AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, April 1, 2010, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director William R. Mills, Chair Ken Vecchiarelli, General Manager
Director John W. Summerfield Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
2.1. Monthly Groundwater Production and Purchased Import Water Report (To be provided
at the meeting.)
2.2. Monthly Preventative Maintenance Program Report (To be provided at the meeting.)
3. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
3.1. Urgent Pipeline Replacement Project, Ohio Street North of Oriente Drive
Recommendation: That the Committee recommend the Board of Directors authorize
issuance of a Professional Services Agreement for engineering services with Tetra
Tech, Inc. for the Ohio Street Pipeline Replacement Project, with a scope of work
and fee for services to be negotiated by District staff and the General Manager,
followed by ratification by the Board.
3.2. Well 5 Pump Installation for the Well Rehabilitation Project.
Recommendation: That the Committee recommend the Board of Directors authorize
execution of an Agreement with Layne Christensen Company in the amount of
$51,249, for the installation of Well 5 pumping equipment as part of the Well
Rehabilitation project.
3.3. Mitigated Negative Declaration, Highland Booster Station Replacement Project
Recommendation: That the Committee recommend the Board of Directors adopt
the Mitigation Monitoring Plan; find and declare that the proposed Project, with
incorporation of the mitigation measures per the Mitigation Monitoring and
Reporting Plan, will not have a significant effect on the environment of the YLWD
service area; and authorize staff to file a Notice of Determination for the Project.
3.4. Brand Name Requirement for Highland Booster Station Project
Recommendation: That the Committee recommend the Board of Directors approve
the Brand Name Requirement for the Highland Booster Station Project for the items
listed on Exhibit A of the attached staff report.
4. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
4.1. Monthly Groundwater Producers Meeting Report
4.2. Capital Improvement and Replacement Projects Budget
4.3. Status Report on Capital Projects in Progress
4.4. Future Agenda Items and Staff Tasks
5. ADJOURNMENT
5.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held
May 6, 2010 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: April 1, 2010
Subject: Monthly Groundwater Production and Purchased Import Water Report (To be
provided at the meeting.)
ATTACHMENTS:
Nam
GW Production and Purchased Water Report.pdf Monthly Report Report(s)
YLWD SOURCE WATER SUMMARY
Fiscal Year 2009-10
TOTAL MONTHLY YTD BUDGET
GW IMPORT CUP DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF) (AF)
Jul-09 192.2 933.4 1,212.0 2,337.6 8.2% 8.2% 2,585.9 -9.6%
Aug-09 377.8 961.3 979.8 2,318.9 16.3% 12.2% 2,544.1 -8.9%
Sep-09 1,309.4 911.5 2,220.9 59.0% 27.3% 2,232.2 -0.5%
Oct-09 1,205.4 617.6 1,823.0 66.1% 35.5% 1,882.8 -3.2%
Nov-09 1,026.4 673.9 1,700.3 60.4% 39.5% 1,487.4 14.3%
Dec-09 793.9 369.4 1,163.3 68.2% 42.4% 1,338.0 -13.1%
Jan-10 806.9 308.0 1,114.9 72.4% 45.1% 1,166.6 -4.4%
Feb-10 564.5 109.5 674.0 83.8% 47.0% 1,116.1 -39.6%
Mar-10 576.2 371.6 289.1 1,236.9 46.6% 47.0% 1,322.6 %
Apr-10 - 1,654.3
May-10 2,188.2
Jun-10 - 2,451.9
FYTD 6,852.7 5,256.2 2,480.9 14,589.8 47.0% 15,675.6 -6.9%
Allowable GW (YTD) 6,802.4 (AF)
CUP Obligation FY 2009-10 2,193.0 (AF)
Monthly CUP Pumping (AF) - (AF)
YTD CUP Pumping (AF) 2,480.9 (AF)
YTD CUP Achieved 113.1%
GROUNDWATER PERCENTAGE
85.0%
75.0%
65.0%
55.0% -MONTHLY GW
45.0% -vro Gw
BPP GOAL 1.6 .6
35.0%
25.0%
15.0%
5.0%
00 O~ O°~ O°~ O°~ 00 ^O ^O N N ENO ^O
~J~ PJ0 c,~Q p°~ ~o~ O~° fat Leo mat QQ~ o"
Month
WATER SUPPLY
FY 2009-2010
March 2010 Water Supply
CUP
23.4%
GW
46.6%
IMPORT
30.0%
2009-2010 YTD Water Supply
CUP
17.0%
GW
47.0%
IMPORT
36.0% GW BPP GOAL
46.6%
3,500
1I
2,500
cz:7 2,000
Q
N
E
O
O
> 1,500
1,000
500
Total Water Use
o o� o�' o o� o o o� o�' o'0' o� o-' cb o� o° ^° o�' o�' '.° o�' o°' �.° o�' o°' �.° o�' o°' �.° op o° ^°
�I �Q �1 �I 11 �A �A �A
Month
■09 -10 GW
009 -10 IMPORT
Monthly Average Mean Temperature ( °F)
008-09 GW
72.7 74.8 008 -09 IMPORT
07 -08 GW
72.2 73.6
:07-08
IMPORT
70.5
70.4
69.8
74.0
74.3
64.0
67.4
74.1 65.9
63.3
66.4
61.0
65.4
61.6
66.1
60.1
62.6
58.2
62.6
54.0
60.2
55.8
54.3 55.0
58.2 55.4
56.3
57.2
o o� o�' o o� o o o� o�' o'0' o� o-' cb o� o° ^° o�' o�' '.° o�' o°' �.° o�' o°' �.° o�' o°' �.° op o° ^°
�I �Q �1 �I 11 �A �A �A
Month
22,000
20,000
18,000
16,000
14,000
U-
Q_ 12,000
0
E
0 10,000
111
. 111
i 111
2,000
0 4--
Jul -09
2009 -2010 YTD Water Supply
Budgeted Total GW + Import
Aug -09 Sep -09 Oct -09 Nov -09 Dec -09 Jan -10 Feb -10 Mar -10 Apr -10 May -10 Jun -10
Month
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: April 1, 2010
Subject: Monthly Preventative Maintenance Program Report (To be provided at the
meeting.)
