HomeMy WebLinkAbout2010-07-01 - Planning-Engineering-Operations Committee Meeting Agenda Packet
Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, July 1, 2010, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director William R. Mills, Chair Ken Vecchiarelli, General Manager
Director John W. Summerfield Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
2.1. Monthly Groundwater Production and Purchased Import Water Report (To be provided
at the meeting.)
2.2. Monthly Preventative Maintenance Program Report (To be provided at the meeting.)
3. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
3.1. Approval of Change Order No. 2 for Hidden Hills Reservoir Project
Recommendation: That the Committee recommend the Board of Directors approve
Change Order No. 2 in the amount of $22,376.97 and 29 additional calendar days
to Pacific Hydrotech Corporation for construction of the Hidden Hills Reservoir
Project, Job No. 2000-28.
3.2. On-Call Services Contract Amendment with MWH Americas, Inc. (MWH)
Recommendation: That the Committee recommend the Board of Directors authorize
approval of On-Call Services contract Amendment No. 3 with MWH Americas, Inc.
for a fee increase not to exceed $45,500, resulting in a total fee of $141,260.
3.3. Amendment to Professional Services Agreement for Tetra Tech, Inc.
Recommendation: That the Committee recommend that the Board authorize
District staff and the General Manager to negotiate an amendment to the
Professional Services Agreement with Tetra Tech, Inc., to expand its existing
pipeline design scope to include engineering services for design of the Oriente
Drive pipeline replacement, from Lakeview to Ohio Street, followed by ratification by
the Board.
4. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
4.1. Monthly Groundwater Producers Meeting Report
4.2. Status Report on Capital Projects in Progress
4.3. Future Agenda Items and Staff Tasks
5. ADJOURNMENT
5.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held
August 5, 2010 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: July 1, 2010
Subject: Monthly Groundwater Production and Purchased Import Water Report (To be
provided at the meeting.)
ATTACHMENTS:
Narn9: Doscrip ion: u
GW Production and Purchased Water Report.pdf GW and Purchased Water Report Backup Material
YLWD SOURCE WATER SUMMARY
Fiscal Year 2009-10
TOTAL MONTHLY YTD BUDGET
GW IMPORT CUP DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF) (AF)
Jul-09 192.2 933.4 1,212.0 2,337.6 8.2% 8.2% 2,585.9 -9.6%
Aug-09 377.8 961.3 979.8 2,318.9 16.3% 12.2% 2,544.1 -8.9%
Sep-09 1,309.4 911.5 2,220.9 59.0% 27.3% 2,232.2 -0.5%
Oct-09 1,205.4 617.6 1,823.0 66.1% 35.5% 1,882.8 -3.2%
Nov-09 1,026.4 673.9 1,700.3 60.4% 39.5% 1,487.4 14.3%
Dec-09 793.9 369.4 1,163.3 68.2% 42.4% 1,338.0 -13.1%
Jan-10 806.9 308.0 1,114.9 72.4% 45.1% 1,166.6 -4.4%
Feb-10 564.5 109.5 674.0 83.8% 47.0% 1,116.1 -39.6%
Mar-10 576.2 370.5 289.1 1,235.8 46.6% 47.0% 1,322.6 -6.6%
Apr-10 665.4 749.6 58.7 1,473.7 45.2% 46.8% 1,654.3 -10.9%
May-10 883.0 1,006.3 60.0 1,949.2 45.3% 46.6% 2,188.2 -10.9%
Jun-10 998.6 964.4 179.0 2,142.0 46.6% 46.6% 2,451.9
FYTD 9,399.7 7,975.4 2,778.6 20,153.6 46.6% 21,970.0 8.3%
Allowable GW (YTD) 9,396.4 (AF)
CUP Obligation FY 2009-10 2,193.0 (AF)
Monthly CUP Pumping (AF) 179.0 (AF)
YTD CUP Pumping (AF) 2,778.6 (AF)
YTD CUP Achieved 126.7%
GROUNDWATER PERCENTAGE
85.0%
75.0%
65.0%
55.0%
45.0% - -
35.0%
25.0%
--*--MONTHLY GW )
15.0% YTD GW
BPP GOAL 46.6%
5.0%
O°~ 00 00 00 O°~ O°~ ,~O NF) NCO NCO NCO NQ)
Qua' ~~Q ova ~oJ Oro )ate ~ac PQc ~a~
Month
WATER SUPPLY
FY 2009-2010
June 2010 Water Supply
CUP
8.4%
GW
46.6%
IMPORT
45.0%
2009-2010 YTD Water Supply
CUP
13.8%
GW
46.6%
IMPORT
39.6% GW BPP GOAL
46.6%
3,500
1I
2,500
cz:7 2,000
a
w
E
0
> 1,500
1,000
500
Total Water Use
O% e Z% e 6 O1 e O) (:P e ' \O O) e 11O O% e ' \O O) e N", O% e 11O e '\O
Month
Monthly Average Mean Temperature (IF)
72.7 74.8
72.2 73.6
162.9
66.4
I�
i
I
O% e Z% e 6 O1 e O) (:P e ' \O O) e 11O O% e ' \O O) e N", O% e 11O e '\O
Month
22,000
20,000
18,000
16,000
14,000
U-
a 12,000
a�
E
0 10,000
8,000
6,000
4,000
2,000
0
Jul -09
2009 -2010 YTD Water Supply
Budgeted Total GW + Import
--s- Actual Total GW + Import
BPP GW Goal 46.6%
Actual GW Production
-000,
Aug -09 Sep -09 Oct -09 Nov -09 Dec -09 Jan -10 Feb -10 Mar -10 Apr -10 May -10 Jun -10
Month
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: July 1, 2010
Subject: Monthly Preventative Maintenance Program Report (To be provided at the
meeting.)
ATTACHMENTS:
Narn9: Doscrip ion: u
PM Report.pdf PM Report Backup Material
PM PROGRAM
2009/2010
Fiscal 2009 -10 1 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 0
5401
3541
131 130
2061
9921
4201
5851
5231
7161
484
INSPECTED THIS YEAR 0
5401
8941
1,025 1,155
1,361
1 2,353
1 2,773
1 3,358
1 3,881
1 4,5971
5,081
% OF TOTAL 0.0%
14.0%1
23.0%1
26.4% 29.8%
35.0%1
60.6%1
71.5%1
86.5%1
100.0%1
118.0%1
130.9%
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 242
2941
4561
5751
326 463
2271
5201
290
1 658
1 7441
614
OPERATED THIS YEAR 242
5361
9921
1,5671
1,893 2,356
2,5831
3,1031
3,3931
4,0511
4,795
5,409
% OF TOTAL 4.5%
10.1%1
18.5%1
29.3%1
35.4% 44.0%
48.0%1
58.0%1
63.4%1
75.7%1
89.6%
DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0
01
01
1551
0 0
01
01
01
1551
01
0
FLUSHED THIS YEAR 0
01
01
1551
0 155
1551
1551
1551
3101
3101
310
% OF TOTAL 0.0%
0.0%1
0.0%1
50.0%1
50.0% 50.0%
50%
50%
50%1
100%
100%
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 0
2051
931
0 1
01
21
11
01
11
01
7
INSPECTED THIS YEAR 0
2051
2981
298 299
2991
3011
3021
3021
3031
3031
310
% OF TOTAL 0.0%
66.3%1
96.4%1
96.4% 96.8%
96.8%1
97.4%1
97.7%1
97.7%1
98.1%1
98.1%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 73,825
18,7981
24,9741
104,224 121,202
128,7031
91,8021
130,579
1 93,8431
59,4971
55,478
1 87,488
CLEANED THIS YEAR 73,825
92,6231
117,5971
221,821 343,023
471,726
563,5281
694,1071
787,950
1 847,4471
902,925
1 990,413
% OF TOTAL 9.2%
11.5%1
14.7%1
27.6% 42.7%
58.8%1
70.2%1
86.5%1
98.2%1
105.6%1
112.5%
SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years.
