HomeMy WebLinkAbout2010-08-05 - Planning-Engineering-Operations Committee Meeting Agenda Packetr a Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Thursday, August 5, 2010, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director William R. Mills, Chair Ken Vecchiarelli, General Manager
Director John W. Summerfield Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
2.1. Monthly Groundwater Production and Purchased Import Water Report
2.2. Monthly Preventative Maintenance Program Report
3. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
3.1. Amendment to On -Call Services Contract with MWH Americas, Inc. (MWH)
Recommendation: That the Committee recommend the Board of Directors authorize
approval of On -Call Services contract Amendment No. 3 with MWH Americas, Inc.
for a fee increase not to exceed $45,500, resulting in a total fee of $140,740.
3.2. Approval of Change Order No. 4 for Highland Reservoir Replacement Project
Recommendation: That the Committee recommend the Board of Directors approve
Change Order No. 4, a credit to the District in the amount of $38,815.00 and the
addition of 47 calendar days to Schuler Engineering Corporation for construction of
the Highland Reservoir Replacement Project, Job No. 200309.
3.3. Award of Construction Contract for Highland Booster Station Replacement Project
Recommendation: That the Committee recommend the Board of Directors award
the Contract for Construction of the Highland Booster Station Replacement Project
to Pacific Hydrotech Corporation for $4,525,800.
3.4. Brand -Name Requirements for Well No. 20 Wellhead Equipping
Recommendation: That the Committee recommend the Board of Directors approve
brand -name requirements for Well No. 20 Wellhead Equipping for the items listed
on the attached memorandum.
3.5. Sewer Agreement for MWD's Diemer Treatment Plant
Recommendation: That the Committee recommend the Board of Directors approve
the Agreement for Extraterritorial Sewer Service Between the Metropolitan Water
District of Southern California and the Yorba Linda Water District.
3.6. Terms and Conditions for Water Service with Yorba Linda Country Club
Recommendation: That the Committee recommend the Board of Directors approve
the Terms and Conditions for Water Service with Yorba Linda Country Club, Job
No. 200707.
3.7. Well Optimization Study Amendment No. 1 with Camp Dresser and McKee, Inc. (CDM)
Recommendation: That the Committee recommend the Board of Directors authorize
approval of the Services Amendment No. 1 with CDM for a fee increase not to
exceed $35,395, resulting in a total fee of $89,785.
4. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
4.1. Report on Preliminary Planning for Elk Reservoir Site Development
4.2. Monthly Groundwater Producers Meeting Report
4.3. Status Report on Capital Projects in Progress
4.4. Future Agenda Items and Staff Tasks
5. ADJOURNMENT
5.1. The next regular meeting of the Planning- Engineering- Operations Committee will be held
September 2, 2010 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
AGENDA REPORT
Meeting Date: August 5, 2010
ITEM NO. 2.1
Subject: Monthly Groundwater Production and Purchased Import Water Report
i
ATTACHMENTS:
Name:
Import2010 -2011 July PEO Sheet.pdf
Import2010- 2011 _July Pie _Chart (2).pdf
Import2010 -2011 July TWU.pdf
Import2010 -2011 July YTD Prod Chart.pdf
Description:
Import 2010 -2011 July PEO Sheet
Import 2010 -2011 July Pie Chart
Import 2010 -2011 July TWU
Import 2010 -2011 July YTD Prod
Type:
Backup Material
Backup Material
Backup Material
Backup Material
YLWD SOURCE WATER SUMMARY
Fiscal Year 2010 -11
Allowable GW (YTD) 1,058.0 (AF)
Underpumped 264.8 (AF)
GROUNDWATER PERCENTAGE
GW
(AF)
IMPORT
(AF)
TOTAL
DEMAND
(AF)
MONTHLY
GW
(%)
YTD
GW
(%)
BUDGET
(Demand Est.)
(AF)
DELTA
(%)
MONTH
Jul -10
Aug -10
Sep -10
Oct -10
Nov -10
Dec -10
Jan -11
Feb -11
Mar -11
Apr -11
May -11
Jun -11
793.2
1,476.0
2,269.2
35.0%
35.0%
2,483.5
45.0%
2,443.4
35.0%
2,143.8
25.0%
MONTHLY GW (%)
1,808.3
tYTD GW (%
BPP GOAL 46.6%
1,428.5
5.0%
Jul -10 Aug -10 Sep -10 Oct -10 Nov -10 Dec -10 Jan -11 Feb -11 Mar -11 Apr -11 May -11 Jun -11
Month
1,285.0
1,120.4
1,071.9
1,270.2
1,588.8
2,101.6
2,354.8
FYTDI
793.2
1 1,476.0
2,269.2
1 35.0%
1 2,483.5
1 -8.6%
Allowable GW (YTD) 1,058.0 (AF)
Underpumped 264.8 (AF)
GROUNDWATER PERCENTAGE
85.0%
75.0%
65.0%
55.0%
45.0%
35.0%
25.0%
MONTHLY GW (%)
15.0%
tYTD GW (%
BPP GOAL 46.6%
5.0%
Jul -10 Aug -10 Sep -10 Oct -10 Nov -10 Dec -10 Jan -11 Feb -11 Mar -11 Apr -11 May -11 Jun -11
Month
WATER SUPPLY
FY 2009 -2010
July 2010 Water Supply
GW
35.0%
IMPORT
65.0%
2010 -2011 YTD Water Supply
GW
35.0%
IMPORT
65.0%
GW BPP GOAL
46.6%
am
2,500
2,000
FS
,07
0' 1,500
0
1,000
500
Total Water Use
N° o o N° N° o%, e N° o° N(° NN o°' Noi o°' '.° o�' NQ, �. o N° NN
Month
22,000
20,000
18,000
16,000
14,000
U-
a 12,000
a�
E
0 10,000
8,000
6,000
4,000
2,000
0
Jul -10
2010 -2011 YTD Water Supply
Aug -10 Sep -10 Oct -10 Nov -10 Dec -10 Jan -11 Feb -11 Mar -11 Apr -11 May -11 Jun -11
Month
July 2010 Daily Average Demand (MG)
30.0
25.0
20.1
20.0
15.0
10.0
5.0
0.0
Sunday
24.9
qI 22.7 23.5
Monday Tuesday Wednesday Thursday
25.5
r
L
r
L
r
L
Friday
22.1
Saturday
a
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: August 5, 2010
Subject: Monthly Preventative Maintenance Program Report
ATTACHMENTS:
Name: Description: Type:
2010 -11 fiscal(1).xls 2010-201 1—fiscal Backup Material
ITEM
PM PROGRAM
20010/2011
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 66
INSPECTED THIS YEAR 66
% OF TOTAL
VALVES (10,706/2= 5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 536
OPERATED THIS YEAR 536
% OF TOTAL
DEAD ENDS (166 X 2 = 310) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0
FLUSHED THIS YEAR 0
% OF TOTAL
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 296
INSPECTED THIS YEAR 296
% OF TOTAL
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 1269497
CLEANED THIS YEAR 1269497
% OF TOTAL
SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years.
TELEVISED THIS MONTH 129176
TELEVISED THIS YEAR 129176
% OF TOTAL
AGENDA REPORT
Meeting Date: August 5, 2010
To: Planning-Engineering-
Operations Committee
From: Ken Vecchiarelli, General
Manager
Presented By: Steve Conklin, Engineering
Manager
Prepared By: Anthony Manzano, Senior
Project Manager
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Job No:
Dept:
Reviewed by Legal:
CEQA Compliance:
ITEM NO. 3.1
Yes
$200,000
$45,500
Water Capital
Reserves
1- 2700 -0903
200903
Engineering
N/A
N/A
Subject: Amendment to On -Call Services Contract with MWH Americas, Inc. (MWH)
SUMMARY:
MWH was previously retained for On -Call Services (services) under the General Manager's signing
authority, to update the District's hydraulic model and evaluate pump- connection locations to
enhance emergency response and fire protection. Subsequently, Amendments No. 1 and 2 were
approved to provide additions to these services. In the process of providing these services, District
staff requested MWH to provide assistance with tasks on other District projects. These combined
tasks nearly consumed the available budget. Staff is requesting approval of Amendment No. 3 to
complete the engineering support services and model conversion.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize approval of On -Call Services
contract Amendment No. 3 with MWH Americas, Inc. for a fee increase not to exceed $45,500,
resulting in a total fee of $140,740.
DISCUSSION:
On May 7, 2009, the District entered into a Professional Services Agreement with MWH to provide
on -call support services to evaluate and update the existing hydraulic model and evaluate the
planning of potential interzonal emergency connections, for a fee not to exceed $15,000. On August
5, 2009, based on good progress and the need for further work on these items, Amendment No. 1
to the PSA was approved by the General Manager for $33,000, increasing the limit to $48,000.
Subsequently, on March 11, 2010, the Board approved On -Call Services contract Amendment No.
2 for $47,240 increasing the limit to $95,240.
Work completed to date by MWH is summarized below. When Addendum No. 1 tasks were
completed, it was determined that the design and upgrading of many of the District's pressure
regulating valves (PRVs) in underground vaults was going to be a larger work effort than
anticipated, and that it should be packaged and completed as a separate project in next year's
budget. It was also determined that the construction of three emergency pump -out facilities was
going to cost in excess of $100,000, and in accordance with District policy, would need full contract
documents and public bidding. Accordingly, funding for and preparation of the plans, specs and
contract documents for the emergency pump -outs was completed under Addendum No. 2. Also,
after Addendum No. 2 was approved, work tasks were identified that required the assistance of
MWH that were not budgeted. These tasks were hydraulic modeling and analysis for:
• Cresthill /Willow Woods Drive, as necessary for the Intertie Improvements Project with the City
of Anaheim (Capital Project 2009 -06)
• Pipeline sizing for the Ohio Street replacement project (Capital Project 2010 -06)
• Supply line sizing for the planned Palm Avenue Booster Pump Station upgrade project
(Capital Project 2008 -17)
• Zones 3, 4 and 5 in the vicinity of Fairmont Pump Station, for a preliminary study of pump
station upgrades at that site (Capital Project 2010 -11)
These hydraulic modeling and analysis tasks were necessary for each of the District's capital
projects listed. Accordingly, the costs related to each of the above will be charged to the noted
capital project number.
Tasks Completed Under Original PSA ($15,000 Expended)
• Hydraulic analysis, site investigations, exhibits and cost estimates to locate five proposed
emergency pump -out locations.
• Reviewed specifications for portable pumps.
• Prepared plans for three emergency pump -out locations to be included in contract with Zone 4
Reconfiguration Project contractor.
• Prepared work plans and facilitated meetings for the District to begin the conversion of the
hydraulic model to InfoWater.
Tasks Completed Under Addendum 1 ($33,000 Expended)
• Evaluated alternatives to modify the Village Center PRV vault to allow safer access, replace
valves and recoat piping.
