HomeMy WebLinkAbout2013-01-03 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda
Hater District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, January 3, 2013, 3:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director Robert R. Kiley, Chair Steve Conklin, Acting General Manager
Director Phil Hawkins Lee Cory, Operations Manager
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
2.1. Approval of Change Order No. 19 for Pressure Regulating Stations Upgrade Project,
Phase 1
Recommendation. That the Committee recommend the Board of Directors approve
Change Order No. 19 to add $7,360 and 18 calendar days for final quantity
adjustments to Vido Samarzich, Inc. for construction of the Pressure Regulating
Stations Upgrade Project, Job No. 201108.
2.2. Sole-Source Proposal for Yorba Linda Blvd Pump Station SCADA Integration Services
Recommendation. That the Committee recommend the Board of Directors
authorize execution of a Professional Services Agreement with RKI for a not-to-
exceed amount of$25,000 to provide Yorba Linda Blvd Booster Pump Station
SCADA Integration Services, in accordance with RKI's proposal of December 19,
2012.
3. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
3.1. Project Recap and Forward Planning
3.2. Esperanza Hills Development Project Status (Verbal Report)
3.3. Monthly Groundwater Production and Purchased Water Report (To be provided at the
meeting.)
3.4. Monthly Production Summary Report
3.5. Monthly Preventative Maintenance Report (To be provided at the meeting.)
3.6. Groundwater Producers Meeting Report (This meeting was canceled.)
3.7. Status Report on Capital Projects in Progress
3.8. Status of Strategic Plan Initiatives
3.9. Future Agenda Items and Staff Tasks
4. ADJOURNMENT
4.1. The next Planning-Engineering-Operations Committee meeting will be held Thursday,
February 7, 2013 at 3:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: January 3, 2013 Budgeted: Yes
Total Budget: $750,000
To: Planning-Engineering- Cost Estimate: $7,360
Operations Committee
Funding Source: All Water Funds
From: Steve Conklin, Acting General Account No: 101-2700
Manager
Job No: J-201108
Presented By: Steve Conklin, Acting General Dept: Engineering
Manager
Reviewed by Legal: N/A
Prepared By: Derek Nguyen, Water Quality CEQA Compliance: Exempt
Engineer
Subject: Approval of Change Order No. 19 for Pressure Regulating Stations Upgrade
Project, Phase 1
SUMMARY:
Construction is complete and all facilities are in operation for the Pressure Regulating Stations
Upgrade Project. Submitted for consideration is Change Order No. 19 for $7,360 for final quantity
adjustments for the project.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Change Order No. 19 to add
$7,360 and 18 calendar days for final quantity adjustments to Vido Samarzich, Inc. for construction
of the Pressure Regulating Stations Upgrade Project, Job No. 201108.
DISCUSSION:
In accordance with the contract documents, Vido Samarzich, Inc. submitted Change Order No. 19
for final quantity adjustments. Proposed Change Order No. 19 requests a combined $7,360 for
grading and replanting the Camino de Bryant site and for additional paving at Timber Ridge which
was more than the quantity indicated in the bid documents. Change Order No. 19 also includes an
additional 18 calendar days necessary to complete the prior approved extra work. District staff and
its engineering consultant reviewed the Change Order request and recommend approval. A copy of
Change Order No. 19 is attached for review and consideration.
The status of the construction contract with Vido Samarzich is as follows:
• The current contract is $672,518.19 with 153.5 working days starting June 12, 2012.
• If approved, Change Order No. 19 adds 18 additional work days and $7,360 (1.1% of current
contract cost).
. If approved, the revised construction contract would be $679,878.19 and 171.5 days. The sum
of the 19 change orders would equate to 13.7% added contract cost and 54.5% added
contract days over the original contract amounts.
STRATEGIC PLAN:
SR 3-A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011-2015 with
adopted amendments
PRIOR RELEVANT BOARD ACTION(S):
• On May 10, 2012 the Board of Directors awarded the construction contract in the amount of
$597,020 to Vido Samarzich, Inc. for the construction of the Pressure Regulating Stations
Upgrade, Job No. 2011-08.
