HomeMy WebLinkAbout2011-04-12 - Planning-Engineering-Operations Committee Meeting Agenda Packet
Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Tuesday, April 12, 2011, 10:00 AM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director Gary T. Melton, Chair Ken Vecchiarelli, General Manager
Director Ric Collett Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
2.1. Construction Contract for Ohio St. and Oriente Dr. Pipeline Replacement
Recommendation: That the Committee recommend the Board of Directors award
the Contract for Construction of the Ohio St. and Oriente Dr. Pipeline Replacement
Project for $1,389,089 to Mamco Construction & Development.
2.2. 2010 Update of the Urban Water Management Plan
Recommendation: That the Planning-Engineering-Operations Committee
recommend that the Board of Directors direct staff to post a Notice of a Public
Hearing for its Board Meeting on May 12, 2011 to receive Public Comments prior to
adopting the 2010 Update of the Urban Water Management Plan.
2.3. Agreement for Fairmont Reservoir and Booster Pump Station Site Improvements
Recommendation: That the Committee recommend the Board of Directors authorize
the President and Secretary to execute the Finance, Design and Construction
Agreement for Fairmont Booster Pump Station Improvements.
2.4. Backhoe Engine Replacement
Recommendation: That the Committee recommend the Board of Directors approve
Coastline Equipment install a new engine in Backhoe #139 at a cost of $14,302.56.
3. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
3.1. Draft FY 2011/12 Engineering Department Budget
3.2. Draft CIP for FY 2011-12
3.3. Draft FY 2011/2012 Operation Department Budget
3.4. Alternative Fuel Report (Verbal Report)
3.5. Monthly Preventative Maintenance Program Report (Sewer report to be provided at the
meeting.)
3.6. Monthly Groundwater Production and Purchased Import Water Report
3.7. Site for Proposed Well No. 21
3.8. Groundwater Producers Meeting Report
3.9. Status Report on Capital Projects in Progress
3.10. Future Agenda Items and Staff Tasks
4. ADJOURNMENT
4.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held
May 5, 2011 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: April 12, 2011 Budgeted: Yes
Total Budget: $775,000
To: Planning-Engineering- Cost Estimate: $3,000,000
Operations Committee
Funding Source: All Water Funds
From: Ken Vecchiarelli, General Account No: 101-2700-201006
Manager
Job No: 201006
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Anthony Manzano, Senior CEQA Compliance: Exempt
Project Manager
Subject: Construction Contract for Ohio St. and Oriente Dr. Pipeline Replacement
SUMMARY:
On March 23, 2011, bids were received from 26 contractors for the construction of the Ohio St. and
Oriente Dr. Pipeline Replacement Project. Following review of the bids, staff recommends award to
the low bidder, Mamco Construction & Development, for the amount of $1,389,089. The Engineer's
Estimate for this project was $3,000,000.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors award the Contract for Construction of the
Ohio St. and Oriente Dr. Pipeline Replacement Project for $1,389,089 to Mamco Construction &
Development.
DISCUSSION:
On March 27, 2010, a water pipeline break occurred on Ohio Street on a 12-inch diameter, unlined
cast iron pipe constructed in 1948. The break was repaired and service was restored early the next
morning. There were two prior breaks and subsequent repairs in this pipeline within the last few
years and its deteriorating condition prompted staff to immediately begin planning its replacement.
The Board supported this action by authorizing the issuance of a Professional Services Agreement
(PSA) for engineering services with Tetra Tech, Inc. for the Ohio Street Pipeline Replacement
Project. Staff was directed to negotiate an agreement with Tetra Tech and return to the Board for
ratification.
On May 27, 2010, the Board ratified issuance of a Professional Services Agreement for engineering
services with Tetra Tech, Inc., for the Ohio Street Pipeline Replacement Project, for a fee of
$85,400.
In June 2010, District and City of Yorba Linda staff met to discuss upcoming projects for each
agency. Included in this discussion was the District's planned replacement of the water pipeline in
Oriente Drive due to its age and condition. Subsequently, on June 23, 2010, City of Yorba Linda
staff requested the District to accelerate its proposed pipeline replacement project in Oriente Drive,
and complete the work before the City's federally-funded pavement replacement project begins in
late 2011.
On July 8, 2010, the Board of Directors approved Amendment No. 1 to the Professional Services
Agreement with Tetra Tech, Inc., to include engineering design of the Oriente Drive Pipeline
Replacement, from Lakeview Avenue to Ohio Street, for a total fee increase not to exceed $63,300,
increasing the total Tetra Tech contract to $148,700.
On March 23, 2011, bids were received from 26 contractors, ranging from a low of $1,389,389 to a
high of $3,171,913, as shown below. The bid tabulation and other bid documents from the apparent
low bidder, Mamco Construction & Development, were reviewed by District staff and found to be
responsive and fully in order.
The apparent low bid was originally listed as $1,389,389; later, staff discovered a math error which
reduced the overall total by $300, for a corrected total bid of $1,389,039. This correction is in
accordance with the project contract documents which state on page I-3, "In the event that there is
more than one bid item in a bidding schedule and the total indicated for the schedule does not
agree with the sum of the prices bid on the individual items, the prices bid on the individual items
shall govern and the total for the schedule will be corrected accordingly." Mamco Construction &
Development agrees with this correction and provided a written acknowledgment.
NO. COMPANY BID
1. Mamco Construction & Development $1,389,389.00
2. VCI Telcom, Inc. $1,533,135.00
3. J. Fletcher Creamer & Son, Inc. $1,588,923.00
4. Sandoval Pipeline Engineering $1,610,588.00
5. Kana Pipeline, Inc. $1,672,000.00
6. Doty Bros. $1,680,666.00
7. Vido Artukovich & Son Inc/Vidmar Inc A JV $1,797,315.00
8. Mike Bubalo Construction Co., Inc. $1,821,540.00
9. Sully-Miller Contracting Co. $1,827,925.00
10. Garcia Juarez $1,882,130.00
11. PEI Paulus Engineering, Inc. $1,927,730.00
12. T.B.U., Inc. $1,974,325.00
13. E.J. Meyer Company $2,111,111.00
14. John Malloy Co. $2,135,060.00
15. C.S. Legacy Construction, Inc. $2,145,906.00
16. J.A. Salazar Construction & Supply Corp. $2,235,000.00
17. SRD Engineering, Inc. $2,257,146.00
18. WEKA, Inc. $2,278,081.00
19. J. De Sigio Construction, Inc. $2,298,310.00
20. Dominguez General Engineering $2,365,140.00
21. T.E. Roberts, Inc. $2,372,795.00
22. TL Pavlich Construction $2,377,425.00
23. Vido Samarzich Inc. $2,478,076.00
24. J.R. Pipeline Co., Inc. $2,737,685.00
25. Minako America Corporation $2,875,760.00
26. Kennedy Pipeline Company $3,171,913.15
PRIOR RELEVANT BOARD ACTION(S):
On May 27, 2010, the Board ratified issuance of a Professional Services Agreement for engineering
services with Tetra Tech, Inc., for the Ohio Street Pipeline Replacement Project, for a fee of
$85,400.
On July 8, 2010, the Board of Directors approved Amendment No. 1 to the Professional Services
Agreement with Tetra Tech, Inc., to include engineering design of Oriente Drive Pipeline
Replacement, from Lakeview Avenue to Ohio Street, for a total fee increase not to exceed $63,300,
increasing the total contract to $148,700.
On March 10, 2011, the Board of Directors authorize approval of Engineering Services Amendment
No. 3 with Tetra Tech, Inc. for a fee increase not to exceed $17,280, resulting in a total fee of
$167,380.
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: April 12, 2011 Budgeted: N/A
Total Budget: $45,000
To: Planning-Engineering- Cost Estimate: $30,000
Operations Committee
Funding Source: Water Operating
Fund
From: Ken Vecchiarelli, General Account No: 101-2720
Manager
Job No: J-20010-13
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Hank Samaripa, Project CEQA Compliance: N/A
Engineer
Subject: 2010 Update of the Urban Water Management Plan
SUMMARY:
The 2010 Urban Water Management Plan (UWMP) has been prepared and will be available for
review on or about April 12, in anticipation of a proposed Public Hearing on May 12, 2011. Copies
will be distributed to the Board and made available for public review in mid-April. At the May 12
Board meeting and Public Hearing, staff will present a summary of the UWMP findings to the Board.
An UWMP is prepared every 5 years by urban suppliers to support their long-term resource
planning and to ensure adequate water supplies are available to meeting existing and future water
demands. The UWMP must be adopted by August 1, 2011 by each representative body to qualify
for any state grants provided by the California Department of Water Resources.
STAFF RECOMMENDATION:
That the Planning-Engineering-Operations Committee recommend that the Board of Directors direct
staff to post a Notice of a Public Hearing for its Board Meeting on May 12, 2011 to receive Public
Comments prior to adopting the 2010 Update of the Urban Water Management Plan.
DISCUSSION:
The State Water Code Sections 10610 through 10656, requires every urban water supplier that
either provides over 3,000 AF annually or serves 3,000 or more connections, to prepare an Urban
Water Management Plan (UWMP) every five years. In 2010, the Municipal Water District of Orange
County (MWDOC) retained the consulting firm Malcolm Pirnie to prepare an UWMP for MWDOC as
well as for YLWD and each of (25) twenty-five other member agencies who chose to participate in
this collaborative effort. The UWMP is prepared by urban suppliers to support their long-term
resource planning and ensure adequate water supplies are available for existing and future water
demands. The 2010 UWMP for YLWD addresses the District's programs, projections and issues
surrounding future water demands. Pursuant to the state regulations, a public hearing and board
adoption of the plan must be completed by August 1, 2011, and the plan must be filed with the
California Department of Water Resources in order to qualify for any future grants. A draft resolution
is attached for consideration by the Board to adopt the UWMP following the required Public
Hearing.
ATTACHMENTS:
Resolution No. 11-07.doc Resolution Resolution
RESOLUTION NO. 11-07
RESOLUTION OF THE BOARD OF DIRECTORS
OF YORBA LINDA WATER DISTRICT ADOPTING
THE 2010 UPDATE OF THE URBAN WATER MANAGEMENT PLAN
WHEREAS, the Board of Directors of Yorba Linda Water District adopted an Urban
Water Management Plan in 1985 pursuant to the requirements of the
Urban Water Management Plan Act of 1983, and
WHEREAS, the Board of Directors adopted an update to the Urban Water
Management Plan in 1990, 1995, 2000 and 2005, and
WHEREAS, the purpose of the plan is to provide a perspective and analysis of current
and alternative water management activities of the District, and
WHEREAS, the Yorba Linda Water District Urban Water Management Plan
incorporates by reference regional plans approved by the Metropolitan
Water District of Southern California and Municipal Water District of
Orange County, and
WHEREAS, the Yorba Linda Water District is required to update the Urban Water
Management Plan at 5 year intervals in accordance with Section 10621 of
the Urban Water Management Planning Act.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Yorba Linda
Water District as follows:
Section 1. The Board of Directors acknowledges the essential nature of water
management with the District and adopts the 2010 Update to the Urban
Water Management Plan.
Section 2. The Board of Directors of Yorba Linda Water District supports the water
management efforts adopted by Metropolitan Water District of Southern
California and Municipal Water District of Orange County in their regional
plans.
Resolution No. 11-07 Adopting the 2010 Update of the Urban Water Management Plan 1
PASSED AND ADOPTED this 12th day of May 2011 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Michael J. Beverage, President
Yorba Linda Water District
ATTEST:
Kenneth R. Vecchiarelli, Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Arthur G. Kidman, Esq.
McCormick, Kidman & Behrens
Resolution No. 11-07 Adopting the 2010 Update of the Urban Water Management Plan 2
ITEM NO. 2.3
AGENDA REPORT
Meeting Date: April 12, 2011 Budgeted: Yes
Total Budget: $1,445,000
To: Planning-Engineering- Cost Estimate: N/A
Operations Committee
Funding Source: District & Developer
Funds
From: Ken Vecchiarelli, General Account No: 1-0010-2700-00
Manager
Job No: 200803
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: Yes
Prepared By: Scott Moulton, Consultant CEQA Compliance: Pending
Subject: Agreement for Fairmont Reservoir and Booster Pump Station Site
Improvements
SUMMARY:
The purpose of the Finance, Design and Construction Agreement for Fairmont Booster Pump
Station Improvements is to document the terms under which Shapell Industries will pay the District
$183,266 for certain improvements at the Fairmont Reservoir and Booster Station site. The
Agreement formalizes the improvements, the responsibility for funding and the actions required by
each party to the Agreement.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the President and Secretary to
execute the Finance, Design and Construction Agreement for Fairmont Booster Pump Station
Improvements.
DISCUSSION:
The District and Shapell Industries have worked together over the years to provide infrastructure for
Shapell's S&S Developments in the vicinity of Fairmont Blvd. and Bastanchury Road. In the 2005
time frame, Shapell suggested modifications at the Fairmont Reservoir and Booster Station site that
they desired to improve the appearance and blend with the design of the planned housing that
would border the Fairmont site. Shapell was willing to fund their requested improvements.
District staff determined that constructing District desired upgrades in combination with the
construction of the Shapell requested improvements, would be beneficial and cost effective for both
parties. The District recommended improvements would be at District expense.
