HomeMy WebLinkAbout2012-08-02 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, August 2, 2012, 3:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director Ric Collett, Chair Steve Conklin, Engineering Manager
Director Robert R. Kiley Lee Cory, Operations Manager
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
2.1. Approval of Change Orders No. 2 & 3 for Pressure Regulating Stations Upgrade Project,
Phase 1
Recommendation. That the Committee recommend the Board of Directors approve
Change Orders No. 2 & 3 for 3 additional work days and$14,904.07 to Vido
Samarzich, Inc. for construction of the Pressure Regulating Stations Upgrade
Project, Job No. 201108.
2.2. Response to NOP for Proposed Cielo Vista Project
Recommendation. That the Committee provide review comments and direct staff to
prepare and submit a letter to the County of Orange with the District's project-
related concerns relative to the planned preparation of the EIR for the Cielo Vista
Project.
3. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
3.1. Monthly Production Division Report
3.2. Monthly Preventative Maintenance Report (To be provided at the meeting.)
3.3. Monthly Groundwater Production and Purchased Import Water Report (To be provided at
the meeting.)
3.4. Groundwater Producers Meeting Report (July meeting was canceled.)
3.5. Status Report on Capital Projects in Progress
3.6. Status of Strategic Plan Initiatives
3.7. Future Agenda Items and Staff Tasks
4. ADJOURNMENT
4.1. The next meeting of the Planning-Engineering-Operations Committee will be held
Thursday, September 6, 2012 at 3:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: August 2, 2012 Budgeted: Yes
Total Budget: $750,000
To: Planning-Engineering- Cost Estimate: $14,904
Operations Committee
Funding Source: All Water Funds
From: Steve Conklin, Engineering Account No: 101-2700
Manager
Job No: J-201108
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Derek Nguyen, Water Quality CEQA Compliance: Exempt
Engineer
Subject: Approval of Change Orders No. 2 & 3 for Pressure Regulating Stations
Upgrade Project, Phase 1
SUMMARY:
Construction is in progress for the Pressure Regulating Stations Upgrade Project. Submitted for
consideration are Change Orders No. 2 & 3 for 3 work days and $14,904.07 for additional time,
labor and materials for the change in condition for the Van Buren site.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Change Orders No. 2 & 3 for 3
additional work days and $14,904.07 to Vido Samarzich, Inc. for construction of the Pressure
Regulating Stations Upgrade Project, Job No. 201108.
DISCUSSION:
In accordance with the contract documents, Vido Samarzich, Inc. submitted Change Orders No. 2 &
3 for changed conditions for the removal of the concrete vault for Van Buren Pressure Regulating
Station. Proposed Change Orders No. 2 & 3 request a combined additional 3 work days required to
demo the concrete vault with wall thicknesses ranging from 18 to 36-inches with double mat rebar
which is different than the 9-in thickness shown on record drawings. The change in wall thickness
required additional labor, new shoring, additional dump fees, and placement of 20 cubic yard of
slurry due to the enlarged size of excavation. District staff and its engineering consultant have
reviewed the changed conditions and the time request and recommend approval. Copies of Change
Orders No. 2 & 3 are attached for review and information.
The status of the construction contract with Vido Samarzich is as follows:
. The current contract is $597,020.00 with 138 working days starting June 12, 2012.
• If approved, Change Orders No. 2 & 3 add 3 work days (2.2% of current contract days) and
$14,904.07 (2.5% of current contract cost) for additional cost.
• If approved, the revised construction contract is $611,924.07 and 141 days.
STRATEGIC PLAN:
SR 3-A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011-2015 with
adopted amendments
PRIOR RELEVANT BOARD ACTION(S):
• On May 10, 2012 the Board of Directors awarded the construction contract in the amount of
$597,020 to Vido Samarzich, Inc. for the construction of the Pressure Regulating Stations
Upgrade, Job No. 2011-08.
• On July 12, 2012 the Board of Directors approved Change Order No. 1 for 27 additional work
days and no additional cost to Vido Samarzich, Inc. for the Construction of the Pressure
Regulating Stations Upgrade, Job No. 2011-08.
