HomeMy WebLinkAbout2025-03-27 - Board of Directors Meeting Agenda Packet
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Thursday, March 27, 2025, 8:30 AM
1717 E Miraloma Ave, Placentia CA 92870
1. PARTICIPATION INSTRUCTIONS
This meeting will be held in person. For public convenience, the meeting can also be accessed via
internet-based service or telephone as indicated below. For questions regarding participation, please call
the Board Secretary at (714) 701-3020.
Computer/Mobile Device: https://us06web.zoom.us/j/82024059298
Telephone: (669) 444-9171 or (669) 900-6833
Meeting ID: 820 2405 9298
2. CALL TO ORDER
3. PLEDGE OF ALLEGIANCE
4. ROLL CALL
5. ADDITIONS/DELETIONS TO THE AGENDA
Items may be added to the agenda upon determination by a two-thirds vote of the Board, or a
unanimous vote if only three Directors are present, that there is a need to take immediate action which
came to the District's attention subsequent to the agenda being posted. (GC 54954.2(b)(2))
6. AB 2449 TELECONFERENCE REQUESTS
7. PUBLIC COMMENTS
Any individual wishing to address the Board (or Committee) is requested to identify themselves and state
the matter on which they wish to comment. If the matter is on the agenda, the Chair will recognize the
individual for their comment when the item is considered. No action will be taken on matters not listed on
the agenda. Comments are limited to three minutes and must be related to matters of public interest
within the jurisdiction of the Water District. (GC 54954.3)
8. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action
of the Board (or Committee) at the meeting, such as technical presentations, drafts of proposed policies,
or similar items for which staff is seeking advice and counsel. Time permitting, it is generally in the
District’s interest to discuss these more complex matters at one meeting and consider formal action at
another meeting. This portion of the agenda may also include items for information only.
8.1. Fiscal Year 2025-26 Budget Workshop #2
8.2. Fiscal Year 2025-26 Proposed Water & Sewer Customer and Developer Fees
9. CLOSED SESSION
The Board may hold a closed session on items related to personnel, labor relations and/or litigation. The
public is excused during these discussions.
9.1. Conference with Legal Counsel - Existing Litigation
Pursuant to Paragraph (1) of Subdivision (d) of Section 54956.9 of the California
Government Code
Name of Case: Mike Bubalo Construction Co., Inc./Pascal & Ludwig
Constructors, Inc. v. Yorba Linda Water District (OCSC - Case No. 30-2025-
01461247-CU-BC-CJC)
Page 1 of 55
9.2. Conference with Labor Negotiators
Pursuant to Section 54957.6 of the California Government Code
Agency Designated Representatives: Mark Toy, General Manager, and Lori
Thompson, Human Resources and Risk Manager
Employee Organization: Yorba Linda Water District Employees Association
9.3. Conference with Labor Negotiators
Pursuant to Section 54957.6 of the California Government Code
Agency Designated Representatives: Mark Toy, General Manager, and Lori
Thompson, Human Resources and Risk Manager
Unrepresented Employees: All Unrepresented Classifications
10. REPORT FROM CLOSED SESSION
11. ADJOURNMENT
11.1. The next regular Board meeting is scheduled Thursday, April 10, 2025 at 8:30
AM.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Non-exempt materials related to open session agenda items that are distributed to a majority of the Board of
Directors (or Committee Members) less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District’s Administrative building located at 1717 E Miraloma Ave, Placentia
CA 92870 during regular business hours. When practical, these materials will also be posted on the District’s
website at https://ylwd.com/. (GC 54957.5)
Accommodations for the Disabled
Requests for disability-related modifications or accommodations, including auxiliary aids or services, required for
participation in the above-posted meeting should be directed to the Board Secretary at (714) 701-3020 at least 24
hours in advance. (GC 54954.2(a))
Page 2 of 55
ITEM NO. 8.1.
AGENDA REPORT
MEETING DATE: March 27, 2025
TO: Board of Directors
FROM: Mark Toy, General Manager
STAFF CONTACTS: Christine McIlrevey, Finance Manager
SUBJECT: Fiscal Year 2025-26 Budget Workshop #2
Staff will present and discuss the proposed Fiscal Year 2025-26 budgets for Revenue, Production &
Variable Costs, and Supplies & Services.
ATTACHMENTS:
1. Slide Deck - FY25-26 Budget Workshop 2
Page 3 of 55
FY2025-26 Budget
Workshop 2
March 27, 2025
3/27/2025 1Page 4 of 55
Overview
•Summary of FY2025-26 Budget
Operating Revenue
•Summary of Proposed Rates
•Revenue
Operating Expenses
•Production
•Variable Costs
•Supplies & Services
3/27/2025 2Page 5 of 55
Summary of
FY2025-26 Budget
3/27/2025 3Page 6 of 55
Financial Summary - Consolidated
Revenue Prior Year
FY2023-24
Projections
FY2024-25
Budget
FY2025-26
Revenue (Operating) $ 48,331,727 $ 56,172,319 $ 60,601,786
Revenue (Non-Operating)
Total Revenue
Rate Study Assumptions
Variance %
3/27/2025
Expenses
Expenses (Operating):
Variable Costs $ 16,900,164 $ 21,002,102 $ 21,321,363
Salary Related Expenses
(Less Capitalized Labor)
Supplies & Services 8,769,143 9,722,737 10,796,582
Expenses (Non-Operating)
Total Expenses
Rate Study Assumptions
Variance %
Net Position Before Capital Contributions &
Depreciation
Capital Contributions
Depreciation
Total Change to Net Position
4Page 7 of 55
Summary of
Proposed Rates
3/27/2025 5Page 8 of 55
FY2025-26 Proposed Rates
3/27/2025 6
Meter
Size
Monthly
Service
Charge
5/8 $ 39.05
3/4 $ 39.05
1 $ 60.61
1 1/2 $ 115.49
2 $ 180.99
3 $ 388.47
4 $ 694.19
6 $ 1,753.35
Meter
Size
Annual Capital
Finance
Charge
5/8 $ 96.36
3/4 $ 96.36
1 $ 160.56
1 1/2 $ 320.64
2 $ 512.52
3 $ 1,120.68
4 $ 2,016.48
6 $ 5,121.00
Commodity
Rate
$ 3.74
Water Rates 9%
Sewer Rates 9.3%
Meter
Size
Monthly
Private Fire
Protection
Charge
4 $ 11.11
6 $ 29.06
8 $ 60.06
10 $ 106.69
Meter Type Monthly Service
Charge
Residential – SFR $ 15.05
Residential Master Metered –
MFR $ 14.48
Commercial $ 15.05
Tier Usage Rates
Tier 1 (0-7 ccfs per month)$ 0.00
Tier 2 (8+ ccfs per month)$ 0.61
Commodity
Rate
Plus Pass-
Through
$ 4.11
Pass-Through
$ 0.37
Page 9 of 55
3/27/2025 7
Billing
FY2024-25
w/ 9% Wtr & 15% Swr Adj
With Pass-Through $0.34
FY2025-26
w/ 9% Wtr & 9.3% Swr Adj
With Pass-Through $0.37
Monthly Water Related Charges $119.97 $130.48
Monthly Sewer Related Charges $13.77 $15.05
Capital Finance Charge (CFC)$12.27 $13.38
Avg Monthly Bill w/ CFC (17 units)$146.01 $158.91
Percentage increase of 8.8%
Cost increase of $12.90
Effect on Customer Bill
Current Assumptions
Page 10 of 55
Revenue
3/27/2025 8Page 11 of 55
Retail Water Consumption
3/27/2025 9
FY2025-26 Budget Calculation
Retail water consumption is calculated from historic trends and production demand. “PT” is Pass-Through.