ATTACHMENTS:
Nam
2009-10 PM Report.pdf Monthly Report Report(s)
PM PROGRAM
2009/2010
Fiscal 2009 -10 1 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 83% 92% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 0
5401
3541
131 130
2061
9921
4201
585
INSPECTED THIS YEAR 0
5401
894
1,025 1,155
1,361
1 2,353
1 2,773
1 3,358
% OF TOTAL 0.0%
14.0%1
23.0%1
26.4% 29.8%
35.0%1
60.6%1
71.5%
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 242
2941
4561
5751
326 463
2271
5201
290
OPERATED THIS YEAR 242
5361
9921
1,5671
1,893 2,356
2,5831
3,1031
3,3931
1
% OF TOTAL 4.5%
10.1%1
18.5%1
29.3%1
35.4% 44.0%
48.0%1
58.0%1
63.4%1
1
DEAD ENDS (962x2= 1,924) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0
01
01
5261
436 0
01
01
0
FLUSHED THIS YEAR 0
01
01
5261
962 962
9621
9621
9621
1
% OF TOTAL 0.0%
0.0%1
0.0%1
27.3%1
50.0% 50.0%
50%
50%
50%1
1
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 0
2051
931
0 1
01
21
11
0
INSPECTED THIS YEAR 0
2051
2981
298 299
2991
3011
3021
302
% OF TOTAL 0.0%
66.3%1
96.4%1
96.4% 96.8%
96.8%1
97.4%1
97.7%1
97.7%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 73,825
18,7981
24,9741
104,224 121,202
128,7031
91,8021
130,579
1 93,843
CLEANED THIS YEAR 73,825
92,6231
117,5971
221,821 343,023
471,7261
563,5281
694,1071
787,950
% OF TOTAL 9.2%
11.5%1
14.7%1
27.6% 42.7%
58.8%1
70.2%1
86.5%
SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years.
TELEVISED THIS MONTH 5,334
21,6511
23,1191
5,463
1 809 3,628
7,062
1 2,077
1 13,022
TELEVISED THIS YEAR 5,334
26,985
1 50,1041
55,567
1 56,376 60,004
67,0661
69,1431
82,165
% TOTAL 2.7%
13.5%1
25.0%1
27.7%1
28.1% 29.1%
33.4%1
34.5%1
41.0%
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: April 1, 2010
Total Budget: N/A
To: Planning-Engineering-Operations Cost Estimate: $220,000
Committee
From: Ken Vecchiarelli, General Account No: 101-2700-201005
Manager
Job No: 201005
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Steve Conklin, Engineering CEQA Compliance: N/A
Manager
Subject: Urgent Pipeline Replacement Project, Ohio Street North of Oriente Drive
SUMMARY:
On Saturday, March 27, 2010, at approximately 4:00 P.M. a water main break occurred in a 12-inch
diameter, unlined cast iron pipe, constructed in 1948. The break was repaired and service was restored
later that evening. However, due to the nature of the break, the damage to the surrounding area, the
condition of the pipeline and the fact that this pipeline has suffered other significant breaks in the recent
past, staff is recommending replacement efforts begin immediately.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize issuance of a Professional Services
Agreement for engineering services with Tetra Tech, Inc. for the Ohio Street Pipeline Replacement
Project, with a scope of work and fee for services to be negotiated by District staff and the General
Manager, followed by ratification by the Board.
DISCUSSION:
The 12-inch cast iron pipeline in Ohio Street north of Orient Dr. was constructed in sections between
1938 and 1948. This pipeline has experienced several breaks in the last ten years and has become a
maintenance and risk liability. The most recent failure occurred on Saturday, March 27, 2010 and caused
significant damage to a section of Ohio Street and a nearby private street called Villa Terrace. The
District's street restoration contractor began removing and replacing the damaged sections of Villa
Terrace on Monday, March 29th. Staff has also initiated contact with representatives from the City of
Yorba Linda to discuss permit requirements and conditions for repairs in Ohio Street.
Upon inspecting the condition of the failed pipeline and in discussing the nature and frequency of the
pipeline failures in the immediate area, staff has concluded the best course of action is to immediately
initiate a replacement pipeline project. In this regard, staff recommends retaining Tetra Tech, Inc. for
engineering services under the Emergency Policy section of the District's Purchasing Policy, Resolution
07-11.
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: April 1, 2010 Budgeted: Yes
Total Budget: $190,000
To: Planning-Engineering- Cost Estimate: $51,249
Operations Committee
Funding Source: All Water Funds
From: Ken Vecchiarelli, General Account No: 101-2700
Manager
Job No: 200813
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Anthony Manzano, Senior CEQA Compliance: N/A
Project Manager
Subject: Well 5 Pump Installation for the Well Rehabilitation Project.
SUMMARY:
Well 5 rehabilitation testing was completed to determine modifications required for continued long-
term production of this 60-year-old well. Staff solicited quotes for the installation of a new pump in
accordance with the pump test results, and recommends award to Layne Christensen Company for
$51,249. In order to minimize lost well production and the cost impacts of purchasing additional
import water, staff directed Layne to commence this work immediately.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize execution of an Agreement with
Layne Christensen Company in the amount of $51,249, for the installation of Well 5 pumping
equipment as part of the Well Rehabilitation project.
DISCUSSION:
Work is continuing on the District's Well Optimization Project, to maximize the life and production of
our existing wells. The first element of work was testing and rehabilitation of Well No. 12. The
second element of work was testing of Well No. 5, which recently underwent video-inspection,
cleaning and test-pumping. The test pump work was performed under the supervision of our
consultant, CDM, and District staff. Based on the test pump results, a discharge of 2,300 GPM with
a pump setting of 280 feet below grade appears to be feasible.
Subsequently, staff requested quotes from General Pump Company (GP) and Layne Christensen
Company (Layne) to install the pump and appurtenances at Well No. 5 in accordance with previous
test pump results. GP submitted a quote for $66,671 and Layne submitted the attached quote,
dated March 11, 2010, for $51,249.
District staff reviewed and recommends approval of the quote from Layne to proceed with further
rehabilitation and service of Well 5.
Recent well improvement projects such as the drilling of Well 20 (which requires Well 11 to be shut-
down) and rehabilitation of Wells 5 and 15, limits our well production. Consequently, staff requested
Layne to proceed with Well 5 pump improvements to minimize lost well production and to limit the
amount of imported water purchased.
PRIOR RELEVANT BOARD ACTION(S):
1. On December 11, 2008, the Board authorized approval of a contract with General Pump
Company for well rehabilitation services.
2. On August 6, 2009, the Board approved Change Order 1 to provide and install a new water-
lubed pump at Well 12 for $56,973.39.
3. On January 14, 2010, the Board approved Change Order 4, in the amount of $36,185, to
conduct test pumping as part of Well 5 rehabilitation.
ATTACHMENTS:
Name: Description: Type:
W5 Layne Price Quote 03-11-2010.pdf Layne Christensen Company Quote Backup Material
LA YNE CHRIS TENSEN COMPANY CA License. # 510411
1 1001 Etiwanda Avenue, Fontana, CA 92337 - Phone: 949-394-2833 - Fax: 909-390-6497 www.laynechristensen.com
Yorba Linda Water District
1717 E. Mira Loma
Placentia, Ca 92870
Phone: 714-701-3162
Fax: 714-701-3128
Well 5 Pumping Equipment & Installation
Quote 27010
Thursday, March 11, 2010
Prepared For: Anthony Manzono, P.E.
