Loading...
HomeMy WebLinkAbout1974-09-12 - Resolution No. 74-14400 00 RESOLUTION NO. 74-14 RESOLUTION OF THE BOARD OF DIRECTORS OF THE YORBA LINDA COUNTY WATER DISTRICT REGARDING WATER RATES FOR TEMPORARY SERVICE WHEREAS, the Board of Directors of the Yorba Linda County Water District is responsible for setting and adjusting the rates for water, and WHEREAS, the water rates for temporary service under section 3.8 of the Rules and Regulations regarding the rendition of water service have not been reviewed and changed since January 1, 19601P and WHEREAS, the Board of Directors of the Yorba Linda County Water District have reviewed the water rates, revenues and needs of the District, and NOW, THEREFORE BE IT RESOLVED that the Board of Directors of the Yorba Linda County Water District does hereby amend Section 3.8 of the Rules and Regulations of the Yorba Linda County Water District to establish the water rates effective with all temporary water service on and after September 12, 1974 as follows: SECTION 3.8 - TEMPORARY SERVICE: Application shall be made to the District for any temporary service desired by contractors and builders for water to be used in construction work. Upon the deposit of such sum as the District may require, a meter shall be furnished for such service. The charges for such service where the water is metered shall be charged at the regular comm- ercial rates including minimums. If in the determination of the District the setting of a meter is impracticable or uneconomical for the supply of construction water, the charges for such un- metered water shall be as follows: 1. For concrete curbs $1.60 per 100 lineal feet. 2. For settling trenches not exceeding 2 feet in width and 5 feet in depth $3.25 per 100 lineal feet. 3. For larger trenches a proportional charge shall be made as estimated by the Manager of the Water District, 4. For concrete walks $.65 per 100 square feet. 5. For settling graded streets $.30 per 100 square feet. 6. For mixing and curing concrete $.40 per cubic yard. 7. For mixing and curing concrete by a patented process $.20 per cubic yard. 8. For settling filled ground a charge will be made for a quantity of water equal to one-third the cubic contents of the fill at a rate of $0.56 per 100 cu. ft. 9. For miscellaneous uses not herein specified the quantity shall be estimated by the Water District and charged at the rate of $0.56 per 100 cu. ft. Approved and adopted by the following roll call vote this 12th day of September, 1974. Ayes: Hastings, Clodt, Wagner, Knauft and Lindow Noes: None Absent: None f~ Date f / 1 ATTEST: 00 President Sec tary