HomeMy WebLinkAbout2012-03-12 - Planning-Engineering-Operations Committee Meeting Minutes MINUTES OF THE
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
March 12, 2012
A meeting of the Planning-Engineering-Operations Committee was called to order by
Director Collett at 4:00 p.m. The meeting was held at the District's Administrative Office
at 1717 E Miraloma Ave, Placentia CA 92870.
COMMITTEE STAFF
Director Ric Collett, Chair Ken Vecchiarelli, General Manager
Director Robert R. Kiley Steve Conklin, Engineering Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
OTHER ATTENDEES
Residents of the Hidden Hills community, including Mark Schock, David Ramocinski,
Cheri Abercrombi, Bob Short, Kathy Short, John Kirby, Teresa Kirby and Shannon Lew.
1. PUBLIC COMMENTS
None.
2. DISCUSSION ITEMS
2.1. Operational Practices During Red Flag Days (Verbal Report)
Mr. Vecchiarelli opened the discussion with information on when and how
the District will be able to respond to the Public Records Request (PRR)
by Mr. Schock for water storage information for various reservoirs at the
time of Red Flag Warning (RFW) notifications by OCFA. He noted that
compliance with the PRR requires that a public agency provide records
that are available, but does not require that new records be created or
prepared. Mr. Vecchiarelli commented that complying with the recent
PRR by Mr. Schock would require an estimated 30-60 hours of staff time
to create and compile the requested documents, which is beyond that
required in the PRR. Mr. Schock indicated that the purpose of his PRR
was to obtain reservoir fill information during RFW periods. He noted that
it was his understanding that the reservoirs would be filled to 90-95% full
during RFW events in accordance with District policy, as reported in the
OC Register. Mr. Vecchiarelli commented that he was not aware of any
policy established by the Board concerning operation during RFW events.
This was followed by a report by Mr. DeCriscio on reservoir operational
practices of the District. He noted that the primary requirement is to
operate the water system and reservoirs to meet water quality standards
for the delivery of potable water for the use of all customers. Concerning
the operation of Hidden Hills (HH) Reservoir, Mr. DeCriscio indicated that
in order to maintain water quality, the volume of water in the reservoir is
1
currently drawn down to 3 ft deep, and then pumped-fill begins, in order to
bring in fresher water. He noted that at the 3 ft minimum depth, the
volume still exceeds the 180,000-gallon volume established by the Orange
County Fire Authority (OCFA) for one residential fire. He also noted that
the measure of water quality is the chlorine residual concentration, which
is continuously monitored with a chlorine residual analyzer in HH
Reservoir.
Mr. Vecchiarelli indicated that delivery of water for fire protection is
secondary to complying with water quality standards. He also noted that
the water system is designed to deliver fire flow for one residential fire at a
time in each service zone, which is the standard of the water industry. He
stated that the District will endeavor to deliver above and beyond this
design standard if there is more than one fire in a water service zone, as
was the case during the Freeway Complex Fire, but the District cannot
guarantee to meet all water demands, such as in this catastrophic wild
fire.
Mr. DeCriscio indicated that in normal operation, reservoirs may operate
with a volume less than 50% full so as to cycle the water out into the
system for use, and not allow it to remain in storage for more than a few
days. This is necessary in order for the water to maintain its chlorine
residual and to comply with water quality standards. This can be
challenging with the water stored in Hidden Hills (HH) Reservoir because
there are less than 140 homes served by this reservoir. On a normal day,
the water used by the residents of these homes is in the range of 100,000
to 150,000 gallons. The storage capacity of the reservoir is two million
gallons, which means that if the reservoir was kept full, only 5% to 8% of
the volume would be used on an average day. This would result in old or
"stale" water that would not meet water quality standards. As a result, HH
Reservoir is normally operated between a low-water volume of 200,000
gallons and a high-water volume of 600,000-700,000 gallons, with water
stored in only one bay of the two-bay reservoir.
Mr. DeCriscio noted that HH Reservoir minimum volume is 200,000
gallons, which is the volume established by OCFA to fight one residential
fire. Drawing down to this volume allows capacity for new, fresh water to
be pumped in on a regular basis. He also noted that he receives a text
message of an impending Red Flag condition, or of an impending windy
condition. In these impending conditions, he directs staff to activate
pumps and initiate a fill cycle in HH Reservoir and other reservoirs.
Discussion followed on how the District works to make use of the extra
volume pumped in after the end of a RFW, and minimize any dumping of
water to waste.
Mr. Schock commented that if HH reservoir volume is 200,000 gallons at
the time a RFW is received and the pumps at Santiago are activated and
can discharge 2,000 gpm to HH reservoir, it would take 1000 minutes (16
2
hours) to feed 2 million gallons to the reservoir. Mr. DeCriscio noted that
the District tries to get a head start by initiating pumping at the first sign of
wind. Mr. Vecchiarelli commented that the 2008 Fire was larger than
could be handled by a public water system designed in accordance with
water industry standards.
On the issue of water storage and water quality, Mr. Schock asked if HH
reservoir could be used as storage to serve all of the hill area to increase
the use of HH reservoir. Mr. DeCriscio responded that the same volume
of storage must be provided between Santiago and HH reservoirs to meet
demands. Mr. Vecchiarelli commented that there are five pressure zones
in the Hidden Hills area, two zones served from HH reservoir and three
from Santiago. To serve all five zones from HH reservoir would be
expensive and would waste energy, because the water would have to be
pumped up to HH reservoir and then served sequentially back down the
hills through five pressure zones.