• Prepared bid documents to modify the Village Center PRV and vault; including structural and
mechanical drawings.
• Reviewed the District's GIS and shape files for conversion to InfoWater.
• Prepared a report and attended meetings, so that staff could clean up the GIS data.
Tasks Completed Under Addendum 2 ($47,240 Nearly Expended)
• Performed hydraulic analysis for Cresthill /Willow Woods Drive to determine available fire flow
and identify potential pressure zone changes and new larger pipelines.
• Prepared bid documents (plans and specifications) for three emergency pump -out locations.
• Performed hydraulic analysis of Zone 3 to size potential pipeline improvements after the Ohio
Street pipe break. This included several alternatives to look at supplying Zone 2 water into
Zone 3.
• Performed hydraulic analysis to determine the maximum size of the proposed new larger
Palm Avenue Pump Station.
• Performed hydraulic analysis of Zones 3, 4, 5 and 6 around the Fairmont Pump Station, to
determine required booster pump station upgrades.
At this time, tasks remain for work in progress on the District's improvement of the water system
hydraulic model and for engineering services during upcoming construction of the Emergency
Pump -out Facilities, for which MWH has completed design plans, specs and contract documents.
District staff requested a proposal from MWH for these services and also requested that they
include a task and budget for Planning Support to the District. A summary of the requested work is
provided below and further described in the attached letter proposal of June 11, 2010 from MWH.
Improved Hydraulic Model: The water - system model will be converted from its existing format
to the District's GIS system, allowing the District to simulate emergency response alternatives
before and during events. Additional MWH services are required to assist staff with this
conversion. District staff will assist with the GIS modifications and the hydraulic analysis to
minimize costs (MWH cost not to exceed $17,500).
Emergency Pump Connections: Pump connection points will allow the District to utilize its
portable pumps to deliver water faster and more efficiently from lower to upper pressure
zones, for which MWH has completed design plans. MWH will provide construction
management support for these facilities (MWH cost not to exceed $14,000).
Planning Support: At the request of District staff, MWH will assist with planning support
including, but not limited to, evaluation of pipeline replacement and pump station rehabilitation
(MWH cost not to exceed $14,000).
Staff reviewed this proposal for $45,500 and recommends approval, with the understanding that this
will be the final contract amendment.
PRIOR RELEVANT BOARD ACTION(S):
On March 11, 2010, the Board approved On -Call Services contract Amendment No. 2 with MWH
Americas, Inc. for a fee increase not to exceed $47,240, resulting in a total fee of $95,240.
ATTACHMENTS:
Name:
Description:
Type:
MWH On -Call Services Proposal Amendment 06 -11
MWH On Call Services Contract Amendment Backup Material
2010 pdf
Q MWH
BVILDIN6 At BETTER WORLD
June 11, 2010
Mr. Steve Conklin
Yorba Linda Water District
1717 East Miraloma Avenue
Placentia, CA 92870 -6785
Subject: On -Call Services Contract Amendment
YLWD Job No. 200903
Dear Mr. Conklin:
MWH is performing "as- needed" professional engineering assistance for the Yorba Linda
Water District (District). Our existing agreement and addendums are almost fully utilized.
MWH is proposing to continue "as- needed" support to the District.
The District has projects and tasks that are identified over the next several months.
MWH will assist District staff on a task -by -task basis. These projects include hydraulic
model support, engineering support during construction and general planning support.
These tasks will be added to our existing on -call contract with the District. The tasks will
be performed on a time and materials basis. Work will not be initiated until authorized by
the District. Listed below is a description of the tasks to be performed as part of the on-
call contract.
Task 1 Hydraulic Model Support
MWH will perform hydraulic modeling assistance for the conversion of the
existing model into the GIS system. District staff is currently performing cleanup
of the GIS in preparation of importing into the hydraulic model. MWH will review
the GIS shape files and provide direction for the District to prepare for the
importation. MWH staff will convert the old model data base files and import them
into the new model software. MWH staff will assist the District in re- allocating the
demands and performing model updates after the conversion process is
complete. (Budget 100 hours /$17,500)
Task 2 Engineering Support During Construction
The District will be constructing three new emergency pump outs to deliver water
to the upper pressure zones in the event of an emergency. The bid documents
are near completion and a solicitation for bids will be issued. MWH will provide
bid support and engineering support during construction. MWH will review
submittals and attend meetings as needed. Record drawings will be prepared for
the as -built condition. (Budget 80 hours /$14,000)
- - - - - -- ----- - - - - --
_
b 1n kAlch INnda Ave -E1 626 796 9141
Site 20G Fk, 626 668 610`
Arcadi3r CA 9100' vNN,,,mw ,&raf.crn
Mr. Steve Conklin - 2 - June 11, 2010
Task 3 General Planning Support
The District evaluates potential changes to the water supply and distribution
system to meet customer needs and address operational changes. MWH will
assist District staff in performing the planning studies by providing hydraulic
analysis, cost analysis, attending meetings, preparing exhibits and preparing
reports. (Budget 80 hours /$14,000)
The proposed task and budgets are based on our knowledge of the District's current
needs. We estimate a budget of $45,500 for tasks 1 -3. Budget may be shifted between
tasks, if needed. MWH will not start on these tasks until we receive your written
authorization. We are pleased to continue to provide service to the District. Please call
Michael Moore if you have any questions at (949) 328 -2405.
Sincerely,
ohn Robinson
ice President
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
August 5, 2010
Planning-Engineering-
Operations Committee
Ken Vecchiarelli, General
Manager
Steve Conklin, Engineering
Manager
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Job No:
Dept:
Reviewed by Legal:
Joe Polimino, Project Engineer CEQA Compliance:
ITEM NO. 3.2
Yes
$11.2M
$11.2M
Water Revenue Bond
102 -2700
200309
Engineering
No
MND
Approval of Change Order No. 4 for Highland Reservoir Replacement Project
Work is almost complete on the construction of the Highland Reservoir Replacement Project.
Submitted for consideration is construction Change Order No. 4.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Change Order No. 4, a credit to the
District in the amount of $38,815.00 and the addition of 47 calendar days to Schuler Engineering
Corporation for construction of the Highland Reservoir Replacement Project, Job No. 200309.
DISCUSSION:
In accordance with the contract documents, Schuler Engineering submitted Change Order No. 4
due to additions and modifications, as well as District - initiated changes encountered during the
course of construction to date. A copy of Change Order No. 4 is attached for review and
information. Details of significant items in the change order are listed below.
Change Order Proposal (COP) 19: The utility water wash down lines were relocated from below the
reservoir slab to on top of the reservoir roof to prevent any issues with leaking of the utility water
lines under the structure. Also, the material for the vent pipe on the inlet line of the reservoir was
changed from PVC to stainless steel to decrease the need for replacement in the future. The
amount of this change order item is $18,566.00 and 9 additional days.
Change Order Request (COR) 20: The contractor proposed a credit for the deletion of the two
retaining walls around the temporary tanks as a cost savings to the District. A credit was also
proposed for the deletion of the retaining wall at the southeast corner of the property, due to the
existing two V- ditches. With an extension of the new V -ditch and modifications to existing grading,
storm run off is directed to the onsite drainage system of V- ditches. The amount of this credit is
$210,000.00 and no additional days.
COP 22: Due to the relocation of the overflow piping and utility water piping, encasement for these
lines was not required. The amount of this credit is $36,000.00 and no additional days.
COR 52: The District requested that additional work associated with COR 20 be broken out for
clarity. Changes included the additional grading to delete the walls, extending manhole heights,
additional survey work and additional labor and equipment to complete the work. The amount of this
change order item is $76,873.00 and no additional days. COP 54: The District requested that the
fence originally shown on the contract drawings along the east side of the reservoir be relocated
along the east property line. This causes additional labor for the contractor, since the property line
will need to be re- surveyed and then shrubs and brush will need to be cleared along the new
alignment. The contractor will also hand dig all of the post holes since there is no access for
equipment. This was requested to provide a larger secure area for District use and will assist when
constructing the new Highland Booster Pump Station. The amount of this change order item is
$40,013.00 and 12 additional days.
COP 59: The District IT Department requested the addition of a high -level float to each basin to
provide back -up monitoring for SCADA. This work included extra conduits, wire, two high level
floats and labor to install. The amount of this change order item is $11,233.00 and 3 additional
days.
COP 61: The District Operations Department requested the addition of an access road on the south
side of the reservoir with gravel base. This road will facilitate vehicle access to the various valve
vaults and manholes on the south side of the reservoir. The amount of this change order item is
$51,700.00 and 11 additional days.
The status of the construction contract with Schuler Engineering is as follows:
The original contract is $9,049,346 and 730 calendar days starting June 2, 2008.
• Authorized change order to date amount is $431,847.87 (4.8% of the original contract amount)
and 74 calendar days (10.1 % of original contract calendar days).
• If approved, Change Order No. 4 deducts ($38,815.00) ( -0.4% of the current contract amount)
and adds 47 calendar days (5.8% of current contract calendar days).
• If approved, the percentage of change orders to the original contract amount is 4.3 %.
• If approved, the percentage of original contract calendar days to additional days is 16.6 %.
• If approved, the revised construction contract amount is $9,442,378.87 and 851 calendar
days.
Staff and Carollo Engineers, the District's construction management consultant, reviewed the
change order request and recommend approval.
PRIOR RELEVANT BOARD ACTION(S):
On April 10, 2008, the Board awarded a construction contract to Schuler Engineering in the amount
of $9,049,346 for construction of the project. On May 15, 2008, the Board approved execution of a
Professional Service Agreement (PSA) with Carollo Engineers in the amount of $605,856 for
engineering support services, construction management and backup inspection services; a PSA
with Leighton Consulting in the amount of $86,200 for geotechnical services, soils, concrete and
materials testing; a PSA with BonTerra Consulting in the amount of $22,251 for environmental
compliance services; and approved the construction budget in the amount of $11,200,000 for
construction of the Highland Reservoir Replacement Project. The Board has approved three
Change Orders and twenty six Progress Pay Requests to date, the most recent of which was
approved on September 10, 2009, and July 8, 2010, respectively.
ATTACHMENTS:
Name:
Description:
Highland Reservoir CO 4 Schuler Engineering. df Highland Reservoir Project Change Order No. 4
Type:
Backup Material
YORBA LINDA WATER DISTRICT
CHANGE ORDER NO. 4
DATE 7/20/10
Page 1 of 2
CONTRACT NAME: Highland Reservoir CONTRACT AMT.:
Replacement
CONTRACT NO.: J- 200309
CONTRACTOR: Schuler Engineering
$ 9,049,346,00 DAYS: 730
PREV. APPRVD. $431,847.87 DAYS: 74
CHANGES:
THIS CHANGE: ($38,815.00) DAYS: 47
OWNER: Yorba Linda water District REVISED CONTRACT $9,442,376.87 DAYS: 851
AMT:
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials,
and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor
and Yorba Linda Water District otherwise referred to as Owner.
