HomeMy WebLinkAbout2009-12-23 - Board of Directors Meeting Agenda Packet Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Wednesday, December 23, 2009, 8:30 AM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
William R. Mills, President
Michael J. Beverage, Vice President
Paul R. Armstrong
Ric Collett
John W. Summerfield
4. ADDITIONS/DELETIONS TO THE AGENDA
5. PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on the agenda, the Board will recognize the individual for their comment
when the item is considered. No action will be taken on matters not listed on the agenda. Comments are limited
to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five
minutes.
6. CONSENT CALENDAR
All items listed on the consent calendar are considered to be routine matters, status reports, or documents
covering previous Board instructions. The items listed on the consent calendar may be enacted by one motion.
There will be no discussion on the items unless a member of the Board, staff, or public requests further
consideration.
6.1. Minutes of the Regular Board of Directors Meeting Held December 10, 2009
Recommendation: That the Board of Directors approve the minutes as presented.
6.2. Payments of Bills, Refunds, and Wire Transfers
Recommendation: That the Board of Directors ratify and authorize disbursements in
the amount of$1,455,348.03.
6.3. Final Progress Payment 5 and Notice of Completion for the Lakeview Sewer Lift Station
Rehabilitation Project
Recommendation: That the Board of Directors approve Final Progress Payment No.
5 in the net amount of$42,571.80 to Schuler Engineering Corporation;authorize
staff to file the Notice of Completion and release the retention thirty-five days
following recordation if no liens have been filed, release the Labor and Material
Bond, and release the Faithful Performance Bond in one year if no defects have
been found in the Lakeview Sewer Lift Station Rehabilitation Project, Job No.
200905.
6.4. Progress Payment No. 6 for the Zone Reconfiguration Project
Recommendation: That the Board of Directors approve Progress Payment No. 6 in
the net amount of$72,423.63 to Ken Thompson, Inc. for construction of the Zone
Reconfiguration Project, Job No. 200710.
6.5. Progress Payment No. 7 for Construction of the Hidden Hills Reservoir Project
Recommendation: That the Board of Directors approve Progress Payment No. 7 in
the net amount of$223,690.05 to Pacific Hydrotech Corporation for construction of
the Hidden Hills Reservoir Project, Job No. 200028.
6.6. Change Order No. 1 for the Zone Reconfiguration Project
Recommendation: That the Board of Directors approve Change Order No. 1 in the
amount of$75,027.39, with the addition of 7 calendar days to Ken Thompson, Inc.
for construction of the Zone Reconfiguration Project, Job No. 200710.
6.7. Sewer Master Plan Update
Recommendation: That the Board of Directors authorize execution of a Professional
Services Agreement with IDModeling in the amount of$300,210 to provide a Sewer
Master Plan Update.
6.8. Quarterly Investment Report for June 2009
Recommendation: That the Board of Directors receive and file the investment report
for the quarter ending June 30, 2009.
6.9. Quarterly Investment Report for September 2009
Recommendation: That the Board of Directors receive and file the investment report
for the quarter ending September 30, 2009.
7. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and Board discussions are needed prior to
formal Board action.
7.1. Board of Directors Committee Assignments
Recommendation: That the Board President in cooperation and consent with the
members of the Board of Directors, establish committee assignments and regular
meeting times for the upcoming year.
8. REPORTS, INFORMATION ITEMS, AND COMMENTS
8.1. President's Report
8.2. Directors' Reports
• CRWUA Conference - December 9-11 , 2009 (Beverage)
8.3. General Manager's Report
8.4. Future Agenda Items and Staff Tasks
9. COMMITTEE REPORTS
9.1. Executive Administrative-Organizational Committee
(Mills/Beverage) Alternate:
Minutes of the meeting held December 14, 2009 at 4:00 p.m.
Meeting scheduled January 19, 2010 at 4:00 p.m.
9.2. Finance-Accounting Committee
(Beverage/Summerfield) Alternate: Mills
• Meeting scheduled January 12, 2010 at 4:00 p.m.
9.3. Planning-Engineering-Operations Committee
(Mills/Armstrong) Alternate: Beverage
• Meeting scheduled January 7, 2010 at 4:00 p.m.
9.4. Public Information-Technology Committee
(Collett/Beverage) Alternate:Armstrong
• Meeting scheduled January 5, 2010 at 4:00 p.m.
9.5. Personnel-Risk Management Committee
(Armstrong/Collett) Alternate: Summerfield
Meeting scheduled December 14, 2009 at 4:00 p.m. was cancelled.
Meeting scheduled January 11 , 2010 at 4:00 p.m.
9.6. MWDOC/OCWD Ad Hoc Committee
(Mills/Collett) Alternate: Summerfield
• Meeting scheduled January 26, 2010 at 4:00 p.m.
9.7. Citizens Advisory Committee
Meeting scheduled December 28, 2009 at 8:30 a.m. has been cancelled.
Meeting scheduled January 25, 2010 at 8:30 a.m.
10. INTERGOVERNMENTAL MEETINGS
10.1. YL City Council - December 15, 2009 (Collett)
10.2. MWDOC Board - December 16, 2009 (Staff)
10.3. OCWD Board - December 16, 2009 (Staff)
11. BOARD OF DIRECTORS ACTIVITY CALENDAR
11.1. Meetings from January 1 , 2010 - January 31 , 2010
12. CONFERENCES AND SEMINARS
12.1. Water Inspection Tours
• Water Resource Tour - January 15, 2010
A.D. Edmonston Pumping Plant - January 29, 2010
Diamond Valley Lake - February 5, 2010
12.2. ACWA DC Conference - February 23-25, 2010
13. CLOSED SESSION
The Board may hold a closed session on items related to personnel, labor relations and/or litigation. The public is
excused during these discussions.
13.1. Public Employee Performance Evaluation
Pursuant to Section 54957 of the California Government Code
Title: General Manager
14. ADJOURNMENT
14.1. The next regular meeting of the Board of Directors will be held January 14, 2010 at 8:30
a.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Board less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870,
during regular business hours. When practical, these public records will also be made available on the District's internet
website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 6.1
AGENDA REPORT
Meeting Date: December 23, 2009
Subject: Minutes of the Regular Board of Directors Meeting Held December 10, 2009
STAFF RECOMMENDATION:
That the Board of Directors approve the minutes as presented.
ATTACHMENTS:
vescription:
121009 BOD - Minutes.doc BOD Mtg Minutes 1 u i u.,G
MINUTES OF THE
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
December 10, 2009
1. CALL TO ORDER
The December 10, 2009 regular meeting of the Yorba Linda Water District Board
of Directors was called to order by President Mills at 8:30 a.m. The meeting was
held at the District's Administrative Office at 1717 E Miraloma Ave, Placentia CA
92870.
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
DIRECTORS PRESENT STAFF PRESENT
William R. Mills, President Ken Vecchiarelli, General Manager
Ric Collett Pat Grady, Assistant General Manager
John W. Summerfield Art Kidman, General Counsel
Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Cindy Navaroli, Interim Finance Director
Chau Le, Accounting Assistant II
Russ Shupe, Storekeeper
Annie Alexander, Executive Secretary
DIRECTORS ABSENT
Paul R. Armstrong
Michael J. Beverage
OTHER VISITORS
Brett Barbre, Director, Municipal Water District of Orange County
Laurie Ellen Park, Associate, McCormick, Kidman & Behrens
4. ADDITIONS/DELETIONS TO THE AGENDA
None.
5. PUBLIC COMMENTS
None.
6. SPECIAL RECOGNITION
President Mills congratulated Mr. Barbre on his recent appointment as the fourth
district appointed representative to Metropolitan Water District's Board of
Directors.
1
6.1. Presentation of Proclamation to Chau Le for 31 Years of Service to the
District
President Mills presented a proclamation to Ms. Le for 31 years of service
to the District.
6.2. Presentation of Proclamation to Russ Shupe for 23 Years of Service to the
District
President Mills presented a proclamation to Mr. Shupe for 23 years of
service to the District.
6.3. Presentation of Proclamation to Director John W. Summerfield for his
Service as President During 2008 and 2009
President Mills presented a proclamation to Director Summerfield for his
service as President during 2008 and 2009.
Director Summerfield commented on achievements and events occurring
during his recent service as President including the construction and
dedication of the new administration building, the successful sale of bonds
for capital improvement projects, Board and staff efforts related to the
Freeway Complex Fire, and affects of the recession and statewide
drought.
The Board then applauded Director Summerfield, Ms. Le and Mr. Shupe
for their service.
Ms. Le and Mr. Shupe left the meeting at this time.
7. CONSENT CALENDAR
On a motion by Director Collett, seconded by Director Summerfield, the Board
voted 3-0 to approve the Consent Calendar.
7.1. Minutes of the Regular Board of Directors Meeting Held November 25,
2009
Recommendation. That the Board of Directors approve the
minutes as presented.
7.2. Payment of Bills, Refunds, and Wire Transfers
Recommendation. That the Board of Directors ratify and authorize
disbursements in the amount of$1,629,513.12.
7.3. 2010 Association of California Water Agencies (ACWA) Annual
Membership Dues
Recommendation. That the Board of Directors authorize payment
of the 2010 ACWA membership dues in the amount of$18,067.50.
2
7.4. Progress Payment No. 4 for the Lakeview Sewer Lift Station Rehabilitation
Project
Recommendation. That the Board of Directors approve Progress
Payment No. 4 in the net amount of $52,570.38 to Schuler
Engineering Corp. for the Lakeview Sewer Lift Station
Rehabilitation Project, Job No. 200905.
7.5. Progress Payment No. 5 for the Zone Reconfiguration Project
Recommendation. That the Board of Directors approve Progress
Payment No. 5 in the net amount of $141,489.99 to Ken
Thompson, Inc. for construction of the Zone Reconfiguration
Project, Job No. 200710.
7.6. Progress Payment No. 6 for Construction of the Hidden Hills Reservoir
Project
Recommendation. That the Board of Directors approve Progress
Payment No. 6 in the net amount of $277,416.54 to Pacific
Hydrotech Corporation for construction of the Hidden Hills
Reservoir Project, Job No. 200028.