ATTACHMENTS:
Description: Type:
CO 2&3—Removal of Concrete Vault—Van Buren
CO2 CO3 Removal of Concrete Vault Van Buren PRS.pdf PRS Backup Material
V I DO 5AMARZ I C H INC. General Engineering Contractor No.433210 A
4972 Crestview Place, Alta Loma, California 91701 TELEPHONE 909-987-6377
FAX 909-987-8988
July 17, 2012
Yorba Linda Water District
1717 E. Miralorna Avenue
Placentia, Ca 92870
Attention- Mr. Derek Nguyen, M.S.,P.E.
Subject: REQUEST FOR CHANGE ORDER#2
ADDITIONAL WORK REQUIRED TO REMOVE CONCRETE VAULT AT VAN
BUREN STATION
PRESSURE REGULATING STATIONS UPGRADE PROJECT-
CONTRACT#J 2411-08
Dear Mr. Nguyen:
Please consider this our firm's request for CHANGE ORDER#2 in the amount of$9,193.50 and 2.5
additional calendar days for additional work required to remove the concrete vault at the Van Buren
station. Plan sheet C-2 shows the existing vault with 9" wail thickness and the actual is 18"thick with a
double mat of rebar. The estimated time to complete the removals is 4 calendar days,with 2.5 calendar
days being allocated to the additional work. I have included a Daily Extra Work Report#1 dated July 16,
2012 for your reference as well as a completed Change Order#2 on the District provided worksheet.
I will review the Daily Extra Work Report#1 with the District inspector,Jesus 5osa this morning.
If you should have any questions, please contact me at(626)926-2216.
Sincerely.
Vido 5amarzich Jr
Vice President
YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 2
DATE July 17,20ii-
Page i Of 1�
CONTRACT NAME- Pressure Regulating Stallorrs Upgrade CONTFiAC f AM]. $597,020.90 DAYS: 138
CONTRACTOR: Vido Samarzich,Inc. THIS CHANGE, 69,E°3.50 DAYS'
Z.5
PROJECT NO: 2011-05
OWNER- Yorba Linda Watar District REVISED CONTRACT AMT: $606,213.60 DAYS: 140
5
This Change Order covers changes to the subject contract as described herein.The Contractor shall construct.furnish equipmenl and materials.
and perform all work as necessary or required to complete the Change Order items for a lump sum gripe agreed upon between the Canuactor
and Yorto Linda Water District othorynse referred to as Owner-
+INCRFA9F CONTRACT
TIME
DESCRIPTION OF CHANCES ?OR *EXTENSIONI
—DECREASE IN OR-RCDUCTION
CONTRACT (DAYS)
AMMINT
tsy
Additional work required to remove existing vault at Van Buren station-plans show approx- 59,19150 2.5
9'wall thickness and actuat is approximately 18'with double mat of mbar
NET CHANGE $9,193.50 2.5
RFViSFD CONTRACT AMOUNT AND TIME $6061213,50 140.5
The amount of tho contract will be rncreasad by the sun*of 69,193,50 and the contract time shall be indsased by 2.6 calendar days-The
undamigned Contractor approves the foregoing Change Order as to the changes,it any,in the contract pricd specified for each item including
any and all supervision Costa and other mWoellaneous Costs relating to the change in work,and as to tha exlenseon of tlma allowed,if any,for
compl9tlon of the entire work on account of said Change Order-The Contractor agrees to turn ish all labor and materlalt:end perform ell ether
necessary work,inclusive of that difecly of End ifectly related to the approved time extension,required to complete the Change Order items,
This document will become a supplement of the contract and all prwHSions will apply hereto-It is understood that the Change Order shall be
effective when approved by the Owner. Thia Change Order canetdutes full,final,and complete 00(hgd"ation to the CnntradtOr for all costs,
expenses,overhead,profit,and any damages of every kind that the Contractor may incur in connection with the above referenced changes in
the work,indudarg any inpect on the referenced work of any other work under the contract,any Changes In the sequences of any work,any
delay to any work,any disruption of any work,any rescnoduring of any work,and any other effect on any of the work under this contract By
the execution of the Change Order,the Contractor eompta the contract price change and the contract completion date change,if any,and
expressly waives any claims for any additional compensation, damages or tine extensions, in connection with the tiWve•roferenced
Changes. _� {/6}
RECOMMENDED OWNER DAft: 7123111
le'
Derek n,�R`mt era or � 1
ACCEPTED: LI CONTRACTOR DATE: 7 23J
SamarziC1Ce ident TT
Vido Sam zich,Inc.
