Loading...
HomeMy WebLinkAbout2011-12-13 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda Water District AGENDA YORBA LINDA WATER DISTRICT PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING Tuesday, December 13, 2011, 11:00 AM 1717 E Miraloma Ave, Placentia CA 92870 COMMITTEE STAFF Director Gary T. Melton, Chair Ken Vecchiarelli, General Manager Director Ric Collett Steve Conklin, Engineering Manager John DeCriscio, Chief Plant Operator 1. PUBLIC COMMENTS Any individual wishing to address the committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. 2. ACTION CALENDAR This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee action. 2.1. Construction Contract for Green Crest Lift Station Repairs Recommendation: That the Committee recommend the Board of Directors award construction for repairs to the Green Crest Lift Station for $90,580 to Pascal & Ludwig Constructors, Inc. 2.2. Purchase of a Sewer/Jetter Truck Recommendation: That the Committee recommend the Board of Directors authorize the General Manager to issue a purchase order to Haaker Equipment Company in the amount of $361,884.84 for acquisition of a Sewer/Jetter Truck. 2.3. Sewer Line Repairs Recommendation: That the Committee recommend the Board of Directors authorize transfers not to exceed $90,000, from Sewer Capital Reserves to Sewer Operating Account No. 5030-0730-59, as needed, to fund additional sewer main line and manhole repairs in the current fiscal year. 2.4. Change Order No. 1 for the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive Recommendation: That the Committee recommend the Board of Directors approve Change Order No. 1 in the amount of $100,112.50 and 41 additional calendar days to Kana Pipeline, Inc. for construction of the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive, Job No. 201012. 3. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 3.1. CCTV Repair Activity (Verbal Report) 3.2. Monthly Preventative Maintenance Program Report 3.3. Monthly Groundwater Production and Purchased Import Water Report 3.4. Groundwater Producers Meeting Report 3.5. Status Report on Capital Projects in Progress 3.6. Status of Strategic Plan Initiatives 3.7. Future Agenda Items and Staff Tasks 4. ADJOURNMENT 4.1. The next meeting of the Planning-Engineering-Operations Committee is scheduled to be held January 5, 2012 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internet website accessible at http://www.ylwd.com/. Accommodations for the Disabled Any person may make a request for a disability-related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. ITEM NO. 2.1 AGENDA REPORT Meeting Date: December 13, 2011 Budgeted: Yes Total Budget: $175,000 To: Planning-Engineering- Cost Estimate: $91,000 Operations Committee Funding Source: Sewer Capital Reserves From: Ken Vecchiarelli, General Account No: 201-2700 Manager Job No: 2011-16S Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: Pending Prepared By: Hank Samaripa, Project CEQA Compliance: Exempt Engineer Subject: Construction Contract for Green Crest Lift Station Repairs SUMMARY: On July 1, 2011, the Yorba Linda Water District acquired the remaining portion of the City of Yorba Linda's wastewater system. As part of the Sewer Transfer Agreement, the City transferred $267,000 of their sewer funds to the District, a portion of which was for repairs and refurbishment to the Green Crest Lift Station (GCLS). On November 30, 2011, staff received bids from four pre-qualified contractors for construction of the third and last element of near-term repairs for GCLS. Following review of the bids, staff recommends award to the low bidder, Pascal & Ludwig Constructors, Inc. for the amount of $90,580. The Engineer's estimate is $110,000. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors award construction for repairs to the Green Crest Lift Station for $90,580 to Pascal & Ludwig Constructors, Inc. DISCUSSION: Immediately after the District acquired the sewer system from the City, District staff retained Malcolm Pirnie Consultants to assess the condition of the existing sewer lift station and prepare a report recommending repairs and refurbishment. The report identified near-term items which should be addressed within two years and longer-term repairs addressed within a five-year period. The first two near-term upgrades have been completed, including: 1) the installation of a communications cable to connect the GCLS to the District's SCADA system ($26,000), and 2) the installation of an electrical plug at the control panel ($5,330), to allow connection of a portable power generator