7.7. Progress Payment No. 19 for the Highland Reservoir Replacement Project
Recommendation. That the Board of Directors approve Progress
Payment No. 19 in the net amount of $502,090.93 to Schuler
Engineering Corporation and 10% retention of $55,787.88
deposited to Citizens Business Bank escrow account for
construction of the Highland Reservoir Replacement Project, Job
No. 200309.
7.8. Change Order No. 1 Lakeview Sewer Lift Station Rehabilitation Project
Recommendation. That the Board of Directors approve Change
Order No. 1 in the amount of $47,302 with the addition of two
calendar days to Schuler Engineering Corp. for construction of the
Lakeview Sewer Lift Station Rehabilitation Project, Job No. 200905.
7.9. Change Order No. 1 for the San Antonio Pressure Reducing Station
Upgrade Project
Recommendation. That the Board of Directors approve Change
Order No. 1 in the amount of $20,566.73, with the addition of 30
calendar days to Paulus Engineering, Inc., for construction of the
San Antonio Pressure Reducing Station Upgrades Project, Job No.
200901.
3
7.10 Terms and Conditions for Water Service with Placentia Medical, LLC
Recommendation. That the Board of Directors approve the Terms
and Conditions for Water Service with Placentia Medical, LLC, Job
No. 200923.
8. REPORTS, INFORMATION ITEMS AND COMMENTS
8.1. President's Report
President Mills did not have any comments at this time.
8.2. Directors' Reports
None.
8.3. General Manager's Report
Mr. Vecchiarelli reported that a District customer had been involved in a
traffic accident near the east exit on Miraloma Avenue. Staff has
contacted the City of Placentia to see if warning signs can be placed on
Miraloma Avenue to alert drivers of the blind curve ahead. Staff will also
be installing signage identifying the east drive approach as an entrance
only and the west approach as an exit only.
Mr. Vecchiarelli further reported that a luncheon was held on December 9,
2009 to recognize two long-term employees retiring at the end of the year
and to recognize and thank our current employees for their service and
dedication throughout the year.
8.4. General Counsel's Report
Mr. Kidman commented on a recent ruling of the Ninth Circuit Court of
Appeals related to climate change.
8.5. Future Agenda Items and Staff Tasks
None.
9. COMMITTEE REPORTS
9.1. Executive-Administrative-Organizational Committee
(Summerfield/Mills) Alternate. Collett
Meeting scheduled December 15, 2009 at 4:00 p.m. was rescheduled to
December 14, 2009 at 4:00 p.m.
4
9.2. Finance-Accounting Committee
(Beverage/Summerfield) Alternate. Mills
Minutes of the meeting held December 7, 2009 were provided at the
meeting. Directors Beverage and Summerfield attended. Matters
discussed during the meeting were as follows: October Budget to Actual
Results; Monthly Investment Report for September and October 2009;
Check Register Descriptions; Leaded Inventory — AB 1953; and Employee
Retirement Alternatives.
Meeting scheduled January 12, 2010 at 4:00 p.m.
9.3. Personnel-Risk Management Committee
(Armstrong/Collett) Alternate. Summerfield
Meeting scheduled December 14, 2009 at 4:00 p.m. was cancelled.
Meeting scheduled January 11, 2010 at 4:00 p.m.
9.4. Planning-Engineering-Operations Committee
(Mills/Armstrong) Alternate. Beverage
Minutes of the meeting held December 3, 2009 were provided in the
agenda packet. Directors Mills and Beverage attended. Matters
discussed during the meeting were as follows: Change Order No. 1 for
San Antonio Pressure Reducing Station Upgrade Project; Change Order
No. 1 for Lakeview Sewer Lift Station Rehabilitation Project; Change
Order No. 1 for Zone Reconfiguration Project; Sewer Master Plan Update;
Monthly Ground Production and Purchased Water Report; Preventative
Maintenance Report; Monthly OC Groundwater Producers Meeting
Report; and Status of Capital Projects in Progress.
Meeting scheduled January 7, 2010 at 4:00 p.m.
9.5. Public Information-Technology Committee
(Collett/Beverage) Alternate. Armstrong
Minutes of the meeting held December 1, 2009 were provided in the
agenda packet. Directors Collett and Beverage attended. Matters
discussed during the meeting were as follows: Pressure Increase
Notification Letter; Water Bill Redesign; Winter Newsletter Schedule and
Content: Home Energy Efficiency Survey; District Participation in
Community Events; Conservation Ordinance Monthly Statistics; and
Status of IT Projects.
Meeting scheduled January 5, 2010 at 4:00 p.m.
5
9.6. MWDOC/OCWD Ad Hoc Committee
(Mills/Collett) Alternate: Summerfield
Meeting scheduled January 26, 2010 at 4:00 p.m.
9.7. Citizens Advisory Committee
Meeting scheduled December 28, 2009 at 8:30 a.m. has been cancelled.
Meeting scheduled January 25, 2010 at 8:30 a.m.
President Mills suggested that when Committee assignments are made
that Board members consider rotating attendance at future Citizens
Advisory Committee meetings.
10. INTERGOVERNMENTAL MEETINGS
10.1. YL City Council - December 1, 2009 (Summerfield)
Director Summerfield attended and commented on the City's response to
the Orange County Grand Jury Report and proposed water efficient
landscape ordinance, both of which were discussed during the meeting.
Director Summerfield suggested that staff try to obtain a copy of the City's
response to the Orange County Grand Jury Report and draft ordinance.
10.2. MWDOC/MWD Workshop - December 2, 2009 (Staff)
Staff did not attend.
10.3 YL Planning Commission - December 9, 2009 (Collett)
Director Collett did not attend.
REPORTS, INFORMATION ITEMS AND COMMENTS CONTINUED
President Mills reported on his attendance at the recent ACWA/JPIA and ACWA fall
conferences. President Mills requested staff to look into the Flawless Performance
Management Program which was highlighted during the ACWA/JPIA conference.
President Mills then commented on the multibillion-dollar water bond and Local
Taxpayer, Public Safety and Transportation Act, both of which were discussed during
the ACWA conference and have been placed on the ballot next November.
Mr. Kidman also commented on the Local Taxpayer, Public Safety and Transportation
Act and stated that the proposal may not provide additional protection to local
government agencies from the state borrowing property tax revenue.
Mr. Kidman then commented on his attendance at the ACWA conference and a bond
measure that would require measureable conservation strategies to be included in
future Urban Water Management Plan updates. Mr. Kidman will provide a memo to
staff regarding this matter before the end of the year.
6
11. BOARD OF DIRECTORS ACTIVITY CALENDAR
11.1. Meetings from December 11, 2009 — January 31, 2010
The Board reviewed the listed meetings. The Personnel-Risk
Management meeting scheduled December 14, 2009 was cancelled. The
Executive-Administrative-Organizational Committee meeting scheduled
December 15, 2009 was rescheduled to December 14, 2009 at 4:00 p.m.
Director Collett will attend the Yorba Linda City Council meeting on
December 15, 2009 in place of Director Mills.
12. CLOSED SESSION
On a motion by Director Collett, seconded by Director Summerfield, the Board
voted 3-0 to adjourn to Closed Session at 9:15 a.m. All Directors in attendance
were present. Also present were Messrs. Vecchiarelli, Grady and Kidman and
Ms. Park.
12.1. Conference with Legal Counsel — Pending Litigation
Pursuant to Subdivision (a) of Section 54956.9 of the California
Government Code
Name of Case: Itani, et al vs. YLWD
(OC Superior Court — Case No. 00124906)
Name of Case: Johnson, et al vs. YLWD, et al
(OC Superior Court — Case No. 00125994)
Name of Case: State Farm General Insurance Company vs. YLWD
(OC Superior Court — Case No. 00311353)
Name of Case: Weiss vs. YLWD
(OC Superior Court — Case No. 00319080)
Name of Case: Lindholm vs. YLWD, et al
(OC Superior Court — Case No. 00320239)
12.2. Conference with Legal Counsel — Liability Claims
Pursuant to Section 54956.95 of the California Government Code
Claimants: Einer G. and Rosalinda Lindholm
Claimant: The Hills at Yorba Linda Community Association
Agency Claimed Against: Yorba Linda Water District
7
The Board reconvened in Open Session at 9:37 a.m. During Closed Session
Director Collett made a motion, seconded by Director Summerfield, to instruct
staff to return the claims submitted by Einer G. and Rosalinda Lindholm and by
The Hills at Yorba Linda Community Association. The Board took action on
claims previously submitted by these claimants on May 14, 2009 and is neither
compelled nor required to repeat these actions for the same claims. The motion
passed 3-0.
13. ADJOURNMENT
13.1. The meeting was adjourned at 9:38 a.m. The next regular meeting of the
Board of Directors will be held December 23, 2009 at 8:30 a.m.
Ken Vecchiarelli
Board Secretary
8
ITEM NO. 6.2
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: N/A
To: Board of Directors Cost Estimate: $1 ,455,348.03
Funding Source: All Funds
From: Ken Vecchiarelli, General Account No: N/A
Manager
Job No: N/A
Presented By: Cindy Navaroli, Interim Finance Dept: Finance
Director
Reviewed by Legal: N/A
Prepared By: Maria Trujillo, Accounting CEQA Compliance: N/A
Assistant I
Subject: Payments of Bills, Refunds, and Wire Transfers
SUMMARY:
Section 31302 of the California Water Code says the District shall pay demands made against it
when they have been approved by the Board of Directors. Pursuant to law, staff is hereby
submitting the list of disbursements for Board of Directors' approval.
STAFF RECOMMENDATION:
That the Board of Directors ratify and authorize disbursements in the amount of $1,455,348.03.
DISCUSSION:
The major items and wire transfers on this disbursement list are as follows: A wire of $454,885.88 to
MWDOC for October 2009 water purchases; a check of $72,423.63 to Ken Thompson, Inc. for a
Zone 4 Extension progress payment; a check of $95,371 .39 to MWH Americas for enigneering
design of the Highland Booster Pump Station Upgrades; a check of $223,690.05 to Pacific
Hydrotech for a Hidden Hills Reservoir progress payment; and a check of $42,571 .80 to Schuler
Engineering for the Lakeview lift station final progress payment. The balance of $334,830.50 is
routine invoices.
ADP issues our payroll checks, with the exception of the third party checks.
The Accounts Payable check register total is $1 ,223,773.25; Payroll No. 25 total is $231 ,574.78;
and, the disbursements of this agenda report are $1 ,455,348.03. A summary of the checks is
attached.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors approves bills, refunds and wire transfers semi-monthly.