In 2008, District and Shapell staff prepared an agreement formalizing the improvements for each
party. The agreement was based on the Facilities Finance, Design and Construction Agreement
(FFDCA) format that has been used in the past for developers at YLWD. The FFDCA defines the
core Fairmont Improvements, identifies how the improvements will be funded, the actions required
by each party to the agreement and how to resolve matters that may come up in the future before
the project is completed.
The original FFDCA described $443,483 of improvements for the Fairmont Site with an agreed cost
sharing of 41.3% by Shapell and 58.7% by YLWD. The original agreement called for Shapell to
construct the improvements. Shapell's total funding was $183,266.
The Agreement was approved by the District Board in May 2009. However, due to the downturn in
the housing market, Shapell did not execute the Agreement as they were not in a position to follow
through and complete the project. In the last few months, District staff have further evaluated how
the site could be redeveloped to maximize use of the space on site and address the District's long
term needs. Out of this, it was determined that a major renovation of the site would achieve
maximum utility. Further study of site redevelopment alternatives will be recommended.
At the same time, District staff did not want to lose the opportunity for funding from Shapell for site
improvements. Accordingly, discussions followed with Shapell and a new agreement was drafted for
consideration. The new agreement calls for the District to manage the construction contracting,
places more control with the District and establishes fixed periodic payments by Shapell based on
progress milestones of the project, with the same total payment by Shapell of $183,266. The
original design was created by Shapell and will be provided to YLWD as part of the revised
agreement. Any future change to the original site components of the design will be provided to
Shapell for approval, which will not be unreasonably withheld. The agreement specifically allows
YLWD to add scope to the project at YLWD's expense.
The Agreement has been executed by Shapell and reviewed by the District's Legal Counsel. A copy
is attached for review and consideration.
PRIOR RELEVANT BOARD ACTION(S):
The original Fairmont Site Improvement Agreement was approved by the Board on May 28, 2009.
ATTACHMENTS:
Name: Description: Type:
FINAL _FFDCA_for Fairmont _Site _Improvement _Agreement _03 29 2011.pdf Fairmont Site Improvement Agreement Backup Material
FINANCE, DESIGN AND CONSTRUCTION AGREEMENT FOR
FAIRMONT BOOSTER PUMP STATION IMPROVEMENTS
THIS AGREEMENT ("Agreement"), dated 2011 is by and between
YORBA LINDA WATER DISTRICT, a local public agency, created and operating under
authority of Division 12 of the California Water Code ("YLWD" herein), and SHAPELL
INDUSTRIES INC, a Delaware Corporation, ("Shapell" herein), (YLWD and Shapell are
sometimes collectively referred to as "Parties" herein). The Parties do hereby enter into the
following agreement:
RECITALS
A. YLWD desires to perform certain maintenance activities and upgrades to its Fairmont
Booster Pump Station ("Booster Station");
B. Shapell owns certain real property adjacent to and near the Booster Station, desires to
develop its property and desires the Booster Station to be compatible in landscape and design.
and
C. Shapell has offered to pay for some improvements to the Booster Station (collectively,
the "Improvements") in order to make the Booster Station compatible in landscape and design to
Shapell's property;
D. The Improvements are generally listed in Exhibit A attached hereto and incorporated
herein by this reference.
EXECUTORY AGREEMENTS
NOW, THEREFORE, in consideration of the mutual covenants contained herein, the
parties hereto agree as follows:
L DESIGN OF IMPROVEMENTS
Shapell has prepared a preliminary design of the Improvements. Within ten (10) business
days of the execution of this Agreement by the Parties, Shapell shall deliver all existing design
documents relating to the Improvements ("Design Documents") to YLWD. YLWD will use the
documents provided by Shapell to assist it in the ongoing design of the Improvements. During
the ongoing design of the Improvements, YLWD shall, if the Improvements are revised, provide
updated designs to Shapell. Within ten (10) business days of receipt of the updated designs,
Shapell shall approve or deny the updated designs. Failure to provide approval or denial within
the ten business-day time frame shall be deemed a Shapell approval of the updated design.
I
Should Shapell deny the updated design on the grounds the Booster Station is not compatible in
landscape and design to Shapell"s property, YLWD shall make further revisions to the design
acceptable to both parties and meeting Shapell's approval, which shall not be unreasonably
withheld.
II. CONSTRUCTION OF IMPROVEMENTS
YLWD, by a contractor duly licensed in the State of California ("Contractor"), shall cause
the Improvements to be constructed in substantially the same form as depicted in the Design
Documents, with approved design revisions under Section I. The procurement of the contract
shall be in accordance with the California County Water District Law and YLWD's general
procurement policy, which require, in part, the award of the construction contract to the lowest
responsible bidder. In the construction contract, YLWD may, in its sole discretion, choose to
include items in addition to the Improvements, but payment associated with any such items
and/or any costs in excess of the amount set forth in Section III shall be the sole responsibility of
YLWD.
III. SHAPELL'S PAYMENT SCHEDULE
Notwithstanding the total cost necessary to construct the Improvements, Shapell's share of
the construction costs shall be limited to One Hundred Eighty Three Thousand Two Hundred and
Sixty Six Dollars ($183,266) payable to YLWD as follows:
A. One payment of Sixty Thousand Dollars ($60,000) due within thirty (30) days after
the execution of this Agreement by Shapell and YLWD.
B. One payment of Sixty Thousand Dollars ($60,000) due within thirty days of YLWD's
notification to Shapell of YLWD's issuance of a Notice to Proceed to the Contractor.
C. One final payment of Sixty Three Thousand Two Hundred and Sixty Six Dollars
($63,266) due within thirty (30) days of YLWD's notification to Shapell of YLWD's recording a
Notice of Completion as set forth in Section V.A.
IV. ADDITIONAL CONSTRUCTION COSTS
A. Construction Change Orders
YLWD may make or approve change order requests for work other than as described in
Exhibit A. As between YLWD and Shapell, YLWD shall be solely responsible for the payment
of all change orders.
2
B. Testing and Construction Oversight/Inspection
In conjunction with the construction of the Improvements, YLWD will incur costs for
materials testing, construction oversight and construction inspection, including YLWD staff and
outside consultant time (collectively, the "Construction Testing, Oversight and Inspection
Costs"). As between YLWD and Shapell, YLWD shall be solely responsible for the payment of
all Construction Testing, Oversight and Inspection Costs.
V. COMPLETION OF IMPROVEMENTS
A. Notice of Completion
Upon completion of the construction of the Improvements and written acceptance by
YLWD, a Notice of Completion shall be prepared and signed by YLWD and recorded with the
County Recorder's Office of Orange County, California.
B. Disclaimer of Interest
It is understood and agreed that upon YLWD's acceptance of the Improvements, Shapell
disclaims in favor of YLWD all right, title and interest in and to the Improvements constructed
pursuant to this Agreement, appurtenances and easements, and that Shapell hereby covenants and
agrees to execute and deliver to YLWD any documents which may be required to complete the
transfer of the Improvements concurrently with the acceptance thereof by YLWD.
VI. GENERAL PROVISIONS
A. Construction
This Agreement shall be governed by the laws of the State of California and construed
according to its plain meaning as if drafted by both YLWD and Shapell.
B. Integration
This Agreement is a fully integrated contract constituting the entire understanding between
YLWD and Shapell with respect to the matters set forth herein. No prior oral or written
understanding shall be of any force or effect with respect to the matter set forth in this
Agreement. No oral order, objection, claim or notice by any party to this Agreement shall affect
or modify any of the terms or obligations contained herein except by a waiver or modification
thereof in writing and signed by the authorized representative of YLWD and Shapell, or their
authorized successors.
3
C. Amendment
This Agreement may be amended only in writing which must be executed by each party to
its successor.
D. Successors and Assigns
All of the terms, conditions and provisions of this Agreement shall inure to the benefit of
and be binding upon YLWD, Shapell, and their respective successors and assigns. Neither party
may assign its rights or delegate its obligations or duties hereunder, in whole or in part, without
the express written consent of the other party, which consent shall not be unreasonably withheld,
based upon reasonable demonstration of the assignee's capacity to carry out the obligations
assigned.
B. Notice
Any notice, payment or instrument required or permitted by this Agreement to be given or
delivered to either party shall be deemed to have been received when personally delivered or
seventy-two (72) hours after deposit of same in any United States Post Office, registered or
certified, postage prepaid, addressed as follows:
(a) SHAPELL INDUSTRIES INC., 22800 Savi Ranch Pkwy, Suite 200, Yorba Linda.
California 92887 Attn: Curt Thielbar.
(b) YORBA LINDA WATER DISTRICT, P.O. Box 309, Yorba Linda, California
92885-0309, Attn: General Manager.
Each party can change its address for delivery of notice by delivering written notice of such
change of address to the other party within twenty (20) days of such change.
F. Binding Arbitration
At the election of YLWD within thirty-six (36) days after service upon YLWD of a civil
action, YLWD may elect to submit this matter to binding arbitration before the Judicial
Arbitration and Mediation Services (.TAMS), located in Orange County. Upon submission of the
matter to JAMS, it shall be the obligation of YLWD's to obtain from JAMS a list of three (3)
randomly selected arbitrators familiar with construction law and to serve said list upon Shapell.
In the event that there are more than two parties to the action, the number of arbitrators randomly
selected and included in the list shall be increased by two for each additional party involved.
Upon service of the randomly selected list of JAMS arbitrators, each party shall have twenty (20)
days to eliminate two arbitrators from the list and return the list to the JAMS office. The
4
arbitrator selected for the arbitration shall be the remaining name on the list. Should more than
one name remain on the list, the JAMS office will randomly select from the names remaining on
the list, which individual will serve as arbitrator. Arbitration shall be scheduled for hearing on
the merits no later than six (6) months after the date the arbitrator is selected.
All parties shall be permitted to conduct discovery as provided by the current rules
contained in the California Code of Civil Procedure. All costs of JAMS or of the arbitrator for
services shall be divided equally among the Parties, unless otherwise ordered by the arbitrator.
In an arbitration to resolve a dispute under this provision, the arbitrator's award shall be
supported by law and substantial evidence.
G. Severability
If any part of this Agreement is held to be illegal or unenforceable by a Court of competent
jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably
possible.
H. Counterparts
This Agreement and any document required to be executed by the Parties hereunder may
be executed in several counterparts, each of which shall be deemed and all of which shall
together constitute, one and the same agreement or document.
IN WITNESS WHEREOF, The Parties have caused this Agreement to be executed on the
day and year first herein above written.
YORBA LINDA WATER DISTRICT, SHAPELL INDUSTRIES, INC.,
a local public agency a Delaware Corporation
By: By:
Michael Beverage Vi ce Rossi
President Vice President
By:
Kenneth R. Vecchiarelli
Secretary
As to Form:
By: By:
Arthur G. Kidman, Esq. comas A. Inbi n sq.
McCormick, Kidman & Behrens, LLP General COUns Shapell Industries, Inc.
General Counsel to YLWD
5
CALIFORNIA ALL-PURPOSE ACKNOIfILEDGMENT
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES )
On March 24, 201 1, before me, Yumi Swenson, a Notary Public in and for said State,
personally appeared, Thomas A. Ingram and Vince Rossi, who proved to me on the basis of satisfactory
evidence to be the persons whose names are subscribed to the within instrument and acknowledged to me
that they executed the same in their authorized capacities, and that by their signatures on the instrument the
persons, or the entity upon behalf of which the persons acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
YUMISWENSON
Commission # 1758084
Notary Public - California 5 1
Los Angeles County
Comm. Expires Jul 18, 2011
SignatLire ;a Notary Pub+hc
(SEAL)
EXHIBIT A
FAIRMONT BOOSTER STATION SITE IMPROVEMENT COMPONENTS
EXHIBIT A
FAIRMONT BOOSTER STATION SITE IMPROVEMENTS
Line ITEM DESCRIPTION
ONSITE ITEMS
EXISTING BUILDING UPGRADES
1 CONCRETE STORAGE BINS
2 ELECTRICAL SWITCIIGEAR AND UPGRADES
3 PLASTERING/STUCCO
4 ROOFING - USE CONCRETE ROOF TILE
5 STRUCTURAL STEEL
6 ARCHITECTURE
7 CONTINGENCIES
8 CONSULTANT - (ELECTRICAL)
9 CONSULTANT - (I IVAC/TITLE 24)
10 CONSULTANT - (POST-TENSION)
I 1 CONSULTANT - (STRUCTURAL)
