HomeMy WebLinkAbout2011-06-01 - Board of Directors Meeting Agenda Packet
Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS WORKSHOP MEETING
Wednesday, June 1, 2011, 2:00 PM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
Michael J. Beverage, President
Phil Hawkins, Vice President
Ric Collett
Robert R. Kiley
Gary T. Melton
4. PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on the agenda, the Board will recognize the individual for their comment
when the item is considered. No action will be taken on matters not listed on the agenda. Comments are limited
to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five
minutes.
5. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action of the
Board of Directors at the meeting, such as technical presentations, drafts of proposed policies, or similar items for
which staff is seeking the advice and counsel of the Board of Directors. Time permitting, it is generally in the
District's interest to discuss these more complex matters at one meeting and consider formal action at another
meeting. This portion of the agenda may also include items for information only.
5.1. Draft Strategic Plan Review and Discussion
5.2. Draft Budget For Fiscal Year 2011/2012
6. ADJOURNMENT
6.1. The next regular meeting of the Board of Directors will be held June 9, 2011 at 8:30 a.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Board less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870,
during regular business hours. When practical, these public records will also be made available on the District's internet
website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 5.1
AGENDA REPORT
Meeting Date: June 1, 2011
Subject: Draft Strategic Plan Review and Discussion
ATTACHMENTS:
Name: Descnpion n: 1 V PC
Board Budget Workshop Discussion Agenda June 1.doc Discussion Agenda Backup Material
Strategic Plan _Draft _053111.docx Strategic Plan Draft Backup Material
YORBA LINDA WATER DISTRICT
BOARD BUDGET WORKSHOP JUNE 1, 2011
DISCUSSION AGENDA
AND LIST OF HANDOUTS
1. Draft Strategic Plan Review and Discussion
a. Review Draft (Draft Strategic Plan Handout)
b. Proposed timeline for adoption (June 9)
2. Proposed Budget Overview (PowerPoint with additional Handouts)
a. Budget Assumptions
b. Factors driving cost increase
c. Total Expenses and Revenues Overview
d. Budget Summary Sheets (Handout)
i. Department Summaries
ii. Public Information/Legislative Affairs Division Detail
e. Variable Water Costs Discussion
f. Organizational Structure (2 Handouts)
g. Capital Improvements (Spreadsheet and Descriptions Handouts)
i. Special Projects Discussion (Elk Mountain Site Slides)
ii. Special Projects Discussion (Meter Replacement Slides)
h. Vehicles and Equipment Outlay
i. Cost reductions and Service Improvements
j. Bond Rating and Debt Service Ratio
k. Reserve Policy Revisions (Slide)
3. Questions and Further Direction
a. Timeline for Adoption
i. Full Draft Budget Document to Board June 9
ii. Adopt Budget and Resolutions June 23
Yorba Linda
Water District
DRAFT
INTRODUCTION
The Yorba Linda Water District (District) is an independent special district
serving approximately 23,800 accounts within the city of Yorba Linda and
portions of Placentia, Brea, Anaheim and unincorporated Orange County. In
addition to supplying water to a predominantly residential community, the
District is also responsible for maintaining wastewater collection systems in the
community.
Like many other water agencies in California, the District is facing a fast-
changing operating environment with unprecedented challenges on many
fronts. These challenges include an uncertain economic climate that has
resulted in a decrease in District revenue; water supply and quality issues;
environmental pressures in the Sacramento-San Joaquin Delta, threatening or
reducing our imported water supplies; regulatory mandates enforcing
permanent conservation levels; urgently needed infrastructure maintenance
and upgrades; rising employee healthcare costs; increasing media scrutiny;
and the impending retirement of many highly trained, knowledgeable staff.
To address these challenges, the District, with the assistance of MAP
Consulting, developed a strategic plan outline in 2009. This document takes
that outline one step further, for the years 2011-2013, creating a plan that can
be adopted by the Board of Directors and utilized for budgeting resources and
forward planning. The plan will be integrated into the FY 2011-2012 budgetary
process to ensure that resources are properly allocated to achieve the goals and
objectives set forth in this plan.
The goals, objectives and action steps within this strategic plan are determined
by the mission and vision statements and core values of the District and
further established through the process initiated by the Board of Directors at
their Strategic Planning Workshop on January 20, 2011. Stakeholders
participating in this process include all five Board Members, the Executive
Management team and members of the Employee Productivity-Innovation-
Communications (EPIC) Committee, made up of staff representatives with
varied levels of experience and expertise from across all District departments.
21
Mission and Vision Statements
Mission Statement
Yorba Linda Water District will provide reliable, high quality water
and sewer services in an environmentally responsible manner, while
maintaining an economical cost and unparalleled customer service to
our community.
Vision Statement
Yorba Linda Water District will become the leading, innovative and
efficient source for high quality reliable services.
3~
GOALS, INITIATIVES AND STRATEGIES
Through the District's strategic planning process, goals are identified as
challenges the District will address and opportunities for improvement that
support the District's mission and further its vision. Initiatives are defined as
high-level concepts or plans for accomplishing the identified goals. Strategies
are defined as action steps to achieving the identified initiatives, which in turn,
achieve the identified goals.
The following five goals were identified as the most critical challenges for the
District to address in the next two years. Milestones for the strategies and
action assignments are incorporated into the appendix of this document, and
will be adapted as needed in conjunction with the FY 2011/2012 and the FY
2012/2013 Budget process.
CP: Community Partnership
Goal FR: Fiscal Responsibility
• • Operational
GoALM Service Reliability
4~
Board Member Opportunities
One of the most important functions of the District's Board of Directors is the
governance of the agency through the establishment of broad policies and
objectives. It is, therefore, vitally important to the agency that the Board of
Directors understand and adhere to their set roles. The following questionnaire
details the Board of Directors' beliefs prior to the development of this document
and, in part, helped to determine areas for improvement outlined in the 2011-
2013 Strategic Plan.
413121110
4 = Outstanding, 3 = Good, # responses
2 = Fair, 1 = Poor, O Unknown for each
score
Board members clearly understand their responsibilities to 3 2
the board and to the organization
I clearly understand my responsibilities to the board and 2 3
to the organization
The board contains the appropriate range of experience 2 3
Board meetings are conducted on a regular basis 4 1
The board meetings are productive and effective 1 3 1
The board is appropriately involved in community events 3 2
I am involved in community events 1 3 1
The board receives accurate and timely information about 4 1
the financial status of the organization
The board regularly attends employee appreciation events 1 2 2
Board members come prepared to the meetings 4 1
I come prepared to the meetings 5
The board sets the policy direction for the future activities 5
of the organization
I believe that the organization is meeting its stated purpose 5
The board safeguards the assets of the organization by 4 1
having effective controls in place
The board works closely with the executive staff to develop 1 4
short-term and long-range projects, goals and objectives
The board regularly assesses whether the organization is 4 1
meeting it goals and stated purpose
Rate the working relationship between the board and the 1 4
general manager
5~
District Opportunities
Just as the Board of Directors utilized a questionnaire to establish areas of
strength and necessary improvements, all of the stakeholders involved in the
2011-2013 Strategic Planning process also utilized a questionnaire as a guide
for the development of the Strategic Plan, focusing on key words in the Mission
and Vision Statements. Each key word is rated on a scale of 1 to 10, with 10
being the highest possible rating.
