Loading...
HomeMy WebLinkAbout2011-05-05 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda Water District AGENDA YORBA LINDA WATER DISTRICT PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING Thursday, May 5, 2011, 4:00 PM 1717 E Miraloma Ave, Placentia CA 92870 COMMITTEE STAFF Director Gary T. Melton, Chair Ken Vecchiarelli, General Manager Director Ric Collett Steve Conklin, Engineering Manager Lee Cory, Operations Manager 1. PUBLIC COMMENTS Any individual wishing to address the committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. 2. ACTION CALENDAR This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee action. 2.1. Construction Contract for 2010 Waterline Replacement Project Phase I - Plumosa Drive Recommendation: That the Committee recommend the Board of Directors award the Contract for Construction of the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive for $568,000 to Kana Pipeline, Inc. 2.2. Material Testing Services for the Ohio Street/Oriente Drive and Plumosa Drive Pipeline Projects Recommendation: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement with Leighton Consulting, Inc. for a fee not to exceed $43,798, to provide material testing services for the Ohio/Oriente Street and Plumosa Street Pipeline Projects. 2.3. Water Recycling Facilities Planning Study Draft Report Recommendation: That the Committee recommend the Board of Directors place a discussion item on its May 12, 2011 agenda for public comments for the Recycled Water Study and ask staff to present the findings and recommendations of the report and respond to any public comments received. 3. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 3.1. 2010 Update of the Urban Water Management Plan 3.2. Review of Operations-Sewer Section Budget for FY 2011/12 (To be provided at the meeting.) 3.3. Monthly Groundwater Production and Purchased Import Water Report 3.4. Monthly Preventative Maintenance Program Report 3.5. Groundwater Producers Meeting Report 3.6. Status Report on Capital Projects in Progress 3.7. Future Agenda Items and Staff Tasks 4. ADJOURNMENT 4.1. The next regular meeting of the Planning-Engineering-Operations Committee will be held June 2, 2011 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internet website accessible at http://www.ylwd.com/. Accommodations for the Disabled Any person may make a request for a disability-related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. ITEM NO. 2.1 AGENDA REPORT Meeting Date: May 5, 2011 Budgeted: Yes Total Budget: $155,000 To: Planning-Engineering- Cost Estimate: $873,300 Operations Committee Funding Source: All Water Funds From: Ken Vecchiarelli, General Account No: 101-2700 Manager Job No: 201012 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: Pending Prepared By: Anthony Manzano, Senior CEQA Compliance: Exempt Project Manager Subject: Construction Contract for 2010 Waterline Replacement Project Phase I - Plumosa Drive SUMMARY: On April 21, 2011, bids were received from 13 contractors for construction of the 2010 Waterline Replacement Project Phase I - Plumosa Drive. Following review of the bids, staff recommends award to the low-bidder, Kana Pipeline, Inc., for the amount of $568,000. The Engineer's estimate was $873,300. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors award the Contract for Construction of the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive for $568,000 to Kana Pipeline, Inc. DISCUSSION: The two-phase project consists of waterline replacement at eight locations, ranging from 200 to 3,000 feet in length totaling approximately 6,700 feet, and are shown on the attachments to this report. The project locations are identified in the Asset Management Plan and the Capital Improvement Plan as requiring near-term replacement due to age and/or condition of the pipeline. The eight locations were packaged as one project for the purpose of retaining one engineering design consultant for efficiency and cost effectiveness. While staff was preparing the RFP for engineering services, YLWD Operations staff reported several recent leaks and repairs for the existing waterline in Plumosa Drive. Given the urgency to replace the Plumosa Drive waterline, this project was divided into two phases for construction, Phase I exclusively