in case of a power outage. The third and last near-term work necessary is: 1) replacement of the broken access hatch to the valve vault, 2) seal all electrical fitting connections in wet well, 3) clean and recoat all metallic surfaces in wet well, and 4) replace five defective valves in the valve vault. Engineering staff prepared a scope of work for these repairs. A bid package was prepared and sent to four contractors experienced with this type of work. Bids as identified below were received on November 30, 2011, reviewed by staff and found to be responsive and fully in order. Accordingly, staff recommends award to low bidder Pascal & Ludwig Constructors, Inc. No. Company Bid 1 Pascal & Ludwig Constructors, Inc. $90,580.00 2 GCI Construction, Inc. $114,500.00 3 Valverde Construction, Inc. $116,000.00 4 Paulus Engineering, Inc. $138,353.09 STRATEGIC PLAN: SR 3-A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011-2015 with adopted amendments PRIOR RELEVANT BOARD ACTION(S): The Board of Directors authorized the Sewer Transfer Agreement from the City for the transfer of all the City remaining wastewater pipelines and one lift station. As part of the agreement, the City transferred their sewer fund balance of $267,000, which in part was to be utilized for refurbishments to this infrastructure. ITEM NO. 2.2 AGENDA REPORT Meeting Date: December 13, 2011 Budgeted: Yes Total Budget: $420,000 To: Planning-Engineering- Cost Estimate: $362,000 Operations Committee Funding Source: Sewer Capital Reserves From: Ken Vecchiarelli, General Manager Presented By: Staff Dept: Operations Reviewed by Legal: Yes Prepared By: Harold Hulbert, Operations CEQA Compliance: N/A Assistant Subject: Purchase of a Sewer/Jetter Truck SUMMARY: Under the District's purchasing policy, staff is required to competitively bid vehicle purchases in excess of $100,001. This same policy also requires Board of Directors Authorization prior to General Manager approving the procurement of such vehicles. This report demonstrates to the Board of Directors that the District's purchasing policy has been followed in obtaining proposals for the acquisition of a new Sewer/Jetter vehicle. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize the General Manager to issue a purchase order to Haaker Equipment Company in the amount of $361,884.84 for acquisition of a Sewer/Jetter Truck. DISCUSSION: In the current year budget 2011-12, funds are included for the purchase of a Sewer/Jetter Vacuum Truck to replace Unit 136 a 1999 Sewer/Jetter Vacuum Truck. Unit 136 has been in service for approximately 12 years and has many hour of service. Air Resources Board (ARB) regulations will require the district to make retrofits to this vehicle order to keep it in service. In addition to the retrofit requirements, this vehicle has become increasingly less reliable because of the amount of service hours. Staff developed a set of specifications and a Request for Proposals (RFP) was sent out to the local papers and to three (3) companies that had requested to be part of the process. The district received a total of three (3) proposals, one of which arrived a day after the deadline: Haaker Equipment Company, La Verne, CA $361,884.84 Owen Equipment Sacramento, CA (Arrived Late) $375,497.97 Inland Kenworth, Montebello, CA $384,402.43 Staff reviewed each of the RFP's to ensure all specification were met. Staff recommends authorizing a purchase order from Haaker Equipment Company in the amount of $361.884.84, for a Sewer/Jetter Truck. Haaker Equipment Company has the equipment and resources to meet the districts need for this vehicle and supported equipment. Copies of the Specification and RFP are available for review. PRIOR RELEVANT BOARD ACTION(S): The Board approved the 2011-2012 budget which included $420,000.00 in the Vehicle & Capital Outlay section for a Sewer Jetter/Vacuum Truck. ITEM NO. 2.3 AGENDA REPORT Meeting Date: December 13, 2011 Budgeted: Yes Total Budget: $35,000 To: Planning-Engineering-Operations Cost Estimate: $125,000 Committee Funding Source: Sewer Operating Fund From: Ken Vecchiarelli, General Account No: 2-5030-0730-59 Manager Presented By: Staff Dept: Operations Reviewed by Legal: N/A Prepared By: Ken Mendum, Water CEQA Compliance: N/A Maintenance Superintendent Subject: Sewer Line Repairs SUMMARY: The District annually cleans and maintains the public sewer system. Staff also video inspects the sewer mains using closed circuit television cameras. These inspections sometimes discover cracked mains, settlements and broken sections of pipe that can often be repaired through trenchless repair methods, which are considerably less expensive than the excavation, expose and repair approach. Staff has found more sections that need repair in the current fiscal year than the budget estimated for this work. As such, staff recommends transferring additional funds from sewer reserves to complete these repairs. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize transfers not to exceed $90,000, from Sewer Capital Reserves to Sewer Operating Account No. 5030-0730-59, as needed, to fund additional sewer main line and manhole repairs in the current fiscal year. DISCUSSION: Main line sewer repairs are categorized as: a) Needing immediate repair. b) Needing repair soon, but not immediately. c) Needing repair, but damage is minor and can be monitored. At present we have four category "b" jobs in progress for a total cost of $13,100, which will take Sewer Line Repairs (5030-0730-59) over budget by $8,300. This will leave 8 category "b" repairs to do, plus however many we find during the rest of the fiscal year, possibly totaling 20 repairs. If each repair costs an average of $3,300, it will take $74,300 to complete these, putting the account over budget by $82,600. ITEM NO. 2.4 AGENDA REPORT Meeting Date: December 13, 2011 Budgeted: Yes Total Budget: $873,300 To: Planning-Engineering- Cost Estimate: $700,000 Operations Committee Funding Source: All Water Funds From: Ken Vecchiarelli, General Account No: 101-2700 Manager Job No: 201012 Presented By: Steve Conklin, Engineering Dept: Engineering Manager Reviewed by Legal: No Prepared By: Joe Polimino, Project Engineer CEQA Compliance: Exempt Subject: Change Order No. 1 for the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive SUMMARY: The 2010 Waterline Replacement Project Phase 1 - Plumosa Drive Project is nearly complete. The project includes construction of approximately 2,900 feet of 12-inch waterline, valves, hydrants and appurtenances in Plumosa Drive, between Lemon Drive and Bastanchury Road and was awarded to Kana Pipeline Inc. for $568,000. Kana has put in a request for Change Order 1, for $100,112.50 and 41 calendar days as described below. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors approve Change Order No. 1 in the amount of $100,112.50 and 41 additional calendar days to Kana Pipeline, Inc. for construction of the 2010 Waterline Replacement Project Phase 1 - Plumosa Drive, Job No. 201012. DISCUSSION: In accordance with the contract documents, Kana Pipeline, Inc. (Kana) submitted a request for Change Order No. 1, for an increase in the contract amount of $113,000.00. Following negotiations with District staff, Kana agreed to a change order request of $100,112.50 and a time extension of 41 calendar days as detailed on the attachment. The requested extra work items include the following substantial change requests: . Kana is claiming an additional $5,415.00 for additional time and labor to break apart, excavate and remove approximately 2-4 feet (thickness) of unforeseen slurry and concrete (1 location at 8-inch thickness, 2 locations at 6-inch thickness and 1 location at 2-inch thickness) found under the asphalt pavement at pipeline station 38+89 to 39+07. . Kana is claiming an additional $12,541.00 for a conflict with an existing YLWD waterline, which required a change in the alignment of the new pipeline in order to maintain service to residents that were still connected to the old waterline. This change added extra pipe and fittings to be installed, causing an increase in time, labor and materials over the original contract amount. . Kana is claiming an additional $12,116.00 for encountering an abandoned and unknown water valve which was encased in concrete and under the sidewalk. This valve was in direct conflict with the new pipeline and had to be removed, mostly by jackhammers and hand digging, which was very time consuming on the production for the crew. . Kana is claiming an additional $6,674.00 for the removal of a large thrust block and waste concrete in conflict with a new tie-in that was encountered under the sidewalk, curb and gutter, not shown on the plan. This cost also includes replacement of the curb, gutter and sidewalk required after the removal of this item. . This item totals $30,979.00 and consists of multiple debits and credits. The debits relate to contract quantities greater than shown on the plan and/or a line items which differed from the actual field measurement or quantity. Some of the debits include additional slurry seal, requested by the City of Yorba Linda, in the amount of $13,375.00; related additional