ATTACHMENTS:
Name: Description: Type:
CkReg1223 Alpha.pdf Check Register Backup Material
09-CS 1223.doc Cap Sheet Backup Material
Yorba Linda Water District
Check Register
For Checks Dated: 12/11/2009 thru 12/23/2009
Check No. Date Vendor Name Amount Description ($25kor>)
53147 12/23/2009 1-800-Conference(R) 53.62
W122309A 12/23/2009 1st Enterprise Bank 24,834.45
53060 12/23/2009 Abbott Staffing Group, Inc. 2,583.15
53061 12/23/2009 ACWA-Assn Of Ca Water Agencies 18,067.50
53062 12/23/2009 Answer One Communications 782.80
53063 12/23/2009 Apollo Technologies Inc. 380.00
53064 12/23/2009 Aqua-Metric Sales Co. 27,959.66 December Inventory
53065 12/23/2009 Aramark Uniform Services, Inc 414.52
53066 12/23/2009 Arrow Hardware 258.52
53067 12/23/2009 AT&T 45.18
53068 12/23/2009 Avante-Garde Inc. 4,091.50
W121409A 12/14/2009 Bank Of America 132.74
53069 12/23/2009 Bell Pipe&Supply 59.96
53070 12/23/2009 Butier Engineering Inc 38,160.00 HHills Res PP Nov
53071 12/23/2009 Calif Water Environ Assn (CWEA) 132.00
53072 12/23/2009 California Business Bank 8,047.07
53073 12/23/2009 Carollo Engineers 34,148.00 HHills Res/Asset Mgt
53075 12/23/2009 CDM, Inc. 12,664.48
53076 12/23/2009 CDW Government, Inc 1,592.49
53077 12/23/2009 Certified Laboratories 561.81
53078 12/23/2009 Chambers Group Inc. 1,994.04
53079 12/23/2009 City Of Anaheim 13,164.93
53080 12/23/2009 City Of Placentia 5,420.66
53081 12/23/2009 Clinical Lab. Of San Bern. 2,625.00
53082 12/23/2009 C& L Refrigeration Corp. 891.40
53083 12/23/2009 CNA Surety 700.00
53084 12/23/2009 Culligan 1,787.90
53085 12/23/2009 Dan Copp Crushing Corp. 164.00
53086 12/23/2009 Dapper Tire Co. Inc. 1,209.46
53087 12/23/2009 Datalok Orange County 275.91
53091 12/23/2009 Dean Criske Trucking 293.11
53088 12/23/2009 Dell Marketing L.P. 547.03
53089 12/23/2009 Dick's Lock&Safe Inc. 78.50
53090 12/23/2009 Doug A. Baker 90.00
53092 12/23/2009 Eisel Enterprises, Inc. 244.69
53093 12/23/2009 Federal Express 18.01
53094 12/23/2009 Fieldman Rolapp&Associates 2,325.32
53095 12/23/2009 Fred Pryor Seminars 199.00
53096 12/23/2009 Fry's Electronics 28.25
53097 12/23/2009 G.M. Sager Construction Co., Inc. 12,077.00
53098 12/23/2009 Haaker Equipment Co. 550.61
53099 12/23/2009 Hall& Foreman, Inc 960.49
53100 12/23/2009 Home Depot Credit Services 264.00
53101 12/23/2009 Infosend Inc. 10,782.02
53102 12/23/2009 Instant Sign Center 247.88
53103 12/23/2009 Integrated Tool Solutions, LLC 2,254.34
53104 12/23/2009 Jackson's Auto Supply- Napa 1,001.31
53105 12/23/2009 John Decriscio 105.00
53106 12/23/2009 Katrina Aragon 1,082.87
53107 12/23/2009 Ken Thompson, Inc. 72,423.63 Zn4 Ext PP Nov
53108 12/23/2009 Kenneth R.Vecchiarelli 225.27
53109 12/23/2009 Konica Minolta Business 661.81
53110 12/23/2009 Leighton Consulting, Inc. 7,375.00
53111 12/23/2009 Light Bulbs Etc 208.28
53112 12/23/2009 Lincoln National Life 1,895.18
53113 12/23/2009 Mc Fadden-Dale Hardware 1,139.16
53114 12/23/2009 Merchants Building Maintenance LLC 11,986.26
53115 12/23/2009 Miles& Kelley Construction 1,000.00
53116 12/23/2009 Mine Safety Appliance Co 3,616.55
53117 12/23/2009 Municipal Water District 7,068.75
W121409 12/14/2009 Municipal Water District 454,885.88 Water Purchase Oct
53118 12/23/2009 MWH Americas, Inc. 95,371.39 Hghld BPS Upgrade Nov
53119 12/23/2009 Nextel Of California 2,267.15
53120 12/23/2009 Office Solutions 463.51
53121 12/23/2009 Orange County-Auditor/Cont 219.50
53122 12/23/2009 Orange County Water District 500.00
53123 12/23/2009 Pacific Coast Tool &Supply 338.25
53124 12/23/2009 Pacific Hydrotech Corporation 223,690.05 HHills PP Nov
53125 12/23/2009 Pacific EH&S Services, Inc. 2,665.40
53059 12/11/2009 PARMA 70.00
W122309 12/23/2009 Parsons Engineering Science 132.25
53126 12/23/2009 Pitney Bowes 763.00
53127 12/23/2009 Placentia Disposal#676 907.76
53128 12/23/2009 Plumbers Depot Inc. 1,213.65
53129 12/23/2009 Praxair Distribution 285.88
53130 12/23/2009 Psomas&Associates 2,450.23
53131 12/23/2009 P.T.I. Sand &Gravel, Inc. 964.53
53074 12/23/2009 SARBS-CWEA 270.00
53132 12/23/2009 Schuler Engineering Corp. 42,571.80 Lkvw Stn Final PP Nov
53133 12/23/2009 Smog Tech 585.00
53134 12/23/2009 Solarwinds Inc. 790.00
53135 12/23/2009 Southern Calif Edison Co. 189.83
53136 12/23/2009 Southern Calif Gas Co. 19,735.37
53137 12/23/2009 Stacy Bavol/Petty Cash 181.26
53138 12/23/2009 Staples Business Advantage 1,376.48
53139 12/23/2009 Stater Bros. Markets 22.19
53140 12/23/2009 Steven Andrews Engineering 85.49
53141 12/23/2009 St.Jude Medical Center 1,350.00
53142 12/23/2009 Tetra Tech, ISG 1,232.03
53143 12/23/2009 Toxguard Fluid Technologies 339.19
53144 12/23/2009 Underground Service Alert 163.50
53145 12/23/2009 United Industries 528.61
53146 12/23/2009 Valverde Construction, Inc. 9,900.97
53148 12/23/2009 Village Nurseries 38.82
53149 12/23/2009 Walters Wholesale Electric Co. 160.07
53150 12/23/2009 Water Education Foundation 85.69
53151 12/23/2009 Wells Supply Co 11,573.62
53152 12/23/2009 William Mills 167.63
53153 12/23/2009 Xerox Corporation 1,233.15
53154 12/23/2009 Yorba Linda Hardware 52.05
Total $1,223,773.25
December 23, 2009
CHECK NUMBERS:
Computer Checks 53059 – 531 54 $ 743,787.93
Void Check 53058
WIRES:
W-121409 MWDOC $ 454,885.88
W-1 21409A Bank of America $ 132.74
W-122309 Parsons $ 132.25
W-122309A 1 St Enterprise Bank $ 24,834.45
$ 479,985.32
TOTAL OF WIRE AND CHECKS $ 1,223,773.25
PAYROLL NO. 25: (including ADP checks):
District Manual Checks 4400-4404 $ 231,574.78
----------------------------------------------------------------------------------------------------------------------
DISBURSEMENT TOTAL: $ 1,455,348.03
------------------------------------------------------------------
------------------------------------------------------------------
APPROVED BY THE BOARD OF DIRECTORS MINUTE ORDER AT BOARD
MEETING OF DECEMBER 23, 2009
------------------------------------------------------------------
------------------------------------------------------------------
TOTAL DISBURSEMENTS ARE DISTRIBUTED TO THE FUND ACCOUNTS
AS FOLLOWS:
WATER $1,004,606.73 SEWER $ 69,452.98
D # 1 $ 98,888.92 I D # 2 $ 282,399.40
TOTAL: $ 1,455,348.03
ITEM NO. 6.3
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: $250,000
To: Board of Directors Cost Estimate: $250,000
Funding Source: Sewer Capital
Reserves
From: Ken Vecchiarelli, General Account No: 201-2700
Manager
Job No: J-200905
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Hank Samaripa, Project CEQA Compliance: Exempt
Engineer
Subject: Final Progress Payment 5 and Notice of Completion for the Lakeview Sewer
Lift Station Rehabilitation Project
SUMMARY:
Construction is complete. Staff recommends approval of Final Progress Payment No. 5 and filing of
the Notice of Completion.
STAFF RECOMMENDATION:
That the Board of Directors approve Final Progress Payment No. 5 in the net amount of $42,571 .80
to Schuler Engineering Corporation; authorize staff to file the Notice of Completion and release the
retention thirty-five days following recordation if no liens have been filed; release the Labor and
Material Bond; and release the Faithful Performance Bond in one year if no defects have been
found in the Lakeview Sewer Lift Station Rehabilitation Project, Job No. 200905.
DISCUSSION:
In accordance with the contract documents, Schuler Engineering Corp submitted a request for Final
Progress Payment No. 5, in the amount of $47,302.00, which is the final payment for all work on the
project through completion date December 9, 2009. During this period, Schuler completed all
electrical installation, testing and start-up and all punchlist items for the project. This is the final pay
request for the project.
The status of the construction contract with Schuler Engineering Corp. is as follows:
• The current contract is $179,389 and 122 calendar days starting August 11 , 2009.
• If approved, Final Progress Payment No. 5 is $47,302.00 (26.3% of the final contract amount),
less 10% retention for a net payment of $42,571 .80.
• Total payments to date including retention are $179,389 (100% of the total contract amount).
Staff has reviewed the contractor's final progress payment and recommend approval. A copy of the
Final Progress Payment No. 5 is attached for your reference.
