HomeMy WebLinkAbout2010-06-02 - Planning-Engineering-Operations Committee Meeting Agenda Packet
Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Wednesday, June 2, 2010, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director William R. Mills, Chair Ken Vecchiarelli, General Manager
Director John W. Summerfield Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
2.1. Monthly Groundwater Production and Purchased Import Water Report (To be provided
at the meeting.)
2.2. Monthly Preventative Maintenance Program Report (To be provided at the meeting.)
3. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
3.1. Approval of Change Order No. 1 for Hidden Hills Reservoir Project
Recommendation: That the Committee recommend the Board of Directors approve
Change Order No. 1 in the amount of $3,027.86 and 16 additional calendar days to
Pacific Hydrotech Corporation for construction of the Hidden Hills Reservoir Project,
Job No. 200028.
3.2. Agreement for Sharing Consultant Costs for 2010 Urban Water Management Plan
(UWMP)
Recommendation: That the Committee support execution by the full Board of
Directors of the Agreement with the Municipal Water District of Orange County
(MWDOC) for Sharing Consultant Costs for the 2010 Urban Water Management
Plans.
3.3. Renewal of Supplier Contract with Nickey Petroleum, Inc.
Recommendation: That the Committee recommend the Board of Directors authorize
the General Manager to enter into the renewal option agreement as part of our
Supplier Contract with Nickey Petroleum Inc. The new term of the contract will be
12 months with service starting on July 1, 2010 and ending on June 30, 2011, with
a total estimated contract cost of $112,350.00.
3.4. Renewal of Maintenance Contract with Marina Landscape
Recommendation: That the Committee recommend the Board of Directors authorize
the General Manager to enter into the renewal option agreement as part of our
Maintenance Contract with Marina Landscape. The new term of the contract will be
12 months with service starting on July 1, 2010 and ending on June 30, 2011, with
a total estimated contract cost of $38,800.
3.5. Renewal of Janitorial Contract with Merchants Building Maintenance
Recommendation: That the Committee recommend the Board of Directors authorize
the General Manager to enter into the renewal option for a Janitorial Service
Contract with Merchants Buildings Maintenance. The new term of the contract will
be 12 months with service starting on July 1, 2010 and ending on June 30, 2011,
with a total estimated contract cost of $71,920.
4. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
4.1. Status Report on Capital Projects in Progress
4.2. Monthly Groundwater Producers Meeting Report
4.3. Future Agenda Items and Staff Tasks
5. ADJOURNMENT
5.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held
July 1, 2010 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: June 2, 2010
Subject: Monthly Groundwater Production and Purchased Import Water Report (To be
provided at the meeting.)
ATTACHMENTS:
Narn9: Doscrip ion: u
GW Production and Purchased Water Report.pdf Monthly GW Production and Import Water Report Backup Material
YLWD SOURCE WATER SUMMARY
Fiscal Year 2009-10
TOTAL MONTHLY YTD BUDGET
GW IMPORT CUP DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF) (AF)
Jul-09 192.2 933.4 1,212.0 2,337.6 8.2% 8.2% 2,585.9 -9.6%
Aug-09 377.8 961.3 979.8 2,318.9 16.3% 12.2% 2,544.1 -8.9%
Sep-09 1,309.4 911.5 2,220.9 59.0% 27.3% 2,232.2 -0.5%
Oct-09 1,205.4 617.6 1,823.0 66.1% 35.5% 1,882.8 -3.2%
Nov-09 1,026.4 673.9 1,700.3 60.4% 39.5% 1,487.4 14.3%
Dec-09 793.9 369.4 1,163.3 68.2% 42.4% 1,338.0 -13.1%
Jan-10 806.9 308.0 1,114.9 72.4% 45.1% 1,166.6 -4.4%
Feb-10 564.5 109.5 674.0 83.8% 47.0% 1,116.1 -39.6%
Mar-10 576.2 370.5 289.1 1,235.8 46.6% 47.0% 1,322.6 -6.6%
Apr-10 665.4 749.6 58.7 1,473.7 45.2% 46.8% 1,654.3 10.906
May-10 883.0 1,006.3 60.0 1,949.2 45.3% 46.6% 2,188.2
Jun-10 - 2,451.9
FYTD 8,401.1 7,011.0 2,599.6 18,011.7 46.6% 19,518.1
Allowable GW (YTD) 8,397.8 (AF)
CUP Obligation FY 2009-10 2,193.0 (AF)
Monthly CUP Pumping (AF) 60.0 (AF)
YTD CUP Pumping (AF) 2,599.6 (AF)
YTD CUP Achieved 118.5%
GROUNDWATER PERCENTAGE
85.0%
75.0%
65.0%
55.0%
45.0% - - -
35.0%
25.0%
MONTHLY GW )
15.0% YTD GW
BPP GOAL 46.6%
5.0%
O°~ 00 00 00 O°~ O°~ ,~O NF) NCO NCO NCO NQ)
Qua' ~~Q ova ~oJ Oro )ate ~ac PQc ~a~
Month
WATER SUPPLY
FY 2009-2010
May 2010 Water Supply
CUP
3.1%
GW
45.3%
IMPORT
51.6%
2009-2010 YTD Water Supply
CUP
14.4%
GW
46.6%
IMPORT
38.9% GW BPP GOAL
46.6%
3,500
1I
2,500
cz:7 2,000
Q
N
E
O
O
> 1,500
1,000
500
Total Water Use
Q%, o°' o� o%' o�' o� o�' o�' o� ob (Z' o% o° ^° 1�' e '.° o%' e �.° d) e �.° o%' e �.° o% o° ^°
e, F q, F ��
Month
■09 -10 GW
009 -10 IMPORT
Monthly Average Mean Temperature ( °F)
008-09 GW
72.7 74.8 008 -09 IMPORT
■07 -08 GW
72.2 73.6
007 -08 IMPORT
70.5
70.4
69.8
74.0
74.3
64.0
67.4
74.1 65.9
63.3
162.9
66.4
6
65.4
1.0
61.6
66.1
60.1
62.6
58.2
62.6
59.3
54.0
60.2
55.8
54.3 55.0
58.2 55.4
56.3
57.2
Q%, o°' o� o%' o�' o� o�' o�' o� ob (Z' o% o° ^° 1�' e '.° o%' e �.° d) e �.° o%' e �.° o% o° ^°
e, F q, F ��
Month
22,000
20,000
18,000
16,000
14,000
U-
Q 12,000
m
E
0 10,000
8,000
6,000
4,000
2,000
0
Jul -09
2009 -2010 YTD Water Supply
Budgeted Total GW + Import
--s- Actual Total GW + Import
BPP GW Goal 46.6%
Actual GW Production
-000,
Aug -09 Sep -09 Oct -09 Nov -09 Dec -09 Jan -10 Feb -10 Mar -10 Apr -10 May -10 Jun -10
Month
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: June 2, 2010
Subject: Monthly Preventative Maintenance Program Report (To be provided at the
meeting.)
ATTACHMENTS:
Name: Description:
2009 -10 fiscal.pdf Monthly PM Report
PM PROGRAM
2009/2010
Fiscal 2009 -10 1 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 0
5401
3541
131 130
2061
9921
4201
5851
5231
716
INSPECTED THIS YEAR 0
5401
8941
1,025 1,155
1,361
2,353
2,773
1 3,358
1 3,881
1 4,597
% OF TOTAL 0.0%
14.0%1
23.0%1
26.4% 29.8%
35.0%1
60.6%1
71.5%1
86.5%1
100.0%1
1
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 242
2941
4561
5751
326 463
2271
5201
290
1 658
1 744
OPERATED THIS YEAR 242
5361
9921
1,5671
1,893 2,356
2,5831
3,1031
3,3931
4,0511
4,795
% OF TOTAL 4.5%
10.1%1
18.5%1
29.3%1
35.4% 44.0%
48.0%1
58.0%1
63.4%1
75.7%1
89.6%
DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0
01
01
1551
0 0
01
01
01
1551
0
FLUSHED THIS YEAR 0
01
01
1551
0 155
1551
1551
1551
3101
310
% OF TOTAL 0.0%
0.0%1
0.0%1
50.0%1
50.0% 50.0%
50%
50%
50%1
100%1
1
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 0
2051
931
0 1
01
21
11
01
11
0
INSPECTED THIS YEAR 0
2051
2981
298 299
299
3011
3021
3021
3031
303
% OF TOTAL 0.0%
66.3%1
96.4%1
96.4% 96.8%
96.8%
97.4%1
97.7%1
97.7%1
98.1%1
98.1%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 73,825
18,7981
24,9741
104,224 121,202
128,7031
91,8021
130,579
1 93,8431
59,4971
55,478
CLEANED THIS YEAR 73,825
92,6231
117,5971
221,821 343,023
471,726
563,5281
694,1071
787,950
1 847,4471
902,925
% OF TOTAL 9.2%
11.5%1
14.7%1
27.6% 42.7%
58.8%1
70.2%1
86.5%1
98.2%1
105.6%1
1
SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years.