traffic control, in the amount of $1,500.00; related additional striping, in the amount of $3,150.00; Bond fees in the amount of $608.00. Other debits included additional pipeline installed on the project which added 33 lineal feet at the cost of $3,234.00; one additional lateral for a fire hydrant in the amount of $3,900.00; and paving grind and cap which added 5,320 square feet in the amount of $8,512.00. Credits to the District include overage payment for the city permit included as a bid item in the amount of $1,500.00; and lease of the District owned yard on Plumosa Drive (the YLWD prior administration building) for storage of equipment and materials to Kana Pipeline for 3 months resulting in a payment to the District of $1,800.00. The status of the construction contract with Kana Pipeline, Inc. is as follows: . The current contract is $568,000.00 and 105 calendar days starting June 28, 2011. . If approved, Change Order No. 1 adds $100,112.50 (17.6% of the original contract) and 41 calendar days. . If approved, Change Order No. 1 increases the total contract amount to $668,112.50 and 146 calendar days. The Engineering Manager and Staff have reviewed the contractor's request for Change Order No. 1 and recommend approval. A copy of Change Order No. 1 is attached for your reference. STRATEGIC PLAN: SR 3-A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011-2015 with adopted amendments PRIOR RELEVANT BOARD ACTION(S): The Board awarded a construction contract in the amount of $568,000 to Kana Pipeline, Inc. on May 12, 2011, for construction of the 2010 Waterline Replacement Project, Phase 1 - Plumosa Drive. The Board has approved two progress payments to date for this project, the last of which was approved October 13, 2011. ATTACHMENTS: Name: Description: Type: Change Order 1 Kana Pipeline for Plumosa Project.pdf Kana Pipeline Chnage Order 1 for Plumosa Project Backup Material YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 1 DATE 1211/11 Page 1 of 1 2010 Waterline Replacement Project CONTRACT NAME: Plumosa Drive CONTRACT AMT.: $568,000.00 DAYS: 105 CONTRACTOR: _Kana Pipeline. Inc. _ THIS CHANGE: $100,112.50 DAYS: 41 PROJECT NO. J-201012 (17.6%) OWNER: Yorba Linda Water District REVISED CONTRACT AMT: $668,112.50 DAYS: 146 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and Yorba Linda Water District otherwise referred to as Owner, DESCRIPTION OF CHANGES +INCREASE CONTRACT TIME OR +EXTENSION - DECREASE IN OR- CONTRACT REDUCTION AMOUNT Work Days) del I Trench to remove unforeseen concrete, approx 12" thick from STA 31+50 to 32+50 $1,306.00 1 Encountered unmarked Gas line around Station #28+00, noon plan or street $0.00 1 Add add'I DI fitting 22bend @ Sta#28+82.Slurry backfilliSpec 11 from STA 28+78 to 29+60 82' $1,521.00 1 Digging thru unforeseen Slurry (2-4' thick) & concrete & 1 ea 8", tea 6" lea 2" from STA 38+89 to 39+07 $5,415.00---- 1 2 Move waterline 4'W due to the new and existing line conflict $12,541.010 2 Added cost due to 9'de th vs.7' depth in plan. Expose, cut & cap exist. Line 9' dee $2,077.50 2 Add 8''x6" reducer at Sta 13+01, existing line was 6" and not 8" as shown $1,787.00 1 Invert underneath 18" line. Work 5.5' underneath 18' waterline, could not cut pipe out as shown _ $2,640.00 1 Exposed unknown & unmarked 20" steel line at Sta 17+84. Remove 20" cast iron pipe $3,192.00 2. Invert under exist 18" water main at Sta 22+24, an unknown 20" CIP has to be removed $3,314-00 1 Removed 4'x4'x18" slurry to finish connection at Sastanchury $1,905.00 1 Added cost due to difference in elev at Sta 19+53 by 5'. Installed 2-45deg bends & 6" valve $3,175.00 2 Encountered/removed abandoned 12" valve at Sta 19+53_ Exposed tie-in, hand_di . $12,116.00 - 2 Remove/re lace 34' of 8" curb A _gutter. Dig wet dirt, backfilllcompact & pour concrete $6,674.00 2 Remove/replace 14' of 6"x8" of cross gutter. Old valve box at Avolinda $3,002.00 2 Remove 16x14 section of crass gutter & 14" of curb. Working at Mandarin $4,112.00 2 Add'l 12" C-9010-33LF, Grind & Cap 5,320 SF, 1" svc @ STA 32+70, 53,500 SF Slurry $30,979.00 15 Repair existing backflow device T $3,122.00 1 Double yellow striping per City of YL. Bond Fees and overhead $1,134.00 1 NET CHANGE $100,112.50 41 REVISED CONTRACT AMOUNT AND TIME $668,112.50 146 The amount of the contract will be increased <deGreased> by the sum of $100,112.50 and the contract time shall be increased 4dec4eased> by 41 calendar days- The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner- This Change Order constitutes full, final, and complete compensation to the Contractor for