TELEVISED THIS MONTH 5,334
21,6511
23,1191
5,4631
809 3,628
7,0621
2,0771
13,0221
25,206
1 17,6101
13,257
TELEVISED THIS YEAR 5,334
26,985
1 50,1041
55,567
1 56,376 60,004
67,0661
69,1431
82,165
1 107,3711
124,981
138,238
% OF TOTAL 2.7%
13.5%1
25.0%1
27.7%1
28.1% 29.1%
33.4%1
34.5%1
41.0%1
53.5%1
62.3%
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: July 1, 2010 Budgeted: Yes
Total Budget: $5,500,000
To: Planning-Engineering- Cost Estimate: $22,377
Operations Committee
Funding Source: ID No. 2 GO Bonds
From: Ken Vecchiarelli, General Account No: 401-2700
Manager
Job No: 2000-28
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Joe Polimino, Project Engineer CEQA Compliance: MND
Subject: Approval of Change Order No. 2 for Hidden Hills Reservoir Project
SUMMARY:
Work is proceeding on schedule for construction of the Hidden Hills reservoir and upgrades to the
Santiago Booster Station. Submitted for consideration is construction Change Order No. 2.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Change Order No. 2 in the amount
of $22,376.97 and 29 additional calendar days to Pacific Hydrotech Corporation for construction of
the Hidden Hills Reservoir Project, Job No. 2000-28.
DISCUSSION:
In accordance with the contract documents, Pacific Hydrotech Corporation submitted Change Order
No. 2 due to additions and modifications, as well as District-initiated changes encountered during
the course of construction to date. Proposed Change Order No. 2 includes the addition of a
weatherproof electrical cabinet and associated wiring for the Santiago Pump Station, extra days for
additional paving requested by the City of Yorba Linda, re-construction of surge tank piping at
Santiago Pump Station and extra material costs for the change in bedding material used for the
storm drain as requested by the City. A copy of Change Order No. 2 is attached for review and
information. Details of the items in the change order are listed below.
The additional electrical cabinet, conduit and wiring was requested by the District IT Department.
This will improve access to the new panel and wiring when maintenance is needed. The current
design had a smaller cabinet in place which was hard to access in the vault at Santiago Pump
Station. This new cabinet will be placed in a better location and will be larger. This change request
is for an additional $1,124.32 and 7 calendar days by the contractor.
The City of Yorba Linda, when inspecting the streets documented additional areas of pavement that
were disturbed by the contractors' material export operation at the beginning of the project. The City
is requiring Pacific Hydrotech Corporation to repave these areas or their permit through the City will
not be released. The contractor has agreed to pave these additional areas at no cost, but is
requesting additional days to complete. This change request is for $0.00 and 8 calendar days by the
contractor.
Concerning the reconstruction of the surge tank piping at Santiago Pump Station for the project, this
became necessary when it was determined that the design was incorrect after installing the new
piping per approved plans. Thereafter, Carollo, the District's design engineer had to re-design the
connection and the contractor had to re-excavate, install a flange and valve to isolate the recently
installed piping, and then re-order, manufacture, excavate and construct the new piping to allow the
surge tank to be connected to the outlet manifold of the existing pump station.
This work has been completed, for which the contractor has made a change request for $20,188.23
and 14 calendar days.
District staff are discussing this change order cost with Carollo, as staff believes there was an error
on Carollo's part interpreting the as-built plan of the pump station. Staff is currently negotiating with
Carollo on their responsibility for this extra work.
The City of Yorba Linda, when inspecting a portion of the new storm drain piping in Hidden Hills
Road, requested a change in bedding material from Class II to pea gravel. This portion of the storm
drain is within the public road and will become the property of the City. This change request is for
$1,064.42 and 0 calendar days by the contractor.
It should be noted that none of this proposed change order work will delay the start of "beneficial
use" for the reservoir, which is currently planned for July 2nd, 2010.The status of the construction
contract with Pacific Hydrotech Corporation is as follows:
. The current contract is $5,015,485.86 and 416 calendar days starting May 11, 2009 (including
Change Order No.1 which added $3,027.86 and 16 calendar days).
. If approved, Change Order No. 2 adds $22,376.97 (0.45% of the current contract amount) and
29 calendar days (6.9% of current contract calendar days).
. If approved, the revised construction contract amount is $5,037,862.83 and 445 calendar
days.
District Staff has reviewed this change order request and recommend approval.
PRIOR RELEVANT BOARD ACTION(S):
The Board has approved thirteen progress payments to date for this project, the last of which was
approved June 24, 2010.
ATTACHMENTS:
Narne: Description: 1 ype:
Hidden _Hills _C02.pdf Hidden Hills Change Order No 2 PHC Corporation Backup Material
YOR13A LINDA WATER DISTRICT CHANGE ORDER NO. 002
DATE June 22, 2810
face 1 if 1
CONTRACT NAME: Hidden Hills Reservoir Project CONTRACT AMT.: $5,0152485.86 DAYS: 416
CONTRACTOR: Pactflc Hydrotech Corporation THIS CHANGE: $22,376.97 DAYS: 29
(0.45%)
OWNER: Yorba Linda Water District REVISED CONTRACT AMT- A 5,437,862.83 DAYS: 445
This Change Order covers changes to the subject contract as described herein. The Contractor shelf construct, fumish squfpment and materfals,
and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor
and Yorba Linda Water District otherwise referred io as Owner.
