Loading...
HomeMy WebLinkAbout2010-10-06 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda Water District AGENDA YORBA LINDA WATER DISTRICT PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING Wednesday, October 6, 2010, 4:00 PM 1717 E Miraloma Ave, Placentia CA 92870 COMMITTEE STAFF Director William R. Mills, Chair Ken Vecchiarelli, General Manager Director John W. Summerfield Steve Conklin, Engineering Manager Lee Cory, Operations Manager Ken Mendum, Operations Superintendent John DeCriscio, Chief Plant Operator 1. PUBLIC COMMENTS Any individual wishing to address the committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. 2. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 2.1. Monthly Groundwater Production and Purchased Import Water Report 2.2. Monthly Preventative Maintenance Program Report (To be provided at the meeting.) 3. ACTION CALENDAR This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee action. 3.1. Engineering Services for the 2010 Waterline Replacement Project Recommendation: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement with RBF for a fee not to exceed $219,309, to provide engineering design, bidding support services and construction management for the 2010 Waterline Replacement Project. 4. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 4.1. Groundwater Producers Meeting Report 4.2. Status Report on Capital Projects in Progress 4.3. Future Agenda Items and Staff Tasks 5. ADJOURNMENT 5.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held November 4, 2010 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internet website accessible at http://www.ylwd.com/. Accommodations for the Disabled Any person may make a request for a disability-related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. ITEM NO. 2.1 AGENDA REPORT Meeting Date: October 6, 2010 Subject: Monthly Groundwater Production and Purchased Import Water Report ATTACHMENTS: Name: Dosciiption: a ype: Import2010-2011 September PEO Sheet.pdf Import 2010-2011 September PEO Sheet Backup Material Import2010-2011_September _Pie_Chart.pdf Import 2010-2011 September Pie Chart Backup Material Import2010-2011 September TWU.pdf Import 2010-2011 September TWU Backup Material Import2010-2011 September YTD Prod Chart.pdf Import 2010-2011 September YTD Prod Backup Material Daily Average September_2010.pdf Daily Average September 2010 Backup Material YLWD SOURCE WATER SUMMARY Fiscal Year 2010-11 TOTAL MONTHLY YTD BUDGET GW IMPORT DEMAND GW GW (Demand Est.) DELTA MONTH (AF) (AF) (AF) (AF) Jul-10 793.2 1,476.0 2,269.2 35.0% 35.0% 2,483.5 -8.6% Aug-10 817.3 1,529.5 2,346.7 34.8% 34.9% 2,443.4 -4.0% Sep-10 753.6 1,404.8 2,158.4 34.9% 34.9% 2,143.8 V Oct-10 1,808.3 Nov-10 1,428.5 Dec-10 1,285.0 Jan-11 1,120.4 Feb-11 1,071.9 Mar-11 1,270.2 Apr-11 1,588.8 May-11 2,101.6 Jun-11 2, 354.8 FYTD 2,364.1 4,410.3 6,774.4 34.9% 7,070.6 -4.2% Allowable GW (YTD) 3,108.1 (AF) Underpumped 744.0 (AF) Conservation Percentage Since July 1, 2009 -17.7% GROUNDWATER PERCENTAGE 85.0% 75.0% 65.0% 55.0% 45.0% 35.0% 25.0% *-MONTHLY GW ) 15.0% FYTD GW ) BPP GOAL 45.9% 5.0% Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Month WATER SUPPLY FY 2010-2011 September 2010 Water Supply GW 34.9% IMPORT 65.1% 2010-2011 YTD Water Supply GW 34.9% IMPORT 65.1% GW BPP GOAL 45.9% am 2,500 2,000 FS ,07 0' 1,500 0 1,000 500 Total Water Use N° o o N° N° o%, e N° o° N(° NN o°' Noi o°' '.° o�' NQ, �. o N° NN Month 22,000 20,000 18,000 16,000 14,000 U- a 12,000 a� E 0 10,000 8,000 6,000 4,000 2,000 0 Jul -10 2010 -2011 YTD Water Supply Aug -10 Sep -10 Oct -10 Nov -10 Dec -10 Jan -11 Feb -11 Mar -11 Apr -11 May -11 Jun -11 Month September 2010 Daily Average Demand (MG) 30.0 25.0 20.1 20.0 15.0 10.0 5.0 0.0 25.3 eKA o�6,ba 22.7 a�a �y ,J 23.7 a1a �y 22.0 aaa 24.5 a�a ITEM NO. 2.2 AGENDA REPORT Meeting Date: October 6, 2010 Subject: Monthly Preventative Maintenance Program Report (To be provided at the meeting.) ATTACHMENTS: Narn9: Doscrip ion: u PM Report.pdf PM Report Backup Material PM PROGRAM 2010/2011 Fiscal 20010-11 