12 ADDITION
13 CABINETS
14 CARPENTRY/FINISI-1
15 CARPENTRY ROUGH-LABOR & MAT'L
16 CARPENTRY ROUGH-LUMBER
17 CARPENTRY ROUGII-TRUSSES
18 CERAMIC TILE
19 CLEAN-UP ROUGII & FINISH
20 CONCRETE FOUNDATION
21 CONCRETE ALTERNATE
22 DRYWALL
23 ELECTRICAL FIXTURES
24 ELECTRICAL WIRING
25 FLOORS
26 GUTTERS/DOWNSPOUT
27 HARDWARE FINISH
28 HEATING & AIR CONDITIONING
29 INSULATION
30 ORNAMENTAL IRON
31 PAINTING
32 PLASTERING/STUCCO
33 PLUMBING
34 ROOFING - Included in Existing Building Upgrades Rooting Cost
35 SEWliR t-IOUSE CONNECTIONS
36 SI IEET METAL
37 WLATIIERSTRIPPING -
38 WINDOWS/SLIDING DOORS
39 ARCHITECTURE
40 REVISE ARCIITECTURE TO MEET CBC UPDATE
41 CONTINGENCIES
42 CONSULTANT - (I LLiCTRICAL)
43 CONSULTANT - (I-IVAC/"CI-FLE 24)
44 CONSULTANT - (POST= TENSION)
45 CONSULTANT - (STRUCTURAL)
46 SCI 1001, FEES (53.55 per Sq. Ft.)
Sheet 1 of 2
47 GARAGE
48 CARPENTRY/FINISH
49 CARPENTRY ROUGH-LABOR
50 CARPENTRY ROUGH-LUMBER
51 CARPENTRY ROUGH-TRUSSES
52 CLEAN-UP ROUGII & FINISI I
53 CONCRETE FOUNDATION
54 DRYWALL - TYPE 'S' STRUCTURE - NO I HR DRYWALL (-$1250)
55 ELECTRICAL FIXTURES
56 ELECTRICAL WIRING
57 GARAGE DOORS, COMMER. ROLL-UP
58 GUTTERS/DOWNSPOUT
59 1IARDWARE FINIS I-1
60 INSULATION - ELIMINATE-'D BY YLWD
61 PAINTING
62 PERMITS AND FEES
63 PLASTERING/STUCCO
64 ROOFING - USE CONCRETE ROOF TILE
65 SHEET METAL
66 STRUCTURAL STEEL
67 WEATHERSTRIPPING
68 ARCHITECTURE
69 CONTINGENCIES
70 CONSULTANT - (ELECTRICAL)
71 CONSULTANT - (I IVAC/TITLE 24)
72 CONSULTANT - (POST-TENSION)
73 CONSULTANT - (STRUCTURAL)
74
75 OFFSITE ITEMS
76 AREA DRAINS & GRADING:
77 F&I 12 " X 12" AREA DRAINS, NDS # 1212 & # 1221 GRATE
78 JOIN EXISTING 24" X 24" CATCH BASIN
79 F&I 6" SDR 35, INCLUDING BEDDING
REMOVE INTERFERING PORTION OF PIPE, INCLUDING TRENCH I BACKFILL/COMPACTION & MAUL
80 DEBRIS TO OFFSITE DISPOSAL AREA
81 Y RECOMPACTION OF NEW BUILDING ADDITION & STORAGE BINS
82 STREET IMPROVEMENTS:
83 D - F&I CONCRETE GUTTER PER DETAIL ON SIIEI.~T 3 (NO BASE)
84 E - F&I 6" PCC PAVEMENT W/#4 BARS AT 24" O.C. (NO BASE)
85 F - F&1 4" AC OVER 8" CMB
86 G - F&1 REDWOOD HEADER
87 1-1 - F&I FEATI IER AC FOR SMOOTI I JOIN
88 J - F&I 4" CURB ONLY
89 K - F&I TRANSITION FROM 0" CF TO 4" CF
90 Ka - 1-&1 0" CURB ONLY
91 L - PAINT 4" WI IITE STRIPE
Q - PAINT HANDICAP STENCIL W/VAN ACCESSIBLE SIGN 80" AFG WITH 18" DIA. X 30" DEEP
92 CONCRETE FOOTING
93 R - F&I 12" 111GI1 "NO PARKING SIGN" PAINTED IN WHITE
94 S - REMOVE 3" AC OVER 3" CM13 DISPOSE OF OFFSITE
95 S I - 6" DIRT TO BE DISPOSED OFFSITE
96 S2 -PROCESS SU13GRADE 12" TO COMPACT TO 90%
97 U - F&I AC DRIVEWAY RAMP
98 i\IASONRY WALLS:
99 F&1 6' SPLITFACE BLOCK WALL WITI I PRECAST CAP (NO PILASTERS)
100 CONSULTANTS
101 CIVIL ENGINEERING
102 GEOTECI INICAL ENGINEERING
Sheet 2 of 2
ITEM NO. 2.4
AGENDA REPORT
Meeting Date: April 12, 2011 Budgeted: No
To: Planning-Engineering- Cost Estimate: $14,302.56
Operations Committee
Funding Source: Multiple Funds
From: Ken Vecchiarelli, General
Manager
Presented By: Lee Cory, Operations Manager Dept: Operations
Prepared By: Lee Cory, Operations Manager
Subject: Backhoe Engine Replacement
SUMMARY:
On September 21, 2010 the District's John Deere Backhoe #139, vintage 1999, was involved in an
accident. The vehicle was removed for repair evaluations to Coastline Equipment of Long Beach,
CA. The backhoe cab was repaired by Coastline Equipment and returned to YLWD. The cost of the
cab repair was covered under the District's insurance through ACWA/JPIA. Several days following
the cab repair the backhoe engine developed a knock and Coastline Equipment came to the
District's yard to evaluate the engine problem. Their evaluation concluded that the engine at a
minimum had suffered rod bearing and crankshaft damage. Their recommendation is to replace the
engine. Coastline Equipment is a John Deere approved vendor. The engine replacement is
approximately 25% of the original equipment cost back in 1999 and is approximately 16% of a full
backhoe replacement at today's costs.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Coastline Equipment install a new
engine in Backhoe #139 at a cost of $14,302.56.
DISCUSSION:
Coastline Equipment is the greater L.A. area's John Deere representative. Verbal inquires were
made to two other local tractor repair shops, Case Tractor shop and Everhart Equipment Company,
about making cab repairs to the District's John Deere backhoe. Both repair shops stated that they
would have problems getting parts and making repairs cheaper than a John Deere representative
shop such as Coastline Equipment.
The estimate from Coastline Equipment for cab repair was deemed fair and reasonable. JPIA, the
district's insurance carrier was notified and a claimed was filed. Coastline Equipment provided a
quote to replace the cab at a cost of $22,995.00, which JPIA covered, less our deductible of just
over $1,900, for a reimbursement to the District in the amount of $21,081.25. It should be noted that
at that price JPIA considered the backhoe totaled and the amount paid was the blue book value of
the 12-year old backhoe.
Coastline Equipment provide a quote for $14,302.56 to replace the backhoe's engine. We also
contacted RDO Equipment Co. to provide an estimate for the engine replacement. Their estimate
was $19,800.63.
In making the recommendation to replace the backhoe engine, YLWD staff looked at the following
areas for consideration:
. The cost of a new backhoe replacement ranges from $82, 000 to $92,000. (2 estimates) the
lesser priced unit is a Caterpillar and the higher is a John Deere.
. Staff estimates the existing backhoe will provide an additional 10 years of service life with
these repairs. This estimate is based on the normal work conditions it is currently subject to.
. Insurability of repaired backhoe. JPIA has agreed to continue insurance on the repaired
backhoe.
ATTACHMENTS:
Name: 1=esdCrip ion: Type:
Backhoe~ John _Deere _Service _Locations.pdf John Deere Service Locations Backup Material
Backhoe Engine Replacement Quotes.pdf Engine Replacement Quotes Backup Material
Backhoe~ Replacement_Quotes.pdf Backhoe Replacement Quotes Backup Material
Iltt~i•n,ltiun,~l (7~aiLrl.iicatiir 1)~al~r l.i~t l'a~.!~Pa~~t I ,il' l
JOHN DEERE
Dealer Locator - Search Results
California 92870
[Death
rnyo Valley N
oVisa liil
L
Ridgiiiiatst
San Luis
Obispo P
I!N n
O t !7 aRl,ti,uon Vleja
lGh Coats kil"i"
Dealer Location Distance
i COASTLINE EQUIPMENT COMPANY 8.98 miles
,216 WESTMINSTER AVENUE
SANTA ANA CA 92703 Detailed Mao
United States Driving Directions
7142655500
C-mail us
visit our web site
2. COASTLINE EQUIPMENT COMPANY 17.48 miles
6188 PARAMOUNT BLVD
LONG BEACH CA 90805 Detailed Mag
United States Drivina Directions
5622727400
Email us
Visit our web site
3. COASTLINE EQUIPMENT COMPANY 42.13 miles
12435 FOOTHILL BLVD.
SYLMAR CA 91342 Detailed Mao
United States Driving Directions
8188903353
Visit our web site
4. COASTLINE EQUIPMENT COMPANY 55.42 miles
888 E AVENUE L4
LANCASTER CA 935355210 Detailed Map
United States Driving Diredlons
6619489993
E-mail us
~ Visit gur web site
5. COASTLINE EQUIPMENT COMPANY 78.01 miles
1930 LOCR.WOOD STREET
OXNARD CA 93036 Detailed Mao
United States DCly ng Directions
8054852106
~-mall Us
Visit our web site
More Locations Start Over
Copyright (0 2011 Deere a Company. Privv-v Legal
All Rights Reserved. CanWCt U~ l
httl~. 'c1c ilerlc,catc~r.~l~erc.ti,n~' r~ letrDcalerl.ocator?command=locate;locator=3&selectL,ocaIe=en_US... /2812011
COASTLINE EQUIPMENT
6188 Paramount Blvd.
Long Beach, CA 90805,
ESTIMATE
Coastline (562) 272-7400
Equipment 10
.JOHN DEERE
DATE: 111712011
Customer No. 90760
Sold To: YORBA LINDA WATER DISTRICT Work Order Number:
Address: 913 S. RICHFIELD AVE. PIN Number: T0310EX875793
City, ST Zip PLACENTIA, CA. 92870 Equipment Hours:
Contact Name MIKE KIDDIE PHONE NO: 714-231-0266 CELL
E:Mail: mkiddiee[i ylwd.com FAX NO: 714-701-3155
SPG DESCRIPTION OF WORK PARTS LABOR
JOHN DEERE 310E BACKHOE
1 REMOVE AND REPLACE COMPLETE ENGINE 9,550.00 2,470.00
INCLUDES : R $ R ENGINE ASSEMBLY, TRANSFER PARTS.
DRAIN AND FILL COOLANT AND HYDRAULIC RESEVOIR'.RBR
PRECLEANER.
EXHAUST STACK,HOOD,FRONT GRILLE,RADIATOR WITH OIL
COOLER, COWL, MAIN HYDRAULIC PUMP AND MAIN HYD.
RESERVOIR, TRANSFER FAN, BELTS, STARTER,ALTERNATOR,
SENDING UNITS, EITHER AID FITTINGS AND MOTOR MOUNTS.
2 ROD OUT RADIATOR AND PRESURE TEST 199.00
3 MISC. PARTS AND FLUIDS 225.00
4 DIAGNOSE TIME CUSTOMERS YARD 346.50
Note : Prices are subject to change. This is an Haut Zone Charge
estimate only, if any additional parts or labor are Field Zone Charge (1114111 125.00
needed the customer will be notified before any further Field Labor -
work is performed.. Estimate does not include any un- Shop Labor -
disclosed damage which may be observed until tear- Sublet Labor -
down and disasembly of said parts listed above. Sublet Parts -
Environment Fee 65.00
Other FRT 475.00
Prepared By: Jesse Sanchez-CSA Date: Subtotal - Parts & Labor $ 10,025.00 $ 3,450.50
Sales Tax 8.250/6 IS 827.06
Authorized By: Date: Total Parts and Labor $ 10,852.06 3,450.50
TOTAL 14, 302.56
2f212011 Pagel of 1 yoi-ba linda wafts list 310e Ong p b (3).xis
RDO Equipment Co.
20 i'owa Ave
PO Box 9069
Riverside, California 92502
ARDO
I
. SERVICE ESTMATE JoHm orLEFm
DATE: 4/412011 Work Order/Esbrnate Number:
Customer
Customer Name: YORBA LINDA WATER DISTRICT Mahe/Model JOHN DEERE 310E
Address: Serial Number: T0310EX875793
City, ST, Zip: YORBA LINDA, CA Equipment Hours:
Unitlstock Number
Contact Name. MIKE KI PHONE NO:
E:Mail: n~kldcl e o tW~.con~ FAX NO:
ITEM # MODEL DIESCRIPTION:OF WORK AR ; .
t REPOWER JOHN DEERE 310E BACKHOE LOADER $11,350-00 $5,500.00
REPLACE EXISTING TIER I ENGINE WITH CERTIFIED TEIR II ENGINE
COMPLETE WITH ALL COOLING PACKAGE AND ELECTRONIC CONTROLS
WITH MISCELANEOUS HARDWARE AND FABRICATION NEEDED TO
COMPLETE INSTALLATION,
2 CORE CHARGE FOR EXISTING TEIR I ENGINE. $1,$00,00
NOTE: THIS CORE CHARGE WILL BE CREDITED TO JOB ONCE ENGINE
HAS BEEN RECEIVED AND MEETS CORE CRITERIA.