DESCRIPTION OF CHANGES +INCREASE CONTRACT
TIME
OR +EXTENSION
- DECREASE IN /OR-
CONTRACT REDUCTION
AMOUNT (DAYS)
Santiago Purrs Staiwn, Sure Tank Piping Re-construction $ 20,188.23 14
Additional NEMA Cabinet, Panel, Wiring and Conduit for SCADA at Santia o PS $1,124.32 7
Da Needed for Additional Paving Areas Re guested b the City of Yorba Linda $ 0.00 a
Change in Material Casts for Storm Drain Beddinq as Requested b the C' $1 064.42 0
NET CHANGE
$ 22,3M97 29
REVISED CONTRACT AMOUNT AND TIME
~5,437.8G2.83 445
The amount of the contract will be Increased <dwr&ared> by the sum of S 22,376.97 and Lhe contract time shalt be Increased edooRmsed-'lay
28 calendar days. The undersigned Contractor approves the foregoing Change Order as to the changes, if any. In the contract price specified for
each item Including any and all supervision costs and other miscellaneous costs relating to the change In wnrft, and as to the extension of time
allowed, If any, for completion of the anflre work on account of said Change Order. The Contractor agrees to furnish all labor and materials and
perform all other necessary work, induslvs of that directly or Indirectly related to the approved time extension, required to complete the Change
Order items. This document will become a supplement of the contract and all provlslons will apply hereto. It Is understood that the Change Order
shall be effective when approved by the Owner. This Change Order constitutes fufl, final, and complets compensation to the Contractor for at
costs, expenses, overhead, profit. and any damages of every kind that the Contractor may Incur In connection with the above referenced
changes in the work, Including any Impact on the referenced work of any other work under the contract, any changes In the sequences of any
work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this
contract. By the execution of the Change Order, the Contractor accepts the contract price change and the contract completion date change, H
any, and expressly waives any dalm~s for any/additional on, damages or time extensions, in connection with the above-referenced
changes.
RECOMMENDED: iENGINEER OR DATE:
Steve C t rrg;nearing Manager
ACCEPTED: ti DATE: Z
° - XONTRACTOR
J. Ki arras. President PHC
APPROVED:_. DATE:
IOWNEIt
Kenneth R. Vecchlaraill, General
Manager
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: July 1, 2010 Budgeted: Yes
Total Budget: $200,000
To: Planning-Engineering- Cost Estimate: $45,500
Operations Committee
Funding Source: Water Capital
Reserves
From: Ken Vecchiarelli, General Account No: 1-2700-0903
Manager
Job No: 200903
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Anthony Manzano, Senior CEQA Compliance: N/A
Project Manager
Subject: On-Call Services Contract Amendment with MWH Americas, Inc. (MWH)
SUMMARY:
MWH was previously retained for On-Call Services (services) under the General Manager's signing
authority, to update the District's hydraulic model and evaluate pump-connection locations to
enhance emergency response and fire protection. Additional work is requested to complete updates
to the hydraulic model and provide construction-phase services for the pump connections.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize approval of On-Call Services
contract Amendment No. 3 with MWH Americas, Inc. for a fee increase not to exceed $45,500,
resulting in a total fee of $141,260.
DISCUSSION:
On May 7, 2009, the District entered into a Professional Services Agreement with MWH to provide
on-call support services to evaluate and update the existing hydraulic model and evaluate the
planning of potential inter-zonal emergency connections, for a fee not to exceed $15,000. On
August 5, 2009, based on the progress and the need for further work on these items, Amendment
No. 1 to the PSA was approved by the General Manager for $33,000, increasing the limit to
$48,000. Subsequently, on March 11, 2010, the Board approved On-Call Services contract
Amendment No. 2 for $47,240 increasing the limit to $95,760.
Substantial progress was made on these items between District and MWH staff. However,
additional work is necessary to take these to completion. The improved water system hydraulic
model, converted from its existing format to the District's GIS system, will allow the District to
simulate emergency response alternatives before and during events. Construction of the
emergency pump connection points will allow the District to utilize its portable pumps to deliver
water faster and more efficiently from lower to upper pressure zones, for which MWH has
completed design plans. District staff will assist with the GIS modifications and the hydraulic
analysis to minimize costs.
The attached letter proposal, provided at the request of District staff, summarizes the proposed
additional services to be provided. Staff reviewed the proposal for $45,500 and recommends
approval.
PRIOR RELEVANT BOARD ACTION(S):
On March 11, 2010, the Board approved On-Call Services contract Amendment No. 2 with MWH
Americas, Inc. for a fee increase not to exceed $47,240, resulting in a total fee of $95,760.
ATTACHMENTS:
MWH On-Call _Services _Proposal _Amendment _ 06-11- MWH On-Call Services Contract Amendment Backup Material
201 0. pdf
MWH
BVILDIN6 At BETTER WORLD
June 11, 2010
Mr. Steve Conklin
Yorba Linda Water District
1717 East Miraloma Avenue
Placentia, CA 92870-6785
Subject: On-Call Services Contract Amendment
YLWD Job No. 200903
Dear Mr. Conklin:
MWH is performing "as-needed" professional engineering assistance for the Yorba Linda
Water District (District). Our existing agreement and addendums are almost fully utilized.
MWH is proposing to continue "as-needed" support to the District.
The District has projects and tasks that are identified over the next several months.
MWH will assist District staff on a task-by-task basis. These projects include hydraulic
model support, engineering support during construction and general planning support.
These tasks will be added to our existing on-call contract with the District. The tasks will
be performed on a time and materials basis. Work will not be initiated until authorized by
the District. Listed below is a description of the tasks to be performed as part of the on-
call contract.
Task 1 Hydraulic Model Support
MWH will perform hydraulic modeling assistance for the conversion of the
existing model into the GIS system. District staff is currently performing cleanup
of the GIS in preparation of importing into the hydraulic model. MWH will review
the GIS shape files and provide direction for the District to prepare for the
importation. MWH staff will convert the old model data base files and import them
into the new model software. MWH staff will assist the District in re-allocating the
demands and performing model updates after the conversion process is
complete. (Budget 100 hours/$17,500)
Task 2 Engineering Support During Construction
The District will be constructing three new emergency pump outs to deliver water
to the upper pressure zones in the event of an emergency. The bid documents
are near completion and a solicitation for bids will be issued. MWH will provide
bid support and engineering support during construction. MWH will review
submittals and attend meetings as needed. Record drawings will be prepared for
the as-built condition. (Budget 80 hours/$14,000)
_ r 1n i ch INnda Ave -E1 626 796 9141
Site 20G Fk, 626, 668 610`
Arcadi3r CA 9100' VNN",mwNior,3f.crn
Mr. Steve Conklin -2- June 11, 2010
Task 3 General Planning Support
The District evaluates potential changes to the water supply and distribution
system to meet customer needs and address operational changes. MWH will
assist District staff in performing the planning studies by providing hydraulic
analysis, cost analysis, attending meetings, preparing exhibits and preparing
reports. (Budget 80 hours/$14,000)
The proposed task and budgets are based on our knowledge of the District's current
needs. We estimate a budget of $45,500 for tasks 1-3. Budget may be shifted between
tasks, if needed. MWH will not start on these tasks until we receive your written
authorization. We are pleased to continue to provide service to the District. Please call
Michael Moore if you have any questions at (949) 328-2405.