Sr. project Manager
Prepared By: Dennis Skinner
Account Manager
Description: Pumping Equipment & Installation
Thank you for choosing Layne Christensen Company, a leader in groundwater development. Layne Christensen
continually works to tailor unique and practical solutions using Layne products and services to meet individual client
needs within the water community. Layne Christensen has been maintaining life's most vital resource since 1882. Our
full range of water-related services encompasses site selection, well field design and development, pump installation
and repair, water treatment, aquifer maintenance and remediation, and well rehabilitation.
Thank you again for choosing Layne Christensen Company. As a representative of the company's Fontana,
California based district office, I realize that Layne possesses the experience and technical expertise to solve your
complex water supply issues. We will diligently work in a consistently courteous and professional manner to meet
your specific site conditions and needs. We look forward to becoming your sole source provider for water-related
services.
W Professional Servicesfor Water Systems
1
Soject Estimate r
Company: Yorba Linda Water District Date: March 11, 2010
Contact: Anthony Manzono, P.E. Estimated By: Dennis Skinner
Address: 1717 E. Mira Loma Location: Well 5
City, State, Zip: Placentia, Ca 92870 Prevailing Wage: Yes
Project: Furnish and Install new pumping equipment Tax Rate: 8.75%
Phone: 714-701-3162 Quote Number: 27010
Fax: 714-701-3128
Description Unit • Total
Labor
Rig, 3 man crew, Install pump and perform start up, mob and demob. LS 1 $6,420.00 $6,420.00
Shop Labor to prepare pump for installation including cleaning and painting
existing discharge head. LS 1 $2,074.00 $2,074.00
Freight and Testing
New Material Freight LS 1 $2,183.00 $2,183.00
Non Witnessed Bowl Performance Test LS 1 $942.00 $942.00
Materials
Suction Pipe 10'x 10" Steel LS 1 $370.00 $370.00
316 Stainless steel cone strainer LS 1 $712.00 $712.00
Goulds 14RJHC 4 Stage Bowl Assembly LS 1 $6,251.00 $6,251.00
416 Stainless steel lineshaft 2 3/16° x 10' EA 28 $335.00 $9,380.00
Column Pipe 10" x 10' EA 28 $500.00 $14,000.00
Bronze retainers with rubber inserts EA 28 $94.00 $2,632.00
Column pipe nipple 10" x 2' LS 1 $377.00 $377.00
Stuffing box bearing LS 1 $384.00 $384.00
Stuffing box packing LS 1 $123.00 $123.00
416 Stainless steel headshaft LS 1 $870.00 $870.00
Adjusting Nut, gib key, and lock screw LS 1 $326.00 $326.00
1/4" Stainless steel airline and direct read guage LS 1 $654.00 $654.00
Misc consumables LS 1 $362.00 $362.00
Materials $36,441.00
Freight and Testing $3,125.00
Labor $8,494.00
Subtotal $48,060.00
Sales Tax $3,188.59
Clarifications Total $51,248.59
L Client to pro%idc Icgal accc-
2. Clicnt to provide all applicable permits.
3. Clicnt to provide on-site water eoureC.
4. This quote is valid lot 30 days from above date.
5. Based Upon Laync Chni tcnscn's attached Tcrmc & Conditions.
6. Layne's payment ternx are'Tet Duc Upon Receipt OI lmoice".
7. This CCtimatC NN ill bC cubjCCt to a IiICI RUrcha ,1C pcr the attached Terms & Conditions.
S. Signing this project CCtimatC authorizes Layne Christensen Company
to proceed with your project.
9. Fuel Surcharge applies. Sce attached Tcrmc and Conditions.
10. Prevailing wage rates apply.
Layne Christensen Company Client: Yorba Linda Water District
311112010 8/5/211118
Dennis Skinner. Account Manages DATE DATE
Thank you for the opportunity to be your water resource solution.
Professiowl Sai ices for Warer Srsrents
ITEM NO. 3.3
AGENDA REPORT
Meeting Date: April 1, 2010 Budgeted: Yes
Total Budget: $5.6M
To: Planning-Engineering- Cost Estimate: $5.6M
Operations Committee
Funding Source: All Water Funds
From: Ken Vecchiarelli, General Account No: 101-2700
Manager
Job No: J-200814
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Hank Samaripa, Project CEQA Compliance: MND
Engineer
Subject: Mitigated Negative Declaration, Highland Booster Station Replacement Project
SUMMARY:
An Initial Environmental Study (IES) under the California Environmental Quality Act has been
prepared for the Highland Booster Station Replacement Project. The analysis in the IES indicates
that the proposed Project can be implemented without causing significant adverse environmental
impacts with the incorporation of mitigation measures for specific issues, as summarized on the
enclosed Mitigation Monitoring and Reporting Plan.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors adopt the Mitigation Monitoring Plan; find
and declare that the proposed Project, with incorporation of the mitigation measures per the
Mitigation Monitoring and Reporting Plan, will not have a significant effect on the environment of the
YLWD service area; and authorize staff to file a Notice of Determination for the Project.
DISCUSSION:
The Initial Environmental Study (IES) and supporting environmental analysis for the Highland
Booster Pump Replacement Project found that the proposed Project will not have a significant
impact on the environment in all CEQA guideline categories when mitigating measures are included
in the project. To address noise concerns, mitigation measures were identified for the construction
phase and for long-term operation and incorporated into the Project. These measures include full
compliance with local noise ordinances and the requirements that all construction equipment be
properly tuned and maintained.Other mitigating measures identified for the Project include
restrictions on disturbing nesting habitat for native bird species, monitoring for potential cultural
resources and monitoring for potential hazardous materials.
The Project construction documents and specifications incorporate the identified mitigation
measures. Pursuant to CEQA Guidelines, copies of the IES were distributed to various responsible
agencies for public review and comment. Only the California Department of Transportation provided
review comments, which stated that if there is work in a State Right of Way, an encroachment
permit is required. (Note that the Project has no work on State property.) Copies of the IES and
Mitigated Negative Declaration are on file and available for review in the office of the Engineering
Manager.
PRIOR RELEVANT BOARD ACTION(S):
On July 9, 2009 the Board of Directors approved the award of the Professional Services Agreement
for the Highland Booster Pump Station Replacement Project to MWH Americas, for a fee not to
exceed $469,593. On January 28, 2010 the Board of Directors approved Amendment No. 1 for a
fee not to exceed $91,940. On February 11, 2010 the Board of Directors approved Amendment No.
