTAMPED METAL PLATE 7 in. X 4in O
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
November 5, 2009
Planning-Engineering-
Operations Committee
Pat Grady, Assistant General
Manager
Steve Conklin, Engineering
Manager
Earl Hamanaka, Engineering
Tech II
Budgeted:
Funding Source:
Job No:
Dept:
Reviewed by Legal:
CEQA Compliance:
ITEM NO. 2.2
N/A
Developer Funded
200919
Engineering
N/A
N/A
Terms and Conditions for Sewer and Water Service with Hadi Atail, Parcel Map
2007 -196
Hadi Atail is proposing to subdivide his property into three residential lots within the District's
Western Service Area. The project consists of approximately 1.9 acres fronting Ohio Street, south
of Buena Vista Avenue. The project site presently has a single - family home that will be demolished
to accommodate the proposed three -lot residential development. An exhibit depicting the project
location, existing water services and proposed sewer improvements is attached for your reference.
STAFF RECOMMENDATION:
That the Planning- Engineering- Operations Committee recommend the Board of Directors approve
the Terms and Conditions for Sewer and Water Service with Hadi Atail for a three -lot residential
development, Parcel Map 2007 -196, Job No. 200919.
DISCUSSION:
This project is located within Drainage Area "1" of the District's Sewer Service Area. The District
does not have an existing sewer main in Ohio Street fronting the proposed project. Staff has
reviewed the sewer master plan for this area and will require the applicant to extend a sewer main
approximately 400 feet, from Linda Verde Street westerly to serve the project. The existing sewer
main in Linda Verde Street is adequate in size to meet the demands of this project.
As for water service, Orange County Fire Authority (OCFA) has reviewed the applicant's plan
showing fire hydrant locations. OCFA has determined that the existing fire hydrants in the vicinity of
this project are within the required range, and that no additional fire hydrants are required. However,
OCFA will condition the applicant to install fire sprinkler facilities in each new residence constructed
in the future. The applicant will utilize the two existing water services that are presently servicing the
existing residence for two of the proposed residences, and a new service will be installed for the
third planned residence, if and when it is constructed. The water meter for the proposed third
service would be installed at Ohio Street and the owner /developer would be responsible to
construct a private water line in the private driveway from the meter to the new residence. The
applicant will be required to comply with the District's Standard Terms and Conditions for Sewer and
Single Water Service. The Terms and Conditions for Sewer and Single Water Service with Hadi
Atail, Parcel Map 2007 -196 are attached for your consideration.
ATTACHMENTS:
Name: Description:
Atail_Exhibit.pdf Exhibit
Type:
Backup Material
T C .doc Terms and Conditions for Sewer and Single Water Backup Material
Service
PARCEL 1
�• °° DWY
�•'f y y'� °1° PARCEL 2 DWY
EX. HOUSE TO
BE DEMOLISHED -a
•� x �, R1
PARCEL 3 .�•`
N Q �.
�Q
BUENA VISTA s V
e a
r�
O
� v
w
U4 ?y�0 PRR�VU
'DR
S
y4Rrsr
ORCw'R0 oR
rlLAN,
IS
1' I
II
FI w I V�
E w EX, WATER SERVICES
f�~ I
7.i
i EX. —
' E X
I ;
I "
�I©
I! f�
LINDA VERDE STREET
X. SEWER MAIN
.8" WATER MAIN!
Date: November 12, 2009
YORBA LINDA WATER DISTRICT
TERMS AND CONDITIONS FOR
SEWER AND SINGLE WATER SERVICE
NAME OF APPLICANT: HADI ATAIL
LOCATION OF PROJECT: WEST OF OHIO ST. AND SOUTH OF BUENA VISTA AVE.
PARCEL MAP NO.: 2007 -196 JOB NO.: 200919 SEWER: 200919 LOT(S): 3
The applicant will be required to complete to the satisfaction of the District the following
items that have an "X" following the number.
1) X The applicant shall provide the District with a copy of the Grant Deed or
Title Report of the property to be served.
2) X The applicant shall include information deemed necessary by the District in
the event the applicant is required to file a Department of Real Estate Tax
Disclosure statement.
3) _ The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 1 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. I.
4) _ The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 2 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. 2.
5) X The applicant shall submit two (2) sets of the following drawings to the
District for plan check processing:
a) Improvement Plans
b) Grading Plans
c) Tract, Parcel or Vesting Map
d) Landscaping Plans
6) X Improvement Plans submitted for plan check shall comply with the submittal
requirements established by the YLWD Engineering Department.
7) X The applicant shall dedicate or obtain all easements deemed necessary by
the District in accordance with the Rules and Regulations of the District. All
easement documents shall be prepared under the supervision of and
stamped by a Professional Land Surveyor or a Registered Civil Engineer
(licensed prior to January 1, 1982) licensed to practice in the State of
California.
Page 2 of 5
NAME OF APPLICANT: HADI ATAIL
LOCATION OF PROJECT: WEST OF OHIO ST. AND SOUTH OF BUENA VISTA AVE.
8) X The applicant shall provide the District with a copy of the Recorded
Tract /Parcel Map(s) illustrating all District easements required by Term and
Condition No. 7, prior to requesting occupancy releases.
9) _ The applicant shall prepare and process all easements to be quitclaimed by
the District in accordance with the Rules and Regulations of the District.
10) X The applicant shall furnish the District with a 24 -hour emergency telephone
number prior to the District's approval of the construction plans.
11) X The applicant shall notify the District 48 hours prior to initiating any work
related to required or proposed improvements.
12) X The applicant shall complete a Temporary Construction Meter Permit
application for all water to be used in construction work and all water used
under such permit shall be taken from the approved construction meter.