for Plumosa Drive, and Phase 11 for the other seven locations, in order for the Plumosa Drive waterline work to be completed as soon as possible. By way of background, concerning the Plumosa Drive waterline project, it was originally conceived and budgeted at $155,000 for pulling a new PVC liner into the old 20" steel line in the southerly half of Plumosa. However, with continuing leaks occurring in this and the northerly half of the line in Plumosa, it was determined in meetings with Operations staff, that replacement of the entire pipeline from Lemon Drive to Bastanchury Road was necessary and appropriate. It was estimated that this new, larger replacement project might cost in the range of $750,000. On October 14, 2010, the Board of Directors awarded a Professional Services Agreement to RBF Consulting for a fee not to exceed $219,309 to provide engineering design, bidding support services and construction management for Phases I and II of the 2010 Waterline Replacement Project. On April 21, 2011, sealed bids were received from 13 contractors, for replacement of approximately 2,900 feet of 12 inch waterline, valves, hydrants and appurtenances in Plumosa Drive. The bids range from a low of $568,000 to a high of $921,395, as shown below. The bid tabulation, bid documents and references from the low bidder, Kana Pipeline, Inc., were reviewed and checked into by District staff and found to be responsive and fully in order. Accordingly, staff recommends award to Kana Pipeline Inc. No. Company Bid 1. Kana Pipeline, Inc. $ 568,000.00 2. Downing Construction Inc. $ 597,825.70 3. John T. Malloy Co. $ 645,464.00 4. Paulus Engineering, Inc. $ 674,359.84 5. J.A. Salazar Construction & Supply Corp. $ 691,248.00 6. VCI Construction $ 729,139.74 7. Williams Pipeline Contractors, Inc. $ 771,915.00 8. Mike Bubalo Construction Co., Inc. $ 777,279.00 9. Vido Samarzich Inc. $ 798,780.00 10. Pro-Craft Construction Inc. $ 798,088.40 11. E&R Construction Inc. $ 802,785.00 12. J. De Sigio Construction, Inc. $ 918,507.00 13. Vido Artukovich & Son Inc/Vidmar Inc A $ 921,395.00 J.V. PRIOR RELEVANT BOARD ACTION(S): On October 14, 2010, the Board of Directors awarded a Professional Services Agreement to RBF Consulting for a fee not to exceed $219,309, to provide engineering design, bidding support services and construction management for this project. ATTACHMENTS: Name: Description: a Ype: Exhibit A.pdf Exhibit A Backup Material Exhibits BTpdf Exhibit B Backup Material Lambert N Legend ~epNCQ~O Birch Proposed Pipeline Project Y y J sde.SDE.YLWD_Service_Boundary wUS ~ R"'G Ill' \l G~yP \ T Ro = w Q g ~~S Ai H rc a NG~ v o SEFW ° Y ~ E E _ `mP - ~ ~ A Rt ~ RAT O N~ LI"ag ~ y moo`" M ♦ PMU ~ . FP,\E ~ o F egg l F POW~C - 5 ~ J~ 2 r 81-~ ~ ~ O Pn /9 ~ONTBEOS A Try . a a U~ P ~ P° W ~~l/N°R v~ "`R ~ ~ s R~ ~ aRG Rem R~ ° R•e ~ _ a v~Raoeh s ~ e ~ ~ ~ ~ ~ Mao a ° a~ _ • a ~ ° ~ ~ ~"'icy ~ ~ ~ R~~♦♦~...~••• s Cha a n RE T s r •♦•100. ♦P ♦ P sae Ram ♦ e 3 f ~ ~C ,C'~~~ ~ ♦♦w♦~•..~o•~ ~ ~7 m P ran R~s~~ La Palma - °~1 v _ 3 N ' • N S F N Lapa\ma cam.o ~i + mm ~ Santz poz aPa\ma ,i v Exit 32 N ~F Canyon Rim ~o ~co c y Noh\ ch R a eii W + E ti co S <<a Ci\ 0~ N 2010 PIPELINE REPLACEMENT PROJECT VICINITY MAP 0 1,375 2,750 5,500 8,250 EXHIBIT "A" Feet TL- MI-- l~A If~TTTTf~'17rr-rr~r _ 6EIO Tamarisk Dr., Fircrest Dr. & - - L Pebble Beach Ln. \ _ I 3 Sunwood / Pe ertree Ln. n PLumosa Dr., from Lemon Dr. to Bastanchury Road 8 inch / 'LL 8ir~c / - - - - - G RO \ .q 15 I North of Catalina Ct., & S. of Joel Brattain Dr. Easement S. of Gordon Ln. & E. / - of Ohio St. 1 ~ - ~ - ~r ~ I ~ ~ ORANG~THORPE L Hidden Hills BPS Discharge Line N - ° w W E EsrEE LL 2010 PIPELINE REPLACEMENT PROJECT IT - - LOCATION MAP 1 THRU 8 ~NCENTE NO SCALE 7 Richfield Rd. 1200 LF of Proposed Slip Lining 11 $ Richfield Rd. Nancita St. to approximately 100' N. of OCFCF - 200 LF of EXHIBIT "B" new8"dia. pipeline ITEM NO. 2.2 AGENDA REPORT Meeting Date: May 5, 2011 Budgeted: Yes Total Budget: $929,000 To: Planning-Engineering- Cost Estimate: $44,000 Operations Committee Funding Source: All Water Funds From: Ken Vecchiarelli, General Account No: 101-2700 Manager Job No: 201006 & 201012 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: Pending Prepared By: Joe Polimino, Project Engineer CEQA Compliance: Exempt Subject: Material Testing Services for the Ohio Street/Oriente Drive and Plumosa Drive Pipeline Projects SUMMARY: Staff issued a Request for Proposals for job site and laboratory material testing services for construction of the Ohio St./Oriente Dr. and Plumosa Dr. Pipeline Projects. Testing services were combined for the two concurrent construction projects for efficiency and cost savings. The District received four proposals. Following evaluation, staff recommends award to Leighton Consulting, Inc., for a fee not to exceed of $43,798. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement with Leighton Consulting, Inc. for a fee not to exceed $43,798, to provide material testing services for the Ohio/Oriente Street and Plumosa Street Pipeline Projects. DISCUSSION: Staff prepared a Request for Proposal to provide material testing services for construction of the Ohio St./Oriente Dr. and Plumosa Dr. Pipeline Projects. Staff solicited proposals from four geotechnical firms experienced in this area. All four firms submitted proposals for consideration. The District's review team ranked and scored the proposals based on experience of the firm's staff, content, and understanding of these particular projects. Following the technical evaluation and ranking, separate envelopes with fees for each proposal were opened by staff. Results of the ranking and the proposed fee for each are as follows: Leighton N&M Hushmand Harrington Technical Score 13.71 12.51 12.72 11.83 Labor Hours 1008 738 831 360 Total Cost $43,798 $36,831 $67,961 $39,860 Avg. Cost / Hr. $43.45 $49.91 $81.78 $110.72 After extensive review of the proposals, staff determined that Harrington Geotechnical Engineering, Inc. did not show in their proposal sufficient data to prove their capability to perform the Scope of Work that was requested. Hushmand Associates, Inc. was very well equipped to perform the work and has a good staff, however, the price was too high when compared to the others, both on the basis of total cost and average cost per hour. Staff further reviewed the proposals of Ninyo & Moore (N&M) and Leighton Consulting. Staff reviewed the total hours, total proposed cost and divided the total cost by the total hours to determine the average cost per hour of service provided. From this calculation, it was noted that Leighton, the firm with the highest-ranked proposal also had the lowest average cost per hour of service provided. It was also noted that Leighton estimated more hours in their proposal than any other firm to perform the scope of work in the RFP. District staff is of the opinion this estimate might be slightly high, so Leighton's final project cost (as all services are provided on an as-needed, hourly rate basis) may likely be lower than estimated in their proposal. The total cost of these material testing services, for projects totaling over 13,500 ft of new water lines, is approximately two percent of the construction cost. This is a typical and reasonable cost for this important construction-phase task. Therefore, based on experience, qualifications, technical scores and cost, staff is recommending award to Leighton Consulting, Inc. PRIOR RELEVANT BOARD ACTION(S): On May 27, 2010, the Board ratified issuance of a Professional Services Agreement for engineering services with Tetra Tech, Inc., for the Ohio Street Pipeline Replacement Project, for a fee of $85,400. On April 14, 2011, the Board of Directors awarded a Contract for Construction of the Ohio St. and Oriente Dr. Pipeline Replacement Project for $1,389,089 to Mamco Construction & Development. ITEM NO. 2.3 AGENDA REPORT Meeting Date: May 5, 2011 Budgeted: Yes Total Budget: $150,000 To: Planning-Engineering- Cost Estimate: $146,044 Operations Committee Funding Source: All Water Funds From: Ken Vecchiarelli, General Manager Job No: 2009-21 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: N/A Prepared By: Derek Nguyen, Water Quality CEQA Compliance: N/A Engineer Subject: Water Recycling Facilities Planning Study Draft Report SUMMARY: The District is preparing a Recycled Water Facilities Planning Study to evaluate the feasibility of using recycled water to irrigate golf courses, parks, schools and greenbelts within the District's service area. In March 2011, the District submitted it's draft report of the Recycled Water Study to the State Water Resources Control Board (SWRCB) for review and in it's response SWRCB noted that the Study must be discussed in a public meeting for public comments. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors place a discussion item on its May 12, 2011 agenda for public comments for the Recycled Water Study and ask staff to present the findings and recommendations of the report and respond to any public comments received. DISCUSSION: The District's Capital Improvement Program includes funding for a Recycled Water Facilities Planning Study to evaluate the feasibility of using recycled water to irrigate golf courses, parks, schools and greenbelts within the District's service area. In February 2010, the Board of Directors authorized the execution of a Professional Services Agreement with Malcolm Pirnie, Inc. in the amount of $146,044 to prepare the Recycled Water Facilities Planning Study. The Study is half funded by the State Water Resources Control Board (SWRCB) with a grant funding amount of $75,000. Of this amount, $37,500 has already been issued to the District following completion of the draft report submitted to SWRCB in March 2011. During its review of the District's draft report in March 2011, SWRCB indicated that the Study must be discussed in a public meeting for public comments. Because of this requirement, Staff is requesting that the Board place a discussion item on its agenda for the May 12, 2011 meeting for public comments on the study. During the May 12, 2011 Board meeting, staff will present the findings of the report, it's recommendation to the Board for approval and respond to any public comments received. PRIOR RELEVANT BOARD ACTION(S): In February 2010, the Board of Directors authorized the execution of a Professional Services Agreement with Malcom Pirnie, Inc. in the amount of $146,044 to prepare the Recycled Water Facilities Planning Study. ITEM NO. 3.1 AGENDA REPORT Meeting Date: May 5, 2011 Budgeted: N/A Total Budget: $30,000 To: Planning-Engineering- Cost Estimate: $30,000 Operations Committee Funding Source: All Water Funds From: Ken Vecchiarelli, General Account No: 101-2700 Manager Job No: J-2010-13 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: N/A Prepared By: Hank Samaripa, Project CEQA Compliance: N/A Engineer Subject: 2010 Update of the Urban Water Management Plan SUMMARY: The 2010 Urban Water Management Plan (UWMP) has been prepared and was made available for public review on April 12, 2011. As directed by the Board on April 14, a Notice of Public Hearing was published in the local newspaper on April 28, and will run again on May 5, for a Public Hearing on May 12, 2011. Staff will discuss the findings of the UWMP with the PEO Committee. DISCUSSION: The State Water Code Sections 10610 through 10656, requires every urban water supplier that either provides over 3,000 AF annually or serves 3,000 or more connections, to prepare an Urban Water Management Plan (UWMP) every five years. The UWMP is prepared by urban suppliers to support their long-term resource planning and ensure adequate water supplies are available for existing and future water demands. In summary the findings of the District's 2010 UWMP are as follows: . In accord with Senate Bill SBx7-7, urban water retailers are required to achieve a 10% reduction in per capita water use by 2015 and a 20% reduction by 2020. Per the 2010 UWMP, the District's goal is to achieve a water use target of 257.5 gallons per capita per day (GPCD) by 2015 and 228.9 GPCD by 2020. The District's current baseline consumption is 286.1 GPCD. . When the draft 2010 UWMP was prepared, it assumed a projected total water demand of approximately 25,800 acre-feet per year (AF/Yr), based on historical data. However, with the establishment of a reduced water allocation over the past two years and the response of our customers to the request for conservation, the District's actual water demand for FY 09-10 was 20,154 AF, which equates to a 22% reduction when compared to the historical projection. The final version of the 2010 UWMP will reflect this change in water consumption. . The District is projecting an 8% increase in demand in the next 25 years, accompanying a projected 13% increase in