PRIOR RELEVANT BOARD ACTION(S):
Construction bids were received and a construction contract in the amount of $137,087.00 was
awarded to the low bidder, Schuler Engineering on July 9, 2009. On December 10, 2009, the Board
approved Progress Payment No. 4 in the net amount of $52,570.38, and approved Change Order
No. 1 in the amount of $47, 302 and 2 additional calendar days. The Board has approved four
progress payments for this project, the most recent of which was approved on December 10, 2009.
ATTACHMENTS:
Description:
Schuler PP 5 rev.pdf Schuler Prog Pay 5
YORBA LINDA WATER DISTRICT PROGRESS PAY REPORT
PROJECT Lakeview Sewer Lift Station PROGRESS PAY REQUEST NO. 6-
FINAL
LOCATION Yorba Unda PROJECT NO. J-M5 PAGE OF PAGES
CONTRACTOR Schuler Engineering DATE
ORIGINAL CONTRACT AMOUNT: $ 132,087
AUTHORIZED CHANGE ORDERS: A 47,302
REVISED CONTRACT AMOUNT: $ 179,389
PROGRESS PAY ESTIMATE FOR PERIOD December 01,2009 TO December
PREVIOUS THIS MONTH TO DATE
VALUE OF WORK COMPLETED $ 132,087.00 $ 132,087.00
CHANGE ORDER 1MORK COMPLETED $ - $ 47,30200 $ 47,30200
TOTAL VALUE OF WORK COMPLETED $ 132,087.00 $ 47,30200 $ 179,389.00
LESS RETENTION 10% $ 17,9W,90
LESS OTHER DEDUCTIONS $AMOUNT DUE THIS ESTIMATE $ 161,450.10
LESS AMOUNT PREVIOUSLY PAID $ 118,878.30
BALANCE DUE THIS ESTIMATE $ 42,571.80
COMPLETION TIME 120 CALENDAR DAYS
APPROVED TIME EXTENSIONS 2 CALENDAR DAYS
TOTAL CONTRACT TIME 122 CALENDAR DAYS
TIME EXPENDED TO DATE 120 CALENDAR DAYS
TIME REMAINING 2 CALENDAR DAYS
l
REQUESTED BY: ` DATE:
Contractor-Chas Wick-Schuler Engineering
APPROVED BY: DATE: U
Owners Representative—Hank Samaripo-Y
APPROVED BY: DATE:
OWNER—Steve Conklin-YLWD
ITEM NO. 6.4
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: 2.3M
To: Board of Directors Cost Estimate: 2.3M
Funding Source: ID No. 1 GO Bonds
From: Ken Vecchiarelli, General Account No: 301-2700
Manager
Job No: 200710
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Joe Polimino, Project Engineer CEQA Compliance: Exempt
Subject: Progress Payment No. 6 for the Zone Reconfiguration Project
SUMMARY:
The Zone Reconfiguration Project is nearly complete. It will result in improved water pressure to
approximately 800 homes in Pressure Zone 3. The project includes construction of approximately
8,500 feet of pipe and appurtenances and was awarded to Ken Thompson, Inc. for $1 ,099,000.
STAFF RECOMMENDATION:
That the Board of Directors approve Progress Payment No. 6 in the net amount of $72,423.63 to
Ken Thompson, Inc. for construction of the Zone Reconfiguration Project, Job No. 200710.
DISCUSSION:
In accordance with the contract documents, Ken Thompson, Inc. submitted a request for Progress
Payment No. 6, in the amount of $80,470.70 for completed work through November 30, 2009.
During this period, the contractor worked on restoration throughout the project limits, including
sidewalk repair, curb and gutter repair, pavement restoration for both arterial and residential streets
and traffic loop repairs.
The status of the construction contract with Ken Thompson, Inc. is as follows:
• The current contract is $1 ,099,000.00 and 200 calendar days starting May 4, 2009.
• If approved, Progress Payment No. 6 is $80,470.70 (7.3% of the total contract amount), less
10% retention of $8,047.07 for a net payment of $72,423.63.
• Total payments to date including retention are $1 ,038,500.00 (94.5% of the total contract
amount).
• As of November 30, 2009, 211 calendar days were used (105.5% of the contract time). (It is
expected that Ken Thompson is going to submit a claim for extra days in the change orders
that are pending.)
District Staff reviewed the contractor's progress payment and recommend approval. A copy of
Progress Payment Number 6 is attached for your reference.
PRIOR RELEVANT BOARD ACTION(S):
On February 12, 2009, the Board of Directors authorized the President and Secretary to award a
construction contract with Ken Thompson, Inc. in the amount of $1 ,099,000.00 for construction of
the project. The Board of Directors has approved 5 Progress Payments to date, the most recent of
which was approved on December 10, 2009.
ATTACHMENTS:
Description: Type:
Ken Thompson Progress Pay Report 6.pdf KTI Progress Pay Report 6 Backup Material
YORBA LINDA WATER DISTRICT PROGRESS PAY REPORT
PROJECT Zone Reconfiguration Project PROGRESS PAY REQUEST NO. 6
LOCATION Yorba Linda, CA PROJECT NO. 200710 PAGES 1 OF 1 PAGES
CONTRACTOR Ken Thompson, Inc. DATE 12/09/09
ORIGINAL CONTRACT AMOUNT $1,099,000.00
AUTHORIZED CHANGE ORDERS $0.00
REVISED CONTRACT AMOUNT 1,099,000.00
PROGRESS PAY ESTIMATE FOR PERIOD 11/01109 TO 11130109
PREVIOUS THIS MONTH TO DATE
VALUE OF WORK COMPLETED $958,029.30 $80,470.70 $1,038,500.00
CHANGE ORDER WORK COMPLETED $0.00 $0.00 $0.00
TOTAL VALUE OF WORK COMPLETED $958,029.30 $80,470.70 $1,038,500.00
LESS RETENTION 10% -$103,850.00
LESS OTHER DEDUCTIONS Electronic Wire Fees $0.00
NET EARNED TO DATE $934,650.00
LESS AMOUNT PREVIOUSLY PAID $862,226.37
BALANCE DUE THIS ESTIMATE $72,423.63
NOTICE TO PROCEED May 4,2009
COMPLETION TIME 200 CALENDAR DAYS
APPROVED TIME EXTENSIONS 0 CALENDAR DAYS
TOTAL CONTRACT TIME 200 CALENDAR DAYS
TIME EXPENDED TO DATE 211 CALENDAR DAYS
TIME REMAINING -11 CALENDAR DAYS
REQUESTED BY: 4 DATE: 12109109
Behzad Basiri,Project Marra er Ken Thompson,Inc.
RECOMMENDED DATE:
BY: Jesu Sosa,Inspector,YLWD
APPROVED BY: DATE:
Steve Conklin,Engineering Manager,YLWD
ITEM NO. 6.5
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: $9,000,000
To: Board of Directors Cost Estimate: $9,000,000
Funding Source: ID No. 2 GO Bonds
From: Ken Vecchiarelli, General Account No: 401-2700
Manager
Job No: 200028
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Joe Polimino, Project Engineer CEQA Compliance: MND
Subject: Progress Payment No. 7 for Construction of the Hidden Hills Reservoir Project
SUMMARY:
Construction is proceeding on schedule and is approaching the half way mark. Work includes
construction of a 2.0 million gallon buried concrete reservoir, upgrades to the Santiago Booster
Pump Station, an all-weather access road and pipeline appurtenances to the reservoir site.
STAFF RECOMMENDATION:
That the Board of Directors approve Progress Payment No. 7 in the net amount of $223,690.05 to
Pacific Hydrotech Corporation for construction of the Hidden Hills Reservoir Project, Job No.
200028.
DISCUSSION:
In accordance with the contract documents, Pacific Hydrotech Corporation submitted a request for
Progress Payment No. 7, in the amount of $248,544.50 for completed work through November 30,
2009. During this period, the contractor continued to install rebar, formwork and pour concrete for
reservoir walls in both the East and West bays. The status of the construction contract with Pacific
Hydrotech Corporation is as follows:
• The current contract is $5,012,458.00 and 400 calendar days starting May 11 , 2009.
• If approved, Progress Payment No. 7 is $248,544.50 (5.0% of the total contract amount), less
10% retention of $24,854.45 for a net payment of $223,690.05.
• Total payments to date including retention are $1 ,977,908.00 (39.5% of the total contract
amount).
• As of November 30, 2009, 204 calendar days were used (51.0% of the contract time).
Staff and Butier, the District's construction manager for the project, have reviewed the contractor's
progress payment and recommend approval. A copy of Progress Payment No. 7 is attached for
your reference.
PRIOR RELEVANT BOARD ACTION(S):
The Board has approved six progress payments to date for this project, the last of which was
approved December 10, 2009.
ATTACHMENTS:
Description: Type:
Pacific Hydrotech Progress Pay Report 7.pdf Pacific Hydrotech PPF Backup Material
YORBA LINDA WATER DISTRICT PROGRESS PAY REPORT
PROJECT Hidden Hills Reservoir PROGRESS PAY REQUEST NO. _ 0-07---
LOCATION Yarba Linda, CA PROJECT NO. J-700028 PAGE 1 OF 1 PAGES
CONTRACTOR Pacific Hydrotech DATE Nov 30, 2009 _®
ORIGINAL CONTRACT AMOUNT: $ 5,012,458.00
I
AUTHORIZED CHANGE ORDERS: 0.00
REVISED CONTRACT AMOUNT: 5,012,458.00
PROGRESS PAY ESTIMATE FOR PERIOD November 1,2009 TO November 30,2009
PREVIOUS THIS MONTH TO DATE
VALUE OF WORK COMPLETED $ 1,729,363.50 5 248,544.50 5 :,977,908.00
CHANGE ORDER WORK COMPLETED
TOTAL VALUE OF WORK COMPLETED $ 1,729,363.50 $ 248,544.50 $ 1,977,908.00
LESS RETENTION 10% $ 197,790.80
LESS OTHER DEDUCTIONS Electronic Wire Fees $ 140.00
NET EARNED TO DATE $ 1.780,1 17.20
LESS AMOUNT PREVIOUSLY PAID $ 1.556,427.15
BALANCE DUE THIS ESTIMATE $ 223,690.05
NOTICE TO PROCEED may 11,2009
COMPLETION TIME 400 CALENDAR DAYS
APPROVED TIME EXTENSIONS 0 CALENDAR DAYS
TOTAL CONTRACT TIME 400 CALENDAR DAYS
TIME EXPENDED TO DATE 204 CALENDAR DAYS
TIME REMAINING 196 CALENDAR DAYS
REQUESTED BY: 1z'0 IN IG{ y DATE. 12/08/09
Ronald Wiehe,Project Coordinator,Pacific Hydrotech.