APPROVED: OWNER DATE' _
Steve Conklin,Engineering Manager
VI DO SAMARZICH, INC. General Engineering Contractor No.433210 A
4972 Crestview Place, Alta Loma, California 91701 TELEPHONE 909-987-6377
FAX 909-987-8988
July 20, 2012
Yorba Linda Water District
1717 E. Miraloma Avenue
Placentia,Ca 92870
Attention: Mr. Derek Nguyen, M.S.,P.E.
Subject: REQUEST FOR CHANGE ORDER#3
ADDITIONAL WORK REQUIRED TO REMOVE EAST CONCRETE WALL AT
VAN BUREN STATION
PRESSURE REGULATING STATIONS UPGRADE PROJECT-
CONTRACT#12011-08
Dear Mr. Nguyen:
Please consider this our firm's request for CHANGE ORDER#3 in the amount of$5,710.57 and .5
additional calendar days for additional work required to remove the East wall of the concrete vault at
the Van Buren station. Plan sheet C-2 shows the existing vault with 9" wall thickness and the actual is
36"thick with a double mat of rebar. Change Order#3 includes all work in excess of Change Order#2 to
complete the demo of the Van Buren vault and also includes new shoring, additional dump fees, and
additional placement of 20 cy of slurry due to the size of the excavation. I have included a Daily Extra
Work Report#2 and#3 dated July 19,2012 for your reference as well as a completed Change Order#3
on the District provided worksheet.
if you should have any questions, please contact me at(626)926-2216.
Sincerely:
Vido Samarrich Jr
Vice President
YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 3
DATE July 20,2012
Page 1 Of 1
CONTRACT NAME: Pressure Regulating Stations Upgrade CONTRACT AMT.: $608,213M DAYS: 140
.5
CONTRACTOR: Vido Samarzich,Inc. THIS CHANGE- $5,710.S7 DAYS: 0.5
PRCQECT NO: 2911.0
OWNER: Yorba Linda Water District REVISED CONTRACT AMT: ;811,924.x7 DAYS: 141
TMs Change Order covers changes to the subject contract as desculbed Jiemi r.-The Contractor shall construct,fumcsh equipment and materials,
and perform all work as necessary or requlfed to comp9ele the Change Order items for a lump sum price agreed upon between the Conlractor
and Yorba Linda Water District olherwim rafu rred to as Owner.
--- - --_ +INCREASE CONFRACT
TIME
OESCRIPTION OF CHANGES i OR +EXTENSION!
-DECREASE IN OR-REDACTION
CON7RACT (DAYS}
AMOUNT
f51
Additional work,in excess of Change Order#2,required to remove existing Van Buren $5,776.57 0.5
concrete vault-Es at wall approximately 35'thick w double rebar mat,includes now
shoring,additional durnp fees,and additional placement of approx 20 cy of slurry due to
the size of the excavation
NET CFiANGE $5,710-57 0.8
REVISED CONTRACT AMOUNT AND TIME 567 7,924-07 141
The amount of the contract will be increased by the sum of$6,710.57 and the contract time shall be increased by 0.5 calendar days.The
hndemigned Contractor approves the foregoing Change Order as to the changes,It any,to"contract price specified for each item including
any and all supervision costs and other miscellaneous costs relating to the change in work,and as to the extension of time allowed d any,for
completion of the entire work on account or said Change Order.The Contractor agrees to furn ish all labor and materials and oftmi7 all other
necessary work,inclusive of that directly or Indirectly related to the approved Um extension,required to complete the Change Order items.