• On July 12, 2012 the Board of Directors approved Change Order No. 1 for 27 additional work
days and no additional cost to Vido Samarzich, Inc. for the Construction of the Pressure
Regulating Stations Upgrade, Job No. 2011-08.
• On August 9, 2012 the Board of Directors approved Change Order Nos. 2 & 3 for 3 additional
work days and $14,904.07 to Vido Samarzich, Inc. for the Construction of the Pressure
Regulating Stations Upgrade, Job No. 2011-08.
• On September 27, 2012 the Board of Directors approved Change Orders 4, 5 and 6 for a
combined 3 additional work days and $10,512.09 to Vido Samarzich, Inc. for the Construction
of the Pressure Regulating Stations Upgrade, Job No. 2011-08
• On October 11, 2012 the Board of Directors approved Change Order Nos. 7-10 for one-half
additional work day and $2,820.33 to Vido Samarzich, Inc. for construction of the Pressure
Regulating Stations Upgrade Project, Job No. 2011-08
• On November 8, 2012 the Board of Directors approved Change Order Nos. 11-14 for six
additional work days and $25,568.49 to Vido Samarzich, Inc. for construction of the Pressure
Regulating Stations Upgrade Project, Job No. 2011-08
• On December 20, 2012 the Board of Directors approved Change Orders No. 15-18 for three
additional work days and $21,693.21 to Vido Samarzich, Inc. for construction of the Pressure
Regulating Stations Upgrade Project, Job No. 201108.
ATTACHMENTS:
Description: Type:
PRS Prom CO#19.pdf Ch Order Req#19 Backup Material
YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 19
DATE December 27, 2012
Page 1 Of 1
CONTRACT NAME: Pressure Regulating Stations Upgrade CONTRACT AMT.: $672,518.19 DAYS: 153
.5
CONTRACTOR: Vido 5amarzlch, Inc. THIS CHANGE: $7,360.00 DAYS: 18
PROJECT NO: 2011.08
OWNER: Ynrba Linda Water District REVISED CONTRACT AMT_ $579,878.19 DAYS: 171
_ .5
This Change Carder covers changes to the subject contract as described herein.The Contractor shall construct,furnish equipment and materials,
and perform ail work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor
and Yorba Linda Water District otherwise referred to as Owner.
+INCf EASE CONTRACT
TIME
DESCRIPTION OF CHANGES /OR +EXTE SION f
DECREASE IN OR-REDUCTION
CONTRACT (DAYS)
AMOUNT
1
i
ADJUSTMENT FOR FINAL QUANTITIES FOR A/C PAVING AND REGRADING AND $7,360.00 18
REPLANTING CAMINO DE BRYANT SLOPE
ADD 18 CALANDER DAYS TO ADJUST FOR WEEKENDS NOT ACCOUNTED FOR
1HOLIDAYSI AND ADD_TIME TO COMPLETE ADDITIONAL QUANTITIES
f
DIET CHANGE $7,360.00 18
REVISED CONTRACT AMOUNT AND TIME $679,878.19 171-5
The amount of the contract wil3 be increased by the sum of$7,360.00 and the contract time shalt be increased by 18 calendar days.The
undersigned Contractor approves the foregoing Change Order as to the changes,if any,in the contract price specified for each item inducting
any and all supervision casts and other miscellaneous costs relating to the change in work,and as to the extension of time allowed,if any,for
completion of the entire work on account of said Change Order,The Contractor agrees to furnish all tabor and materials and perform all other
necessary work, Inclusive of that directly or indirectly related to the approved time extension,required to complete the Change Order items.