Mission Statement Effectiveness
10.0
8.0
6.0
4.0
2.0
0.0
Z" CP 110
~c CP
Vision Statement Effectiveness
10.0
8.0
6.0
i
4.0
2.0
0.0
Overall Leading Innovative Efficient High Quality Reliable
6~
District Core Values
All of the stakeholders involved in the 2011-2013 Strategic Planning process
utilized a second questionnaire as a guide for the development of the Strategic
Plan, focusing on potential core values for the District. A list of core values
from the 2009 Strategic Plan outline, as well as from the 2011 Strategic Plan
workshop was incorporated into the questionnaire. Each core value was then
rated on a scale of 1 to 10, with 1 being the most important value to the
District. The results are listed below, with the five highest ranked core values
including: Integrity, Accountability, Responsibility, Transparency and
Teamwork.
These core values form the foundation on which the District will perform work
and conduct itself. They underlie how the District's employees and Board will
interact with each other, as well as with customers, and which strategies the
District will employ to fulfill this Plan. They define the character of the agency
and guide how decisions are made.
Core Values Statement
The Yorba Linda Water District Board of Directors and staff are guided in
everything we do by the following core values:
Integrity- We demonstrate integrity every day by practicing the highest ethical
standards and by ensuring that our actions follow our words.
Accountability- We acknowledge that both the Board and staff of the District
are accountable to the public that we serve, as well as to each other.
Responsibility- We take full responsibility for our actions- both our successes
and our opportunities for growth. We maintain a commitment of courtesy,
assessment and resolution with all customer concerns.
Transparency - We promote a culture where we actively listen to our customers
and communicate openly about our policies, processes and plans for the future.
Teamwork - Success centers on all departments working together and sharing
information and resources to achieve common goals. We are dedicated to
ensuring that every voice of the District, from the Board to each individual
employee is treated with dignity and respect, and that differences are valued
and individual abilities and contributions are recognized.
7~
Goal CP: Community Partnership
As a public agency, the District is expected to demonstrate the prudent use of
public funds. The District's services should provide tangible benefits that are
of value to the community. Strengthening existing relationships with key
stakeholders, including customers and agency partners, while demonstrating
our dedication to transparency in the most professional manner, is paramount.
Initiatives
Strategies
Enhance Resources for Public Information 8v Governmental
Affairs Division
Develop a Public Relations Master Plan with Measurable
Goals
Have Board of Directors and YLWD Staff Attend More Events
and Inter-governmental Meetings within the Local
Community
Continue to Support Regional Training and Multi-Agency
Workgroups through the Joint Use of the Administration
Building
8~
Effectively Use Broad Spectrum Communication
Opportunities
Provide Financial Incentives and Rebates for Water Use
Efficiency
Develop and Expand a Youth Education Program
Consider Participation in the California Urban Water
Conservation Council's Best Management Practices
Enhance the District's Regional Water and Wastewater
Industry Participation
a0"
9
Goal FR: Fiscal Responsibility
The District is ranked highly by financial ratings organizations, has proven to
be a good financial steward, and consistently strives for a clear, well-
documented budget process and clean annual financial audit. However, with
the state and national economic crisis, the District has an even greater
responsibility to demonstrate effective and responsible use of public funds
while responding to ever-increasing financial challenges.
Initiatives
Strategies
Develop a Comprehensive Multi-Year Financial Plan
Prepare a High Level Annual Budget Document and
Comprehensive Annual Financial Report and Compete for
Recognition by the Government Finance Officers Association
10 1
Revise the Water and Sewer Rules and Regulations and
Evaluate Fee Schedules Regularly for Proper Cost of Service
Coverage
Evaluate and Revise the Sewer Fund Allocation
Maintain Commitment to a Strong Debt Services Ratio
Review the Reserve Policy and Funding Levels Annually
Analyze the Asset Management Plan to Determine Future
Asset Replacement Needs
Implement an Approach to Ensure Reserves are Responsibly
Funded
Research and Obtain Grant Funding Whenever Feasible
M-4 Review Opportunities to Earn "Cash-Back" on Operating
Expenses through Commercial Credit Card Accounts
7777 Manage Cash Flow to Maximize Investment Income
Complete the Cost of Service and Water Rate Study
Evaluate Equitable Rate Structures that Promote
Conservation and Efficiency
2 7
E
2.
9 $
7 o
L 6 4 38 ■3U -■E ■.■MEMEMMEM■M■M$■■■
■■■■M■M..■
t■_ ■■.■■N
■.r E■■.■■M■ ■.O■■■■■■■■E■
in ■ MEN=
g■ q MEMO ■■■■■M■■■■■■■■■
NO. 13■ ■■■EE■ ■■■■■■E■■ ■
NE IM■■■■■OE■■■■O■■■
■ 1
■ ■
M M
12
Goal OE: Operational Efficiency
The District has provided reliable and trusted service for more than one
hundred years, yet it recognizes the importance of continual improvements to
increase operational efficiency.
Initiatives
r"-
OE Optimize Use • Existing Technologies
OE 2: Address Identified
Assessment Survey
OE 3: Consider Utilization of a Peer Review Survey
Strategies
L
Identify the Current Functionality of Existing Technology
and Determine if it is Being Utilized to Full Capacity
• Evaluate How Each Department Might Make Further Use of
Existing Technology
Provide, Support and Encourage Employee Training
13
ssessment
J~L
ff Identify Core Inefficiencies
Develop Measurable Productivity Goals
Engage Employees in Methods of Addressing Inefficiencies
J
Determine the Cost Benefit Ratio of a Peer Review Survey
a
• Establish a Team to Determine the Focus of the Survey
s Institute Guidelines for Areas to Be Addressed
61 t 'IJAr
14
Goal SR: Service Reliability
The ultimate purpose of District assets and infrastructure is to safely and
reliably provide vital services to the public. Our goal is to maintain all assets
for optimal continuity of District services. Effective management of assets
involves monitoring asset conditions against the level of service to manage risk
of failure, planning for future financial needs and anticipating uncertainties or
changing levels of service.