This document will became a supplement of the contract and all provisions will apply hereto.It is understood that the Change Orders h2 J be
effective when approved by the Owner. Thia Change Order oonstautes full,final,and complete compensation to the Contractor for all costs.
expenses,overhead,proft and any damages of every kind that the Contractor may incu r in connection with the above referenced changes in
the work,including any impact on the referenced work of any other work under the dontract,any the ages in the sequences of any work,any
delay to any worn,any dlsrupdon of any work,any re5Gleduling of any work,and any other effect on any of the work under inm contract. ay
the amcutton of the Change Order,the Contractor accepts the contract price mange and the contract completion dale change,if any,and
expressly waives any claims for arty additional oomperaatlon,damages or lime extensions, in connection with the above-referenced
changes. �y J
RECOMMENDED: Q OWNER DATE: �r-
Demk N rx.P_j r= ..
.r
ACCEPTED: _ ..-./ —CONTRACTOR '3ATF,: _7/
rdo Sarnar ti Vlce46resldent T
Vido Samarxlch,Inc.
APPROVED; _ OWNER DATE:
Steve Conklin,E l *—nng Manager
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: August 2, 2012
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Engineering
Manager
Presented By: Steve Conklin, Engineering Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Steve Conklin, Engineering
Manager
Subject: Response to NOP for Proposed Cielo Vista Project
SUMMARY:
A draft letter has been prepared by staff presenting the District's concerns to be addressed in the
EIR to be prepared through the County for the proposed Cielo Vista Project. Review comments by
the PEO Committee are requested.
STAFF RECOMMENDATION:
That the Committee provide review comments and direct staff to prepare and submit a letter to the
County of Orange with the District's project-related concerns relative to the planned preparation of
the EIR for the Cielo Vista Project.
DISCUSSION:
On July 2, 2012, the District received a letter titled Notice of Preparation (NOP) and Notice of
Scoping Meeting from the County of Orange Planning Division regarding the proposed Cielo Vista
Project. The County is the Lead Agency for the Project and will be responsible for the EIR
preparation. The County is requesting written comments from potential Responsible and Trustee
Agencies presenting Project-related concerns regarding the proposed 84-acre, 112-unit single-
family residential development. The Project location is in unincorporated County area, between San
Antonio Road and the Hidden Hills community.
At the July 12 Board meeting, staff reported to the Board that a letter was being drafted and that it
must be submitted to the County by August 6, 2012. As requested by the Board, staff is submitting
its draft letter to the PEO Committee for review. The letter, as approved by PEO, will be submitted
to the County by August 6, and a copy provided to the Board.
ATTACHMENTS:
Description: Type:
Cielo Vista Prom Resp to NOP JuIV2012.docx Draft Letter re Cielo Vista Project Backup Material
July 23, 2012
Ms. Channary Leng
OC Public Works/OC Planning
300 N. Flower Street
Santa Ana, CA 92702-4048
Subject: Comments regarding the Notice of Preparation (NOP) of EIR
For Proposed Cielo Vista Project (Project No. PA100004)
This is in response to the NOP for the subject project, dated July 5, 2012. Yorba Linda Water
District (District) is the water service provider and sewer collection service provider for the
proposed project area. On February 10, 2010 and June 6, 2012, the District provided
Conditional Will-Serve Letters for water and sewer services, respectively, for the subject
project. In those letters the following conditions were noted:
1%0161 lab,
This letter is issued at the request of the developer for the entitlement process. Accordingly,
this Conditional Will-Serve Letter is not a contractual offer or commitment to provide service,
but a representation that the proposed development area is in, or may be annexed to the Yorba
Linda Water District. The applicant must satisfy certain conditions specified by the District and
agreed to by the applicant before service will be available to supply the project. Any future,
binding commitment by the District to service this project will be subject to the availability of
sewer facilities and the planning, design, and construction of adequate facilities to meet the
demands of the project in accordance with (1) the terms and conditions of a Pre-annexation
Agreement to be executed by the applicant and the District; and (2) the terms and conditions of
an Application to an Agreement with the Yorba Linda Water District for Water and Sewer
Service executed by the applicant and the District; both in accordance with the District's
policies existing at the time such agreements are executed.