DESCRIPTION OF CHANGES
+INCREASE
/OR
— DECREASE IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
+EXTENSION
/OR-
REDUCTION
(DAYS)
COP 19: Reservoir wash dawn relocation, sample ports, vent
$18,566.00
9 days
COR 20: Deletion of retaining walls 1,2,4 for credit.
($210,000.00)
0 days
COP 22: Rebar encasement for overflow and UW piping
($36,000.00)
0 days
COR 52: Revised grading due to deleted retaining walls
$76,873.00
0 days
COP 53: Air Gap Extension
$'1,671.1`10
2 days
COP 54: Fence relocated to along property line
$40,013.00
12 days
COP 55: Inspection on 11 -11-09 and 1 -16 -10
($1,068.00)
0 days
COP 56: Column Identification Credit
($4,540.00)
0 days
COR 57: Added T -wall rebar
$3,605.00
4 days
COP 59: Add 2 high & relocate the high high floats
$11,233.00
3 days
COP 60: T &M Issues
$9,132.00
6 days
COP 61: New South road grading and base
$51,700.00
11 days
NET CHANGE
($38,815.08)
47 days
REVISED CONTRACT AMOUNT AND TIME
$9,442,378.87
851 days
The amount of the contract will be increased by the sum of [$38.815.001 and the contract time shall be increased by fo -seven 47
calendar days. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for
each Item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and
perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change
Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change
Order shall be effective when approved by the Owner. This change order constitutes full, final, and complete compensation to the contractor
for all costs, expenses, overhead, profit, and any damages of every kind that the contractor may incur in connection with the above referenced
changes in the work, including any impact on the referenced work of any other work under the contract, any changes in the sequences of any
work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this
contract. By the execution of the change order, the contractor accepts the contract price change and the contract completion date change, if
any, and expressly waives any claims for any additional compensation, damages or time extensions, in connection with the above - referenced
changes.
h*U'
1' tom- :1,1gI►1111 :►'►'1 -Ilk i=1:4 f]6-11.IC010
RECOMMENDED:
ACCEPTED:
APPROVED:
Brian
CHANGE ORDER NO. 4
DATE 7120110
Page 2 of 2
Carollo
Engineers DATE: ;;1— 0(7 -lQ
Schuler DATE: ,
Engineering �—/76 b—C)
Chas wick
Vorba Linda DATE:
L�o
Water District
� onklin
ITEM NO. 3.3
AGENDA REPORT
Meeting Date:
August 5, 2010
Budgeted:
Yes
Total Budget:
$5.5M
To:
Planning- Engineering-
Cost Estimate:
$5.44M
Operations Committee
Funding Source:
Water Revenue Bond
From:
Ken Vecchiarelli, General
Account No:
101 -2700
Manager
Job No:
J- 200814
Presented By:
Steve Conklin, Engineering
Dept:
Engineering
Manager
Reviewed by Legal:
N/A
Prepared By:
Hank Samaripa, Project
CEQA Compliance:
MND
Engineer
Subject:
Award of Construction Contract for Highland Booster Station Replacement
Project
SUMMARY:
On July 15, 2010, bids were received from nine contractors for the construction of the Highland
Booster Station Replacement Project. The low bid was $4,525,800 by Pacific Hydrotech Corp. The
Engineer's Estimate was $5,440,000.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors award the Contract for Construction of the
Highland Booster Station Replacement Project to Pacific Hydrotech Corporation for $4,525,800.
DISCUSSION:
The 18,000 -gpm- capacity Highland Booster Station Replacement Project includes construction of a
new pump building, three electric motor driven pumps, two gas engine driven pumps, larger suction
and discharge headers, upsizing a section of the Zone 2 transmission pipeline and a 5,000 gallon
surge relief tank. Construction will commence in October 2010 following completion of the new 6
MG Highland Reservoir. The new pump station was designed to allow continued pumping
operations through the existing station during construction activities, and therefore will have minimal
impacts on the District's production operations. Completion of the new Highland Booster Station
Replacement Project is expected in late 2011.
Bids were received from nine contractors, ranging from a low of $4,525,800 to a high of $5,631,596,
as shown below. The bid tabulation and other bid documents from the low bidder, Pacific Hydrotech
Corp., were reviewed by District staff and found to be responsive.
Name of Contractor Bid Amount
Pacific Hydrotech Corp.
$4,525,800
Schuler Engineering Corp.
$4,875,283
SCW Contracting Corp.
$4,875,432
Norman A.Olsson Construction, Inc.
$4,960,000
Brutoco Engineering & Construction, Inc.
$5,187,000
J.F. Shea Construction, Inc.
$5,218,000
Gantry Constructors, Inc.
$5,231,000
R.C. Foster Corp.
$5,270,000
Environmental Construction, Inc.
$5,631,596
PRIOR RELEVANT BOARD ACTION(S):
On July 9, 2009, the Board of Directors approved the award of the Professional Services
Agreement (PSA) for design of the Highland Booster Pump Station Replacement Project to MWH
Americas, for a fee not to exceed $469,593. On January 28, 2010, Board of Directors approved
Amendment No. 1 to the PSA with MWH Americas, in the amount of $91,940, for additional
engineering services. On February 11, 2010 the Board of Directors approved Amendment No. 2 for
a fee of $18,929.
ITEM NO. 3.4
AGENDA REPORT
Meeting Date:
August 5, 2010
Budgeted:
Yes
Total Budget:
$2M
To:
Planning- Engineering-
Cost Estimate:
N/A
Operations Committee
Funding Source:
Water Capital
Reserves
From:
Ken Vecchiarelli, General
Account No:
101 -2700
Manager
Job No:
200711
Presented By:
Steve Conklin, Engineering
Dept:
Engineering
Manager
Reviewed by Legal:
N/A
Prepared By:
Anthony Manzano, Senior
CEQA Compliance:
Exempt
Project Manager
Subject:
Brand -Name Requirements for Well No. 20 Wellhead Equipping
SUMMARY:
Staff has determined that several key design and manufactured components from specific suppliers
are desired to match systems currently in use by the District in order to maximize opertional and
maintenance efficiencies and overall system reliability. Attached is a copy of a staff memorandum
titled "Recommended Brand -Name Requirements for Well No. 20 Project" that lists recommended
brand names for this project and justification for each.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve brand -name requirements for Well
No. 20 Wellhead Equipping for the items listed on the attached memorandum.
DISCUSSION:
During the design and review process, District staff determined that several key design components
and manufactured parts are desired from specific suppliers in order to match products currently in
use within the District's water system. This request is similar to the Highland Booster Station brand -
name request approved by the Board on April 8, 2010 where Counsel determined, per Public
Contract Code Section 3400, that, with Board approval, brand -name products can be specified
provided that they are used to match products in use. A staff memorandum is attached listing
recommended brand names and justification for each.
PRIOR RELEVANT BOARD ACTION(S):
1. In August 2008, the Board of Directors approved a Professional Services Agreement with
Camp Dresser & McGee in the amount of $179,469 to provide hydrogeologic services to
evaluate two potential well sites and provide a well drilling design, specifications and
inspection services.
2. In January 2010, the Board of Directors authorized execution of a Drilling Contract for Well
No. 20 to Bakersfield Well & Pump Company, in the amount of $367,291.
3. On March 11, 2010, the Board of Directors authorized execution of a Professional Services
Agreement with Civiltec Engineering, Inc. for a fee not to exceed $79,820, for design, bid
support and construction management services for Wellhead equipping of Well No. 20.
ATTACHMENTS:
Name: uescripi u r
MEMO - Well 20 Name
Well 20 Brand Name Requirement Memorandum
Brand Recommendations.docx
0 Yorba Linda
Water District
MEMORANDUM
DATE: July 23, 2010
TO: Steve Conklin, Engineering Manager
FROM: John DeCriscio, Chief Plant Operator
COPY: Anthony Manzano, Sr. Project Engineer
Lee Cory, Operations Manager
Rick Walkemeyer, SCADA Administrator
SUBJECT: Recommended Brand -Name Requirements for Well No. 20 Project
During the Well #20 preliminary design review with Civiltec Engineering on July 21,
2010, District staff noted some items in the design for which specific brands are very
important for operational continuity and efficiency. Below is a list of brand -name
equipment requested and the justifications:
1. Onsite Sodium Hypochlorite System. Because of the complexities and
proprietary parts associated with this type of equipment, YLWD staff would like
to limit these systems to the two manufacturers we are currently using. In an
effort to make repairs in a timely manner, the District stocks key repair parts for
these two manufacturers in our warehouse. As such, PSI Microclor and
Severn Trent are the two recommended manufacturers.
2. Chlorine System Analyzers. Like the sodium hypochlorite system, the
analyzers also require regular maintenance and repairs with proprietary parts.
This equipment is critical for accurate chlorine dosages. The District has strict
requirement from the California Department of Public Health pertaining to the
chlorine dose rate. We have found two manufacturers and models to perform
better than others in our system. Staff is recommending we specify ProMinent
Model DC1 /DMT control package for our import water supplies and the Capitol
Controls Series 1870E with the "CO2" adapter for pH buffering for our
groundwater supplies. The recommended Capitol Controls unit buffers pH for a
stable reading without the use of reagents. Because we use the reading to
drive the dose rate, a stable reading is essential to the operation of the system.
Further, a unit that does not require the addition of reagents is critical because
the Well #20 location doesn't have a sanitary sewer system nearby to
discharge used reagents.
1
3. Chemical Feed Pumps. The chemical feed pumps are another key
component in the chlorine feed systems. The lead time for rebuild kits and
repair parts for these types of pumps is typically many months. To minimize
downtime the District has stocked several of these expensive parts and rebuild
kits in our warehouse. We have also trained staff on the repair of the pumps
we currently have in our system. The pumps have been proven to be reliable
when properly maintained. Therefore, we are recommending the use of the
pumps from one of the two manufacturers we currently have installed in our
system: Alldos and Encore 700 series chemical feed pumps.
4. PLC. Programming language for a programmable logic controller (PLC) is a
very specialized field. All of the District's PLCs must communicate and work
together in order to operate in our water system. The District's SCADA
Administrator has specialized training and software to work with the Modicon
PLC systems. The District also stocks repair parts for this unit. Therefore,
because of the District's successful experience with the Modicon M340 PLC, it
is recommended that this be the only model PLC the District will specify.
5. Flow Meters. The District is specifying a magnetic flow meter for flow
measurement, the current standard of the industry for accuracy and ease of
maintenance. The District has six locations with mag meters in place, and five
of those are meters manufactured by ABB, all of which are working very well.
Flow meters must be calibrated on a regular basis. The District's SCADA
technician has specialized training in calibration of the ABB meters, and we
also stock limited repair parts and calibration equipment for these units.