Subtotal - Parts & Labor $13,150.00 $5,500.00
NOTICE: PRICES ARE ONY AN ESTIMATE AND ARE SUBJECT TO CHANCE IF Travel charges - 2 travel trips
ADDITIONAL PARTS OR LABOR ARE REQUIRED DURING THE REPAIR. IF Sublet Labor
FURTHER ITEMS ARE NEEDED YOU WILL BE NOTIFIED BEFORE ANY EXTRA Sublet Parts
WORK IIN ADDITION TO THIS ESTIMATE IS PERFORMED. THIS ESTIMATE DOES Freight
NOT INCLUDE ANY UNDISCLOSED ADDITIONAL REPA;RS THAT MAY NOT BE Other (Specify); HAZ MAT
DISCOVERED UNTIL TEARDOWN OF THE MACHINE WHICH MAY RESULT IN THE Sales Tax $.75°/a $1,150.63
REOUIRMENT OF EXTRA PARTS AND LABOR FROM THE ITEMS LISTED ABOVE.
FREIGHT CHARGES ARE SUBJECT TO CHANGE AS THEY ARE INCURRED Total Parts and Labor $14,300.63 $5,500.00
TOTAL $ 19,800.63
Prepared By. RON MONTER Date:
WORK AUTHORIZATION: (CHECK ONE) ❑ ORIGINAL ADDrMNAL
APPROVED/DATE ORDERED: AUTHORIZED BY:
CUSTOMER TITLE:
Page 1 of 1
01,'26/2011 10:59 FAX 002
Coastline
r'.- L-.- 'd
rill It
nc=
ULQW
P. O. Box 22732, Long Bern, CA 90801-5732
6188 Paramount Blvd., Long Beach, CA 90806 • (562)272-7400 (714)973-9220 • FAX (562) 272-7444
ui
A BUDGETARY PROPOSAL FOR
Yorba Linda Water District
913 S. Richfield Rd.
Placentia, CA 92870
Attn. Doug Baker
(1) 7310T NEW JOHN DEERE JD310J WHEEL LOADER BACKHOE
84 Net H P. Diesel Engine; Torque Converter/Powerahift Transmission; Power Steering;
Wet Disk Brakes; Differential Lock; Engine Side Shields; Self-Leveling Loader
Unit"d Main frame; Electronic Monitoring System; Tachometer; Hom;
Back-Up Alarm; Bolt-On Cutting Edge; Reversible Stabilizer Feet; Grill Extension
3035 Two Wheel Drive
4770 19.5 x 24 10-Ply Tires 7675 1.25 Yd. 4-1 Loader bucket
4770 12 x 16.5 8-Ply Tires 8485 Counterweight
2085 Cab and Air 2625 Suspension Seat w/Arrnrest
9225, 3" Seat Bak 9110 Ride Control
507017' 11" Backhoe Incl . Extension 1085 Mtude Compensating Turbo
Budget Price
Sales Price $84,750-00
8.75% Sales Tax --LjjLL2
Total $92,165.62
Options:
5080 Auxiliary Plumbing for Hammer Add...... ...$2,245.00 plus tax
5285 Pilot Controls Add......... $2,135.00 plus tax
pe ed
- / r-4 - zQ r
Thomas Crabs
Governmental Sales Manager
RA'M HUDGUARMM
SUCH Ov"M SAWA IMIIiI
WX V"40 I M) 4M MOS (W61 r~aM PRIM"" DAKERM" (40x) jp~ t>wf ysa.o~ I44 ANA ~04M
(six) nossW
(IUIIVN 1
Quote 105574-01 Budget Proposal
January 31, 2011
YORBA LINDA WATER DISTRICT
PO BOX 309
YORBA LINDA, CA 92885-0309
Attention Mike Kiddie
Dear Mike,
Quinn Company is pleased to present this quote for your consideration.
CATERPILLAR INC. Model: 416E Backhoe Loader w Buckets
STUCK NUMBER: TBD SERIAL NUMBER: TBD YEAR: 2011
Quinn Company wishes to thank you for the opportunity of quoting on your equipment needs. Sale Price excludes all
applicable taxes unless expressly stated. Machine availability is subject to prior sale. If there are any questions,
please do not hesitate to contact me.
Sincerely,
Jeff Liebl
Governmental Machine Sales Representative
(714) 713-511'0
jliebi@quinncompany.com
Flage 1 of 4
Quinn Quake 10557401
CATERPILLAR INC. Model: 416E Backhoe Loader
STANDARD EQUIPMENT
BACKHOE -14'4" Center pivot excavator style - backhoe with 24ever control - Boom transport lock - Swi ng
transport lock - Street type stabilizer shoes -12 volt electrical start
ELECTRICAL - 12 volt electrical start -100 ampere aftemator - Horn - Backup alarm - Hazard flasherstturn signals -
Halogen head lights (2) - Halogen rear flood lights (2) - Stop and tail lights - Audible system fault alarm - Key
startfstop system - 880 CCA maintenance free battery - Battery disconnect switch - External Power Receptacle (12v)
- Bucket level indicator
LOADER - Bucket level indicator - Lift cylinder brace - Retum-to-dig - (automatic bucket positioner) - Self-leveling
loader with single lever - control - Transmission neutralizer switch - Single Tilt Loader
OPERATOR ENVIRONMENT - Lighted gauge group - Interior rearview mirror - Rear fenders - ROPS canopy - 2-inch
retractable seat belt - Hand and foot throttle - Lunch box holder - Air suspension seat
POWERTRAIN - Non-EPA Regulated Countries: Cat 3054C - Direct Injection Engine, Tier 2 - Emissions Compliant.
- EPA Regulated Countries: Cat C4.4 92HP - Direct Injection Turbo Charged Engine, - Tier 3 Emissions Compliant.
Includes - High Ambient Cooling Package and - Open Circuit Breather. - Water separator - Thermal starting aid
system - A dry type axial seal air cleaner with - Integral precleaner, automatic dust - ejection system, and lfter
condition - indicator - Hydraulically applied mufti-plate wet - disk brake with dual pedals and - interlock - Differential
lock - Drive-in parking brake - Torque converter - Transmission-four speed synchro mesh - with power shuttle and
neutral safety - switch - Spin-on fuel, engine oil, and - transmission oil filters - Outboard Planetary Rear Axles
OTHER STANDARD EQUIPMENT - Hydrostatic power steering - Toot box - Transport tie-down points - Ground line
fill fuel tank - Lockable Hood - Valve Stem Protection
HYDRAULICS - Load sensing, variable flow system - with 35 gpm axial piston pump - 5 micron spin-on hydraulic
lifter - O-ring face seal hydraulic fittings - Caterpillar XT-3 hose - Hydraulic oil cooler - Flow-Sharing Hydraulic Valves
- Extended Life Coolant -30C (-20F)
ANTIFREEZE - Extended Life Coolant -30C (-20F)
Page 2 of 4
i
Quinn Quote 105574-01
MACHINE SPECIFICATIONS
Description Reference No
416E BHL ST 14FT 291-9185
416 Single Tilt Backhoe Loader
SEAT BELT, 3" SUSPENSION 206-1748
CONTROLS, BACKHOE (Standard) 209-3370
E-STICK 209-9929
HYDRAULICS, BH, 5 FUNCTION 209-9935
BEACON, MAGNETIC MOUNT 211-4292
LOCK, VANDALISM 216-0909
BUCKET-MP, 1.3 CYD 216-8800
CUTTING EDGE, TWO PIECE 9R-5321
COUNTERWEIGHT, 1075 LBS 252-9984
TIRES, 2ND BIAS, FIRESTONE 282-3853
POWERTRAIN, 2WD, STD SHIFT 291-9186
ENGINE, 92HP, TURBO, TIER 3 291-9188
CAB, UTILITY PLUS WIAC 291-9195
HYDRAULICS, LOADER,MULTI PURPOSE 317-1463
RIDE CONTROL 332-7131
STABILIZER PADS, FLIP-OVER 9R-6007
COUPLER, PIN LOCK 222-7379
BUCKET-HD, 12", 3.4 CFT PL 247-1947
BUCKET-HD, 24", 7.3 CFT PL 247-1950
Machine Price $ 87.559.80
Gov. Machine Pricing Discount $ 11,776 80
Grand Total $75,783.00
Orange County (8.75%) Sales Tax $6,631.01
Grand Total $ 82,414.01
Page 3 cf 4
Quinn Quote 10557401
WARRANTY
Standard Warranty: 12 Months/ Unlimited Hours
F.O.B/TERMS
Foothill Ranch- Quote based on Orange County Delivery
Net 30 days with written PO.
ADDITIONAL CONSIDERATIONS
• Subject to factory order.
Accepted by on
Signature
I
I
Page 4 of 4
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: April 12, 2011
To: Planning-Engineering-
Operations Committee
From: Ken Vecchiarelli, General
Manager
Presented By: Steve Conklin, Engineering
Manager
Subject: Draft FY 2011/12 Engineering Department Budget
ATTACHMENTS:
Name: Dosciiption: a ype:
Engineering_Summary.xlsx Engineering Budget Summary Backup Material
4010-Eng Admin.pdf 4010 Detailed Budget Backup Material
4020-Ping Design.pdf 4020 Detailed Budget Backup Material
4030-Construction.pdf 4030 Detailed Budget Backup Material
4040-Water Quality.pdf 4040 Detailed Budget Backup Material
Eng - Vehicles-Capital Budget.pdf Engineering Vehicles & Capital Items Backup Material
ENGINEERING
FY 2010/11 FY 2010/11 FY 2011/12
Budget Forecast Budget
Expenses (Operating)
Supplies & Services
Communications $ 1,000 $ - $ -
Contractual Services $ 77,970 $ 62,000 $ 65,220
Data Processing $ - $ - $ 1,300
Dues & Memberships $ 1,300 $ 1,300 $ 2,300
Fees & Permits $ 20,500 $ 25,300 $ 24,500
Materials $ 1,550 $ 2,450 $ 2,350
Non-Capital Equipment $ 300 $ 500 $ -
Office Expense $ 3,000 $ 950 $ 2,800
Professional Services $ 163,000 $ 85,000 $ 109,000
Training $ 8,500 $ 3,000 $ 8,800
Travel & Conferences $ 3,500 $ 1,000 $ 5,000
Supplies & Services Sub-Total $ 280,620 $ 181,500 $ 221,270
Section Detail Expense Budget
Dept/Section: Eng (Admin) (4010) FY 2012
Detail Item Description 1w
6,
1-4010-0640-00 $500 1-4010-0640-00 500 500
DUES,MEMBERSHIPS,SUBSCRI DUES,MEMBERSHIPS,SUBSCRIPTI
PTIONS (E) ONS (E)
1-4010-0780-00 $9,000 1-4010-0780-00 5,000 Misc. consulting services 5,000
PROFESSIONAL SERVICES (E) PROFESSIONAL SERVICES (E)
1-4010-0780-05 4,000 Legal Services 4,000
Legal Services
1-4010-0810-00 $500 1-4010-0810-00 500 500
Training Training
1-4010-0830-00 $1,500 1-4010-0830-00 1,500 Travel& Conferences 1,500
TRAVEL & CONFERENCES (E) TRAVEL & CONFERENCES (E)
Section Total $11,500
Section Detail Expense Budget
Dept/Section: Eng (Planning & FY 2012
Design) (4020)
1-4020-0620-00 $1,300 1-4020-0620-00 1,300 Water model software license renewal 1,300
DATA PROCESSING (E) DATA PROCESSING (E)
1-4020-0645-00 $2,500 1-4020-0645-20 2,500 2,500
FEES & PERMITS (E) USA Underground Service Alerts
1-4020-0710-00 $300 1-4020-0710-00 300 300
MATERIALS (E) MATERIALS (E)
1-4020-0760-00 $2,000 1-4020-0760-00 2,000 2,000
Office Expense Office Expense
1-4020-0780-00 $100,000 1-4020-0780-00 5,000 Legal Services 5,000
PROFESSIONAL SERVICES (E) PROFESSIONAL SERVICES (E)
1-4020-0780-10 5,000 Sewer Plan-Check Services 5,000
Sewer Consultant
1-4020-0780-30 90,000 On-call Surveying Services 10,000
Water Consulting Engineer
Corrosion Monitoring Program 20,000
On-call Miscellaneous Consulting Engineering Servi 10,000
Plumosa Site Redevelopment Study 50,000
1-4020-0810-00 $1,800 1-4020-0810-00 1,800 1,800
Training Training
1-4020-0830-00 $1,500 1-4020-0830-00 1,500 1,500
TRAVEL & CONFERENCES (E) TRAVEL & CONFERENCES (E)
Section Total $109,400 i _71
Section Detail Expense Budget
Dept/Section: Eng (Construction) FY 2012
(4030)
1-4030-0600-00 $220 1-4030-0600-50 220 220
CONTRACTUAL SERVICES (E) Uniforms
1-4030-0640-00 $300 1-4030-0640-00 300 300
DUES,MEMBERSHIPS,SUBSCRI DUES,MEMBERSHIPS,SUBSCRIPTI
PTIONS (E) ONS (E)
1-4030-0710-00 $500 1-4030-0710-00 500 Field Supplies 500
MATERIALS (E) MATERIALS (E)
1-4030-0760-00 $500 1-4030-0760-30 500 Code Books 500
Office Expense Books & Publications
1-4030-0810-00 $1,500 1-4030-0810-00 1,500 1,500
Training Training
1-4030-0830-00 $1,500 1-4030-0830-00 1,500 1,500
TRAVEL & CONFERENCES (E) TRAVEL & CONFERENCES (E)
Section Total $4,520 1 i i i -71
Section Detail Expense Budget
Dept/Section: Eng (Water Quality) FY 2012
(4040)
1-4040-0600-00 $65,000 1-4040-0600-12 350 350
CONTRACTUAL SERVICES (E) Backflow Device Rep
1-4040-0600-15 2,400 2,400
Distribution Physical Testing
1-4040-0600-25 14,250 14,250
Distrubution System Disinfection
1-4040-0600-60 43,000 43,000
Microbiological Examination
1-4040-0600-80 5,000 5,000
Well 15 Blending
1-4040-0640-00 $1,500 1-4040-0640-00 1,500 1,500
DUES,MEMBERSHIPS,SUBSCRI DUES,MEMBERSHIPS,SUBSCRIPTI
PTIONS (E) ONS (E)
1-4040-0645-00 $22,000 1-4040-0645-10 22,000 22,000
FEES & PERMITS (E) Dept of Health Services
1-4040-0710-00 $1,550 1-4040-0710-20 1,550 1,550
MATERIALS (E) Wtr Quality Test Kit Reagents
1-4040-0760-00 $300 1-4040-0760-30 300 300
Office Expense Books & Publications
1-4040-0810-00 $5,000 1-4040-0810-00 5,000 5,000
Training Training
1-4040-0830-00 $500 1-4040-0830-00 500 500
TRAVEL & CONFERENCES (E) TRAVEL & CONFERENCES (E)
Section Total $95,850
Vehicles Capital Items Budget
Dept: Eng FY 2012
Eng (Planning & Design) 2011 Ford Escape SUV 4-WD Replace two 14-year old Ford Explorers, each with 24,000
98,000 miles, with one new vehicle for Engineering
Dept staff use.