13) X The applicant shall provide, per the District specifications, one complete set
of "As Built" mylars and electronic copy of ACAD drawings (version 2002 or
later) for the Water and /or Sewer facilities.
14) _ The applicant shall complete an Application to and Agreement for Water
Service.
15) X The applicant shall pay all of the water fees as required by the Rules and
Regulations of the District.
16) X The applicant shall pay meter fees associated with the installation of radio
read meters for this project.
17) X The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Water Service.
18) _ The applicant shall comply with all provisions of the "Water and Sewer
Facilities Phasing Agreement between Yorba Linda Water District and Shell
Western E & P, Inc. executed on May 27, 1999, and recorded as Document
No19990486356 on June 30, 1999, in the Orange County Recorder's
Office.
19) X The applicant shall provide the District with a set of plans stamped and
approved by the Orange County Fire Authority, or fire agency having
jurisdiction, that identifies approved fire hydrant locations. Such approved
plan must be submitted to the District before staff will initiate a District plan
check for water improvements.
20) _ The applicant shall have all water facilities designed in accordance with the
District's Water Facilities Plan, the Insurance Services Office's suggested
standards contained in the "Grading Schedule of Municipal Fire Protection ",
and the District's Standard Specifications. All design plans shall be
prepared under the supervision of and stamped by a Registered Civil
Engineer licensed to practice in the State of California.
Page 3 of 5
NAME OF APPLICANT: HADI ATAIL
LOCATION OF PROJECT: WEST OF OHIO ST. AND SOUTH OF BUENA VISTA AVE.
21) _ The applicant's water facilities (on -site) shall be _ owned and maintained.
22) X The applicant shall be required to conduct flow tests at their cost in the
event the Orange County Fire Authority requires a flow test. A District
representative shall be present to witness the flow test.
23) _ The applicant shall comply with all additional District requirements, relative
to the fire protection system, fire hydrant construction and fire hydrant
locations.
24) _ The applicant shall install water Sampling Station(s) in conformance
with the District's Standard Plans.
25) _ The applicant shall provide a completed Surety Bond for the water facilities
prior to the District signing the Water Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed water facilities.
26) _ The applicant shall install the curb and gutters a minimum of one week prior
to the installation of the water main and services.
27) _ All existing water services that are not useable in the new plan shall be cut
and plugged and properly abandoned at the main pipeline connection point.
28) X The applicant shall coordinate through the District all connections of new
water facilities to the existing District facilities.
29) _ The applicant shall provide a written copy of the Bacteriological Report prior
to occupancy releases certifying that the water meets the Health
Department's requirements.
30) _ The applicant shall adjust and raise to grade all valve covers within the
limits of this project.
31) X The applicant shall install a pressure regulator in all dwellings that have
over 80 p.s.i. static water pressure in accordance with the appropriate
building codes.
32) X The applicant shall complete a Temporary Water Permit for all water that
will be used through the new water services to temporarily serve the new
dwellings.
33) X The applicant shall install a District approved backflow device in connection
with any private fire suppression sprinkler facilities that may be required by
the Orange County Fire Authority or fire agency having jurisdiction.
34) _ The applicant shall install a reduced pressure principle backflow prevention
device on all commercial buildings and landscape services.
Page 4 of 5
NAME OF APPLICANT: HADI ATAIL
LOCATION OF PROJECT: WEST OF OHIO ST. AND SOUTH OF BUENA VISTA AVE.
35) X The applicant shall install and provide a written test report to the District for
each backflow device certifying that the backflow devices are operating
properly prior to the water meters being turned on for service.
36) _ The applicant shall install and provide a written test report to the District
certifying that the double check detector assembly is operating properly
prior to the double check detector assembly being turned on for service.
37) X The applicant and their successors (through required disclosure by the
applicant) shall provide an annual written test report to the District certifying
that the backflow devices and fire detector assemblies are operating
properly pursuant to the District's Backflow Prevention Program and the
State of California Administrative Code, Title 17, Public Health Rules and
Regulations Relating to Cross - Connections.
38) _ The applicant shall complete a Sewer Connection Application and Permit
for Sewer Service.
39) X The applicant shall complete an Application to and Agreement for Sewer
Service.
40) X The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Sanitary Sewer Service.
41) X The applicant shall pay all of the sewer fees as required by the Rules and
Regulations of the District.
42) X The applicant shall have all sewer facilities designed in accordance with the
District's Sewer Master Plan, applicable Sub -Area Master Plans and
Standard Specifications. All design plans shall be prepared under the
supervision of and stamped by a Registered Civil Engineer licensed to
practice in the State of California.
43) X The applicant shall provide a completed Surety Bond for the sewer facilities
prior to the District signing the Sewer Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed sewer facilities.
44) X The applicant's sewer facilities (on -site) shall be District owned and
maintained.
45) X The applicant shall construct a sewer main and appurtenances in
conformance with the approved plans and the District's Plans and
Specifications.
46) X The applicant shall adjust and raise to grade all sewer manhole covers
within the limits of this project.
Page 5 of 5
NAME OF APPLICANT: HADI ATAIL
LOCATION OF PROJECT: WEST OF OHIO ST. AND SOUTH OF BUENA VISTA AVE.
47) X The applicant shall install a sewer backflow prevention valve on all sewer
service connections in which the pad elevations of the property being
served is lower than the rim elevation of the upstream manhole.
Installation of the backflow device shall comply with all requirements of the
Building and Plumbing Codes of the appropriate agency having jurisdiction.
48) X The applicant shall submit a CCTV video of their sewer project as
constructed per approved plans and the District's Sewer Specifications.
The video of the sewer facilities shall be conducted in the presence of the
District inspector and shall include stationing locations of manholes,
cleanouts, wyes, laterals, backflow devices and appurtenances.