all costs, expenses, overhead, profit, and any damages of every kind that the Contractor may incur in connection with the above referenced changes in the work, including any impact on the referenced work of any other work under the contract, any changes in the sequences of any work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this contract- By the execution of the Change Order, the Contractor accepts the contract price change and the contract completion date change, if any, and expressly waives any claims for any additional compensation, damages or time extensions, in connection with the above-referenced changes. RECOMMENDED: fENGINEER OR DATE: f d f CONSULTANT- g Joe P*irn no, Project Engineer, YLWD BATE: ACCEPTED: 11 IT4 /CONTRACTOR ry _ Daniel Locke, President Kana Pipeline, Inc. APPROVED: [SATE: /OWNER Kenneth R. Vecchiarelli General Manager, YLWD ITEM NO. 3.2 AGENDA REPORT Meeting Date: December 13, 2011 Subject: Monthly Preventative Maintenance Program Report ATTACHMENTS: Name: Dosciiption: a ype: 20011-12 fiscal.xls Operations Preventative Maintenance Report Exhibit PM PROGRAM FISCAL 2011/12 Fiscal 2011-12 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100% HYDRANTS (3,881) Target; all hydrants to be serviced annually. INSPECTED THIS MONTH 38 78 142 228 635 INSPECTED THIS YEAR 38 116 258 486 1,121 % OF TOTAL 1.0% 3.0% 6.7% 12.5% 28.9% VALVES (10,706/2=5,353) Target; all valves to be operated every two years OPERATED THIS MONTH 444 494 634 616 560 OPERATED THIS YEAR 444 938 1,572 2,188 2,748 9/6 OF TOTAL 8.3% 17.5% 29.4% 40.9% 51.3% DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed twice each year. FLUSHED THIS MONTH 2 0 0 155 0 FLUSHED THIS YEAR 2 2 2 157 157 % OF TOTAL 0.7% 0.7% 0.7% 50.7% 50.7% AIR VACS (330) Target; all air/vacs to be serviced annually. INSPECTED THIS MONTH 224 106 1 3 1 INSPECTED THIS YEAR 224 330 331 334 335 % OF TOTAL 72.5% 100.0% 100.0% 101.2% 101.5% PRVs (150) 40 STATIONS Target; all PRVs to be serviced annually. INSPECTED THIS MONTH 35 48 41 58 6 INSPECTED THIS YEAR 35 83 124 182 188 % OF TOTAL 23.3% 55.3% 82.7% 121.3% 125.3% SEWER CLEANING (264.1 M) Target; all sewers to be cleaned annually. CLEANED THIS MONTH 21.4 23.9 22.9 27.5 24.87 CLEANED THIS YEAR 21.4 45.3 68.3 95.8 120.67 % OF TOTAL 8.1% 17.2% 25.9% 36.3% 45.69% SEWER TELEVISING (44.02M) Target; all sewers to be televised every 6 years. TELEVISED THIS MONTH 1.2 0.58 1.38 4.85 TELEVISED THIS YEAR 1.2 1.78 1.78 3.16 8.01 % OF TOTAL 2.7% 4.04% 4.04% 7.18% 18.20% OTHER SEWER WORK. S.S. OVERFLOWS 0 0 0 0 0 SERVICE CALLS 1 0 2 1 1 ROOT CONTROL 0 267 0 0 0 REHAB FOOTAGE 0 241 12 0 12 11MAIN REPAIRS 1 0 3 1 0 MANHOLE ROOT CLEANING 11 9 0 3 0 MANHOLE REPAIRS 3 27 3 4 0 ITEM NO. 3.3 AGENDA REPORT Meeting Date: December 13, 2011 Subject: Monthly Groundwater Production and Purchased Import Water Report ATTACHMENTS: Name: Dosciiption: a ype: Import 2011-12 Nov PEO Sheet.pdf Import 2011-12 Nov PEO Sheet Backup Material Import _2011-12_Nov_Pie_Chart.pdf Import 2011-12 Nov Pie Chart Backup Material Import 2011-12 Nov TWU.pdf Import 2011-12 Nov TWU Backup Material Import 2011-12 Nov YTD Prod Chart.pdf Import 2011-12 Nov YTD Prod Backup Material YLWD SOURCE WATER SUMMARY FY 2011-12 IN-LIEU ACTUAL ADJUSTED TOTAL MONTHLY YTD BUDGET GW GW IMPORT DEMAND GW GW (Demand Est.) DELTA MONTH (AF) (AF) (AF) (AF) (AF) Jul-11 609, 256.6 1 4,Cl 2,430.1 35.6% 35.6% 2,630.6 -7.6% Aug-11 59,3.; 225.7 'j, i 'i.7 2,394.0 34.4% 35.0% 2,588.1 -7.5% Sep-11 530.0 219.4 1,391.8 2,141.2 35.0% 35.0% 2,270.8 -5.7% Oct-11 - 652.2 1,116.3 1,768.4 36.9% 35.4% 1,915.4 -7.7% Nov-11 535.2 723.7 1,258.9 42.5% 36.3% 1,513.1 -16.8% Dec-11 1,361.1 Jan-12 1,186.8 Feb-12 1,135.4 Mar-12 1,345.5 Apr-12 1,683.0 May-12 2,226.1 Jun-12 2,494.3 FYTD 1,736.2 1,889.0 6,367.4 9,992.7 36.3% 10,918.0 -8.5% Red denotes In-Lieu month Allowable GW (YTD) 4,806.5 (AF) Underpumped 1,181.2 (AF) GROUNDWATER PERCENTAGE 60.0% 55.0% 50.0% 45.0% 40.0% 35.0% 30.0% -MONTHLY GW (°o) 25.0% -1-YTO GW BPP GOAL 48.1% 20.0% Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Month WATER SUPPLY FY 2011-12 November 2011 Water Supply IN-LIEU GW 0.0% GW 42.5% IMPORT 57.5% 2011-12 YTD Water Supply GW 36.3% IMPORT 63.7% GW BPP GOAL 48.1% TOTAL WATER USE FY 2011-12 2,500 730 ■09-10 GW ❑09-10 IMPORT 72.9 Monthly Average Mean Temperature (0F) 4.0 74 73.2 ■ 10-11 GW ❑ 10-11 IMPORT .3 69.7 74.1 ■11-12 GW ❑11-12 IMPORT 70.8 70.3 67.2 66.4 2,000 62.9 63.8 66.1 66.4 62.6 62.4 1,500 65.4 61.5 59.3 Q 59.6 60.2 E 55.8 60.0 55.2 2 58.2 58.7 1,000 56.4 57.2 500 0 °NNN"0 N°11Nri, NQ5N`N1, N°N°1``0 NIZ,1,N ~ ~,o e~ PPP 555 000 ~ ~ ~ F F F Month FY 2011-12 YTD Water Supply 24,000 Budgeted Total GW + Import 22,000 Actual Total GW + Import --*---BPP GW Goal 48.1 % 20,000 Actual GW Production -*-Actual Total GW + Import 2010-11 18,000 '00~ 16,000 14,000 000.0 Q E 12,000 0 10,000 8,000 6,000 4,000 2,000 0 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Month ITEM NO. 3.4 AGENDA REPORT Meeting Date: December 13, 2011 Subject: Groundwater Producers Meeting Report ATTACHMENTS: Name: Dosciiption: a ype: GWP Mtg Notes 9Nov2011.docx GWP Meeting Notes Nov 2011 Backup Material Yorba Linda Water District, MEMORANDUM DATE: November 10, 2011 TO: Ken Vecchiarelli FROM: Steve Conklin SUBJECT: Groundwater Producers Meeting, November 9, 2011 John DeCriscio and I attended the Groundwater Producers (GWP) meeting on November 9 at OCWD. A summary of each item discussed is as follows: 1. BEA Program Proposal for City of Garden Grove Well #28. OCWD staff reported on the proposed plan to include the subject project back into OCWD's BEA Exemption Program. It was noted that Well #28, with a sustained capacity of 4000 AFY (2500 gpm), pumps from the shallow groundwater aquifer, with nitrate concentrations that range at or above the MCL (45 mg/I as N03). The project was in the original BEA Exemption program in 1988, under which the high-nitrate well water was blended with uncontaminated water from another well to allow distribution of the blend as drinking water. The City recovered its capital investment and discontinued pumping of W-28 in 2005 due to high operating costs. The City recently invested $348,276 in improvements into W-28 and has asked that the project be approved for the BEA Program, because it is removing unpotable water from the shallow aquifer and making beneficial use by blending. The City has asked for a BEA exemption to cover its capital cost and the annual O&M cost. OCWD completed an evaluation and is proposing a partial BEA exemption for the project that would include: • $87/AF for one year so the City can recover its $347,276 capital cost (i.e., $87/AF x 4000 AF) • $92/AF for one year so the City can recover 10 years of O&M costs OCWD staff indicated that with the above, OCWD will receive sufficient RA and remaining BEA funds to purchase 4000 AF of untreated full service MWD water, such that there is no impact on the groundwater basin or the other Producers. I OCWD staff listed the benefits of the project to include: • City recovers capital cost and 10-years of O&M costs. • Additional pumping from shallow aquifer (a goal of OCWD). • Removal of nitrates from aquifer (a goal of OCWD). • No impact to BPP or accumulated overdraft. • Potential to expand program to other minor water quality investments made by other Producers. This will be considered by OCWD Board in December. 2. MWD Replenishment Program Update. OCWD reported that meetings and discussions are continuing with MWD staff on a new program for providing replenishment water under various conditions. The challenge is coming up with a program that is beneficial to the agencies that have the ability to store groundwater, but not viewed as overly beneficial by the other agencies that cannot benefit but pay part of the bill. MWD is currently proposing a three-level program, which must be complimentary with other storage programs, including the Conjunctive Use Program currently in place in Orange County. Future updates will follow. 3. OCSD IRWD Green Acres Project Agreement. OCWD reported that the 15-year- old agreement is expiring. Under the agreement, in winter, when IRWD has excess recycled water, it is pumped to OCWD's Green Acres Project (GAP) for use by OCWD's recycled water users, rather than the excess discharged to waste through OCSD. Under this situation, OCWD's GAP treatment plant is shut down. OCWD noted that OCSD is developing its own recycled water source, and is phasing out its use of GAP water for plant washdown and other uses. These and other changes will require significant changes in the new agreement. 4. Recent GWRS Expansion Workshops with Local Agencies. OCWD reported that they have had recent presentations with local agencies (cities and water districts) regarding the planned expansion of GWRS, providing informational materials and a presentation. Unfortunately, it was noted that water department staff were not notified ahead of time by OCWD that the presentation was on the agenda for that agency. This resulted in some confusion and unhappy water department staff, for which OCWD GM Mike Markus apologized at the GWP meeting today. He indicated that a schedule of all planned presentations (including YLWD) and a copy of all documents to be presented or handed out will be provided to all Producers. 