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100% HYDRANTS (3,881) Target; all hydrants to be serviced annually. INSPECTED THIS MONTH 55 293 160 INSPECTED THIS YEAR 55 348 508 % OF TOTAL 1.4% 9.0% 13.1% VALVES (10,706/2=5,353) Target; all valves to be operated every two years OPERATED THIS MONTH 536 378 380 OPERATED THIS YEAR 536 914 1,294 % OF TOTAL 10.0% 17.1% 24.2% DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year. FLUSHED THIS MONTH 0 0 01 1 FLUSHED THIS YEAR 0 0 0 % OF TOTAL 0.0% 0.0% 0.0%1 1 AIR VACS (309) Target; all air/vacs to be serviced annually. INSPECTED THIS MONTH 296 13 2 INSPECTED THIS YEAR 296 309 3111 1 % OF TOTAL 95.8% 100.0% 100.7%1 1 SEWER CLEANING (802,560) Target; all sewers to be cleaned annually. CLEANED THIS MONTH 126,497 68,133 38,676 CLEANED THIS YEAR 126,497 194,630 233,306 % OF TOTAL 15.8% 24.3% 29.1% SEWER TELEVISING (200,640) Target; all sewers to be televised every 4 years. TELEVISED THIS MONTH 12,176 18,676 6,5241 1 TELEVISED THIS YEAR 12,176 30,852 37,376 % OF TOTAL 6.1% 15.4% 18.6% ITEM NO. 3.1 AGENDA REPORT Meeting Date: October 6, 2010 Budgeted: Yes Total Budget: $2M To: Planning-Engineering- Operations Committee Funding Source: Water Operating Fund From: Ken Vecchiarelli, General Account No: 101-2700 Manager Job No: 201012 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: Pending Prepared By: Anthony Manzano, Senior CEQA Compliance: Exempt Project Manager Subject: Engineering Services for the 2010 Waterline Replacement Project SUMMARY: Staff issued a Request for Proposal for engineering design, bidding support services and construction management for the 2010 Waterline Replacement Project. The District received four proposals. Following evaluation, staff recommends award to RBF Consulting, Inc. (RBF), for a fee not to exceed of $219,309. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement with RBF for a fee not to exceed $219,309, to provide engineering design, bidding support services and construction management for the 2010 Waterline Replacement Project. DISCUSSION: The Project consists of waterline replacement at eight locations, ranging from 200 to 3,000 feet in length totaling approximately 6,700 feet. The Project locations are identified in the Asset Management Plan and the Capital Improvement Plan as requiring urgent replacement. The eight locations were packaged as one project for efficiency and cost effectiveness. Staff solicited proposals from five consulting firms experienced in this field. Four firms submitted proposals. The District's review team ranked and scored the proposals based on experience of staff and firm, content, and understanding of the project. Following the technical evaluation and ranking, separate envelopes with fees for each proposal were opened by staff. Results of the ranking and the proposed fee for each are as follows: Firm Evaluation Score Fee RBF Consulting, Inc. (RBF) 1271 $ 219,309 Albert A. Webb Associates (Webb) 1262 $ 203,900 PSOMAS 1226 $ 346,978 Tetra Tech, Inc. (TTI) 1219 $ 280,000 After extensive review of the four proposals, the engineering staff review team determined that RBF had the best overall proposal, including a well experienced project manager and project team, a very good project approach, and a reasonable and competitive proposed fee. Based on all factors, staff recommends award to RBF. ATTACHMENTS: Narne: Descrip ion: Type: Exhibit A.pdf Exhibit A Backup Material Exhibits BTpdf Exhibit B Backup Material Birch 4\ EXHIBIT "A" La Palma Legend Proposed Pipeline Project ����J sde.SDE.YLWD_Service_Boundary 2010 PIPELINE REPLACEMENT PROJECT VICINITY MAP 0 1,375 2,750 N W+ E S 5,500 8,250 Feet 111111 \�� ��► r E ��� ■ IMMIN ■11111. a .