49) _ The applicant shall pay all annexation fees in accordance with Section II, B
of the Facilities Phasing Agreement referenced in Terms and Condition
No. 18.
50) _ The applicant shall comply with all provisions of the Settlement Agreement
and Mutual Release executed on November 22, 2005.
(END OF STANDARD TERMS AND CONDITIONS)
PROJECT SPECIFIC TERMS AND CONDITIONS
51) X The existing 1'/" and 2" meters at the proposed 3 lot residential
subdivision shall serve the lot to which they front. The applicant shall be
responsible for all necessary adjustments and /or abandonments to the 1'/"
and 2" water services, per approved drawings, District Standards and
Specifications. A more detailed water service requirement will be
identified, when the applicant makes a formal request to the District for a
third water service connection.
I hereby certify that the foregoing Terms and Conditions were approved at the November
12, 2009 Regular meeting of the Board of Directors of the Yorba Linda Water District.
The approved Terms and Conditions shall become void six (6) months from the approval
date if a formal Application to and Agreement with the Yorba Linda Water District for
Sewer Service is not executed for the project under consideration.
Kenneth R. Vecchiarelli
General Manager
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
November 5, 2009
Planning-Engineering-
Operations Committee
Pat Grady, Assistant General
Manager
Steve Conklin, Engineering
Manager
Earl Hamanaka, Engineering
Tech II
Budgeted:
Funding Source:
Job No:
Dept:
Reviewed by Legal:
CEQA Compliance:
ITEM NO. 2.3
N/A
Developer Funded
200918
Engineering
N/A
N/A
Terms and Conditions for Water Service with Placentia -Yorba Linda Unified
School District (PYLUSD)
PYLUSD is planning to construct two new buildings that will be utilized for a library and classroom
facilities at its Van Buren Elementary School site. The Elementary School is located west of Van
Buren Street, south of Collette Place within Pressure Zone 2 of the District's Western Service Area.
An exhibit depicting the project location and proposed water service is attached for your reference.
STAFF RECOMMENDATION:
That the Planning- Engineering- Operations Committee recommend the Board of Directors approve
the Terms and Conditions for Water Service with PYLUSD for the new library and classroom
facilities at Van Buren Elementary School, Job No. 200918.
DISCUSSION:
The District has an existing water main in Van Buren Street fronting the Elementary School that is
adequate in size and of sufficient pressure to serve the project's needs. The applicant is conditioned
by the Orange County Fire Authority to provide a fire suppression system to the proposed buildings
and one additional onsite fire hydrant for the proposed project. The new onsite fire hydrant will be
private and the applicant is required to construct a double -check detector assembly in association
with this system.
As part of the onsite water facilities, the District has an existing public fire hydrant that benefits only
the Elementary School site. Due to this condition, staff approached the PYLUSD to consider making
this a private fire hydrant facility. PYLUSD is aware of the responsibilities of a private water facility
and agreed to this condition. Therefore, staff will require that PYLUSD abandon the fire hydrant
connection in Van Buren Avenue and make a new connection to the proposed private onsite water
facilities.
The applicant will be required to comply with the District's Standard Terms and Conditions for Water
Service. The proposed Terms and Conditions for Water Service with PYLUSD are attached for your
consideration.
ATTACHMENTS:
Jame: Description: Type:
Exhibit.pdf Exhibit Backup Material
T C .doc Terms and Conditions for Water Service Backup Material
x
PROPOSED 8° WATERLINE (PRIVATE) PROPOSED 8" DCDA
x x x
Hilikki
w
id i= PPRItV1C LOT w
Ex. WATER
SERVICES
`
$ CALGARY AVENUE
s x x x oeq
PR.I.E® 6LGG. r
7 —
— b "AC
.:.i.:.� TO MI!
Dm
2
J W a
a F°
i �ml m
a KANXR
EX. BLDG. �' ~•
RNGER
z
® 0 Ex. KW- � � I m � z
EX. RLDG.
x -- x x x x-
N
SITE PI-AN
SCALE (2)
m
E%. BLDG. PI,PNiEid
U
Q
(A
x x
IF
VICINITY HEAP
IffM WALE
WATER IMPROVEMENT PLAN FOR
VAN BUREN ELEMENTARY SCHOOL
SCALE
NITS
DATE:
10 -14 -09
FILENAME:
2009018
PREPARED BY:
rL YORBA LINDA WATER DISTRICT
1717 E. MIRALOMA AVENUE
PLACENTIA, CALIFORNIA 92870
(714) 701-8100
VICINITY HEAP
IffM WALE
WATER IMPROVEMENT PLAN FOR
VAN BUREN ELEMENTARY SCHOOL
SCALE
NITS
DATE:
10 -14 -09
FILENAME:
2009018
Date: November 12, 2009
YORBA LINDA WATER DISTRICT
TERMS AND CONDITIONS
FOR WATER SERVICE
NAME OF APPLICANT: PLACENTIA - YORBA LINDA UNIFIED SCHOOL DISTRICT
LOCATION OF PROJECT: VAN BUREN ELEMENTARY SCHOOL
PARCEL MAP NO.: N/A JOB NO.: 200918 SEWER: N/A LOT(S): 1
The applicant will be required to complete to the satisfaction of the District the following
items that have an "X" following the number.
1) X The applicant shall provide the District with a copy of the Grant Deed or
Title Report of the property to be served.
2) _ The applicant shall include information deemed necessary by the District in
the event the applicant is required to file a Department of Real Estate Tax
Disclosure statement.
3) _ The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 1 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. I.
4) _ The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 2 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. 2.