This document will become a supplement of the contract and all provisions will apply hereto.It is understood that the Change Order shall be
etfectiva when approved by the awner. This Change Order constitutes full,final,and complete compensation to the Contractor for all costs,
expenses,overhead,profit,and any damages of every kind that the Contractor may Incur in connection with the above referenced changes in
the work,including any impact on the referenced work of arty other work under the contract,any changes in the sequences of any►vork,any
delay to any work,any disruption of any work,any rescheduling of any work,and any other effect on any of the work under this contract. By
the execution of the Change Carder,the Contractor accepts the contract price change and the contract completion date change, if any, and
expressly waives any ctaims for any additional compensation, damages or time extensions, in connection with the above-referenced
changes.
RECOMMENDE OWNER [SATE:
N en,Pr, ject alter
ACCEPTED. r
���r CONTRACTOR f]ATE:
Vido Sa rxich, ice-President
Vido Samarzich,Inc.
APPROVED: OWNER _ HATE:
Steve Conklin,Acting General Manager
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: January 3, 2013 Budgeted: Yes
Total Budget: $25,000
To: Planning-Engineering- Cost Estimate: $25,000
Operations Committee
Funding Source: Water Capital
Reserves
From: Steve Conklin, Acting General
Manager
Job No: J2008-17B
Presented By: Steve Conklin, Acting General Dept: Engineering
Manager
Reviewed by Legal: Pending
Prepared By: Hank Samaripa, Project CEQA Compliance: Exempt
Engineer
Subject: Sole-Source Proposal for Yorba Linda Blvd Pump Station SCADA Integration
Services
SUMMARY:
At the request of District staff, RKI Engineering, LLC (RKI) provided a sole-source proposal for
SCADA integration services (integration) for the Yorba Linda Blvd Pump Station Project. RKI
recently completed integration for District facilities including Highland Booster Pump Station and
Well 20, professionally and to the satisfaction of staff. Additionally, RKI's hourly rates are
approximately half that of other integration consultants. Following evaluation, staff recommends
award to RKI for a fee not to exceed $25,000.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize execution of a Professional
Services Agreement with RKI for a not-to-exceed amount of $25,000 to provide Yorba Linda Blvd
Booster Pump Station SCADA Integration Services, in accordance with RKI's proposal of December
19, 2012.
DISCUSSION:
Yorba Linda Blvd. Booster Pump Station construction is expected to begin in early 2013. SCADA
integration is not included in the construction contract and is typically completed by District staff and
an integration consultant working together, to ensure that SCADA system is fully integrated with the
existing system to seamlessly allow District staff to control the facility remotely and receive critical
operating status.
The District has had issues in the past with integration of new SCADA facilities into its existing
system and the provider of these services. For the recently completed Highland Booster Station
Project, District staff decided to hire the integration consultant directly, rather than have the
consultant working for the design engineer or working for the construction contractor. Staff, through
various contacts and from prior work, found and after evaluation, hired RKI to perform integration
services for the Highland Project. This proved very successful on a challenging project. Thereafter,
RKI was hired again in this capacity for the Well 20 Project, which has just been successfully
completed.
With the above success in the means of project delivery and system coordination, RKI was asked to
provide a sole-source proposal for the same services for the Yorba Linda Blvd Booster Station
Project. Staff evaluated RKI's attached proposal based on experience, technical merit, content,
understanding of the project, hours and fee.
RKI's scope of work includes, but is not limited to, the following major items:
• Design review and project support
• Logic development for station controls
• Station test and start-up procedures
• SCADA interface and final functional test
• Documentation and Training
Staff reviewed the proposed fee and staff hours for the project and confirmed with RKI's Officer in
Charge, Norman Iseri, that they will complete all work described in the proposal for a fee not to
exceed $25,000. Additionally, RKI's hourly rates are approximately half that of other integration
consultants, and RKI is very familiar with District standards. Based on the above, staff recommends
award to RKI.
STRATEGIC PLAN:
SR 3-A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011-2015 with
adopted amendments
PRIOR RELEVANT BOARD ACTION(S):
On December 20, 2012, the Board of Directors award the Contract for Construction of the Yorba
Linda Blvd Pump Station to Environmental Construction, Inc.(ECI), in the amount of $1,581,179.00.