APPROVED BY: r DATE:
Stev i e, onstruction N%nager,Butier Engineering
APPROVED BY: DATE:.
Steve Conklin,Engineering Manager,YLWD
ITEM NO. 6.6
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: 2.3M
To: Board of Directors Cost Estimate: 2.3M
Funding Source: ID No. 1 GO Bonds
From: Ken Vecchiarelli, General Account No: 301-2700
Manager
Job No: 200710
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Joe Polimino, Project Engineer CEQA Compliance: Exempt
Subject: Change Order No. 1 for the Zone Reconfiguration Project
SUMMARY:
The Zone Reconfiguration Project is nearly complete. It will result in improved water pressure to
approximately 800 homes previously in Pressure Zone 3. The project includes construction of
approximately 8,500 feet of pipe and appurtenances and was awarded to Ken Thompson, Inc. for
$1 ,099,000. Ken Thompson, Inc. has put in a request for Change Order 1 , for $75,027.39 and 7
calendar days as described below.
STAFF RECOMMENDATION:
That the Board of Directors approve Change Order No. 1 in the amount of $75,027.39, with the
addition of 7 calendar days to Ken Thompson, Inc. for construction of the Zone Reconfiguration
Project, Job No. 200710.
COMMITTEE RECOMMENDATION:
The Planning-Engineering-Operations Committee discussed this at their meeting on December 3,
2009 and support staff recommendation for approval.
DISCUSSION:
In accordance with the contract documents, Ken Thompson, Inc. has submitted a request for
Change Order No. 1 , for an increase in the contract amount of $75,027.39 and a time extension of 7
calendar days. The requested extra work items include the following:
• KTI is claiming $13,050.67 for a conflict with an existing underground gas line owned by The
Gas Company. This line was marked improperly by the Gas Company's locating service and
as a result the line was hit by KTI's excavator, damaged but not ruptured. KTI is claiming a
delay since the line needed to be repaired by The Gas Company crews. District staff has
submitted a claim to The Gas Company for reimbursement.
• The remaining items consist mostly of time and material costs for utility conflicts during the
construction, all of which were tracked by the YLWD inspector. One of the utility conflicts
which resulted in a claim for $1 ,436.56, was a result of a mismarked line by AT&T. District
staff has submitted a claim to AT&T for reimbursement.
The status of the construction contract with Ken Thompson, Inc. is as follows:
• The current contract is $1 ,099,000.00 and 200 calendar days starting May 4, 2009.
• If approved, Change Order No. 1 adds $75,027.39 (6.8% of the original contract) and 7
calendar days.
• If approved, Change Order No. 1 increases the total contract amount to $1,174,027.39 and
207 calendar days.
The Engineering Manager and Staff have reviewed the contractor's request for Change Order No. 1
and recommend approval. A copy of Change Order No. 1 is attached for your reference.
PRIOR RELEVANT BOARD ACTION(S):
On February 12, 2009, the Board of Directors authorized the President and Secretary to award a
construction contract with Ken Thompson, Inc. in the amount of $1 ,099,000.00 for construction of
the project. The Board of Directors has approved 5 Progress Payments to date, the most recent of
which was approved on November 25, 2009.
ATTACHMENTS:
Description:
Ken Thompson CO 1 Zone Project Signed.pdf Ken Thompson CO 1,Zone Projec:
YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 001
DATE December 7, 2009
._..____....__.Page 1 of...V.�
CONTRACT NAME: Zone Reconfiguration Areas 1,2&3 CONTRACT AMT.: $1,099,040.00 GAYS: 200
CONTRACTOR: Ken Thompson,Inc. THIS CHANGE: $75,027.39 CLAYS: 7
(6.8%)
OWNER: Yorba Linda Water District REVISED CONTRACT AMT: $ 1,174,027.39 DAYS: 207
This Change Order covers changes to the subject contract as described herein.The Contractor shall construct,furnish equipment and materials,
and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor
and Yorba Linda Water District otherwise referred to as Owner.
DESCRIPTION OF CHANGES +INCREASE CONTRACT
TIME
/OR +EXTENSION
_DECREASE IN /OR-
CONTRACT REDUCTION
AMOUNT (DAYS)
(s)
Additional Potholes 0
$ 3,418,22
Over excavate unsuitable material and replace with Class II from 30+15 to 31+82 $ 3,979.18 .5
Conflict with existing utilities installing 12-inch pipeline, revisions shown on Sheet 7 $ 4,532.47 ,g
Unknown 4-inch conduit conflict at 51+60. $ 1,436.56 0
Gas Line Conflicts at 56+61 $ 13,050.67 1
Unknown CMP Line Buried in Concrete $ 13,138.46 1
Extra Paving as Directed by Inspector $ 1,499.08 0
Extra Rock as Directed by Inspector $ 376.67 0
2 Conduits in Conflict, Pipe Adjustment $ 1,418.26 0
Storm Drain Conflict 57+26 $ 2,504.00 1
Conflict with Existing waterline $ 3,190.46 .5
Re-survey of reach A, B, D $ 1,371,52 0
Unknown conduit at 90+83.
$ 1,028.13 0
14-inch watermain conflict at 95+50.
$ 2,6ao.oa
Conflict with utilities at 101+90. _ w
$ 3,266.58 .5
Conflict with existing 12-inch at 110+07.
$ 3,574.15 .5
Unknown conduit at 90+83, repaired by KT{
$ 1,400.00 0
12-inch water main conflict at 114+44.
$ 3,411.76 •5
24-inch storm drain conflict at 120+20.
$ 3,567.91 .5
12-inch water main conflict at 123+20.
$ 2,155.84 0
Utility conflict at Yorba Ranch Road.
$ 4,607.47 .5
Trench Plate Maintenance (YLWD Crew)
$ (500.00) 0
NET CHANGE $ 75,027.39 7
REVISED CONTRACT AMOUNT AND TIME
$1,174,027.39 247
The amount of the contract will be increased-cdecrea°°ds by the sum of$75,027.39 and the contract time shall be increased 4deereased>by
7 calendar days.The undersigned Contractor approves the foregoing Change Order as to the changes,if any,in the contract price specified for
each item including any and all supervision costs and other miscellaneous costs relating to the change in work,and as to the extension of time
allowed,if any,for completion of the entire work on account of said Change Order.The Contractor agrees to furnish all labor and materials and
perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension,required to complete the Change
Order items.This document will become a supplement of the contract and all provisions will apply hereto.It is understood that the Change Order
shall be effective when approved by the Owner. This Change Order constitutes full, final, and complete compensation to the Contractor for all
costs, expenses, overhead, profit, and any damages of every kind that the Contractor may incur in connection with the above referenced
changes in the work, including any impact on the referenced work of any other work under the contract, any changes in the sequences of any
work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this
contract. By the execution of the Change Order,the Contractor accepts the contract price change and the contract completion date change, if
any, and expressly waives any claims for any-?dditi n compensation, damages or time extensions, in connection with the above-referenced
changes.
RECOMMENDED: /ENGINEER OR DATE: ¢
Stey nklin, 't f anager
ACCEPTED:
_ (CONTRACTOR
DATE-
Kenneth D.7' ampsan, President
APPROVED: /} DATE:
v .. [OWNER
Kenneth R.Vecchiarelli,General
Manager
ITEM NO. 6.7
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: Yes
Total Budget: $350,000
To: Board of Directors Cost Estimate: $300,210
Funding Source: Sewer Operating
Fund
From: Ken Vecchiarelli, General Account No: 2-2720
Manager
Job No: J200916
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Anthony Manzano, Senior CEQA Compliance: N/A
Project Manager
Subject: Sewer Master Plan Update
SUMMARY:
The District's Capital Improvement Program includes funding for a Sewer Master Plan (SMP)
Update of the District's sewer collection system to evaluate and determine system deficiencies and
capacity needs for existing and future flow conditions. For the preparation of the SMP Update, staff
issued a Request for Proposals and received five consultant proposals. Following an evaluation,
staff recommends award to IDModeling for a fee not to exceed $300,210.
STAFF RECOMMENDATION:
That the Board of Directors authorize execution of a Professional Services Agreement with
IDModeling in the amount of $300,210 to provide a Sewer Master Plan Update.
COMMITTEE RECOMMENDATION:
The Planning-Engineering-Operations Committee discussed this item at its meeting on December
3, 2009 and supports staff recommendation.
DISCUSSION:
Engineering staff prepared a Request for Proposal to provide engineering consulting services for
preparation of a Sewer Master Plan (SMP) Update and solicited six consulting firms experienced in
this field. All consultants submitted a proposal, including a joint proposal from IDModeling and
Psomas. The District's review team ranked and scored the proposals based on experience, content,
and understanding of the Project. Following the technical evaluation and ranking, separate fee
envelopes, with fees for each proposal, were opened by staff. Results of the ranking and the
proposed fee for each are as follows:
Firm Evaluation Score Fee
IDModeling/Psomas 57.5 $300,210
RBF Consultants 50.1 $298,856
Hall & Foreman, Inc. 48.7 $341 ,530
Malcolm Pirnie, Inc. 43.9 $248,643
Willdan Engineering 43.3 $320,000
The IDModeling/Psomas Team had the most innovative and unique approaches to collecting data
and completing the SMP Update, in comparison with the other consultants. Additionally, this team
had the most SMP Update experience.
PRIOR RELEVANT BOARD ACTION(S):
None.
ITEM NO. 6.8
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: N/A
To: Board of Directors
Funding Source: N/A
From: Ken Vecchiarelli, General Manager
Presented By: Cindy Navaroli, Interim Finance Dept: Finance
Director
Reviewed by Legal: N/A
Prepared By: Sandi Van Etten, Senior Accountant CEQA Compliance: N/A
Subject: Quarterly Investment Report for June 2009
SUMMARY:
Government Code Section 53607, et, seq., requires the person delegated to invest funds to make a quarterly
report of the investments to the legislative body. Staff is submitting the June 2009 Quarterly Investment
Report for review and filing.