TELEVISED THIS MONTH 5,334
21,6511
23,1191
5,4631
809 3,628
7,0621
2,0771
13,0221
25,206
1 17,610
TELEVISED THIS YEAR 5,334
26,985
1 50,1041
55,567
1 56,376 60,004
67,0661
69,1431
82,165
1 107,3711
124,981
% OF TOTAL 2.7%
13.5%1
25.0%1
27.7%1
28.1% 29.1%
33.4%1
34.5%1
41.0%1
53.5%1
62.3%
ITEM NO. 4.1
AGENDA REPORT
Meeting Date: June 2, 2010 Budgeted: Yes
Total Budget: $5,500,000
To: Planning-Engineering- Cost Estimate: $5,500,000
Operations Committee
Funding Source: ID No. 2 GO Bonds
From: Ken Vecchiarelli, General Account No: 401-2700
Manager
Job No: 200028
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Joe Polimino, Project Engineer CEQA Compliance: MND
Subject: Approval of Change Order No. 1 for Hidden Hills Reservoir Project
SUMMARY:
Work is proceeding on schedule for construction of the Hidden Hills reservoir and upgrades to the
Santiago Booster Station. Submitted for consideration is construction Change Order No. 1.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Change Order No. 1 in the amount
of $3,027.86 and 16 additional calendar days to Pacific Hydrotech Corporation for construction of
the Hidden Hills Reservoir Project, Job No. 200028.
DISCUSSION:
In accordance with the contract documents, Pacific Hydrotech Corporation submitted Change Order
No. 1 due to additions and modifications, as well as District-initiated changes encountered during
the course of construction to date. Proposed Change Order No. 1 includes the addition of reservoir
floats for each bay, signs to display weight limits, additional days for a road closure and weather
rain days through April 12, 2010. A copy of Change Order No. 1 is attached for review and
information. Details of the items in the change order are listed below.
Reservoir floats were requested by the District Operations Department. as an additional means to
show water levels in the reservoir bays, and add redundancy to the overall system. This change
request is for an additional $2,275.85 and no calendar days by the contractor.
The District requested the addition of three signs to be placed on top of the reservoir, at key points
along the access road, so District personnel in vehicles will be alerted to the weight limitations on
the roof of the new reservoir. This change request is for $752.01 and no calendar days by the
contractor. Concerning the addition of calendar days to the project, the first two days was for a road
closure on Hidden Hills Road, which stopped the export of material from the project while the
reservoir site was being excavated. The road closure was due to a water line break and subsequent
repair by District staff. An additional 14 calendar days is being requested for rain delays which
prevented work, through April 12, 2010. This totals 16 additional calendar days being requested by
the contractor.
The status of the construction contract with Pacific Hydrotech Corporation is as follows:
. The original contract is $5,012,458.00 and 400 calendar days starting May 11, 2009.
. If approved, Change Order No. 1 adds $3,027.86 (0.05% of the current contract amount) and
16 calendar days (4.0% of current contract calendar days).
. If approved, the revised construction contract amount is $5,015,485.86 and 416 calendar
days.
Staff and Butier, the District's construction management consultant, reviewed this change order
request and recommend approval.
PRIOR RELEVANT BOARD ACTION(S):
The Board has approved twelve progress payments to date for this project, the last of which was
approved May 13, 2010.
ATTACHMENTS:
Name: Description: Type:
Hidden _Hills _Change Order _No_1.pdf Hidden Hills Change Order No 1 PHC Corporation Backup Material
YOREA LINDA WATER DISTRICT CHANGE ORDER NO. 001
HATE May 25, 20101
Page 1 of 1
CONTRACT NAME: Hidden Hills Reservoir Project CONTRACT AMT.: $5,412,458.00 DAYS, 40D
CONTRACTOR: Pacific Flydrstech GorpQraticrt THIS CHANtaE: $ 3,027.86 DAYS: 15
OWNER: Yorba Linda Water D strict REVISED CONTRACT AMT: $ 5,015,485.85 CLAYS: 416
This Change Carder covers changes to the subject contract as described herein. The Contractor shall construct, fumish equipment and materials,
and perform all work as necessary or required to complete the Charge Order items for a lump sum price agreed upon, between the Contractor
and Yorba Lima Water Districi otherwise referred to as owner.
DESCRIPTION OF CHANGES +INCREASE CON7RiACT
I OR TIME
EXTENSION
- DECREASE IN /OR-
CONTRACT REDUCTION
AMOUNT (DAYS)
(
Hidden Hills Road Closure Prevented Truckiri xne ! 0,0
Signs for Reservoir Load Urnits $ 752.0, a 1
Additional Reservoir Floats $ 2,275.85 0
Additional Weather Rain. a s TtZra Ap
igh 12, 2010 $ 0.0 14
I
NET CHANCE
$ 3,027.86 16
REVISED CONTRACT AMOUNT AND TIME
$5,015,485,86 416
The amount of the contract will ba increased ~ by the sum of $ 3,027.86 and The contract time shall he increased ~ by
16 calendar days. The unIe:sined Contractor approves the foregoing Change Order as to the changm it any, in the contract price specified for
each itern including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of lima
allowed, 4 any, for completion et the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and
pertorrn all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change
Or:ier items. This dccu ent wil3 become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Carder
shall be effective when approved by the Owner. This Change Order constitutes full, final, and complete compensation to the Contractor for all
coasts, expenses, overhead, profit, and any damages of every kind that the Contractor may incur in connection with Los above referenced
changes in the work, including any Impact on the referenced work of any other work under the contract, any changes in the sequences of any
work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this
contract By the execution of the Change Order, the Contractor accepts the contract price change and the contram completion dare change, 6
any, and expressly walves any claims for arty additional compensation, damages or time extensions. in connection with the above-referenced
changes.
RECOMMENDED: AENGINEER OR DATE:
Sw b lcJ ngineerrihg Manager-
ACCEPTED: ` - /CONTRACTOR DATE;
j, Kirk rns. President PHC
APPROVED: DATE:
/OWNER
Kenneth R. Vecchiarelli, General
Manager
ITEM NO. 4.2
AGENDA REPORT
Meeting Date: June 2, 2010 Budgeted: Yes
Total Budget: $45,000
To: Executive-Administrative- Cost Estimate: $32,250
Organizational Committee
Funding Source: Water Operating
Fund
From: Ken Vecchiarelli, General Account No: 1-4020-0780-00
Manager
Presented By: Ken Vecchiarelli, General Dept: Engineering
Manager
Reviewed by Legal: Pending
Prepared By: Cindy Botts, Management CEQA Compliance: N/A
Analyst
Subject: Agreement for Sharing Consultant Costs for 2010 Urban Water Management
Plan (UWMP)
SUMMARY:
The California Water Code section 10621 requires water providing agencies serving more than
3,000 customers to prepare, adopt and update every five years, an Urban Water Management Plan
(UWMP). The District hired a consultant to update this plan in 2005. Since many of the components
of the UWMP are similar throughout the local water agencies, and since the long term supply
considerations rely on the Metropolitan Water District of Southern California's UWMP, the Municipal
Water District of Orange County (MWDOC) has proposed sharing consultant costs for the
preparation of individual agency 2010 UWMP's.
STAFF RECOMMENDATION:
That the Committee support execution by the full Board of Directors of the Agreement with the
Municipal Water District of Orange County (MWDOC) for Sharing Consultant Costs for the 2010
Urban Water Management Plans.
DISCUSSION:
MWDOC has agreed to coordinate the process of consultant cost-sharing for preparation of the
2010 Urban Water Management Plan (UWMP). Twenty four agencies have expressed interest in
working collectively and utilizing a common consultant to prepare these plans. MWDOC has taken
the lead role in coordinating these efforts, including administration of the Request For Proposal
(RFP) process. The RFP was sent out to a number of competent firms, with two submitting
proposals. The proposals were reviewed by a working group of the participating agencies, who
recommended selection of Malcolm Pirnie as the consultant best able to prepare 2010 UWMP for
all of the participating agencies.
MWDOC has prepared the attached cost-sharing agreement for the agencies interested in working
cooperatively with MWDOC and Malcolm Pirnie for the 2010 UWMP preparation. Upon execution of
the agreement, each agency shall deliver the full amount of their specific portion of the cost to
MWDOC, who will, in turn, make progress payments to the consultant for any work performed and
will also hold back 10% of the cost paid by each agency until such time as the agency is fully
satisfied with the work prepared by the consultant. Each agency will be notified prior to any
additional work completed in the preparation of the UWMP that is above and beyond costs already
identified.