ATTACHMENTS:
Name: Description: Type:
RKI SCADA Services-
Yorba Linda Pump Station Project (2).pdf RKI Engineering YLBBPS Proposal 12-19-12 Backup Material
RKI Engineering LLC
SCADA INTEGRATION SERVICES
FOR THE
YORBA LINDA PUMP STATION
PROJECT
Prepared for:
Hank Samaripa
Project Engineer, YLWD
RKI Engineering LLC
2029 Verdugo Blvd. #109
Montrose, CA 91020
(818) 317-3003
12/19/2012
RKI Engineering LLC
December 19, 2012
Mr. Hank Samaripa
Yorba Linda Water District
1717 Mira Loma Ave.
Placentia, CA 92870
RE: SCADA Integration Services for the Yorba Linda Pump Station Project
Dear Mr. Samaripa:
RKI`s major expertise is in furnishing engineering services to the water and power
industries. Our staff has successfully completed numerous projects of different project
size and scope. RKI can draw from experiences in a variety of process control projects
with proficiencies in power equipment and distribution, distributed control systems,
PLC's, HMI's, communications and computer networks, database, and software
applications. Our experience involves working with major electricity and water providers,
industrial process, municipalities, and governmental agencies.
Our goal, at RKI Engineering, is to work with you in making this project a complete
success and forging a continued relationship. Please let me know if you have any
questions by giving me a call at (818) 317-3003 or contact me by e-mail at
rki-engr @earthlink.net.
Sincerely,
4v5?:�'
Norman S. Iseri, P.E.
2029 Verdugo Blvd #109, Montrose, CA 91020-1626 (818) 317-3003
RKI Engineering LLC
TABLE OF CONTENTS
PAGE
BACKGROUND..................................................................................................................................4
SCOPEOF WORK.............................................................................................................................4
COST OF SUPPORT AND SERVICES.............................................................................................5
FEESCHEDULE................................................................................................................................5
INSURANCE COVERAGE.................................................................................................................5
PROJECT EXPERIENCE...................................................................................................................7
PROJECT METHODOLOGY .............................................................................................................9
RKI Services and Projects, 12/19/2012 I
RKI Engineering LLC
BACKGROUND
In the quick paced world of business, the ability to complete a task faster, better and less
expensive is critical. At RKI Engineering, we are committed to finding the best solutions
for our customers. Our goal is to work closely with your staff to compliment your efforts
on projects. Because of our experience with control systems in the Water and Power
Industries, we can provide a control system that meets your every need.
SCOPE OF WORK
RKI Engineering will provide the following SCADA Integration Services to assist in the
Yorba Linda Pump Station:
• Design Review and Project Support: On a request bases, provide review of
project design to assure compatibility with the established Yorba Linda Water
District standards. Determine proper interface between the station control and
the proposed field devices.
• Logic Development for Station Controls: Program the Yorba Linda Water
District standard controller to interface with the various field devices: Station
pumps, chemical systems, field transmitters, etc. Utilize the YLWD base PLC
program to maintain common logic.
• Station Test and Startup procedure: Develop test and startup procedure to
check the various field devices. Work with the General Contractors and
subcontractors to perform point to point testing of all field wiring to the station
PLC. Assist in configuring the various devices, as needed. Perform a complete
local test and startup.
• SCADA Interface and Final Functional Test: Work on the Application Service
I/O Object to interface with the SCADA graphics. Utilize the newer SCADA
objects. Participate in complete functional test with the various entities. Test the
SCADA and alarming system Interface to insure proper operations from the
graphic screens to the field devices.
• Documentation. Provide Operation and Maintenance manuals for the Station
PLC Logic. Provide narrative to describe the operations of the local controls.
• Training: Provide one operator training class on the local control system.
• Additional Services: Other requested scope of work will be provided based on
the Fee Schedule.
PLC programming software and Wonderware Application Server for SCADA will be
provided by Yorba Linda Water District.