Initiatives
Strategies
Ail
Continue with Efforts to Annex District Service Area to
Orange County Water District
Forecast Service Demand Projections
Engage with Regional Agencies on Water Supply Issues
Strengthen Existing Emergency Operations Partnerships
15
SM, Develop Additional Well Sites
Evaluate Alternative Water Sources
SR 2: Explore Service Boundary Opportunities
L
C Evaluate Feasibility of Providing Additional Water Services
within the Region
> Evaluate Feasibility of Providing Additional Wastewater
Services within the Region
Evaluate Feasibility of Providing Other Professional Services
within the Region
• ' ~ III I ~
Complete Implementation of Five Year Capital Improvement
Plan from FY 2011-2015 with adopted amendments
Continue Planning for Long Term Capital Improvements and
Replacements into the future
16
Goal WE: Workforce Engagement
The District is known for its highly skilled staff and quality work. In order to
retain a highly productive and proficient workforce, maintaining and building
on employee engagement in the District will be critical to future success. With
uncertain economic times to continue in the near term, however, greater calls
for efficiency and responsiveness will require staff to be flexible and prepared to
demonstrate effectiveness and accountability.
Initiatives
Strategies
Maintain Competitive Compensation via Classification and
Compensation Surveys
Explore Alternative Benefits
.y Establish Career Development Expectations of Existing
Employees
Develop Methodologies to Assist Employees in Attaining
Career Expectations
17
Continue to Support Additional Training for Staff
Encourage Staff Participation in Professional Organizations
and Local Civic Groups
Execute Timely and Consistent Employee Performance
Evaluations
Identify Key Roles for Succession
Define the Competencies and Motivational Profile Required
for Key Roles
Identify Individuals with the Potential to Perform Highly in
e:
Key Roles
Develop Methodologies to Assist Employees in Preparing for
Advancement
WE 3: Enhance Employee Relations
Implement a Program to Recognize Employees for Excellence
Conduct Quarterly All Hands Meetings
Continue to Encourage Employee Training in Leadership and
Technology
18
Acknowledgements
The following individuals contributed to the creation of this Strategic Plan.
Board of Directors
Michael J. Beverage, President
Phil Hawkins, Vice-President
Ric Collett
Robert R. Kiley
Gary T. Melton
Staff
Annie Alexander
Dave Barmer
Cindy Botts
Steve Conklin
Lee Cory
Nicole Dalton
Jennifer Hill
Harold Hulbert
Gina Knight
Delia Lugo
Anthony Manzano
Damon Micalizzi
Stephen Parker
Robyn Shaw
Ken Vecchiarelli
Art Vega
L
J
19
Appendix: Initiatives and Action Plans
Goal CP: Community Partnership
Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
CP 1: Increase Brand Recognition within the Community
Include in
Enhance Resources Retain Public
for Public Information Public Information & Gov't 2011/ 12 Budget
CP 1-A Jul-11 Dec-11 Information and proposed
& Governmental Affairs
Affairs Division Officer Specialist/Interns organizational
changes
Current Supplies
Develop a Public and Se rvi cc s Budget Include in
Public total should be
Relations Master Plan P FY2011/ 12 Budget
CP 1-B Jul-11 Jun-12 Information adequate with
with Measurable and proposed
Officer addi ti onal staff to
Goals expenses
assist in completing
program objectives.
Have Board of
Directors andYLWD Estimated67%
Include in
Staff Attend More Immediately increase in BOD
BOD/GM/PIO/ FY2011/12 Budget
CP 1-C Local and Regional following Nov- On-going Staff total salaries, and proposed
Events andInter- 2010 election benefits and
expenses
governmental expenses
Meetings
Continue to Support
Regional Training
and Multi -Agency Adopt Joint Use
General Facilities Agreement
CP 1-D Workgroups through On-going On-going None
Manager in first quarter of FY
the Joint Use of the
Administration 2011/ 12
Building
Effectively Use Broad Manage within Implement Audio
Spectrum Public expanded Public Recording ofYLWD
CP 1-E On-going On-going Information Information &
Communication BOD Mtgs by Apr-11
Officer Government Affairs
Opportunities Division and Video by Jul-11
20 1
Goal CP: Community Partnership (Continued)
I I Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
CP 2: Increase Public Awareness of Water and Wastewater Related Issues
Provide Financial Include in
Incentives and Additional $10,000 2011/ 12 Budget
CP2-A Rebates for Water Use Jul-11 On-going BOD/GM/PIO for FY 1 l/ 12 and proposed
Efficiency expenses in PI/GA
Division
Include in
Develop and Expand a Public FY2011/ 12 Budget
Additional $14,500
CP 2-B Youth Education Jul-11 On-going Information for FY 1 l/ 12 and proposed
Program Officer expenses in PI/GA
Division
Consider Explore and report on
Participation in the agency
California Urban Assign Task to responsibility,
CP 2-C Water Conservation Sep-11 Dec-11 GM Management impacts and benefits
Council's Best Analyst with
Management recommendation by
Practices Dec-11
Enhance the
District's Regional Board Budget Include in
CP 2-D Water and On-going On-going BOD/GM/Staff impacts included in FY2011/12Budget
Wastewater Industry CP 1-C; Staffimpacts and proposed
Participation minimal expenses
Goal FR: Fiscal Responsibility
Completion Financial/ Staffing
Strategies Start Date Date Lead Party Impacts Comments
FR 1: Maintain Fiduciary Responsibility
Finance Accounting
Develop a Water: Included in Committee to
Finance
FR 1-A Comprehensive Multi Feb-11 Oct-11 Director Cost of Service Study consider Adding
Year Financial Plan Sewer: $10,000 Sewer Model to
Contract in Jun-11
Prepare a High Level
Annual Budget
Document and
Comprehensive
Finance $900 in application Include Fees in FY
FR 1-13 Annual Financial Feb-11 Jun-11
Director fees 2011/12 Budget
Report and Compete
for Recognition by the
Government Finance
Officers Association
21
Goal FR: Fiscal Responsibility (Continued)
Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
Revise the Water and
Sewer Rules and Complete Study in
Regulation and General House and
FR 1-C Evaluate Fee Feb-11 Dec-11 Manager/ None Recommend Fees
Schedules Regularly Finance Structure Update for
for Proper Cost of Director Adoption by
December Coverage 2011
Evaluate and Revise Revised Allocation
FR 1-D the Sewer Fund Nov-10 Mar-11 Finance None included in FY
Director
Allocation 2011/ 12 Budget
Substantial Rate