Sincerely,
ohn Robinson
ice President
ITEM NO. 3.3
AGENDA REPORT
Meeting Date: July 1, 2010 Budgeted: Yes
Total Budget: $304,000
To: Planning-Engineering- Cost Estimate: $90,000
Operations Committee
Funding Source: Water Capital
Reserves
From: Ken Vecchiarelli, General Account No: 101-2700-2010-05
Manager
Job No: 2010-05
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: No
Prepared By: Steve Conklin, Engineering CEQA Compliance: Exempt
Manager
Subject: Amendment to Professional Services Agreement for Tetra Tech, Inc.
SUMMARY:
In a meeting with City of Yorba Linda staff on June 23, the District was requested to accelerate its
proposed pipeline replacement project in Oriente Drive, and complete the work before the City's
federally-funded pavement replacement project, planned for Fall 2011. In order for the District to
meet this one-year window to complete design and construction, staff is requesting that the Board
authorize staff to negotiate an amendment to the existing Professional Services Agreement with
Tetra Tech, Inc.
STAFF RECOMMENDATION:
That the Committee recommend that the Board authorize District staff and the General Manager to
negotiate an amendment to the Professional Services Agreement with Tetra Tech, Inc., to expand
its existing pipeline design scope to include engineering services for design of the Oriente Drive
pipeline replacement, from Lakeview to Ohio Street, followed by ratification by the Board.
DISCUSSION:
In a meeting with City of Yorba Linda Engineering staff on June 23, projects planned by the City and
by the District were discussed. One of the City's important projects is a pavement overlay project for
Avocado, Oriente, Ohio and Palm, for which the City is receiving federal stimulus funding. In order
to not jeopardize funding, the City must start construction of the paving project by Fall 2011. With
this in mind, the City asked if the District could accelerate any planned work on those streets.
The District previously retained Tetra Tech, Inc., to design a replacement water line for Ohio Street.
We also have budgeted the replacement of the water line in Oriente Drive, planned for design and
construction in late FY 2010-11 and early FY 2011-12. Accordingly, in order to accommodate the
City's request for completion of the Oriente Drive pipeline work before Fall 2011, staff recommends
that it be authorized to negotiate an amendment to the work scope for Tetra Tech, Inc., to add the
design of approximately 2,600 lineal feet of 16-inch diameter water main and appurtenances in
Oriente Drive. This would make it possible for the design work to begin very quickly, and for
construction to be packaged with the Ohio Street work to begin by late 2010. A benefit to
completing the pipeline construction just ahead of the City's project is that the District may save on
pavement replacement costs.
PRIOR RELEVANT BOARD ACTION(S):
On May 27, 2010, the Board ratified issuance of a Professional Services Agreement for engineering
services with Tetra Tech, Inc., for the Ohio Street Pipeline Replacement Project, for a fee of
$85,400.
ATTACHMENTS:
Revised _Agenda _Report.pdf Revised Agenda Report Backup Material
ITEM NO. 3.3
AGENDA REPORT
Meeting Date: July 1, 2010 Budgeted: Yes
Total Budget: $304,000
To: Planning-Engineering- Cost Estimate: $70,000
Operations Committee
Funding Source: Water Capital
Reserves
From: Ken Vecchiarelli, General Manager Account No: 101-2700
2010-05
Job No: 2010-05
Presented By: Steve Conklin, Engineering Manager Dept: Engineering
Reviewed by Legal: No
Prepared By: Anthony Manzano, Sr. Project Manager CEQA Compliance: Exempt
Subject: Amendment to Professional Services Agreement for Tetra Tech, Inc. - REVISED
SUMMARY:
In a meeting with City of Yorba Linda staff on June 23, the District was requested to accelerate its
proposed pipeline replacement project in Oriente Drive, and complete the work before the City's
federally-funded pavement replacement project, planned for fall 2011. In order for the District to meet
this one-year window to complete design and construction, staff is requesting that the Board authorize
staff to negotiate an amendment to the existing Professional Services Agreement with Tetra Tech, Inc.
On June 28, Tetra Tech submitted a District requested proposal for the above services, as attached.
Staff reviewed the proposal and recommends approval.
STAFF RECOMMENDATION:
That the Committee recommend that the Board approve Amendment No. 1 to the Professional Services
Agreement with Tetra Tech, Inc., to expand its existing pipeline design scope to include engineering
services for design of the Oriente Drive pipeline replacement, from Lakeview to Ohio Street for a total
fee increase not to exceed $63,300.
DISCUSSION:
In a meeting with City of Yorba Linda Engineering staff on June 23, projects planned by the City and by
the District were discussed. One of the City's important projects is a pavement overlay project for
Avocado, Oriente, Ohio and Palm, for which the City is receiving federal stimulus funding. In order to
not jeopardize funding, the City must start construction of the paving project by fall 2011. With this in
mind, the City asked if the District could accelerate any planned work on those streets.
The District previously retained Tetra Tech, Inc., to design a replacement water line for Ohio Street. We
also budgeted for replacement of the water line in Oriente Drive, planned for design and construction in
late FY 2010-11 and early FY 2011-12. Accordingly, in order to accommodate the City's request for
completion of the Oriente Drive pipeline work before Fall 2011, staff recommends that it be authorized
to negotiate an amendment to the work scope for Tetra Tech, Inc., to add the design of approximately
2,600 lineal feet of 16-inch diameter water main and appurtenances in Oriente Drive. This would make
it possible for the design work to begin very quickly, and for construction to be packaged with the Ohio
Street work to begin by late 2010. A benefit to completing the pipeline construction just ahead of the
City's project is that the District may save on pavement replacement costs.
PRIOR RELEVANT BOARD ACTION(S):
On May 27, 2010, the Board ratified issuance of a Professional Services Agreement for engineering
services with Tetra Tech, Inc., for the Ohio Street Pipeline Replacement Project, for a fee of $85,400.
TETRA TECH
June 28, 2010
Mr. Steve Conklin
Yorba Linda Water District
1717 E Miraloma Avenue
Placentia, CA 92870
Reference: Proposal to Provide Professional Engineering Services for the
Oriente Drive Pipeline Replacement Project
Dear Mr. Conklin:
We are pleased to present our proposal to provide professional engineering services for the Oriente
Drive Pipeline Replacement Project. The District desires to replace the existing cast iron main
within Oriente Drive with a 16-inch diameter pipe from Lakeview Avenue to Ohio Street. The
proposed 16-inch pipeline within Oriente Drive is part of the District's capital improvement plans
to increase the capacity of the suction pipeline to the Palm Booster Pump Station. It is our
understanding that the Oriente Drive Pipeline Replacement Project will be combined with the
Ohio Street Pipeline Replacement Project that Tetra Tech is currently designing for the District.
Attached herewith is our proposed scope of work and compensation. We believe the scope of work
provides the District with the level of detail and commitment you desire, and all work tasks needed
to complete the contract documents for bidding.
Please do not hesitate to call us should the District have any questions relative to the scope or fee
for the project We look forward to working with you to complete the project.