SCADA Integration Services for YLPS, 12/19/2012 Page 4
RKI Engineering LLC
COST OF SERVICES
The cost to provide the SCADA Integration Services for the Yorba Linda Pump Station
Project that was outline in the Scope of Work shall not excel $25,000.
FEE SCHEDULE
Standard Rate.. .......................................$100.00 per hour
SCHEDULE OF CHARGES
A: LABOR
• Travel Time Standard Rate
• Weekdays up to 8 hrs/day between 7:00 am & 9:00 Standard Rate
pm
• Weekdays in excess of 8 hrs/day Service & 1.5 times Standard Rate
nocturnal time between 9 p.m. & 7 a.m.
• Saturdays, Sundays, Holiday. 1.5 times Standard Rate
B. EXPENSES
• Equipment and Expenses will be invoiced at cost plus 15% handling fee.
PAYMENT TERMS: NET 30
INSURANCE COVERAGE
RKI Engineering maintains both General and Professional Liability Insurance. The
General Liability Insurance policy has coverage of$1,000,000. The Professional
Liability Insurance policy has coverage of$1,000,000. Evidence of these insurance
policies will be provided upon request.
SCADA Integration Services for YLPS, 12/19/2012 Page 5
RKI Engineering LLC
Norman S. Iseri, P.E.
SUMMARY:
Over 20 years of experience in Control and Computer Applications in a variety
of functions and projects. Experience includes Project Management and lead
Engineer in the design and installation of control systems at various facilities,
including SCADA Water System, Steam Generating Facilities, Hydro
Generating Facilities, and Electrical Power Distribution systems. Extensive
knowledge in both EPA and Regional Air Quality Management District
regulatory requirements for Continuous Emission Monitoring Systems/Data
Acquisition and Handling System. Background includes Project Management
and Contract Administration.
EXPERTISE:
• Industrial Automation and Process Control
• Air Quality Supervision and Project Management
• Programming on Allen-Bradley, Modicon, Siemens, GE Fanuc, Bristol
platforms, etc.
• Human Machine Interface and Operator interface software development
including Inductive Automation Ignition, Wonderware Archestra, CiTect,
Iconics, FactoryLink, PanelView, etc.
• Continuous Emissions Monitoring System/Data Acquisition and Handing
Systems
• ORACLE and Microsoft SQL Server Development and Administration
• Microsoft ACCESS Development
PROFESSIONAL EXPERIENCE:
• RKI Engineering LLC (2001 — Present)
• MASS Group (1998 - 2001), Manager of Product Development
• Los Angeles Department of Water and Power (1986 - 1998), Electrical
Engineering
• Hughes Radar Systems Group (1985 - 1986), Member of Technical Staff
• Registered Professional Electrical Engineer, CA (since 1990)
• Certified US Data FactoryLink Trainer, (1998)
EDUCATION:
• M.S., Electrical Engineering - University of Southern California
• B.S., Electrical Engineering - University of California, Los Angeles
• Business Management Courses - University of California, Los Angeles
Extension Program
SPECIAL TRAINING:
• Oracle Database Administration Course, 1993
• Oracle Advanced SQL Course, 1992
• U.S. Data FactoryLink Application Course, 1992
SCADA Integration Services for YLPS, 12/19/2012 Page 6
RKI Engineering LLC
PROJECT EXPERIENCE
RKI's staff has completed a variety of projects related to the Water and Power Industries. The
following represent a partial list of such projects.
YORBA LINDA WATER DISTRICT SCADA SYSTEM
SCOPE: Engineering and integration support for YLWD SCADA System.
Upgrade and maintain a Wonderware A2 System. Includes Redundant
Application Servers-1/0 Server configuration. Utilize IDE object modeling
of their Wells, Booster Pump Stations, Reservoirs, Pressure Reducing
Station, etc. Application server connects to Modicon PLCs using a
wireless TCP/IP network operating on 5.6Gz. Intouch operator interface
accesses the AppSry though a Galaxy data network.