2 for a fee not to exceed $18, 929.
ATTACHMENTS:
Narn9: Description: u :
MitNegDecPlan032210.PDF MitNegDec Backup Material
MITIGATION MONITORING AND REPORTING PLAN
YORBA LINDA WATER DISTRICT
HIGHLAND BOOSTER PUMPING STATION REPLACEMENT PROJECT
Biological Resources
BIO-1: Should vegetation clearing activities be scheduled to take place during peak nesting
season (March 1 through September 15), native bird nesting surveys will be performed by a
qualified biologist prior to vegetation clearing in conformance with CDFG requirements. All
active nests will be plotted on a map with an associated buffer.
Impact: Birds protected by the Migratory Bird Treaty Act may nest in
trees adjacent to the proposed construction
Party Responsible for YLWD
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Nesting surveys performed by qualified biologist hired by YLWD
Documentation of Compliance: Date: Initial:
BIO-2: Should eucalyptus or other ornamental tree be impacted within the raptor breeding
season (February 1 through August 31), a survey for active raptor nests in conformance with
CDFG requirements will be required seven days prior to the commencement of any construction
activities. Any occupied nests found during survey efforts will be mapped on the construction
plans. Some restrictions on construction activities may be required in the vicinity of the nest
until the nest is no longer active as determined by a qualified biologist.
Impact: Raptors may nest in trees adjacent to the proposed
construction
Party Responsible for ~YLWD
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Nesting surveys performed by qualified biologist hired by YLWD
Documentation of Compliance: Date: Initial:
Cultural Resources
CUL-1: The Project specifications shall state that if previously unidentified and potentially
significant archaeological resources (e.g., stone artifacts, dark ashy soils or burned rocks, or old
glass, metal, or ceramic artifacts) become apparent during ground disturbances, work in that
location shall be diverted and a qualified archaeologist shall be contacted immediately to
evaluate the nature and significance of the find. Additional archaeological surveys will be
needed if project limits are extended beyond the present survey limits.
Impact: Unknown archaeological resources could be encountered during
construction
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Evaluation of find(s) by a qualified archeologist hired by YLWD
Documentation of Compliance: Date: Initial:
CUL-2: A qualified paleontologist shall be retained by YLWD. A pre-construction meeting
will be conducted in which the qualified paleontologist shall explain the procedures necessary to
protect and safely remove potentially significant fossil materials for study and curation. The
qualified paleontologist shall be retained thereafter on an on-call basis to identify and evaluate
potential cultural resources should any be encountered during Project construction.
Impact: Unknown paleontological resources could be encountered during
construction
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring: E
Monitoring Method: Pre-construction meeting conducted by a qualified paleontologist
hired by YLWD and on-call evaluation by the paleontologist
Documentation of Compliance: Date: Initial:
CUL-3: Any fossils and associated geologic data collected during the project earthmoving shall
be prepared and identified by a qualified paleontologist. Excavated significant fossil finds shall
be donated with funding for stabilization, identification, and curation on a first right-of-refusal
basis, to an appropriate institution that has a retrievable collection system and an educational and
research interest in the materials (e.g., the Orange County Natural History Museum). A final
report prepared by the qualified paleontologist detailing findings and disposition of specimens
shall be submitted to the Orange County Current and Advanced Planning Department and/or the
City of Yorba Linda.
Impact: Unknown paleontological resources could be encountered during
construction
Party Responsible for YLWD
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Identification of find(s) by a qualified paleontologist
Documentation of Compliance: Date: Initial:
CUL-4: If human remains are discovered, the Orange County Coroner's office must be notified
immediately under state law (California Health and Safety Code § 7050.5) and all activities in
the immediate area of the find must cease until appropriate and lawful measures have been
implemented. If the Coroner determines that the remains are Native American, the Coroner shall
contact the NAHC (California Public Resources Code § 5097.98). The NAHC will designate a
Most Likely Descendent who will make recommendations concerning the disposition of the
remains in consultation with the lead agency and Project archaeologist.
Impact: Unknown human remains could be encountered during construction
Party Responsible for YLWD
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: On site inspection during construction
Documentation of Compliance: Date: Initial:
Hazards and Hazardous Materials
HAZ-1: If contaminated soil is encountered during construction, the Orange County Health
Care Agency (HCA) in Santa Ana, the local Certified Unified Program Agency (CUPA), will be
notified of the discovery. The impacted soil will be handled and disposed of in accordance with
the requirements of the CUPA.
Impact: Project construction may encounter contaminated soils
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD and HCA
Monitoring:
Monitoring Method: On site inspection during construction
Documentation of Compliance: Date: Initial:
Noise
N0I-1: Construction noise shall be reduced by sound barriers at construction sites and by prior
notification of construction timing and duration and request that windows be kept closed during
that period.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial-
N01-2: All construction equipment, stationary or mobile, shall be equipped with properly
operating and maintained mufflers.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
N0I-3: The following maximum equipment sound levels shall be included in the procurement
specifications for the project:
Maximum Equipment Noise Levels for Proposed Project Construction
Maximum Sound Maximum Sound
Equipment Item Power Level, LW, Pressure Level, LP,
Under Full Load Under Full Load
Right angle drive 99 dB(A) 3 feet 88 dB(A) 3 feet
Gas engine mechanical noise 114 dB(A) 3 feet 103 dB(A) 3 feet
Gas engine exhaust, unsilenced 125 dB(A) 3 feet 114 dB(A) 3 feet
Electric vertical turbine pump
motor 108 dB A 3 feet 97 dB(A) 3 feet
PLC cabinet A/C outlet 71 dB(A) 3 feet 60 dB(A) 3 feet
Transformer in electrical room 55 dB(A) 3 feet 44 dB(A) 3 feet
Exhaust fan 59 dB(A) 3 feet 48 dB(A) 3 feet
Transformer outdoors 71 dB(A) 3 feet 60 dB(A) 3 feet
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise generation and report
violations
Documentation of Compliance: Date: Initial:
N0I4: The northeast, southeast, and southwest exterior walls of the pump station, as well as
the wall separating the pump room from the electrical room, shall be constructed using 12 inch-
thick solid-grouted concrete blocks, and shall be covered on both the exterior and interior sides
with two coats of latex paint or sealer. The northwest exterior wall of the pump station shall be
constructed of minimum 8 inch thick tilt-up concrete panels. All walls shall be constructed full
height and shall be constructed airtight.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor _
Implementation:
Agency Responsible for YLWD _
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-5: The roof of the pump station shall be constructed with minimum 3.25 inch-thick
lightweight concrete over metal decking.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor - -
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review roof specification and construction
and report violations
Documentation of Compliance: Date: Initial:
N0I-6: All personnel and access doors, both exterior and interior, shall be sound-rated
assemblies that provide the following minimum octave band sound transmission loss values:
63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz
23 dB 23 dB 43 dB 41 dB 42 dB 43 dB 51 dB
This may be achieved with an Industrial Acoustics Company (IAC) Noise-Lock door or
equivalent providing a sound transmission class (STC) rating of 43. Door hardware, frames and
seals shall be utilized and installed in strict conformance with manufacturer's instructions in
order to maintain the acoustical performance of the doors. Such requirements may include, but
are not limited to: the use of gasket seals and drop seals at the perimeter of the doors, and
astragal seals. The perimeters of all door frames shall be sealed to the exterior wall construction
with a weather-resistant sealant. Roll-up doors shall not be used. All doors shall be kept closed
when not in use and shall not be left open for ventilation purposes.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for
Implementation: YLWD and Contractor
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
N0I-7: All exterior and interior windows shall provide a minimum sound transmission class
(STC) rating of 43. The perimeters of all window frames shall be sealed to the wall construction
with a weather-resistant sealant. The windows above the personnel doors shall be fixed
assemblies rather than operable transom assemblies.