Prior Year
FY2023-24
Projected
FYE2024-25
Budget
FY2025-26
Consumption (CCF) 6,443,548 7,605,355 7,362,786
Consumption in Acre-Feet 14,792 AF 17,459 AF 16,903 AF
Revenue ($) $ 20,363,484 $ 28,447,649 $ 30,012,591
Consumption Unit Price $ 3.14 + PT $ 0.31 = $ 3.45 $ 3.43 + PT $ 0.34= $ 3.77 $ 3.74 + PT $ 0.37 = $ 4.11
AF: Acre-Feet
CCF: Centum cubic feet
(100 cubic feet)
CC
F
Prior Year
FY2023-24
Projected
FY2024-25
Budget
FY2025-26
$5.5M
$6.0M
$6.5M
$7.0M
$7.5M
$8.0M
14,792 AF
6,443,548CCF
17,459 AF
7,605,355CCF
16,903 AF
7,362,786CCF
16,943 AF
7,380,219CCF
16,943 AF
7,380,219CCF
16,943 AF
7,380,219CCF
Retail Consumption
Consumption (CCF)2021 Rate Study Assumptions
Page 12 of 55
Revenue Analysis
3/27/2025 10
17,332,568 1,884,552 3,622,962 15,999,358 3,526,631 3,585,075 417,051 1,950,873
21,421,085 2,105,117 4,921,445 17,546,715 3,890,245 4,252,641 468,797 1,566,272
22,584,477 2,376,634 5,195,174 19,164,365 4,260,742 4,672,028 512,395 1,835,971
FY24 Prior Year
FY25 YE Projections
FY26 Budget
Water Revenue
(Res.)
Water Revenue
(Comm & Fire)
Water Revenue
(Irrigation)Service Charges Property Tax - CFC Sewer Charge
Revenue
Sewer Parcel
Assmnt
Other Operating
Revenue
$0.0M
$2.0M
$4.0M
$6.0M
$8.0M
$10.0M
$12.0M
$14.0M
$16.0M
$18.0M
$20.0M
$22.0M
$24.0M
Page 13 of 55
Production
3/27/2025 11Page 14 of 55
Production Demand
3/27/2025 12
Prior Year
FY 2023-24
Projected
FY 2024-25
Budget
FY 2025-26
Production Demand 16,900 19,474 18,709
2021 Rate Study Assumption 18,416 18,416 18,416
Total Production Demand
Ac
r
e
-
F
e
e
t
Prior Year
FY 2023-24
Projected
FY 2024-25
Budget
FY 2025-26
22,000.0
20,000.0
18,000.0
16,000.0
14,000.0
12,000.0
10,000.0
8,000.0
6,000.0
4,000.0
2,000.0
0.0
14,765.6 16,553.0 15,612.8
2,134.7
2,920.6 3,095.7
18,416.0 18,416.0 18,416.0
Ground Water Import Water 2021 Rate Study Assumptions
Page 15 of 55
Production Demand
(Rate Study Comparison)
3/27/2025 13
Prior Year
FY 2023-24
Projected
FY 2024-25
Budget
FY 2025-26
Ground Water 14,765.6 16,553.0 15,970.5
Import Water 2,134.7 2,920.6 2,738.0
Total 16,900.3 19,473.6 18,708.5
Historic & Future Demand
2021 Rate Study Assumptions
Ground Water %87%85%85%
Import Water %13%15%15%
FY 2023-24 FY 2024-25 FY 2025-26
Ground Water 13,812.0 13,812.0 13,812.0
Import Water 4,604.0 4,604.0 4,604.0
Total 18,416.0 18,416.0 18,416.0
Ground Water %75%75%75%
Import Water %25%25%25%
Page 16 of 55
Variable Costs
3/27/2025 14Page 17 of 55
Variable Costs Detail
(Rate Study Comparison)
3/27/2025 15
2021 Rate Study Assumptions
Prior Year
FY 2023-24
Projections
FY 2024-25
Budget
FY 2025-26
Groundwater Purchases $ 9,187,162 $ 11,388,464 $ 11,355,025
OCWD Annexation Fee 717,261 722,639 764,977
Power Costs 3,003,259 3,471,297 3,542,430
Import Water Purchases 2,502,822 3,754,750 3,830,536
MWDOC Fixed Costs 1,489,661 1,664,952 1,828,395
$ 16,900,164 $ 21,002,102 $ 21,321,363
Historic & Future Variable Costs
FY 2023-24 FY 2024-25 FY 2025-26
Groundwater Purchases $ 7,138,127 $ 7,280,890 $ 7,426,508
OCWD Annexation Fee 553,395 564,462 575,752
Power Costs 1,414,839 1,485,581 1,559,860
Import Water Purchases 5,719,737 6,005,724 6,306,010
MWDOC Fixed Costs 882,718 909,200 936,476
$ 15,708,816 $ 16,245,857 $ 16,804,606
Rate Study Assumptions $ 1,191,348 $ 4,756,245 $ 4,516,757
Variance %7.6%29.3%27%
Variance from Assumptions
Page 18 of 55
Variable Costs - Budget Calculation
3/27/2025 16
FY2025-26 Budget Calculation
Variable costs are set by our operating plan. They are then calculated by the rates and fixed costs
received from OCWD and MWDOC. Power is calculated from historical trends in cost by acre-feet and
the proposed cost increases from our utilities providers.
Variable Cost Prior Year
FY 2023-24
Projected
FY 2024-25
Budget
FY 2025-26
OCWD Replenishment Assessment (ground water)$624/AF $688/AF $711/AF
Variance %15%10%3%
Metropolitan Treated Water Rate (imported water)$1,209/$1,256/AF $1,256/$1,395/AF $1,395/$1,528/AF
Variance %4%11%9.5%
OCWD Annexation $717,261 $722,639 $764,977
Variance %4%1%6%
MWDOC Fixed Costs – Connection Fee $343,724 $376,080 $389,531
Variance %11%9%4%
MWDOC Fixed Costs – Capacity Fee $326,830 $359,616 $430,212
Variance %1%10%19%
MWDOC Fixed Costs – Readiness to Serve Fee $819,106 $929,256 $1,008,651
Variance %57%13%9%
Power $3,003,259 $3,471,297 $3,542,430
Variance %1%15%2%
Historic & Future Variable Costs
The variance % is the increase/decrease from the previous year.
Page 19 of 55
Variable Costs - Budget Calculation (continued)
3/27/2025 17
Variable Cost % Increase Per
Year FY 2023-24 FY 2024-25 FY 2025-26
OCWD Replenishment Assessment
(ground water)2%$517/AF $527/AF $538/AF
Metropolitan Treated Water Rate
(imported water)5%$1,217/$1,278/AF $1,278/$1,342/AF $1,342/$1,409/AF
OCWD Annexation 2%$553,395 $564,462 $575,752
MWDOC Fixed Costs – Connection Fee 3%$337,281 $347,400 $357,822
MWDOC Fixed Costs – Capacity Fee 3%$233,600 $240,608 $247,826
MWDOC Fixed Costs – Readiness to Serve Fee 3%$311,837 $321,192 $330,828
Power 5%$1,414,839 $1,485,581 $1,559,860
2021 Rate Study Assumptions
Variable Cost FY 2023-24 FY 2024-25 FY 2025-26
OCWD Replenishment Assessment (ground water)21%31%32%
Metropolitan Treated Water Rate (imported water)-2%4%8%
OCWD Annexation 30%28%33%
MWDOC Fixed Costs – Connection Fee 2%8%9%
MWDOC Fixed Costs – Capacity Fee 40%50%74%
MWDOC Fixed Costs – Readiness to Serve Fee 163%189%205%
Power 112%134%127%
The variance % is the increase/decrease from actuals to rate study.
Page 20 of 55
Supplies &
Services
3/27/2025 18Page 21 of 55
Prior Year
FY2023-24
Projected
FYE2024-25
Budget
FY2025-26
$.0M
$2.0M
$4.0M
$6.0M
$8.0M
$10.0M
$12.0M
Total:
$8,769,143
Total:
$9,722,737
Total:
$10,796,582
$ 7,082,671
$ 7,231,018
$ 7,382,668
Supplies & Services
Combined 2021 Rate Study Assumptions
Supplies & Services
(Rate Study Comparison)
2021 Rate Study AssumptionsHistoric & Future
3/27/2025 19
Supplies & Services
Prior Year
FY2023-24
Projected
FYE2024-25
Budget
FY2025-26
Combined $ 8,769,143 $ 9,722,737 $ 10,796,582
Supplies & Services FY2023-24 FY2024-25 FY2025-26
Combined $ 7,082,671 $ 7,231,018 $ 7,382,668
Variance from Assumptions
Rate Study Variance $ $ 1,686,472 $ 2,491,719 $ 3,413,914
Rate Study Variance %24%34%46%
Page 22 of 55
Supplies & Services Analysis (group 1)
3/27/2025 20
Variances Explanations for Impactful Expenses – 2025 Projections to 2026 Budget
Contractual Services – The decrease of 2% is primarily due to a reduction in class & compensation study costs as most of the work
for the study is anticipated to be completed in FY 2024-25.