population. . Today, the District relies on 46% groundwater and 54% import water. It is projected that through 2035, the water supply mix will remain roughly the same. . MWD's Regional Urban Water Management Plan finds that MWD is able to meet full service demands of its member agencies with existing supplies from 2015 through 2035 during normal years, single dry years, and multiple dry years. The District is therefore capable of meeting the water demands of its customers in normal, single dry and multiple dry years between 2015 and 2035. ITEM NO. 3.3 AGENDA REPORT Meeting Date: May 5, 2011 Subject: Monthly Groundwater Production and Purchased Import Water Report ATTACHMENTS: Name: Dosciiption: a ype: Import2010-2011 Apr Pie Chart.pdf Pie Chart Backup Material Import2010-2011 _Apr PEO_Sheet.pdf PEO Sheet Backup Material Import2010-2011 Apr TWU.pdf TWU Backup Material Import2010-2011 Apr YTD Prod Chart.pdf YTD Prod Chart Backup Material Daily Average April 2011.pdf Apr Daily Avg Backup Material WATER SUPPLY FY 2010-2011 April 2011 Water Supply IMPORT 33.3% GW 66.7% 2010-2011 YTD Water Supply GW 45.2% IMPORT 54.8% GW BPP GOAL 45.9% YLWD SOURCE WATER SUMMARY FY 2010-2011 TOTAL MONTHLY YTD BUDGET GW IMPORT DEMAND GW GW (Demand Est.) DELTA MONTH (AF) (AF) (AF) (AF) Jul-10 793.2 1,476.0 2,269.2 35.0% 35.0% 2,483.5 -8.6% Aug-10 817.3 1,529.5 2,346.7 34.8% 34.9% 2,443.4 -4.0% Sep-10 753.6 1,404.8 2,158.4 34.9% 34.9% 2,143.8 0.7% Oct-10 449.1 936.4 1,385.5 32.4% 34.5% 1,808.3 -23.4% Nov-10 427.8 917.5 1,345.2 31.8% 34.1% 1,428.5 -5.8% Dec-10 226.2 694.7 920.8 24.6% 33.3% 1,285.0 -28.3% Jan-11 873.5 281.1 1,154.6 75.7% 37.5% 1,120.4 3.0% Feb-11 813.2 336.5 1,149.7 70.7% 40.5% 1,071.9 7.3% Mar-11 742.7 308.3 1,051.1 70.7% 42.8% 1,270.2 -17.3% Apr-11 1,050.0 524.1 1,574.1 66.7% 45.2% 1,588.8 May-11 2,101.6 Jun-11 2, 354.8 FYTD 6,946.6 8,408.8 15,355.4 45.2% 16,643.7 -7.7% Allowable GW (YTD) 7,045.1 (AF) Underpumped 98.5 (AF) Conservation Percentage Since July 1, 2009 -19.3% GROUNDWATER PERCENTAGE 80.0% 70.0% 60.0% 50.0% 40.0% MONTHLY GVV 30.0% YTD GW BPP GOAL 45.9% 20.0% Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Month TOTAL WATER USE FY 2010-2011 3,000 Monthly Average Mean Temperature (°F) ■09-10GW 73.6 009-10 IMPORT 72.2 ■08-09 GW 2,500 72.1 008-09IMPORT 69.8 ■10-11 GW 74.0 74.373.2 69.7 74.1 010-11 IMPORT 70.8 65.9 67.2 2,000 62.9 66.4 61.6 66.1 62.6 L% I Q 62.4 1,500 62.6 58.2 59. E 65.4 E 61.5 > 60.2 55.8 60.0 55.2 54.3 58.2 58.7 1,000 56.4 56.3 57.2 500 0 o~ o~' 0300 NQ, oo' e NQ1 (Z' NQ1 o~' e NQ) o° N° NN NQ5 NQ) N° NN ~A' ~A ~A' Month FY 2010-2011 YTD Water Supply 22,000 Budgeted Total GW + Import 20,000 Actual Total GW + Import 18,000 --rrBPP GW Goal 45.9% 16,000 Actual GW Production 14,000 - U- Q 12,000 m E 0 10,000 8,000 6,000 4,000 2,000 0 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Month April 2011 Daily Average Demand (MG) 18.0 17.8 17.5 17.2 17.0 16.5 16.1 16.0 15.9 16.0 15.5 15.4 15.5 15.0 14.5 14.0 aa a aaa J~yaaa a ~~yaaa ~a~a ~~aaa ~ I ITEM NO. 3.4 AGENDA REPORT Meeting Date: May 5, 2011 Subject: Monthly Preventative Maintenance Program Report ATTACHMENTS: Name: Dosciiption: a ype: 2010-11 Fiscal.pdf PM Report Backup Material PM PROGRAM FISCAL 2010111 Fiscal 2010-11 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100% HYDRANTS (3,881) Target; all hydrants to be serviced annually. INSPECTED THIS MONTH 55 293 160 446 552 589 337 419 902 8541 1 INSPECTED THIS YEAR 55 348 508 954 1,506 2,095 2,432 2,851 3,753 4,607 % OF TOTAL 1.4% 9.0% 13.1% 24.6% 38.8% 54.0% 62.7% 73.5% 96.7% 118.7%1 1 VALVES (10,70612=5,353) Target; all valves to be operated every two years OPERATED THIS MONTH 536 378 380 457 343 315 414 517 890 481 OPERATED THIS YEAR 536 914 1,294 1,751 2,094 2,409 2,823 3,340 4,230 4,711 % OF TOTAL 10.0% 17.1% 24.2% 32.7% 39.1% 45.0% 52.7% 62.4% 79.0% 88.0%1 1 DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year. FLUSHED THIS MONTH 0 0 0 0 155 0 0 9 0 1551 1 FLUSHED THIS YEAR 0 0 0 0 155 155 155 164 164 3191 1 % OF TOTAL 0.0% 0.0% 0.0% 0.0% 50.0% 50.0% 50% 53% 53% 102.9%1 1 AIR VACS (309) Target; all air/vacs to be serviced annually. INSPECTED THIS MONTH 296 13 2 0 0 0 0 0 0 01 1 INSPECTED THIS YEAR 296 309 311 311 311 311 311 311 311 3111 1 % OF TOTAL 95.8% 100.0% 100.7% 100.7% 100.7% 100.7% 