YLWD's portion of the cost-sharing agreement is $32,226, which includes printing costs, attendance
at up to 3 YLWD Board meetings and additional work in the Water Demand Management Measures
section as YLWD is not currently a California Urban Water Conservation Council (CUWCC)
reporting agency.
PRIOR RELEVANT BOARD ACTION(S):
UWMPs were adopted in 1990, 1995, 2000, and 2005. Prior to the 2005 update, all work was
completed in-house by staff. Complexities in the scope of the requirements have continued at each
update, requiring consultant assistance.
ATTACHMENTS:
Name: Description: -I ype:
Multi Agency Cost _Sharing _UWMP.pdf 2010 UWMP Agreement Backup Material
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
AGREEMENT FOR SHARING CONSULTANT COSTS
FOR 2010 URBAN WATER MANAGEMENT PLANS
THIS AGREEMENT is made and entered into as of 2010, by
and between:
1. MWDOC
2. City of Anaheim
3. City of Buena Park
4. City of Fullerton
5. City of Garden Grove
6. City of La Palma
7. City of Orange
8. Serrano Water District
9. City of Seal Beach
10. City of Tustin
11. Yorba Linda Water District
12. East Orange County Water District
13. City of Fountain Valley
14. City of Newport Beach
15. City of Santa Ana
16. Mesa Consolidated Water District
17. City of San Clemente
18. El Toro Water District
19. South Coast Water District
20. Moulton Niguel Water District
21. City of San Juan Capistrano
22. Santa Margarita Water District
23. City of Brea
24. City of La Habra
25. Laguna Beach County Water District
(collectively "Participating Agencies" and individually "Participating Agency") and the
Municipal Water District of Orange County ("MWDOC"). The Participating Agencies and
MWDOC are also collectively referred to as "Parties."
RECITALS
WHEREAS, under California Water Code section 10621, subdivision (a), the
Participating Agencies are required to update their respective Urban Water
Management Plan ("UWMP") at least once every five years, on or before December 31
in years ending in five and zero; and
WHEREAS, this year water agencies have an additional 6 months, or until July
1, 2011, to update their respective UWMP; and
WHEREAS, each Participating Agency intends to prepare a separate 2010
UWMP for submission by July 1, 2011; and
1
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
WHEREAS, the Participating Agencies share many water supply characteristics,
including water sources, regional water management agencies, location, climate history,
and demographics; and
WHEREAS, pursuant to California Water Code section 10620, subdivision (d)(2),
the Participating Agencies wish to coordinate the preparation of their 2010 UWMPs in
the interest of reducing preparation costs; and
WHEREAS, the Participating Agencies and MWDOC desire to cooperate with
each other to obtain economies of scale and thereby reduce preparation costs for each
of the Participating Agencies; and
WHEREAS, MWDOC and the Participating Agencies have jointly prepared and
agreed to a Scope of Work that was incorporated into a Request for Proposals that was
sent to a number of competent Consulting Firms, two of which submitted proposals
which were reviewed by a working group of the Participating Agencies who
recommended selection of Malcolm Pirnie as the successful consultant to prepare
Urban Water Management Plans for the Participating Agencies, and
WHEREAS, MWDOC and its staff are willing to coordinate this process, including
the issuance of a Request for Proposal as described above, the review of proposals
received, the selection of a consultant, the preparation and administration of a
professional services agreement with the selected consultant; and the administration of
the cost sharing provisions of this Agreement;
NOW, THEREFORE, in consideration of the payment of money as set forth
below and the mutual promises of the Parties hereto, it is agreed:
1. Engagement of Consultant and Administration of Consultant Agreement
MWDOC shall award a professional services agreement for the work identified in
the Request for Proposals to Malcolm Pirnie ("Consultant Agreement"). MWDOC
shall use its standard professional services agreement form for the Consultant
Agreement and require appropriate types and limits of insurance coverage. Each
CGL policy shall identify MWDOC, the Participating Agencies, and their directors,
officers, agents, employees, attorneys, consultants and volunteers as additional
insureds, or be endorsed to identify these parties as additional insureds using a
form acceptable to MWDOC. Coverage for additional insureds shall not be
limited to vicarious liability. The Consultant Agreement will require the
consultant's insurer(s) to waive all rights of subrogation against MWDOC, the
Participating Agencies, and their directors, officers, agents, employees,
attorneys, consultants and volunteers. The Consultant Agreement will require
consultant to ensure that its subconsultants, if any, provide similar insurance
coverage.
2
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
1.2 MWDOC shall coordinate all aspects of the proposed work with the selected
contractor and communicate with each Participating Agency, regularly and
upon request of the Participating Agency, regarding the status and substance
of its 2010 UWMP;
1.3 MWDOC shall make payments to the Consultant for progress payments as
work proceeds. MWDOC shall withhold 10% of each progress payment in a
retention fund until such time as every Participating Agency has notified
MWDOC that it is satisfied with the final UWMP prepared for it by Consultant.
1.4 Each Participating Agency shall provide all documents, information and
assistance requested by the selected contractor during the performance of
the Consultant Agreement.
2. Cost Sharing by Participating Agencies.
2.1 MWDOC shall:
2.1.1 Collect from each Participating Agency upon execution of this Agreement
the full amount of the portion of the total cost allocated to that Participating
Agency in the selected contractor's proposal, as attached in Exhibit A;
2.1.2 Inform each Participating Agency of any proposed extra work under the
Consultant Agreement that relates to preparation of that Participating
Agency's 2010 UWMP and that would result in an increase in that
Participating Agency's payment under this Agreement. MWDOC and the
affected Participating Agency must both approve such extra work before
MWDOC will notify Consultant to proceed on the work.
2.1.3 Be responsible for making progress payments directly to consultant from
funds paid to MWDOC by Participating Agencies (see section 1.3).
2.1.4 Prepare a final accounting and distribute any remaining funds collected
from the Participating Agencies back to the Participating Agencies or
make a final billing payment to Participating Agencies where there are
funds due.
2.2 Each Participating Agency shall:
2.2.1 Pay to MWDOC upon execution of this Agreement the full amount of the
portion of the total cost allocated to that Participating Agency in the
selected contractor's proposal, as attached in Attachment A;
3
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
2.2.2 Pay to MWDOC, upon approval of any extra work under the Consultant
Agreement that relates to preparation of its 2010 UWMP, the full amount
owed for the approved work. Each Participating Agency shall bear all
costs associated with extra work it approves.
3. Accounting
Upon request of any Participating Agency, MWDOC will provide copies of the
selected consultant's payments requests invoices and MWDOC's payment
records.
4. Independent Contractor
Any consultant engaged by MWDOC on behalf of the Participating Agencies
as contemplated in this Agreement will not be a party to this Agreement and
will not be an employee or agent of MWDOC or any of the Participating
Agencies, either as a result of this Agreement or as a result of a professional
services agreement between MWDOC and the consultant. Any consultant
engaged as contemplated in this Agreement will be an independent
contractor to MWDOC.
5. Warranty and Indemnification
MWDOC shall use its best efforts in administering the Consultant Agreement,
but makes no representations, guarantees or warranties to the Participating
Agencies as to the quality or timeliness of work product provided by the
selected contractor pursuant to the Consultant Agreement. The Participating
Agencies, and each of them, shall indemnify MWDOC, its directors, officers,
employees and agents against, and will hold and save them harmless from,
any and all actions, claims, penalties, obligations or liabilities, in law or in
equity, of every kind or nature whatsoever, that may be asserted or claimed
by any person, firm, entity, corporation, political subdivision or other
organization arising out of or in any manner directly or indirectly connected
with the 2010 UWMPs prepared pursuant to the Consultant Agreement. As
between the Participating Agencies, any costs associated with the indemnity
and defense obligations set forth in the previous two sentences shall be the
financial responsibility of each Participating Agency based on the same pro
rata basis as the allocation of costs set forth in Section 2.1.1 herein and
Exhibit A hereto. In the event MWDOC, its directors, officers, employees and
agents are made a party to any action or proceeding filed in connection with a
challenge to any 2010 UWMP prepared pursuant to the Consultant
Agreement, the Participating Agency whose 2010 UWMP is challenged shall
provide a complete defense to MWDOC, its directors, officers, employees and
agents and shall reimburse MWDOC for all costs and expenses incurred as a
result of the action or proceeding, including reasonable attorney's fees.
4
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
6. Notice
Any notice or communication required to be given under this Agreement shall
be in writing and effective when deposited, first class postage prepaid, with
the United States Postal Service addressed to the contracting Parties as
follows:
Notices to Parties
If to:
1. MWDOC Kevin P. Hunt, General Manager
Municipal Water District of Orange County
18700 Ward St.
P.O. Box 20895
Fountain Valley, CA 92728
2. City of Anaheim Thomas Wood, City Manager
City of Anaheim
City Hall East, 200 S. Anaheim Blvd.