Data Processing – The increase of 15% is primarily due to a new hydraulic modeling software ($50,000) and other allocations of
purchased software from consultants.
Dues & Memberships – The increase of 9% from FY25 Projections is due to increased current membership fees and one new
membership of $5,000.
0 187,568 629,988 273,426 40,292 94,857
0 283,440 837,879 495,796 72,795 123,637
0 282,765 823,850 572,217 69,345 134,415
99,919 268,319 589,418 361,758 51,970 111,231
2024 Actuals
2025 Projection
2026 Budget
2021 Rate Study
Board Election Communications Contractual
Services Data Processing District Meetings &
Events
Dues &
Memberships
$ -
$ 500,000
$ 1,000,000
$ 1,500,000
$ 2,000,000
$ 2,500,000
$ 3,000,000
$99,919
$268,319
$589,418
$361,758
$51,970 $111,231
FY24 Actuals, FY25 Projections, FY26 Budget
Page 23 of 55
Supplies & Services Analysis (group 2)
3/27/2025 21
Variances Explanations for Impactful Expenses – 2025 Projections to 2026 Budget
Insurance – The increase of 27% is due to higher cost of liability and property insurance.
Maintenance – The increase of 13% is primarily due to the City of Yorba Linda paving project which was reduced in FY 2024-25 and
more of the work is anticipated to be completed in FY 2025-26.
Materials – The increase of 49% is primarily due to resin changeouts of the PFAS treatment plant vessels. There are 10 vessels that
are anticipated to be changed in FY 2025-26 and the contracted cost increased 22% from FY 2023 pricing.
Non Capital Equipment – The decrease of 20% is due to the laptop/desktop replacement program, with not as many to purchase in
FY 2026.
458,258 467,891 2,065,341 1,810,900 272,310 43,495
489,927 587,445 1,789,780 1,665,250 301,254 41,258
526,750 746,600 2,016,800 2,473,950 239,800 45,705
562,198 373,236 783,456 2,066,010 206,100 41,486
2024 Actuals
2025 Projection
2026 Budget
2021 Rate Study
Fees & Permits Insurance Maintenance Materials Non Capital
Equipment Office Expense
$ -
$ 500,000
$ 1,000,000
$ 1,500,000
$ 2,000,000
$ 2,500,000
$ 3,000,000
$562,198 $373,236
$783,456
$2,066,010 $206,100
$41,486
FY24 Actuals, FY25 Projections, FY26 Budget
Page 24 of 55
Variances Explanations for Impactful Expenses – 2025 Projections to 2026 Budget
Professional Services – The decrease of 15% is due to consulting services that were budgeted in FY 2025 and will not carry over into
FY 2026. Professional services that will not carry over into FY 2026 include the Well Siting Study, Santiago Reservoir stability study,
the Fairmont Reservoir structural evaluation, Highland Access Road and Green Crest Drive.
Travel & Conferences – The increase of 84% is due to travel and conferences that were budgeted but not attended in prior year due
to various factors, such as scheduling conflicts and other work priorities, including work to complete bond projects. It is anticipated
that these conferences will be attended in FY 2026.
Supplies & Services Analysis (group 3)
3/27/2025 22
42,072 1,396,426 68,463 12,390 225,940 679,526
68,995 1,820,960 73,899 22,071 229,600 818,752
80,750 1,543,070 136,270 17,735 235,600 850,960
69,761 1,068,876 53,217 10,820 246,005 418,888
2024 Actuals
2025 Projection
2026 Budget
2021 Rate Study
Professional
Development
Professional
Services
Travel &
Conferences
Uncollectible
Accounts Utilities Vehicle Expenses
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$69,761 $1,068,876
$53,217 $10,820 $246,005
$418,888
FY24 Actuals, FY25 Projections, FY26 Budget
Page 25 of 55
Anticipated Items
Budget Workshop #3
•Meeting Date: April 24th
Topics
•Salary Related Expenses
•Including OPEB and Pension
•Non-Operating
•Debt Service
•5-Year CIP (update) and Capital Outlay
•Other Key Updates
3/27/2025 23Page 26 of 55
ITEM NO. 8.2.
AGENDA REPORT
MEETING DATE: March 27, 2025
TO: Board of Directors
FROM: Mark Toy, General Manager
STAFF CONTACTS: Christine McIlrevey, Finance Manager
Sophia Phuong, Accounting Supervisor
Rosanne Weston, Engineering Manager
SUBJECT: Fiscal Year 2025-26 Proposed Water & Sewer Customer and Developer
Fees
Staff will present and discuss the proposed Fiscal Year 2025-26 Water & Sewer Customer and
Developer Fees, which include updates to the capacity fees and frontage charges.
ATTACHMENTS:
1. Slide Deck - FY25-26 Proposed Water & Sewer Development Fees
2. Water Resources Economics Memorandum - Update of Capacity Fees and Frontage Charges
Page 27 of 55
PROPOSED
CUSTOMER AND
DEVELOPER FEES
Fiscal Year
2025-26
3/27/2025 Board of Directors Workshop 1Page 28 of 55
Water
Customer And
Developer Fees
3/27/2025 2Board of Directors Workshop Page 29 of 55
Customer Service Fees
3/27/2025 Board of Directors Workshop 3
Types of Service Fees FY24-25 Fee per
Occurrence
FY25-26 Fee per
Occurrence
Fee Increase
or (Decrease)
Fee
Change %
New Account Set up Fee $50 $50 $0 -
Notice of Discontinuance $15 $15 $0 -
Shut-Off Due to Non-Payment $50 $50 $0 -
Establish Service $50 $50 $0 -
Callout After Hours $230 $230 $0 -
Tampered Lock - Residential $95 $95 $0 -
Tampered Lock - Commercial $150 $100 $(50)(33)%
Meter Removal $140 $80 $(60)(43)%
Meter Replacement
$140(Plus addt’l labor and
materials due to customer
tampering)
$135(Plus addt’l labor
and materials due to
customer tampering)
$(5)(4)%
Return Payment Fee $40 $40 $0 -
Stop Payment Of District
Check $25 $25 $0 -
Page 30 of 55
Customer Service Fees (Continued)
3/27/2025 Board of Directors Workshop 4
Types of Service Fees FY24-25 Fee FY25-26 Fee Fee Increase
or (Decrease)
Fee
Change %
Water Meter Testing Fee
$145 (Plus cost of
independent
laboratory testing if
applicable)
$150 (Plus cost of
independent
laboratory testing if
applicable)
$5 3%
Residential Customer Deposit
Potential of Risk “Green”$0 per Meter $0 per Meter $0 -
Potential of Risk “Yellow”$180 per Meter $200 per Meter $20 11%
Potential of Risk “Red”$320 per Meter $350 per Meter $30 9%
Commercial Customer Deposit
1 ½ Inch Meter & Below $880 per Meter $940 per Meter $60 7%
2 Inch Meter $1,560 per Meter $1,700 per Meter $140 9%
3 Inch Meter $3,450 per Meter $4,000 per Meter $550 16%
4 Inch and Larger Meter $3,490 per Meter $3,850 per Meter $360 10%
Page 31 of 55
New Meter Connection Fees
3/27/2025 Board of Directors Workshop 5
Meter
Size
(Inches)
FY24-25
Fee per
Meter
FY25-26
Fee Per
Meter
Fee
Increase or
(Decrease)
Fee Change
%
1 $910 $900 $(10)(1)%
1 ½$1,460 $1,480 $20 1%
2 $1,860 $1,900 $40 2%
> 2 Incurred
Costs
Incurred
Costs TBD
Construction Meter Connection Fees
Activity FY24-25 Fees FY25-26 Fees
Fee Increase or
(Decrease)
Fee
Change
%
Deposit $3,360 per Meter $3,160 per Meter $(200) per Meter (6)%