Total Vehicles & Capital $24,000
Items
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: April 12, 2011
To: Planning-Engineering-
Operations Committee
From: Ken Vecchiarelli, General
Manager
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Prepared By: Steve Conklin, Engineering
Manager
Subject: Draft CIP for FY 2011-12
SUMMARY:
Attached is a copy of the Draft CIP for FY 2011-12 for review and discussion with the PEO
Committee.
ATTACHMENTS:
Name: L)9sczirAd o : uype:
CIP Budget FY11-12.pdf Draft CIP for FY 2011-14 Backup Material
Capital Improvement Projects--FY 2011-12 Draft Budget Revised April 6, 2011
FY 2010-11 FY 2010-11 FY 14-15 and
Improvement Projects Total Est. Cost Budget Yr End FY 2011-12 FY 2012-13 FY 2013-14 Later Comments
Expended
Highland Reservoir $ 9,500,000 $ 240,000 $240,000 Completed
New Well 20 $1,700,000 $ 1,025,000 $500,000 $1,200,000 Complete const in FY 11-12
Wells 1, 5, 12 Upgrade $ 350,000 $ 150,000 $150,000 Completed
OC-51 Upgrade $ 170,000 $ 75,000 $33,000 Can be closed
Hidden Hills Res. $ 5,000,000 $160,000 $160,000 Completed
Anaheim Interties $160,000 $50,000 $160,000 In construction
Lakeview Fencing & Landscaping $ 50,000 $50,000 Fencing complete; landscaping remains
GIS Implementation $ 410,000 $ 60,000 $55,000
Fire Flow Improvements--South
Gordon Lane $120,000 $ 100,000 $20,000 $50,000 $50,000 2010 Waterline Project
Elk Mtn. Reservoir Site Impvmts. $790,000 $ 300,000 $50,000 $740,000 Awarding contract for design services
YL Blvd BPS & Pipeline $5,500,000 $ 500,000 $250,000 $500,000 $4,250,000 $500,000 Currently in design
Fairmont Reservoir, BPS & Site
Improvements $6,000,000 $1,445,000 $500,000 $2,000,000 $3,500,000 Combined 4 budgeted projects for site
Sewer Master Plan $300,000 $300,000 $200,000 Complete; can be closed
GIS/CMMS $ 300,000 $ 300,000 $200,000 $80,000
Service Area Interconnections $100,000 $ 120,000 $100,000 In construction
Cresthill Dr. Fire Flow
Improvements $330,000 $ 300,000 $30,000 $150,000 $150,000 2010 Waterline Project
Highland BPS Upgrade $6,000,000 $ 5,500,000 $2,200,000 $3,800,000 In construction
Mixer at Hidden Hills Res. $ 80,000 $ 80,000 $80,000 In construction
Non-Pot Water for Irrig Use $150,000 $ 225,000 $100,000 $50,000 Study being completed
South & West Wells (3) $8,000,000 $ 1,060,000 $1,000,000 $1,500,000 $2,000,000 $3,500,000 3 new wells & pipeline, in planning phase
Catalina Court Pipeline $100,000 $ 300,000 $20,000 $40,000 $40,000 2010 Waterline Project
PAGE SUBTOTAL $ 45,110,000 $ 12,290,000 $ 4,548,000 $ 8,110,000 $ 8,040,000 $ 6,000,000 $ 3,500,000
Capital Replacement Projects--FY 2011-12 Draft Budget
FY 2010-11 FY 10-11 Yr FY 14-15 and
Replacement Projects Total Est. Cost Budget End Expended FY 2011-12 FY 2012-13 FY 2013-14 Later Comments
Green Crest Drive Sewer Lift
$175,000 New project resulting from Sewer Transfer
Station Upgrade
Vista del Verde Valve
Replacement $ 705,000 $ 600,000 $440,000 In construction
Valley View Pipeline
Replacement $ 120,000 $60,000 $60,000 2012 Waterline Project
Blair Drive Pipeline Replacement $80,000 $40,000 $40,000 2012 Waterline Project
Highland Pipeline Replacement $ 120,000 $ 120,000 $60,000 $60,000 2012 Waterline Project
Plumosa Water Line $750,000 $ 110,000 $100,000 $650,000 Preparing to award const. contract
Bastanchury Pipeline
Replacement $ 1,300,000 $700,000 $600,000 2012 Waterline Project
Ohio St. Pipeline Replacement $900,000 $ 470,000 $150,000 $750,000 Preparing to award const. contract
Pebble Beach Rd Pipeline
Replacement $220,000 $170,000 $50,000 2010 Waterline Project
Wabash & Short St Pipeline
Impvments $135,000 $65,000 $70,000 2012 Waterline Project
South Grandview St
Improvements $ 100,000 $50,000 $50,000 2012 Waterline Project
Hidden Hills Pipeline
Replacement $120,000 $ 90,000 $20,000 $70,000 $30,000 2010 Waterline Project
Richfield Rd Pipeline $350,000 $ 200,000 $30,000 $220,000 $100,000 2010 Waterline Project
Oriente Dr. Pipeline
Replacement $700,000 $305,000 $150,000 $550,000 Preparing to award const. contract
Imperial Hwy. Pipeline
Replacement $700,000 $360,000 $ 340,000 2012 Waterline Project
PAGE SUBTOTAL $ 6,300,000 $ 1,895,000 $ 890,000 $2,585,000 $ 1,515,000 $ 1,220,000 $ -
COMBINED TOTAL $ 51,410,000 $ 14,185,000 $ 5,438,000 $ 10,695,000 $ 9,555,000 $ 7,220,000 $ 3,500,000
POTENTIAL NEW PROJECTS
Meter Replacement $1,200,000 $1,200,000 $400,000
PR Station Retrofits $500,000 $500,000
Disinf. Bstr. Sta. at H. Hills Res. $200,000
New Project Subtotal $1,700,000 $1,900,000 $400,000
Color Key
Projects completed in FY 2010-11
Projects in Design and Construction FY 2010-11
Projects in Planning
ITEM NO. 3.3
AGENDA REPORT
Meeting Date: April 12, 2011
Dept: Operations
Subject: Draft FY 2011/2012 Operation Department Budget
ATTACHMENTS:
Name: Description: Type:
2011-2012 Draft OPS Budget.pdf 2011-2012 Draft OPS Budget Backup Material
OPERATIONS
FY 2010111 FY 2010/11 FY 2011112
Budget Forecast Budget
Expenses (Operating)
Supplies & Services
Communications $ 2,000 $ 700 $ 2,400
Contractual Services $ 169,900 $ 190,603 $ 171,050
Dues & Memberships $ 2,246 $ 2,074 $ 2,725
Fees & Permits $ 29,902 $ 29,401 $ 38,250
Materials $ 289,950 $ 364,106 $ 341,100
Maintenance $ 464,100 $ 363,827 $ 342,300
Non-Capital Equipment $ 25,850 $ 17,044 $ 30,000
Office Expense $ 17,200 $ 11,425 $ 12,900
Professional Services $ 27,500 $ 34,600 $ 29,000
Training $ 15,500 $ 5,322 $ 15,925
Travel & Conferences $ 4,300 $ 1,177 $ 5,100
Utilities $ 123,000 $ 107,603 $ 123,200
Vehicle Expense $ 312,850 $ 324,168 $ 350,450
Supplies & Services Sub-Total $ 1,484,298 $ 1,452,050 $ 1,464,400
- Figures have been adjusted to reflect changes in the District's account structure.
Vehicles & Capital Items Budget
Dept., Ops FY 2012
Yry
Ops (Water Ops & Leak Repair Utility Truck Repair of Ford F450 Leak crew truck. 20,000
Maintenance)
Ops (Sewer Ops & Sewer Jetter/Vacuum Truck Replacement of 1999 Sewer Vactor. 420,000
Maintenance)
Ops (Sewer Ops & Sewer Slip-lining 100,000
Maintenance)
Ops (Water Ops & Valve Turning Utility Truck Replacement of 2000 Ford F250 Valve Truck. This 82,000
Maintenance) vehicle would include same set-up and equipment
as 2008 F350 Valve truck, including same Valve
turning machine and software.
Ops (Water Ops & Back Hoe Trailer Additional trailer to use to haul one of the two 22,000
Maintenance) district back hoes around the district. Needed to
meet the safety requirements of transporting
district back hoes.