2 ITEM NO. 3.5 AGENDA REPORT Meeting Date: December 13, 2011 Subject: Status Report on Capital Projects in Progress ATTACHMENTS: Name: cv, i~a$icri: a ype: CIP Rept Dec2011.pdf Status Report on Capital Projects in Progress Backup Material CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: December 1, 2011 New Information since Last Report is Shown in Red IN CONSTRUCTION Project Current Status Next Actions Comments 1 Highland Booster Station Upgrade Constructing the vee-ditch Installation of the pipeline The current completion date is Budget: $5,000,000 Job No. 200814 on the reservoir, completing in the access road, and the March 2012. The Board approved Project Contact: Joe Polimino the 30-inch tie-in and poured surge tank. Change Order #2. Planned Completion Date: March 2012 the concrete footing for the surge tank. 2 Ohio/Oriente Pipeline Replacement The mainline testing and The contractor will The project is scheduled to be Budget: $615,000 Job No. 201006 chlorination is complete. Tie- complete tie-ins and complete in December 2011. Project Contact: Joe Polimino ins have begun for laterals service connections, and Planned Completion Date: Dec 2011 and services. pavement restoration. 3 2010 Waterline Replacement Project, Phase I All tie-ins and service The contractor will finish Final completion is scheduled for Plumosa Drive connections are complete, as up punch-list items in the December 2011 due to pending Budget: $700,000 Job No. 201012 well as paving and slurry field and then contract change order items. Project Contact: Joe Polimino coat. Striping was also administration close-out Planned Completion Date: Fall 2011 completed. will commence. 4 Well 20 Equipping The contractor has Will begin work on outfalI February 2012 estimated Budget: $1,200,000 Job No. 200711 completed demolition of structure, including completion. Project Contact: Joe Polimino equipment in the existing clearing and placing rip- Planned Completion Date: Feb 2012 building, and completed sub- rap. Electrical work will grade work around the well also begin inside the head. building. 5 Green Crest Lift Station Upgrades Emergency connection for Identify low-bid contractor Meet with selected contractor to Budget: $100,000 Job No. 2011165 backup power completed. for upgrades and prepare schedule construction for upgrades Project Contact: Hank Samaripa Reviewing contractor bids agenda reports for award of Green Crest Lift Station. Planned Completion Date: June 2012 for further upgrades recommendation. 6 Fairmont Reservoir Valve Replacement Notice to Proceed issued to Complete equipment Contractor installs new valves Budget: $210,000 Job No. 201011 Contractor. Contractor & submittal reviews. following MWD Diemer shutdown Project Contract: Anthony Manzano staff inspected reservoir to Contractor orders valves & in January 2012. Planned Completion: February 2012 confirm valve measurements. appurtenances. 1 CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: December 1, 2011 New Information since Last Report is Shown in Red IN DESIGN Project Current Status Next Actions Comments 1 Lakeview Grade Separation (OCTA Project) Met with OCTA Nov 17 Next mecting with OCTA Awaiting final design submittal Budget: $700,000 Job No. 201002 regarding cost sharing. scheduled for Dec 14. from OCTA's consultant. Project Contact: Anthony Manzano Submitted additional Planned Completion Date: Sept. 2013 requested information. 2 2010 Waterline Replacement Project, Ph. 11 Discussed 75% design 75% design drawings to be Constriction expected to start Pebble Beach, Cresthill Dr., Hidden Hills, drawing revisions with submitted to cities of Yorba mid 2012. Catalina Ct., Gordon Ln. & Richfield Rd. Consultant. Submittal of Linda, Anaheim and Budget: $13M Job No. 201120 revised plans & specs from Placentia, for comments Project Contact: Anthony Manzano Consultant due by rnid and for procuring Planned Completion Date: Spring 2012 December. casements. 3 YL Blvd. BPS & Pipeline Consultant preparing 100% Review 100% pipeline Consultant to resume preparation Budget: $4.5M Job No. 200817 design plans for pipeline. design. Make City Traffic of pump station design plans. Project Contact: Hank Samaripa CEQA being reviewed by Commission presentation Planned Completion Date: May 2013 legal. Three easements need on Dec 13. Advertise City of YL council approval pipeline job for on December 6. construction in January. 