New Account Setup $20 per Occurrence $30 per Occurrence $10 per Occurrence 50%
Meter Use $9.21 per Day $8.66 per Day $(0.55) per Day (6)%
Move to a New Location $145 per Occurrence $145 per Occurrence $0 per Occurrence -
Temporary Water Service – 2X
Commodity Rate in effect
$7.54 per Unit
(Pending calculated
pass-through)
$8.22 per Unit
(Pending calculated
pass-through)
$0.68 per Unit 9%
Page 32 of 55
Miscellaneous Water Service Fees
3/27/2025 Board of Directors Workshop 6
Fee Type FY24-25 Fees FY25-26 Fees
Fee Increase or
(Decrease)
Fee
Change %
Change of Meter
Size Fee Incurred Cost Incurred Cost TBD TBD
Backflow Device
Monitoring Fee
$4.07 per
month
$4.15 per
month $.08 per month 2%
Single Service Fee $2,110 $2,450 $340 16%
Page 33 of 55
Tampering Penalties
3/27/2025 Board of Directors Workshop 7
Violation FY24-25 Penalty FY25-26 Penalty
Cost
Increase or
(Decrease)
Cost
Change %
Meter Tampering Penalties
1st
$ 1,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 1,000 + Incurred Costs of
Inspection, Repair, Calibration and
Estimated Usage
$0 -
2nd
$ 2,500 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 2,500 + Incurred Costs of
Inspection, Repair, Calibration and
Estimated Usage
$0 -
3rd
$ 5,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 5,000 + Incurred Costs of
Inspection, Repair, Calibration and
Estimated Usage
$0 -
Hydrant Tampering Penalties
1st
$ 1,000 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 1,000 + Incurred Costs of
Inspection, Repair, and Estimated
Usage
$0 -
2nd
$ 2,500 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 2,500 + Incurred Costs of
Inspection, Repair, and Estimated
Usage
$0 -
3rd
$ 5,000 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 5,000 + Incurred Costs of
Inspection, Repair, and Estimated
Usage
$0 -
Page 34 of 55
Water Service Initial Deposit Fees For More
Complex Developments
3/27/2025 Board of Directors Workshop 8
Developer Deposits allow for reimbursement to District for costs pertaining to: Plan check, Inspection,
GIS, Administrative, Legal Review and other project costs.
Additional deposits will be assessed if required to reimburse District for all project related costs. Unused
deposit funds will be refunded to the Developer upon close out of project.
Number of
Service
Connections
FY24-25
Deposit
FY25-26
Deposit
Deposit
Increase or
(Decrease)
Fee
Change %
5 or less $15,240 $15,900 $660 4%
6-10 $19,870 $19,870 $0 -
11-20 $24,790 $24,790 $0 -
21-30 $33,280 $34,210 $930 3%
31-40 $41,800 $41,920 $120 -
41-50 $47,550 $50,120 $2,570 5%
51-99 $54,070 $55,400 $1,330 2%
100 and higher $71,440 $72,810 $1,370 2%
Page 35 of 55
Water Service Capacity Fees
Adequate Water Mains Serve Property*
3/27/2025 Board of Directors Workshop 9
Meter Size
(Inches)
FY24-25
Fee per Meter
FY25-26
Fee per Meter
Fee
Increase
Fee
Change %
1 $13,900 $14,113 $213 2%
1-1/2 $27,801 $28,226 $425 2%
2 $44,481 $45,161 $680 2%
3 $97,302 $98,790 $1,488 2%
4 $175,144 $177,822 $2,678 2%
6 $361,409 $366,935 $5,526 2%
Additional Capacity fees may apply to larger developments that will utilize more facility capacity.
* Existing and adequate waterline fronting the property.
Page 36 of 55
Water Service Capacity Fees
Developer to Construct Water Mains to Serve Property*
3/27/2025 Board of Directors Workshop 10
Meter
Size
(Inches)
FY24-25
Fee per
Meter
FY25-26
Fee per
Meter
Fee Increase Fee Change
%
1 $10,045 $10,488 $443 4%
1-1/2 $20,091 $20,976 $885 4%
2 $32,146 $33,562 $1,416 4%
3 $70,318 $73,416 $3,098 4%
4 $126,573 $132,149 $5,576 4%
6 $261,182 $272,689 $11,507 4%
Additional Capacity fees may apply to larger developments that will utilize more facility capacity.
* No or inadequate waterline fronting the property. To be installed or replaced at developer’s expense.
Page 37 of 55
Sewer
Customer And
Developer Fees
3/27/2025 11Board of Directors Workshop Page 38 of 55
Sewer Single Service Fee
3/27/2025 Board of Directors Workshop 12
Fee FY24-25 FY25-26 Fee Increase or
(Decrease)
Fee
Change %
Single Service Fee $1,890 $2,120 $230 12%
FOG Fee $250 per
year $270 per year $20 8%
FOG Non-
Compliance Fee
$440 per
Occurrence
$340 per
Occurrence $(100)(23)%
FOG Mitigation Fee Actual Cost Actual Cost TBD TBD
Page 39 of 55
3/27/2025 Board of Directors Workshop 13
Violation FY24-25 Penalty FY25-26 Penalty Cost Increase
or (Decrease)
Cost
Change %
Sewer Tampering Penalties
1st
$ 1000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 1000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
2nd
$ 2500 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 2500 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
3rd
$ 5000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 5000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
Illegal Sewer System Connection Penalties
1st $ 5000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 5000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
2nd $ 10,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 10,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
3rd
$ 15000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 15000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
Sewer Tampering Penalties
Page 40 of 55
Sewer Service Initial Deposit Fees For More
Complex Developments
3/27/2025 Board of Directors Workshop 14
Developer Deposits allow for reimbursement to District for costs pertaining to: Plan check, Inspection,
GIS, Administrative, Legal Review and other project costs.
Additional deposits will be assessed if required to reimburse District for all project related costs. Unused
deposit funds will be refunded to the Developer upon close out of project.
Number of
Connections
FY24-25
Deposit
FY25-26
Deposit
Deposit Increase
or (Decrease)
Deposit
Change %
5 or less $10,700 $11,250 $550 5%
6-10 $13,250 $14,330 $1,080 8%
11-20 $21,490 $22,680 $1,190 6%
21-30 $25,410 $27,860 $2,450 10%
31-40 $30,650 $32,380 $1,730 6%
41-50 $35,690 $37,070 $1,380 4%
51-99 $42,230 $43,950 $1,720 4%
100 and higher $54,550 $55,040 $490 1%
Page 41 of 55
Sewer Service Capacity Fees
3/27/2025 Board of Directors Workshop 15
Property Class
(Various
Examples)
FY24-25
Capacity Fee
Per Connection
FY25-26
Capacity Fee
Per Connection
Fee
Increase or
(Decrease)
Fee Change
%
Single Family
Residence
$865 $1,096 $231 26.7%
Master Metered 0.82 x Number of
Units x $865
0.82 x Number of
Units x $1,096
TBD 26.7%
Commercial
Equivalent Dwelling
Unit x Total
SF/1,000SF x $865
Equivalent Dwelling
Unit x Total
SF/1,000SF x
$1,096
TBD 26.7%
Equivalent Dwelling Unit is based on one Single Family Residence.