Anaheim, CA 92805
3. City of Buena Park Rick Warsinski, City Manager
City of Buena Park
6650 Beach Blvd.
Buena Park, CA 90622
4. City of Fullerton Chris Meyer, City Manager
City of Fullerton
303 W. Commonwealth Avenue
Fullerton, CA 92832-1775
5. City of Garden Grove Matthew Fertal, City Manager
City of Garden Grove
P.O. Box 3070
Garden Grove, CA 92842
6. City of La Palma Dominic Lazzaretto, City Manager
City of La Palma
7822 Walker Street
La Palma, CA 90623
7. City of Orange John Sibley, City Manager
City of Orange
P.O. Box 449
Orange, CA 92866
5
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
8. Serrano Water District David Noyes, General Manager
Serrano Water District
18021 Lincoln Street
Villa Park, CA 92861-6446
9. City of Seal Beach David Carmany, City Manager
City of Seal Beach
211 8th Street
Seal Beach, CA 90740
10. City of Tustin William Huston, City Manager
City of Tustin
300 Centennial Way
Tustin, CA 92780
11. Yorba Linda Water District Ken Vecchiarelli, General Manager
Yorba Linda Water District
1717 E. Miraloma
Placentia, CA 92870
12. East Orange County Water Lisa Ohlund, General Manager
District East Orange County Water District
185 N. McPherson Rd.
Orange, CA 92869
13. City of Fountain Valley Ray Kromer, City Manager
City of Fountain Valley
10200 Slater Avenue
Fountain Valley, CA 92708
14. City of Newport Beach Dave Kiff, City Manager
City of Newport Beach
P.O. Box 1768
Newport Beach, CA 92663
15. City of Santa Ana David Ream, City Manager
City of Santa Ana
P.O. Box 1988, M-24
Santa Ana, CA 92702
16. Mesa Consolidated Water Paul Shoenberger, General Manager
District Mesa Consolidated Water District
1965 Placentia Avenue
Costa Mesa, CA 92627-3420
17. City of San Clemente George Scarborough, City Manager
City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
6
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
18. El Toro Water District Robert Hill, General Manager
El Toro Water District
P.O. Box 4000
Laguna Hills, CA 92654
19. South Coast Water District Michael Dunbar, General Manager
South Coast Water District
31592 West Street
Laguna Beach, CA 92651
20. Moulton Niguel Water Robert Gumerman, General Manager
District Moulton Niguel Water District
27500 La Paz Road
P.O. Box 30203
Laguna Niguel, CA 92607-0203
21. City of San Juan Capistrano Joe Tait, City Manager
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
22. Santa Margarita Water John J. Schatz, General Manager & General
District Counsel
Santa Margarita Water District
P.O. Box 7005
Mission Viejo, CA 92690
23. City of Brea Tom O'Donnell, City Manager
City of Brea
1 Civic Center Circle
Brea, CA 92821
24. City of La Habra Don Hannah, City Manager
City of La Habra
P.O. Box 337
La Habra, CA 90633-0337
25. Laguna Beach County Renae Hinchey, General Manager
Water District Laguna Beach County Water District
P.O. Box 987
Laguna Beach, CA 92652
7. Jurisdiction and Venue
In all matters concerning the validity, interpretation, performance, or effect of
this Agreement, the laws of the State of California shall govern and be
7
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
applicable. The Parties hereby agree and consent to the exclusive
jurisdiction of the courts of the State of California and that venue of any action
brought hereunder shall be in Orange County, California.
8. Joint Drafting
All parties have participated in the drafting of this Agreement. The Agreement
may be signed in counterpart to facilitate processing.
9. Severability
If any provision of this Agreement shall be held illegal, invalid, or
unenforceable, in whole or in part, the legality, validity, and enforceability of
the remaining provisions shall not be affected thereby.
10. Entire Agreement
This Agreement contains the entire agreement of the Parties relating to the
subject matter hereof; and the Parties have made no agreements,
representations, or warranties, either written or oral, relating to the subject
matter hereof that are not set forth herein. Except as provided herein, this
Agreement may not be modified or altered without prior written approval from
both parties.
IN WITNESS WHEREOF, the Parties have hereunto affixed their names as of the
day and year thereinafter written, which shall be and is the effective date of This
Agreement.
8
Cost Sharing Agreement for 2010 UWMP - Final 5-28-10
Execution of Agreement by Parties
1. MWDOC
Date
By:
Kevin P. Hunt, General Manager
Municipal Water District of Orange County
Approved as to Form:
Date
By:
Daniel J. Payne
General Counsel
2. City of Anaheim
Date
By:
Thomas Wood, City Manager
City of Anaheim
Approved as to Form:
Date
By:
City Attorney
3. City of Buena
Park Date
By:
Rick Warsinski, City Manager
City of Buena Park
Approved as to Form:
Date
By:
City Attorney
9
Cost Sharing Agreement for 2010 UWMP
4. City of Fullerton
Date
By:
Chris Meyer, City Manager
City of Fullerton
Approved as to Form:
Date
By:
City Attorney
5. City of Garden
Grove Date
By:
Matthew Fertal, City Manager
City of Garden Grove
Approved as to Form:
Date
By:
City Attorney
6. City of La Palma
Date
By:
Dominic Lazzaretto, City Manager
City of La Palma
Approved as to Form:
Date
By:
City Attorney
10
Cost Sharing Agreement for 2010 UWMP
7. City of Orange
Date
By:
John Sibley, City Manager
City of Orange
Approved as to Form:
Date
By:
Dave DeBerry
City Attorney
8. Serrano Water
District Date
By:
David Noyes, General Manager
Serrano Water District
Approved as to Form:
Date
By:
General Counsel
Joel Kuperberg
9. City of Seal
Beach Date
By:
David Carmany, City Manager
City of Seal Beach
Approved as to Form:
Date
By:
City Attorney
11
Cost Sharing Agreement for 2010 UWMP
10. City of Tustin
Date
By:
William Huston, City Manager
City of Tustin
Approved as to Form:
Date
By:
City Attorney
11. Yorba Linda
Water District Date
By:
Ken Vecchiarelli, General Manager
Yorba Linda Water District
Approved as to Form:
Date
By:
General Counsel
Arthur Kidman
12. East Orange
County Water Date
District
By:
Lisa Ohlund, General Manager
East Orange County Water District
Approved as to Form:
Date
By:
General Counsel
Joan Arneson
12
Cost Sharing Agreement for 2010 UWMP
13. City of Fountain
Valley Date
By:
Ray Kromer, City Manager
City of Fountain Valley
Approved as to Form:
Date
By:
City Attorney
14. City of Newport
Beach Date
By:
Dave Kiff, City Manager
City of Newport Beach
Approved as to Form:
Date
By:
City Attorney
15. City of Santa Ana
Date
By:
David Ream, City Manager
City of Santa Ana
Approved as to Form:
Date
By:
City Attorney
13
Cost Sharing Agreement for 2010 UWMP
16. Mesa
Consolidated Date
Water District
By:
Paul Shoenberger, General Manager
Mesa Consolidated Water District
Approved as to Form:
Date
By:
Robert Anslow
General Counsel
17. City of San
Clemente Date
By:
George Scarborough, City Manager
City of San Clemente
Approved as to Form:
Date
By:
City Attorney
18. El Toro Water
District Date
By:
Robert Hill, General Manager
El Toro Water District
Approved as to Form:
Date
By:
Gil Granito
General Counsel
14
Cost Sharing Agreement for 2010 UWMP
19. South Coast
Water District Date
By:
Michael Dunbar, General Manager
South Coast Water District
Approved as to Form:
Date
By:
Betty Burnett
General Counsel
20. Moulton Niguel
Water District Date
By:
Robert Gumerman, General Manager
Moulton Niguel Water District
Approved as to Form:
Date
By:
Patricia B. Giannone
General Counsel
21. City of San Juan
Capistrano Date
By:
Joe Tait, City Manager
City of San Juan Capistrano
Approved as to Form:
Date
By:
City Attorney
15
Cost Sharing Agreement for 2010 UWMP
22. Santa Margarita
Water District Date
By:
John J. Schatz, General Manager & General Counsel
Santa Margarita Water District
23. City of Brea
Date
By:
Tom O'Donnell, City Manager
City of Brea
Approved as to Form:
Date
By:
City Attorney
24. City of La Habra
Date
By:
Don Hannah, City Manager
City of La Habra
Approved as to Form:
Date
By:
City Attorney
16
Cost Sharing Agreement for 2010 UWMP
25. Laguna Beach
County Water Date
District
By:
Renae Hinchey, General Manager
Laguna Beach County Water District
Approved as to Form:
Date
By:
Paula Meyer
General Counsel
17
Cost Sharing Agreement for 2010 UWMP - Final 5 -28 -10
ATTACHMENT A
For Development of Urban Water Management Plans for 2010
Itemized Time and Materials Cost Allowance (Contingency Items) Total
,
\o °Q
° °a ..°ate rep Ne�
o� �e� °�
. R.rj yew aye .°ate e��
� a
.,° °a°'e° °cc9�•Q °� °� a� °� aG° e�cc
aaa` tea,` °e.Q �`r ° Q�eQFa� Q� �a
°t a• ° k, °, �o pe �o °cc �o tp as �e a� o \Q
9V o�� ° N1,
o OR
a a C aR
e
NO oa °�`�
� eFe �e�t4ey
\°Qe�'G
°wee
Budget Groupings of Agencies
Base Cost
Q<���`��o paa �o�� at�a QaaGJ� QaaQ.e° Qaa.`�.QQ\a° Paao�•a y °a P��e�a �c�`
• •
1.