Accordingly, staff is recommending that ABB magnetic flow meters be
specified for new projects.
6. Pump Control Valves. For pump control valves, District staff is specifying
units manufactured by Cla -Val, which have proved to be of high quality and
value. The District has a crew trained in the maintenance and repair of the Cla-
Val brand product. Because these valves are manufactured locally, District
staff can generally call -in for parts and pick them up the same day. This has
expedited repairs, which allows staff to get systems back on line quickly. In an
effort to minimize repair -parts inventory in our warehouse, we utilize the local -
availability of CIa -Vat's warehouse to meet that need. With these multiple
benefits, staff recommends specifying only CIa -Val for pump control valves.
7. Operator Interface (OI). Programming the computer -based interface between
the District's operator and equipment is very specialized. The District's various
Operator Interfaces must communicate and work together in order to operate in
our water system through our existing SCADA infrastructure and software. The
District's SCADA Administrator has specialized training and software to work
with the Wonderware Operator Interfaces. Utilizing this, the District is able to
replicate the SCADA system at the control center and at the field site with
minimal effort and cost. Therefore, because of the District's experience and
success with the Wonderware Operator Interface Panel, it is recommended
that this be the only model OI specified by the District.
K
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
August 5, 2010
Planning-Engineering-
Operations Committee
Ken Vecchiarelli, General
Manager
Steve Conklin, Engineering
Manager
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Job No:
Dept:
Reviewed by Legal:
Scott Moulton, Consultant CEQA Compliance:
Sewer Agreement for MWD's Diemer Treatment Plant
ITEM NO. 3.5
N/A
N/A
N/A
N/A
2 4010 0780 20
0902
Engineering
Yes
Exempt
The existing sewer agreement for MWD's Diemer Treatment Plant was created in 1968 for a much
smaller operation. The Diemer Plant is much larger today, with peak effluent discharge rates 70
times larger than referenced in the original agreement. In addition, a second discharge connection
has been requested by MWD for a sewer force main in Valley View Circle. District staff has
negotiated a new agreement with MWD which will cover Diemer's current and planned discharges,
and will recover $265,890 of past sewer trunk line investment.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve the Agreement for Extraterritorial
Sewer Service Between the Metropolitan Water District of Southern California and the Yorba Linda
Water District.
DISCUSSION:
The District has invested over $3 million in sewer trunk lines to support the northwesterly area of the
District. The District's policy is to recover a portion of the investment from major users that require
dedication of a part of that capacity. Staff calculated that the Diemer Plant discharges will require
9% of the capacity of Bastanchury Trunk Sewer, 7% of the Wabash Trunk Sewer, and 12% of the
Valley View Trunk Sewer. In total, $265,890 of past sewer construction capacity (actual historical
cost) is now dedicated to the Diemer Plant operations discharge and is not available for other uses.
Accordingly, this capacity cost is included in the new agreement to be borne by MWD.
District staff negotiated a new agreement with MWD that addresses capital facility fee, monthly
service costs, effluent standards, pumping rates and times of discharge, metering requirements,
and legal issues. The new proposed agreement has been reviewed and approved by legal counsel
at both districts. A copy of the proposed agreement is attached for review.
PRIOR RELEVANT BOARD ACTION(S):
None.
ATTACHMENTS:
Name: Description:
Sewer Agreement Between YLWD and Metropolitan 7 22 2010.doc Sewer Agreement for MWD Diemer Plant
Type:
Agreement
AGREEMENT FOR EXTRATERRITORIAL SEWER SERVICE
BETWEEN THE
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA
AND THE
YORBA LINDA WATER DISTRICT
This Agreement ( "Agreement ") for extraterritorial sewer service is made and entered into
as of , 2010, by and between the METROPOLITAN WATER DISTRICT OF
SOUTHERN CALIFORNIA ( "METROPOLITAN') and the YORBA LINDA WATER
DISTRICT ( "YLWD ") (METROPOLITAN and YLWD are sometimes herein referred to
collectively as "Parties" or individually as a "Party" to this Agreement).
RF,CITAIN
A. YLWD owns and operates sewer pipelines as part of its water system.
B. METROPOLITAN owns and operates, as part of its water system, a facility
adjoining YLWD's service territory known as the Robert B. Diemer Filtration Plant ( Diemer
Plant).
C. METROPOLITAN requires sanitary sewer service in order to facilitate its
operation of the Diemer Plant.
D. The Parties entered into an agreement that provided for an extraterritorial sewer
connection from the Diemer Plant to a YLWD sewer line at or near the intersection of Casa
Loma Street and Pacific Avenue on or about July 1, 1968 (" 1968 Agreement ")
E. The Parties now desire to enter into a new agreement for extraterritorial sewer
service to cover the connection set forth in the 1968 Agreement, as well as one additional
connection.
1
F. This Agreement supersedes any and all agreements between the Parties for
extraterritorial sewer service, including the 1968 Agreement.
NOW, THEREFORE, it is agreed between the Parties as follows:
AGREEMENT
1. COMPENSATION.
1.1 METROPOLITAN shall pay Sewer Maintenance Charges consistent with the
applicable Sewer Maintenance Charge adopted by YLWD's Board of Directors for Commercial,
Industrial and Public School customers, which is subject to change. In the event that YLWD's
Board of Directors changes the Sewer Maintenance Charge, METROPOLITAN shall pay the
new charge beginning the first month after adoption of the change. The current fee for
Commercial, Industrial and Public School customers, when metered, is $5.50 per month for the
first 1,100 cubic feet of effluent and $5.06 per month per 1,000 cubic feet of effluent in excess of
1,100.
1.2 YLWD shall assess, and METROPOLITAN shall pay, the standard service fee of
$1,957.00 for the connections covered by this Agreement. Payment under this Section 1.2 is due
and payable no later than thirty (30) days after receipt of an invoice from YLWD.
1.3 METROPOLITAN shall pay a sewer trunk capital facility fee of $265,890.00 in
lieu of the standard acreage fee. Payment under this Section 1.3 is due and payable no later than
thirty (30) days after receipt of an invoice from YLWD.
2. EFFLUENT STANDARDS.
All effluent must comply with all applicable Federal, State and local laws and regulations.
Specific effluent requirements are discussed in greater detail in Section 9.6.
3. PUMPING HOURS.
Pumping at Connection # 1 of 1) treated rainwater runoff effluent approved under a Class II
permit issued by Orange County Sanitation District ( "OCSD ") and 2) effluent approved under a
Special Discharge permit issued by OCSD shall occur only between the hours of 8 p.m. and 4
a.m., Pacific Time.
4. REPAIR AND MAINTENANCE OF CONNECTIONS AND PIPE.
METROPOLITAN shall be responsible for repairing and maintaining each connection and pipe
that is upstream of each connection. YLWD is authorized to, but not obligated to, access any of
2
the connections or pipes for repair and maintenance if METROPOLITAN fails to perform its
obligations under this Section 4. In the event YLWD undertakes such repair or maintenance of
the connections and /or pipes, YLWD is entitled to full reimbursement for all associated costs
from METROPOLITAN. YLWD shall be responsible for repair and maintenance of pipe which
is downstream of each connection.
5. [INTENTIONALLY OMITTED]
6. METERING.
6.1 All connections shall be equipped with a meter capable of measuring the flow of
effluent into the YLWD sewer system.
6.2 METROPOLITAN is responsible for all costs associated with the meters
including, but not limited to, the purchase of the metering equipment, the installation of the
metering equipment and the repair and maintenance of the metering equipment.
6.3 In the event METROPOLITAN fails to properly install and maintain metering
equipment, YLWD is authorized, but not obligated to, undertake these tasks. In the event
YLWD undertakes installation, repair or maintenance of the metering equipment, YLWD is
entitled to full reimbursement for all associated costs from METROPOLITAN.
6.4 METROPOLITAN shall take and record monthly readings on the meters on
connections through which effluent was discharged during the previous month.
6.5 On the last day of each month, an accounting of all effluent discharged into the
YLWD system shall be completed by METROPOLITAN and submitted to YLWD. The
accounting shall set forth the total amount of effluent discharged into the YLWD system, as well
as the amount of effluent discharged at each connection. The amount of effluent shall be
multiplied by the applicable Sewer Maintenance Charge set forth in Section 1.1 of this
Agreement.
6.6 No later than the end of each month YLWD shall submit an invoice for all sewer
charges incurred during the previous month to METROPOLITAN. METROPOLITAN shall pay
YLWD the full amount of the invoice within thirty (30) days of receipt of the invoice. All
amounts not paid within 30 days of the invoice shall be subject to interest at a rate of one percent
(1 %) per month. All payments of Sewer Maintenance Charges shall be addressed to YLWD as
provided in Section 14.1 of this Agreement.
6.7 In the event a portion of an invoice is disputed, the Parties agree that the entire
amount of the charge, including the disputed amount shall be paid when due. Upon the
determination of a correction to the original amount of the invoice, the amount of said correction
shall be refunded promptly after such determination with interest accrued at the rate of one
percent (1 %) per month, computed from the date of payment to the date of refund.
6.8 YLWD shall be permitted to independently verify the meters at any time with
appropriate escort by METROPOLITAN to ensure safety and security of METROPOLITAN's
facility.
7. RECORDS CONCERNING FLOW DATA.
METROPOLITAN shall maintain accurate records and accounts of effluent discharged into the
YLWD system. Said records shall include total amounts of discharge, as well as laboratory data
of the discharge, at each connection for a period of three (3) years after the respective discharge.
Such records and accounts shall be subject to audit by YLWD or an independent accountant
selected by YLWD upon thirty (30) days advance written notice to METROPOLITAN. The
records shall be available during normal business hours, at METROPOLITAN's main place of
business. YLWD shall not release METROPOLITAN's records or disclose any information
contained therein without the express written consent of METROPOLITAN unless required to
do so pursuant to the California Public Records Act.
8. INDEMNITY.
To the fullest extent permitted by law, METROPOLITAN shall indemnify, defend and
hold YLWD, its directors, officers, consultants, employees, or authorized volunteers harmless
from and against any and all claims, expenses, damages, losses, liability or costs (including
reasonable attorneys' fees and costs of defense) arising from or related to METROPOLITAN's
performance (whether based on actual performance or alleged non - performance), except to the
extent resulting from the willful misconduct or active negligence of YLWD, its directors,
officers, consultants, employees, or authorized volunteers. METROPOLITAN's duties and
obligations under this Section 8 shall survive the termination of this Agreement.
9. CONNECTIONS.
This Agreement shall cover two sewer connections by METROPOLITAN to the YLWD system.
For the purpose of identification, these connections are referred to as Connection #1 and
M
Connection #3. (Connection #2 is currently not planned to be used.)