STAFF RECOMMENDATION:
That the Board of Directors receive and file the investment report for the quarter ending June 30, 2009.
COMMITTEE RECOMMENDATION:
The Finance-Accounting Committee has reviewed and discussed the Investment Report and supports staff's
recommendation.
DISCUSSION:
The average portfolio yield for total investments excluding Wells Capital is 0.29% compared to the June
2008 yield of 1.85%. The average portfolio yield including Wells Capital is .58%.
The average number of days to maturity as of June 30, 2009 equaled 144 days, and the average term for the
portfolio totaled 52 days.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors receives the Investment Report on a quarterly basis.
ATTACHMENTS:
Description: Type:
Agenda 8-11 backup.doc Backup for Investment Rpt Backup Material
Invst_Rpt 6 09.xls Invst Rpt Backup Material
Investment Report Summary
Below is a chart summarizing the yields as well as terms and maturities for the month of June
2009.
Avg. Portfolio Avg. Portfolio # of Avg. Term
Month Yield Without Yield With Days to of Portfolio
of 2009 Wells Capital Wells Capital Maturity in Days
June 0.29% 0.58% 144 52
Below is a chart comparing operating fund interest for current and prior fiscal years.
Actual Interest 06/30/08 06/30/09
Monthly, Operating Fund $ 614 $ 489
Year-to-Date, Operating Fund $28,823 $ 6,655
Budget 2007/2008 2008/2009
Interest Budget, Operating Fund, June YTD $86,000 $64,500
Interest Budget, Operating Fund, Annual $86,000 $64,500
Interest earned on investments is recorded in the Fund that owns the investment.
Investment Summary Comparison
The distribution of investments in the portfolio both in dollars and as a percentage of the total
portfolio by funds is as follows:
Fund Description Balance 06/30/09
Annexation 9,256,503 19.60%
Water Operating -5.70%
Water R&R 2,048,767 4.34%
Water Capital Projects 149,500 0.32%
Restricted for Debt Service 1,453,657 3.08%
COP Revenue Bond 2003 0 0.00%
COP Revenue Bond 2008 21,513,330 45.54%
Sewer Operating 1,450,833 3.07%
Sewer R&R 371,271 0.79%
Sewer Capital Projects 188,729 0.40%
ID1 4,332,005 9.17%
ID2 9,159,402 19.39%
$47,235,913 100.00%
Yorba Linda Water District
Investment Portfolio Report
June 30, 2009
Market % Percent Investment Maturity
Value Cost of Total Institution Yield Date Date
Cash & Checking Accounts:
$ 1,475,934 $ 1,475,934 Wells Fargo Bank N/A
1,200 1,200 Imprest Cash
$ 1,477,134 $ 1,477,134 3.13% Total 0.00%
Money Market Accounts:
$ 178,549 $ 178,549 Wells Fargo Money Market 0.30% N/A
- - Wells Fargo MM/Annexation 0.30%
$ 178,549 $ 178,549 0.38% Total 0.30%
$ 1,655,683 $ 1,655,683 3.51% Sub-total 0.03%
California Asset Mgmt. Program:
$ 6,689,780 $ 6,689,780 14.18% California Asset Mgmt. Program 0.56% N/A
Money Market Account:
$ 21,513,330 $ 21,513,330 US Bank 2008 Revenue Bond 0.22%
0 0 US Bank 2003 Revenue Bond 0.00% N/A
$ 21,513,330 $ 21,513,330 45.59% 0.22%
$29,858,793 $ 29,858,793 63.28% Sub Total Investments 0.29%
Individual Management Account:
$ 17,345,088 $ 17,330,058 36.72% Wells Capital Management 1.10% N/A
$ 47,203,881 $ 47,188,851 100% Total Investments 0.58%
Per Government Code requirements,the Investment Report is in compliance with the Yorba Linda Water District's
Investment Policy, and there are adequate funds available to meet budgeted and actual expenditures for the next
six months.
a*CC yalu v6e_�
Sandi Van Etten, Senior Accountant
6/30/2009
ITEM NO. 6.9
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: N/A
To: Board of Directors
Funding Source: N/A
From: Ken Vecchiarelli, General
Manager
Presented By: Cindy Navaroli, Interim Finance Dept: Finance
Director
Reviewed by Legal: N/A
Prepared By: Sandi Van Etten, Senior CEQA Compliance: N/A
Accountant
Subject: Quarterly Investment Report for September 2009
SUMMARY:
Government Code Section 53607, et, seq., requires the person delegated to invest funds to make a
quarterly report of the investments to the legislative body.
STAFF RECOMMENDATION:
That the Board of Directors receive and file the investment report for the quarter ending September
30, 2009.
COMMITTEE RECOMMENDATION:
The Finance-Accounting Committee has reviewed and discussed the Investment Report and
supports staff's recommendation to receive and file the report.
DISCUSSION:
Government Code Section 53607, et, seq., requires the person delegated to invest funds to make a
quarterly report of the investments to the legislative body. Staff is submitting the September 2009
Quarterly Investment Report to receive and file.The average portfolio yield for total investments
excluding Wells Capital is 0.31% compared to the September 2008 yield of 1 .63%. The average
portfolio yield including Wells Capital is .51%.
The average number of days to maturity as of September 30, 2009 equaled 134 days, and the
average term for the portfolio totaled 57 days.
In an effort to maximize investment yield, the Finance-Committee will be discussing alternatives
within the District's approved investment policy at the next Committee meeting.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors receives the Investment Report on a quarterly basis.
ATTACHMENTS:
Name: Description: Type:
Agenda, 12-7_backup-Sep.doc Discussion/Backup Backup Material
Invst Rpt 9-09.x1s Investment Report Backup Material
Investment Report Summary
Below is a chart summarizing the yields as well as terms and maturities for the month of
September 2009.
Avg. Portfolio Avg. Portfolio # of Avg. Term
Month Yield Without Yield With Days to of Portfolio
of 2009 Wells Capital Wells Capital Maturity in Days
September 0.31% 0.51% 134 57
Below is a chart comparing operating fund interest for current and prior fiscal years.
Actual Interest 09/30/08 09/30/09
Monthly, Operating Fund $ 1,003 $ 4,370
Year-to-Date, Operating Fund $ 1,925 $ 9,548
Budget 2008/2009 2009/2010
Interest Budget, Operating Fund, Sept. YTD $16,125 $1,875
Interest Budget, Operating Fund, Annual $64,500 $7,500
Interest earned on investments is recorded in the Fund that owns the investment.
Investment Summary Comparison
The distribution of investments in the portfolio both in dollars and as a percentage of the total
portfolio by funds is as follows:
Fund Description Balance 09/30/09
Annexation $4,704,717 10.85%
Water Operating 567,100 1.31%
Water R&R 2,054,029 4.74%
Water Capital Projects 231,204 0.53%
Restricted for Debt Service 474,304 1.09%
COP Revenue Bond 2003 448,242 1.03%
COP Revenue Bond 2008 20,827,231 48.05%
Sewer Operating 1,412,079 3.26%
Sewer R&R 417,379 0.96%
Sewer Capital Projects 189,214 0.44%
ID1 3,681,540 8.49%
D2 8,342,968 19.25%
$43,350,007 100.00%
Yorba Linda Water District
Investment Portfolio Report
September 30, 2009
Market % Percent Investment Maturity
Value Cost of Total Institution Yield Date Date
Cash & Checking Accounts:
$ 377,182 $ 377,182 Wells Fargo Bank N/A
1,200 1,200 Imprest Cash
$ 378,382 $ 378,382 0.87% Total 0.00%
Money Market Accounts:
$ 178,684 $ 178,684 Wells Fargo Money Market 0.30% N/A
- - Wells Fargo MM/Annexation 0.30%
$ 178,684 $ 178,684 0.41% Total 0.30%
$ 557,066 $ 557,066 1.29% Sub-total 0.10%
California Asset Mgmt. Program:
$ 5,095,718 $ 5,095,718 11.78% California Asset Mgmt. Program 0.38% N/A
Money Market Account:
$ 21,275,473 $ 21,275,473 US Bank 2008 Revenue Bond 0.30%
0 0 US Bank 2003 Revenue Bond 0.00% N/A
$ 21,275,473 $ 21,275,473 49.16% 0.30%
$26,928,257 $ 26,928,257 62.23% Sub Total Investments 0.31%
Individual Management Account:
$ 16,372,221 $ 16,346,337 37.77% Wells Capital Management 0.83% N/A
$ 43,300,478 $ 43,274,594 100% Total Investments 0.51%
Per Government Code requirements,the Investment Report is in compliance with the Yorba Linda Water District's
Investment Policy, and there are adequate funds available to meet budgeted and actual expenditures for the next
six months.
a*CC yalu v6e_�
Sandi Van Etten, Senior Accountant
9/30/2009
ITEM NO. 7.1
AGENDA REPORT
Meeting Date: December 23, 2009 Budgeted: N/A
Total Budget: 61 ,500
To: Board of Directors
Funding Source: N/A
From: Ken Vecchiarelli, General
Manager
Job No: N/A
Presented By: Ken Vecchiarelli, General Dept: Administration
Manager
Reviewed by Legal: N/A
Prepared By: Annie Alexander, Executive CEQA Compliance: N/A
Secretary
Subject: Board of Directors Committee Assignments
SUMMARY:
Following reorganization of the Board of Directors and appointment of officers, the newly elected
President assigns the members of the Board of Directors to the various standing committees.
STAFF RECOMMENDATION:
That the Board President in cooperation and consent with the members of the Board of Directors,
establish committee assignments and regular meeting times for the upcoming year.
COMMITTEE RECOMMENDATION:
The Executive-Administrative-Organizational Committee discussed this matter at its meetings held
November 17, 2009 and December 14, 2009.
DISCUSSION:
Pursuant to the Board of Directors' Rules for Organization and Procedure (Resolution No. 07-16),
the Board has five standing committees. Two Directors and an alternate are assigned to each
standing committee and each Director is assigned to two standing committees.
Special or ad hoc committees are formed by the Board as needed. Board members also attend
intergovernmental and other meetings as assigned and approved.
Attached is a description of each standing and current ad hoc committee and related assignments.