Maintain Include in
Commitment to Sept-09 Rate Quarterly Board of Increase Adopted in
FR 1-E None Sept 2009 followed by
Strong Debt Services Increase Financial Directors
Pass Through
Ratio Review
Increase in Aug 2010
FR 2: Increase Reserve Funding
Latest Revisions
Reviewed by Finance
Review the Reserve Finance
FR 2-A Policy and Funding Apr-11 Jul-11 Director/Board None Accounting
Committee for Board
Levels Annually of Directors
of Directors to
Consider in Jun-11
Annual Review of
Analyze the Asset Annual Plan to Determine if
FR 2-13 Management Plan to Dec-11 Review Prior Engineering None Asset Replacements
Determine Future to Budget and Manager are on Track or
Needs CIP Update Asset Conditions are
Reassessed
Annual
Review of CIP
Implement an
Financial Finance Rates, COP's and
Approach to Ensure
FR 2-C Apr-11 Needs Director/Board To Be Determined Other Capital
Reserves are
Responsibly Funded Included in of Directors Financing Options
Budget
Preparation
FR 3: Identify and Develop Additional Revenue Options
Research and Obtain Gauge Cost
General Consider Part-time Effectiveness on
FR 3-A Grant Funding On-going On-going Manager Grant Coordinator Project by Project
Whenever Feasible
Basis
Review Opportunities Card Options
Discussed with
to Earn "Cash Back"
FR 3-13 on Operating Expense Jan-11 On-going Finance $200 in annual fees Finance -Accounting
Director Committee in March
through Commercial
- Add'1 research
Credit Card Accounts
Required
Manage Cash Flow to Track Opportunities
FR 3-C Maximize Investment On-going On-going Finance Negligible transfer and Effectiveness
Income Director fees with Quarterly
Investment Reports
22 1
Goal FR: Fiscal Responsibility (Continued)
I I Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
FR 4: Provide a Rate Structure that Promotes Water Use Efficiency
Board to Consider
Complete the Cost of Finance
Rate Structure
FR 4-A Service and Water Mar-10 Mar-12 Director/Board None
Alternatives in Oct
Rates Study of Directors
2011
Evaluate Equitable Board of Cost of Billing Board to Consider
FR 4-13 Rate Structures that Oct- 11 Mar- 12 Directors/ System Revisions to Rate Structure
Promote Conservation General be Determined if Alternatives in Oct
and Efficiency Manager Needed 2011
Goal OE: Operational Efficiency
Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
OE 1: Optimize Use of Existing Technologies
Identify the Current
Functionality of
IT Possible Costs for
Existing Technology
OE 1-A Jul-11 Sep-11 Director/EPIC Additional Staff
and Determine if it is
Being Utilized to Full Committee Training TBD
Capacity
Evaluate How Each
Department Might EPIC Possible Costs for
OE 1-13 Make Further Use of Sep-11 Dec-11 Committee/ Additional Staff
Existing Technology Executive Staff Training TBD
Provide, Support and Budget Preparation
OE 1-C Encourage Employee On-going On-going Executive Staff to Include Training
and Professional
Training
Development
OE 2: Address Inefficiencies Identified in the Self-Assessment Survey
Identify Core EPIC
OE 2-A Jul-11 Jun-12 None
Inefficiencies Committee
Develop Measurable EPIC
OE 2-13 Aug-11 Jun-12 None
Productivity Goals Committee
Engage Employees in
EPIC
OE2-C Methods of Addressing Sep-11 Jun-12 None
Committee
Inefficiencies
23
OE: Operational Efficiency (Continued)
I I Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
OE 3: Consider Utilization of a Peer Review Survey
Complete Cost
Determine the Cost Benefit Analysis and
OE 3-A Benefit Ratio of a Jul-11 Sep-11 Management None Present to Board of
Peer Review Survey Analyst Directors Prior to
initiating Peer
Review
Establish a Team to
OE 3-13 Determine the Focus Sep-11 Oct-11 EPIC $45,000 Prepare for Focused
Committee Peer Review
of the Survey
Institute Guidelines Results should
OE 3-C for Areas to Be Sep-11 Dec-11 EPIC Reflect Cost Savings
Addressed Committee and Efficiency
Increases
Goal SR: Service Reliability
Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
SR 1: Work Toward Service Reliability and Efficiency
Continue with Efforts
to Annex District Environmental
$110,000 included in
SR 1-A Service Area to On-going On-going General FY 2011/ 12 Budget Impact Report in
Orange County Water Manager for CEQA Progress through
District OCWD
Completed with
SR 1-13 Forecast Service Oct-10 Jun-11 Engineering Costs Included in FY Urban Water
Demand Projections Manager 2010/ 11 Budget Management Plan
Update
Completed Recycled
Engage with Regional General Water Study
SR 1-C Agencies on Water On-going On-going Manager Continue to Monitor
Supply Issues De sal and Other
Local Projects
Strengthen Existing Complete 2011
Emergency Emergency Update of Emergency
SR 1-D Operations On-going On-going Operations Response Plan &
Partnerships Coordinator/GM Participate in
Regional Exercises
Maximizing this
SR 1-E Develop Additional Mar- 11 Jun-12 Engineering est. $1.5M per site resource will lower
Well Sites Manager Operating Costs by
$1M per year
Evaluate Alternative Engineering Develop Goals and
SR 1-F Objectives after
Water Sources Manager
Completing SR 1-E
24 1
Goal SR: Service Reliability (Continued)
Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
SR 2: Explore Service Boundary Opportunities
Evaluate Feasibility of
Providing Additional General Analyze Cost Benefit
SR 2-A Jul-11 Jun-12 of Acquiring Locke
Water Services with Manager
Ranch Water System
the Region
Evaluate Feasibility of Analyze Cost Benefit
Providing Additional General of Acquiring
SR 2-13 Wastewater Services Jul-11 Jun-12 Manager Placentia
Wastewater the Region Collections System
Evaluate Feasibility of Analyze Cost Benefit
SR 2-C Providing Other Jul- 11 Jun-12 General of Partnering in GIS
Professional Services Manager Services with Local
with the Region Agencies
SR 3: Continue Implementation of Capital Improvement Project Plan 2007-2012
Complete Current Capital
Implementation of Projects Update
Five-Year Capital Completes the
Engineering See Annual Updates
SR 3-A Improvement Plan On-going On-going Aggressive Cl Plan
Manager ofThree Year CIP
from FY 2007-2012 started in 2003 and
with Adopted 2007 with supporting
Amendments Bond Sales
Continue Planning for Annually Review
SR 3-13 Long-Term Capital On-going On-going Engineering Service Reliability
Improvements and Manager and As set
Replacements Replacement Needs
25 1
Goal WE: Workforce Engagement
Completion Financial/ Staffing