9.1. Description and General Location
Connection #1: This is an existing connection from the Diemer Filtration Plant to the YLWD
system. It connects at or near the intersection of Casa Loma Street and Pacific Avenue in the
City of Yorba Linda.
Connection #3: This is a recent connection from new and existing facilities including the West
Filter Building, the Solids Handling Facility, the Vehicle Maintenance Center and Vehicle Wash
Rack, and the Guard Station at the Diemer Plant to the YLWD system. It connects at or near
Valley View Circle in the City of Yorba Linda.
9.2. Construction
Connection #1: This connection has already been constructed and is currently in operation.
Connection #3: This connection has already been constructed and is currently in operation.
9.3. Pipe Size and Type
Connection #1: 8 -inch gravity flow sewer main.
Connection #3: 4 -inch sewer force main.
9.4. [INTENTIONALLY OMITTED]
9.5. Maximum Flows
Connection #1: Maximum peak flow 45 gallons per minute. Total flows not to exceed 22,000
gallons per calendar day.
Connection #3: Maximum flow of 30 gallons per minute. Total flows not to exceed 43,000
gallons per calendar day.
In the event of an emergency that results in an unavoidable release to prevent loss of life,
personal injury, or severe property damage, METROPOLITAN shall immediately notify the
YLWD by telephone and METROPOLITAN shall implement any remedial measures required.
In the event that METROPOLITAN is unable to comply with any permit condition due to
a breakdown of equipment, accidents, or human error, METROPOLITAN shall immediately
notify the YLWD by telephone and METROPOLITAN shall implement any remedial measures
required.
Notwithstanding the above in this Section 9.5, METROPOLITAN's indemnification
obligations under Section 8 shall apply in the event of an emergency that results in an
unavoidable release to prevent loss of life, personal injury, or severe property damage or if
METROPOLITAN is unable to comply with any permit condition due to a breakdown of
equipment, accidents, or human error.
9.6 Type of Effluent
All effluent for which METROPOLITAN has obtained a permit from the Orange County
Sanitation District. Percent solids not to exceed five percent (5 %).
9.7. Discharge of Other Effluent
Unless and until METROPOLITAN obtains express written approval from YLWD, it shall not
discharge effluent different from that specified in Section 9.6 above, at the respective
connections.
9.8. Third Party Use of Connections
YLWD may allow others to connect to YLWD's system and shall not be obligated to make any
refund therefore; provided, however, that any such connection and service shall be subordinate to
METROPOLITAN's right to use the sewer to its full contracted capacity as provided in this
Agreement.
10. NECESSARY APPROVALS AND PERMITS.
10.1 METROPOLITAN shall obtain any and all necessary approvals and permits for
discharge of effluent and comply with all requirements of said approvals and permits.
10.2 The necessary approvals and permits referred to in Section 10.1 include, but are
not limited to, those required by the Orange County Sanitation District.
11. COMPLIANCE WITH LAWS.
METROPOLITAN warrants that it will comply with all Federal, State and local laws
governing the discharge of effluent. YLWD shall not be responsible either jointly or severally
for METROPOLITAN's failure to adhere to said standards.
12. TERM OF AGREEMENT.
This Agreement shall remain in effect unless and until either Party gives the other Party at least
one (1) year written notice.
13. LAW GOVERNING CONSTRUCTION OF TERMS.
This Agreement shall be governed by the laws of the State of California. If any portion of this
Agreement is held invalid under any applicable statute or rule of law, then only that portion shall
0
be deemed invalid. All other portions shall remain valid.
14. NOTICES.
14.1. Any formal notice, demand or request provided for in this Agreement, or given or
made in connection with this Agreement, shall be in writing and shall be deemed to be properly
given or made if personally delivered or sent by registered mail, postage prepaid to the person
specified below:
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA
Water Treatment Unit Manager
3972 Valley View Ave.
Yorba Linda, California 92886
YORBA LINDA WATER DISTRICT
P.O. Box 0309
Yorba Linda, California 92885
ATTN: General Manager
14.2. A Party may at any time, by written notice, change the designation or the address
of the person specified to receive notices pursuant to Section 14.1. This paragraph does not
apply to notices and requests of a routine nature. Such notices and requests shall be given in
such manner as the Single Point of Contact from time to time shall specify.
15. WAIVER.
15.1. No waiver or failure to exercise any right, option or privilege under the terms of
this Agreement on any particular occasion shall be construed to be a waiver of any other right,
option, or privilege on any other occasion.
16. ENTIRE AGREEMENT.
16.1. This document constitutes the entire Agreement between the Parties and
supersedes all oral or written representations or agreements which may have been entered into
between the Parties regarding the extraterritorial sewer service discussed herein. Specifically,
this Agreement supersedes the 1968 Agreement. No modification, revision or amendment to this
Agreement shall be of any force or effect, unless the same is in writing and executed by the
Parties hereto.
17. EFFECTIVE DATE AND AUTHORITY.
The effective date of this Agreement shall be the latest date of execution hereinafter set
7
forth below.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed
on a date hereinafter respectfully set forth.
METROPOLITAN WATER DISTRICT
OF SOUTHERN CALIFORNIA
By: _
Name
Title:
Date:
Jeff Kightlinger
General Manager
YORBA LINDA WATER DISTRICT
BY: _
Name
Title:
Date:
William R. Mills
President
APPROVED AS TO FORM:
a
Karen L. Tachiki
General Counsel
Metropolitan Water District of Southern California
APPROVED AS TO FORM:
n-M
Arthur G. Kidman
McCormick, Kidman & Behrens, LLP
Counsel for Yorba Linda Water District
AGENDA REPORT
Meeting Date: August 5, 2010
ITEM NO. 3.6
To:
Planning- Engineering- Operations
Committee
Funding Source:
Developer Funded
From:
Ken Vecchiarelli, General Manager
Job No:
200707
Presented By:
Steve Conklin, Engineering
Dept:
Engineering
Manager
Prepared By:
Ariel Bacani, Engineering
CEQA Compliance:
N/A
Technician II
Subject:
Terms and Conditions for Water Service with Yorba Linda Country Club
SUMMARY:
Yorba Linda Country Club has requested water service as a back -up to their two onsite wells that provide
irrigation to the golf course. The proposed connection is located at the north end of Parkhurst Place, within
Pressure Zone 2 of the District's Western Service Area. An exhibit depicting the project location is attached
for your reference.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve the Terms and Conditions for Water
Service with Yorba Linda Country Club, Job No. 200707.
DISCUSSION:
The District has an existing pipeline in Parkhurst Place that has provided water service through the use of a
temporary meter. Yorba Linda Country Club is requesting a permanent connection to the distribution
system to supplement their two onsite wells for irrigation purposes. The applicant will construct a two -inch
service and meter with a backflow prevention device.
The Yorba Linda Country Club will agree to pay for water used at the District's construction rate. The
applicant's proposed water service may be terminated at the District's discretion during declared drought
conditions.
The Terms and Conditions for Water Service with Yorba Linda Country Club are attached for your
consideration. The applicant will pay all water service fees and execute an approved water service
agreement in accordance with the District's Rules and Regulations.
ATTACHMENTS:
Namt
200707 T C.doc
EXHIBIT - Prop. YLCC Wtr. Service 07- 22- 2010.pdf
Description:
Terms and Conditions for Water Service with Yorba Linda
Country Club
Exhibit - Proposed Water Improvements for Yorba Linda
Country Club
Type:
Agreement
Exhibit
Date: August 12, 2010
YORBA LINDA WATER DISTRICT
TERMS AND CONDITIONS
FOR WATER SERVICE
NAME OF APPLICANT: YORBA LINDA COUNTRY CLUB
LOCATION OF PROJECT: NORTH END OF PARKHURST PLACE, YORBA LINDA
TRACT NUMBER: N/A JOB NUMBER: 200707 LOT(S): N/A
The applicant will be required to complete to the satisfaction of the District the following
items that have an "X" following the number.
1) X The applicant shall provide the District with a copy of the Grant Deed or
Title Report of the property to be served.
2) X The applicant shall include information deemed necessary by the District in
the event the applicant is required to file a Department of Real Estate Tax
Disclosure statement.
3) The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 1 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. I.
4) The applicant shall provide to all purchasers of the homes a statement that
the home is located within Improvement District No. 2 and that the home is
subject to a property tax over and above the normal 1 % Basic Tax Levy to
pay for Production, Storage, and Transmission water facilities serving
Improvement District No. 2.
5) X The applicant shall submit two (2) sets of the improvement plans to the
District for plan check processing.
a) Improvement Plans
b) marling DlaR
c) TraGt Dornol nr VP —Sting Map
d) Landscaping Plans
6) X Improvement Plans submitted for plan check shall comply with the submittal
requirements established by the YLWD Engineering Department.
Page 2 of 5
NAME OF APPLICANT: YORBA LINDA COUNTRY CLUB
LOCATION OF PROJECT: NORTH END OF PARKHURST PLACE, YORBA LINDA
7) The applicant shall dedicate or obtain all easements deemed necessary by
the District in accordance with the Rules and Regulations of the District. All
easement documents shall be prepared under the supervision of and
stamped by a Professional Land Surveyor or a Registered Civil Engineer
(licensed prior to January 1, 1982) licensed to practice in the State of
California.
8) The applicant shall provide the District with a copy of the Recorded
Tr�n vel Map(s)er Easement Documents illustrating all District
easements required by Term and Condition No. 7, prior to Feq6leGtmRg
^^^61paRGY releases construction.
9) The applicant shall prepare and process all easements to be quitclaimed by
the District in accordance with the Rules and Regulations of the District.
10) X The applicant shall furnish the District with a 24 -hour emergency telephone
number prior to the District's approval of the construction plans.
11) X The applicant shall notify the District 48 hours prior to initiating any work
related to required or proposed improvements.
12) X The applicant shall complete a Temporary Construction Meter Permit
application for all water to be used in construction work and all water used
under such permit shall be taken from the approved construction meter.
13) X The applicant shall provide per the District specifications one complete set
of "As Built" mylars and electronic copy of ACAD drawings (version 2008 or
later) for the Water and SeWe r facilities.
14) X The applicant shall complete an Application to and Agreement for Water
Service.
15) X The applicant shall pay all of the water fees as required by the Rules and
Regulations of the District.
16) X The applicant shall pay meter fees associated with the installation of radio
read meters for this project.
17) X The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Water Service.
18) The applicant shall provide the District with a set of plans stamped and
approved by the Orange County Fire Authority, or fire agency having
jurisdiction, that identifies approved fire hydrant locations. Such approved
plan must be submitted to the District before staff will initiate a District plan
check for water improvements.
Page 3 of 5
NAME OF APPLICANT: YORBA LINDA COUNTRY CLUB
LOCATION OF PROJECT: NORTH END OF PARKHURST PLACE, YORBA LINDA
19) X The applicant shall have all water facilities designed in accordance with the
District's Water Facilities Plan and the District's Standard Specifications. All
design plans shall be prepared under the supervision of and stamped by a
Registered Civil Engineer licensed to practice in the State of California.