CLIENT: Yorba Linda Water District
JURUPA COMMUNITY SERVICES DISTRCT SCADA SYSTEM
SCOPE: Integration support for JCSD SCADA System. Programming and
installed a Bristol 3305 and ControlWave Micro for the various water
facilities. SCADA communication was established using the BSAP
protocol through MDS radio. Redundant SCADA Workstations
configured with Iconics provides the Operator Interface to the system.
CLIENT: Yorba Linda Water District
WMWD ARLINGTON DESALTER FACILITY
SCOPE: Developed control scheme for the reverse osmosis potable water
system. Programmed Siemens 545 PLC to control the variable
frequency drives to supply well water to the RO process. Used radio
modems to communicate to remote turnouts to control the supplied
drinking water.
CLIENT: Western Municipal Water District
CITY OF LAS VEGAS WATER POLLUTION CONTROL FACILITY
SCOPE: Assisted the City of Las Vegas Personnel in developing their new Water
Pollution Control Facility SCADA System. The projects included the
design of Operator Screens, develop Math and Logic scripts, and
configured database logging.
CLIENT: City of Las Vegas
SCADA Integration Services for YLPS, 12/19/2012 Page 7
RKI Engineering LLC
AES ALAMITOS AND REDONDO BEACH SELECTIVE CATALYTIC
REDUCTION (SCR) SYSTEM
SCOPE: Designed the SCR control system for Alamitos Units 1, 2, 3, 4 and
Redondo Beach Units 5, 6. Programmed a hot-standby Modicon
Quantum System that interfaces to the RMV9000 DCS control system.
Modicon Momentum PLCs were used as gateways.
CLIENT: Mitsubishi Power Systems, Inc.
ALAMITOS AND REDONDO BEACH SELECTIVE CATALYTIC REDUCTION
(SCR)
SCOPE: Designed the SCR control system for Alamitos Units 1, 2, 3, 4 and
Redondo Beach Units 5, 6. Programmed a hot-standby Modicon
Quantum System that interfaces to the RMV9000 DCS control system.
Modicon Momentum PLCs were used as datalink devices.
CLIENT: Mitsubishi Power Systems, Inc.
CONTINUOUS EMISSIONS MONITORING/DATA ACQUISITION AND
HANDLING SYSTEM
SCOPE: Develop and install a continuous emissions monitoring/data acquisition
and handling system to meet all the requirement of the South Coast Air
Quality Management District Rule RECLAIM, Rule 1135, and the
Environmental Protection Agency 40 CFR Part 75. This project involved
working with OPTO 22, Allen Bradley SLC 500, Kaye Instruments DIGI,
US Data FactoryLink, Oracle Database, and Microsoft Access.
CLIENT: City of Burbank, Glendale, and Pasadena Public Service Department
CLIENT: Los Angeles Department of Water and Power
SCADA Integration Services for YLPS, 12/19/2012 Page 8
RKI Engineering LLC
PROJECT METHODOLOGY
The capability described herein highlights RKI's project design and implementation methodology.
This work description is based on our standard project methodology as applied to the scope of
work and associated proposed Systems Overview drawings supplied with the request for
proposal.
Based on project experience, RKI teams have learned to work within our customers' project
environment. Our success is based on quickly assimilating each customer's technical and
documentation standards, project procedures, construction processes, supplier requirements,
contractual terms and conditions, and preferred contractors and equipment supplier agreements.
In many situations, we function as an extension of our customer's staff and as an integral part of
the project effort.
In addition, we believe that our team can add value to the project execution process based on our
experience and internal company policies and procedures. The methodology assures your
expectations are met and with essential approval steps. You are given the opportunity to
measure RKI performance in a concise and detailed manner that assures the system provided by
RKI exactly meets your expectations. In this role, we take responsibility for the project scope
definition, engineering, start-up assistance, commissioning, project documentation, and training.
RKI's methodology consists of 10 integral phases. Each phase consists of one or more items.
The diagram below illustrates the methodology.