Strategies Start Date Date Lead Party Impacts Comments
WE 1: Retain a Highly Skilled and Capable Workforce
Maintain Competitive
Compensation via
WE 1-A Classification and On-going On-going HR Manager TBD
Compensation
Surveys
WE 1-13 Explore Alternative Jul-11 Jun- 12 HR Manager LongTerm Cost Include in FY
Benefits Savings Expected 2012/13 Budget
Establish Career
Development Initiate one-on-one
WE 1-C Jul-11 Dec-11 Executive Staff None
Expectations of employee interviews
Existing Employees
Develop
Include
Methodologies to Executive
recommendations in
WE 1-D Assist Employees in Jan-12 On-going Staff/EPIC None
employee annual
Attaining Career Committee
reviews
Expectations
Continue to Support General Incremental Budget
WE 1-E Additional Training On-going On-going Manager/HR Adjustments if
for Staff Manager Needed
Encourage Staff Track and Report on
Participation in Progress Regularly to
General
WE 1-F Professional On-going On-going Manager None Personnel-Risk
Organizations and Management
Local Civic Groups Committee
Execute Timely and Track and Report on
Consistent Employee General Progress Regularly to
WE 1-G Performance On-going On-going Manager None Personnel-Risk
Evaluations Management
Committee
WE 2: Develop a Comprehensive Succession Plan
Present Draft Report
General to Personnel-Risk
Indentify Key Roles
WE 2-A Jul-11 Sep-11 Manager/HR None Management
for Succession
Manager Committee at Oct-
2011 Meeting
Define the Present Draft Report
Competencies and General to Personnel-Risk
WE 2-13 Motivational Profile Jul-11 Sep-11 Manager/HR None Management
Required for Key Manager Committee at Oct-
Roles 2011 Meeting
Identify Individuals Present Draft Report
General to Personnel-Risk
with the Potential to
WE 2-C Perform Highly in Key Jul-11 Sep-11 Manager/HR None Management
Role s Manager Committee at Oct-
2011 Meeting
Develop Present Draft Report
Methodologies to HR to Personnel-Risk
WE 2-D Assist Employees in Oct-11 Dec-11 Manager/EPIC None Management
Preparing for Committee Committee at Jan-
Advancement 2012 Meeting
26 1
Goal WE: Workforce Engagement (Continued)
I Strategies Start Date Completion Lead Party Financial/ Staffing Comments
Date Impacts
WE 3: Enhance Employee Relations
Implement a Program Cost Savings from
WE 3-A to Recognize Jul- 11 Sep-11 EPIC TBD Efficient and
Employees for Committee Excellent Service
Excellence May Fund Program
Begin with Adopted
WE 3-13 Conduct Quarterly All- Jul- 11 Quarterly General None Strategic Plan and
Hands Meetings Manager Budget Goals in early
Jul 2011
Present to Encourage Employee Opportunities and
General Program Progress to
WE 3-C Training in On-going On-going
Manager Personnel-Risk
Leadership and
Technology Management
Committee Regularly
27
ITEM NO. 5.2
AGENDA REPORT
Meeting Date: June 1, 2011
Subject: Draft Budget For Fiscal Year 2011/2012
ATTACHMENTS:
Name: Dosciiption: a ype:
Budget FY2011-12 PPT.pdf Power Point Presentation Backup Material
Org Chart _FY_2010-11_Altered _Positions.pdf Org Chart Backup Material
Org Chart Rev FY 2011-12.pdf Revised Org Chart Backup Material
CIP Budget 16May2011.xlsx CIP Budget Backup Material
Capital _Improvements _Prog_for FY_2011-12.docx CIP Program Backup Material
ElkMtn PowerPoint 1June2011.pdf Elk Mtn PowerPoint Presentation Backup Material
2012_Meter _Replacement _Program.pdf Meter Replacement PowerPoint Presentation Backup Material
Recommended Changes to the Reserve Polices
Reserve Policy Handout Backup Material
(2).pdf
6/8/2011 17
Water Dfttrict
Proposed Budget
FY 2011/12
Presented 6y: Ken Vecchiarelli
June 1, 2011
Budget Assumptions
• Variable Water Costs & Water Revenue
- Based on Assumed Usage of 22,350 AF
• FY 2010/11 Conservation Goal: 10% Cut, Actual Usage: 17% Cut
• FY 2011/12 projects a 4% cut from the CY 2004-06 baseline
• OCWD BPP
- Increased from 62% to 65%, (YLWD's BPP is 48% of total demands)
- Cost increase to $254/AF (from $249), effective July 1, 2 011
- Ground Water: 10,750 AF
• MWDOC (FY 2011/12)
- Import Water:11,600AF
- - Cost increase to almost $798/AF (from $744), effective Jan. 1, 2012
~a
1
6/8/2011
17 C_~
Expenses Key Factors
• $1,029,000 Variable Water Costs
- Increased Import Water Costs to MWDOC
- Assumes 6% increase in Water Purchased over FY 10/11
Budget
• $317, 000 Salary-Related Expenses
- $140,000 Benefits (PERS, medical, dental)
- $138,000 Max. Merit Increases & Position Reclass
- Holding at 76.5 FTE's both years
cam" ~i ~ r 5w- ~ •^il
• Key Factors, Continued
• $543,823-- Depreciation
- Aggressive CIP Spending in FY 2010/11
- Acquisition of City of YL Sewer System
• ($1,000)-- Supplies & Services
- $110,000 CEQA Report for OCWD Annexation
- $60,000 Legislative Advocate
- $77,000 Public Affairs
- $60,000 Safety Program Consultant
2
6/8/2011
17 C-~
Budget Summary
Current Budget Forecast Proposed Budget
(FY 2010/11) (FY 2010/11) (FY 2011/12)
Total Operating Revenue $27,495,473 $24,471,748 $29,198,311
Total Non-Operating Reven UE $1,615,114 $1,742,329 $1,555,239
Total Revenue $29,110,587 $26,214,077 $30,753,550
Variable Water Costs $12,667,236 $10,750,147 $13,696,538
Salary-Related Expenses $7,624,683 $6,669,204 $7,941,306
Supplies & Services $3,996,584 $3,311,775 $3,995,833
Total Operating Expenses $24,288,503 $20,731,126 $25,633,677
Total Non-Operating Expense $2,044,147 $2,046,360 $2,029,619
Total Expenses $26,332,650 $22,777,486 $27,663,296
Depreciation $5,017,876 $5,029,042 $5,561,699
Capital Contributions $145,860 $512,189 $425,586
Income (Loss) ($2,094,079) ($1,080,262) ($2,045,859)
Total Expenses
FY 2011/12
12% 6% 17%
i Depreciation
■ Variable Water Costs
24% Salaries & Benefits
■ Supplies & Services
41% Long Term Debt
"Illr
_ Total Budget: $33,224,995 _
00
3
6/8/2011
Variable 17 C-~
Water Costs
FY 2011/12
9%
20%
2 Power
71% ■ Groundwater
Import Water
Total Budget: $13,696,538
2ZIf'!~ ~ ~ -
History • Variable Water Costs
$14.00
$13.70
$12.00
$12.67
$10.00 $10.69 $10.75
$8.00
`o
$6.00
$4.00
$2.00
$0.00
FY09/10 (Actual) FY10/11 (Budget) FY10/11 (Forecast) FY11/12 (Budget)
00
4
6/8/2011
Capital 17 C-~
Improvements Projects (CIP) Outlay
FY 2011/15
3%
12%
x Pre-Approved
■ Current CIP Cost Increases
New CIP Proposed
85%
AWW00 Total:$ 49,164,000
2ZIF
J z
Vehicles & Capital Items
$700.0 -
$600.0 FY 2009/10 Total: $628,300
$500.0 - FY 2010/11 Total: $286,500
$400.0 FY 2011/12 Total: $776,850
$300.0
$200.0
$100.0
FY 2009/10 FY 2010111 FY 2011112
It Eng. ■ Fin. I.T. ■ Ops.