Sin rely,
Tom Epperson, P.E.
Divisional Vice President
MWB/cg
M:\Marketing\Proposals\W TRS\2010\101 Utr. doc
Attachments
Tetra Tech, Inc.
17885 Von Karman Avenue, Suite 500, Irvine, CA 926 1 4-62 1 3
Tel 949.809.5000 Fax 949.809.5010 www.tetratech.com
YORBA LINDA WATER DISTRICT
Oriente Drive Pipeline Replacement Project
EXECUTIVE SUMMARY
Tetra Tech, Inc. has the combination of management and technical expertise along with the depth of
resources to deliver Oriente Drive Pipeline Replacement Project on time, within budget and in
compliance with the design and construction standards set by the District and the involved approval
agencies (City of Yorba Linda). Tetra Tech intends to provide the District with the same strong team
that is currently working on the Ohio Street Pipeline Replacement Project. The project team has:
• Outstanding Project Team - Our Project Team will consist of Mr. Tom Epperson, P.E., Project
Supervisor and Mr. Mark Bush, P.E., Project Manager. Tom and Mark have worked together for
15 years on pipeline projects throughout southern California. They bring with them extensive
pipeline design and management experience.
• Extensive Pipeline Experience - During the last ten years, members of the project team have
designed more than 75 miles of water, recycled water and sewer mains within fully developed areas
having extensive traffic control issues and utility conflicts.
• Commitment to the District - We are committing some of our best and most experienced people to
the District to provide a quality project.
• Ability to Expedite Project Schedule - Tetra Tech has staff ready to mobilize immediately and
begin work upon receipt of notice to proceed. Tetra Tech will keep the District informed and
updated on work progress and meet the project milestones.
PROJECT APPROACH
The Oriente Drive Pipeline Replacement Project will be incorporated into the Ohio Street Pipeline
Replacement Project. The scope of work has been revised to include additional work necessary to
incorporate the two projects into one set of Construction Drawings and Specifications.
Due to our previous pipeline experience, Tetra Tech understands the potential requirements that the City
of Yorba Linda may impose and the impacts to this project (traffic control, limited work hours, and
minimize street impacts). Tetra Tech will work through the development of the pipe alignment, phasing
of construction, traffic control, working hours and pavement restoration with the District.
Tetra Tech is ready to begin the project immediately. Our previous experience on District projects
provides the added benefit of no learning curve.
PROJECT TEAM
Our project team is the same as that currently working on the Ohio Street Pipeline Replacement project
and consists of the following: Mr. Tom Epperson, Project Supervisor, Mr. Mark Bush, Project Manager
and Laurence Esguerra as the Design Engineer. We have included Coast Surveying, Inc. for the design
survey and mapping; and Harrington Geotechnical Engineering, Inc. for the geotechnical investigation.
M\Mukalngtrroposalstwrxstzoio\ioithr.d« . i - TETRA TECH
YORBA LINDA WATER DISTRICT
Oriente Drive Pipeline Replacement Project
SCOPE OF WORK
Task 1 - Project Management and Quality Assurance
1.1 Project Meetings: Tetra Tech will attend one (1) additional project meeting for the 50%
preliminary design (horizontal alignment selection) for the pipeline within Oriente Drive. The review of
the Oriente Drive Pipeline Replacement will be included at the two (2) meetings for the 90% and 100%
design submittals for the Ohio Street Pipeline Replacement Project. The purpose of project meetings
will be to review design decisions, and review plan check comments. Tetra Tech will prepare agenda
and meeting minutes for the additional meeting
1.2 Project Management: Tetra Tech will complete all project management duties for this project
including day-to-day communications, budget and schedule tracking, invoicing, coordination with
YLWD, coordination of subconsultants, design team and quality review team.
1.3 Quality Assurance: Tetra Tech will perform independent quality reviews prior to all submittals.
Quality reviews will be performed by and/or under the direction of the Quality Assurance Team leader,
Mr. Steven Agor, P.E. All individuals completing quality reviews will be completely independent from
this project; that is that they have not completed any portion of the calculations, design, drafting or word
processing on this project.
Task 2 - Preliminary Design
2.1 Survey: Tetra Tech will complete topographic mapping for the project limits. Work includes
setting control, setting aerial targets, aerial photography and topographic mapping. Topographic
mapping will be provided with 1-foot contour intervals and be based on found County of Orange
recorded bench mark, basis of bearings per recorded map and California State Plane Coordinate System.
Due to the existing tree coverage, the surveyor will also provide one day of field survey to pick up
culture, and/or cross sections for portion of the alignment that cannot be obtained from the topographic
mapping.
2.2 Utility Research, Base Mapping and Utility Conflict Checks: Tetra Tech will obtain a listing of
utility owners from USA Dig Alert. Each utility owner will be contacted to obtain available record
drawings, as-builts, atlas maps and any other pertinent data, such as planned projects within our project
area. Once the information is obtained, the data shall be plotted in AutoCAD onto the record drawings
once the centerline of street and right-of-way have been established. This base map will serve as the
primary tool for determining the alignment of the new pipelines. Upon completion of the 90% design
package, plans will be distributed to each utility owner so they can verify their utilities have been
plotted accurately.
2.3 Geotechnical Investigation: Tetra Tech, through our subconsultant, will obtain the necessary
permits to perform 2 soil borings to a depth of 25 feet, complete necessary field work, complete
laboratory testing, conduct desk top analysis and prepare a written geotechnical report. The report shall
provide information of existing geology, shoring requirements, pipeline trenching, bedding and backfill
requirements, determine if native material can be used for backfill above the trench zone and pavement
restoration requirements. We have assumed that the City will issue a no fee permit to perform this work
M:\Marketing\Proposals\WTRS\2010U01Utr.doc -2- TETRA TECH
YORBA LINDA WATER DISTRICT
Oriente Drive Pipeline Replacement Project
on the behalf of the Water District. If fees are imposed, we have assumed that the District will reimburse
Tetra Tech the cost of the fees at no mark-up.
2.4 Preliminary Alignment Selection: Tetra Tech will prepare a strip plot showing the base map
(existing utilities and topography) and the location of the proposed pipeline's horizontal alignment for
District review. Tetra Tech will meet to discuss the available utility corridors and the resulting
construction impacts (traffic control, phasing, etc).
Task 3 - Preparation of Plans, Specifications and Estimate
3.1 Construction Drawings: This task includes preparation of the detailed design plans for the
construction. The following is an estimated list of the required drawings to be included with the Ohio
Street Pipeline Replacement Project.
• Oriente Drive Plan and Profile Drawings (40 scale) (3 Sheets)
• Connection Detail Sheets (plan view) (2 sheets)
All sheets will be stamped with a seal and signed by a California registered civil engineer.