Page 42 of 55
Frontage Charge
Adequate Sewer Mains Serve Property and Property is Not Subject to
Developer Reimbursement Program
3/27/2025 Board of Directors Workshop 16
Property Class FY24-25 Frontage
Charge
FY25-26 Frontage
Charge
Fee
Increase or
(Decrease)
Fee
Change %
Single Family
Residence
$6,305 $6,959 $654 10.4%
Master Metered Sewer Frontage
(FT)/75FT x $6,305
Sewer Frontage
(FT)/75FT x $6,959
TBD 10.4%
Commercial Sewer Frontage
(FT)/75FT x $6,305
Sewer Frontage
(FT)/75FT x $6,959 TBD 10.4%
75 Feet is average frontage of a Single Family Residence.
Page 43 of 55
Page 1
Memo
To: Rosanne Weston, Engineering Manager – Yorba Linda Water District
From: Sanjay Gaur, Founder/President – Water Resources Economics, LLC
Date: March 19, 2025
Re: Water and Wastewater Capacity Fees and Wastewater Frontage Charge Update
INTRODUCTION
Water Resources Economics, LLC (WRE) was engaged by the Yorba Linda Water District (District) in
2024 to update existing water and wastewater capacity fees and wastewater frontage charges. The
current water and wastewater capacity fees and wastewater frontage charges were established as
part of the Water & Wastewater Development Capacity Fee Study Report prepared by Raftelis on
May 22, 2023. Capacity and frontage charges were updated based on Raftelis’ report on April 5,
2024. This update follows the same methodology as the 2023 report and 2024 update, apart from
the sewer lateral methodology. In the 2023 report and 2024 update private sewer laterals were
netted out of the total wastewater system value. For this update District staff confirmed that sewer
laterals are not included in the District’s Asset Management Program (AMP) and therefore were not
netted out of the wastewater system value.
DISCLAIMER
All table values are rounded to the nearest digit shown unless stated otherwise. However, all
calculations are based on precise values. Attempting to manually recreate the calculations
described in this memo from the values displayed in the tables may therefore produce slightly
different results.
PROPOSED CAPACITY FEES
The Equity Buy-In Method was previously selected to calculate capacity fees and is still applicable
today as the existing water and sewer systems can accommodate further growth for new service
connections. Existing customers have financed the costs for the existing systems, so new
customers will be required to pay their fair share of the net equity of the systems. The first step of
the Equity Buy-In Method is to calculate the value of the water and wastewater system based on
the system’s existing capital assets. The outstanding debt principal was deducted from the value of
the water system assets. Currently the District does not have outstanding debt for the wastewater
system. Once the value of the system was calculated, the total system value was divided by the
existing demand of the system, measured in equivalent dwelling units (EDUs). The value of the
Page 44 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 2
system per EDU is allocated across different meter sizes or customer classes to arrive at the
proposed water and wastewater capacity fees.
Wastewater capacity fees were adjusted to exclude the asset value of sewer mains (frontage
sewers) that have pipe diameters 8-inch and smaller to account for customers that do not have
existing sewer mains fronting development. These customers will need to upsize an existing sewer
or construct a new sewer in front of their property to connect to the District’s sewer system and
therefore do not benefit from having an existing sewer main fronting their properties.
VALUE OF THE SYSTEM
Based on discussions with staff and consistent with the methodology used in the 2023 report and
2024 update, WRE used the Replacement Cost Less Depreciation (RCLD) method of valuing
existing capital assets. The District provided their Asset Management Program (AMP) that was most
recently updated at the end of 2024, which WRE used to calculate the RCLD values of the water
and wastewater systems. To maintain consistency with the past update, some wastewater and
water assets are excluded from the system values, including sewer manholes, sewer force mains,
water meters, and pipelines installed before 2022 excluded from the past report and update.
Private sewer laterals are not included in the AMP.
Replacement costs were estimated by escalating the current AMP replacement costs to current
day replacement costs in 2024 using the Engineering News-Record’s (ENR) 20-City Construction
Cost Index (CCI). This index tracks construction costs over 20 major US cities to account for
inflation of project costs over time. The replacement costs of all assets in the AMP installed before
or in 2018 (the year AMP was created) have already been inflated relative to 2018. These assets are
inflated consistently by 122.7% to arrive at their 2024 replacement costs based on the 2018 CCI.
For assets installed after 2018, the AMP replacement cost represents the actual project cost from
the year the asset was installed. These assets are inflated relative to the year they were installed
and the adjustment for each year to bring the replacement costs to 2024 equivalent value.
The depreciation cost of each asset is based on the 2024 replacement value and was calculated
using a straight-line method of depreciation. The total depreciation over each asset’s life up to
2024 was subtracted from the replacement cost of each asset to determine the RCLD values.
Assets that have remained in use past their useful life are considered fully depreciated with no
RCLD value.
Table 1 and Table 2 below show total 2024 replacement costs, accumulated depreciation, and
replacement cost less depreciation (RCLD) by each facility type defined in the AMP for the water
and wastewater systems. Water and wastewater pipes are split into those 8-inch in diameter and
smaller and those greater than 8-inch in diameter. Base assets refer to Richfield Headquarters
base assets as well as vehicles and equipment such as trailers, forklifts, trucks, etc.
Page 45 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 3
Table 1: Water System Assets Value
Line Facility Replacement
Project Cost 2024
Accumulated
Depreciation 2024 RCLD 2024
1 Pipes 8” and Smaller $271,985,592 $167,488,848 $105,602,977
2 Pipes Greater than 8” $251,559,285 $126,123,918 $126,149,058
3 Well Drain Line $47,986 $1,280 $46,706
4 BPS $34,571,845 $21,350,574 $15,594,987
5 Interconnection $137,161 $167,758 $27,854
6 PRS $15,937,494 $10,473,266 $6,253,367
7 Reservoir $232,016,108 $70,344,134 $162,261,298
8 Source $245,368 $223,285 $22,083
9 Well $42,030,827 $16,943,019 $26,259,828
10 Base 1 $35,636,477 $16,393,807 $20,827,605
11 Total $884,168,143 $429,509,888 $463,045,763
Table 2: Wastewater System Assets Value
Line Facility Replacement
Project Cost 2024
Accumulated
Depreciation 2024 RCLD 2024
1 Pipes 8" and Smaller $313,790,094 $134,370,058 $179,003,998
2 Pipes Greater than 8" $42,760,574 $18,310,778 $24,393,102
3 LS $833,515 $374,202 $459,312
4 Base1 $5,754,965 $2,581,945 $3,328,828
5 Total $363,139,147 $155,636,984 $207,185,240
DEBT BALANCES
In addition to the value of the water system assets, this method will also account for debt principal
balances. WRE used debt balances as December 31, 2024 to maintain consistency as shown
below in Table 3. As mentioned earlier, there is currently no debt for the wastewater system.
Table 3: Water Outstanding Debt Principal Balance
Line Existing Debt Outstanding Principal
1 2017A Revenue Bonds $21,730,000
2 2022A Revenue Bond $31,325,000
3 Total $53,055,000
1 Base assets refer to Richfield Headquarters base assets as well as vehicles and equipment such as trailers,
forklifts, trucks, etc.
Page 46 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 4
TOTAL WATER SYSTEM VALUE
To arrive at the total value of the water system, WRE subtracted the total outstanding debt principal
balance in Table 3 (Line 3) from the total RCLD water system assets value in Table 1 (Line 11). The
Total Water System Value is shown in Table 4 (Line 3).
Table 4: Total Water System Value
Line Water System Value Amount
1 Water System Assets $463,045,763
2 Less Outstanding Debt Principal ($53,055,000)
3 Total $409,990,763
TOTAL WASTEWATER SYSTEM VALUE AND BACKBONE VALUE
The Total Wastewater System Value is calculated by subtracting the debt principal balance from
the total RCLD assets value in Table 2 (Line 5). Since the debt principal balance is zero, the total
wastewater system value equals approximately $207,185,240.
The Total Wastewater System Backbone Value is utilized to calculate wastewater capacity fees. It
includes all of the RCLD assets value from Table 2, less the wastewater pipes 8-inches in diameter
and smaller. The results are shown in Table 5. Pipelines 8” and smaller represent approximately
88% of the wastewater system total pipeline mileage and are included in the “Frontage Charge”
calculation in Table 16.
Table 5: Total Wastewater System Backbone Value
Line Wastewater System Value Amount
1 Wastewater System Assets Value $207,185,240
2 Less Pipelines 8" and Smaller $179,003,998
3 Total Wastewater System Backbone Value $28,181,242
CURRENT DEMAND
Capacity is expressed in terms of demand on the system in EDUs rather than the number of service
connections.
