HomeMy WebLinkAbout2025-08-28 - Board of Directors Meeting Agenda Packet Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Thursday, August 28, 2025, 3:30 PM
1717 E Miraloma Ave, Placentia CA 92870
1. PARTICIPATION INSTRUCTIONS
This meeting will be held in person. For public convenience, the meeting can also be accessed via
internet-based service or telephone as indicated below. For questions regarding participation, please call
the Board Secretary at (714) 701-3020.
Computer/Mobile Device: https://us06web.zoom.us/m/88950070726
Telephone: (669)444-9171 or(669) 900-6833
Meeting ID: 889 5007 0726
2. CALL TO ORDER
3. PLEDGE OF ALLEGIANCE
4. ROLL CALL
5. ADDITIONS/DELETIONS TO THE AGENDA
Items may be added to the agenda upon determination by a two-thirds vote of the Board, or a
unanimous vote if only three Directors are present, that there is a need to take immediate action which
came to the District's attention subsequent to the agenda being posted. (GC 54954.2(b)(2))
6. AB 2449 TELECONFERENCE REQUESTS
7. PUBLIC COMMENTS
Any individual wishing to address the Board (or Committee) is requested to identify themselves and state
the matter on which they wish to comment. If the matter is on the agenda, the Chair will recognize the
individual for their comment when the item is considered. No action will be taken on matters not listed on
the agenda. Comments are limited to three minutes and must be related to matters of public interest
within the jurisdiction of the Water District. (GC 54954.3)
8. CLOSED SESSION
The Board may hold a closed session on items related to personnel, labor relations and/or litigation. The
public is excused during these discussions.
8.1. Public Employee Performance Evaluation
Pursuant to Section 54957 of the California Government Code
Title: General Manager
8.2. Conference with Labor Negotiators
Pursuant to Section 54957.6 of the California Government Code
Agency Designated Representative: Andrew Gagen, General Counsel
Unrepresented Employee: General Manager
9. OPEN SESSION WILL BEGIN AT 4:30 PM
10. REPORT FROM CLOSED SESSION
11. PUBLIC COMMENTS CONTINUED
12. DISCUSSION ITEMS
This portion of the agenda is for items that cannot reasonably be expected to be concluded by action of
the Board (or Committee) at the meeting, such as technical presentations, drafts of proposed policies, or
similar items for which staff is seeking advice and counsel. Time permitting, it is generally in the District's
Page 1 of 26
interest to discuss these more complex matters at one meeting and consider formal action at another
meeting. This portion of the agenda may also include items for information only.
12.1. 2025 Water and Wastewater Rate Study and Public Outreach
Recommendation: That the Board of Directors and YLWD staff conduct a
Public Engagement Meeting to inform, educate, and collaborate with the
residents and businesses in our service area in order to highlight how YLWD
water and sewer rates support the infrastructure that keeps clean, safe, and
reliable water flowing every day.
13. ADJOURNMENT
13.1. The next regular Board meeting is scheduled Thursday, September 11, 2025 at
8:30 AM.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Non-exempt materials related to open session agenda items that are distributed to a majority of the Board of
Directors (or Committee Members) less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's Administrative building located at 1717 E Miraloma Ave, Placentia
CA 92870 during regular business hours. When practical, these materials will also be posted on the District's
website at https://ylwd.com/. (GC 54957.5)
Accommodations for the Disabled
Requests for disability-related modifications or accommodations, including auxiliary aids or services, required for
participation in the above-posted meeting should be directed to the Board Secretary at (714) 701-3020 at least 24
hours in advance. (GC 54954.2(a))
Page 2 of 26
ITEM NO. 12.1.
Yorba Linda
Water District
AGENDA REPORT
MEETING DATE: August 28, 2025
TO: Board of Directors
FROM: Mark Toy, General Manager
STAFF CONTACTS: Christine Mcllrevey, Finance Manager
SUBJECT: 2025 Water and Wastewater Rate Study and Public Outreach
RECOMMENDATION:
That the Board of Directors and YLWD staff conduct a Public Engagement Meeting to inform,
educate, and collaborate with the residents and businesses in our service area in order to highlight
how YLWD water and sewer rates support the infrastructure that keeps clean, safe, and reliable
water flowing every day.