In addition to the conditions noted above, District staff has had recent meetings with
representatives for the proposed Cielo Vista Project. Meetings have also taken place with
representatives for another proposed single-family residential project referred to as the Yorba
Linda Estates Project. This latter project would be located northeasterly of the Cielo Vista
Project. These two proposed projects would develop the last major undeveloped parcels in the
District's service area. The representatives for each of the two projects were advised that
water and sewer services and facilities for the two projects must be planned and designed in
concert to serve the combined area. That is, separate or piece-meal development of water and
sewer services is not acceptable.
In this regard, they were advised that the District is proceeding with a project called the
Northeast Area Water Service Planning Study. The study will be based on hydraulic modeling to
determine the various alternative means to service the potential new residential developments
as well as to meet the ultimate needs and goals of the District for this portion of the water
service area. The study is expected to begin about August 1, 2012, and may be completed by
January 2013.
In Section 6 of the Cielo Vista Project Description Summary, Utilities and Infrastructure, Potable
Water, it states that "Points of connection for water utilities that would serve the project exist
in Aspen Way and Via del Agua." This is an assumption that has not been validated.
Connection at these points assumes that water can be made available from the existing water
facilities and infrastructure near the proposed project. This is yet to be determined; additional
water facilities are likely necessary, the cost of which will be proportionately borne by the
proposed project.
Concerning sewer services for the projects, the representatives for the two projects were
advised that the District will require gravity-sewer service from all areas of the Yorba Linda
Estates Project, with such service extending southerly and westerly downward to and through
the Cielo Vista Project to connect to existing District sewers. Engineering studies by the project
developers will be required to confirm the size of the sewer lines throughout the projects, and
to confirm that the existing downstream sewers have adequate existing capacity for the
additional flow. &1h, Nor 19
Should you have any questions regarding this letter, please feel free to contact me at (714) 701-
3102, or via email at sconklin@vlwd.co
Sincerely,
Steve Conklin, P.E.
Engineering Manager
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: August 2, 2012
Subject: Monthly Production Division Report
ATTACHMENTS:
Description: Type:
Monthly Production Division Status Report July 2012 Final.pdf Monthly Production Report Backup Material
Monthly Production Summary Report
July 25,2012
Water Production
Groundwater
33.25
Import Water
65.75
Max Day
27.47
Min Day
21.48
Average Day
24.5
Weather Conditions
Number of PM's Performed
Max Temperature
93
Min Temperature
76
#of High Wind Days
0
#of Red Flag Days
0
Inches of Rain
0.05
Water Quality
Location Average C12 Dose
Richfield (North Loop)
1.29
Richfield (South Loop)
1.24
Lakeview Booster(Zone 2)
1.22
Lakeview Booster(Zone 3)
2.00
Well# 15
N/A
Well# 20
N/A
Location Average C12 Residual
Highland Booster
1.25
Valley View Booster
1.85
Paso Fino Booster
2.15
Hidden Hills Reservoir
1.23
Camino de Bryant Reservoir
1.14
No chanages to sourse water expected this next month.
collected.
Out of Service Equipment
Equipment Name
Reason for Out of Service
Well #5
Engine problems
Timber Ridge Booster#4
Exhaust leak on gas engine
Richfield Cl2 System
PLC upgrade project
Timber Ridge Booster #1
Pump. Getting quotes to remove and evaluate
7/5/2012
Number of PM's Performed
Pumps& Motors
6
Returned to Service
Equipment Name
Date
Well #5
7/21/2012
Timber Ridge Booster#4
7/12/2012
Box Canyon Ball Valve
7/13/2012
Santiago Motor#3
7/5/2012
Number of PM's Performed
Pumps& Motors
6
CL2 Systems
5
Reservoirs
2, Hidden Hill and CDB res. Flush. And H.H. tank Cl2
Wells
N/A
After Hours Responses
Hi/Lo Water Levels
3
Hi/Lo Cl2 Levels
5
Power Failures
0
Communication
8
Pump Alarms
3
Intrusion Alarms
2
Still working to get Well#20 on line, needs to be flushed and water quality samples need
ITEM NO. 3.2
AGENDA REPORT
Meeting Date: August 2, 2012
Subject: Monthly Preventative Maintenance Report (To be provided at the meeting.)