20) X The applicant's water facilities (on -site) shall be Privately owned and
maintained.
21) X The applicant shall be required to conduct flow tests at their cost in the
event the Orange County Fire Authority requires a flow test. A District
representative shall be present to witness the flow test.
22) X The applicant shall comply with all additional District requirements, relative
to the fire protection system, fire hydrant construction and fire hydrant
locations.
23) The applicant shall install one 1 water Sampling Station(s) in conformance
with the District's Standard Plans.
24) X The applicant shall provide a completed Surety Bond for the water facilities
prior to the District signing the Water Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed water facilities.
25) The applicant shall install the curb and gutters a minimum of one week prior
to the installation of the water main and services.
26) X All existing water services that are not useable in the new plan shall be cut
and plugged at the main line.
27) X The applicant shall coordinate through the District all connections of new
water facilities to the existing District facilities.
28) The applicant shall provide a written copy of the Bacteriological Report prior
to occupancy releases certifying that the water meets the Health
Department's requirements.
29) The applicant shall adjust and raise to grade all valve covers within the
limits of this project.
30) The applicant shall install a pressure regulator in all dwellings that have
over 80 p.s.i. static water pressure in accordance with the appropriate
building codes.
31) X The applicant shall complete a Temporary Water Permit (Jumper
Installation) for all water that will be used through the new water service to
serve the A &A4 4 .4elli e golf course.
Page 4 of 5
NAME OF APPLICANT: YORBA LINDA COUNTRY CLUB
LOCATION OF PROJECT: NORTH END OF PARKHURST PLACE, YORBA LINDA
32) The applicant shall install a District approved backflow device in connection
with any private fire suppression sprinkler facilities that may be required by
the Orange County Fire Authority or fire agency having jurisdiction.
33) X The applicant shall install a reduced pressure principle backflow prevention
device on all commercial buildings and landscape services.
34) X The applicant shall install and provide a written test report to the District for
each backflow device certifying that the backflow devices are operating
properly prior to the water meters being turned on for service.
35) The applicant shall install and provide a written test report to the District
certifying that the double check detector assembly is operating properly
prior to the double check detector assembly being turned on for service.
36) X The applicant shall provide an annual written test report to the District
certifying that the backflow devices and fire detector assemblies are
operating properly pursuant to the District's Backflow Prevention Program
and the State of California Administrative Code, Title 17, Public Health
Rules and Regulations Relating to Cross - Connections.
37) The applicant shall complete a Sewer Connection Application and Permit
for Sewer Service.
38) The applicant shall complete an Application to and Agreement for Sewer
Service.
39) The applicant shall comply with the Rules and Regulations of the Yorba
Linda Water District with regard to the Rendition of Sanitary Sewer Service.
40) The applicant shall pay all of the sewer fees as required by the Rules and
Regulations of the District.
41) The applicant shall have all sewer facilities designed in accordance with the
District's Sewer Master Plan and Standard Specifications. All design plans
shall be prepared under the supervision of and stamped by a Registered
Civil Engineer licensed to practice in the State of California.
42) The applicant shall provide a completed Surety Bond for the sewer facilities
prior to the District signing the Sewer Improvement Plans. The applicant
shall also provide to the District an estimate of the construction costs of the
proposed sewer facilities.
43) The applicant's sewer facilities (on -site) shall be Privately owned and
maintained.
44) The applicant shall construct a sewer main and appurtenances in
conformance with the approved plans and the District's Plans and
Specifications.
Page 5 of 5
NAME OF APPLICANT: YORBA LINDA COUNTRY CLUB
LOCATION OF PROJECT: NORTH END OF PARKHURST PLACE, YORBA LINDA
45) The applicant shall adjust and raise to grade all sewer manhole covers
within the limits of this project.
46) The applicant shall install a sewer backflow prevention valve on all sewer
service connections in which the pad elevations of the property being
served is lower than the rim elevation of the upstream manhole. Installation
of the backflow device shall comply with all requirements of the Building
and Plumbing Codes of the appropriate agency having jurisdiction.
47) The applicant shall submit a video inspection report of their sewer project in
DVD format. The video of the sewer facilities shall be conducted in the
presence of the District inspector, which will include stationing locations of
manholes, cleanouts, wyes, laterals, backflow devices and appurtenances.
(END OF STANDARD TERMS AND CONDITIONS)
PROJECT SPECIFIC TERMS AND CONDITIONS
48) X The applicant shall install one new water service, per approved plans and
District Specifications.
49) X The applicant shall agree to pay for all water supplied at construction rate.
50) X The applicant's proposed water service may be terminated at the District's
discretion during declared drought conditions.
I hereby certify that the foregoing Terms and Conditions were approved at the August 12,
2010 Regular Meeting of the Board of Directors of the Yorba Linda Water District. The
approved Terms and Conditions shall become void six (6) months from the approval date
if a formal Application To and Agreement with the Yorba Linda Water District for Sewer
Service is not executed for the project under consideration.
Kenneth R. Vecchiarelli, P.E., General Manager
'S
EXIST. 4" PVC WATER
BY YORBA LINDA
COUNTRY CLUB
EXIST. FIRE
HYDRANT
PROPOSED 2"
SERVICE & METER
WITH A BACKFLOW
PREVENTION DEVICE
EXIST. 8" WATER
MAIN
LOCATION MAP
PREPARED BY:
ELYORBA LINDA WATER DISTRICT
w1717 E. MIRALOMA AVENUE
PLACENTIA, CALIFORNIA 92870
(714) 701 -3100
VICINITY MAP
NOT TO SCALE
EXHIBIT
PROPOSED EMERGENCY WATER SERVICE
FOR
YORBA LINDA COUNTRY CLUB
SCALE:
NO SCALE
DATE:
7 -22 -10
FILENAME:
JOB - 200707
ITEM NO. 3.7
AGENDA REPORT
Meeting Date:
August 5, 2010
Budgeted:
Yes
Total Budget:
$190,000
To:
Planning- Engineering-
Cost Estimate:
$35,395
Operations Committee
Funding Source:
All Water Funds
From:
Ken Vecchiarelli, General
Account No:
101 -2700
Manager
Job No:
200813
Presented By:
Steve Conklin, Engineering
Dept:
Engineering
Manager
Reviewed by Legal:
Yes
Prepared By:
Anthony Manzano, Senior
CEQA Compliance:
N/A
Project Manager
Subject:
Well Optimization Study Amendment
No. 1 with Camp Dresser and McKee,
Inc. (CDM)
SUMMARY:
CDM was previously retained to provide Consulting Services (Services) for the Well Optimization
Study to evaluate the condition of the District's wells and provide recommendations on means to
maximize production to meet current water demands. Additional work is required to complete these
evaluations and provide inspection services for well rehabilitation work.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize approval of the Services
Amendment No. 1 with CDM for a fee increase not to exceed $35,395, resulting in a total fee of
$89,785.
DISCUSSION:
On October 16, 2008, the District entered into a Professional Services Agreement with CDM to
evaluate the condition of the District's wells and maximize production to meet current water
demands, for an amount not to exceed $54,390.
Work completed to date includes:
• Attended several meetings with District staff to collect data including well characteristics,
water levels, interference drawdown, pump performance curves, specific capacity and
operational records.
• Performed Well Nos. 5 and 12 pump analyses including several days of field observation
while the contractor conducted pump testing.
• Reviewed Well Nos. 5 and 12 video logs.
• Completed Well Nos. 5 and 12 reports which included the following recommendations to
assist in eliminating cascading water and air entrapment during pumping: Pump setting levels,
installation and setting of packer, maximum discharge flow rate.
• Confirmed District's calculations for Well Nos. 5 and 12 pump sizing.
• Provided sizing calculations for Well No. 5 electric motor conversion and attended a
conference call meeting with District staff to discuss sizing requirements with the contractor.
• Reviewed Well No. 11 modifications with District staff and evaluated extent of production and
quality improvements.
• Provided pump installation inspection services for Well No. 5. Well No. 5 pump was recently
installed and test pumped at approximately 2,200 GPM; a small portion of this required
inspection work exceeding the previously authorized $54,390 by approximately $1,900.
Payment for this overage is requested as part of the proposal for additional services.
Currently, additional well optimization support services will be required, including inspection of Well
No. 12 pump installation, and consulting services for the refurbishment of Well No. 1. At the
District's request, CDM provided the attached letter proposal dated June 8, 2010, describing the
proposed work and fee. District staff reviewed the proposal and recommends approval.
PRIOR RELEVANT BOARD ACTION(S):
On August 28, 2008, the Board of Directors authorized the General Manager to execute a
Professional Services Agreement with Camp Dresser & McKee for the amount not to exceed
$54,390 to provide hydrogeologic and support engineering services to prepare an optimization
study of the District's existing water production wells, Job No. 200813.
ATTACHMENTS:
Name: Des pdon: Type:
Well Optimization Study Amendment 1/w Camp Dresser
ylwd_ammendment _ r2 June_061710.pdf Backup Material
etc.
YLWD well 1 evaluation June 2010 r2.pdf CDM Well optimization study amendment Backup Material
*I P , Ly�
111 Academy, Suite 150
Irvine, California 92617
tel: 949 752 -5452
fax: 949 725 -3790
June 8, 2010
Steve Conklin
Anthony Manzano
Yorba Linda Water District
1717 East Miraloma Avenue
Placentia, CA 92870
Subject: Yorba Linda Water District Well Optimization Study Amendment
Dear Steve and Anthony:
As requested, CDM is submitting this amendment to our contract with the District to provide
engineering services to evaluate the current conditions of the District's wells so that the
District can maximize production and meet the current water demands. Well 5 work was
recently completed; rehabilitation of Well 12 has been completed, and the District has
requested CDM to assist in the oversight of the installation of the permanent pump,
evaluation, and oversight of Well 1 rehabilitation.
1.0 Scope of Work
Task 1 -1 Well Evaluation and Recommendations
CDM will evaluate the well data and develop recommendations to increase production.
Wells 1, 5 and 12 were experiencing aeration due to the pumping water levels being below the
top of the perforations. CDM will provide guidance to the District during the field testing.
The preliminary field work has been completed for Well 5 and the aeration issue appears to
be resolved; however, Layne Christensen recently installed the pump and the District
requested that CDM provide construction observation services.
During this task the following items will be performed:
• CDM provided pump installation observation for Well 5. This task has been completed.
However, this task represents additional engineering services completed in excess of the
approved $54,390.