For the water system, EDUs are calculated based on meter capacity ratios, which represent the
safe operating capacity of a water meter relative to the safe operating capacity of a 1” meter (the
standard meter size for new connections in the District). This ensures that costs are allocated
appropriately across different capacity demands of the system since larger meter sizes have higher
capacity demands. All meters under 1” are also considered as 1”. The safe operating capacities
from the American Water Works Association (AWWA) M1 Principles of Water Rates, Fees and
Page 47 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 5
Charges, Seventh Edition (M1 Manual) were utilized in the conversion process, consistent with the
methodology used in 2023 and 2024. The total EDU count was calculated by multiplying the meter
counts by the meter capacity ratio for each meter size. Table 6 shows the total EDU amount (Line
9) based on meter counts as of December 31, 2024.
Table 6: Water System Demand by Meter Size
Line Meter Size Meter Count Safe Operating
Capacity (gpm)
Meter
Capacity Ratio Total EDUs
1 5/8" 25 20 1.00 25
2 3/4" 5,583 30 1.00 5,583
3 1" 18,140 50 1.00 18,140
4 1 1/2" 656 100 2.00 1,312
5 2" 1,127 160 3.20 3,606
6 3" 44 350 7.00 308
7 4" 4 630 12.60 50
8 6" 1 1,300 26.00 26
9 Total 25,580 29,0511
1 The difference in EDU amount is due to rounding.
For the wastewater system, EDUs relate the relative demand of each service connection based on
customer class, so costs are appropriately allocated across different capacity demands of the
system. For residential customers, EDUs are calculated based on the ratio of densities between
single family and multi-family (master metered) residential dwelling units. For commercial
customers, EDUs are calculated based on average commercial flow in gallons per day (gpd)
relative to the wastewater flow of a single family residence, in this case equal to approximately 172
gpd. The same density and gpd values were used as in 2023 and 2024.
Table 7: Wastewater System Demand by EDU
Line Customer Class Density /
GPD
Number of
Accounts
Multiple of
SFR EDUs
1 Residential
2 Individual 3.05 22,239 1.00 22,239
3 Master metered 2.50 1,627 0.82 1,334
4 Commercial 839 441 4.87 2,1502
5 Residential Subtotal 23,866 23,573
6 Commercial Subtotal 441 2,150
7 Total 24,307 25,723
2 The difference in EDU amount is due to rounding.
Page 48 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 6
EQUITY BUY-IN CAPACITY FEE
The equity buy-in capacity fee for water was calculated by dividing the total water system value in
Table 4 by the current total number of EDUs from Table 6. This results in a per EDU cost of
approximately $14,113 shown below in Table 8 for properties with adequate water mains fronting
their property. For properties without adequate water mains fronting their property, the RCLD value
of pipelines 8-inch in diameter and smaller is subtracted from the total water system value, as
shown in Table 9.
Table 8: Water Capacity Fee Calculation – Adequate Water Main Fronts Property
Line Capacity Fee Calculation Amount
1 Total Water System Value $409,990,763
2 Divided by Total EDUs 29,051
3 Capacity Fee per EDU $14,113
Table 9: Water Capacity Fee Calculation – Developer to Construct Water Main in Front
of Property
Line Capacity Fee Calculation Amount
1 Total Water System Value $409,990,763
2 Less Pipelines 8" and Smaller $105,304,569
3 Divided by Total EDUs 29,051
4 Capacity Fee per EDU $10,488
The per EDU cost is then multiplied by the meter capacity ratios from Table 6 to determine the
appropriate fee for each meter size. The current proposed rates for each meter size are shown
below in Table 10 for properties with adequate water mains fronting the property and Table 11 for
properties requiring developers to construct water mains in front of the property.
Table 10: Current and Proposed Water Capacity Fee
Schedule – Adequate Water Main Fronts Property
Line Meter Size Meter
Capacity Ratio Current Fee Proposed Fee
1 1" and smaller 1.00 $13,900 $14,113
2 1 1/2" 2.00 $27,801 $28,226
3 2" 3.20 $44,481 $45,161
4 3" 7.00 $97,302 $98,790
5 4" 12.60 $175,144 $177,822
6 6" 26.00 $361,409 $366,935
Page 49 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 7
Table 11: Current and Proposed Water Capacity Fee
Schedule – Developer to Construct Water Main in Front of Property
Line Meter Size Meter
Capacity Ratio Current Fee Proposed Fee
1 1" and smaller 1.00 $10,045 $10,488
2 1 1/2" 2.00 $20,091 $20,976
3 2" 3.20 $32,146 $33,562
4 3" 7.00 $70,318 $73,416
5 4" 12.60 $126,573 $132,149
6 6" 26.00 $261,182 $272,689
The equity buy-in wastewater capacity fee is calculated by dividing the total wastewater system
backbone value in Table 5 by the current total number of EDUs from Table 7. This results in a per
EDU cost of approximately $1,096 shown below in Table 12.
Table 12: Wastewater Capacity Fee Calculation
Line Capacity Fee Calculation Amount
1 Total Backbone System Value $28,181,242
2 Divided by Total EDUs 25,723
3 Capacity Fee per EDU $1,096
The per EDU cost is then multiplied by the multiple of SFR values from Table 7 to determine the
appropriate fee for each residential customer class.
Table 13: Current and Proposed Wastewater Capacity Fee Schedule - Residential
Line Customer Class Multiple of SFR Current Fee Proposed Fee
1 Individual 1.00 $865 $1,096
2 Master Metered 0.82 $709 $8983
3 The difference in fee amount is due to rounding.
For each commercial customer class, multiple of SFR values are determined based on average
flow for each class relative to the average flow of a single-family residential customer, in this case
equal to 253 gallons per day. The per EDU cost is then multiplied by each multiple of SFR value in
Table 14 to determine the appropriate fee for each commercial customer class. The fee for each
customer also accounts for building square footage, shown in Table 15.