BACKGROUND:
District staff has been working with Water Resources Economics (WRE) for the performance of the
District's new 2026 Water and Sewer Rate Study, which will set the rates for all District customers
effective July 1 , 2026. The current schedule is as follows:
RATE STUDY SCHEDULE:
Thy, /10 BOO Mtg Preliminary Flnannlal Plan
�-rra -07Trry
Thu, 08/28 BOD Mtg — Public Engagement Mtg (4:30 — 5:30 PM)
Thu, 09/11 BOD Mtg — Preliminary Rates
Sat, 10/04 Open House (9:00 AM — 12:00 PM)
Thu, 11/13 BOD Mtg — Final Rates
Thu, 01/22 BOD Mtg — Receive Report and Approve Proposition 218 Notice
Thu, 04/09 BOD Mtg — Public Hearing to Adopt Rates
Wed, 07/01 New Rates Implemented
PRIOR RELEVANT BOARD ACTION:
On July 10, 2025, WRE founder and Project Manager Sanjay Gaur presented the preliminary water
and wastewater financial plan models, which included a review of financial policies and financial
inputs, including estimated escalation factors.
STRATEGIC PLAN INITIATIVES:
G2 3A— Perform cost of services analysis periodically and appropriately to ensure rates and charges
are fair and equitable, including compliance with Proposition 218 requirements.
Page 3 of 26
ATTACHMENTS:
1. Slide Deck
Page 4 of 26
Yorba Linda
Water District f�
®4na u�aa
hi rDisr
WELCOME TO
Yorba L*inda
is ric Water ., y
PUBLIC ENGAGEMENT MEETING
August 28 2025
@YLWD
• @YORBALINDAWATERDISTRICT
Page 5 of 26
YLWD
YL
Is hosting a?V4
W
z Public Engagement Meeting
W
W
� Wh Water Why We Looking Back
y Need to do a to Move
LU
Z Rates Matter
Rate Study Forward
W
Q
0 _
Z
W -_
V • •
A /6#
ve
Page 6 of 26
YLWP
Rate Study Schedule
March Jun-Jul • Dec
1. Ma 2074�
• Selection of Kick-off Financial Plan • Cost of Report Proposition Rates
consultant Workshop Development Service Development 218 Public effective
• Data Analyses Hearing
Collection • Water and Final Rate
Sewer Rate Adoption by
Design Board
Board Meeting Schedule
Date Meeting
Thu, 08/28 BOD Mtg - Public Engagement Mtg (4:30 - 5:30 PM)
Thu, 09/1 1 BOD Mt - Preliminary Rates
Sat, 10/04 Open House 9:00 AM - 12:00 PM
Thu, 1 1/13 BOD Mt - Final Rates
Thu, 01/22 BOD Mt - Receive Report and Approve Proposition 218 Notice
Thu, 04/09 BOD Mt - Public Hearing to Adopt Rates
Wed, 07/01 New Rates Implemented
Page 7 of 26
Yorba Linda
our Wof SWater
High-quality, safe, and reliable
�I
• Economical and fiscally responsible
• 82 highly-skilled water professionals g `:
a
_ r
� r a
Page 8 of 26
F--I
J Water Boundary
Anaheim
Brea
-- --•, Placentia
Yorba Linda
County of Orange
• O EN A.1 •\
- EAarnrc�,n+Y no
0
YORBAUNwkw
O,p
111 r% �*TAAYE
& � I
1 .A GK\111.E
i r
,l Elevation in the YLWD service area ranges
'
from 250 feet to over 1 ,390 feet. w
0 0.25 0.5 1 Miles
I I
Page 9 of 26
YL •
qfructurp
YLWD has made significant investments in our water
supply and manages a robust water distribution system.
• Over 56,000 individual assets valued at
approximately $1 .3d hlllion
• 14 Reservoirs
• 12 Booster Pump Stations Highland Reservoir
• 10 Groundwater Wells
• Elevation levels: 250 feet to over 1 ,390 feet
• 20 Pressure Zones
• 355 Miles of water mains - 4-1A_ r
• 270 Miles of sewer mains 1
• Over 25,000 customer connections
i
WIT
l
Fairmont Booster Pump Station
Page 10 of 26
• • SWater
b . •
eves in in our
Ir
ins ruc urnIF
_
Through thoughtful investments, YLWD has strengthened our
community's water future with:
A state-of-the-art PFAS Treatment Plant
Heli-hydrants to aid wildfire response and protection
Enhanced fire protection systems in high-risk zones
Upgrades to pipelines and essential infrastructure
Page 11 of 26
I Wayne Miller, Ph . D ., Water Treatment Plant
Largest IX PFAS Water Treatment Plant in the Nation
25 million gallons per day $27. 7 milliosawle
-� —
r`.;
F
M
_ :, ,: �• °ray
YLWD Signature Project
Page of 26
YLWD Heli - Hydrants
A game-changing way to safeguard life, property,
and the environment.
Heli-Hydrants help local fire authorities save critical time and fight wildfires more efficiently by
offering a strategically placed, quick-fill, pilot-operated water source that can fill in minutes.