Phase Phase 2 Phase 3 Phase 4 Phase 5
Proposal Kickoff System System Test Plans
Meeting Requir ent Design
Spec. Spec.
lift RM -Amw� -� -
Phase 10 Phase 9 Phase 8 Phase 7 Phase 6
Contirtious Oocumertation Onsite Factory System
Improvement Antl Support Acceptance Oev elopme nt
Warranties Sery Testing
___JA Integration Services for YLPS, 12/19/2012 Page 9
RKI Engineering LLC
The following describes the phases in RKI's project methodology. The phases do not necessarily
occur sequentially or for every project.
Phase 1 — Proposal
This phase establishes the initial foundation for the working relationship between your staff and
RKI Project team. The proposal establishes the complete framework in which the project will be
completed.
Phase 2— Kickoff Meeting
RKI will participate in a kickoff meeting with our design team upon award of the project contract.
RKI project team members work with you to review the scope of work, review the project
schedule, and document outstanding technical issues and questions.
Phase 3—System Requirements Specification
This phase results in a Systems Requirements Specification document that is developed jointly
with RKI and your team. This document describes in detail the project's goals and objectives,
process capacities, product chemistry, product physical properties, product mixes, control
functions, terminology and preferred hardware and software to be implemented with the project.
Phase 4—System Design Specification and Detailed Design
RKI will perform the detailed design, resulting in a System Design Specification. When
completed, this document is presented to your team for review and approval. This document
becomes the base document for configuration, programming, implementation, testing, start-up,
and acceptance criteria.
Phase 5—Test Plans
This phase consists of the development of the Factory Acceptance Test (FAT), Site Acceptance
Test (SAT) and other industry specific test plans. When complete, they will be presented for
review and approval. These documents describe the testing procedures and measurement
criteria to determine the system functions as desired.
Phase 6—System Development
The project implementation phase includes equipment, hardware and third party software
procurement and construction. Automation components are assembled, communications
networks are configured and the specific control and display functions are programmed in
accordance to the System Design Specification. Associated plant construction activities are also
coordinated in this phase.
SCADA Integration Services for YLPS, 12/19/2012 Page 10
RKI Engineering LLC
Phase 7— Factory Acceptance Testing
This phase is the integration testing of the system. This test can be witnessed by your team
members in order to assure the delivered system meets the project requirements and provides
the expected benefits.
Phase 8—On-site Support Services
RKI provides field support during construction, equipment installation, and system start-up. This
phase includes execution of the previously submitted SAT Plan (Phase 5)to assure the system is
ready for operation. RKI supports your team through start-up, validation, and training.
Phase 9— Documentation and Training
This phase consists of finalizing project documentation to "as-built" status. In addition, training
will be provided to insure proper transfer of knowledge to key Personnel.
Phase 10—Continuous Improvement
This phase represents the ongoing relationship between your organization and RKI that will have
matured over the life of the project. Because of our in depth experience and knowledge of your
system, we can offer services to help maintain the system and to help you identify additional
enhancements to improve productivity and reduce operating costs.
SCADA Integration Services for YLPS, 12/19/2012 Page 11
ITEM NO. 3.1
AGENDA REPORT
Meeting Date: January 3, 2013
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Acting General
Manager
Subject: Project Recap and Forward Planning
SUMMARY:
Attached is a summary of projects completed in 2012, and those currently in design and in planning
for review and discussion with the Committee.