Also included is a list of intergovernmental meeting assignments previously approved by the Board
for attendance.
The budgeted amount shown above includes Board compensation for regular, committee and
intergovernmental meetings
PRIOR RELEVANT BOARD ACTION(S):
The newly elected President assigns each Board member to various committee assignments for the
upcoming year. The committee assignments made in 2008 remained the same for 2009.
ATTACHMENTS:
Description: Type:
Committee Assignments.doc Committee Assignments Backup Material
YLWD Standing Committee Assignments
Executive-Admin-Organizational Meets Monthly on 3rd Tuesday at 4:00 p.m.
Director Mills, Chair Studies, advises and makes
Director Beverage recommendations to the Board regarding
Alternate policy, organization, legislative and legal
issues.
Finance-Accounting Meets Monthly on 2nd Monday at 4:00 p.m.
Director Beverage, Chair Studies, advises and makes
Director Summerfield recommendations to the Board regarding
Director Mills, Alternate budgets, investments, rates, fees and
charges, financial reports, auditors and
appropriations.
Personnel-Risk Management Meets Monthly on 2nd Tuesday at 4:00 p.m.
Director Armstrong, Chair Studies, advises and makes
Director Collett recommendations to the Board regarding
Director Summerfield, Alternate personnel, employee and labor relations, and
insurance procurement.
Planning-Engineering-Operations Meets Monthly on 1St Thursday at 4:00 p.m.
Director Mills, Chair Studies, advises and makes
Director Armstrong recommendations to the Board regarding five
Director Beverage, Alternate year plans, construction activities, customer
service, operations and maintenance,
building, equipment, property and fire
defenses.
Public Information-Technology Meets Monthly on 1St Tuesday at 4:00 p.m.
Director Collett, Chair Studies, advises and makes
Director Beverage recommendations to the Board regarding
Director Armstrong, Alternate public information activities, community
involvement and promotion of water
conservation measures.
YLWD Ad Hoc Committee Assignments
City of Placentia Meets As Needed
Director Beverage Studies, advises and makes recommendations
to the Board regarding City of Placentia policy
issues.
City of Yorba Linda Temporarily Discontinued
None Studies, advises and makes recommendations
to the Board regarding City of Yorba Linda policy
issues.
MWDOC/OCWD Meets Bi-Monthly on 4t" Tuesday at 4:00 p.m.
Director Mills Studies, advises and makes recommendations
Director Collett to the Board regarding MWDOC and OCWD
Director Summerfield, Alternate policy issues.
Revenues and Rates Meets As Needed
Director Collett Studies, advises and makes recommendations
Director Mills to the Board regarding rates, fees and charges.
YLWD Intergovernmental Meeting Assignments
MWD None
MWDOC None
OCWD None
Placentia City Council None
Placentia Planning Commission None
Yorba Linda City Council Director Mills / Director Armstrong
Yorba Linda Planning Commission Director Collett / Director Summerfield
ACWA/JPIA Director Mills / Director Armstrong
ACWA Region 10 None
ISDOC Director Mills
LAFCO Director Beverage
WACO Director Mills
ITEM NO. 9.1
AGENDA REPORT
Meeting Date: December 23, 2009
Subject: Executive Administrative-Organizational Committee
(Mills/Beverage) Alternate:
Minutes of the meeting held December 14, 2009 at 4:00 p.m.
Meeting scheduled January 19, 2010 at 4:00 p.m.
ATTACHMENTS:
Name: Description: Type:
121409 EAO - Minutes.doc EAO Mtg Minutes 12/14/09 Minutes
MINUTES OF THE
YORBA LINDA WATER DISTRICT
EXEC-ADM IN-ORGANIZATIONAL COMMITTEE MEETING
December 14, 2009
A meeting of the Executive-Administrative-Organizational Committee was called to
order by Director Mills at 2:00 p.m. The meeting was held at the District's
Administrative Office at 1717 E Miraloma Ave, Placentia CA 92870.
COMMITTEE STAFF
Director William R. Mills, Chair Ken Vecchiarelli, General Manager
Director Michael J. Beverage Pat Grady, Assistant General Manager
1. PUBLIC COMMENTS
None.
2. ACTION CALENDAR
2.1. Ethics Policy
Mr. Grady presented this item and explained that when the Board
approved the District's Grand Jury responses in August 2009, it was noted
that the District would adopt an ethics policy by March 2010. The
Committee directed Staff to draft a policy and to include a table of
contents and an Executive Summary. A draft ethics policy will be
presented to this Committee at a future meeting and to the Board for final
consideration.
3. DISCUSSION ITEMS
3.1. 2009 Summary of EAO Committee Activities
Mr. Vecchiarelli reviewed the major activities that were addressed and/or
discussed within the last year by the previous Executive-Administrative-
Organizational Committee. Two major activities initiated included
annexation to Orange County Water District and sewer discussions with
both the cities of Yorba Linda and Placentia.
3.2. 2010 Goals and Objectives
Mr. Vecchiarelli reviewed the major goals and objectives for 2010.
Discussions with the Committee included continued focus on the OCWD
annexation efforts, continuing discussions with the Cities of Placentia and
Yorba Linda for dedication of the sewer systems to the District, finalizing a
licensing agreement for use of District facilities, formal review and
implementation of a strategic plan, development of a budget schedule for
FY 2010/11, water rate projections, updating various policies and
procedures, and considering the services of an efficiency consultant to
evaluate the District.
1
3.3. Board of Directors Committee Assignments
Mr. Vecchiarelli reviewed the existing Board committee assignments.
President Mills continues to finalize the new assignments and ratification
will be considered at the next Board meeting.
3.4. Customer Correspondence
Mr. Vecchiarelli reviewed the latest customer comment cards with the
Committee and discussed formatting a summary presentation for future
meetings.
3.5. Records Retention Policy
Mr. Grady reported that Staff was in the process of updating the District's
records retention policy with the assistance of a consultant. A revised
policy will be presented to the Committee at a future meeting and
eventually to the Board for their consideration.
3.6. Citizens Advisory Committee Membership
Mr. Vecchiarelli updated the Committee regarding the attendance and
participation of the Citizens Advisory Committee since the Committee was
formed.
3.7. OCWD Annexation
Mr. Vecchiarelli reported that a draft MOU from OCWD has been
submitted to YLWD and that legal counsel is currently reviewing this draft.
Staff will update the Committee monthly on the progress of these efforts.
3.8. City of Yorba Linda and City of Placentia Sewers
Mr. Vecchiarelli reported that the City of Yorba Linda may discuss
ownership, operations and maintenance of the east end sewer system at a
council meeting scheduled for January 2010.
3.9. Final Report on 2009 Legislative Bills
The Committee reviewed the yearly legislative report prepared by District's
legal counsel.
3.10. General Counsel's Monthly Summary Billing Report
The Committee reviewed the report.
3.11. Future Agenda Items and Staff Tasks
None.
4. ADJOURNMENT
4.1. The Committee adjourned at 3:35 p.m. The next regular meeting of the
Executive-Administrative-Organizational Committee will be held January
19, 2010 at 4:00 p.m.
2
ITEM NO. 11.1
AGENDA REPORT
Meeting Date: December 23, 2009
Subject: Meetings from January 1 , 2010 - January 31 , 2010
ATTACHMENTS:
Description: Type:
BOD Activity Calendar.pdf BOD Activity Calendar Backup Material
Board of Directors Activitv Calendar
Event Date Time Attendance by:
January 2010
Holiday Fri, Jan 1 7:30AM District Offices Closed
Public Information-Technology Committee Meeting Tue, Jan 5 4:OOPM Collett/Beverage
Yorba Linda City Council Tue, Jan 5 6:30PM Mills
MWDOC/MWD Workshop Wed, Jan 6 7:30AM Staff
OCWD Board Wed, Jan 6 5:OOPM Staff
Planning-Engineering-Operations Committee Meeting Thu, Jan 7 4:OOPM Mills/Armstrong
Personnel-Risk Management Committee Meeting Mon, Jan 4:OOPM Armstrong/Collett
Finance-Accounting Committee Meeting Tue, Jan 4:OOPM Beverage/Summerfield
Yorba Linda Planning Commission Wed, Jan 7:OOPM Collett
Board of Directors Regular Meeting Thu, Jan 8:30AM
Exec-Admin-Organizational Committee Meeting Tue, Jan 4:OOPM Mills/Beverage
Yorba Linda City Council Tue, Jan 6:30PM Armstrong
MWDOC Board Wed, Jan 8:30AM Staff
OCWD Board Wed, Jan 5:OOPM Staff
Citizens Advisory Committee Meeting Mon, Jan 8:30AM
MWDOC/OCWD Ad Hoc Committee Meeting Tue, Jan 4:OOPM Mills/Collett
Yorba Linda Planning Commission Wed, Jan 7:OOPM Summerfield
Board of Directors Regular Meeting Thu, Jan 8:30AM
12'16'2009 9:15:13 AM
ITEM NO. 12.1
AGENDA REPORT
Meeting Date: December 23, 2009
Subject: Water Inspection Tours
Water Resource Tour - January 15, 2010
A.D. Edmonston Pumping Plant - January 29, 2010
Diamond Valley Lake - February 5, 2010
ATTACHMENTS:
Description: Type:
Overview of Water_Inspection_Trips.pdf Inspection Trips Flyer Backup Material
The Municipal Water District of Orange County (MWDOC) is now accepting reservations for the
following one-day water inspection trips:
Water Resource Tour- January 15, 2010
6 A.D. Edmonston Pumping Plant- January 29, 2010
! Diamond Valley Lake- February 5, 2010
The Metropolitan Water District of Southern California (Metropolitan) and the Municipal Water District of
Orange County (MWDOC) would like to invite you to participate on upcoming water inspection trips. As
guests of Metropolitan and MWDOC, all meals, transportation and refreshments will be provided without
charge. I have attached a brief summary of each of these trips for your review. If you have trouble viewing
the attachment, please let me know!
These trips are very popular and space is extremely limited. Reservations will be processed on a first
come, first served basis and the buses do fill up quickly! If you are interested in participating on one or
more of these trips, please contact me directly at 714-593-5013 or tbacaOmwdoc.com to reserve your
seat as soon as possible. Confirmation letters with a complete itinerary and any additional trip information
will be mailed after all reservations are processed.