1 2
�t
Marc M mrAW10 Heli-Hydrant Wells Fargo Heli-Hydrant& Landing Zone Wells Fargo Hell-Hydrant& Landing Zone
Total • • • • Cost:
01,000 $490,000
Page 13 of 26
Learn how YLWD is helping our community YL
• with homeowners ' insurance. W
YLWD partnered
with OCFA and the
City of Yorba Linda
in a joint letter
addressing
homeowners'
insurance issues.
0 '~'}'0
sF:'4W'rr'F
o
Page 4 of 26
W
YLWD is Wildfire Ready
Increased Fire Protection
YLWD is dedicated to ensuring the safety and well-being of our community through
proactive wildfire emergency preparedness.
Backup Booster Fire-.
Reservoirs Generators Pump Hardening
Stations Landscaping
Page 15
' ryNllh
YL
Elk Mountain Emergency Timber Ridge B.P.S. Hidden Hills B.P.S.
Backup Generator - 500kw Design Pumping Capacity: Design Pumping Capacity:
Elevation: 780' 2,700 GPM 3,600 GPM
of 26
Preventative Maintenance Programs
YLWD's Commitment to Ensuring a Safe, Reliable Water Supply
Fire HydrantsLlAir Release Apparatus
MIJ
— ,� Valves Sewer Line Assessments
Water Quality Reservoirs and Booster Pump
l :�: � Stations
YLWD's preventative maintenance
Pressure Reducing Valves program _ backbone _
. .l( water system
Page 16 of •
W
Since 2010
2024: Hidden Hills
2010: Hidden Hills 2024: Well 5 and Booster Pump
Well 19 Station and
Reservoir �
Rehabilitation Emergency Backup . __
Generator F
P
YLWD Resiliency Projects
2021: Two 2025: Timber Ridge
Hidden HillBooster
Marc Emergency Backup Booster Pump
Marcantonio Heli- Generators at YLWD Station and
Hydrant Headquarters Emergency Backup
(1 ,000 kW) Generator
2020: Elk Mountain
Booster Pump 2021: Wells Fargo 2025: Well 21 - �_= -� — � _ - Y_ -- '
Station Emergency Heli-Hydrant and Phase 1 =ram
Backup Generator Landing Zone _
Emergency - - . .
YLWD Headquarters
Page
YLWD Waterline Projects to Enhance
Fire Flow, Operations, Maintenance, & Safety
L *IE . - - . I -Ma
This past year, the District replaced or rehabilitated 13,760 feet of waterlines at:
• Mandarin Lane • Via del Agua
• Shinnyo-En • Via del Puente
• Villa Terrace • Via del Cerro
• Vallecito Lane • Via Tomas
• Avolinda Drive • Box Canyon
• Camela Street • Mabel Paine Elementary School
• Camino de Bryant Ph. 2 • Charles Wagner Elementary School
• Lute Avenue • McKenzie Drive
• Roxborough Drive • Cedar/own Drive
Camino De Bryant Waterline
Replacement
Page 18 of 26
OngoingYLWD ProJ'ects
Project
Mill kE Description
Kellogg Drive Waterline Upgrade to a 10-inch waterline July 2025 to
Replacement at Esperanza High June 2027
Kellogg Drive Sewer Main Upgrade to 15-inch sewer mains July 2025 to
Replacement at Esperanza High June 2027
Santiago Booster Pump Station July 2025 to
Discharge Waterline on Green Rehabilitate 12-inch pipe June 2026
Crest Drive
Santiago Booster Pump Station Pump replacements and new building July 2025 to
Rehabilitation June 2028
Well 10 Rehabilitation Clean well and replace equipment July 2025 to
Mar. 2026
Well 18 Rehabilitation Clean well and replace equipment July 2025 to
Mar. 2026
Well 21 Rehabilitation Ph. 2 Installation of new equipment Jan. 2026
Page 19 of 26
Upcom *ing CIP
(through FY 2031 )
Water $40.8 million Sewer
• Well 23 Drilling & Equipping $13.7 million Yorba Linda Town Center Sewer Main $ 3.3 million
• Waterline Projects $ 8.1 million Kellog Dr Sewer Main $ 3.0 million
• Santiago Booster Pump Station Rehab $ 6.4 million FY26-31 Sewer CIPP Rehab $ 2.0 million
• Fairmont Reservoir Rehab $ 5.2 million Capacity Enhancement Project $ 2.0 million
• Lakeview Booster Pump Station Rehab $ 3.4 million Buena Vista Sewer Main $ 1.7 million
• Other Water Projects $ 4.0 million Other Sewer Projects $ 1.0 million
Other CapitalOutlay
• Vehicle replacements $ 5.5 million
• Enterprise Resource Planning System $ 1 .3 million
• Other Capital Outlay $ 1.3 million Grants Awarded:
$300 thousand EPA Grant (Green Crest)
• • • • • •-
. - .
million • pEngineers
- • • •
Page 20 of 26
What is the Value of our Infrastructure
A Breakdown
Va&aia Rece&led S#ar
Supplies&
Variable Water Costs Services Capital
Non-Operating Bond Proceeds $0.36 $0.15 $0.18
Revenues 11%
' '�I��T�\1'1'1:1)
THIS NOTE IS LEGALTENDER
S EDR ALL DEBTS.PUSUC AND VRIV In (_j�Jr sl_ C 8 1 2 3 0 C 5 1 _
V
3 . WwUaExcTor.11.C.