MWDOC $25,207
$ 900
$2,724
$0 $1,908 $3,172
$1,032
$3,000
$37,943
• •
.-
2.
CitV of Anaheim not part of MWDOC
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
3.
CitV of Buena Park
$16,486
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,226
4.
CitV of Fullerton not a part of MWDOC
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
5.
CitV of Garden Grove
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
6.
CitV of La Palma
$16,486
$ 900
$2,724
1 $3,004
$1,908
$3,172
$1,032
$3,000
$32,226
7.
CitV of Orange
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
8.
Serrano Water District
$16,486
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,226
9.
CitV of Seal Beach
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
10.
CitV of Tustin
$16,486
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,222
11.
Yorba Linda Water District
$16,486
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,226
12.
East Oran e Count Water District-
$19,986
$ 900
$2,724 $3,004
$1,908
$3,172
1 $1,032
1 $3,000
1 $35,726
13.
CitV of Fountain ValleV
$17,095
$ 900
$2,724 $0
$1,908
$3,172
$1,032
$3,000
$29,831
14.
Cit of Newport Beach
$17,095
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,831
15.
Cit of Santa Ana not a art of MWDOC
$17,095
$0
$0
$0
$1,908
$3,172
$1,032
$0
$23,207
16.
Mesa Consolidated Water District
$17,095
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,831
17.
MIT .-
CitV of San Clemente
$16,850
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,586
18.
El Toro Water District
$16,850
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,586
19.
South Coast Water District
$16,850
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$3,000
$29,586
20.
Moulton Niguel Water District
$16,850
$ 900
$2,724
$0
$1,908
$3,172
$1,032
$0
$26,586
21.
CitV of San Juan Capistrano
$16,850
$ 900
$2,724
$0
$0
$0
$1,032
$3,000
$24,506
22.
Santa Mar arita Water District
$16,850
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,590
•
• .-
23.
CitV of Brea
$17,177
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,917
24.
CA of La Habra
$17,177
$ 900
$2,724
$3,004
$1,908
$3,172
$1,032
$3,000
$32,917
25. Laguna Beach County Water District $16,241
$ 900
$2,724 $3,004 $1,908 $3,172
$1,032 $3,000
$31,981
. 1
.11
1
:11 off
I j cast orange t,ounty vvater Districts Based t,ost is zp3,500 more due to the Tact that the uvvroir wm inciude both its whoiesaie and retaii zone.
.
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
ITEM NO. 4.3
AGENDA REPORT
June 2, 2010
Planning-Engineering-
Operations Committee
Ken Vecchiarelli, General
Manager
Budgeted
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Lee Cory, Operations Manager Dept:
Reviewed by Legal:
Harold Hulbert, Operations CEQA Compliance:
Assistant
Renewal of Supplier Contract with Nickey Petroleum, Inc.
Yes
$112,350
$112,350
Water Operating
Fund
Multiple Accounts
Operations
N/A
N/A
The District currently has a Supplier Contract agreement with Nickey Petroleum Inc ( Nickey), to
supply gasoline to the District. The agreement has an option for renewal if both parties agree to the
conditions of the renewal. Nickey has submitted a request to renew the current contract, which
began in July 2009, with no price increase for the 2010/2011 fiscal year.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the General Manager to enter into
the renewal option agreement as part of our Supplier Contract with Nickey Petroleum Inc. The new
term of the contract will be 12 months with service starting on July 1, 2010 and ending on June 30,
2011, with a total estimated contract cost of $112,350.00.
DISCUSSION:
The District's new Maintenance and Supplier agreements include options for renewing the contract
without the District having to seek new proposals. Each contract agreement can be renewed up to 3
times extending the total contract to four (4) years. The renewal option request, made by the
vendor, can be based on either a no cost offer or with a price increase that is tied to the Orange
County Consumer Prince Index.
The District's current contract with Nickey ends on June 30, 2010. Nickey has provided a letter
stating they wish to renew the contract for another year with no price increase.
The District has had an annual supplier contract each year since 2007 with Nickey. Their main fuel
station is located at 925 Lakeview Ave, two blocks from the Richfield Plant. The fueling site is larger
than most service stations and Nickey provides detailed cost and fuel usage reports to the District
with each invoice. This better allows the District to track it fuel usage and costs by vehicle.
Nickey makes fuel purchases on the spot market, tracking fuel prices daily to gain a competitive
price advantage for its customers. The price markup to the District per gallon is $0.12 over the
fifteen day running average of purchases by Nickey.
As of May 27, 2010 the District has paid $88,830.00 in fuel cost for the current fiscal year. Staff
estimates fuel cost to end the fiscal year around $101,520.00 based on year to date average fuel
usage.
ATTACHMENTS:
Name: Description:
Nickey Petroleum_ Contract_Extension.pdf Correspondence
Type:
Backup Material
Conoco Nickey Petroleum Company, Inc.
I.uhricants 925 Lakeview Ave., Placentia, CA 928717 - P.O. Sax 669 ' Atwood, CA 92811
(714) 547 -4123 • (562) 860 -4711 ' FAX (714) 547 -3646
May 25, 2010
Mr. Harold Hulbert,
Yorba Linda Water District
913 S. Richfield Road
Placentia, Ca 92807
Dear Mr. Hulbert,
Nickey Petroleum would like to exercise the renewal option for one additional year
on the current contract for gasoline and diesel fuel purchases at our card lock, site
in Placentia, Ca.
All current terms and conditions will remain as indicated by the agreement and we
Will sign and return paperwork to your offices promptly. Should you have any
Additional questions regarding this extension please feel free to contact me at your
earliest convince.
S, rely,
ohn Kearns, VP /GM
Nickey Petroleum Company, inc.
E
tE
mor., wr W
CFN
' PF
24 HR. KARDLOCK
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
June 2, 2010
Planning-Engineering-
Operations Committee
Ken Vecchiarelli, General
Manager
Budgeted
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Lee Cory, Operations Manager Dept:
Reviewed by Legal:
Harold Hulbert, Operations CEQA Compliance:
Assistant
ITEM NO. 4.4
Yes
$40,000
$38,800
Water Operating
Fund
1- 5060 - 0600 -40
Operations
N/A
N/A
Renewal of Maintenance Contract with Marina Landscape
The District currently has a Maintenance Contract agreement with Marina Landscape (Marina), to
provide landscape maintenance service to the District. The agreement has an option for renewal if
both parties agree to the conditions of the renewal. Marina, who has been performing the contract
duties beginning in November 2009, has submitted a request to renew the agreement with a price
increase based upon the District's change in the scope of work for the 2010/2011 fiscal year.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the General Manager to enter into
the renewal option agreement as part of our Maintenance Contract with Marina Landscape. The
new term of the contract will be 12 months with service starting on July 1, 2010 and ending on June
30, 2011, with a total estimated contract cost of $38,800.
DISCUSSION:
The District's new Maintenance and Supplier agreements include options for renewing the contract
without the District having to seek new proposals. Each contract agreement can be renewed up to 3
times extending the total contract to four (4) years. The renewal option request, made by the
vendor, can be based on either a no cost offer or with a price increase that is tied to the Orange
County Consumer Prince Index.
The District's current contract with Marina ends on June 30, 2010. Marina has provided a letter
stating they wish to renew the contract for another year with a price increase only due to the
addition of sites and work from the District.
The revised scope of work has Marina performing Landscape services at:
. 12 Reservoirs
. 8 Pump Stations
. Plumosa and Richfield /Mira Loma Site
Worked performed at the reservoirs and pump stations are done on a quarterly basis (October,
January, March and June). One of the sites has some work that is done weekly as it is exposed to
the public and another site has work done monthly. The Plumosa site is done once a month and the
Richfield /Mira Loma site is cleaned once a week. The cost for services are based on monthly or
quarterly work.
Quarterly Cost: $8,013.57 x 4 = $32,054.28
Monthly Cost: $841.47 x 8 = $6,731.76
Total Annual Cost: $38,786.04
As of May 27, 2010 the District has paid $31, 386.59 to Marina for landscape services for the
current fiscal year.