3.2 Technical Specifications: Tetra Tech will incorporate requirements specific to the construction of
the water main within Oriente Drive into the technical specifications currently being prepared for the
Ohio Street Pipeline replacement to support the drawings and complete the elements of the project. We
will utilize the District's Standard Specifications and Standard Drawings where appropriate. We will
follow the District's Standard Specifications format and utilize technical specifications to the extent
feasible. New specification sections will be written as required. In addition, this project will be publicly
bid; as such we will utilize the latest version of the District's front ends to complete the package.
3.3 Engineer's Estimate of Probable Construction Cost. Tetra Tech will include the additional
quantities specific to the Oriente Drive pipeline replacement to the Engineer's Estimate of Probable
Construction Cost currently being prepared for the Ohio Street Pipeline Replacement Project. The
estimate will be based on the actual quantities of materials as shown on the plans, utilizing past pipeline
bids and updated cost information obtained during design from vendors, suppliers, manufactures, and
contractors.
3.4 Deliverables: Tetra Tech will submit a strip plot showing the horizontal alignment and base map
for the 50% design submittal. Per our agreement for the Ohio Street Pipeline Replacement Project, Tetra
Tech will submit three (3) sets of plans, specifications and estimate for review and comment at the 90%,
and 100% stages. We have included budget with this proposal to include the additional construction
drawings with these submittals that are already a part of our current contract. One (1) set of original
mylars, loose bond copy of specifications, both sealed and signed, will be provided to YLWD for final
approval, signature and reproduction for bidding.
3.5 Permits/Coordination: Per our current contract for the Ohio Street Pipeline Replacement Project
Tetra Tech will submit 90% plans and specifications to the City of Yorba Linda for review, comment,
plan approval and permit. We have included budget in this proposal to include the additional
construction drawings with the permit submittal, respond to all reasonable comments, revise the plans
M:\Marketing\Proposals%WrPS\2010u01Vtr.doc - 3 - TETRA TECH
YORBA LINDA WATER DISTRICT
Oriente Drive Pipeline Replacement Project
and specifications and resubmit to verify comments have been satisfactorily addressed. This process will
be repeated for up to three submittals (two resubmittals) to obtain final approvals/permits if necessary.
We have assumed that no traffic control plans will be required.
3.6 Assist with Bid. Per our current contract Tetra Tech will assist the District in the bidding and
award of the contract for the Ohio Street Pipeline Replacement Project. We have assumed that no
additional effort is required.
Task 4 - Construction Support Services
4.1 Shop Drawing Review: Per our current contract Tetra Tech will review and process shop drawings
for the project for the Ohio Street Pipeline Replacement Project. The materials being proposed for this
project are the same as the Ohio Street Pipeline Replacement Project therefore we have assumed that no
additional effort is required.
4.2 Respond to RFIs: Per our current contract Tetra Tech will review and respond to ten (10) Requests
for Information from the Contractor for the Ohio Street Pipeline Replacement Project, therefore
assuming that there may be some overlap between the two, we have assumed that we will review and
respond to five (5) Requests for Information from the Contractor for this work.
4.3 Record Drawings: Tetra Tech will revise the final design drawings based on information furnished
by the Contractor and the District. Record drawings will be furnished on mylar to the District along with
the electronic drawing files.
Assumptions Included In Preparing Our Scope of Services
It is assumed that the following items will be provided by and are the responsibility of others, or deemed
not required for this project:
• The District will provide available existing data, information, reports, records and maps in District
files, which may exist and be relevant to this particular work.
• The District will provide all available existing utility information in District files.
• The District will provide a project manager/contract administrator.
• The District will pay all permit plan checking and other fees not waived by other agencies nor made
the responsibility of the Contractor, direct or reimburse Tetra Tech for said fees at cost with no
mark-up.
• YLWD shall provide reproduction for bidding and construction phase services, or reimburse Tetra
Tech, Inc. at cost plus 15% above the contract amount.
All pipelines and appurtenances thereto are to be located within public right-of-way, as such
easements/legal descriptions will not be required.
The District will provide a staff member to walk the alignment with Tetra Tech design staff after the
50% submittal to determine the location and size of all water and sewer laterals within the project
limits.
M..\Marketing\Proposals\WTR.S\2010\101\ttr.doc -4- TETRA TECH
YORBA LINDA WATER DISTRICT
Oriente Drive Pipeline Replacement Project
SCHEDULE
Tetra Tech staff are ready to mobilize immediately and begin work upon receipt of notice to proceed.
We will be able to complete the preliminary design within four (4) weeks. Attached is the anticipated
project schedule containing the Ohio Street and Oriente Drive Pipeline Replacement Project.
COMPENSATION
Based on the Scope of Work detailed herein, Tetra Tech proposes to complete the work for the
estimated not-to-exceed fee listed below.
Task 1 - Project Management and Quality Assurance $ 6,850
Task 2 - Preliminary Design $32,100
Task 3 - Preparation of Plans, Specifications and Estimate $21,550
Task 4 - Construction Support Services 2,800
Total Compensation $63,300
We have attached Exhibit "A: 2010 Hourly Charge Rate and Expense Reimbursement Schedule" on the
following page. Accordingly, all actual labor and expenses will be invoiced on a monthly basis, up to
the "not to exceed contract amount."