00
5
6/8/2011
17 C_~
• Reductions & Service Improvements
Streamlined
Deposit Process
Retrieval of Major
Email Archiv s Infrastructure
Simplified
I
Reliability of 2 Funded
SCADA Positions
Enhanced L Eliminated A
Web Bill Pay
• . used by Customers
s P Ratings • YLWD Bonds
YLWD Bonds Revised to AA+, with a Stable Outlook
Rating Rationale Based On:
• Rate Increases Approved Sept '09 and Aug '10
• A Rate Study/Future Rate Structure Change
• No Additional Near-Term Debt
6
6/8/2011
17
-
; l :4 r
Income Less Expenses
0
MM 1 M
Audit Basis (1,080,000) (2,050,000)
Debt Service 1.97 1.79
Coverage Basis *
Budget Basis 2,680,000 2,210,000
" Need Debt Service Ratio to Trend Towards Historical Norms (2.0)
QUESTIONS?
~ °t-1 Y ~ ~ t• t'Lr '1s. ~T y.+ r > 1l.`" - l -/A[/
7
Yorba Linda Board of
Water District Directors
General
Engineering Manager
Assist. GM/IT
Manager Director
I
Executive
Secretary
G.I.S. Info. Systems ` 1
Quality Engineering Project Water Secretary Engineer Engineer Public Information
Officer I
Info. Systems Technician J Instrumentation
1
Eng. Technician Sr. Construction 1/11 Technician 1/11 Technician
Project It Inspector
Engineer 3 PrE i2Lj I FTE Management
Analyst
Construction
Inspector J ~J~
.
Manager
1 o
u.r
Sr. Accountant Customer Svc. Personnel Sr. Fleet Operations S~ater Maint. Chief Plant
Supervisor Technician Mechanic Assistant I d. Operator
Dist. Accounting Customer Srv. Mechanic Sr. Maintananc
eter Services 11/111 Facilities Sr. Plant
Operator Operator
Assistant 1/11 Rep. 1/11/111 Lead 2 FTE J 4 FTE 2 FTE 4 F1
Meter Reader 1 Dist. Maintanance Plant Operator
1/11 Ma
rator [if If Worker I If
Organization Chart
FY 2010-11
Total: 76.5 positions budgeted Job Classification Legend
Altered/Eliminated
in FY 11/12 Management Part-Time Supervisory/Confidential Bargaining Unit
Directors
Yorba Linda
Water District General
Manager
Executive
Secretary
Engineering I.T. Manager
Manager
--r Public Information
Officer
Sr. Project Engineering Water Quality Project
Manager Secretary Engineer Engineer Management S.C.A.D.A. Info. Systems G.I.S.
I I I Analyst Administrator Administrator Administrator
WQ Technician
1/11 Sr. Construction
Project Eng. Technician Inspector Legislative Pu* Affairs Instrumentation Info. Systems
Engineer If I FTE Affairs Intern Intern Technician Technician 1/11
Construction
spector
Finance Operations
Manager Manager
HR & Risk
Manager
Sr.Account I Sr. Fleet Water Maint,t Chief Plant
ant Customer Svc. Mechanic Superintende Operator
Technician Mechanic Sr. Maintananc
Accounting Customer Srv. 11/111 Dist. Operato Facilities Sr. Plant
Assistant 1/11 Rep. 1/11/111 Meter Services Maintenance Operator
eter eader Operator [if Operator 11 Worker I If
I
Organization Chart
FY 2011-12
Job Classification Legend
Total: 76 positions budgeted
3 part-time positions Management Part-Time Supervisory/Confidential Bargaining Unit
PROPOSED CIP BUDGET
FY 11/12
FY 10/11
10/11 Project Increase/ Total Project Expenditures Expenditure FY 11/12 Total Future
Project # Project Description Budget (Decrease) Budget Thru 6/30/2010 Forecast Budget Budgets FY12/13+
2008-14 Highland BPS Upgrade $ 6,100,000 $ - $ 6,100,000 $ 665,129 $ 1,800,000 $ 3,635,000 $ -
2010-06 Ohio&Oriente Pipeline Replacement $ 615,000 $ 985,000 $ 1,600,000 $ 64,490 $ 275,000 $ 1,250,000 $ -
2010-12 2010 Waterline Project $ 1,575,000 $ 415,000 $ 1,990,000 $ 279 $ 220,000 $ 1,770,000 $ -
2007-11 Well No. 20 $ 1,500,000 $ 500,000 $ 2,000,000 $ 551,264 $ 100,000 $ 1,400,000 $ -
2008-17 YL Blvd Booster Station $ 5,400,000 $ 100,000 $ 5,500,000 $ 4,574 $ 150,000 $ 500,000 $ 4,850,000
2005-22 Elk Mountain Site Imp $ 300,000 $ 490,000 $ 790,000 $ - $ 30,000 $ 760,000 $ -
2009-21 Non-Pot Water Study for Irrig. Use $ 225,000 $ (75,000) $ 150,000 $ 37,726 $ 70,000 $ 50,000 $ -
2009-22 South & West Well Project $ 9,100,000 $ (1,100,000) $ 8,000,000 $ 8,289 $ 10,000 $ 1,000,000 $ 7,000,000
2009-15 Computerized Maint&Mgmt System $ 300,000 $ - $ 300,000 $ 33,670 $ 200,000 $ 65,000 $ -
2010-11 Fairmont Res., BPS & Site Imp $ 1,885,000 $ 4,115,000 $ 6,000,000 $ 36,184 $ 15,000 $ 450,000 $ 5,500,000
2010-02 Lakeview Grade Separation $ - $ 700,000 $ 700,000 $ 45,000 $ 155,000 $ 500,000
2010-12 2012 Pipeline Project $ 2,162,000 $ 393,000 $ 2,555,000 $ - $ - $ - $ 2,555,000
2010-02 Lakeview Fencing $ 50,000 $ - $ 50,000 $ - $ - $ - $ 50,000
New Green Crest Dr. Sewer Lift Stn Upgr $ - $ 175,000 $ 175,000 $ - $ - $ 175,000 $ -
New Press. Reg. Stations Upgrade $ - $ 1,000,000 $ 1,000,000 $ - $ - $ 500,000 $ 500,000
New Disinf. Bstr. Sta. at Hidden Hills Res $ - $ 200,000 $ 200,000 $ - $ - $ 200,000
New GIS--Phase 2 $ - $ - $ 133,000 $ - $ - $ 76,000 $ 57,000
TOTAL $ 29,212,000 $ 7,898,000 $ 37,243,000 $ 1,401,606 $ 2,915,000 $ 11,786,000 $ 21,212,000
Capital Improvements Program for FY 2011/12
Highland Booster Pump Station Upgrade Project
Total Project Budget: $6,100,000 Proposed FY 11/12 Budget: $3,635,000
The new, 18,000-gpm-capacity pump station will complete construction in FY 2011/12. The
high-capacity pump station will make it possible to deliver up to 70 percent more groundwater
to the higher zones of the District than with the pump station being replaced.