■ ■■D■■■■ i ■� �� 1 moll /111 _ ills ONE, n PLumosa Dr., from Lemon Dr. to Bastanchury Road i d�,C: A Hidden Hills BPS Discharge Line N L4 W +E S 2010 PIPELINE REPLACEMENT PROJECT LOCATION MAP 1 THRU 8 NO SCALE EXHIBIT "B" Tamarisk Dr., Fircrest Dr. & Pebble Beach Ln. i i 1i I j I North of Catalina Ct., & S. of Joel Brattain Dr. 11111E E �► � ��� IIIII - • - I■ \R�q< 3 Sunwood / Peppertree Ln. RENO /' 6 Easement S. of Gordon Ln. & E. of Ohio St. .EN7E- �� ORANG�THORPE o� 7 Richfield Rd. , 1200 LF of Proposed Slip Lining $ Richfield Rd. , Nancita St. to approximately 100' N. of OCFCF - 200 LF of new 8" dia. pipeline ITEM NO. 4.1 AGENDA REPORT Meeting Date: October 6, 2010 Subject: Groundwater Producers Meeting Report ATTACHMENTS: Name: cv, i~a$icri: a ype: GWP MtgNotes 8Sept10.pdf GWP Meeting Report for September 2010 Backup Material Yorba Linda Water District MEMORANDUM DATE: September 8, 2010 TO: Ken Vecchiarelli, General Manager FROM: John DeCriscio, Chief Plant Operator COPY: Pat Grady, Assistant General Manager Lee Cory, Operations Manager Steve Conklin, Engineering Manager SUBJECT: Groundwater Producers Meeting, September 8, 2010 1 attended the Groundwater Producers (GWP) Meeting on September 8, 2010 at OCWD. A summary of each item discussed is as follows: 1. Water Quality Update. OCWD provided information on the Unregulated Contaminant Monitoring Regulation (UCMR). UCMR is a Federal regulation that requires testing for 25 chemicals classified in five categories, Pesticides and flame retardants, explosives and related compounds, Nitrosamines, Acetanilide, and Acetanilide degradates. The testing program began in January of 2008 and will end in December 2010. In California, the only category that has been detected is the Nitrosamines and only in 2% of all the samples collected. They have been detected at concentrations of 2-53 parts per trillion (ppt) and the current California Department of Public Health response level is set at 300 ppt. Over the next few years the EPA will be reviewing this data in order to establish a maximum contaminant level (mcl). 2. Forebay Annual Report. OCWD staff reported that this year (July 2009-June 2010) rainfall at the field headquarters in Anaheim totaled 17.3 inches or 20% above average. Storm flows reached 140,000 acre feet (AF), which was the fifth highest year in the past 20 years. However, since 1998 the base flow has dropped 37% and totaled 100,000 AF this last year. The decline in base flows has been attributed to improved water management in the upper watershed. Staff also reported that the District captured 25,000 AF of storm flow in the Prado Conservation Pool behind Prado Dam. During the month of January the Army 1 Corp allowed up to 30,000 AF to be held behind the dam in order to protect the "SARI" line from high flows on the river. It was reported that the primary source of recharge water over the last two years was recycled water from the Groundwater Replenishment System. Historically SAR base flow has been the primary source of recharge. Even with the above- average rainfall, recharge was 4% below average do to the reduction in base flow. Staff also noted that the intensity and timing of storms can have a major impact on their ability to capture storm water. This was exemplified in a bar chart displayed showing that the captured flow from 2007-08 was equal to 2009-10 even though rainfall totals were considerably lower in 2007-08. 3. GWRS FY09-10 Unit Cost. Mike Marcus gave a brief cost summary of GWRS. The summary was developed to show the cost with and without contributions from outside sources. Net cost for OCWD to produce GWRS water is currently $478/AF. The true cost to produce this water without any outside subsidies or contributions would be $887/AF. 4. Continued Basin Equity Assessment (BEA) Exemption Program Discussion. On August 18, 2010 the OCWD Board adopted a revised BEA Exemption Program Policy. The policy has been revised in an effort to improve the benefit of the program for all the Groundwater Producers. Discussion amongst the producer group is that only a few agencies are benefiting from this program while the others are paying the way. Currently Irvine Ranch Water District (IRWD) and Mesa Consolidated Water District (MCWD) have turned in applications for the new program. A public hearing has been scheduled on October 6, 2010 at OCWD to discuss the IRWD and MCWD projects. 