100.7% 100.7% 100.7% 100.7%1 1 PRVs (150) 40 STATIONS Target; all PRVs to be serviced annually. INSPECTED THIS MONTH 0 12 16 31 42 38 34 1 5 2 INSPECTED THIS YEAR 0 12 28 59 101 139 173 174 179 181 % OF TOTAL 0.0% 8.0% 18.7% 39.3% 67.3% 92.7% 115.3% 116.0% 119.3% 120.7%1 1 SEWER CLEANING (867,487) Target; all sewers to be cleaned annually. CLEANED THIS MONTH 126,497 68,133 38,676 46,790 73,169 82,782 97,798 79,855 106,787 67,441 CLEANED THIS YEAR 126,497 194,630 233,306 280,096 353,265 436,047 533,845 613,700 720,487 787,928 % OF TOTAL 15.0% 22.4% 26.9% 32.3% 40.7% 50.3% 61.5% 70.7% 83.1% 90.8%1 1 SEWER TELEVISING (160,512) Target; all sewers to be televised every 5 years. TELEVISED THIS MONTH 12,176 18,676 6,524 14,128 - 201 7,508 17,041 16,863 TELEVISED THIS YEAR 12,176 30,852 37,376 51,504 51,504 51,705 51,705 59,213 76,254 93,117 % OF TOTAL 7.6% 19.2% 23.3% 32.1% 32.1% 32.2% 32.2% 36.9% 47.5% 58.0%1 1 OTHER SEWER WORK. S.S. OVERFLOWS 0 0 0 0 0 0 0 0 0 1 SERVICE CALLS 1 0 0 1 1 2 0 0 1 2 REHAB FOOTAGE 0 0 0 319 629 346 225 320 0 0 MAIN REPAIRS 0 0 0 3 0 2 2 1 0 0 MANHOLE REPAIRS 0 4 16 1 2 1 0 2 0 6 ITEM NO. 3.5 AGENDA REPORT Meeting Date: May 5, 2011 Subject: Groundwater Producers Meeting Report ATTACHMENTS: Name: cv, i~a$icri: a ype: GWP MtgNotes 13Apr2011.pdf GWP Meeting Report for April 2011 Backup Material Yorba Linda Water District MEMORANDUM DATE: April 15, 2011 TO: Ken Vecchiarelli, General Manager FROM: Steve Conklin, Engineering Manager COPY: Lee Cory, Operations Manager John DeCriscio, Chief Plant Operator SUBJECT: Groundwater Producers Meeting, April 13, 2011 John DeCriscio and I attended the Groundwater Producers (GWP) Meeting on April 13 at OCWD. A summary of each item discussed is as follows: 1. Water Quality Update. OCWD staff provided an update on water quality issues including: a. Consumer Confidence Reports. b. CDPH Vulnerability Assessment Waiver. c. EPA Draft Unregulated Contaminant Monitoring Regulation, Phase 3. 2. OCWD Budget and Rate Update. OCWD staff reported that the FY 11-12 budget will be approved by the Board later this month. Current recommendations are $255/AF for the RA and 65% for the BPP, with no production surcharge for overpumping. There was an extended discussion on the pros and cons of keeping the RA at $249 vs raising it to $255, and a BPP of 65% vs 67%. A key point in the discussion was the fact that the OCWD Board approved proceeding with the GWRS Expansion Project (see Item 5 below) which will require the RA to ramp up to $328/AF over the next five years (FY15- 16) to cover the increased GWRS capital and operating cost. The consensus of the GWPs was that they favored keeping the BPP and the upward ramping of the RA relatively uniform to make it easier for budget projections and rate setting at the retail level. 3. OCWD Reserve Policy and Transfer of Reserves from R&R Fund. OCWD staff reported that they recently performed an analysis and updated the Replacement and Refurbishment Fund model. As an outcome, staff recommended and the Board approved transfer of $10 million from R&R to the District's Operating Fund. This lead to a GWP discussion if the $10M should be in the Operating Fund for emergencies, or should be refunded back to the ratepayers via a lower RA, or a reduced rate of increase in the RA. At the 1 conclusion of the discussion there was no consensus for a change from that planned by OCWD. 4. GWRS Deliveries vs SAR Water for Recharge in the Basins. OCWD made a presentation on the cost and benefits of delivering GWRS water for recharge in the basins versus using storm water from the Santa Ana River. Staff provided graphs and other data showing that it is more cost effective to provide GWRS water for recharge than SAR storm water. Graphs were shown indicating that Miller Basin will continue to recharge for a much longer period with the high- quality, low-TDS GWRS water than with river water, which contains silt and organic material. Regardless, efforts will be made to retain and use river water as much as possible, primarily in the river bed, Warner Basin and Anaheim Lake. 5. GWRS Expansion Update. OCWD reported that at a special OCWD Board meeting on March 30 the Board approved proceeding with construction of the 30- mgd capacity expansion of the GWRS plant, increasing overall capacity from 70- to 100 mgd. Design is complete. The cost estimate for design and construction is $156 million. It is estimated that construction could be complete around October 2014. As noted in Item 3, it is projected that the RA will have to ramp up to $328/AF by FY 15-16 to cover the cost of expansion. 