Ohio St. and Oriente Dr. Pipeline Replacement Project
Total Project Budget: $1,600,000 Proposed FY 11/12 Budget: $1,261,000
Construction of approximately 4,900-ft. of 8- to 16-inch diameter pipeline, valves, hydrants and
appurtentance in Ohio Street and Oriente Drive, will be completed this FY, replacing 60-70
year old waterlines. These pipelines will be sized to serve the local area as well as to deliver
water to the planned Yorba Linda Booster Station.
2010 Waterline Replacement Project
Total Project Budget: $1,990,000 Proposed FY 11/12 Budget: $1,770,000
The project consists of replacing old waterlines and appurtenances in eight locations, ranging
from 200 to 3,000 feet, with a total replacement length of approximately 6,700 feet. These
locations were identified in the Asset Management Plan and the Capital Improvement Plan as
requiring near-term replacement due to age and condition of the pipelines. The project is
divided into two phases for construction, with both planned to be completed by the end of FY
11/12.
Well No. 20 Project
Total Project Budget: $2,000,000 Proposed FY 11/12 Budget: $1,349,000
Well drilling and test pumping were completed in early 2010 to determine the safe yield of the
planned new Well No 20. Based on that information, design of the above-grade well facilities
was completed in FY 10/11. Construction of the well facilities will be completed in IFY1 1/12, to
provide new groundwater production to replace older wells, and to increase the District's local
water resource production capabilities.
Yorba Linda Blvd Booster Pump Station and Pipeline Project
Total Project Budget: $5,500,000 Proposed FY 11/12 Budget: $500,000
The project consists of replacing the existing Palm Avenue Booster Pump Station with a three-
pump 5,000-gpm capacity new pump station at Gun Club Road and Yorba Linda Blvd. Work
will also include 4,700 feet of 20-inch pipeline and other improvements. The project will make
is possible to deliver more groundwater to the easterly portion of the District's service area.
Design work will be completed in FY 11/12. Construction may begin in late FY 11/12 and will
be complete by early FY 13/14. Projected costs in FY 12/13 and FY 13/14 are $4,250,000 and
$595,000, respectively.
Elk Mountain Reservoir Site Improvements
Total Project Budget: $790,000 Proposed FY 11/12 Budget: $760,000
Design and construction of practice fields for use by local neighborhood groups is planned for
completion in FY 11/12 at the District's Elk Mountain Reservoir Site. Partial funding was
provided as a condition of development by a local developer.
Non-potable Water Study for Irrigation Use
Total Project Budget: $150,000 Proposed FY 11/12 Budget: $42,000
A study is nearing completion, evaluating the feasibility of constructing a small-scale facility to
treat wastewater from local sewers and use the treated and disinfected water for irrigation of
local golf courses, parks, greenbelts, and other landscaped areas. The study, half-funded by a
state grant, will be completed in early FY 11/12. If the study findings are promising, a more
detailed study and preliminary design report may follow, subject to Board approval.
South and West Well Project
Total Project Budget: $8,000,000 Proposed FY 11/12 Budget: $1,000,000
Work has been initiated, investigating potential well sites south and west of the District's
existing Richfield Wellfield. If findings are positive, drilling of Well No. 21 is planned for FY
11/12, along with design of above-grade facilities, at an estimated cost of $1 million. Planned
for FY 12/13 is construction of Well No. 21 and a transmission pipeline, at an estimated cost of
$2 million. Proposed for FY 13/14 and 14/15 is acquisition of two additional wells sites, well
drilling and construction, pipelines and appurtenances, at an estimated cost of approximately
$5 million. It is anticipated that the project will include three wells to replace and augment
existing wells, and to increase the District's groundwater pumping capacity, at a total project
cost of approximately $8 million.
Computerized Maintenance and Management System (CMMS)
Total Project Budget: $300,000 Proposed FY 11/12 Budget: $66,000
This project consists of a software-based maintenance and management system for improved
tracking of work performed on the District's infrastructure. The system integrates directly with
the District's GIS and financial information systems to produce reports on true costs of service
and to assist District staff on future infrastructure planning and budgeting. Completion is
scheduled for FY 11/12.
Fairmont Reservoir, Pump Station and Site Improvements Project
Total Project Budget: $6,000,000 Proposed FY 11/12 Budget: $450,000
The project is the refurbishment and upgrading of the Fairmont site. The existing 37-year old
booster station will be demolished and its two booster pumps will be replaced by six, with two
each pumping to three different pressure zones. A new building will be constructed to house
the pumps, as well as facilities for operations and maintenance and a SCADA control center.
Facilities will also be provided for equipment and material storage. The project will also
include refurbishment of the Fairmont Reservoir, with new valves and other appurtenances.
Part of the cost of the improvements will be offset by developer-provided funding. It is
anticipated that $450,000 in planning and design work will occur in FY 11/12, followed by an
estimated $5.5 million in construction in FY 12/13 and 13/14.
Lakeview Grade Separation Project
Total Project Budget: $700,000 Proposed FY 11/12 Budget: $155,000
The Orange County Transportation Authority (OCTA) is the lead agency for a planned
Lakeview Avenue bridge over Orangethorpe Avenue and the adjacent BNSF Railroad tracks.
As part of the project, it will be necessary to replace and relocate the District's water lines
currently in Lakeview Avenue through the project area. The District has been in discussions
with OCTA as to how much of the total cost of the relocation and replacement of its waterlines
and appurtenances the District must pay for, estimated at a cost in the range of $1 million.
During this process, the District has been pursuing means to minimize the project cost it will
bear, through work with legal counsel, land surveyors, and title companies. It is anticipated
that OCTA and the District will reach a decision on the project cost share to be borne by each
by early in FY 11/12, and that construction of the pipeline relocation work will begin late in FY
11/12, with completion in FY 12/13.
Green Crest Dr Sewer Lift Station Upgrade Project
Total Project Budget: $175,000 Proposed FY 11/12 Budget: $175,000
As part of the Sewer Transfer Agreement with the City of Yorba Linda, the District is taking
over operation and maintenance of the existing sewer lift station, which serves eight homes on
Green Crest Drive. The agreement includes transfer of $175,000 from the City for O&M of the
lift station, which will be used for upgrades. The upgrade work will include new SCADA and
control elements for the lift station, which will be tied into the District's central control and
monitoring system at District Headquarters.
Pressure Regulating Station Upgrade Project
Total Project Budget: $1,000,000 Proposed FY 11/12 Budget: $500,000
The District owns and maintains 37 pressure reducing stations for its six pressure zones in the
water system. The stations are equipped with combination pressure reducing/pressure
sustaining valves, with many of the stations having lead valves and one or two additional
valves and pressure relief valves and other appurtenances. The stations are located below
ground, in streets and parkways, some of which are 30 to 40 years old. A plan is being
developed to refurbish and upgrade the stations, starting with those determined to be most in
need of work. Budgeted in FY 11/12 and 12/13 is $500,000 each for design and refurbishment
of pressure regulating stations.