• CDM will review the video surveys and provide field oversight during the installation of
the packer/ cylinder (if the District determines it is needed) with the pump and test
pumping and provide recommendations for eliminating or reducing the aeration for Well
C: \Documents and Settings \hoffmanmj \Desktop \ylwd ammendment r2 June 061710.doc
consulting • engineering • construction • operations
CDM
Steve Conklin
June 8, 2010
Page 2
1. CDM will provide pump installation observation for Well 1, if needed. After the pump
is installed, the well will be evaluated for air in the discharge. Photographs will be taken
and a short memorandum prepared to document the installation and testing.
■ CDM will provide pump installation observation for Well 12. Photographs will be taken
and a short memorandum prepared to document the installation and testing.
2.0 Fee and Cost Breakdown
The total not -to- exceed cost approved by the District for the Well Optimization Study is
$54,390. The estimate to perform the work described in this letter is $35,395 which would
increase the upper limit to $89,785. The cost breakdown for the additional services described
herein is detailed on the attached table. All other terms and conditions of the original contract
dated October 16, 2008 will remain in effect.
Should you have any questions, or require additional clarification, please let me know.
Very truly yours,
Richard W. Corneille, P.E.
Principal -In- Charge
Camp Dresser & McKee Inc.
I�
Su anne M. Rowe, C.HG.
Project Manager
Camp Dresser & McKee Inc.
C: \Documents and Settings \hoffmanmj \Desktop \ylwd ammendment r2 June 061710.doc
Yorba Linda Water District
Wells 1 Analysis, Well 5 and Well 12 Observation
Budget Estimate
June 2010
TASK
Officer in
Charge
$210
Project
Manager
SCGE 8
$180
Tech Advisor/
Review
SCGE 9
$210
Senior WR
Planner/
Engineer 7
$175
Project
Hydrogeologist
SCGE 5
$135
Prof II
Geol./ Eng.
SCGE3 /4
$125
Drafter
$85
Clerical/
Contract. Admin
$80
Total
Labor
Hours
Total
Labor
Dollars
ODCs
Total
Task
Costs
1
Improve Well Yields
1.0
Well Evaluation and Recommendations
Well 5 Observation
1
1
2
7
2
13
$1,775
$140
$1,915
Well 1 Evalution, Recommendations and Observation
40
6
12
40
40
2
140
$21,120
$400
$21,520
Well 12 Pump Installation Observation
4
2
2
24
2
34
$4,650
$400
$5,050
2.0
Project Management
1
8
1
1
1
1
1
1 8
1 17
$2,290
$300
$2,590
3.0
Meetin s
8
1 4
1 4
1 8
1
1
1 2
1 26
$4,220
$100
$4,320
TOTALI
1
1 61
1 13
1 20
1 48
71
1 0
1 16
1 230
$34,0551
$1,3
$35 395
AGENDA REPORT
Meeting Date: August 5, 2010
ITEM NO. 4.1
Subject: Report on Preliminary Planning for Elk Reservoir Site Development
ATTACHMENTS:
Name: Description: Type:
ElkSiteSTAFF REPORT 02Aug2010 (2).pdf ElkSiteReport Backup Material
ElkSitePrelimCostEst _02Aug2010Grass. pdf
ElkSitePrelimCostEst 02Aug2010ArtifTurf (2).pdf
ElkSiteDevel Plan Map. Rdf
ElkSiteGrass
ElkSiteTurf
ElkSiteMap
Backup Material
Backup Material
Backup Material
Yorba Linda
Water District
STAFF REPORT
DATE: August 2, 2010
TO: STEVE CONKLIN
FROM: HANK SAMARIPA
SUBJECT: PROPOSED DEVELOPMENT OF ELK MTN RESERVOIR SITE FOR YOUTH SPORTS FIELD
Background
In the early 1990s, as a condition in its development agreement with the District, Vista del Verde
Development provided $300,000 to the District to help establish a community park on the District's Elk
Mountain Reservoir site. Recently, District staff initiated discussions with local representatives for youth
soccer and baseball organizations located in the eastern portion of the Yorba Linda community. The
purpose of the discussions was to determine if they have an interest in the use of the reservoir site, with
modest improvements, for practice fields for the youngest age groups.
Those representatives indicated that they were very interested in the site for practice fields. Based on
this response, District staff prepared preliminary cost estimates for two variations on modest
improvements to the site, which would include a grass field (natural or artificial), grading and drainage,
irrigation system for a natural grass field, chain -link fencing around the field, asphalt -paved parking lot
for about 10 cars, and other minor improvements. The two estimates are attached, the first based on
providing a natural -grass field, and the second based on providing an artificial -turf field. See attached
sketch showing a preliminary plan for development of 57,000 square foot (about 1.3 acres) playing field.
Preliminary Cost Estimate
Based on the preliminary information at hand, and general cost quotes from suppliers, it is estimated
that a natural -grass field may cost in the range of $271,000, and the same -sized artificial -turf field may
cost in the range of $738,000. These costs include 10% for design costs, and 10% contingency. Thus,
the added cost to provide a field with artificial turf versus natural grass is estimated to be $738,000-
$271,000 = $467,000.
However, there are potential savings with artificial turf. These savings would be the avoided costs
associated with maintaining a natural -grass field, which includes mowing, irrigation and fertilizer. As
shown on the attached cost estimate, the estimated cost to maintain and irrigate the natural -grass field
may be in the range of $19,000 per year. Therefore, the potential payback for the added cost of
providing a field with artificial turf would be the added cost for construction divided by the annual
savings for reduced maintenance cost, which is $467,000/$19,000 per year, which equates to a payback
of 24+ years. Note that this very simple payback analysis is based on preliminary cost data and assumes
that there are no annual costs to maintain an artificial -turf field.
If the District was to invest this extra cost into the project, it would save approximately 1.3 million
gallons of water annually that would otherwise be used for irrigation with a grass field. This would be a
strong affirmation by the District of its commitment to water conservation. The District would also be
providing a larger -scale demonstration project for artificial turf and its benefit for water conservation.
The proposed project for modest development for practice fields for local community sports
organizations would demonstrate the District's desire to provide dual -use of its facilities, with the
proviso that use would be controlled and limited to local recreational groups that provide all necessary
insurance and indemnification. The issue at hand is to determine how much the District is willing to
invest at this site, keeping in mind that proceeding with dual use could potentially lead to requests for
the District to improve other sites for dual use.
Preliminary Construction Cost Estimate -- Natural Grass
Elk Mountain Site Youth Sports Field
2- Aug -10
Item
Units
Unit Cost
Cost
Chain link fence
780 Lf.
$55 /LF
$
43,000 *
15'Sliding gate
1
$ 2,500
$
2,500
Grading /Drainage
57,000 SF
$1 /SF
$
57,000
Natural grass
57,000 SF
$0.75/SF
$
42,750 *
Irrigation
57,000 SF
$0.43/SF
$
25,000 *
Asphaltic Concrete
7,000 SF
$7 /SF
$
49,000
Retaining Wall
100 Lf.
$30 /Lf.
$
3,000
Signage
4
$250 EA
$
1,000
Sub Total of Construction
Costs
$
223,250
Design Cost Estimate (10
%)
$ 22,750
Sub Total
$
246,000
Contingency (10 %)
$ 25,000
Total Cost Estimate - Natural
Grass
$
271,000
*Preliminary Cost Quote from contractor or supplier
Estimated Maintenance Expenses for 57,000 SF natural grass sports field
Mowing one time per week- 3 hrs. @ $30 =$90 x 52 wks. = $4700 /yr.
Water consumption: 3 AF /AC per yr x 1.3 acres = 1,280,000 gal /yr = 1713 units
Annual water cost: 1713 units x $2.52 per unit = $4300 /yr
Lawn food and weed abatement: $10,000 /yr.
Total Estimated Maintenance Expenses per year:
Comment or Description of Estimate
8 ft. high coated chain link fence
8 ft. coated 15' wide sliding chain link gate
Include rough grading, 6" rock base, water barrier,
drain pipe. Slope 1/2 % per ft. min.
Natural sod - hybrid bermuda Tifgreen
Designed for athletic fields, soccer and baseball.
Commercial sprinkler installation with Smart Controller
Asphalt pavement for 10 parking spaces at entrance
30" high retaining wall at entrance to parking lot.
Miscellaneous allowance for signage to field.
Annual Cost
$4,700
$4,300
$10,000
$19,000
Preliminary Construction Cost Estimate -- Artificial Turf
Elk Mountain Site Youth Sports Field
2- Aug -10
Item
Units
Unit Cost
Cost
Comment or Description of Estimate
Chain link fence
780 LF.
$55 /LF
$
43,000 *
8 ft. high coated chain link fence
15'Sliding gate
1
$2,500 EA
$
2,500
8 ft. coated 15' wide sliding chain link gate
Grading /Drainage
57,000 SF
$4.50 /SF
$
260,000 *
Include rough grading, 6" rock base, water barrier,
drain pipe, curb & gutter. Slope 1/2 % per ft min.
Artificial Sod
57,000 SF
$4.25/SF
$
250,000 *
A -Turf Sod manufacture Mo. A -Turf Premier -RS -XP
Designed for athletic fields, soccer and baseball.
Asphaltic Concrete
7,000 SF
$7 /SF
$
49,000 *
Asphalt pavement for 10 parking spaces at entrance
Retaining Wall
100 Lf.
$30 /Lf.
$
3,000
30" high retaining wall at entrance to parking lot.
Signage
4
$250 EA
$
1,000
Miscellaneous allowance for signage for field.
Greens Groomer
1
$1,500 EA
$
1,500 *
Artifical sod groomer
Sub Total of Construction Costs
$
610,000
Design Cost Estimate
(10 %)
$ 61,000
Sub Total
$
671,000
Contingency (10 %)
$ 67,000
Total Cost Estimate - Artificial Turf
$
738,000
Notes:
1. *Preliminary cost quote from contractor or supplier.
2. Estimate assumes minimal maintenance expenses and no irrigation system.
3. Information indicates that surface temperature of artificial turf may exceed 120 F, making it unusable at times.
o
t 11
tot
O
90j Lx v/
W V,11-
l
14
�4
� rl
\�pVlgi ?2AtCTtCC rInD5
fk ,NbuNrA9J
wof
L•
ITEM NO. 4.2
AGENDA REPORT
Meeting Date: August 5, 2010
Subject: Monthly Groundwater Producers Meeting Report
ATTACHMENTS:
Name: Description: Type:
GWP MtgNotes 14July10.pdf GWP Meeting Report for July 2010 Backup Material
0 Yorba Linda
Water District
MEMORANDUM
DATE: July 15, 2010
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Pat Grady, Assistant General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
SUBJECT: Groundwater Producers Meeting, July 14, 2010
John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on July 14
at OCWD. A summary of each item discussed is as follows:
1. Water Quality Update. OCWD provided an update on proposed Public Health
Goals (PHGs) for Methoxychlor (0.09 parts per billion [ppb]), Selenium (30 ppb),
and Chromium -six (60 parts per trillion). None are a concern in the Orange
County groundwater basin. ( Methoxychlor is a pesticide that has not been
approved for use in California since 1995.)