4 Pressure Regulating Stations Upgrade Consultant completing District to pothole existing 70% design drawings and Budget: $1,000,000 Job. No. 201108 technical design memo. Staff utilities. Consultant to specifications are anticipated in Project Contact: Derek Nguyen and consultant have visited complete and submit February 2012. Planned Completion: TBD and reviewed existing Preliminary Design Report utilities at four sites. in mid December. 2 CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: December 1, 2011 New Information since Last Report is Shown in Red IN PLANNING Project Current Status Next Actions Comments 1 Fairmont BPS & Site Improvements Staff discussing site Develop Fairmont site plan Will begin work on this project Budget: $1,885,000 Job No. 200803 improvement options. and prepare RFP for design. after design work is complete on Project Contact: Anthony Manzano Yorba Linda Booster Station Planned Completion Date: TBD project. 2 Recycled Water Study Board directed staff to District to receive remaining Budget: $225,000 Job No. 200807 receive and file report and grant of $35,519 from State. Project Contact: Derek Nguyen revisit study when cost is Planned Completion Date: TBD more economically feasible. 3 South & West Wells Project Well 21 site alternative Seek Well 21 site approval Continue search for potential Budget: $9,000,000 Job No. 200922 completed per OCWD from OCWD Board. Well 22 site. Project Contact: Anthony Manzano Board's request. Searching Planned Completion Date: TBD for Well 22 site. 4 Elk Mountain Site Improvements Pursuing adjacent property Awaiting proposals for Fence pending approvals. Budget: $6,000 Job No. 200522 owner approval to install a wrought-iron fence at Project Contact: Hank Samaripa wrought iron fence to close- northeast corner of site. Planned Completion Date: Dec 2011 off access to corner of site. 5 Locke Ranch Area Annexation LAFCO mailed-out flyers Public Hearing scheduled Public Hearing period is Budget: $9000 Job No. 2001104 with 30-day Public Hearing for 12/14/11. estimated to be 35 days long. Project Contact: Ariel Bacani period. Planned Completion Date: TBD 3 ITEM NO. 3.6 AGENDA REPORT Meeting Date: December 13, 2011 Subject: Status of Strategic Plan Initiatives ATTACHMENTS: Name: cv, i~a$icri: a ype: Strat PI Tracking- Nov2011.pdf Strategic Plan Tracking Nov 2011 Backup Material Strategic Plan Initiatives Status Report Planning-Engineering-Operations Committee Strategies Start Date Completion Lead Party Prior Progress November 2011 Progress Date FR 2: Increase Reserve Fundin Analyze the Asset Annual Review Received Sewer Fund payout from City. Awarding construction contract for last of Management Plan to Dec Prior to Budget Engineering Initiated analysis of tasks and cost to upgrade near-term upgrades to sewer lift station. FR 2 B Determine Future - 1 1 and CIP Manager sewer lift station, and same for prep of GIS Issued RFP to consultants for preparation Needs Update database for east side sewers. of GIS database for east side sewers. SR 1: Work Toward Service Reliabilit and Efficienc Service Demand Projections were examined SR 1-B Forecast Service Oct-10 Jun-11 Engineering and incorporated into the District's 2010 No change. Demand Projections Manager Urban Water Management Plan (dated May 2011 out to Year 2035 Completed site topographic map and prepared At OCWD's request, prepared well-site Develop Additional Engineering three well rendition and easement requirements for SR 1-E Well Sites Mar-11 Jun-12 Manager -site alternative plans for a meeting favored alternative, for consideration by to be scheduled with OCWD. OCWD Board. Evaluate Alternative Engineering Staff presented final Water Recycling Facilities Final study was received and filed for SR 1-F On-going On-going Planning study to PEO and the Board in future consideration when project might be Water Sources Manager November. more economically viable. SR 3: Continue Im lementation of Ca itaI Im rovement Pro'ect Plan 2007-2012 Complete Implementation of Five-Year Capital Current status is approximately $6.7 SR 3-A Improvement Plan On-going On-going Engineering The 2011-12 Budget includes $11.8 million for million of projects in construction phase from FY Improvement 012 Manager Capital Improvement Projects and $5.1 million in the planning and design phases. with Adopted Amendments Continue Planning for The 2011-12 Budget identifies $21.2 million Long-Term Capital Engineering for Capital Improvement Projects for FY2012 SR 3-B Improvements and On-going On-going Manager 13 through FY2014-15. Staff will continue to No change. Replacements evaluate our systems' needs and capabilities.