5) X The applicant shall submit two (2) sets of the following drawings to the
District for plan check processing:
a) Improvement Plans
b) Grading Plans
c) Tract, Parcel or Vesting Map
d) Landscaping Plans
6) X Improvement Plans submitted for plan check shall comply with the submittal
requirements established by the YLWD Engineering Department.
7) X The applicant shall dedicate or obtain all easements deemed necessary by
the District in accordance with the Rules and Regulations of the District. All
easement documents shall be prepared under the supervision of and
stamped by a Professional Land Surveyor or a Registered Civil Engineer
(licensed prior to January 1, 1982) licensed to practice in the State of
California.
Page 2 of 5
NAME OF APPLICANT: PLACENTIA -YORBA LINDA UNIFIED SCHOOL DISTRICT
LOCATION OF PROJECT: VAN BUREN ELEMENTARY SCHOOL
8) _ The applicant shall provide the District with a copy of the Recorded
Tract /Parcel Map(s) illustrating all District easements required by Term and
Condition No. 7, prior to requesting occupancy releases.
9) X The applicant shall prepare and process all easements to be quitclaimed by
the District in accordance with the Rules and Regulations of the District.
10) X The applicant shall furnish the District with a 24 -hour emergency telephone
number prior to the District's approval of the construction plans.
11) X The applicant shall notify the District 48 hours prior to initiating any work
related to required or proposed improvements.
12) X The applicant shall complete a Temporary Construction Meter Permit
application for all water to be used in construction work and all water used
under such permit shall be taken from the approved construction meter.
13) X The applicant shall provide, per the District specifications, one complete set
of "As Built" mylars and electronic copy of ACAD drawings (version 2002 or
later) for the Water and /or Sewer facilities.
14) X The applicant shall complete an Application to and Agreement for Water
Service.
15) X The applicant shall pay all of the water fees as required by the Rules and
Regulations of the District.
16) _ The applicant shall pay meter fees associated with the installation of radio
read meters for this project.
17) X The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Water Service.
18) _ The applicant shall comply with all provisions of the "Water and Sewer
Facilities Phasing Agreement between Yorba Linda Water District and Shell
Western E & P, Inc. executed on May 27, 1999, and recorded as Document
No19990486356 on June 30, 1999, in the Orange County Recorder's
Office.
19) X The applicant shall provide the District with a set of plans stamped and
approved by the Orange County Fire Authority, or fire agency having
jurisdiction, that identifies approved fire hydrant locations. Such approved
plan must be submitted to the District before staff will initiate a District plan
check for water improvements.
20) X The applicant shall have all water facilities designed in accordance with the
District's Water Facilities Plan, the Insurance Services Office's suggested
standards contained in the "Grading Schedule of Municipal Fire Protection ",
and the District's Standard Specifications. All design plans shall be
prepared under the supervision of and stamped by a Registered Civil
Engineer licensed to practice in the State of California.
Page 3 of 5
NAME OF APPLICANT: PLACENTIA -YORBA LINDA UNIFIED SCHOOL DISTRICT
LOCATION OF PROJECT: VAN BUREN ELEMENTARY SCHOOL
21) X The applicant's water facilities (on -site) shall be privately owned and
maintained.
22) X The applicant shall be required to conduct flow tests at their cost in the
event the Orange County Fire Authority requires a flow test. A District
representative shall be present to witness the flow test.
23) X The applicant shall comply with all additional District requirements, relative
to the fire protection system, fire hydrant construction and fire hydrant
locations.
24) _ The applicant shall install water Sampling Station(s) in conformance
with the District's Standard Plans.
25) X The applicant shall provide a completed Surety Bond for the water facilities
prior to the District signing the Water Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed water facilities.
26) _ The applicant shall install the curb and gutters a minimum of one week prior
to the installation of the water main and services.
27) _ All existing water services that are not useable in the new plan shall be cut
and plugged and properly abandoned at the main pipeline connection point.
28) X The applicant shall coordinate through the District all connections of new
water facilities to the existing District facilities.
29) X The applicant shall provide a written copy of the Bacteriological Report prior
to occupancy releases certifying that the water meets the Health
Department's requirements.
30) X The applicant shall adjust and raise to grade all valve covers within the
limits of this project.
31) _ The applicant shall install a pressure regulator in all dwellings that have
over 80 p.s.i. static water pressure in accordance with the appropriate
building codes.
32) _ The applicant shall complete a Temporary Water Permit for all water that
will be used through the new water services to temporarily serve the new
dwellings.
33) X The applicant shall install a District approved backflow device in connection
with any private fire suppression sprinkler facilities that may be required by
the Orange County Fire Authority or fire agency having jurisdiction.
34) _ The applicant shall install a reduced pressure principle backflow prevention
device on all commercial buildings and landscape services.
Page 4 of 5
NAME OF APPLICANT: PLACENTIA -YORBA LINDA UNIFIED SCHOOL DISTRICT
LOCATION OF PROJECT: VAN BUREN ELEMENTARY SCHOOL
35) _ The applicant shall install and provide a written test report to the District for
each backflow device certifying that the backflow devices are operating
properly prior to the water meters being turned on for service.
36) X The applicant shall install and provide a written test report to the District
certifying that the double check detector assembly is operating properly
prior to the double check detector assembly being turned on for service.
37) X The applicant and their successors (through required disclosure by the
applicant) shall provide an annual written test report to the District certifying
that the backflow devices and fire detector assemblies are operating
properly pursuant to the District's Backflow Prevention Program and the
State of California Administrative Code, Title 17, Public Health Rules and
Regulations Relating to Cross - Connections.
38) _ The applicant shall complete a Sewer Connection Application and Permit
for Sewer Service.
39) _ The applicant shall complete an Application to and Agreement for Sewer
Service.