ATTACHMENTS:
Name: Description: Type:
Change Orderer Marina.pdf Change Order Backup Material
Renewal Letter Marina.pdf Renewal Letter Backup Material
THE YORBA LINDA WATER DISTRICT
(YLWD)
CHANGE ORDER
TO
LANDSCAPE MAINTENANCE SERVICES
Contract No. OPS- 100909 -01
MAY 2010
Requests for Clarification are due to Harold Hulbert at YLWD: 4:30 p.m., May 20, 2010
Cost Changes will be received until: 4:30 p.m., May 24, 2010
at Yorba Linda Water District, 1717 E. Miraloma Ave., Placentia, California 92870
Phone: (714) 701 -3000
TABLE OF CONTENTS
SECTION 1: SCOPE OF WORK
SECTION 2: INFORMATION REQUIRED OF CONTRACTORS
SECTION 3: PROPOSAL
ATTACHMENTS
Attachment 1— Map of YLWD Facilities
Attachment 2 -- Form of YLWD Landscape Maintenance Services Agreement
Page 2 of 8
SECTION 1: SCOPE OF WORK
FOR
LANDSCAPE MAINTENANCE SERVICES
The Yorba Linda Water District has several facilities located around its service area that require
various degrees of landscape maintenance. In the past most of this work was handled either by
District staff or on an "as needed basis" from our current contractor. The District has decided
that all of the landscape maintenance should be handled by a single contractor on a single
contract. This scope of work will provide the contractor with an understanding of what each of
the District's site work requirements are and a time frame for completing these tasks.
The District's Point of Contact is:
Harold D Hulbert
Operations Assistant
hhulbert @ylwd.com
(714) 701 -3121
The District has sixteen (17) sites that are listed below. Each of these sites has various tasks that
must be performed during the months that are listed with each site.
Contractor shall to furnish all labor, materials, tools, equipment, and any other resources
necessary for:
1. Irrigation system care and adjustments;
2. Lawn care;
3. Shrub, vine, and ground cover care and trimming;
4. Tree care and pruning;
a. All trees should be shall be shaped and provide proper clearance for vehicles
and sightline.
5. Clean -up;
6. Mulch replenishment;
7. Weed control; Only State Certified personnel shall be allowed to spray weeds.
8. Fertilizing, insecticides, and herbicides, with cost of materials included;
9. Hauling and disposal.
Further, the following work and provision of the following materials will constitute Extra
Services under the Landscape Maintenance Services Agreement:
1. 2. Irrigation repairs, parts and labor
3. Plant replacement: replacing 1- gallon, 5- gallon, 15- gallon and 24" box size plants.
4. Mulch replenishment as described in Site 16 — Task 7 below will be extra.
5. These and all other extra work and materials shall be approved by the Yorba Linda
Water District prior to providing the services or materials
Page 3 of 8
All work must be completed within the given timeframe for contractor to receive payment for
services. Further, work that is missed must be completed within three days of contractor being
notified that work was missed.
THERE SHALL BE NO PRE- EMERGENT USED ON DISTRICT FACILITIES.
Site #1 - Bryant Ranch Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 - Cut grass and weeds on top of reservoir.
Task 2 — Keep walkway clear two feet either side to under - drain.
Task 3 - Weeds to be sprayed in March and June using Rodeo.
Site #2 - Camino De Bryant Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 - Cut grass and weeds on top of reservoir.
Task 2 — Trim around Hatches.
Task 3 — Keep V- Ditches free and clear.
Task 4 - Trim slopes around reservoir and keep weeds below three inches.
Task 5 - Cut weeds two feet back either side of road.
Task 6 - Cut weeds back two feet inside and outside of perimeter fence.
Task 7 - Weeds to be sprayed in March and June using Rodeo.
Site #3 — Chino Hills Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 - Cut grass and weeds on top of reservoir.
Task 2 — Clear weeds on pathway to antenna ten feet either side.
Task 3 — Clear weeds ten feet around antenna.
Task 4 — Clear weeds ten feet around hatch.
Task 5 — Keep access road clear and keep weeds trimmed at each side of access road.
Sites #4 - Elk Mountain Reservoir & Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 - Cut grass and weeds on top of reservoir.
Task 2 — Trim around Hatches.
Task 3 — Keep V- Ditches free and clear.
Task 4 - Clear slopes from top of reservoir to V- ditches.
Task 5 - Keep trees and weeds trimmed two feet back either side of walkway to pump
station.
Task 6 — Clean in and around Pump Station to include all Shrubs.
Task 7 — Clean front of slope along Elk Mountain between Pump Stations and Reservoir.
Task 8 - Weeds to be sprayed in March and June using Rodeo.
Page 4 of 8
Site #5 - Fairmont Reservoir and Pump Station (See Attached Map)
Work Schedule: Unless Noted: Quarterly: October, January, March and June.
Task 1 — Cut grass and weeds on top of roof.
Task 2 - Clear weeds from reservoir slopes.
Task 3 - Cut weeds back two feet inside and outside of perimeter fence.
Task 4 - Trim vegetation and weed planters around pump station apron. (Monthly)
Task 5 - Weeds to be sprayed in March and June using Rodeo.
Site #6 - Gardenia Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 - Clear brush back five feet either side of access road.
Task 2 - Clear brush between access road and pad.
Task 3 - Weeds to be sprayed in March and June using Rodeo.
Site #7 — Hidden Hills Booster Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 — Clear brush fifteen feet around building.
Task 2 — Maintain irrigation and ground cover in and around under -drain by pump
station.
Site #8 - Lakeview Reservoir and Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1- Cut grass and weeds on top of reservoir.
Task 2 - Clear weeds from reservoir slopes.
Task 3 - Keep slope clear at pump station.
Task 4 - Weeds to be sprayed in March and June using Rodeo.
Site #9 - Little Canyon Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1
— Cur grass and weeds on top of reservoir.
Task 2
— Clear brush to fifteen feet around under drain vault.
Task 3
— Keep lower access road clear.
Task 4
- Clear brush back two feet either side of access road.
Task 5
- Clear slopes along access road.
Task 6
- Clear slope between reservoir and vault.
Task 7
- Weeds to be sprayed in March and June using Rodeo.
Site #10 — Paso Fino Booster Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 — Maintain plants around building.
Page 5 of 8
Site #11 - Quarter Horse Reservoir (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1
— Cut grass and weeds on top of reservoir.
Task 2
— Keep V- ditches clear and free running.
Task 3
— Clear weeds two feet back from hatches.
Task 4
- Clear weeds from reservoir slopes.
Task 5
- Clear weeds back two feet inside and outside of perimeter fence.
Task 6
- Remove trees from inside perimeter fence.
Task 7
- Remove non - native plants from inside perimeter fence.
Task 8
- Weeds to be sprayed in March and June using Rodeo.
Site #12 - Santiago Reservoir and Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June
Task 1 — Cut grass and weeds on top of reservoir and lower area.
Task 2 - Clear all slopes.
Task 3 - Clear weeds back two feet inside and outside of perimeter fence.
Task 4 - Weeds to be sprayed in March and June using Rodeo.
Site #13 - Springview Reservoir and Pump Station (See Attached Map)
Work Schedule: Quarterly: October, January, March and June.
Task 1 — Cut grass and weeds on top of reservoir.
Task 2 — Keep V- ditches clear and free running.
Task 3 — Clear weeds five feet back from hatches.
Task 4 - Keep assigned slopes clear.
Task 5 - Clear weeds back two feet inside and outside of perimeter fence. (North, East
and West fence line)
Task 6 - Clear weeds back two feet either side of access road.
Task 7 - Weeds to be sprayed in March and June using Rodeo.
Site #14 - Valley View Reservoir and Pump Station (See Attached Map)
Work Schedule: Quarterly (Unless noted): October, January, March and June
Task 1
— Maintain and service sprinkler systems. (Weekly)
Task 2
- Cut grass and weeds on top of reservoir and around pump station. (Weekly)
Task 3
- Clear all slopes around reservoir and pump station following fence line.
Task 4
— Keep all V- ditches clear and free.
Task 5
— Maintain and clear assigned Slopes.
Task 6
- Weeds to be sprayed in March and June using Rodeo.
Site #15 — Timber Ridge Booster Station
Work Schedule: Quarterly: October, January, March and June.
Task 1 — Maintain plants around building.
Page 6 of 8
Site #16 — Plumosa Office (See Attached Map)
Work Schedule: Monthly
Task 1 — Trim all bushes and clean out planter boxes.
Task 2 — Clear out any weeds around Planter boxes and parking lot.
Site #17 - Richfield Facility (See Attached Map)
Description of Services:
Task 1 - Irrigation system care:
A. Every month, check all drip irrigation for leaks, clogs, sticking valves, while system is
running.