2. Annexation Process Update. OCWD reported that on July 14 the OCWD
Water Issues Committee supported the staff recommendation that the Board
consider approval of the Memorandum of Understanding with Anaheim, IRWD
and YLWD for annexation, which will initiate the process for the preparation of
the EIR. If approved by the Board on July 21, staff will conduct Annexation
Workshops, approximately every other month, to consider the issues and
concerns of the Groundwater Producers on such topics as CEOA Process and
Annexation Policy, Water Resources and Financial Impacts. The workshops will
proceed in parallel with the preparation of the EIR. It is anticipated by OCWD
staff that the workshops and EIR preparation will take one year or more to
complete. Thereafter, there would be preparation of the Annexation Agreement,
adoption of the EIR, and preparation of the LAFCo resolution. LAFCo approval
and annexations would follow.
3. BEA Exemption Program for Water Quality Projects. OCWD provided a list
of six projects in the above program, under which the four participating agencies
may produce groundwater requiring treatment, with the production not subject to
the Basin Production Percentage (BPP). Groundwater production under the
exemption program is typically 23,000 afy, but may theoretically be as high as
38,000 afy under existing agreements. This equates to 8% to 13% of current
1
basin pumping, over and above the existing 296,000 afy at 62% BPP. [As an
aside, the proposed additional pumping from the basin from the proposed
annexation by Anaheim, IRWD and YLWD will be 9,361 afy at 62% BPP.
Pumping under the existing BEA Exemption Program is about 2.5 times more
than that for the proposed annexations.] OCWD will examine the existing
exemption program in a Board workshop in August 2010. They will consider
means to reduce the exempt pumping, such as adding sunset clauses, reducing
the amount of pumping exempted, and eliminating projects that are not meeting
objectives.
4. Future BPP and RA Projections. OCWD will provide more information next
month, but in general, the BPP will probably remain in the range of 62% and the
RA may increase at a rate of 5% per year in the near future. They noted that
increasing demand on the basin will be offset by increasing recharge, allowing
the BPP to remain relatively stable.
5. Update on Alamitos Seawater Barrier Project. OCWD reported that recent
studies have found increased salinity in monitoring wells, indicating seawater
passing the existing injection wells into Orange County. Increased salinity was
detected within 2,000 ft of three production wells, operated by the City of Seal
Beach and Golden State Water Company. More injection wells and more
injection water are proposed to mitigate, though the supply pipeline is nearing its
capacity. About half of the existing injection supply is recycled water (3,000 afy).
6. Update on North Basin VOC and MTBE Lawsuits. The groundwater basin
area impacted by VOC and MTBE contamination is west of the 57 Fwy and north
of the 91 Fwy, in Anaheim and Fullerton. The remediation project will consist of
five extraction wells drawing from the plumes, pipelines, a centralized treatment
plant, and injection of the treated water. OCWD is proceeding with design and
construction of the project, and has sued the identified responsible parties for
reimbursement of costs. The lawsuits and counter -suits will take years to settle.
7. Classification of Reclaimed Water with respect to the Annual BPP. The
City of Buena Park is pursuing grant funding for a project to bring recycled water
from LA County into Orange County. However, the project is not cost effective if
recycled water continues to be counted as supplemental water, reducing the
proportional take of groundwater. The city wants a change so that they can take
their full allotment of groundwater and reduce their more - expensive Met -water
use. OCWD commented that they will review this, but noted that any change will
impact how all other recycled water is used and counted by others as well.
8. MWD Storage Account. OCWD noted that they just received a request from
MWD for OCWD to receive and recharge 16,000 of under the existing
Conjunctive Use Program, for potential future use. OCWD will be recharging 90
cfs for three months for MWD.
2
ITEM NO. 4.3
AGENDA REPORT
Meeting Date: August 5, 2010
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Name: Description: Type:
CIP Rept Aug10.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2010
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Highland Reservoir
Hydrotest and Bacti sampling
Under -drain to be installed
On schedule with no significant
Budget: $11,200,000 Job No. 200309
results acceptable. Reservoir
and backfilled. Ops Dept. to
issues outstanding.
Project Contact: Joe Polimino
placed online July 15. Electrical
monitor reservoir and controls,
Planned Completion Date: August 2010
controls tested and approved.
and determine when to remove
temp tanks from service.
2
Hidden Hills Res & Santiago BPS
Complete and placed online
Coordinate with Edison to
Punch list being finalized.
Budget: $7,000,000 Job No.200028
June 30. Completed backfilling
energize. Electrical controls to
Project Contact: Joe Polimino
and final grading. Access road
be tested and finalized at the
Planned Completion Date: July 2010
and Hidden Hills Road paved.
reservoir and Santiago BPS.
3
Vista del Verde Valve Replacement
Phase 1 construction completed
Pay Contractor's final invoice
Construction on schedule &
Budget: $1M Job No. 200908
July 21. Both City and District
and plan to combine Phases 2,
complete. Change order = $1,267
Project Contact: Derek Nguyen
are very happy with the
3 and Emergency Pump Out
including permit fees, additional
Planned Compl. Date: July 2010 (Ph. 1)
Contractor's performance.
Facilities into one project.
cathodic protection and labor.
4
Wells 1, 5 and 12 Upgrade
W -12 electric conversion nearly
W -12 new pump to be
New W -5 test pumped at 2,200
Budget: $190,000 Job No. 200813
complete. W -5 gas engine
installed in August. W -5
GPM. Developing plan of action
Project Contact: Anthony Manzano
refurbishment underway.
dampener and new drive shaft
for Well No. 1.
Project Completion: TBD
to be installed by mid- August.
5
Well 20
Wellhead Equipping design
Wellhead Equipping 90%
Pumping capacity designed for
Budget: $2,000,000 Job No.200711
PDR completed and reviewed
plans & 50% specs due late
3,000 GPM.
Project Contact: Anthony Manzano
by staff. 50% design plans
August.
Planned Completion Date: TBD
reviewed.
IN DESIGN
Project
Current Status
Next Actions
Comments
1
OC -51 Connection Upgrade
MWD proposed administrative
Review proposed MWD costs,
Staff to review overall project costs
Budget: $242,000 Job No. 200815
& inspection fees = $160,700.
design engineering costs and
with GM to determine if project is
Project Contact: Derek Nguyen
Staff & consultant reviewing
est. construction costs.
economically beneficial.
Planned Completion Date: TBD
cost proposal.
2
Highland Booster Station Upgrade
Received 9 bids, low -bid
Recommending award to PHC
Issue Notice to Proceed about
Budget: $5,000,000 Job No. 200814
contractor is Pacific Hydrotech
at August 5 PEO. Proposed
August 301'. Tentative construction
Project Contact: Hank Samaripa
Corp at $4.5M. Bid documents
award by Board on Aug 12.
mobilization Sept 20 for 13 -month
Planned Completion Date: Nov 2011
and references ok.
construction.
3
Anaheim Intertie Connection
Anaheim approved installation
Issue Amendment No.I to
Solicit proposals for construction to
Budget: $250,000 (YLWD Share)
of control valve to deliver
Steve Andrews Engr. PSA for
four approved contractors with
Job No. 200906
emergency fire flow demands
revising plans at Willow
work experience with Anaheim and
Project Contact: Hank Samaripa
in Willow Woods Drive.
Woods Drive intertie.
YLWD.
Planned Completion Date: Nov 2010
4
Ohio St Pipeline Replacement Project
Board approved addition of
Preliminary layout to be
Anticipate design completion for
Budget: $530,000 Job No. 201005
Oriente Drive pipeline
reviewed with City. 90% plans
combined Ohio /Oriente pipeline
Project Contact: Anthony Manzano
replacement. Consultant
and specs expected to be
replacement in October 2010.
Planned Completion Date: TBD
completing preliminary plans.
complete within 2 -3 months.
5
Emergency Pumpout Facilities
Completed design plans and
Staff to combine this project
Plan coordination meeting to
Budget: $120,000 Job No. 200903
specs. City and staff reviewed
with VDV Valve Replacement
determine logistical requirements to
Project Contact: Derek Nguyen
project documents on June 23.
phases 2 & 3.
combine the three projects. Bid
Planned Completion Date: TBD
documents scheduled for release in
September 2010.
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Fairmont Site Improvements
Shapell verbally agreed with
Complete internal review and
Pursue agreement from Shapell in
Budget: TBD
District taking over design and
make recommendations for
lieu of site design and partial
Job No. 200803
construction. Sent draft
layout and site improvements.
payment for construction of site
Project Contact: Hank Samaripa
agreement conditions to
improvements.
Planned Completion Date: TBD
Shapell for review.
2
Recycled Water Study
Consultant reviewing supply
Begin preparation of 50% +
Project due date for draft report is
Budget: $1,800,000 Job No. 200807
and demand data to make
draft report. Report to include
end of September 2010.
Project Contact: Derek Nguyen
recommendation on project
recommended sites and
Planned Completion Date: TBD
feasibility.
potential treatment process.
3
West Wellfield Project
Investigating additional
Review hydrogeology data and
May retain a Property Acquisition
Budget: $9,000,000 Job No.
potential well sites east of
contact land owners to
Firm for assistance.
Project Contact: Anthony Manzano
Tustin Avenue
determine if there is interest in
Planned Completion Date: TBD
selling small site for well.
4
Sewer Master Plan
Flow monitoring report
Consultant to refine and
Modeling expected to be complete
Budget: $350,000 Job No. 200916
complete. Reviewed draft
complete model and start
by late summer 2010.
Project Contact: Anthony Manzano
model and preliminary
master plan report.
Planned Completion Date: Oct. 2010
analysis with consultant.
5
Lakeview Grade Separation
Preliminary pipeline relocation
Design submittal remains on
Awaiting OCTA final decision to
Budget: TBD Job No. 201002
alignment finalized.
hold pending OCTA Board
determine agency financially
Project Contact: Anthony Manzano
approval to resume work.
responsible for pipe relocation.
Planned Completion Date: Sept. 2013
6
YL Blvd. Booster Station
Met with MWD reps on site
Gather all utility substructure
Pursue response from City. Finalize
Budget: TBD Job No. 200817
and obtained their comments.
drawings to determine future
RFP for design consultant.
Project Contact: Hank Samaripa
Awaiting City of YL response
pipeline alignment to new
Planned Completion Date: Dec 2011
re proposed location.
pump station.
7
Elk Mountain Site Improvements
Drafted development options.
Discuss potential site
Review insurance documents of
Budget: $300,000 Job No. 200522
Received responses from
development options with PEO
soccer organizations and determine
Project Contact: Hank Samaripa
youth teams.
committee.
if there are liabilities or other issues
Planned Completion Date: Dec 2011
of concern.