Impact: Construction will occur in the immediate vicinity of sensitive
_ y receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-8: All ventilation louvers shall be acoustical louvers that provide the following minimum
octave band sound transmission loss values:
63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz 8 kHz
5 dB 7 dB 11 dB 12 dB 13 dB 14 dB 12 dB 9 dB
This may be achieved with Industrial Acoustics Company (IAC) Noiseshield Model R louvers or
equivalent. The louvers shall be sealed airtight to the exterior fagade in which they are installed.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for ; YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
N0I-9: The roof access hatches shall be insulated metal assemblies designed for noise control,
and shall be sealed airtight with neoprene compression gaskets when closed. The hatches shall
be kept closed when not in use.
Impact: Construction will occur in the immediate vicinity of sensitive
_ receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-10: Skylights shall not be permitted.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-11: At least 1,000 square feet of the walls and ceiling shall be covered with acoustical
panels that provide the following minimum octave band absorption coefficients:
125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz
0.86 0.89 0.93 0.89 0.84 0.77
This may be achieved with Industrial Acoustics Company (IAC) Model NF-I-4-P Noise-Foil
sound absorptive panels or equivalent. The panels shall be attached per the manufacturer's
instructions and specifications. The panels shall be distributed evenly over the walls and ceiling
rather than concentrated at any one location. In distributing the material, the following shall be
considered: (a) The panels shall be attached with a Type A mounting; (b) Panels placed in
corners will provide greater benefit than those placed in the field of a wall or ceiling; and (c)
Panels placed at the intersection of two walls or at the intersection of the walls and the ceiling
will provide greater benefit than those placed in the field of the walls.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-12: The exhausts of the two pump engines shall be fitted with hospital grade silencers that
provide the following minimum octave band insertion loss values:
63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz 8 kHz
36 dB 42 dB 42dB 40 dB 37 dB 37 dB 37 dB 40dB
This may be achieved with Johnson Matthey QX Model silencers or equivalent. The silencers
shall be installed within the interior of the building. The exhaust pipes and silencers shall be
resiliently isolated from the building structure with suitable hangers and mounts.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for i YLWD and Contractor
Implementation: !
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-13: The rooftop exhaust fans shall be fitted with silencers that provide the following
minimum octave band insertion loss values:
63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz 8 kHz
5 dB 7 dB 15 dB 18 dB 17 dB 12 dB 10 dB 10 dB
This may be achieved with Industrial Acoustics Company (IAC) Model 3LFM silencers or
equivalent. The silencers shall be sealed airtight to the roof structure. The SMACNA guidelines
shall be followed with care when attaching the silencers to the exhaust fans.
Impact: Construction will occur in the immediate vicinity of sensitive
_ receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-14: All rotating equipment items shall be properly balanced to minimize noise from
vibration.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-15: The proposed engines shall be mounted on concrete bases having a mass at least twice
the mass of the engine. The concrete bases shall be isolated from the building foundation with
suitable vibration isolation.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for
YLW D
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-16: All pipes, conduits and ducts shall be resiliently isolated from the building structure.
Impact: Construction will occur in the immediate vicinity of sensitive
_ receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-17: All pipes, conduits, electrical connections, ducts, etc., shall be attached to the
mechanical equipment with slack, flexible connectors or conduits. The flexible connectors shall
be as close to the mechanical equipment as possible. Best performance is achieved when the
connector is installed in a pipe that is parallel to the equipment shaft.
Impact: Construction will occur in the immediate vicinity of sensitive
_ receptors_
Party Responsible for
Implementation: YLWD and Contractor ~J
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-18: Where an above-ground hose, pipe or conduit penetrates a wall, the penetration shall
be made through a prefabricated split metal sleeve. The hose/pipe/conduit shall float inside the
sleeve with a resilient material filling the gap. The gap between the metal sleeve and the wall
shall be grouted or packed airtight.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for _ I YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
NOI-19: Pipes and conduits through the roof deck shall be centered in an opening with a
diameter about 1/8 inch larger than the outside diameter of the pipe or conduit. The opening
shall be sealed with mineral fiber all around with resilient (non-hardening) caulk on both sides.
If a steel pipe clamp is required, it shall be isolated from the deck with properly sized spring
isolators.
Impact: Construction will occur in the immediate vicinity of sensitive
receptors
Party Responsible for YLWD and Contractor
Implementation:
Agency Responsible for YLWD
Monitoring:
Monitoring Method: Site inspector shall review noise control measures and report
violations
Documentation of Compliance: Date: Initial:
ITEM NO. 3.4
AGENDA REPORT
Meeting Date: April 1, 2010 Budgeted: Yes
Total Budget: $5.6 Million
To: Planning-Engineering- Cost Estimate: N/A
Operations Committee
Funding Source: Water Revenue Bond
From: Ken Vecchiarelli, General Account No: 101-2700
Manager
Job No: 200814
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: Yes
Prepared By: Hank Samaripa, Project CEQA Compliance: MND
Engineer
Subject: Brand Name Requirement for Highland Booster Station Project
SUMMARY:
During the project design and subsequent reviews, District staff and the consultant team determined
that several key design components and manufactured parts from a specific supplier were desired
in order to match other products already in use in the District's water system. Staff reviewed the
possibility of requiring brand name items with legal counsel. Counsel determined that per the Public
Contract Code, Section 3400, a Board finding is required to approve a brand-name requirement.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve the Brand Name Requirement for
the Highland Booster Station Project for the items listed on Exhibit A of the attached staff report.