Ops (Mechanical Services) Work Benchs and Cabinets for 15,000
Mechanics Shop
Total Vehicles & Capital $659,000
Items
Dept/Section: Qps (Admin) (5010) FY 2012
IC Y= ~1 r;ie ant P,` C1{' 5~~:"~A~a in4,, C~~1511+r'
J;
1 I ~jY3 ~r rG u. YIY 'r' . I - 0 0;1
1-5010-0640-00 $1,175 1-5010-0640-00 1,175 CESA Membership 55
Dues, [Memberships, Dues, Memberships, AWWA Memberships 400
Subscriptions Subscriptions
CWEA Memberships 220
OCWA Memberships 50
WEF Memberships 450
1-5010-0710-00 $8,600 1-5010-0710-65 8,600 PPE Equipment 8,600
MATERIALS (E) PPE Equipment
1-S010-0760-00 $12,100 1-5010-0760-0C 3,000 Misc Supplies 3,000
OFFICE EXPENSE (E) OFFICE EXPENSE (E)
1-5010-0760-10 600 Paper Supplies 600
Paper
1-5010-0760-20 4,000 Printer Ink 4,000
Printer Ink
1-5010-0760-30 500 Manuals/Books/Magazines 500
Books & Publications
1-5010-0760-40 2,000 Breakroom Supplies 2,000
Breakroom Supplies
1-5010-0760-50 2,000 Meeting Supplies 2,000
Meeting Supplies
1-5010-0780-00 $22,500 1-5010-0780-05 2,500 Legal Fees 2,500
PROFESSIONAL SERVICES (E) Legal Services
1-5010-0780-19 20,000 Emergency Service Consultant 20,000
Emergency Service Consultant
1-5010-0810-00 $1,500.1-5010-0810-OS 20C Safety 200
Training Safety
1-5010-0810-20 500 Job Training 500
Job Training
1-5010-0810-30 500 Emergency Response 590
Emergency Response
1-5010-0810-40 300 Certificate Reimbursement 300
Certificate Reimbursment
1-5010-0830-00 $2,700 1-5010-0830-10 300 Travel
300
TRAVEL & CONFERENCES (E) Travel
1-5010-0830-20 1,600 Lodging 1,600
Lodging
1-5010-0830-30 300 Meals 300
Meals
1-5010-0830-40 50C Registration 500
Registration
Section Total $48.575
~i ~L C"u'Lv III r'` x t_ ru'1 ~{t
Dept/Section: Ops (Water Ops & FY 2012
Maintenance) (5020)
_✓r.~~+l~-v~{F1
1-5020-0600.00 $6,000 1-5020-0600-50 5,000 Uniforms 6,000
CONTRACTUAL SERVICES (E) Uniforms
1-5020-0645-00 $22,700 1-5020-0645-25 1,500 NPDES DemWmus (RWQCB) 1,500
FEES & PERMITS (E) NPDES/RWQCB
1-5020-0645-45 15,000 Landfill (Orange County & Dan Coop) 15,000
Landfill (Orange County & Dan
Coop)
1-5020-0645-55 6,200 6,200
Encroachment Permits
1-5020-0640-00 $600 1-5020-0640-00 600 AWWA Memberships 600
Dues, Memberships, Dues, Memberships,
Subscriptions Subscriptions
1-5020-0710-00 $261,800 1-5020-0710-05 30,000 Road Material 30,000
MATERIALS (E) Road Material
1-5020-0710-13 11,000 Air Vac parts 11,000
Air-Vac Parts
1-5020-0710-15 10,000 Cla Valve Parts 10,000
Cia-Vaive Parts
1-5020-0710-25 50,000 Hydrant Repair Parts 50,000
Hydrant Repair Parts
1-5020-0710-30 30,000 Valve Repair Parts 30,000
Valve Repair Parts
1-5020-0710-40 20,000 Replacement Meters 20,000
Replacement Meters
1-5020-071055 9,000 Meter Saxes/Lids/Vaults 9,000
Meter Boxes/Lids/Vaults
1-5020-0710-60 6,000 Hardware Supplies 6,000
Hardware Supplies
1-5020-0710-81 2,500 Welding Supplies 2,500
Welding Supplies
1-5020-0710-85 1,500 Cleaning/Painting Supplies 1,500
Cleaning/Painting Supplies
1-5020-0710-90 80,000 Water Service Repair Parts 80,000
Water Service Repair Parts
1-5020-0710-94 7,000 Miscellaneous Warehouse Parts 7,000
Miscellaneous Warehouse Parts
1-5020-0710-96 1,800 Ready Mix Concrete 1,800
Ready Mix Concrete
1-5020-0710-00 $261,800 1-5020-0710-98 3,000 Landscape Supplies 3,000
MATERIALS (E) Landscape Supplies
1-5020-0730-00 $162,000 1-5020-0730-66 140,000 Asphalt Paving 140,000
MAINTENANCE (E) Asphalt Paving
1-5020-0730-67 20,000 Concrete Repair 20,000
Concrete Repair
1-5020-0730-72 2,000 Safety Equipment Repairs 2,000
Safety Equipment Repairs
1-5020-0750-00 $12,500 1-5020-0750-15 2,000 Equipment Rental 2,000
NON-CAPITAL EQUIPMENT (E) Equipment Rental
1-50200750-20 5,000 Road Equipment (Jackhammers, wackers Etc) 5,000
Road Equipment (Jackhammers,
wackers Etc)
1-5020-0750-30 3,000 Tool & Equipment 3,000
Tool & Equipment
1-5020-0750-50 2,500 Traffic Cones, Barricades, and Signs 2,500
Safety Equipment
1-5020-0780-00 $2,500 1-5020-0780-05 2,500 LegaCServices 2,500
PROFESSIONAL SERVICES (E) Legal Services
1-5020-0810-00 $9,300 1-5020-0810-OS 1,000 Safety 1,000
Training Safety
1-5020-0810-20 7,000 Job Training 7,000
Job Training
1-5020-0810-40 1,300 Certificate Reimbursement 1,300
Certificate Reimbursment
1-5020-0830-00 $1,000 1-5020-0830-10 300 Travel
300
TRAVEL & CONFERENCES (E) Travel
1-5020-0830-30 200 Meals 200
Meals
1-5020-0830-40 500 Registration 500
Registration
5ectiOn Totai $478,400
Section oetaou Lxpense lua et
Dept/Section: Ops (Sewer Ops & FY 2012
Maintenance) (5030)
f %lPa1, 171.::
2-5030-0580-00 $2,000 2-5030-0580-00 2,000 FOG Materials 2,000
COMMUNICATIONS (E) COMMUNICATIONS (E)
2-5030-0500-00 $1,200 2-5030-0600-50 1,200 Uniforms 1,200
CONTRACTUAL SERVICES (E) Uniforms
2-5030-0645-00 $4,900 2-5030-0645-00 2,400 FOG Inspections & Fees (OCSD) 2,400
FEES & PERMITS (E) FEES & PERMITS (E)
2-5030-0645-30 1,300 WDR - SSG (SWRCB) 1,300
WDR - SSO (SWRCB)
2-5030-0645-55 1,200 Encroachment Permits 1,200
Encroachment Permits
2-5030-0640-00 $400 2-5030-0640-00 400 CWEA Memberships 400
Dues, Memberships, Dues, Memberships,
Subscriptions Subscriptions
2-5030-0710-00 $21,500 2-5030-0710-60 1,000 Hardware Supplies 1,000
MATERIALS (E) Hardware Supplies
25030-0710-72 500 Calibration Supplies 500
Calibration Supplies
2-5030-0710-92 20,000 Sewer Main Repair Parts 20,000
Sewer Main Repair Parts
2-5030-0730-00 $49,800 2-5030-0730-20 1,500 Electrical Repair Work 1,500
MAINTENANCE (E) Electrical General maintenance
2-5030-0730-54 1,500 Sewer Lift Station Repairs 1,500
Sewer Lift Station Repairs
2-5030-0730-59 30,000 Sewer Line Repairs 30,000
Sewer Line Repairs
2-5030-0730-65 6,000 Vector Control in Manholes 6,000
Vector Control In Manholes
2-5030-0730-71 10,000 CCTV Repairs 10,000
CCTV Repairs
2-5030-0730-72 80D Safety Equipment Repairs 800
Safety Equipment Repairs
2-5030-0750-00 $13,000 2-5030-0750-30 11,500 Tools & Equipment 11,500
NON-CAPITAL EQUIPMENT (E) Tools & Equipment
2-5030-0750-50 1,200 Traffic Cones, Barricades, and Signs 1,200
Safety Equipment
2-5030-0750-00 $13,000 2-5030-0750-80 300 Gas Dectector Replacement 300
NON-CAPITAL EQUIPMENT (E) Gas Detector Replacement
2-5030-0780-00 $1,500 2-5030-0780-05 1,500 Legal Fees 1,500
PROFESSIONAL SERVICES (E) Legal Services
2-5030-0810-00 $2,300 2-5030-0810-05 500 Safety 500
Training Safety
2-5030-0810-20 1,500 Job Training 1,500
Job Training
2-5030-0810-40 300 Certificate Reimbursement 300
Certificate Reimbursment
2-5030-0830-00 $600 2-5030-0830-10 200 Travel 200
TRAVEL & CONFERENCES (E) Travel
2-5030-0830-30 100 Meals 100
Meals
2-5030-0830-40 300 Registration 300
Registration
2-5030-0870-00 $700 2-5030-0870-10 700 SCE - Sewer Llft Station 700
UTILITIES (E) Electric
2-5030-0890-00 $51,300 2-5030-0890-46 30,000 OPS - Sewer Vehicle Maint 30,000
VEHICLE EXPENSES (E) Vehicle Expense: Sewer Vehicle
Maintenance
2-5030-0890-47 2,000 CPS - Sewer - Equipment Maintenance 2,000
Vehicle Expense: Sewer
Equipment Maintenance
2-5030-0890-48 7,800 CPS - Sewer - Gas 7,800
Vehicle Expense: Sewer Gas
F 30-0890-49 11,500 CPS - Sewer - Diesel 11,500
cle Expense: Sewer Diesel
Section Total $149,200
Section 'etaio Expense Budget
Dept/Section: ©ps (Water FY 2012
Production) (5040)
1-5040-0600-00 $6,200 1-5040-0600-00 2,000 Miscellaneous Contractor Services 2,000
CONTRACTUAL SERVICES (E) CONTRACTUAL SERVICES (E)
1-5040-0600-25 3,000 Distribution System Disinfection 3,000
Distribution System Disinfection
1-5040-0600-50 1,200 Uniforms 1,200
Uniforms
1-5040-0640-00 $550 1-5040-0640-00 550 AWWA Memberships 500
Dues, Memberships, Dues, Memberships,
Subscriptions Subscriptions OCWA Memberships 50
1-5040-0660-00 $13,698,538 1-5040-0660-10 40,000 City of Anaheim 40,000
FUEL & POWER-PUMPING (E) City of Anaheim
1-5040-0660-20 758,435 S.C.E. 758,43S
S.C.E..
1-5040-0660-30 439,103 The Gas Company 439,103
The Gas Company
1-5040-0660-40 2,760,000 OCWD Replenishment Assessment 2,760,000
Groundwater Replenishment
1-5040-0660-50 9,100,000 Purchased Water 9,100,000
Purchased Water
1 5040-0660-60 601,000 Municipal Water District of D.C. 601,000
Connection/Readiness Charge
1-5040-0710-00 $35,000 1-5040-0710-17 6,000 Pump Repair Parts 6,000
MATERIALS (E) Pump Repair Parts
1-5040-0710-35 10,000 CL2 Parts 10,000
CL2 Parts
1-5040-0710-60 2,500 Hardware Supplies 2,500
Hardware Supplies
1-5040-0710-75 9,000 Salt 9,000
Salt
1-5040-0710-84 5,000 Production Repair Parts 5,000
Production Repair Parts
1-5040-0710-94 2,500 Miscellaneous Warehouse Parts 2,500
Miscellaneous Warehouse Parts
1-5040-0730-00 $70,200 1-5040-0730-00 5,000 Maintenance 5,000
MAINTENANCE (E) MAINTENANCE (E)
1-5040-0730-05 3,000 CL2 System Service 3,000
CL2 System Service
1-5040-0730-00 $70,200 1-5040-0730-10 2,000 Electrical Motor Repairs 2,000
MAINTENANCE (E) Electrical Motor Repairs
1-5040-0730-20 10,000 Electric General Maintenance 10,000
Electrical General Maintenance
1-5040-0730-24 10,000 Reservoir Repairs 10,000
Reservoir Repairs
1-5040-0730-25 6,000 Reservoir Inspections & Cleaning 6,000
Reservoir Inspections & Cleaning
1-5040-0730-29 5,000 Wells, Mtce & Repairs 5,000
Wells: Calibration, Mtce, Repairs
1-5040-0730-44 24,000 Water Softener Service 24,000
Water Softener Service
1-5040-0730-72 200 Safety Equipment Repairs 200
Safety Equipment Repairs
1 5040-0730-75 5,000 Pump Repairs 5,000
Pump Station Repairs
1-5040-0750-00 $300 1-5040-0750-80 300 Gas Dettector Replacement 300
NON-CAPITAL EQUIPMENT (E) Gas Detector Replacement
1-5040-0760-00 $400 1-5040-0760-30 400 Manuals/Books/Magazines 400
OFFICE EXPENSE (E) Books & Publications
1-5040-0780-00 $1,500 1-5040-0780-05 1,500 Legal Fees 1,500
PROFESSIONAL SERVICES (E) Legal Services
1-5040-0810-00 $2,125 1-5040-0810-05 500 Safety 500
Training Safety
1-5040-0810-20 1,000 Job Training 1,000
Job Training
1-5040-0810-40 625 Certificate Reimbursment 625
Certificate Reimbursment
1-5040-0830-00 $800 1-5040-0830-10 200 Travel 200
TRAVEL & CONFERENCES (E) Travel
1-5640-0830-30 200 Meals 200
Meals
1-5040-0630-40 400 Registration 400
Registration
Section Total $13,815,613
Dept/Section: Ops (Mechanical FY 2012
Services) (5050)
1-5050-0580-00 $400 1-5050-0580-00 400 Communications 400
COMMUNICATIONS (E) COMMUNICATIONS (E)
1-5050-0600-00 $850 1-5050-0600-50 850 Uniforms 850
CONTRACTUAL SERVICES (E) Uniforms