6. MWD Funding for GWRS Expansion. Staff noted that the request to MWD for Local Resource Project (LRP) funding was denied by MWD. The denial was based on the finding that the estimated unit cost of water at $612/AF is too low to justify the need for rebate funding. 7. Anaheim Regional Transportation Inter-modal Center (ARTIC) Project. Staff reported that the City of Anaheim is requesting the use of GWRS water for the proposed transportation center project, to be located at the southeast corner of Katella Avenue and the 57 Freeway, adjacent to the Santa Ana River. The GWRS transmission pipeline is located in the west levee of the SAR, bordering the ARTIC site. They are requesting an estimated 11 AF/Yr of GWRS water for cooling tower use, toilet flushing in restrooms, and landscape irrigation. The project would have to pay OCWD the full cost of the water ($476/AF) and would have to provide all necessary piping and other improvements to deliver the water from the pipeline to point of use. In addition, the project may provide sites for up to three injection wells for recharge of GWRS water into the aquifer. Following discussion, the GWPs expressed support for the use of GWRS water for the project, as it is a cost-effective use of recycled water, for a project which would otherwise have to be supplied by potable water, imported or pumped from the aquifer. The project will be considered by the OCWD Board in May. 2 ITEM NO. 3.6 AGENDA REPORT Meeting Date: May 5, 2011 Subject: Status Report on Capital Projects in Progress ATTACHMENTS: Name: cv, i~a$icri: a ype: CIP Rept May2011.pdf Status Report on Capital Projects in Progress Backup Material CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: May 1, 2011 New Information since Last Report is Shown in Red IN CONSTRUCTION Project Current Status Next Actions Comments 1 Wells 1, 5 and 12 Upgrade W-1, 5 & 12 refurbishments Consultant to complete well Staff will discuss feasibility of Budget: $190,000 Job No. 200813 complete. W-1 & 5 operating overview study with District refurbishing an additional on-site Project Contact: Anthony Manzano at 2,000 GPM (each), W-12 staff by fall 2011. well and completing an overall well Project Completion: TBD operating at 1,200 GPM. analysis/operational study. 2 Highland Booster Station Upgrade Excavated ahead of meter vault, Continue with exterior wall Project construction period is 13.5 Budget: $5,000,000 Job No. 200814 conduit bank lowering footings, afterwards move months, with completion estimated Project Contact: Joe Polimino continues. Poured rear retaining inside to install rebar and December 2011. Planned Completion Date: Dec. 2011 wall at back of building. begin parts of the building Continue rebar installation and floor. Electrical conduit form portions of exterior installations continue as building wall footing. concrete pours progress. 3 VDV Valve Replacement Ph 2 & 3 All 17 defective valves Contractor to complete street Project completion is expected by Budget: $600,000 Job No. 200908 successfully replaced. re-pavement and slurry seal. the end of April. Project Contact: Derek Nguyen Final work includes site Planned Completion Date: May 2011 cleanup and demobilization. 4 Emergency Pump-out Facilities & Anaheim Intertie work started. Complete Crystal Drive and Construction completion is expected Anaheim Intertie Connection Willow Woods intertie, nearly Willow Woods sites and begin by summer of 2011. Budget: $500,000 complete, with electrical the finial site, Fairbury Lane. Job No. 200903 & 200906 controls still being installed. Project Contact: Joe Polimino The site at Crystal Drive has Planned Compl. Date: Summer 2011 been started. 5 Mixers in Hidden Hills Reservoir Contractor to install injectors, Complete electrical and Installation expected to be complete Budget: $75,000 Job No. 2010-25 chlorine analyzers and mixing schedule for District's by early May. Project Contact: Derek Nguyen pumps. Contractor building SCADA interface after tank Planned Completion Date: May 2011 material procurement delays, systems are in place. Schedule delayed 2 weeks. 