DISCUSSION:
During the design process and reviews, District staff and the design team determined that several
key design components and manufactured parts were desired from specific suppliers in order to
match products already in use in the District's water system. Legal counsel informed District staff
that a brand-name requirement cannot be used unless the Board makes a finding per Public
Contracts Code Section 3400 that the brand name requirement is necessary in order to match other
products already in use in the District's water system. A copy of the staff report setting forth the
reasons for requiring brand-name components and parts for the Highland Booster Station Project is
attached.
PRIOR RELEVANT BOARD ACTION(S):
On July 9, 2009, the Board approved the award of the Professional Services Agreement for the
Highland Booster Station Project to MWH Americas for a fee not to exceed $469,593. On January
28, 2010, the Board approved Amendment No. 1 for a fee not to exceed $91,940. On February 11,
2010, the Board approved Amendment No. 2 for a fee not to exceed $18,929.
ATTACHMENTS:
Name: Description: Type:
STAFF REPORT Brand-Name Reqmt 25Mar10.pdf Brand-Name Reqmt Staff Rept Backup Material
Yorba Linda
Water District,
STAFF REPORT
DATE: March 25, 2010
TO: STEVE CONKLIN
FROM: HANK SAMARIPA
SUBJECT: REQUEST FOR BRAND NAME COMPONENTS AND PARTS -HIGHLAND BOOSTER STATION
REPLACEMENT PROJECT
BACKGROUND
During the planning and design phases for a District improvement project, the Engineering Department meets
with and solicits input from the Operations Department which will operate the new elements. The Operations
Department has certain maintenance history and training with certain brand name components and parts in the
District's system. For certain projects, the Operations Department has requested that bid specifications require
a part by brand name in order to improve the efficiency of operating and maintaining the District's water
system. However, Public Contract Code Section 3400 (b) prohibits the drafting of specifications in a manner that
will limit bidding to one specific concern, or call for a designated item by specific brand or trade name, unless
the specifications are followed by the words "or equal," and which would allow the bidders to furnish an equal
item. However, there are exceptions to this rule that support requiring brand name components and parts if the
District's Board makes certain findings.
Per Section 3400 (c), the "or equal" rule is not applicable when the awarding authority makes a finding that the
item as specified by the brand name is needed for one of the following reasons:
(1) In order that a field test or experiment may be made to determine the product's suitability for future
use.
(2) In order to match other products in use on a particular public improvement either completed or in the
course of completion.
(3) In order to obtain a necessary item that is only available from one source.
(4) In an emergency situation as described in detail in Section 3400.
WATER SYSTEM COMPONENTS AND PARTS
The District has a complex assortment of mechanical, electrical, and instrumentation components that are
integrated into one public improvement - its water system. The use of different brand name components and
parts for its water system creates inefficiency because the District must maintain a large inventory of said parts.
In addition, the District's staff must be familiar with different maintenance and repair schedules/procedures for
these parts, thus requiring a large amount of training. Requiring a brand name for certain components and
parts would permit the District to maintain a smaller inventory (for example, one part in inventory could serve
as a back-up replacement for several sites, whereas, if five sites had five parts made by five different
manufactures, the District would be required to keep one back-up part for each site), lessen the risk of
incompatible products, lessen the amount of time required to diagnose problems, and lessen training costs
related to maintenance and repair (for example, instead of requiring expertise regarding the nuances of five
different brand name parts, District staff would only be required to know how to maintain and repair one brand
name part).
During the final design development for the Highland Booster Station Replacement Project, it was determined
that several key operating components and parts for the project should be specified with a brand name in order
to match other components and parts in use in the District's water system. As set forth in the attached Exhibit
A, the components and parts listed are either already in a vast majority of District facilities or are part of a
movement to modernize certain District facilities.
SUMMARY
The District has a complex assortment of mechanical, electrical, and instrumentation components unique to its
system. Requiring brand name components and parts to match other components and parts already in use in
the District's water system is in the best interest of the District because it will permit the District to maintain a
smaller inventory of parts, lessen the risk of incompatible products, and lessen the amount of time required to
diagnose problems and perform maintenance and repair. Therefore, it is the recommendation of Engineering
and Operations staff that the specified components and parts in Exhibit A to the staff report be specified by
brand name for the Highland Booster Station Replacement Project in order to match other products already in
use in the District's water system.
EXHIBIT A
BRAND NAME REQUIREMENT
HIGHLAND BOOSTER STATION REPLACEMENT
March 25, 2010
Name of Reviewers: Rick Walkemeyer, John DeCriscio, and Mike Kiddie
Departments: Information Systems, Production, Operations
Product Function Manufacturer
1. Gas Engine (365bhp) Primary gas engines for the District Caterpillar
Use in water system: 10 of 13 District gas engines are Caterpillar
2. Diaphragm Control Valves Control water flows Cla-Val
Use in water system: 30 of 38 control valves at District booster stations are Cla-Val
3. Air Fuel Ratio Controller Control emissions from gas engines Mec-R
Use in water system: 10 of 13 of the gas engines air-fuel ratio controllers are Mec-R.
4. Gas Meter for interior space Measure gas fumes inside booster station MSA
Use in water system: 5 of 7 District gas meters in pump rooms are manufactured by MSA.
5. Gas Engine Control Engine control interfaces with air fuel controller Murphy
Use in water system: 10 of 13 District's gas-engine controllers are manufactured by Murphy.
6. Process Controller (PLC) Automatic Control Logic (Modicon) Schneider Elec.
Use in water system: Used at all District booster stations
7. Pressure Switches High and low pressure measurement Mercoid
Use in water system: In place at 10 of 12 pump stations.
8. Magnetic Flow Meter Flow measurement at booster stations ABB
Use in water system: In place at 5 of 6 locations with mag meters.
ITEM NO. 4.1
AGENDA REPORT
Meeting Date: April 1, 2010
Subject: Monthly Groundwater Producers Meeting Report
ATTACHMENTS:
Name: cv,r i~a$icri: a ype:
GWP MtgNotes 10Mar10.pdf Monthly Groundwater Producers Meeting Report Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: March 11, 2010
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Pat Grady, Assistant General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
SUBJECT: Groundwater Producers Meeting, March 10, 2010
John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on March
10 at OCWD. Items presented and discussed include the following:
1. Water Quality Update. OCWD staff reported on the schedule for preparation of the
2010 Consumer Confidence Report, for which OCWD is providing input and
assistance. In addition, an update on the Federal Unregulated Contaminant
Monitoring Regulation Phase 2 was provided.
2. Santa Ana River (SAR) Flow Analysis. OCWD staff provided a summary of
conclusions on the "White Paper-Recent Changes in Santa Ana River Discharge."