ATTACHMENTS:
Description: Type:
PM 2012-13 Jul.xls PM Report Backup Material
PREVENTATIVE AND REACTIVE MAINTENANCE
FISCAL 2012/13
Fiscal 2012-13 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100%
HYDRANTS(3,881) Target;all hydrants to be serviced annually.
INSPECTED THIS MONTH
361
INSPECTED THIS YEAR
361
%OF TOTAL
VALVES(10,706/2=5,353) Target;all valves to be operated every two years
OPERATED THIS MONTH
486
OPERATED THIS YEAR
486
%OF TOTAL
9.1%
DEAD ENDS(155 X 2=310) Target;all dead ends to be flushed twice each year.
FLUSHED THIS MONTH
0
FLUSHED THIS YEAR
0
%OF TOTAL
0.0%
AIR VACS(330) Target;all air/vacs to be serviced annually.
INSPECTED THIS MONTH
0
INSPECTED THIS YEAR
0
%OF TOTAL
0.0%
PRVs(150) 40 STATIONS Target;all PRVs to be serviced biannual!y.
INSPECTED THIS MONTH
4
INSPECTED THIS YEAR
4
%OF TOTAL
2.7%
WATER LEAKS Target;all leaks repaired at first available opportunity.
MAIN REPAIRED
1
SERVICE REPAIRED
4
SERVICE REPLACED
11
AMS REPLACED
6
METERS Target;all meter work completed no later than next working day.
NEW INSTALL 6
STUCKS 4
PREVENTATIVE AND REACTIVE MAINTENANCE
FISCAL 2012/13
SEWER CLEANING(235 M) Target;all sewers to be cleaned annually.
CLEANED THIS MONTH
25.72
CLEANED THIS YEAR
25.721
1
%OF TOTAL
SEWER TELEVISING(39.17M) Target;all sewers to be televised every 6 years.
TELEVISED THIS MONTH
3.75
TELEVISED THIS YEAR
3.75
%OF TOTAL
9.57
OTHER SEWER WORK.
S.S.OVERFLOWS
0
SERVICE CALLS
0
ROOT CONTROL
0
REHAB FOOTAGE
15
MAIN REPAIRS
1
MANHOLE ROOT CLEANING
2
MANHOLE REPAIRS
3
ITEM NO. 3.3
AGENDA REPORT
Meeting Date: August 2, 2012
Subject: Monthly Groundwater Production and Purchased Import Water Report (To be
provided at the meeting.)
Im
ATTACHMENTS:
Description: Type:
Import 2012-13 Jul.pdf Water Report Backup Material
YLWD SOURCE WATER SUMMARY
FY 2012-13
IN-LIEU ACTUAL ADJUSTED TOTAL MONTHLY YTD BUDGET
GW GW IMPORT DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF) (%) (%) (AF) (%)
Jul-12 - 785.3 1,622.6 2,407.8 32.6% 32.6% 2,354.0 2.3%
Aug-12 2,316.0
Sep-12 2,032.0
Oct-12 1,714.0
Nov-12 1,354.0
Dec-12 1,218.0
Jan-13 1,062.0
Feb-13 1,016.0
Mar-13 1,204.0
Apr-13 1,506.0
May-13 1,992.0
Jun-13 2,232.0
FYTD - 785.3 1 1,622.6 1 2,407.8 1 1 32.6% 1 2,354.0 2.3%
Red denotes In-Lieu month
Allowable GW(YTD) 1,158.2 (AF)
Underpumped 372.9 (AF)
GROUNDWATER PERCENTAGE
80.0%
MONTHLY GW(%)
75.0%
tYTD GW(%)
70.0% -gpp GOAL 50.3%
65.0%
60.0%
55.0%
50.0%
45.0%
40.0%
35.0%
30.0%
Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13
Month
WATER SUPPLY
FY 2012-13
July 2012 Water Supply
IN-LIEU GW
0.0%
GW
32.6%
IMPORT
67.4%
2012-13 YTD Water Supply
GW
32.6%
IMPORT
67.4% GW BPP GOAL
50.3%
LL
Q
G)
E
O
2,500
2,000
1,500
1,000
500
111
TOTAL WATER USE
FY 2012-13
73.0 Monthly Average Mean Temperature (°F) 010-11 GW 1310-11 IMPORT
71 4 72.9
73.2 011-12 GW 011-12 IMPORT
69.7 0 12-13 GW 012-13 IMPORT
70.8703 67.