Mr. Short asked, following a RFW and the filling of HH reservoir, how long
can the high reservoir level be maintained? Mr. DeCriscio answered that
the high level must be cycled down in about three days. In that period, the
District will monitor the chlorine residual and will draw down the level
through normal water consumption by residential use.
Concerning the issue of District policy during RFWs, Mr. Vecchiarelli
commented that he was not aware of any, but will check. Directors Collett
and Kiley indicated that they were not aware of any formal Board policy on
this matter. Director Kiley commented that the City of YL is reviewing
building code requirements for residential areas in the fire zone.
Questions and comments that came out of the discussion include the
following:
• The Committee asked that this information presented by staff be
made to the full Board at its March 22 meeting.
• That the meeting time be rescheduled to 4 pm that day, if
possible, to accommodate attendance by the residents and others.
• What is the District's policy or goal for water storage in Red Flag
Warning conditions?
• Mr. Schock made a verbal request to modify his Public Information
Request to be water volume stored in Hidden Hills, Santiago, and
Chino Hills reservoirs for the time period of Yorba Linda Red Flag
Warning Dates and times, as listed in a table provided by Mr.
Schock, from October 2011 to January 2012.
• The Committee asked staff to determine what would be required
to have the above data retrievable on a continuing rolling basis for
the current six-month period.
3
At the close of this discussion item, all of the attendees from the Hidden
Hills community departed, except for Mr. Schock, who stayed until the end
of the meeting.
3. ACTION CALENDAR
3.1. Award of Construction Contract for Yorba Linda Blvd Pipeline Project
Mr. Conklin reported that 19 bids were received for the construction of the
subject project, with Garcia Juarez Construction, Inc (GJC) as the low
bidder. The bid package and references of GJC were reviewed by staff
and found to be in order. In addition, there was material received from the
Center for Contract Compliance, a labor-management organization, with
information of concern regarding past performance by GJC. District staff
and legal counsel reviewed the information and met with the president of
GJC to discuss the information. All of the questions and concerns were
adequately addressed to the satisfaction of staff and legal counsel. After
discussion, the Committee supported the staff recommendation that the
Board award the contract for construction of the Yorba Linda Blvd Pipeline
Project to GJC for $1,681,650.
3.2. Well No. 20 Engineering Services Amendment No. 4 with Civiltec
Engineering, Inc.
Mr. Conklin reported that additional construction management services
were required beyond that specified in the Professional Services
Agreement and that an amendment is requested to provide the additional
necessary services. Following discussion, the Committee supported the
staff recommendation that the Board authorize approval of Engineering
Services Amendment No. 4 for $6,730 with Civiltec Engineering, resulting
in a total fee of $103,065.
3.3. Change Order No. 1 for the Fairmont Reservoir Valve Replacement
Project
Mr. Conklin reported that work is proceeding with construction of the
subject project and should be complete by the end of March. However,
after the contract was awarded to Pascal & Ludwig Constructors on
October 13, 2011, it was found that the necessary valves would require 12
weeks fabrication time (as confirmed in writing by the supplier) rather than
the earlier quoted 6 weeks. Following discussion, the Committee
supported the staff recommendation that the Board approve Change
Order No. 1, a no-cost, 37 calendar-day contract time extension for the
Project.
4
4. DISCUSSION ITEMS CONTINUED
4.1. Draft FY 2012/13 Engineering Department Budget
Mr. Conklin presented the draft Engineering Department Budget. He
reported that the Supplies and Services Budget was reduced by 48% from
the current year, primarily due to a reduction in the budgeting of
professional services, specifically consulting services. He noted that if the
need for these services arises, and if approved by the General Manager or
Board as necessary, funding will be provided from a reserve account for
this purpose. The Committee reviewed the numbers and had no
questions.
4.2. Draft FY 2012/13 Operations Department Budget
Mr. Cory presented the draft Operations Department Budget. He reported
on the elements of the draft Supplies and Services Budget and noted that,
overall, it will be reduced by $85,625 (5.5%) from the current year. The
Committee reviewed the numbers and had no questions.
4.3. Monthly Preventative Maintenance Program Report
Mr. Cory reported on PM status for February, noting that our crews are on
target for the work elements listed. He pointed out two new categories
listed, Water Leaks and Meters, with the work elements for each. It was
also noted that our crews are making good progress now on sewer
televising and are approaching the target goal.
4.4. Monthly Groundwater Production and Purchased Import Water Report
Mr. Conklin reported that for the month of February, water demand was
11% above our projected value; however, for the FY to date (8 months)
we are 4.4% under our demand projection. Our groundwater use remains
high, at 68% of our total use for the month, and cumulatively to date it is
almost 43% for the FY.
4.5. Development of a Monthly Production Summary Report
Mr. Cory reported that the Production Department is developing a new
monthly report to provide a summary of key operational information. The
purpose of the new report will be to apprise the Board of important
operational information in a brief summary format. Draft report layouts
were presented to the Committee to review. Following discussion, the
Committee favored the report that presented the information in tabular box
format.
4.6. Groundwater Producers Meeting Report
Mr. Conklin reported on the items discussed at the February 8 GWP
meeting.
4.7. Status Report on Capital Projects in Progress
Mr. Conklin reported on the status of capital projects currently in planning,
design and construction.
5
4.8. Status of Strategic Plan Initiatives
Mr. Conklin reported on the status of strategic plan objectives that relate to
engineering and operations.
4.9. Future Agenda Items and Staff Tasks
None.
5. ADJOURNMENT
5.1. The meeting adjourned at 6:20 p.m. The next meeting of the Planning-
Engineering-Operations Committee will be held April 9, 2012 at 4:00 p.m.
6