1 IN DESIGN Project Current Status Next Actions Comments 1 Ohio/Oriente Pipeline Replacement Mamco Construction awarded Staff to issue NTP and push for Construction completion anticipated Budget: $530,000 Job No. 201005 contract for $1,389,089. construction to begin late May by October 2011. Project Contact: Anthony Manzano to early June 2011. Planned Completion Date: Oct. 2011 2 Well 20 Equipping 100% Instrumentation design Final design expected May Anticipate going out to bid in June, Budget: $2,000,000 Job No.200711 reviewed and resubmitted to 2011. with construction completion late Project Contact: Anthony Manzano consultant. 2011. Planned Completion Date: Nov 2011 3 Lakeview Grade Separation Staff reviewed prior-rights Resolve prior-rights issues and 100% design submittal expected Budget: TBD Job No. 201002 issue with counsel. Wrote complete Agreement w/OCTA. within I to 2 months. Project Contact: Anthony Manzano counteroffer to OCTA - Planned Completion Date: Sept. 2013 awaiting response. 4 2010 Waterline Replacement Project Phase 1, Plumosa Dr. bids Award of construction contract Plumosa Dr. construction expected Budget: $2M Job No. 201012 received 04/21, recommending to Kana Pipe for $568,000. summer 2011. Construction for Project Contact: Anthony Manzano award to low bidder, Kana other sites expected to start fall Planned Completion Date: Dec. 2011 Pipeline Inc., for $568,000. 2011. 5 YL Blvd. BPS & Pipeline Awaiting input on pump Consultant working on Prelim. Review Preliminary Design Report Budget: TBD Job No. 200817 station sketches from City. Design Report. Schedule a to include new pump station and Project Contact: Hank Samaripa Reviewed pumps, hydraulic meeting with City to finalize 5,000 ft. long pipeline in Yorba Planned Completion Date: Dec 2012 design and CFQA documents. pump station location/esthetics. Linda Blvd. 2 IN PLANNING Project Current Status Next Actions Comments 1 Fairmont BPS & Site Improvements Final agreement with Shapell Develop Fairmont site Budget: TBD Job No. 200803 for partial payment for site redevelopment plan and Project Contact: Anthony Manzano improvements approved by prepare RFP for design. Planned Completion Date: TBD YLWD Board. 2 Recycled Water Study District provided review Once comments are Final report will be brought to PEO Budget: $1,800,000 Job No. 200807 comments to Consultant for incorporated, final draft report and Board for review and Project Contact: Derek Nguyen revision. will be submitted to SWRCB consideration. Final grant payment Planned Completion Date: TBD for final approval. of $37,500 from State. 3 West Wellfield Project OCWD staff tentatively Complete feasibility analysis May retain a Property Acquisition Budget: $9,000,000 Job No. 2009-22 approved W-21 site. Started for W-21 & W-22 sites & Firm for assistance and explore Project Contact: Anthony Manzano preliminary feasibility analysis prepare MOU for test drilling other sites. Planned Completion Date: TBD for W-21 & W-22 with for W-21. consultant. 4 Elk Mountain Site Improvements Soliciting three additional Review design proposals. Draft Professional Services Budget: $300,000 Job No. 200522 design proposals from general Prepare agenda for PEO Agreement if project is approved. Project Contact: Hank Samaripa engineering fines. Proposals committee for June 2nd and Set up design kickoff meeting. Planned Completion Date: Dec 2011 due May 12th. Board June 12`1'. 5 OC-51 Connection Upgrade District determined it's not Staff provided District's Budget: $242,000 Job No. 200815 economically beneficial to decision to MWDOC and Project Contact: Derek Nguyen pursue this project at estimated MWD representatives. Planned Completion Date: TBD cost. 6 Urban Water Management Plan Final draft review completed Draft agenda report and Submit final adopted 2010 UWMP Budget: $20,000 Job No. 2201013 and copies distributed. Notice Resolution for May 12"' Board to Department of Water Resources Project Contact: Hank Samaripa of Public Hearing posted in meeting adopting the 2010 by August I" due date. Distribute Planned Completion Date: June 2011 local newspaper for May 12d' UWMP. copies to local agencies. Board meeting 3