5. Annexation Update. OCWD staff reported four firms have been issued RFP's for the preparation of a Program EIR for the proposed YLWD, Anaheim, IRWD Annexation to OCWD. Staff anticipates recommending award to one of these firms at their October Board Meeting. A representative from Fountain Valley asked if the financial impact to the other producers was to be included in the study. OCWD staff indicated, yes it would be part of the scope of work. 6. Other. Do to time constraints other items on the agenda were moved to next month's meeting. 2 ITEM NO. 4.2 AGENDA REPORT Meeting Date: October 6, 2010 Subject: Status Report on Capital Projects in Progress ATTACHMENTS: Name: Dosciiption: a ype: CIP Rept 0ct10.pdf Status Report on Capital Projects in Progress Backup Material CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: October 1, 2010 New Information since Last Report is Shown in Red IN CONSTRUCTION IN DESIGN Project Current Status Next Actions Comments 1 Highland Reservoir Reservoir placed online July Landscape will be installed On schedule with no significant Budget: $11,200,000 Job No. 200309 15. Contractor completed last, punch list is being issues outstanding. Project Contact: Joe Polimino backfilling, installing fence and generated. Planned Completion Date: Oct. 2010 preparing roads for paving. bids. 2 Hidden Hills Res & Santiago BPS Placed online June 30. Project is complete and Notice of Completion filed Budget: $7,000,000 Job No.200028 closed. September 20. Project Contact: Joe Polimino Planned Completion Date: August 2010 3 Wells 1, 5 and 12 Upgrade W -5 refurbishments complete, W -12 instrumentation & Developing plan of action for W -1. Budget: $190,000 Job No. 200813 operating at 2,200 GPM. W -12 controls expected to be W -12 refurbishments expected to be Project Contact: Anthony Manzano startup pending completion of completed by October. W -1 complete during October. Project Completion: TBD instrumentation & controls. analysis underway. 4 Highland Booster Station Upgrade Will issue Notice to Proceed to PHC will begin sending in Project construction period is 13.5 Budget: $5,000,000 Job No. 200814 Pacific Hydrotech Corp (PHC), submittals for review and will months, with completion estimated Project Contact: Joe Polimino in mid October 2010. mobilize on the project site. December 2011. Planned Completion Date: Dec. 2011 IN DESIGN Project Current Status Next Actions Comments 1 Emergency Pump -out Facilities & Anaheim reviewing final plans Complete the bid package for Plan to bring recommendation for Anaheim Intertie Connection and specs for Intertie Project. the combined projects. award to December PEO meeting. Budget: $500,000 (YLWD Share) Advertise for construction Job No. 200903 & 200906 bids. Project Contact: Hank Samaripa Planned Completion Date: May 2011 2 Ohio /Oriente Pipeline Replacement Oriente Drive pipeline layout Anticipate design completion Construction completion anticipated 1 Budget: $530,000 Job No. 201005 reviewed with City on Sept 30. for combined Ohio /Oriente by summer 2011. Project Contact: Anthony Manzano Fairmont pumping facilities, pipeline replacement in payment from Shapell in lieu of Planned Completion Date: TBD and preliminary plan for November 2010. Fairmont site design and partial 3 VDV Valve Repl. Phases II & III Met with City of YL Sep 29 to Bid documents being finalized. Anticipate construction award by Budget: $350,000 Job No. 200908 review project and confirm District will advertise and December and project completion 2 Project Contact: Derek Nguyen street permit conditions to be solicit Contractor bids in by late spring 2011. Planned Completion Date: June 2011 included in bid documents. October. payment (half of total grant) upon 4 Well 20 Equipping 90% design plans for well 90% design plans to be Anticipate construction completion Budget: $2,000,000 Job No.200711 equipping being reviewed by reviewed with consultant on by summer 2011. 