66.4
65.3
63.8
66.4
62.4
65.4
59.7 58.0
61.5
62.0
55.5
59.6 57.6
60.0 55.2
58.7
56.4
I
I
o�-o,- o�- �`'�`'�`' m����� �,o����
PPP 5 5 5 owl " ' " A
Month
22,000
" :
16,000
14,000
UL
a
12,000
E
10,000
8,000
6,000
4,000
2,000
0
Jul-12
FY 2012-13 YTD Water Supply
Budgeted Total GW+ Import
—00-Actual Total GW+ Import
BPP GW Goal 50.3%
Actual GW Production
—0--Actual Total GW+ Import 2011-12
Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13
Month
ITEM NO. 3.5
AGENDA REPORT
Meeting Date: August 2, 2012
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Description: Type:
CIP Rept Aug2012.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2012
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Highland Booster Station Upgrade
District attained "Beneficial
Final walkthrough
Anticipate completion in August
Budget: $5,000,000 Job No. 200814
Use." Contractor completing
inspection to be scheduled
2012.
Project Contact: Joe Polimino
punch-list items and awaiting
after contractor completes
Planned Completion Date: July 2012
AQMD gas engine test results.
work.
2
Well 20 Equipping
Contractor coordinating start-up
When internal SCADA
Anticipate completion in August
Budget: $1,200,000 Job No. 200711
and testing with District.
programming and water
2012.
Project Contact: Joe Polimino
SCADA programming
quality testing is complete,
Planned Completion Date: June 2012
continues by District staff.
start-up will be scheduled.
3
Green Crest Lift Station Upgrades
Work in wet well including new
Issue Notice of
Close the job and update record
Budget: $100,000 Job No. 2011165
pipe, refurbishing elec. conduit,
Completion and file with
drawings.
Project Contact: Hank Samaripa
and installation of 3�d float, to
County Recorder.
Planned Completion Date: July 2012
be completed by August Is'
4
Fairmont Reservoir Valve Replacement
Notice of Completion issued
Inlet check valves not working
Budget: $210,000 Job No. 201011
and filed with County Recorder.
as expected; staff continuing to
Project Contract: Derek Nguyen
work with vendor for credit&
Planned Completion: May 2012
replacement.
5
Yorba Linda Blvd. Pipeline
Contractor installed pipe from
Contractor will continue
Contractor placed four electronic
Budget: $1.6M Job No. 2008-17
east end to Gun Club Rd. &re-
installing pipe from Ohio
message boards through-out site,
Project Contact: Joe Polimino
mobilized at Ohio St., installing
Street, working east.
updating the public daily of
Planned Completion Date: November 2012
pipe from the project's west
current construction operations.
end.
6
Pressure Regulating Stations Upgrade
Construction is in progress.
Expected completion for
Next station is Jefferson PRS.
Budget: $1,000,000 Job No.: 201108
Contractor working on Van
Van Buren is Y week of
Construction scheduled to begin
Project Contact: Derek Nguyen
Buren PRS site.
August.
2nd week of August.
Planned Completion: October 2012
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2012
New Information since Last Report is Shown in Red
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Lakeview Grade Separation (OCTA Project)
Negotiating OCTA cost
After cost-sharing is
Awaiting final cost sharing
Budget: $700,000 Job No. 201002
sharing.
resolved, staff to receive and
decision and design submittal
Project Contact: Anthony Manzano
approve final design.
from OCTA's consultant.
Planned Completion Date: Late 2013
2
2010 Waterline Repl.,Ph.II.: Tamarisk,Hidden
Finalizing plans & specs.