40) _ The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Sanitary Sewer Service.
41) _ The applicant shall pay all of the sewer fees as required by the Rules and
Regulations of the District.
42) _ The applicant shall have all sewer facilities designed in accordance with the
District's Sewer Master Plan, applicable Sub -Area Master Plans and
Standard Specifications. All design plans shall be prepared under the
supervision of and stamped by a Registered Civil Engineer licensed to
practice in the State of California.
43) _ The applicant shall provide a completed Surety Bond for the sewer facilities
prior to the District signing the Sewer Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed sewer facilities.
44) _ The applicant's sewer facilities (on -site) shall be _ owned and maintained.
45) _ The applicant shall construct a sewer main and appurtenances in
conformance with the approved plans and the District's Plans and
Specifications.
46) _ The applicant shall adjust and raise to grade all sewer manhole covers
within the limits of this project.
Page 5 of 5
NAME OF APPLICANT: PLACENTIA -YORBA LINDA UNIFIED SCHOOL DISTRICT
LOCATION OF PROJECT: VAN BUREN ELEMENTARY SCHOOL
47) _ The applicant shall install a sewer backflow prevention valve on all sewer
service connections in which the pad elevations of the property being
served is lower than the rim elevation of the upstream manhole.
Installation of the backflow device shall comply with all requirements of the
Building and Plumbing Codes of the appropriate agency having jurisdiction.
48) _ The applicant shall submit a CCTV video of their sewer project as
constructed per approved plans and the District's Sewer Specifications.
The video of the sewer facilities shall be conducted in the presence of the
District inspector and shall include stationing locations of manholes,
cleanouts, wyes, laterals, backflow devices and appurtenances.
49) _ The applicant shall pay all annexation fees in accordance with Section II, B
of the Facilities Phasing Agreement referenced in Terms and Condition
No. 18.
50) _ The applicant shall comply with all provisions of the Settlement Agreement
and Mutual Release executed on November 22, 2005.
(END OF STANDARD TERMS AND CONDITIONS)
PROJECT SPECIFIC TERMS AND CONDITIONS
51) X The applicant agrees to make the existing public onsite fire hydrant
assembly a private system, by abandoning the 6" water main in Van Buren
Avenue and reconnecting to the proposed onsite private water facilities.
I hereby certify that the foregoing Terms and Conditions were approved at the November
12, 2009 Regular meeting of the Board of Directors of the Yorba Linda Water District.
The approved Terms and Conditions shall become void six (6) months from the approval
date if a formal Application to and Agreement with the Yorba Linda Water District for
Water Service is not executed for the project under consideration.
Kenneth R. Vecchiarelli
General Manager
Meeting Date:
Subject:
ATTACHMENTS:
Name:
AGENDA REPORT
November 5, 2009
ITEM NO. 3.1
Monthly Groundwater Production and Purchased Water Report
Description:
YLWD Monthly GW Production and Purchased Water Report.pdf Groudwater and Purchased Water Report
Type:
Report(s)
YLWD SOURCE WATER SUMMARY
Fiscal Year 2009 -10
Allowable GW (YTD) 4,056.6 (AF)
CUP Obligation FY 2009 -10 2,193.0 (AF)
Monthly CUP Pumping (AF) - (AF)
YTD CUP Pumping (AF) 2,191.8 (AF)
YTD CUP Achieved ( %) 99.9%
GROUNDWATER PERCENTAGE
85.0%
80.0%
75.0%
70.0% tMONTHLYGW (%)
--M-YTD GW (% )
65.0%
_BPP GOAL 46.6%
60.0%
-CUP ADJ GOAL 56.6
55.0%
50.0%
45.0%
Jul -09 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun -
09 09 09 09 09 10 10 10 10 10 10
Month
GW
(AF)
IMPORT
(AF)
TOTAL
DEMAND
(AF)
MONTHLY
GW
( %)
YTD
GW
(%)
BUDGET
(Demand Est.)
(AF)
DELTA
(%)
MONTH
Jul -09
Aug -09
Sep -09
Oct -09
Nov -09
Dec -09
Jan -10
Feb -10
Mar -10
Apr -10
May -10
Jun -10
1,404.2
933.5
2,337.7
60.1%
60.1%
2,585.9
-9.6%
1,357.6
961.4
2,319.0
58.5%
59.3%
2,544.1
-8.9%
1,309.4
911.5
2,220.9
59.0%
59.2%
2,232.2
-0.5%
1,205.4
617.6
1,823.0
66.1%
60.6%
1,882.8
-3.2%
-
1,487.4
-
1,338.0
-
1,166.6
-
1,11UO
-
1,32
-
1,65
-
2,18
-
2,45
FYTD
5,276.6
3,424.0
8,700.6
60.6%
9,24
Allowable GW (YTD) 4,056.6 (AF)
CUP Obligation FY 2009 -10 2,193.0 (AF)
Monthly CUP Pumping (AF) - (AF)
YTD CUP Pumping (AF) 2,191.8 (AF)
YTD CUP Achieved ( %) 99.9%
GROUNDWATER PERCENTAGE
85.0%
80.0%
75.0%
70.0% tMONTHLYGW (%)
--M-YTD GW (% )
65.0%
_BPP GOAL 46.6%
60.0%
-CUP ADJ GOAL 56.6
55.0%
50.0%
45.0%
Jul -09 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun -
09 09 09 09 09 10 10 10 10 10 10
Month
WATER SUPPLY
FY 2009 -2010
October 2009 Water Supply
CUP
0.0%
IMPORT
33.9%
GW
66.1%
2009 -2010 YTD Water Supply
CUP
25.2% GW
35.5%
GW BPP GOAL
46.6%
IMPORT
39.4%
3,500
3,000
2,500
2,000
a
a)
E
0
> 1,500
1,000
500
Total Water Use
Q%, o°' o� o�' o�' o� o`� o�' o� o�' o�' o� o° ^° o o° '.° o�' o°' �.° o�' o°' �.° o%' e 1.° o% o° ^°
Month
22,000
--ow— Budgeted Total GW + Import
20,000
18,000
16,000
14,000
U-
Q 12,000
m
E
0 10,000
8,000
6,000
4,000
2,000
0
Jul -09
2009 -2010 YTD Water Supply
Aug -09 Sep -09 Oct -09 Nov -09 Dec -09 Jan -10 Feb -10 Mar -10 Apr -10 May -10 Jun -10
Month
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: November 5, 2009
Subject: Monthly Preventative Maintenance Program Report
ATTACHMENTS:
Name: Description: Type:
2009 Annual.xls Annual PM Report Report(s)
2009 -10 Fiscal.xls Fiscal PM Report Report(s)
PM PROGRAM
2009
Annual 2009 1 JAN I FEB I MAR I APR I MAY I JUN I JUL I AUG I SEP I OCT NOV I DEC
Percent of target 8% 1 17% 1 26% 1 33% 1 42% 1 50% 1 58% 1 67% 1 76% 1 92% 1 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 364
4631
2201
51 718
3431
01
6401
3641
1311
1
INSPECTED THIS YEAR 364
8171
1,0371
1,088 1,806
2,149
2,149
2,689
3,043
3,174
% OF TOTAL 9.4%
21.2%1
26.9%1
28.2% 46.8%
66.7%1
66.7%1
69.3%1
78.4%1
31.8°>
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years.