B. Every quarter, check and clean all drip filters.
C. Every quarter or more often, reset controller schedule for seasonal conditions. As
plants mature, adjust schedule for decreased water needs.
D. Bubblers for trees in lawn areas may not be needed as trees grow
Task 2 - Lawn care:
A. Mow and edge weekly.
B. Fertilize every 120 days.
C. Control weeds weekly.
Task 3 - Shrub and ground cover care:
A. Fertilize every three months with balanced fertilizer until shrubs and ground covers fill
in.
B. Plants that die or lose more than 30% of their original leaves shall be replaced within 7
days. Replacement plants will be paid as an extra.
C. Trim shrubs as needed. Do not shear shrubs /hedges.
D. Trim ornamental grasses annually
Task 4 - Tree care:
A. Stakes for trees shall be checked and removed when the tree is self - supporting. Adjust
tree ties and stakes as needed for proper support
B. Trees, which die or lose more than 30% of their original leaves, shall be replaced
within 7 days. Notify owner as to cause of decline. Replacement of trees will be paid as
an extra.
C. Trimming of trees in all other areas shall be as needed to clear vehicles, shape, and
thin the trees. No topping is allowed.
Task 5 - Clean -up:
A. All litter shall be removed weekly.
B. The entire project site shall be maintained in a neat and presentable condition.
Page 7 of 8
Task 6 - Weed Control:
A. Contractor will remove weeds in the course of performing other tasks listed above as
they area found.
B. Areas of note are the Lawn area listed in drawings, planter and shrubs areas, and all
areas that face streets. Attached Drawings will provide a detail of area to observe.
Task 7 - Fertilizers, insecticides:
A. Install "Grow -Power 7 -gram Tablet" with 20% humus as manufactured by Gro-
Power, Inc., Chino, CA 909 - 393 -3744, or approved equal, annually for each tree. Use 6
tablets per tree spaced equally at the drip line and placed at least 12" below grade
B. Fertilize shrub areas with balanced fertilizer. Do not fertilize Baccharis (Coyote Bush)
or ornamental grasses.
Contractor is responsible for detecting turf and plant diseases and pests as soon as their presence
is manifested. Contractor shall take immediate action to identify the disease and /or pest and
apply such remedies as are necessary to control the problem. Contractor shall remove all
rodents, taking control measures immediately upon discovery.
Task 8 - Hauling and disposal:
A. All trimmings and debris shall be removed from the site and disposed of by the
contractor.
Additionally, contractor will furnish to the District a schedule for the year the dates that the
contractor will perform all work as listed in this revised scope of work. If the contractor wishes
to adjust schedule they must do so in writing and by calling the district to inform them of new
dates and times.
Page 8 of 8
LIARINi
Still Grow+r�g
May 26, 2010
Yorba Linda Water District
Attn: Harold Hulbert
913 South Richfield Road
Placentia, CA 92870
RE: Contract Extension & Added Scope of Work (Contract #OPS- 100909 -01)
Dear Harold,
landscape construction
landscape maintenance
landscape architecture
erosion control
Marina Landscape, Inc. would like to take this opportunity to thank you for your
continued consideration to service your locations. Marina Landscape, Inc. desires to
renew the above referenced agreement contract with the Yorba Linda Water District.
Our prices will not increase for the upcoming year however, the Yorba Linda Water
District has added new areas and responsibilities to our scope of work. Please find below
the price changes per your revised scope of work dated May 2010.
Existing Amount
Added scope of work:
New Contract Amount:
$5.545.57 quarterly
$841.47 monthly
$2,468 quarterly
$8,013.57 quarterly
$841.47 monthly
If you have any questions, please do not hesitate to contact me,
Thank you very much.
Sincerely,
ol
Marcus Nishihara
Business Development
Din (714) 704 -0492
Fax: (714) 704 -0451
MARINA LANDSCAPE, INC.
7333 Cfyhourn Avenue ^ Sun Valley, CA 91352 p 818.891,0398 f 818.837.2091 w marinaco.com License #492862, A, B,C27, C36
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
June 2, 2010
Planning-Engineering-
Operations Committee
Ken Vecchiarelli, General
Manager
Budgeted
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Lee Cory, Operations Manager Dept:
Reviewed by Legal:
Harold Hulbert, Operations CEQA Compliance:
Assistant
ITEM NO. 4.5
Yes
$75,000
$71,920
Water Operating
Fund
1- 5020 - 0600 -35
Operations
N/A
N/A
Renewal of Janitorial Contract with Merchants Building Maintenance
The District currently has a contract agreement with Merchants Building Maintenance (MBM), for
agreed to specific janitorial services within District owned properties at the Mira Loma and Richfield
sites. The agreement has an option to renew if both parties agree. MBM, who's current contract
duties began in August 2009, has submitted a request to renew the agreement with no price
increase for the 2010/2011 fiscal year.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the General Manager to enter into
the renewal option for a Janitorial Service Contract with Merchants Buildings Maintenance. The new
term of the contract will be 12 months with service starting on July 1, 2010 and ending on June 30,
2011, with a total estimated contract cost of $71,920.
DISCUSSION:
The Districts new maintenance and supplier agreements have in place options for renewing the
contract without the District having to seek new proposals. Each agreement can be renewed up to 3
times extending the total contract to four (4) years. The renewal option allows for the vendor to
request the District to extend the contract with either no price increase or with a price increase that
is tied to the Orange County Consumer Prince Index.
The Districts current contract with MBM ends on June 30, 2010. MBM has provided a letter stating
they wish to renew the contract for another year with no price increase.
The current contract price is $5,993.13 per month, with the district having paid by the end of this
first term of the contract $53, 9328.17. As MBM is not increasing their price the monthly cost will
remain the same; For fiscal year 2010/2011 the cost of this contract will be $71,917.56.
ATTACHMENTS:
Name: Description: Type:
Renewal Letter - Merchants.pdf Renewal Letter Backup Material
4
April 22, 2010
merchants building maintenance, 1_LC
Mr_ Harold D. Hulbert
Yorba Linda %rater District
913 S. Richfield Road
Placentia_ CA 92820
Re: Janitorial Serytce Contract
Dear Mr. Holbert,
It has come to our attention that our janitorial service contract with the Yorba Linda
Water District will be expiring on June 1. 2010. Merchants Building Maintenance «would
like the Yorba Linda Water District to renew our janitorial service contract for a year.
Should you have any questions or require further information please reel free to give me
a call at"(71 l) 973 -9272, Fax (71 1) 973 -2124. 4
Sincerely,
Creargc Rodriguez
Branch Manager
Merchants Building :Maintenance
1619 1-7 Ldin-c - Avenue Suire C Santa Ana. CA 92705 714 973-A?72 Fa-\ 714/97- -2124
Meeting Date:
Subject:
ATTACHMENTS:
Name:
CIP Report June 2010.pdf
AGENDA REPORT
June 2, 2010
Status Report on Capital Projects in Progress
ITEM NO. 5.1
Type:
Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: June 1, 2010
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Highland Reservoir
Staircases are being installed
Flush lines & prepare for
On schedule with no significant
Budget: $11,200,000 Job No. 200309
along with concrete placements
hydro -test. Continue
issues outstanding.
Project Contact: Joe Polimino
for the weir box wall and roof
appurtenant roof work
Planned Completion Date: August 2010
hatches. Contractor also
including sampling stations
flushing new pipelines.
and vents.
2
Hidden Hills Res & Santiago BPS
Hydro -test underway; epoxy
Pressure test storm drain.
The easement document from State
Budget: $7,000,000 Job No.200028
injection of some reservoir wall
Coordinate final electrical
Parks for construction of paved
Project Contact: Joe Polimino
areas. Electrical work continues
wiring and switchover of new
access road to reservoir is complete.
Planned Completion Date: July 2010
at Santiago PS. Drain piping &
control panel at Santiago PS;
State awaiting response from Edison
observation vault being
Pave Hidden Hills Rd. at
to complete that easement
installed.
reservoir.
document.
3
Photovoltaic Panels —Admin Bldg
Solar System completed and
File a NOC and at end of 35
Awaiting California Solar Initiative
Budget: $250,000 Job No. 200912
punch list issued. Final progress
day lien release, issue
rebate of $72,000.
Project Contact: Hank Samaripa
payment and NOC prepared for
withheld retention dollars.
Planned Completion Date: May 2009
Board action.
4
Wells 1, 5 and 12 Upgrade
W -5 start-up pump test
New pump and motor to be
W -5 in operation.
Budget: $190,000 Job No. 200813
successful; awaiting vibration
installed at W -12. Finalize W-
Project Contact: Anthony Manzano
analysis. Larger transformer
12 electrical upgrades.
Project Completion: TBD
installed to accommodate W-
12.