The conclusions are:
• The decrease in base flow at below Prado Dam for the most recent 10-year and
4-year periods is primarily due to decreased non-storm discharge, decreased
rising groundwater and decreased wastewater discharge.
• The decrease in rising groundwater in this reach is probably due to increased
groundwater production and drought.
3. SAR Sediment Removal Study Final Report. OCWD reported on the completed
study, which evaluated the feasibility of removing sediment from SAR water to
increase performance (i.e., percolation rate and duration) of the District's existing
recharge facilities and potential future subsurface recharge systems. Through the
study they identified five and determined two technologies effective at removing
sediment and increasing percolation rate. The two technologies were pilot tested
and recommended for additional evaluation. A work scope will be developed, and if
approved by the Board, larger-scale testing will take place with river water with
percolation in Olive Basin and Riverview Basin.
4. Review of Draft OCWD FY10-11 Budget. OCWD reported on the first draft of its
new budget presented to Board, along with the proposed water budget. The
proposed Replenishment Assessment (RA) and Basin Production Percentage (BPP)
1
remain unchanged at $249/AF and 62%, respectively. The current total budget is
$155.4 M and that proposed is $157.1 M. They propose $3.6 M for the Water Fund,
which will increase the balance to $57.5 M. That would allow for purchase of
approximately 118,000 AF of MWD replenishment water at future replenishment
rates, if and when available. This volume equals 50% of the amount necessary to
recharge the basin to the target overdraft range of 125,000 AF.
5. IRWD Wells 21 and 22 BEA Exemption Request. OCWD staff reported that IRWD
is applying for a Basin Equity Assessment (BEA) Exemption for its proposed Wells
21 and 22 Project in Tustin. The wells, located southeast of the intersection of the
55 and 5 freeways, were drilled in 1992 but never used due to nitrate concentration
above drinking water standard and TDS above recommended standard. IRWD
proposes to construct a 5-mgd Reverse Osmosis treatment plant to reduce the
parameters to drinking water standards. They are pursuing a USBR grant, a MWD
LRP operating subsidy and BEA relief from OCWD, for the estimated $44 M
treatment plant and pipeline project. There was considerable discussion at the
Groundwater Producers meeting on why needed, impact on Tustin and other
producers, and why more BEA exemptions at the expense of other producers. This
item will go to OCWD Board for consideration in April.
6. GWMP BPP Projections. Deferred to next month.
7. Continued BEA Methodology Discussion as Proposed by Mesa Consolidated
WD. Mesa is proposing that the BEA be based upon MWDOC melded marginal rate
instead of the MWD Tier 2 rate for MWDOC member agencies. Due to time
constraints, this was deferred to a planned conference call for interested parties.
8. Other. OCWD reported that the Board has decided to submit a letter requesting
capacity in the Poseidon Huntington Beach desal project.
2
ITEM NO. 4.2
AGENDA REPORT
Meeting Date: April 1, 2010 Budgeted: N/A
To: Planning-Engineering-
Operations Committee
Funding Source: Multiple Funds
From: Ken Vecchiarelli, General Account No: N/A
Manager
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Steve Conklin, Engineering CEQA Compliance: N/A
Manager
Subject: Capital Improvement and Replacement Projects Budget
SUMMARY:
As part of the development process for the FY 2010/11 Budget, the proposed Capital Improvement
and Replacements Projects Budget will be presented to the Planning-Engineering-Operations
Committee for review and discussion. That document is being prepared and refined by staff and will
be provided as a hand-out at the April 1 PEO Committee meeting.
For background information, a copy of the Five-Year Capital Improvement Program (FY 2009/14) is
attached. That CIP was approved by the Board for FY 2009/10. The proposed project list for
2010/11 will present the status of those projects, plans for upcoming years, and the addition of
newly proposed projects.
ATTACHMENTS:
Name: _Des°:Cripstion: Type:
Five Yr CIP FY 2009-10 Budget.pdf Five Yr C I P FY 2009/10 Budget Backup Material
Yot-ba Linda Water District FY 2009110 Budget
Five-Year Capital Improvement Program (FY 2009/14)
Previously Approved Projects FY 2009110 FY 2010111 FY 2011112 FY 2012113 Total
Highland Reservoir 3,952,000 1,224.000 5,176,000
New Well 20 590;000 1,025:000 1,615,000
Wells 1,5,12 Upgrade 190,000 190,000
OC-51 Upgrade 100,000 100,000
Fairmont BPS Pump Retrofit 400,000 400,000
Zane Reconfig- Pipelines 1,300,000 1;300,000
San Antonio PRS Upgrades 270,000 270,000
Hidden Hills Reservoir 5,500,000 5.500,000
Fire Flaw Impvmts Via Serena & Ohio 25.000 100,000 125,000
Lakeview Sewer Lift Sta Upgrade 220,000 220,000
Anaheim lnterties 150.00Q 150,000
Lakeview Fencing & Landscaping 210,000 210,000
CIS Implementation 100,000 100,000
Fairmont Site Improvements 300,000 300,000
Foxtail Pipeline 50,000 195,000 245,000
Elk Mtn- Reservoir Site Impvmts. 300,000 300,000
Palm Ave BPS Replacement 540,000 2,160,000 2,700,000 5,400,000
Zone 5 BPS 270,000 270,000 540,000 1,080,000
FY 2007-12 Program SUBTOTAL $13,767,000 $5,674,004 $3,240,000 $22,681,000
Flew Projects for CtP
Plumosa Site Redevelop. Study 50,000 50,000
Asset Management Plan 120,000 120,000
Sewer Master Plan 350,000 350,000
CMMS Implementation 200,000 200,000
Zone Interconnect Stub-ups (3) 120,000 120,000
Corrosion Monitoring Program 20,000 20,000
Valley View Pipeline Replacement 120,000 120,000
Blair Drive Pipeline Replacement 50,000 50,000
Highland Pipeline Replacement 120,000 120,000
Plumosa Water Line Relining 110,000 110,000
Bastanchury Pipeline Replacement 1,300,000 1,300,000
Vista del Verde Valve Replacement 500,000 500,000 1,000,000
Highland BPS Replacement 1,000,000 6,500,000 7,500,000
Mixing/Re-Chlor Facil at 2 Res Sites 100,000 100,000
Non-Pot WaterFacii for brig Use 900,000 900,000 1,800,000
West Wellfield 500,000 2,500,000 3,000,000 3,000,000 9,000,000
Proposed New Projects SUBTOTAL $4,560,000 $10,500,000 $3,900,000 $3,000,000 $21,960,000
COMBINED TOTAL $18,327,000 $16,174,000 $7,140,000 $3,000,000 $44,641,000
Page 131
ITEM NO. 4.3
AGENDA REPORT
Meeting Date: April 1, 2010
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Name: Dosciiption: a ype:
CIP Rept Apr10.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 1, 2010
New Information since Last Report is Shown in Red
IN CONSTRUCTION
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Highland Reservoir
First roof pour completed.