OPERATED THIS MONTH 381
6141
429
1 997
1 566 312
2421
2931
456
1 575
OPERATED THIS YEAR 381
8961
1,3241
2,3211
2,887 3,199
3,4411
3,734
1 4,190
1 4,765
% OF TOTAL 7.6%
17.9%1
26.6%1
46.4%1
57.7% 64.0%
68.8%1
69.8%1
78.3%
89%1
1
DEAD ENDS (887x2 =1774) Target; all dead ends to be flushed twice every year.
FLUSHED THIS MONTH 0
01
01
4871
0 0
01
01
01
6261
1
FLUSHED THIS YEAR 0
01
01
4871
487 487
4871
4871
4871
10131
1
% OF TOTAL 0.0%
0.0%
0%1
50%
50% 50%
50%
50%
50%
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 7
11
1321
177 0
01
01
2061
931
01
1
INSPECTED THIS YEAR 7
81
1401
317 317
3171
3171
6221
6161
6161
1
% OF TOTAL 2.3%
2.6%1
46.3%1
102.6% 102.6%
102.6%1
102.6%1
169.0%1
199.0%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annualy.
CLEANED THIS MONTH 399180
219649
369860
529823
279437 859989 739825
189798
1 249974
1 1049224
CLEANED THIS YEAR 399180
609829
979689
1509512
1779949 2639938 3379763
3569561
1 3819535
1 4859759
% OF TOTAL 4.9%
7.6%
12.2%1
18.8%
22.2% 32.9% 42.1%1
44.4%1
47.5%
SEWER TELEVISING (200,640) Target; all sewers to be televised every four years.
TELEVISED THIS MONTH 219857
109302
369359
289159
129796 79507
59334
219651
239119
59463
TELEVISED THIS YEAR 219857
329159
689518
969677
1099473 1169980
1229314
1439965
1679084
1729547
% OF TOTAL 13.6%
20.0%1
42.7%1
60.2%1
68.2% 72.9%
61.0%1
71.8%1
83.3%
PM PROGRAM
2009/2010
Fiscal 2009 -10 1 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 42% 50% 58% 67% 75% 83% 92% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 0
6401
3641
131
INSPECTED THIS YEAR 0
6401
8941
1,025
% OF TOTAL 0.0%
14.0%1
23.0%
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 242
2941
4661
575
OPERATED THIS YEAR 242
6361
9921
1,567
% OF TOTAL 4.5%
10.1%1
18.6%1
29.3°1 =_.
DEAD ENDS (887x2 =974) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0
01
01
526
FLUSHED THIS YEAR 0
01
01
526
% OF TOTAL 0.0%
0.0%
0%
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 0
2061
931
0
INSPECTED THIS YEAR 0
2061
2981
298
% OF TOTAL 0.0%
66.3%1
96.4%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 739825
189798
249974
1049224
CLEANED THIS YEAR 739825
929623
1179597
2219821
% OF TOTAL 9.2%
11.6%1
14.7%
SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years.
TELEVISED THIS MONTH 59334
219651
239119
59463
TELEVISED THIS YEAR 59334
269985
509104
559567
% OF TOTAL 2.7%
13.6%1
26.0%1
27.7%
Meeting Date:
Subject:
ATTACHMENTS:
AGENDA REPORT
November 5, 2009
Monthly Groundwater Producers Meeting Report
Name: Description:
GWProducer Mtg Notes 140ct09.pdf GWP Summary Report for Oct09
ITEM NO. 3.3
Type:
Backup Material
ML
MEMORANDUM
DATE: October 14, 2009
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Pat Grady, Assistant General Manager
Lee Cory, Operations Manager
SUBJECT: Groundwater Producers Meeting, October 14, 2009
John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on October 14 at
OCWD. Items presented and discussed included the following:
1. Forebay Recharge Facilities Model. The computer -based model of the District's
recharge facilities in Anaheim and Orange is undergoing final calibration and testing.