1-5050-0645-00 $10,650 1-5050-0645-00 1,200 1,200
FEES & PERMITS [E) FEES & PERMITS (E)
1-5050-0645-05 6,000 AQMD Permits 6,000
AQMD Permits
1-5050-0645-15 300 E.P.A. Fees 300
E.P.A.. Fees
1-5050-0645-35 2,000 Haz Mat Fee (OCFA) 2,000
Haz Mat Fees (OCFA)
1-5050-0645-60 1,150 C.A.R.3 Fee 1,150
CARS Fees
1-5050-0710-00 $6,500 1-5050-0710-60 2,000 Hardware Supplies 2,000
MATERIALS Hardware Supplies
1-5050-0710-65 500 PPE Equipment 500
PPE Equipment
1-5050-0710°80 3,000 Mech. Shop Supplies 3,000
Mech. Shop Supplies
1-5050-0710-81 1,000 Welding Supplies 1,000
Welding Supplies
1-5050-0750-00 $4,000 1-5050-0750-40 4,000 1 Meth Shop Equipment 4,000
NON-CAPITAL EQUIPMENT [E) Mech Shop Equipment
13050-0760-00 $400 1-5050-0760-30 400 Manuals/Books/Magazines 400
OFFICE EXPENSE (E) Books & Publications
1-5050-0810-00 $500 1-5050-0810-05 200 Safety 200
Training Safety
1-5050-0810-40 300 Certificate Reimbursment 300
Certificate Reimbursment
1-5050-0890-00 $299,150 1-5050-0690-10 1,100 Admin - Gas 1,100
VEHICLE EXPENSES Admin - Gas
1-5050-0890-11 750 Admin -Vehicle Maint 750
Admin - Vehicle Maint
1-5050-0890-20 13,600 Finance - Gas 13,600
Finance - Gas
1-5050-0890-00 $299,150 1-5050-0890-21 4,000 Finance -Vehicle Maint 4,000
VEHICLE EXPENSES Finance - Vehicle Maint
1-5050-0890-30 10,700 Engineering- Gas 10,700
Engineering - Gas
1-5050-0890-31 3,000 Engineering -VehicleMaint 3,000
Engineering -Vehicle Maint
1-5050-0890-40 1,500 OPS -Admin Vehicle Maint 1,500
OPS - Admin Vehicle Maint
1-5050-0890-41 4,200 OPS Adrnin Gas 4,200
CPS - Admin Gas
1-5050-0890-42 50,000 CPS Water Vehicle Maintenance 50,000
CPS - Water - Vehicle Maint
1-5050-0890-43 5,000 CPS - Water Equipment Maintenance 5,000
OPS - Water - Equipement Maint
1-5050-0890-44 63,000 OPS - Water - Gas 63,000
CPS - Water - Gas
1-5050-0890-45 15,000 CPS - Water - Diesel 15,000
OPS - Water - Diesel
1-5050-0890-50 5,000 OPS -Production Vehicle Maint 5,000
OPS - Production Vehicle Maint
1-5050-0890-51 2,000 CPS Production Equipment Maint 2,000
OPS - Production Equipment
V int
1-5050-0890-52 19,000 CPS Production - Gas 19,000
OPS - Production - Gas
1-5050-0890-53 2,500 OPS Mech Svcs - Vehicle Maint 2,500
CPS - Mech Svcs - Vehicle Maint
1-5050-0890-54 4,40D OPS - Mech Svcs - Gas 4,400
OPS - Mech Svcs - Gas
1-5050-0890-s5 1,000 OPS - Facilities - Vehicle Maint 11000
OPS - Facilities - Vehicle Maint
1-5050-0890-56 2,000 OPS - Facilities - Gas 2,000
CPS - Facilities - Gas
1-5050-0890-57 3,000 OPS -Tool Repair 3,000
OPS - Tool Repair
1-5050-0890-70 2,000 IT -Vehicle Maintenance 21000
IT - Vehicle Mtce
1-5050-0890-71 4,400 IT - Gas 4,400
IT - Gas
1-5050-0890-80 65,000 Stationary Engine Maint 65,000
Stationary Engine Maint
1-5050-0890-81 14,000 Stationary Engine Emissions Testing 14,000
Stationary Engine Emissions
Testing
1.5050-0890-00 $299,150 1-5050-0890-90 3,000 Haz Mat Disposal 3,000
VEHICLE EXPENSES Hazardous Materials Disposal
Section Total $322,450
Section ibetah Lxpense udge
Dept/Section: Ops (Facilities FY 2012
Maintenance) (5060)
mt jP _7t'P~'== a~= I1 'f~l rSLv t.LS 1111
1-5060-0600-00 $156,800 1-5060-0600-05 13,000 AC & Heating 13,000
CONTRACTUAL SERVICES (E) AC & Heating
1-5060-0600-29 7,000 Disposal Service 7,000
Disposal Service
1-5060-0600-35 75,000 Janitorial Service 75,000
Janitorial Service
1-5060-0600-40 55,000 Landscape Service 55,000
Landscape Service
1-5060-0600-45 3,000 Pest Control Service 3,000
Pest Control Service
1-5060-0600-50 3,800 Uniforms & Mats 3,800
Uniforms
1-5060-0710-00 $7,700 1-5060-0710-00 1,500 1,500
MATERIALS (E) MATERIALS (E)
1-5060-0710-10 2,500 Building Repair Parts 2,500
Building Repair Parts
1-5060-0710-60 3,000 Hardware Supplies 3,000
Hardware Supplies
1-5060-0710-85 500 'Clean ing/PaintingSupplies 500
Cleaning/Painting Supplies
1-5060-0710-98 200 Landscape Supplies 200
Landscape Supplies
1-5060-0730-00 $60,300 1-5060-0730-00 2,800 2,800
MAINTENANCE (E) MAINTENANCE (E)
1-5060-0730-20 5,000 Electrical Repair Work 5,000
Electrical General Maintenance
1-5060-0730-35 7,500 Fire Extinguiser Maint/Calibration 2,500
Fire Extinguisher
Maint/Calibration
1-5060-0730-50 20,000 Fainting 20,000
Painting & Fencing
1-5060-0730-65 25,000 Aspha It Paving 25,000
Asphalt Paving
1-5060-0730-67 5,000 Concrete Repair 5,000
Concrete Repair
1-5060-0750-00 $200 1-5060-0750-00 100 100
NON-CAPITAL EQUIPMENT (E) NON-CAPITAL, EQUIPMENT (E)
1-5060-0750-00 $200 1-5060-0750-30 100 Tools & Equipment 100
NON-CAPITAL EQUIPMENT (E) Tools & Equipment
1-5060-0780-00 $1,000 1-5060-0780-05 1,000 Legal Fees 1,000
PROFESSIONAL SERVICES (E) Legal Services
1-5060-0810-00 $200 1-5060-0810-20 200 Job Training 200
Training Job Training
1-5050-0870-00 $122,500 1-5060-0870-10 122,000 Electric 122,000
UTILITIES (E) Electric
75060-0870-20 500 Gas 500
Gas
Section Total $348,700
ITEM NO. 3.5
AGENDA REPORT
Meeting Date: April 12, 2011
Subject: Monthly Preventative Maintenance Program Report (Sewer report to be
provided at the meeting.)
ATTACHMENTS:
Narn9: Doscrip ion: u
2010-11 PM Report.pdf PM Report Backup Material
PM PROGRAM
FISCAL 2010111
Fiscal 2010-11 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100%
HYDRANTS (3,881) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 55 293 160 446 552 589 337 419 902
INSPECTED THIS YEAR 55 348 508 954 1,506 2,095 2,432 2,851 3,753
% OF TOTAL 1.4% 9.0% 13.1% 24.6% 38.8% 54.0% 62.7% 73.5% 96.7%
VALVES (10,70612=5,353) Target; all valves to be operated every two years
OPERATED THIS MONTH 536 378 380 457 343 315 414 517 890
OPERATED THIS YEAR 536 914 1,294 1,751 2,094 2,409 2,823 3,340 4,230
% OF TOTAL 10.0% 17.1% 24.2% 32.7% 39.1% 45.0% 52.7% 62.4% 79.0%
DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH 0 0 0 0 155 0 0 9 0
FLUSHED THIS YEAR 0 0 0 0 155 155 155 164 164
% OF TOTAL 0.0% 0.0% 0.0% 0.0% 50.0% 50.0% 50% 53% 53%
AIR VACS (309) Target; all air/vacs to be serviced annually.
INSPECTED THIS MONTH 296 13 2 0 0 0 0 0 01 1
INSPECTED THIS YEAR 296 309 311 311 311 311 311 311 311
% OF TOTAL 95.8% 100.0% 100.7% 100.7% 100.7% 100.7% 100.7% 100.7% 100.7%
PRVs (150) 40 STATIONS Target; all PRVs to be serviced annually.
INSPECTED THIS MONTH 0 12 16 31 42 38 34 1 5
INSPECTED THIS YEAR 0 12 28 59 101 139 173 174 179
% OF TOTAL 0.0% 8.0% 18.7% 39.3% 67.3% 92.7% 115.3% 116.0% 119.3%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 126,497 68,133 38,676 46,790 73,169 82,782 97,798 79,855 106,787
CLEANED THIS YEAR 126,497 194,630 233,306 280,096 353,265 436,047 533,845 613,700 720,487
% OF TOTAL 15.8% 24.3% 29.1% 34.9% 44.0% 54.3% 66.5% 76.5% 89.8%
SEWER TELEVISING (160,512) Target; all sewers to be televised every 5 years.
TELEVISED THIS MONTH 12,176 18,676 6,524 14,128 - 201 7,508 17,041
TELEVISED THIS YEAR 12,176 30,852 37,376 51,504 51,504 51,705 51,705 59,213 76,254
% OF TOTAL 7.6% 19.2% 23.3% 32.1% 32.1% 32.2% 32.2% 36.9% 47.5%
OTHER SEWER WORK.
S.S. OVERFLOWS 0 0 0 0 0 0 0 0 0
SERVICE CALLS 1 0 0 1 1 2 0 0 1
REHAB FOOTAGE 0 0 0 319 629 346 225 320 0
MAIN REPAIRS 0 0 0 3 0 2 2 1 0
MANHOLE REPAIRS 0 4 16 1 2 1 0 2 0
ITEM NO. 3.6
AGENDA REPORT
Meeting Date: April 12, 2011
Subject: Monthly Groundwater Production and Purchased Import Water Report
ATTACHMENTS:
Name: Dosciiption: a ype:
Import2010-2011 Mar PEO Sheet.pdf Import 2010-11 Mar PEO Sheet Backup Material
Import2010-2011 _Mar_Pie_Chart.pdf Import 2010-11 Mar Pie Chart Backup Material
Import2010-2011 Mar TWU.pdf Import 2010-11 Mar TWU Backup Material
Import2010-2011 Mar YTD Prod Chart.pdf Import 2010-11 Mar YTD Prod Backup Material
Daily Average March _2011.pdf Daily Avg Mar Backup Material
YLWD SOURCE WATER SUMMARY
FY 2010-2011
TOTAL MONTHLY YTD BUDGET
GW IMPORT DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF)
Jul-10 793.2 1,476.0 2,269.2 35.0% 35.0% 2,483.5 -8.6%
Aug-10 817.3 1,529.5 2,346.7 34.8% 34.9% 2,443.4 -4.0%
Sep-10 753.6 1,404.8 2,158.4 34.9% 34.9% 2,143.8 0.7%
Oct-10 449.1 936.4 1,385.5 32.4% 34.5% 1,808.3 -23.4%
Nov-10 427.8 917.5 1,345.2 31.8% 34.1% 1,428.5 -5.8%
Dec-10 226.2 694.7 920.8 24.6% 33.3% 1,285.0 -28.3%
Jan-11 873.5 281.1 1,154.6 75.7% 37.5% 1,120.4 3.0%
Feb-11 813.2 336.5 1,149.7 70.7% 40.5% 1,071.9 7.3%
Mar-11 742.7 308.3 1,051.1 70.7% 42.8% 1,270.2 -17.3%
Apr-11 1,588.8
May-11 2,101.6
Jun-11 2, 354.8
FYTD 5,896.6 7,884.7 13,781.3 42.8% 15,054.9 -8.5%
Allowable GW (YTD) 6,322.9 (AF)
Underpumped 426.3 (AF)
Conservation Percentage
Since July 1, 2009 -19.4%
GROUNDWATER PERCENTAGE
80.0%
70.0%
60.0%
50.0%
40.0%
MONTHLY GVV
30.0%
YTD GW
BPP GOAL 45.9%
20.0%
Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11
Month
WATER SUPPLY
FY 2010-2011
March 2011 Water Supply
IMPORT
29.3%
GW
70.7%
2010-2011 YTD Water Supply
GW
42.8%
IMPORT
57.2%
GW BPP GOAL
45.9%
TOTAL WATER USE
FY 2010-2011
3,000
Monthly Average Mean Temperature (°F) ■09-10GW
73.6 009-10 IMPORT
72.2
■08-09 GW
2,500 72.1 008-09IMPORT
69.8 ■10-11 GW
74.0 74.373.2
69.7 74.1 010-11 IMPORT
70.8 65.9 67.2
2,000 62.9 66.4
61.6
66.1
62.6
L% I
Q
1,500 62.6 58.2 59.3
E 65.4
E 61.5
> 60.2
55.8 60.0 55.2
54.3 58.2
58.7
1,000 56.4 56.3
57.2
500
0
Q~ Oo Oo Oo Oo N° Oo e N° O~ N° O% e N° Oo N° NN N° NQ) N° NN
e,~ F e, ~ F e, ~A ~A ~
Month
FY 2010-2011 YTD Water Supply
22,000
Budgeted Total GW + Import
20,000
Actual Total GW + Import
18,000 --rrBPP GW Goal 45.9%
16,000 Actual GW Production
14,000 -
U-
Q 12,000
m
E
0 10,000
8,000
6,000
4,000 000001111~
2,000
0
Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11
Month
March 2011 Daily Average Demand (MG)
12.5
12.0 11.9 11.8 12.0
11.5 11.4
11.3
11.0 -
11.0
10.5 11 Ej 10.4
10.0
9.5
~~~aaa o~aaa Jeyaaa ~~yaaa ~~yaaa ``a~a ~~aaa
ITEM NO. 3.7
AGENDA REPORT
Meeting Date: April 12, 2011 Budgeted: Yes
To: Planning-Engineering- Cost Estimate: $2M
Operations Committee
Funding Source: Water Capital
Reserves
From: Ken Vecchiarelli, General Account No: 101-2700
Manager
Job No: 2009-22
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Steve Conklin, Engineering CEQA Compliance: Pending
Manager
Subject: Site for Proposed Well No. 21
SUMMARY:
Staff has been pursuing a site for proposed Well No. 21 and received a favorable response from
OCWD. See attached memorandum and site map regarding well sites and proposed next steps.