M:\Marketing\Proposals\WTRS\2010\101\ltr.doc - 5 - TETRA TECH
Price Proposal
Labor Plan
ry / Totals
7 Labor Resources
Task Pricin Totals
63,300
Oriente Sreet Pipeline Replacement Project
Design the replacement o 2600 of water main consisting o 16 -inch diameter pipeline
Bill Rate
Pro) Area
260.00
mm
16500
127M
117.00
117M
8
Specify Add'I Fees onSetup
o
Technology Use Fee
Total Price
63,300
Submitted 7_ o: Yor a Lin a Water District
Contract Type: T &M
rPrice
Pricing
by Resource
z
2
f
e
q
b
g
S
ap
° O
_
w
s
$
a
;°
bor
Subs
Travel
Mat'Is & Equip
ODCs
Task Pricing
Totals
Project Phases / Tasks
Schedule
c
°
3:
r
y
;
Total
Labor Hrs
From
Thru
Months
299
16
35
62
41
s2
94
92
17,000
113
2,895
63,300
Task 1 Project Management
31
14
12
4
87
63
6,650
1.1 Project Meetings
9
4
4
1
1,547
63
1,610
1.2 Project Management
10
2
B
2,120
2,120
1.3 Quality Assurance
12
12
3,120
3,120
Task 2 Preliminary Design
109
2
7
16
12
20
48
4
14AN
17,000
so
662'
32,100
2.1 Survey
3
1
2
530
12,700
13,230
2.2. Utility Research and Base Mapping
80
4
12
20
40
4
9,552
so
432
10,034
2.3 Geotechnlcal lnvestiation
5
1
2
2
990
4,300
5,290
2.4 Preliminary Alignment Selection
21
1
4
B
8
3,316
230
3,546
Task 3 Preparation of Plans, Specifications and Estimate
145
14
34
29
32
32
4
19,929
1,621
21,550
3.1 construction Drawings
93
a
14
21
16
24
11,257
11,257
Title Sheet
3
1
2
361
361
General Sheets (2)
4
2
2
463
4M
Plan and Profile Sheets (3)
30
2
6
10
12
4,064
4,064
Detall Sheet (Incid. In Ohlo)
Connection Detall Sheets (2)
46
6
a
a
16
a
6,364
6,344
3.2 Specifications
16
4
8
4
2,468
2,466
3.3 Engineer's Estimate
16
2
6
a
2,326
2,326
3.4 Deliverables
10
2
4
4
1,306
1,621
2,927
35 Permits/Coordination
20
4
4
4
8
2,572
2,572
3.6 Assist with Bid (ineld. In Ohio)
Task 4 construction Support Servkes
14
2
a
4
;188
612
;800
4.1 Shop Drawing Review (Indd. In Ohio)
4.2 Respond to RFIs (S)
8
2
6
1,390
1,390
4.3 Record Drawings
6
2
4
7%
612
1,410
Totalsl
I
I
I
1
299
16
35
62
1 411
sx
1 94
9
0.00%
4M92
17,000
1 113
2,89S
63 300
Tetra Tech - Confidential and Proprietary Page 1 of 1 Printed 6/25/2010
YORBA LINDA WATER DISTRICT
ORIENTE DRIVE & OHIO STREET PIPELINE REPLACEMENT
ID
Task Name
Duration
Start
Jun Jul
Aug Sep Oct Nov Dec
1
Notice to Proceed
0 days
Thu 7/8/10
7/8
7/28
o- 9/7
4 ±�4
9 /�`�i
X0, 12
�;l 1/
2
Preliminary Design (Oriente Dr. Alignment)
20 days
Thu 7/8/10
3
Data Gathering
5 days
Thu 7/8/10
4
Utility Research
20 days
Thu 7/8/10
5
Geotechnical Investigation
20 days
Thu 7/8/10
6
Design Survey
15 days
Thu 7/8110
7
Prepare Base Maps
20 days
Thu 7/8/10
8
Alignment Selection
15 days
Thu 7/8/10«
9
Meet with District to Discuss Alignment Selection
0 days
Wed 7/28/10
10
Final Design (Combined Ohio St. & Oriente Dr.)
69 days
Thu 7/29110
11
Prepare 90% Plans, Specs and Estimate
29 days
Thu 7/29/10
12
Permitting
35 days
Wed 9/8/10
13
Submit 90% Submittal
0 days
Tue 9/7/10
14
District Review
10 days
Wed 9/8110
15
Review Meeting
0 days
Tue 9/21/10
16
Prepare 100% Plans, Specs and Estimate
15 days
Wed 9/22/10
17
Submit 100% Submittal
0 days
Tue 10/12/10
18
District Review
5 days
Wed 10/13/10
19
Review Meeting
0 days
Tue 10/19/10
20
Prepare Bid -Ready Plans and Specs
10 days
Wed 10/20/10
21
Submit Bid -Ready Plans and Specs
0 days
Tue 11/2/10
Project: Schedule
Date: Mon 6 /28/10
Task
Split
Progress
Milestone O
Summary
" " " " " " "
Project Summary =
External Tasks
External Milestone O
Deadline b
Page 1
ITEM NO. 4.1
AGENDA REPORT
Meeting Date: July 1, 2010
Subject: Monthly Groundwater Producers Meeting Report
ATTACHMENTS:
Name: cv, i~a$icri: a ype:
GWP MtgNotes 9June10.pdf GWP Meeting Report for June 2010 Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: June 10, 2010
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Pat Grady, Assistant General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
SUBJECT: Groundwater Producers Meeting, June 9, 2010
Ken Vecchiarelli, John DeCriscio and I attended the Groundwater Producers (GWP)
Meeting on June 9 at OCWD. The meeting was listed as one primarily to discuss
issues and concerns regarding the requested annexations by the City of Anaheim,
IRWD and YLWD to the Orange County Water District. As proposed, the three
annexations will be packaged together for consideration, with one EIR prepared to
address environmental documentation requirements.
OCWD staff opened with a presentation that summarized:
• Description of annexation requests by Anaheim, IRWD, and YLWD
• OCWD's Basin Management Principles
• OCWD's Annexation Policy
• History of annexations (45 annexations in 77 years)
• Draft Memorandum of Understanding
• Concerns and Questions previously provided in writing by Groundwater
Producers
An extended open discussion ensued on issues, concerns and general comments on
the impact of the proposed annexations, and the process by OCWD to consider the
annexations. At the conclusion of the discussion, the proposed plan by OCWD is as
follows:
• Make the above presentation to the OCWD Board on June 16 and summarize
the discussion from the June 9 Groundwater Producers meeting.
• At the July 14 OCWD Water Issues Committee, staff will ask the Committee to
consider recommending approval of the Memorandum of Understanding (MOU)
with Anaheim, IRWD and YLWD, which will initiate the process for the
preparation of the EIR.
1
• If recommended by the Water Issues Committee, staff will request that on July
21, the OCWD Board approve the MOU.
• If the above is approved, staff will conduct Annexation Workshops, approximately
every other month, to consider in detail the issues and concerns of the
Groundwater Producers on such topics as CEQA Process and Annexation
Policy, Water Resources, and Financial Impacts. The workshops will proceed in
parallel with the preparation of the EIR, with the OCWD Board kept apprised of
developments, findings and recommendations coming out of the workshops.
• It is anticipated by OCWD staff that the workshops and EIR preparation will take
one year or more to complete. Thereafter, there would be preparation of the
Annexation Agreement, adoption of the EIR, and preparation of the LAFCo
resolution. LAFCo approval and annexations would complete the process.
Two other items were discussed at the meeting. The first was the selection of chair
persons to lead the Producers Meetings for FY 2010-11. Selected were Rick Shintaku,
City of Anaheim, as chair, and Dave Schickling, City of Fullerton, and Ken Dills, City of
Huntington Beach, as co-vice chairs.
The final item was a summary by Ken Vecchiarelli on the legal action in progress
against YLWD arising from the Freeway Complex Fire. Ken briefly described the
inverse condemnation claim and the paramount implications of liability for all retail water
agencies if the action is sustained in court. He noted that the District is moving forward
with its response through collaboration with a legal team managed by ACWA-JPIA. Ken
stated that he will follow up shortly with a request for support to all water agencies and
cities that provide water service to the community, asking them to also consider
submitting a timely and coordinated amicus letter to the Fourth District Court of Appeals.
The response of the Producers was one of support and concern.
2
ITEM NO. 4.2
AGENDA REPORT
Meeting Date: July 1, 2010
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Name: Dosciiption: a ype:
CIP Rept July10.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: July 1, 2010
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Highland Reservoir
Contractor completed both
Test to take place after
On schedule with no significant
Budget: $11,200,000 Job No. 200309
interior bays, disinfected
reservoir is filled; any exterior
issues outstanding.