Page 50 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 8
Table 14: Current and Proposed Wastewater Capacity Fee Schedule – Commercial
Line Customer Class Unit Multiple of
SFR
Current
Fee
Proposed
Fee
1 SFR 1 unit 1.00
2 AMUSEMENT PARKS 1000 sqft 1.37 $1,186 $1,503
3 AUTOMOBILE DEALERSHIP 1000 sqft 0.39 $338 $429
4 AUTO REPAIR SHOP 1000 sqft 0.39 $338 $429
5 AUTOMOTIVE SERVICE 1000 sqft 0.39 $338 $429
6 USED CAR LOT 1000 sqft 0.39 $338 $429
7 AIRPORT AND RELATED 1000 sqft 0.55 $478 $606
8 BOWLING ALLEYS 1000 sqft 0.59 $509 $645
9 CONVENTIONAL CAR WASH 1000 sqft 15.53 $13,431 $17,018
10 COIN OPERATED CAR WASH 1000 sqft 2.74 $2,372 $3,005
11 CEMETERY & RELATED 1000 sqft 0.39 $338 $429
12 CHURCH BUILDINGS 1000 sqft 0.20 $171 $217
13 DORMITORY 1000 sqft 0.99 $854 $1,083
14 ENTERTAINMENT CENTER 1000 sqft 1.37 $1,186 $1,503
15 FINANCIAL BUILDINGS 1000 sqft 0.39 $338 $429
16 FRATERNAL BUILDINGS 1000 sqft 0.49 $424 $537
17 FUNERAL HOME 1000 sqft 0.39 $338 $429
18 GOLF COURSE 1000 sqft 0.39 $338 $429
19 HEALTH CLUB 1000 sqft 0.34 $290 $368
20 HOSPITAL 1000 sqft 1.00 $865 $1,096
21 HIGH DEMAND HOTEL/MOTEL 1000 sqft 1.12 $967 $1,225
22 LUMBER/CONSTR MATL YARD 1000 sqft 0.18 $154 $195
23 MARINAS 1000 sqft 0.55 $478 $606
24 SUPERMARKET 1000 sqft 0.59 $509 $645
25 CONVENIENCE MARKET 1000 sqft 0.39 $338 $429
26 SINGLE MEDICAL BLDGS TO 3 STORIES 1000 sqft 1.17 $1,015 $1,286
27 SMALL MEDICAL CENTER 1000 sqft 1.17 $1,015 $1,286
28 MEDICAL CENTER COMPLEX 1000 sqft 1.17 $1,015 $1,286
29 HIGH RISE MEDICAL 1000 sqft 1.17 $1,015 $1,286
30 CONVERTED RESIDENCE TO MEDICAL 1000 sqft 1.17 $1,015 $1,286
31 MOBILE HOME PARK 1000 sqft 0.51 $444 $563
32 LOW DEMAND HOTEL/MOTEL 1000 sqft 1.12 $967 $1,225
33 MOTORCYCLE/SMALL VEHICLE BLDG 1000 sqft 0.39 $338 $429
34 NURSERIES (PLANTS) 1000 sqft 0.09 $79 $100
35 NURSING HOME 1000 sqft 1.03 $889 $1,126
36 CONVALESCENT HOSPITALS 1000 sqft 0.98 $848 $1,074
Page 51 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 9
Line Customer Class Unit Multiple of
SFR
Current
Fee
Proposed
Fee
37 CONVERTED RES USED AS NURSING 1000 sqft 1.03 $889 $1,126
38 LOW RISE RETIREMENT BUILDING 1000 sqft 1.12 $967 $1,225
39 HIGH RISE RETIREMENT BUILDING 1000 sqft 1.12 $967 $1,225
40 SINGLE OFFICE BLDGS TO 3 STORIES 1000 sqft 0.40 $342 $433
41 SMALL OFFICE CENTER 1000 sqft 0.40 $342 $433
42 OFFICE COMPLEX 1000 sqft 0.40 $342 $433
43 HIGH RISE OFFICE 1000 sqft 0.40 $342 $433
44 CONVERTED RESIDENCE TO OFFICE 1000 sqft 0.40 $342 $433
45 PARKING GARAGE 1000 sqft 0.18 $154 $195
46 PAVED PARKING LOT 1000 sqft 0.18 $154 $195
47 RECREATION 1000 sqft 1.37 $1,186 $1,503
48 RECREATION VEHICLE PARK 1000 sqft 0.22 $188 $238
49 RESTAURANT - LOW DEMAND 1000 sqft 1.90 $1,640 $2,079
50 RESTAURANT - COFFEE SHOP 1000 sqft 3.79 $3,281 $4,157
51 RESTAURANT - DINNER HOUSE 1000 sqft 3.79 $3,281 $4,157
52 RESTAURANT - CONVERSION FROM SFR 1000 sqft 3.79 $3,281 $4,157
53 PRE-SCHOOLS, NURSERY OR CARE 1000 sqft 0.79 $684 $866
54 PRIVATE SCHOOLS 1000 sqft 0.79 $684 $866
55 AUTOMOTIVE SERVICE STATION 1000 sqft 0.39 $338 $429
56 MARINE SERVICE STATION 1000 sqft 0.39 $338 $429
57 COMBIN: SERV STN/RESTAURANT 1000 sqft 0.39 $338 $429
58 COMBIN:SERVICE STN/CONVIENCE MKT 1000 sqft 0.39 $338 $429
59 LOW FLOW CENTER 1000 sqft 0.31 $270 $342
60 AVERAGE FLOW CENTER 1000 sqft 0.79 $684 $866
61 HIGH FLOW CENTER 1000 sqft 1.28 $1,111 $1,407
62 SKATING RINKS 1000 sqft 0.59 $509 $645
63 DEPARTMENT STORE 1000 sqft 0.22 $188 $238
64 DISCOUNT STORE 1000 sqft 0.22 $188 $238
65 UNATTACHED SINGLE STORE 1000 sqft 0.22 $188 $238
66 STRIP STORE 1000 sqft 0.22 $188 $238
67 STORE WITH OFFICES OR LIV QTR 1000 sqft 0.79 $684 $866
68 STORE W/ OFFICE UPSTAIRS 1000 sqft 0.79 $684 $866
69 DRIVE-IN THEATER 1000 sqft 0.09 $79 $100
70 UNATTACHED THEATER 1000 sqft 0.49 $424 $537
71 CHEMICAL TANK AND BULK STORAGE 1000 sqft 1.00 $865 $1,096
72 FOOD PROCESSING PLANT 1000 sqft 1.00 $865 $1,096
73 COLD STORAGE PLANT 1000 sqft 1.00 $865 $1,096
74 FACTORY 1000 sqft 1.00 $865 $1,096
Page 52 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 10
Line Customer Class Unit Multiple of
SFR
Current
Fee
Proposed
Fee
75 LIGHT INDUSTRIAL - SINGLE TENANT 1000 sqft 0.30 $256 $325
76 LIGHT INDUSTRIAL - MULTI TENANT 1000 sqft 0.30 $256 $325
77 RESEARCH AND DEVELOPMENT 1000 sqft 0.30 $256 $325
78 WAREHOUSE - SINGLE TENANT 1000 sqft 0.10 $85 $108
79 WAREHOUSE - MULTI TENANT 1000 sqft 0.10 $85 $108
80 STEEL BUILDING 1000 sqft 0.04 $34 $43
81 MINI-WAREHOUSE 1000 sqft 0.04 $34 $43
82 INDUSTRIAL PARK 1000 sqft 0.30 $256 $325
83 RECREATIONAL VEHICLE STORAGE 1000 sqft 0.10 $85 $108
84 TRUCK TERMINAL 1000 sqft 0.10 $85 $108
85 GOVERNMENTAL USE 1000 sqft 0.78 $677 $857
86 PUBLIC UTILITY 1000 sqft 1.00 $865 $1,096
87 WATER MUTUAL OR COMPANY 1000 sqft 1.00 $865 $1,096
88 CONVERSION-COMPOSITE PROP 1000 sqft 1.00 $865 $1,096
89 LAUNDROMAT 1000 sqft 15.12 $13,072 $16,563
90 NIGHTCLUB 1000 sqft 1.38 $1,196 $1,516
91 UNITED STATES POST OFFICE 1000 sqft 0.25 $215 $273
Table 15 shows an example calculation for an auto repair shop with one new sewer connection
and a square footage of 800.
Table 15: Commercial Wastewater Example Calculation
Line Example Calculation Amount
1 Proposed Fee $429
2 Times Square Footage 800
3 Divided by Units 1,000
4 Total Capacity Fee $343
FRONTAGE CHARGES
In addition to the capacity fees calculated above, if a property has an adequate sewer main fronting
the property, a frontage charge will apply. If a developer is required to upsize an existing sewer or
construct a new sewer in front of the property to connect to the District’s sewer system, like the
wastewater capacity fee scenario above, frontage charges will not be applied. To calculate the
proposed frontage charge, the RCLD value of the wastewater pipelines 8-inch in diameter and
smaller from Table 2 (Line 1) was divided by the total number of wastewater EDUs from Table 7
(Line 7). The Frontage Charge per EDU results are shown in Table 16. The Frontage Charge per EDU
is based on the average length of single family residence parcels (sewer frontage), which is 75 feet.
For a single family residence (1 EDU), the frontage charge will be $6,959. For master metered or
Page 53 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 11
commercial facilities, the frontage charges are calculated by multiplying $6,959 by the ratio of
actual sewer frontage divided by 75 feet.
Table 16: Frontage Charge Calculation
Line Frontage Charge Calculation Amount
1 RCLD System Value of Pipelines 8" and smaller $179,003,998
2 Divided by Total EDUs 25,723
3 Frontage Charge per EDU $6,959
ADU CALCULATION
Capacity fees charged to ADUs must be proportionate to the burden of the ADU relative to the
primary residence, based on either square footage or the number of water fixtures as defined in the
Uniform Plumbing Code. The District has chosen to continue calculating capacity fees based on
square footage. The methodology for calculating capacity fees for ADUs was adopted from
assessing ADU square footage relative to an average single-family residence in Yorba Linda to
assessing ADU square footage relative to the square footage of the primary dwelling where the ADU
resides pursuant to the January 2025 Accessory Dwelling Unit Handbook prepared by the California
Department of Housing and Community Development.
For example, a 900 square foot ADU with a primary dwelling equal to 2,700 square feet would be
charged one third (1/3) of the single-family water and wastewater capacity fees. Table 17 shows
the example calculations for ADU water and wastewater capacity fees.