ATTACHMENTS:
Name: Description: V ype:
Well 21 Memo 4Apr2011.pdf Well Site Memo Backup Material
Groundwater _Replacement _Well _Sites.pdf Well Site Map Backup Material
Fm Yorba Linda
Water District,
MEMORANDUM
DATE: April 4, 2011
TO: Ken Vecchiarelli
FROM: Steve Conklin
SUBJECT: Meeting with OCWD to Discuss Site for Proposed Well No. 21
On March 28, Anthony Manzano and I met with OCWD Property Management staff members, Bruce
Dosier and Don Jackson. The purpose of the meeting was to discuss the request of YLWD to locate a
new production well on OCWD property on the south side of La Palma Avenue, adjacent to OCWD's
Warner Basin (also referred to as the Santa Ana River Lakes). Mr. Dosier indicated that YLWD's request
was discussed with OCWD management and various departments, and they were not opposed to a well
located as shown as Proposed Well 21 on the attached site map. The site is a grassy area with trees that
should work very well.
As agreed in the meeting, the proposed next step is for YLWD to prepare a draft Memorandum of
Understanding (MOU) that could lead to a 50-year lease of OCWD property for a well site. The purpose
of the MOU is to obtain conceptual approval from the OCWD Board for the well site and approval of a
license agreement that would allow YLWD to drill a test hole at the well site to determine water quality
and production. If good results are obtained, YLWD could proceed with preparation of a preliminary
design report, CEQA documentation, and determination of permit requirements for the project.
If all of the above items are moving forward favorably, OCWD would prepare a draft lease agreement for
YLWD's consideration. If so approved by YLWD staff and Board, the lease agreement and CEQA
document would be brought to the OCWD Board for approval at the same time.
Before moving forward with OCWD, staff is recommending authorization to proceed with a review of
available well and geology data in the vicinity of proposed Well 21 by YLWD's well and hydrogeology
consultant, CDM. If CDM's findings are promising, and they recommend proceeding, we would begin
work with YLWD's legal counsel on the framework for a MOU for the project.
Also shown on the attached map is a potential location for the pipeline from proposed Well 21, and the
location for a possible Well 22. The Well 22 site is the corner of an existing strawberry field. Staff
recommends that we be authorized to perform a hydrogeologic study of available data for this site at the
same time as the above. If the findings are promising, it may be prudent to pursue purchase of property
for a well here, while it is undeveloped and may be available.
GROUNDWATER REPLACEMENT WELL SITES
, u
_ I 5z_
HIM 111111 4-
W
• S n
s,. y~tiiS 4. ' { s i
l
9 IMPOSSIBLE-41
1. = L e 46' i
-
Y
LWD !
t
CML&-
L.A 4,0
too
i
lo -
r e C r~ a
L fill ~~~3
P,,ROPOSED
VVFII 21 1 STL
- ~ 1
=s.~a'I y -
~I "
1 r i
3 uAlWELL20
f~ Warner B sin Conrock Basin (UNDER"'CONSTRUCTION)
io
S
i'
l
- a
ittle Warne
F
Prepared By: v
YORBA LINDA WATER DISTRICT
e
1717 MIRALOMAAVE
PLACENTIANTIA, CALIFORNIA 92870 0 260 520 1,040 Feet
(714) 701-3000
ITEM NO. 3.8
AGENDA REPORT
Meeting Date: April 12, 2011
Subject: Groundwater Producers Meeting Report
ATTACHMENTS:
Name: cv, i~a$icri: a ype:
GWP MtgNotes 09Mar2011.pdf GWP Meeting Report for March 2011 Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: March 11, 2011
TO: Ken Vecchiarelli, General Manager
FROM: Steve Conklin, Engineering Manager
COPY: Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
SUBJECT: Groundwater Producers Meeting, March 9, 2011
John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on March 9
at OCWD. A summary of each item discussed is as follows:
1. Water Quality Update. OCWD staff provided an update on water quality issues
including:
a. Consumer Confidence Reports.
b. California Department of Public Health Monitoring Waiver Assessment.
c. EPA Draft Unregulated Contaminant Monitoring Regulation, Phase 3.
2. Prado Dam Water Storage Status. OCWD reported that starting March 1,
storage elevation can increase from Elevation 498 ft to 505 ft due to the end of
the Army Corps' flood-hazard season. As of March 9, water elevation was 501 ft
and storage was 13,000 acre-ft (AF). Required release from Prado is 350 cfs
(minimum) until elevation drops to 498 ft at which point OCWD can reduce
discharge to any desired rate. Irvine Lake continues to spill into Santiago Creek
at a rate of approx 100 cfs, which discharges into OCWD's Santiago Pits and is
recharged. Currently, OCWD's surface recharge capacity is approx 350 cfs.
However, combined flow from Prado and Santiago Creek is approx 450 cfs,
resulting in a net loss to the ocean of approx 100 cfs, until flow from Prado can
be reduced to 250 cfs.
3. Annexation Financial-Impact Estimates. OCWD provided a handout with
updated information on the estimated financial impacts on the Groundwater
Producers (GWPs) from the proposed annexation by IRWD, YLWD and
Anaheim. OCWD asked the GWPs to review the information and provide any
comments. OCWD noted that the Notice of Preparation (NOP) for the
Annexation Project EIR will be released in two to three weeks. A scoping
meeting will follow at which time comments will be formally received for items to
be addressed in the EIR. The NOP and scoping meeting will also provide
information on the proposed schedule for preparing and processing of the EIR.
1
4. Review of draft OCWD FY 2011-12 Budget. OCWD provided a handout with
information presented to the OCWD Board on March 2. Staff estimates that RA
will increase from $249 this year to $253/AF in FY 11-12, and BPP from 62% to
65%, subject to Board approval in April. It was noted that these changes do not
include impacts from potential annexation or GWRS expansion. With GWRS
expansion, the RA and BPP are estimated to ramp up to $328/AF and 70% by
FY 15-16. With GWRS expansion and a projected BPP of 70%, the overall cost
of water (pumped and imported) to the GWPs will be less, based on OCWD
calculations.
5. Update on Groundwater Basin Losses to LA County. Tabled for discussion
next month due to time constraints.
6. Annual Recharge Operations Report. OCWD provided a presentation on the
annual groundwater recharge in the Orange County Groundwater Basin. It was
noted that the 10-year average total recharge (surface, injection and in-lieu) is
340,700 AF/year. The 10-year average recharge through surface-water facilities
(recharge basins, lakes, riverbed and creek bed) in Anaheim and Orange is
280,000 AF/year. Recharge water includes river base flow, storm flow, recycled
water, purchased water and incidental recharge from the surrounding hills.
Annual reports on recharge operations are prepared by OCWD and are available
to the GWPs.
7. Other. OCWD reported that there will be a special OCWD Board meeting on
March 30 to consider proceeding with construction of the 30-mgd capacity
expansion of the GWRS plant, increasing overall capacity from 70- to 100 mgd.
Design is complete. The cost estimate for design and construction is $150
million. Analyses by OCWD indicate that the higher RA to cover the cost of
GWRS capital and operation will be more than offset by the increase in the
BPP-resulting in a net lower cost of water to the GWPs with GWRS expansion.
Based on this information and the need for more groundwater production from
the basin, the GWPs support expansion of the GWRS plant.
2
ITEM NO. 3.9
AGENDA REPORT
Meeting Date: April 12, 2011
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Name: cv, i~a$icri: a ype:
CIP Rept Apr2011.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 4, 2011
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project Current Status Next Actions Comments
1 Wells 1, 5 and 12 Upgrade W-1, 5 & 12 refurbishments Consultant to complete well Staff will discuss feasibility of
Budget: $190,000 Job No. 200813 complete. W-1 & 5 operating overview study by early fall refurbishing an additional on-site
Project Contact: Anthony Manzano at 2,000 GPM (each), W-12 2011. well and completing an overall well
Project Completion: TBD operating at 1,200 GPM. analysis/operational study.
2 Highland Booster Station Upgrade Contractor completed pump Contractor will excavate Project construction period is 13.5
Budget: $5,000,000 Job No. 200814 cans, intake & discharge ahead of the meter vault, to months, with completion estimated
Project Contact: Joe Polimino headers and cell retaining wall. lower electrical duct bank. December 2011.
Planned Completion Date: Dec. 2011 Backfill complete behind They will then encase all
retaining wall; contractor under slab piping and pour
installing pipe and conduit. outer footing for BPS walls.
3 VDV Valve Replacement Ph 2 & 3 11 of the 17 valves have been Replace the remaining five 36- Construction completion is expected
Budget: $600,000 Job No. 200908 replaced. Contractor is working inch BFVs and one 16-inch by the end of April.
Project Contact: Derek Nguyen on the last 6 valves. BFV and appurtenances.
Planned Completion Date: May 2011
4 Emergency Pump-out Facilities & Trentino site pump-out piping Complete Emergency Pump- Construction completion is expected
Anaheim Intertie Connection complete. Pipe also complete at out Facilities. Contractor will by summer of 2011.
Budget: $500,000 Aviemore site, some backfill & then begin work for Anaheim
Job No. 200903 & 200906 paving required. Began Intertie Project.
Project Contact: Joe Polimino excavating for Eagles Nest site.
Planned Compl. Date: Summer 2011 No Anaheim Intertie work yet.
5 Mixers in Hidden Hills Reservoir All underground conduit work Complete electrical and Installation expected to be complete
Budget: $75,000 Job No. 2010-25 complete. Contractor to install schedule for District's by mid April.
Project Contact: Derek Nguyen injectors, chlorine analyzers SCADA interface after tank
Planned Completion Date: April 2011 and mixing pumps. systems are in place.
1
IN DESIGN
Project Current Status Next Actions Comments
1 Ohio/Oriente Pipeline Replacement Bids received 03/24, staff PEO and Board approval; issue Construction completion anticipated
Budget: $530,000 Job No. 201005 recommends award to low- NTP and push for construction by October 2011.
Project Contact: Anthony Manzano bidder, Mamco Construction to begin late May to early June
Planned Completion Date: Oct. 2011 for $1,389,089. 2011.
2 Well 20 Equipping 100% design reviewed and re- Final design expected late Anticipate going out to bid in May,
Budget: $2,000,000 Job No.200711 submitted to consultant. April 2011. with construction completion fall
Project Contact: Anthony Manzano 2011.
Planned Completion Date: Nov 2011
3 Lakeview Grade Separation Staff reviewing prior-rights Resolve prior-rights issues and 100% design submittal expected in
Budget: TBD Job No. 201002 issue with counsel. Submitted complete cost-sharing May.
Project Contact: Anthony Manzano 65% design review comments Agreement w/OCTA.
Planned Completion Date: Sept. 2013 to OCTA's consultant.
4 2010 Waterline Replacement Project Phase 1, Plumosa Drive Plumosa Dr. bids due April 21. Plumosa Dr. construction expected
Budget: $2M Job No. 201012 replacement, out to bid. Remainder of design expected summer 2011. Construction for
Project Contact: Anthony Manzano to be complete June 2011. other sites expected to start fall
Planned Completion Date: Dec. 2011 2011.
5 YL Blvd. BPS & Pipeline Presented pump station Awaiting comments from City. Expect Preliminary Design Report
Budget: TBD Job No. 200817 sketches to City for review. Meet thereafter with City staff to address all design criteria and
Project Contact: Hank Samaripa Consultant working on Prelim. re final location and esthetics issues prior to formal design
Planned Completion Date: Dec 2012 Design Report and CEQA of project, submittal,
document.
2
IN PLANNING
Project Current Status Next Actions Comments
1 Fairmont BPS & Site Improvements Final agreement executed by PEO & Board approval of Develop Fainnont site
Budget: TBD Job No. 200803 Shapell for partial payment for Shapell agreement planned for redevelopment plan and prepare
Project Contact: Anthony Manzano construction of site April. RFP for design.
Planned Completion Date: TBD improvements.
2 Recycled Water Study Final draft report completed by Upon completion of District's Final report will be brought to PEO
Budget: $1,800,000 Job No. 200807 Consultant and submitted to review, Final draft submitted to and Board for review and
Project Contact: Derek Nguyen District for review. SWRCB for final approval. consideration. Final grant payment
Planned Completion Date: TBD of $37,500 from state.
3 West Wellfield Project Discussed W21 & 22 sites Investigate W-21 site & May retain a Property Acquisition
Budget: $9,000,000 Job No. 2009-22 (near La Palma Ave.) prepare MOU for test drilling. Firm for assistance and explore
Project Contact: Anthony Manzano w/OCWD staff & they said Investigate new potential W-22 other sites.
Planned Completion Date: TBD ``yes" to W21 but not W22. locations.
4 Elk Mountain Site Improvements Design & Const. Services If approved by PEO, bring Potential improvements would
Budget: $300,000 Job No. 200522 proposals due April 7. Present design proposal for artificial include artificial turf playing field
Project Contact: Hank Samaripa to PEO on April 12. turf field to April 14 Board for and an adjacent parking lot.
Planned Completion Date: Dec 2011 approval.
5 OC-51 Connection Upgrade District determined it's not Staff provided District's
Budget: $242,000 Job No. 200815 economically beneficial to decision to MWDOC and
Project Contact: Derek Nguyen pursue this project at estimated MWD representatives.
Planned Completion Date: TBD cost.
6 Urban Water Management Plan Submitted comments to Present to PEO and Board for Submit final 2010 UWMP by
Budget: $20,000 Job No. 2201013 consultant for editing and final May 12 Public Hearing for August 1, 2011 to State Department
Project Contact: Hank Samaripa draft. Send Notices of Public UWMP. of Water Resources.
Planned Completion Date: June 2011 Hearing to Cities in Service
Area.
3