The model includes all facilities such as recharge basins, pumps, pipelines, valves, rubber
dams and the Santa Ana River. The model considers various water sources and quality,
including river water, MWD water, GWRS water and incidental water. The model was
calibrated against historical data and showed a close correlation. Among other uses, the
model will be used as a planning tool to look at the recharge potential of proposed future
projects, and the planning of operation and maintenance events.
2. Proposal to Change Pumping Patterns to Avoid Tier 2 Charges. MWDOC is
recommending a proposed shift in the use of groundwater and import water between now
and April 2010 to avoid approximately one -half million dollars of Tier 2 Charges borne
by MWDOC agencies. MWDOC's Tier 1 limit is about 228,000 AF. Latest projection is
that MWDOC's demand will be 7,300 AF into Tier 2 for 2009. Tier 2 cost in 2009 is
$80 /AF more than Tier 1, resulting in an extra charge for Tier 2 water of approximately
$560,000. This charge can be reduced or avoided entirely if 11 Groundwater Producers
increase groundwater pumping the rest of the calendar year and match that difference
with increased imported MWD water use, January to April 2010. Those of the 11
Groundwater Producers present including YLWD, indicated that they will work to match
the pumping shift requested of each by MWDOC.
3. Miraloma ( LASCO) Property Acquisition Update. OCWD advised that LASCO has
agreed to the sale of 13.1 acres of property for $13.6 million to OCWD and that details of
the final agreement are being worked out. The agreement includes 15 months of use of
the site by LASCO, at the same time that OCWD would be preparing environmental
documentation and design drawings for clearing and use of the site for a water recharge
basin.
4. Expiring GAP Wholesale Agreements. OCWD reported that the agreements between
OCWD and the Green Acres Project (GAP) wholesalers (Fountain Valley, Santa Ana,
Newport Beach, and Mesa Consolidated WD) will be expiring in the next two years.
Each agreement will have to be renegotiated. Under GAP, wastewater is treated by
OCWD for irrigation use and wholesaled to the water retailers above, who sell it to
customers for irrigation of parks, schools, greenbelts and golf courses in their service
areas. Under the existing agreements the water is sold by OCWD to the retailers for 80%
of the groundwater cost, and the retailers sell it to customers at 90% of the current
potable water rate.
5. Quagga Mussels Update. OCWD reported that Quagga are small fresh -water mussels
that are spreading rapidly across the country in lakes and rivers. About the size of a seed,
the mussels have spread from MWD raw -water facilities and are now in Irvine Lake, and
OCWD's Kraemer and Anaheim basins. It is anticipated that they will eventually spread
to other recharge basins and the Santa Ana River. They can clog pipelines, valves and
water treatment works. Control is possible using chemicals such as chlorine or drying of
the basin, though total eradication is doubtful.
6. Water Sale by Chino Basin Watermaster. OCWD reported that the former is selling
by auction 36,000 AF of groundwater along with 30 years of groundwater storage rights
on November 4. No decision yet if OCWD will plan to bid.
7. Meeting Rescheduled. The next GWP meeting was rescheduled to Wednesday
November 18 at 10:30 am.
2
ITEM NO. 3.4
AGENDA REPORT
Meeting Date: November 5, 2009
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Name: Description: Type:
CIP Rept Nov09.pdf CIP Report Nov 09 Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: November 1, 2009
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Highland Reservoir
Continue to set bottom slab
Complete concrete floor slabs
On schedule with no significant
Budget: $11,200,000 Job No. 200309
formwork and rebar. Basin
by the end of October. Begin
issues outstanding.
Project Contact: Joe Polimino
floor slabs continue to be
walls and columns.
Planned Completion Date: August 2010
poured in a "checker board"
pattern.
2
Zone 4C Reconfiguration
Majority of pipeline installation
Ken Thompson, Inc. will
KTI Change Orders under review
Budget: $1,500,000 Job No.200710
completed. Tie -ins are going
chlorinate and test all lines,
by the District.
Project Contact: Joe Polimino
smoothly including
then Zone valves will be
Paulus will request an extension of
Planned Completion Date: Dec 2009
coordination with YLWD
positioned per plan to break
time, since the vault needed extra
San Antonio PRS Upgrades
Operations for shutdowns as
out new zones.
work and ATT requested a change
Budget: $300,000 Job 200901
needed. Paulus working on
Paulus will begin installation
in the location of the
Project Contact: Joe Polimino
repairs to existing vault
of mechanical appurtenances
communication line. This change
Planned Completion Date: Nov 2009
concrete, and installing ATT
and vault hatches for San
order is currently being reviewed.
communication line.
Antonio PRS.
3
Hidden Hills Res & Santiago BPS
Made contact with State's
Continue rebar installation for
State Parks has agreed to allow
Budget: $7,000,000 Job No.200028
representative in Sacramento
next set of floor slabs to be
paving of access road to Reservoir.
Project Contact: Joe Polimino
who will process easement
poured in the West Bay. The
Working with State and Edison on
Planned Completion Date: July 2010
documents. Continued
forming, rebar and concrete
easements.
installation of rebar and
should be placed for the West
concrete for bottom slab. West
Bay sump walls by the end of
Bay sump floor has been
October, 2009.
poured. Placed concrete for
walls in the East Bay.
4
Lakeview Site Improvements
Metal work, handrails, stairs all
Awaiting decision on
Preliminary landscape plan cost
Budget: $150,000 Job No. TBD
completed.
preliminary landscape plan.
estimate is $45 -50K.
Project Contact: Hank Samaripa
Planned Completion Date: TBD
5
Lakeview Swr. Lift Station Upgrade
Underground conduits installed
All new equipment, new
Installation date set for Nov. 4t
1
Budget: $200,000 Job No. 200905
and awaiting SCE cutover on
utilities, and new electrical
unless forecast for rain which would
Project Contact: Hank Samaripa
Nov.41h. By -pass piping
panel ready for two day
delay new electric service and
Planned Completion Date: Nov. 2009
installed and awaiting test on
cutover starting on Nov. 4 and
chopper pump and panel
Planned Completion Date: TBD
Nov.2nd.