Placing rebar for second roof
On schedule with no significant
Budget: $11,200,000 Job No. 200309
MET thru MWDOC regarding
pour.
issues outstanding.
Project Contact: Joe Polimino
the 7 comments received in
receipt of MET's 2nd response.
MET might bring forth.
Planned Completion Date: August 2010
MET's letter. Waiting to hear
2
Hidden Hills Res & Santiago BPS
Roof complete. Removing
Stripping inside forms,
Received verbal approval from State
Budget: $7,000,000 Job No.200028
shoring, set internal stair units.
finishing walls, forming
Parks for construction of paved
Project Contact: Joe Polimino
Set new pumps at Santiago
hatches, installing pipe
access road to reservoir.
Planned Completion Date: July 2010
BPS. Placing storm drain pipe.
3
Photovoltaic Panels —Admin Bldg
City of Placentia issued a
Shutdown of Main Richfield
Commissioning and final inspection
Budget: $250,000 Job No. 200912
permit to construct. Solar Panel
transformer and tie -in to the
to be coordinated with various
Project Contact: Hank Samaripa
installation April 5 -16.
Admin Bldg Main Electrical
agencies. Training and final punch
Planned Completion Date: May 2009
April 23�d after 6PM.
list to be prepared.
4
Wells 1, 5 and 12 Upgrade
Analyzing W -12 electric motor
Finalize W -12 motor
Well 5 was successfully test -
Budget: $190,000 Job No. 200813
replacement. Seeking Board
replacement specifications.
pumped at original design flow rate.
Project Contact: Anthony Manzano
authorization for W -5 pump
Proceed with W -5 pump
Project Completion: TBD
installation.
installation.
5
Well 20
Board awarded drilling contract
Drilling expected to start
Well drilling and well development
Budget: $2,000,000 Job No.200711
to Bakersfield Well & Pump,
March 29. Wellhead
to be completed in 60 days.
Project Contact: Anthony Manzano
and Wellhead Equipping design
Equipping design to
Planned Completion Date: TBD
to Civiltec Engineering Inc.
commence by April 1.
IN DESIGN
Project
Current Status
Next Actions
Comments
1
OC -51 Connection Upgrade
District provided responses to
Meet with MWDOC staff to
Coordinate w/ MWDOC staff to
Budget: $242,000 Job No. 200815
MET thru MWDOC regarding
discuss further plans upon
address any additional concerns
Project Contact: Derek Nguyen
the 7 comments received in
receipt of MET's 2nd response.
MET might bring forth.
Planned Completion Date: TBD
MET's letter. Waiting to hear
back from MET.
2
Highland Booster Station Upgrade
90% plans and specs due first
Review Plans and Specs of
Coordinate Reservoir and Booster
1
Budget: $6,000,000 Job No. 200814
week of April. Sole- Source
90% design. Prepare
Station site work construction.
Project Contact: Hank Samaripa
Justification and Mitigated
Invitation -to -Bid documents
Review SCE and Gas Co. rebate
Planned Completion Date: Mid 2011
Negative Declaration prepared
and decide on advertisement
opportunities for the Highland BPS
Project Contact: Hank Samaripa
for Board consideration.
date and final bid date.
Replacement Project.
3
Anaheim Intertie Connection
Review 100% plans and
Determine construction
Evaluate bids and select General
2
Budget: $250,000 (YLWD Share)
specifications. Prepare a short-
advertisement date with
Contractor. Coordinate with
Job No. 200906
list of General Contractors for
Anaheim for project.
Anaheim Public Works.
Project Contact: Hank Samaripa
construction phase.
customers to Malcolm Pirnie
Planned Completion Date: March 2010
and available sewer -flow
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Fairmont Site Improvements
Agreement approved by
S &S has proposed a code
Present schedule to Operations and
Budget: $300,000 (YLWD share)
Board. Waiting for signed
update review by City.
Production departments.
Job No. 200803
agreement from S &S. S &S
Contact S &S for preliminary
Project Contact: Hank Samaripa
has delayed signing pending
kickoff meeting to establish
Planned Completion Date: TBD
completion of other priorities.
schedule.
2
Recycled Water Study
District executed Professional
Provide updated irrigation
Coordinate and begin work with
Budget: $1,800,000 Job No. 200807
Services Agreement with
demand data and projected
Consultant on project tasks.
Project Contact: Derek Nguyen
Malcolm Pirnie Inc.
customers to Malcolm Pirnie
Planned Completion Date: TBD
and available sewer -flow
monitoring data
3
West Wellfield Project
Investigating additional
Review hydrogeology data and
May retain a Property Acquisition
Budget: $9,000,000 Job No.
potential well sites east of
contact land owners to
Firm for assistance.
Project Contact: Anthony Manzano
Tustin Avenue
determine if there is interest in
Planned Completion Date: TBD
selling small site for well.
4
Asset Management Plan (AMP)
Carollo preparing final AMP
Carollo to conduct training
Follow up with GIS on correcting
Budget: $120,000 Job No. 200909
report for the District and for
module for the AMP project.
discrepancies on the District water
Project Contact: Hank Samaripa
final distribution.
Schedule to be determined.
and sewer Atlas Maps.
Planned Completion Date: Feb. 2010
5
Sewer Master Plan (SMPU)
Staff and Consultant working
Final stage of flow monitors set
Flow monitoring expected to be
Budget: $350,000 Job No. 200916
on setting flow monitors.
to capture dry and wet weather
complete by early April. GIS
Project Contact: Anthony Manzano
Sewer system GIS database
flows.
system to be updated by late April.
Planned Completion Date: August 2010
being updated.
6
Lakeview Grade Separation
Discussing Lakeview, at
Final pipeline relocation
Awaiting OCTA decision to
Budget: TBD Job No. 201002
Orangethorpe Ave., pipeline
alignment to be determined and
determine agency financially
Project Contact: Anthony Manzano
relocation scenarios with
design work to commence.
responsible for pipe relocation.
Planned Completion Date: Sept. 2013
OCTA representatives.
CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING
1. Zone 5 (1000) Booster Station ($1,080,000)
2. Fairmont Booster Station Reconfiguration ($400,000)
3. Foxtail Drive Pipeline ($245,000)
4. Elk Mountain Reservoir Site Improvements ($300,000)
5. Fire Flow Improvements- -Via Sereno and Ohio ($125,000)