Geographical Information System (GIS) Implementation Project-Phase 2
Total Project Budget: $133,000 Proposed FY 11/12 Budget: $76,000
Final tasks in the implementation of a digital information database and analytical geographical
information system (GIS) containing the water and sewer infrastructure, parcel and street
information linked to the customer service and operational database systems. Phase 2 work
will integrate applications such as CMMS, the hydraulic model, valve-exercising program and
hydrant-flushing program. Anticipate completion next year, with a budget in FY 12/13 of
$57,000.
6/8/2011
-1-;,Ywba Linda
Water Diarict
ELK MOUNTAIN SITE
DEVELOPMENT PROJECT
Date: June 1, 2011
lid
:fiat'"-?i`S.
6W
r :t - ~y « ci 1, • ~M ! -
y;~a
1
6/8/2011
• Per 1999 Development Agreement, SWEPI to provide
park improvements at Elk Mtn. site.
• As condition of dispute settlement in Nov. 2005,
$200,000 provided by SWEPI for YLWD to provide Elk
Mtn. site improvements (Current fund value: $233,000)
• Staff conducts prelim meetings with local sports groups
for Youth Soccer and T-ball and gets favorable response
• In July 2010, staff prepares preliminary development
alternatives study, including turf alternatives and costs
t 4
PROJECT BACKGROUND continued
• Staff study looks at modest development: grass field
(natural or artificial), grading, drainage, irrigation,
fencing, and parking lot for 10 cars.
• Natural-grass field alternative: $271,000
• Artificial-turf field alternative: $738,000
• PEO Committee recommends that staff continue to
pursue City's participation in project
2
6/8/2011
• Staff meets with City (2 occasions) to invite
participation in project and is informed that City is
not in a position to participate
• Staff solicits proposals from three Landscape
Architectural firms for preliminary alternatives study,
pros and cons, and costs.
• Staff selects Webb Associates for study for $19,000
4.
PROJECT BACKGROUND continued
• From study, Board committee recommends basic
(minimum) development plan maximizing artificial
turf field (54,000 sf) with 20-car parking lot
• Staff issues RFP for design and construction-phase
services for the above approach and receives four
proposals
• Staff evaluates proposals and recommends award to
Albert A. Webb Associates for $93,512 for design
and construction-phase services
3
6/8/2011
SUMMARY OF DESIGN PROPOSALS
ALBERT A. 9.60 1 $93,512 806
WEBB ASSOC.
RBF 8.68 2 $145,708 915
CONSULTING
TETRA TECH 8.56 3 $108,712 847
TCLA, Inc. 8.43 4 $151,870 1446
I
~Rn
n
yY "
y { Y i
9~, / y I
4
6/8/2011
III :
ELK MOUNTAIN YOUTH PRACTICE FIELD
22
Preliminary Study & Staff Costs to Date: $35,000
Proposed Design & Const-Phase Services Cost: 95,000
Estimated Construction Cost: 7501000
Estimated Staff Costs thru Construction: 20,000
Estimated Total Cost through Construction: $900,000
5
6/8/2011
• The District providing for • Higher cost of construction
the local community than original contribution
• The District fulfilling a goal • On-going annual
to build a park maintenance costs for the
• Setting an example of turf and the site
water conservation • Increased liability and
• The Youth teams have a vandalism potential
superior practice field • Increased traffic and noise
surface for the local neighbors
IREMENTS
• SYNTHETIC TURF
❑ Weekly Pick up debris to preserve materials
❑ Monthly Groom the turf per manufacture's specs
❑ Annual Replace any infill material and broom
❑ Every 10 yrs+/............... Replace artificial turf field ($300k
• PARKING LOT
❑ Periodic slurry seal..... Contract with paving contractor to seal
• GENERALGROUNDS
❑ Security Regularly check reservoir hatches
❑ Weed abatement........... Remove weeds and treat annually
6
6/8/2011
- c,
• The District will be required to manage and monitor the field
activities (including Youth-team-provided portable toilets)
• The District will need to assign coordination & scheduling
responsibilities to a Staff person to work with the Youth Teams
• The District will need to create an agreement with
indemnification to minimize potential injury and other claims
• The Decision for the District is: Are the benefits greater than
the potential risks for providing a Youth Practice Field at the
Elk Mountain Reservoir site
_J!0'R THE BOARD
• Direct staff to step back and reconsider less-costly
natural grass field concept, OR
• Direct staff to proceed with artificial-turf field
concept and authorize issuance of PSA for design and
construction-phase services with Webb Associates
for $93,512 (or an alternative firm), O
• Direct staff to cancel project due to greater-than-
anticipated cost.
7
6/8/2011
- =I a Water District '
Meter Replacement Program
2,011
MEL
EASTERN SERVICE AREA
The area east of Locke Ranch, known as the Eastern Service
Area, contains approximately 9,200 services consisting of
landscape, commercial, and residential meters.
~ R
_4
1
6/8/2011
INSTALLATION DATES ig8i-i996
The Badger Recordall meters used in the Eastern Service Area, were
installed between ig8i and 1996. Over 40% of the meters are greater than
20 years old. These meters have been in service much longer than their
expected lifespan, by both AWWA and the manufacturer's standards and
have registered far more gallons than described on the AWWA 0700-02
standard.
A
BADGER RECORDALL METERS
The Badger Recordall meter were
used during the build-out of the
Eastern Service Area. At the time
of installation, Badger's accuracy
warranty on the new meters was
5 years from the date of shipment E ~ 3.
or registration of 750,000 gallons, 7 4
whichever occurred first (AWWA
Standard C700-02).
Badger's repaired meter accuracy warranty was 15 years or
2,500,000 gallons, whichever occurred first (AWWA M6
manual).
2
6/8/2011
Meter Accuracy
During periodic testing we discovered that many of
these meters were registering below AWWA
standards. (AWWA accuracy standard is 98.5%-
101.5%). The industry standard on meter accuracy
loss is .33% per year. As the meter ages, this
percentage increases.
SENSUS Distributed by AQUA-METRIC
-The Sensus product is more expensive than competitive
solutions that offer more features.
-Existing Sensus product in the ground is failing and not
performing as expected, costing the District time and money.
-We have experienced delays with warranty returns and other
servicing issues with Aqua-Metric.
3
6/8/2011
REQUEST FOR PROPOSAL
On April z8, 2oii, as part of the meter
replacement project, the District released a
Request for Proposal to the 4 industry leaders
in metering. We have received and reviewed
the proposals from each vendor and have
determined that a mobile or `drive-by' solution
would be the most efficient for the topography
of the area.
4
Recommended Changes to the
Reserve Policy
*No overall change in total reserve dollars
*Add a new reserve -Maintenance Reserve
- Funding to come out of Capital Replacement
-Allows for a decrease to operating expense
for contingency line items
•Reclassify Employee Liability Reserve as "Designated"