Project Contact: Joe Polimino
interior surfaces and is
leaks will be repaired. Water
Planned Completion Date: August 2010
currently filling reservoir for
samples will be taken and
testing.
tested for both bays.
2
Hidden Hills Res & Santiago BPS
Hydro -test passed; contractor
Interior reservoir bays will be
The easement documents for
Budget: $7,000,000 Job No.200028
backfilling reservoir and
re- cleaned and disinfected.
YLWD and for Edison were signed
Project Contact: Joe Polimino
finalizing electrical work at
Elect. system to be tested &
June 23 by State Parks. We are in
Planned Completion Date: July 2010
reservoir and Santiago Pump
transformer set. Santiago PS
contact with Edison to proceed with
Station.
to go online w /new controls.
electrical work as soon as possible.
3
Vista del Verde Valve Replacement
Completing contract agreement
Execute contract agreement
Construction is scheduled to begin
Budget: $1M Job No. 200908
with Valverde Construction.
and prepare for pre -
July 12, 2010.
Project Contact: Derek Nguyen
Contract is in review with
construction meeting June 29.
Planned Compl. Date: July 2010 (Ph. 1)
District's Attorney.
4
Wells 1, 5 and 12 Upgrade
W -12 conversion to electric
New pump, motor & electrical
W -5 in operation. Developing plan
Budget: $190,000 Job No. 200813
motor from gas- engine driver
upgrades to be installed at W-
of action for Well No. 1.
Project Contact: Anthony Manzano
underway.
12. Vibration issues at W -5 to
Project Completion: TBD
be resolved soon.
5
Well 20
Drilling Contractor completed
Plan to receive draft
Pumping capacity to be designed for
Budget: $2,000,000 Job No.200711
work & fully demobilized.
Preliminary Design Report for
3,000 GPM.
Project Contact: Anthony Manzano
Wellhead Equipping design in
wellhead equipping in early
Planned Completion Date: TBD
progress.
July 2010.
IN DESIGN
Project
Current Status
Next Actions
Comments
1
OC -51 Connection Upgrade
Awaiting MWD Board
Preparation of PSA with Black
Received "unofficial" response thru
Budget: $242,000 Job No. 200815
approval of District's proposal,
& Veatch for design of OC -51
MWDOC that MWD may be able to
Project Contact: Derek Nguyen
anticipated in Sept. 2010.
retrofit.
approve YLWD's proposal at staff -
Planned Completion Date: TBD
level rather than going to Board.
2
Highland Booster Station Upgrade
District advertised Notice
Issue any Addendum. Bids
Plan to award contract at August 12
Budget: $6,000,000 Job No. 200814
Inviting Bids for construction.
due July 15. Evaluate bids and
Board meeting and issue notice to
Project Contact: Hank Samaripa
Pre -bid meeting held June 22
make recommendation for
proceed with construction by early
Planned Completion Date: Mid 2011
at District office.
award to August PEO.
September.
3
Anaheim Intertie Connection
Awaiting City of Anaheim
Update plans with new fire
Evaluate construction bids with
Budget: $250,000 (YLWD Share)
response to determine if City
flow requirement or set up pre-
Anaheim, and make
Job No. 200906
has capacity to deliver
con meeting with contractors if
recommendation to PEO for award
Project Contact: Hank Samaripa
emergency fire flow demands
no change in plans.
of construction.
Planned Completion Date: July 2010
in Willow Woods area.
4
Ohio St Pipeline Replacement Project
Preliminary design complete.
Preliminary layout to be
Anticipate design completion,
Budget: $530,000 Job No. 201005
Staff and Consultant
reviewed with City. 90% plans
August 2010.
Project Contact: Anthony Manzano
completing next submittal and
and specs expected to be
Planned Completion Date: TBD
draft specifications.
complete within 2 months.
5
Emergency Pumpout Facilities
Completed design plans and
Prepare final bid documents
Plan to present bid results and
Budget: $120,000 Job No. 200903
specs. Review meeting with
and advertise for bids.
award recommendation to Aug PEO
Project Contact: Derek Nguyen
City on June 23.
and award contract at Aug 12 Board
Planned Completion Date: TBD
meeting.
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Fairmont Site Improvements
Evaluating upgrading Fairmont
Complete internal review and
Pursue receipt of payment from
Budget: TBD
BPS to include proposed Zone
make recommendations for
Shapell in lieu of site design and
Job No. 200803
5 BPS and other pumping
layout and site improvements.
partial payment for construction of
Project Contact: Hank Samaripa
scenarios.
Meet with Shapell to discuss
site improvements.
Planned Completion Date: TBD
District taking over site design
2
Recycled Water Study
Complete irrigation demand
Hold progress meeting w/
Review project schedule to ensure
Budget: $1,800,000 Job No. 200807
data and provide information
Consultant and review project
50% completion for grant
Project Contact: Derek Nguyen
to consultant.
tasks.
compliance.
Planned Completion Date: TBD
3
West Wellfield Project
Investigating additional
Review hydrogeology data and
May retain a Property Acquisition
Budget: $9,000,000 Job No.
potential well sites east of
contact land owners to
Firm for assistance.
Project Contact: Anthony Manzano
Tustin Avenue
determine if there is interest in
Planned Completion Date: TBD
selling small site for well.
4
Sewer Master Plan
Flow monitoring report
Consultant refining GIS base
Modeling expected to be complete
Budget: $350,000 Job No. 200916
complete. Sewer system GIS
and starting model.
by late summer 2010.
Project Contact: Anthony Manzano
modeling underway.
Planned Completion Date: Oct. 2010
5
Lakeview Grade Separation
Preliminary pipeline relocation
Design submittal remains on
Awaiting OCTA final decision to
Budget: TBD Job No. 201002
alignment finalized.
hold pending OCTA Board
determine agency financially
Project Contact: Anthony Manzano
approval to resume work,
responsible for pipe relocation.
Planned Completion Date: Sept. 2013
6
Palm Ave. Booster Station
Prepared Prelim Gun Club Rd.
Present pump station site
Evaluate utility conflicts in Yorba
Budget: TBD Job No. 200817
site proposal for City Parks
proposal to MWD. Awaiting a
Linda Blvd. for new 24" Zone 2
Project Contact: Hank Samaripa
meeting. Discussed this site
response from City on use of
pipeline to pump station.
Planned Completion Date: July 2011
with MWDOC. No objections
Gun Club Rd site and any
to date.
issues and concerns.
7
Elk Mountain Site Improvements
Reviewed project goals and
Prepare a preliminary design
Review insurance documents of
Budget: $300,000 Job No. 200522
visited site. Met with local
for a Youth Practice Field.
soccer organizations and determine
Project Contact: Hank Samaripa
soccer reps to discuss potential
Tour Elk Mountain site in July
if there are liabilities or other issues
Planned Completion Date: Dec 2011
interest in the site,
with local soccer reps
of concern.