Table 17: ADU Example Calculation
Line ADU sqft
Primary
Dwelling
sqft
ADU Ratio ADU Wastewater
Capacity Fee
ADU Water Capacity
Fee
1 900 2,700 1/3 $365 $4,704
Page 54 of 55
Yorba Linda Water District
Water and Wastewater Capacity Fee Update
Page 12
Water and wastewater (sewer) capacity fees and frontage charges are included
below:
Water Capacity Fee
Adequate Water Main Fronts Property
Meter Size Fee
1 Inch Meter $14,113
1-1 1/2 Inch Meter $28,226
2 Inch Meter $45,161
3 Inch Meter $98,790
4 Inch Meter $177,822
6 Inch Meter $366,935
Developer to Construct Water Main in Front of Property
Meter Size Fee
1 Inch Meter $10,488
1-1 1/2 Inch Meter $20,976
2 Inch Meter $33,562
3 Inch Meter $73,416
4 Inch Meter $132,149
6 Inch Meter $272,689
Sewer Capacity Fee
Property Type Fee
Single Family Residence $1,096
Master Metered 0.82 x Number of Units x $1,096 = $898
Accessory Dwelling Unit Sq ft of ADU/ Sq ft of Primary Dwelling x $1,096
Commercial Equivalent Dwelling Unit x Total SF/1,000SF x
$1,096
Equivalent Dwelling Unit (EDU is based on one Single Family Residence)
Frontage Charge
Applies to Properties Where Adequate Sewer Main Fronts Property and Property is Not Subject to
Developer Reimbursement Program
Property Type Fees
Single Family Residence $6,959
Master Metered Sewer Frontage (FT)/75 FT x $6,959
Commercial Sewer Frontage (FT)/75 FT x $6,959
Page 55 of 55
BACKUP MATERIALS DISTRIBUTED LESS THAN 72 HOURS PRIOR TO THE MEETING
Retail Water Consumption
3/27/2025 9
FY2025-26 Budget Calculation
Retail water consumption is calculated from historic trends and production demand. “PT” is Pass-Through.
Budget
FY 2025-26
Projected
FY 2024-25
Prior Year
FY 2023-24
7,362,786 7,605,355 6,443,548 Consumption (CCF)**
16,903 AF 17,459 AF 14,792 AF Consumption (AF)*
$ 30,012,591 $ 28,447,649 $ 20,363,484 Revenue ($)
$ 3.74 + PT $ 0.37 = $ 4.11$ 3.43 + PT $ 0.34= $ 3.77$ 3.14 + PT $ 0.31 = $ 3.45Consumption Unit Price (per CCF)
* Acre-Feet (AF) **Centum cubic feet (CCF) (1 CCF = 100 cubic feet) (1 CCF = 748 gallons)
14,792 AF
6,443,548 CCF
17,459 AF
7,605,355 CCF
16,903 AF
7,362,786 CCF
16,943 AF
7,380,219 CCF
16,943 AF
7,380,219 CCF
16,943 AF
7,380,219 CCF
$5.8M
$6.0M
$6.3M
$6.5M
$6.8M
$7.0M
$7.3M
$7.5M
$7.8M
Prior Year
FY2023-24
Projected
FY2024-25
Budget
FY2025-26
CC
F
Retail Consumption
Consumption (CCF)2021 Rate Study Assumptions
REVISED ITEM NO. 8.1.
Revenue Analysis
3/27/2025 10
Water Revenue
(Res.)
Water Revenue
(Comm & Fire)
Water Revenue
(Irrigation)Service Charges Property Tax -
CFC
Sewer Charge
Revenue
Sewer Parcel
Assmnt
Other
Operating
Revenue
FY24 Prior Year 17,332,568 1,884,552 3,622,962 15,999,358 3,526,631 3,585,075 417,051 1,950,873
FY25 YE Projections 21,421,085 2,105,117 4,921,445 17,546,715 3,890,245 4,252,641 468,797 1,566,272
FY26 Budget 22,584,477 2,376,634 5,195,174 19,164,365 4,260,742 4,672,028 512,395 1,835,971
$0.0M
$2.0M
$4.0M
$6.0M
$8.0M
$10.0M
$12.0M
$14.0M
$16.0M
$18.0M
$20.0M
$22.0M
$24.0M
Increases due to proposed FY 2025-26 rates from Prop 218 rate schedule
REVISED ITEM NO. 8.1.
New Meter Connection Fees
3/27/2025 Board of Directors Workshop 5
Meter
Size
(Inches)
FY24-25
Fee per
Meter
FY25-26
Fee Per
Meter
Fee
Increase or
(Decrease)
Fee Change
%
1 $910 $900 $(10)(1)%
1 ½$1,460 $1,480 $20 1%
2 $1,860 $1,900 $40 2%
> 2
Incurred
Costs
Incurred
Costs $0 -
Construction Meter Connection Fees
Activity FY24-25 Fees FY25-26 Fees
Fee Increase or
(Decrease)
Fee
Change
%
Deposit $3,360 per Meter $3,160 per Meter $(200) per Meter (6)%
New Account Setup $20 per Occurrence $30 per Occurrence $10 per
Occurrence 50%
Meter Use $9.21 per Day $8.66 per Day $(0.55) per Day (6)%
Move to a New Location $145 per Occurrence $145 per Occurrence $0 per Occurrence -
Temporary Water Service –
2X Commodity Rate in effect
$7.54 per Unit
(Pending calculated
pass-through)
$8.22 per Unit
(Pending calculated
pass-through)
$0.68 per Unit 9%
REVISED ITEM NO. 8.2.
Miscellaneous Water Service Fees
3/27/2025 Board of Directors Workshop 6
Fee Type FY24-25 Fees FY25-26 Fees
Fee Increase
or (Decrease)
Fee
Change %
Change of Meter
Size Fee Incurred Costs Incurred Costs $0 -
Backflow Device
Monitoring Fee
$4.07 per
month
$4.15 per
month $.08 per month 2%
Single Service
Fee $2,110 $2,450 $340 16%
REVISED ITEM NO. 8.2.
Water Tampering Penalties
3/27/2025 Board of Directors Workshop 7
Violation FY24-25 Penalty FY25-26 Penalty
Cost
Increase or
(Decrease)
Cost
Change %
Meter Tampering Penalties
1st
$ 1,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 130 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$(870)(87)%
2nd
$ 2,500 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 700 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$(1,800)(72)%
3rd
$ 5,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$ 1,300 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$(3,700)(74)%
Hydrant Tampering Penalties
1st
$ 1,000 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 1,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$0 -
2nd
$ 2,500 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 2,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$(500)(20)%
3rd
$ 5,000 + Incurred Costs of
Inspection, Repair, and
Estimated Usage
$ 3,000 + Incurred Costs of
Inspection, Repair, Calibration
and Estimated Usage
$(2,000)(40)%
REVISED ITEM NO. 8.2.
Sewer Single Service Fee
3/27/2025 Board of Directors Workshop 12
Fee FY24-25 FY25-26 Fee Increase or
(Decrease)
Fee
Change %
Single Service Fee $1,890 $2,120 $230 12%
FOG Fee $250 per
year
$270 per
year $20 8%
FOG Non-
Compliance Fee
$440 per
Occurrence
$340 per
Occurrence $(100)(23)%
FOG Mitigation
Fee Actual Cost Actual Cost $0 -
REVISED ITEM NO. 8.2.
3/27/2025 Board of Directors Workshop 13
Violation FY24-25 Penalty FY25-26 Penalty Cost Increase
or (Decrease)
Cost
Change %
Sewer Tampering Penalties
1st
$ 1,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 1,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
2nd
$ 2,500 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 2,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$(500)(20)%
3rd
$ 5,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 3,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$(2,000)(40)%
Illegal Sewer System Connection Penalties
1st $ 5,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 5,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
2nd $ 10,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 10,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
3rd
$ 15,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$ 15,000 + Actual Costs of
Inspection, Repair and
Estimated Usage
$0 -
Sewer Tampering PenaltiesREVISED ITEM NO. 8.2.