5
Well 20
Contractor completing drilling
Well development & testing
Plan to receive draft Preliminary
Budget: $2,000,000 Job No.200711
& pump test. Wellhead
completed. Pumping capacity
Design Report for wellhead
Project Contact: Anthony Manzano
Equipping design started by
is 3,000 GPM.
equipping in early July 2010.
Planned Completion Date: TBD
Civiltec Engineering Inc.
IN DESIGN
Project Current Status Next Actions Comments
1 OC-51 Connection Upgrade Awaiting MWD Board Inform Black & Veatch of Coordinate w/ MWDOC on status
Budget: $242,000 Job No. 200815 approval of District's proposal. current project status and of MWD's Board approval and
Project Contact: Derek Nguyen Anticipated in Sept. 2010. verify if proposal sent Oct begin preparation of PSA for B&V
Planned Completion Date: TBD 2009 is valid for design. in anticipation of design.
2 Highland Booster Station Upgrade District to review 100% design Prepare Invitation-to-Bid Review solar system potential for
Budget: $6,000,000 Job No. 200814 plans and specs on May 26. documents and decide on Highland Booster Station power
Project Contact: Hank Samaripa MWH to revise documents and advertisement date and final load and then prepare final report.
Planned Completion Date: Mid 2011 issue for public bid. bid date.
3 Anaheim Intertie Connection Awaiting City of Anaheim Update plans with new fire Evaluate construction bids with
Budget: $250,000 (YLWD Share) response to determine if City flow requirement or set up pre- Anaheim, and make
Job No. 200906 has capacity to deliver con meeting with contractors if recommendation to PEO for award
Project Contact: Hank Samaripa emergency flow to mitigate no change in plans. of construction.
Planned Completion Date: July 2010 Willow Woods fire flow
deficiencies as part of project.
4 Ohio St Pipeline Replacement Project Tetra Tech agreement fully Preliminary design layout Anticipate design completion,
Budget: $530,000 Job No. 201005 executed, awaiting Board expected by July 2010. August 2010.
Project Contact: Anthony Manzano ratification. Kick-off meeting
Planned Completion Date: TBD complete & design underway.
5 Vista del Verde Valve Replacement Bid results received on 5/20. Complete Contract Agreement Phase 1 work is scheduled during
Budget: $1M Job No. 200908 Valverde Construction was and Insurance Documents for the week of July 12, 2010.
Project Contact: Derek Nguyen lowest responsible bidder. Will Project. Test valves and begin
Planned Compl. Date: July 2010 (Ph. 1) start paperwork for Contract. construction.
2
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Fairmont Site Improvements
Evaluating upgrading Fairmont
Complete internal evaluation
Pursue receipt of payment from
Budget: TBD
BPS to include proposed Zone
and make recommendations for
Shapell in lieu of site design and
Job No. 200803
5 BPS and other pumping
layout and other site
partial payment for construction of
Project Contact: Hank Samaripa
scenarios.
improvements. Meet with
site improvements.
Planned Completion Date: TBD
Shapell to discuss District
taking over site design plans.
2
Recycled Water Study
Still gathering data on large
Complete irrigation demand
Coordinate w /metering- reading staff
Budget: $1,800,000 Job No. 200807
landscape users. Provided flow
data and provide to consultant.
to field - verify irrigation data. Meet
Project Contact: Derek Nguyen
monitoring data to consultant.
w /consultant to plan next tasks.
Planned Completion Date: TBD
3
West Wellfield Project
Investigating additional
Review hydrogeology data and
May retain a Property Acquisition
Budget: $9,000,000 Job No.
potential well sites east of
contact land owners to
Firm for assistance.
Project Contact: Anthony Manzano
Tustin Avenue
determine if there is interest in
Planned Completion Date: TBD
selling small site for well.
4
Asset Management Plan (AMP)
Training completed.
Establish AMP planning team.
Set up long term project schedule to
Budget: $120,000 Job No. 200909
coincide with budget cycle.
Project Contact: Hank Samaripa
Planned Completion Date: Feb. 2010
5
Sewer Master Plan (SMPU)
Flow monitoring report
Consultant refining GIS base
Modeling expected to be complete
Budget: $350,000 Job No. 200916
complete. Sewer system GIS
and starting model.
by late summer 2010.
Project Contact: Anthony Manzano
modeling underway.
Planned Completion Date: August 2010
6
Lakeview Grade Separation
Preliminary pipeline relocation
60% design submittal on hold
Awaiting OCTA decision to
Budget: TBD Job No. 201002
alignment finalized.
pending OCTA coordination
determine agency financially
Project Contact: Anthony Manzano
work with other agencies.
responsible for pipe relocation.
Planned Completion Date: Sept. 2013
7
Palm Ave. Booster Station
Met May 25 with City of YL.
City staff to discuss Gun Club
Contact MWDOC about Gun Club
Budget: TBD Job No. 200817
Gun Club Rd. site favored by
Rd site with Council and
site easement and MWD easement.
Project Contact: Hank Samaripa
City staff.
provide feedback (probably in
Planned Completion Date: July 2011
July).
ITEM NO. 5.2
AGENDA REPORT
Meeting Date: June 2, 2010
Subject: Monthly Groundwater Producers Meeting Report
ATTACHMENTS:
Name: Dosciiption: a ype:
GWP MtgNotes 12May10.pdf Monthly Groundwater Producers Meeting Report Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: May 12, 2010
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Pat Grady, Assistant General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
SUBJECT: Groundwater Producers Meeting, May 12, 2010
Ken Vecchiarelli, John DeCriscio and I attended the Groundwater Producers (GWP)
Meeting on May 12 at OCWD. Items presented and discussed include the following:
1. Trace Organics Water Quality Study. OCWD reported on the status of the subject
study jointly conducted by OCWD, MWD and the National Water Research Institute
(NWRI) to better understand the presence of Constituents of Emerging Concern
(CEC) in water. These constituents, found at "trace" levels (parts per trillion), include
endocrine disruptors, pharmaceuticals, and personal care products in our waters-
surface water, drinking water, wastewater, and recycled water. Of the 49 CECs
evaluated, 22 were detected in the Santa Ana River. Typical concentrations varied
from 2 to 200 parts per trillion. The findings were presented to a Review Panel of
experts, who determined that the concentrations found were not a health concern.
The full report will be published on May 19, 2010. The above findings will be
discussed by staff of OCWD, NWRI and MWD with a reporter from the Orange
County Register today. After the information is published in the newspaper, retail
water agencies may receive phone calls from concerned customers. If retailers
need help with responses, they can contact Mike Wehner, Nira Yamachika, or Greg
Woodside at OCWD.
2. Annexation Requests and Memorandum of Understanding. The proposed MOU
for the joint annexation request for YLWD, IRWD and the City of Anaheim is being
brought to the OCWD Board for approval on May 19. If approved by OCWD, the
MOU will be brought to the YLWD Board and the other agencies for consideration. If
approved, next steps will include preparation of a program-level EIR by OCWD and
preparation of an Annexation Agreement. Actions to follow would include OCWD
Board adoption of the EIR, approval of the Agreement, and approval of a LAFCO
resolution. Consideration by LAFCO would follow. It is estimated that the entire
1
process may take about one year to complete. At the Groundwater Producers
Meeting, there was considerable discussion concerning the proposed annexation
and the impact (financial and otherwise) on the other producers.
3. Update on Purchasing MWD Untreated Full-Service Water for Recharge.
OCWD reported that they are proceeding with the plan to recharge all of MWDOC's
under-utilized MWD import-water allocation of 26,000 AF for FY 09-10 by June 30.
Remaining water in storage behind Prado Dam (about 3,000 AF) will be retained for
recharge thereafter.
4. Santa Ana River Watermaster Annual Report. OCWD reported on the recently-
completed report for Water Year 08-09, which indicated that annual flow in the river
was 116,000 AF in WY07-08 and dropped to 103,000 AF in WY08-09. As previously
reported, they believe that this was due to the drought, decreased non-storm
discharge, decreased rising groundwater and decreased wastewater discharge.
Increased groundwater production in the inland empire also played a part.
5. Prop 84 and SAWPA OWOW Update. Proposition 84 is a $5.4 billion bond
passed in 2006 for water, parks, and natural resource projects, of which $1 billion is
allocated for integrated regional water planning projects. SAWPA was designated by
the State as the agency to prepare the plan for the Santa Ana watershed and to
distribute funds. SAWPA's regional plan is the One Water, One Watershed (OWOW)
Plan. OCWD is submitting projects for funding including GWR System initial
expansion, GWR flow equalization, and the Five Coves and Lincoln Basins Bypass
Pipeline project.
6. Imported Recycled Water. The representative from Buena Park reported that the
City is pursuing a deal to obtain recycled water from LA County, and noted that per
the OCWD Act, that water would be charged against the BPP, which deters the
benefit of pursuing this new water source. Following discussion it was agreed that
this issue will be an agenda item at the next Groundwater Producers Meeting.
2