Advertise mid August with a
Construction expected to start
Hills, Catalina Ct., Gordon Ln. & Richfield Rd.
All permits issued.
bid due date of September
January 2012, with Richfield
Budget: $13M Job No. 201120
Awaiting YLCC approval
201'.
Road work starting first.
Project Contact: Anthony Manzano
of Agreement.
Planned Completion Date: Late 2013
3
Yorba Linda Blvd. Pump Station
Currently reviewing 100%
Advertise on August 22,
Projected construction start of
Budget: $23M Job No. 200817B
design drawings and specs.
2012. Bid date is September
December 2012. Schedule pre-
Project Contact: Hank Samaripa
20th. Award to follow.
con meeting with Contractor.
Planned Completion Date: Dec 2013
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2012
New Information since Last Report is Shown in Red
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Northeast Area Planning Study
Board awarded project to Carollo
Execute PSA and complete
Anticipating December
Budget: $120,000 Job No. 201011B
Engineers, Inc. (Carollo) on July
kick-off meeting with
2012 completion of NE
Project Contact: Anthony Manzano
12th.
Carollo.
Area Planning Study
Planned Completion Date: January 2013
2
Fairmont BPS & Site Improvements
Prepare conceptual site plan, to
Prepare draft RFP for
Northeast Area Planning
Budget: $6,000,000 Job No. 201011B
be part Fairmont BPS upgrade
Engineering, Design, and
Study and hydraulic
Project Contact: Hank Samaripa
RFP.
Construction Services.
analysis will provide key
Planned Completion Date: Jan 2014/15
data.
3
Well 21 Project
OCWD Board approved use of
Will review proposed lease
Will begin preparation of
Budget: $2,300,000 Job No. 200922
Well 21 site. Met with OCWD
and easement costs with
license agreement with
Project Contact: Anthony Manzano
staff to discuss agreement
YLWD Board. If approved,
OCWD for access and
Planned Completion Date: TBD
conditions and proposed cost of
will prepare RFP for well-
drilling of well.
lease and easement areas.
drilling consultant.
ITEM NO. 3.6
AGENDA REPORT
Meeting Date: August 2, 2012
Subject: Status of Strategic Plan Initiatives
ATTACHMENTS:
Description: Type:
Strat PI Tracking- July20l2.xlsx Strategic Plan Tracking Backup Material
Strategic Plan Initiatives Status Report
Planning-Engineering-Operations Committee
Strategies
Start Date
Completion
Lead Party
July 2012 Progress
Date
FR 2: Increase Reserve Funding
Analyze the Asset
Annual Review
Completing construction of upgrades to
FR 2-B
Management Plan to
Dec-11
Prior to Budget
Engineering
Greencrest Sewer Lift Station. Preparing
Determine Future
and CIP
Manager
GIS database for eastside sewers.
Needs
Update
SR 1: Work Toward Service Reliabilitv and Efficiency
Service Demand Projections were examined
SR 1-13
Forecast Service
Oct-10
Jun-11
Engineering
and incorporated into the District's 2010
Demand Projections
Manager
Urban Water Management Plan (dated May
2011) out to Year 2035
Met with OCWD staff on July 18 re site for
SR 1-E
Develop Additional
Mar-11
Jun-12
Engineering
Well 21 to discuss deal points and lease
Well Sites
Manager
and easement area requirements. OCWD
to respond with proposed cost data.
SR 3: Continue
Implementation of Ca itaI Im rovement Project Plan 2007-2012
Complete
Implementation of
Current status is approximately $8.7
Five-Year Capital
Engineering
million of projects in construction phase
SR 3-A
Improvement Plan
On-going
On-going
Manager
and $18.3 million in the planning and
from FY 2007-2012
design phases.
with Adopted
Amendments
Continue Planning for
Board authorized agreement with Carollo
SR 3-B
Long-Term Capital
On-going
On-going
Engineering
Engineers for preparation of Northeast Area
Improvements and
Manager
Planning Study. Preparing response to
Replacements
County for Cielo Vista EIR preparation.