P �; 0 ija
C 81230251 D
3
lk�
' ► ' ' � RYEN�41
_Operating
Revenues
80% Personnel Services Non-Operating
$0.26 $0.05
Variable Water Costs
• Groundwater $0.21
• Imported Water $0.06
Examples of Funding Sources: • Water Supply Fixed Costs $0.03
Rates, Bonds, Grants, Property Taxes, Investment Earnings • Fuel/Power&Pumping $0.06
Page 21 of 26
How do Rates Support our Costs? wYorba Linda
Monthly Customer Bill
YORBA LINDA WATER DISTRICT Phone(714)701-3000 Annual Property
• •
1717 E Miraloma Avenue Website:www.yWd.com
x Bill
Placentia.CA 92870 Fax(714)701-3058
STATEMENT OF SERVICES
Account Summary Water Usage
Customer Name VALUED CUSTOMER Meter Previous Cur ent Current Usage 0 Capital Finance Charges
Account No: OOOODO-000000 nyM12= $d11 am runits-1
Current Charges Due. 09/07/2025 ow000x 488 474 6
Billing Date: 0811 V2025
Billing Period: 07108r2025 to 08042025
No of Days 28 Average gallons/day: 160.3
Service Address. 123 MAIN ST Average uniWday: 0.21 '1 unit= 748 gallons : • annually
• to
property
owners
AMr r.
Previous Bill 071142025 103.58 PaymentPrevious
Balance
2025-Thank you! 103.58 ; • • • • • portion
• • •
Previous Balance 0.00
Current Bi
Inch Meter Basic Service Charge 60. " " bt service
Water Charge(9 Units @ 3.77/Unit) 24.66
Sevier Maintenance Charge 15.05 a D e u u u
al Current Charges 100.32 Usa a Units, r r n I a obligation
To ount Due 100. Prior Year 5 8 10 11 16
Current year S 9 6
Did You Know?YLWD offers a severe Online Bill Pay
Service featuring:Paperless Billing-Receive an email
when your bill is ready to view online and reduce
excess paper clutter.Pay By Text-Viewing and paying
your tills is now at your fingertips.Receive a text
message when your bill is ready to view and pay.
Auto-Pay Option-Take the worry out of paying your
bill on time.Electronically process your payment using
your preferred auto-payment method. Ir
Enroll Todayl Visit us at www.ylwd.com or contact us
at 714-701-3000.
Page 22 of 26
Annual
0
SerV*ICeObligations
• Outstanding Debt @ 6/30/2025 $31,325,000 • Outstanding Debt @ 6/30/2025 $21,730,000
• Annual Debt Service $ 1,992,700 • Annual Debt Service $ 2,133,919
Total Outstanding Debt $53,055,000
Total Annual Debt Service $ 4, 126,619
Yorba Linda AAA
Water District FitchRatings
Page 23 of 26
Reserves
RESERVE TYPE TARGET LEVEL
Operating Provides cash flow stability and mitigates revenue volatility 60% annual operating budget
- • - Protects against losses from unplanned events/circumstances 5% net capital assets
Capital Replacement Funds CIP, capital repair & replacement as infrastructure ages 2 yrs CIP, Cap Outlay & Depr.
• - Stabilization Assists in smoothing out rate increases 10% budgeted water sales
ConservationProvides funding for District conservation efforts Administrative penalties assessed
Employee Liabilit jd Covers employee accrued vacation, other comp time & Employee Comp Absences
retiree medical
?a w aia p-� W uMaq�, Z)Wwer a 36. 4iV 4 caa ow 4aad,
2021 $31 .3 million $ 5.1 million $36.4 million
2025 $56.6 million $10.5 million $67.1 million
Page 24 of 26
SWater
d .
our ommuni
• A True Community Partner
• A Model for Others
• Local Commitment
• Community at the Center
�r
rr�
L�
®Yorba L:
Water D
r A �4r1
Page 25 of 26
i
,
1 r
e
IL
LU
910
Z ,' An
J
Q
m
0
YL
' Quest*ioris
Page 26 .