5.
installation.
6
Wells 1, 5 and 12 Upgrade
W -12 retrofits complete. W -5
Gen Pump Co. to re- install
Well 5 retrofit expected to be
Budget: $190,000 Job No. 200813
wire brushed and re- videoed.
pump at W -5 and to test with
similar to Well 12.
Project Contact: Anthony Manzano
W -1 flowrate reduced to
packer at various flow rates.
if it is cost - effective to proceed with
Project Completion: TBD
eliminate air.
project.
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Well 20
Completed draft contract does
Advertise bidding of Well 20
Meeting with OCWD Oct 28 to
Budget: $2,000,000 Job No.200711
for bidding of W -20 drilling.
drilling, and issue mechanical
discuss potential property exchange
Project Contact: Anthony Manzano
equipment RFP.
for siting of wells.
Planned Completion Date: TBD
2
OC -51 Connection Upgrade
Met with consultants
Receive and evaluate
After input from consultants on
Budget: $242,000 Job No. 200815
recommended by MET to
proposals.
design and cost, we will determine
Project Contact: Steve Conklin
complete design and requested
if it is cost - effective to proceed with
Planned Completion Date: TBD
proposals.
project.
3
Highland Booster Station Upgrade
Final design 30% complete.
Submit AQMD application for
Coordination between new 6MG
Budget: $6,000,000 Job No. 200814
Gas Engine selection a
Permit once gas engines model
reservoir and new 18,000gpm
Project Contact: Hank Samaripa
potential concern. Governor
is finalized. Review 70%
booster station continues.
Planned Completion Date: Mid 2011
has signed bill reactivating
design drawings. Set up
AQMD permit process and
instrumentation kickoff
saving $1.2M in project cost.
meeting for project.
4
Photovoltaic Panels —Admin Bldg
Board awarded 30kW -AC
Execute contract agreement
Review construction schedule and
Budget: $250,000 Job No. 200912
solar installation to Akeena
and issue Notice to Proceed.
timing and possibly expedite for
Project Contact: Hank Samaripa
Solar. Awaiting signed
Set up design kickoff meeting.
Jan.2010 installation date.
Planned Completion Date: Mar 2009
agreements and insurance
certificates.
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Fairmont Site Improvements
Agreement approved by
S &S has proposed a code
Present schedule to Operations and
Budget: $300,000 (YLWD share)
Board. Waiting for signed
update review by City.
Production departments.
Job No. 200803
agreement from S &S. S &S
Contact S &S for preliminary
Project Contact: Hank Samaripa
has delayed signing pending
kickoff meeting to establish
Planned Completion Date: TBD
completion of other priorities.
schedule.
2
Recycled Water Study
Submitted application for 50%
Informed that State approval
Will issue RFP for preparation of
Budget: $1,800,000 Job No. 200807
grant funding for Feasibility
for grant funding will take two
Feasibility Study, with work to
Project Contact: Steve Conklin
Study. Received confirmation
months.
proceed after grant funding approval
Planned Completion Date: TBD
of receipt from State Board.
and YLWD Board approval.
3
Anaheim Intertie Connection
City of Anaheim concurred
Execute PSA and review
Review design drawings and
Budget: $250,000 (YLWD Share)
that Steven Andrews Engrng.
insurance certificates. Set up
specifications. Prepare a short list of
Job No. 200906
be retained to perform design.
kickoff design meeting with
General Contractors for
Project Contact: Hank Samaripa
Forwarded PSA to SAE for
City.
construction phase.
Planned Completion Date: TBD
signature and insurance does.
4
West Wellfield Project
Investigating potential well
Potential well sites to be
Land availability along with
Budget: $9,000,000 Job No.
sites, including evaluation of
determined and evaluated.
separation requirements from City
Project Contact: Anthony Manzano
Property Acquisition Services.
of Anaheim Wells will impact well
Planned Completion Date: TBD
selection.
5
Asset Management Plan
Completed condition
Compile criticality,
Confirm next workshop date of late
Budget: $120,000 Job No. 200909
assessment of all District
vulnerability, and risk ratings
Nov 09 and attendees list for review
Project Contact: Hank Samaripa
aboveground facilities.
for the District's various assets.
of the first draft of AMP.
Planned Completion Date: Jan 2010
Interviewed Operations
Review the underground
personnel for other system
pipeline inventory and
components.
locations of problem areas.
6
Sewer Master Plan
RFPs submitted to consultants,
Proposals scheduled to be
Review proposals and bring
Budget: $350,000 Job No. 200916
and pre - proposal meeting held
received on Nov 6.
recommendation for selection to
Project Contact: Anthony Manzano
on Oct 13
December PEO meeting.
Planned Completion Date: August 2010
7
Reservoir WQ Improvement
Processing agreement with
Mixing system to be tentatively
System will mitigate thermal
Budget: $100,000 Job No. 200917
low -bid proposer, PSI, Inc., for
installed in January 2010.
stratification and nitrification issues.
Project Contact: Anthony Manzano
$68,000 for GM's signature.
Planned Completion Date: Jan 2010
CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING
1. Zone 5 (1000) Booster Station ($1,080,000)
2. Fairmont Booster Station Reconfiguration ($400,000)
3. Foxtail Drive Pipeline ($245,000)
4. Elk Mountain Reservoir Site Improvements ($300,000)
5. Fire Flow Improvements- -Via Sereno and Ohio ($125,000)