3 Project Contact: Anthony Manzano District staff. October 07. May retain a Property Acquisition Planned Completion Date: TBD potential well sites east of contact land owners to Firm for assistance. IN PLANNING Project Current Status Next Actions Comments 1 Fairmont Site Improvements Developed plan for new Confirm Fairmont site Submitted Draft agreement for Budget: TBD Job No. 200803 Fairmont pumping facilities, redevelopment plan and payment from Shapell in lieu of Project Contact: Anthony Manzano and preliminary plan for prepare RFP for design of Fairmont site design and partial Planned Completion Date: TBD upsizing of Springview BPS. Fairmont and Springview payment for construction of site booster facilities. improvements. 2 Recycled Water Study Draft report due by early State and District will have 6 District will receive $37,500 grant Budget: $1,800,000 Job No. 200807 October. weeks to review draft report payment (half of total grant) upon Project Contact: Derek Nguyen and provide comments for final completion of State's review. Planned Completion Date: TBD report. 3 West Wellfield Project Investigating additional Review hydrogeology data and May retain a Property Acquisition Budget: $9,000,000 Job No. 2009 -22 potential well sites east of contact land owners to Firm for assistance. Project Contact: Anthony Manzano Tustin Avenue. determine if there is interest in Planned Completion Date: TBD selling small site for well. 4 Sewer Master Plan Reviewed model and Model expected to be complete Consultant to refine and complete Budget: $350,000 Job No. 200916 preliminary analysis with by Fall 2010. model, start master plan report and Project Contact: Anthony Manzano consultant on Aug 19. Next provide training to District staff on Planned Completion Date: Oct. 2010 meeting on October 12. use of modeling software. 5 Lakeview Grade Separation OCTA Board resumed project Next design submittal from Awaiting final decision to Budget: TBD Job No. 201002 after putting on -hold. Met OCTA in December 2010. determine agency financially Project Contact: Anthony Manzano with OCTA on Sept 30 to responsible for YLWD pipe Planned Completion Date: Sept. 2013 discuss prior rights. relocation. 6 YL Blvd. Booster Station City Mgr discussed proposal Meeting with City Mgr and Will modify and finalize design Budget: TBD Job No. 200817 for pump station with City Director of Parks on Oct. 14th RFP for the new pump station based Project Contact: Hank Samaripa Council on Sep 7. Initial to discuss next step in the on input from City meeting and next Planned Completion Date: Dec 2011 Council feedback was positive process. steps in process. per the Director of Parks. 7 Elk Mountain Site Improvements City did not express interest in Prepare a scope of work for Interview three landscape firms Budget: $300,000 Job No. 200522 participating in the Elk Landscape Architects to submit with sports field design experience Project Contact: Hank Samaripa Mountain Youth Sports Park design proposal for site to finalize scope of services. Planned Completion Date: Dec 2011 concept. improvements. 8 2010 Waterline Replacement Project Project for replacement of Recommending award of Phase 1 design, for Plumosa Drive, Budget: $2M Job No. 201012 aged waterlines in 8 locations. design consultant at 10/06 anticipated to be complete March Project Contact: Anthony Manzano Four design proposals received PEO, and 10/14 Board. 2011, pending Board approval of Planned Completion Date: Oct. 2011 on September 16. consulting services. 9 OC -51 Connection Upgrade Met w/ MWDOC staff to MWDOC to solicit further Will consider next steps after Budget: $242,000 Job No. 200815 discuss further options and to comments and options from further feedback from MWD and Project Contact: Derek Nguyen finalize decision for OC -51 MWD. MWDOC. Planned Completion Date: TBD project. 10 Urban Water Management Plan Met with consultant to review Review preliminary 2010 Templates from MWD and other Budget: $20,000 Job No. 2201013 2005 UWMP data and updated UWMP with department data to be part of YLWD 2010 Project Contact: Hank Samaripa data for new report. managers for final report. UWMP. Planned Completion Date: June 2011