We sincerely hope that you will be able to participate on one or more of these inspection trips, and take
advantage of this unique opportunity to learn more about our local water supply.
Very best regards,
Tiffany E. Baca
Senior Administrative Assistant
Municipal Water District of Orange County
P.O. BOX 20895, Fountain Valley, CA 92728-0895
(714) 593-5013
WATER.' i:- .p. I .':i l
OVERVIEW OF
WATER INSPECTION TRIPS:
January 15, 2010
Water Resource Tour
This tour will begin at Marcel Electronics International (MEI), a privately owned printed circuit
board manufacturer located in the city of Orange. MEI operates etching, stripping, and plating
equipment that once used an average of about 37 million gallons of water annually. MEI has
reduced potable water consumption by updating their equipment; installing a new, deionized
water recycling system; and introducing water recycling into their production lines. Through
their efforts, MEI saved more than 14 million gallons of water over the last year, a savings that
will supply more than 200 average Orange County households for an entire year.
We will continue our tour at F.E. Weymouth
Water Treatment Plant in La Verne. Weymouth
was the first treatment plant built by >e
Metropolitan, and today, largely serves Los -
Angeles and Orange counties. Most of the water u
treated at the plant originates in mountain
ranges of seven western states, travels down the
Colorado River, and flows through 4t L
Metropolitan's 242-mile Colorado River Ce ;� , ,
Aqueduct. To a lesser degree, water supplied to "t
the plant also comes from Northern California MT A
rivers and streams that feed the State Water
Project's 444-mile California Aqueduct.
This inspection trip will conclude with a tour of
the Groundwater Replenishment System (GWR System) located at the Orange County Water
District in Fountain Valley. The GWR System diverts highly treated sewer water that is currently
discharged into the ocean and then purifies it though a series of advanced techniques:
microfiltration,reverse osmosis, ultraviolet disinfection and hydrogen peroxide. The treated
water is returned to the groundwater basin to increase both water supply and quality.
January 29, 2010
AM Edmonston Pumping Plant
The center piece of the State Water Project is the Edmonston Pumping Plant tucked along the
Bakersfield side of the Tehachapi Mountains. With an elevation of 1,926 feet, it is the highest
single lift pumping plant in the world, capable of delivering 2 billion gallons or 8,340,000 tons of
water a day.
Designed on four levels, carved into the side of the mountain, the plant houses 14 pumping units
each operating at 80,000 horsepower, standing more than three stories high, and weighing nearly
225 tons.
We will visit the Vista Del Lago Visitor's
Center at Pyramid Lake, and continue on to
Joseph Jensen Water Treatment Plant in
Granada Hills. The Jensen Plant is the
operating headquarters for the Valley Branch
of Metropolitan. The Valley Branch provides
treated water to an area that covers all, or
portions of Ventura, Los Angeles and Orange
counties.
February 5, 2010
Diamond Valley Lake
Diamond Valley Lake is located in the Domenigoni Valley near the city of Hemet. It is Southern
California's largest reservoir, and was designed to provide protection against water shortages
caused by earthquakes or drought. Diamond Valley Lake can store up to 810,000 acre-feet, or
more than 264 billion gallons of water, and almost doubles Southern California's surface water
storage capacity.
On our inspection trip we will drive across the
West Dam, take in the sights from the
reservoir's viewpoint, inspect the pumping
plant and see the east marina. You will also
have an opportunity to enjoy a self-guided tour
of the Visitors' Education Center and Western
Center for Archeology & Paleontology.
This inspection trip will conclude with a tour
of Robert A. Skinner treatment plant, a five-
year, multimillion dollar expansion project
that included construction of two additional
treatment modules; a covered, treated water
storage reservoir; a bypass pipeline system; and expansion of the San Diego Canal. Now one of
the largest water treatment plants in the United States, Skinner delivers 520 million gallons per
day to 2.5 million people who are customers of the Eastern and Western Municipal Water
Districts in Riverside County and the San Diego County Water Authority. It is the prime source
of drinking water for the San Diego region.
ITEM NO. 12.2
AGENDA REPORT
Meeting Date: December 23, 2009
Subject: ACWA DC Conference - February 23-25, 2010
ATTACHMENTS:
Description: Type:
ACWA DC Conf.pdf Conference Flyer Backup Material
r
Y
RECEIVED
Association of California Water Agencies r:- - ? 2009
Illi()"i since 1410
YORDA LINDA WATER DISTRICT
November 20,2009
Dear ACWA Member,
Plans are underway for the 2010 ACWA DC Conference,February 23-25,2010. 1 am writing
to encourage you and other representatives of your agency to attend this event.
The conference provides a unique opportunity to learn about the plans and priorities of the
Obama Administration and Congress. The conference includes an Executive Branch speakers
program as well as Legislative session where invited members of Congress will address ACWA
members and answer questions. Additional speakers will provide an analysis of the first year of
the administration and what it may mean for water agencies.
Once again the conference hotel is the Washington Court. ACWA DC Conference participants
are responsible for making their own hotel reservations within the block of rooms reserved
by ACWA at the Washington Court Hotel(see attached form for registration information).
The Washington Court Hotel will accept reservations in the ACWA room block until
January 29 after which,the rooms will be released for general sale.After January 29,the
hotel will accept reservations based on room and rate availability. Additionally, should our
block fill prior to the cut-off date, reservations will be accepted based on room and rate
availability.
We look forward to seeing you at the 2010 DC Conference. Should you have any questions,
please feel free to call ACWA's Washington office at 202.434.4760.
Sincerely,
X.
Randy Record
Federal Affairs Chairman
Association of California Water Agencies 910 K Street, Suite 100, Sacramento, California 95814-3577 916/441-4545 FAX 916/325-4849
Hall of the States 400 N. Capitol St., N.W., Suite 357 South,Washington, D.C. 20001-1512 202/434-4760 FAX 202/434-4763
www.acwa.com
DRAFT AGENDA
2090 ACWA WASHINGTON, D.C. CONFERENCE
Washington Court Hotel
February 23—February 25, 2010
Tuesday, February 23
6 p.m. - 8 p.m. Welcoming Reception
(Conference attendees and spouses are invited.
Others by invitation only)
Wednesday. February 24
8:30 a.m. - 9:30 a.m. Welcome, ACWA President, Paul Kelley
Breakfast and Opening Speaker
9:45 - Noon Obama Administration Speakers
12:15 p.m. - 1:30 p.m. Lunch
1:50 P.M. Group Photo
Capitol Visitors' Center Steps
2:15 p.m. -- 5:15 p.m. House Speech Program
5:30p.m. - 7:30 p.m. Congressional Reception
Thursday, February 25
8:30 - 10:30 a.m. Breakfast and Closing Speaker
9:00 a.m. Senator Barbara Boxer (invited)
9:30 a.m. Issue Groups Leaders' Panel
10:30 a.m. Conference Adjourns
ACWXs 2010 Washington, D.C. Conference Preregistration
Washington Court Hotel * Washington, D.C. * February 23-25, 2010
ONLINE REGISTRATION NOW AVAILABLE:
PREREGISTRATION DEADLINE IS JANUARY 29, 2010. OFFICE USE ONLY - DC10
Those received after January 29 will be returned,regardless of postmark.Deadline to cancel and receive ENT
refund voucher is January 29.There is a$50 handling fee on all cancellations prior to this date. DATE
Fill in Completely-Please Print/Type Clearly
*Required Fields(if bringing a guest,guest's name and e-mail address are required as well.) ❑ My info has changed.Please update it.
* Name on Badge to Read Guest($35 fee if attending) Guest E-mail(MUST be different from attendee's e-mail)
*Title Credit Card Payment Information
Please charge my fee to my credit card:
*Organization
❑ CV`' ❑
*Address Credit Card Number:
*City *State *Zip lLJ I j I l 11 u
* Phone: ( ) FAX: ( ) Exp. Date: I I I 1_l Amount: $
*Attendee E-mail: Cardholder's Name(as seen on card):
*Confirmation E-mail: Please print clearly.
If registering on someone's behalf,please be sure to include YOUR e-mail Signature:
address here and a copy of the confirmation email will be sent to you.
HOTEL INFORMATION:
Washington Court Hotel, 525 New Jersey Ave. N.W.,Washington, D.C. 2 0001-1 52 7 Phone: 800-321-3010
Group Rate: $297 Single/Double.The cut-off date to receive this special rate is January 29, 2010.
Preregistration PACKAGE- For ACWA public agency members, affiliates & associates only
(Includes registration & all meals. Does not include guest registration.) Not available on-site. (20) . . . . $565 $
Conference Registration(21) Includes Opening&Congressional Receptions Preregistration On Site Amount
but other meal functions not included
Advantage* . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . $485 ($520) $
Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $725 ($780) $
Guest(Non-refundable) (22) . . . . . . . . . . . . . . . . . . . $35 ($45) $
Daily Conference Registration Preregistration On Site Amount
Meal functions not included (Advantage) (Standard) (Advantage) (Standard)
` ❑ Wednesday, February 24(23) . . . . . . . . . . . . . . . . . . . . . $275 $415 $295 $445 $
fl ❑ Thursday, February 25 (24) . . . . . . . . . . . . . . . . . . . . . . . $230 $345 $250 $375 $
® Quantity Preregistration On Site Amount
Tuesday, February 23
Opening Reception (30) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Included Included $
Wednesday,February 24 $
Breakfast(311) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35 ($40) $
Luncheon (321 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45 ($50) $
Congressional Reception (33) . . . . . . . . . . . . . . . . . . . . . . . . . . . . Included Included $
Thursday, February 25
Breakfast(34) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35 ($40) $
* People eligible for ACWA advantage pricing include:any ACWA member organization's officers/directors;any employee on an
ACWA public agency member,affiliate or associate organization's payroll,any individual or honorary life member;any ACWA TOTAL $
board member whose fee is paid for by a member agency;any state or federal administrative or legislative personnel in elective,
appointive or staffing positions;staff of ACWA11PIA,Water Education Foundation,or California Water Awareness Campaign.
Make checks payable to ACWA,and send to:ACWA, P.O.Box 2408,Sacramento, CA 95812-2408.
or FAX to(916)325-2316. If you mail this form,please do not also fax to avoid duplicate registration.
Questions?Contact ACWA at(916)441-4545,tall free(888)666-2292,or e-mail:eventseacwa.com.