ATTACHMENTS:
.a Description: Type:
Protect Recap for PEO 3Jan2013.docx Project Recap&Forward Planning Backup Material
Project Recap and Forward Planning
For Planning/Engineering/Operations Committee
January 3, 2013
RECAP OF PROJECTS FOR 2012
Construction Projects Completed in 2012
Date Const Approx. Const
Project Name/Description Completed Cost
Well 20 Equipping Sept 2012 $1,146,000
Fairmont Valve Replacement May 2012 $220,000
Highland Booster Station Upgrade July 2012 $4,700,000
Green Crest Lift Station Upgrades July 2011 $113,000
Ohio/Oriente Pipeline Replacement Jan 2012 1,410,000
2010 Waterline Replacement Project, Ph. I—Plumosa Drive Jan 2012 669,000
Total $8,258,000
Reports/Studies/Agreements Completed in 2012
Date
Project Name/Description Completed Cost
Locke Ranch Annexation Mar 2012 $9,000
GIS Database Conversion for Eastside Sewers Sept 2012 $23,000
Total $32,000
Projects in Construction in 2013
Date Const Est. Date Const Est. Const
Project Name/Description Started/To Complete Cost
Begin
2012 Waterline Replacement Project, Phase II Feb 2013 March 2014 $1,400,000
Yorba Linda Blvd. Pump Station Feb 2013 Feb 2014 $1,900,000
Bryant Reservoir Drainage and Fence Improvements Mar 2013 June 2013 $80,000
Lakeview Grade Separation Pipeline Relocation(OCTA) Mid 2013 Mid 2014 $0
Well 21 Drilling Mid 2013 Late 2013 $600,000
YL High School Park Pipeline Relocation Mid 2013 Late 2013 $250,000
Pressure Regulating Upgrade, Phase I June 2012 Jan 2013 $680,000
Yorba Linda Blvd. Pipeline June 2012 Jan 2013 $1,700,000
Total $6,610,000
2013 Projects in Design
Date Design Est. Date Design Est. Design &
Project Name/Description Started Complete Const Cost
2014 Waterline Replacement Project Mid 2013 Early 2014 $1,400,000
Fairmont BPS& Site Improvements Mid 2013 Early 2014 $6,000,000
Pressure Regulating Stations Upgrade Phase2/four sites Mid 2013 Early 2014 $600,000
Total $8,000,000
2013 Reports/Studies/Agreements in Planning
Date Est. Date
Project Name/Description Started Complete Est. Cost
Northeast Area Planning Study Sep 2012 Feb 2013 $120,000
OCWD Annexation Coordination/Dist annexation study costs Jan 2011 Sep 2013 $1,100,000
Total $1,220,000
FORWARD PLANNING OBJECTIVES FOR 2013+
• Water System Operating Plan
• Fairmont/Springview Booster Station and Site Upgrades
• Cathodic Protection Study
• Water Line Replacement Program (on-going)
• Water and Sewer System Planning for Downtown Redevelopment Project
• New Wells for Replacement and for Annexation Production
• Completion of Agreement Terms and Coordination with OCTA on Lakeview Grade Separation Project
• Preparation of Expanded Sewer Master Plan
• Preparation of Expanded Asset Management Plan
• Pursuing Plan for Converting Private Septic Systems to Sewer Connection Services
• Pressure Regulating Upgrade, Future Phases
• Development Agreement for Cielo Vista Residential Development
• Development Agreement for Esperanza Hills Residential Development
S4 a 0p OC PUBLIC WORKS
J{ y2 300 N. FLOWER STREET 2
o n
P. O. BOX 4048
SANTA ANA, CALIFORNIA 92702.4048 �NDPwptERDISIR��
ti
941POVL VO
NOTICE OF PREPARATION and NOTICE OF SCOPING MEETING
Date: December 21, 2012
Subject: Notice of Intent to Prepare Draft Environmental Impact Report/Notice of Scoping Meeting
Project Title: Esperanza Hills Specific Plan (PA1200371VTTM 17522)
Applicant: Douglas Wymore, 7114 E. Stetson Drive, Suite 350, Scottsdale, AZ 95251
Project Contact: Kevin Canning, OC Public Works/OC Planning
OC Public Works, 300 N. Flower Street, Santa Ana, CA 92702-4048
Kevin.Canning(0)ocpw.ocgov.com Phone: (714)667-8847
Project Description: The Esperanza Hills Project proposes to construct 340 single-family residential
units on 468.9 acres in the unincorporated portion of Orange County adjacent to the City of Yorba Linda.
Project components will include approximately 13.9 acres of active and passive parks, 7 miles of trails
and 230 acres of open space. The trails will include pedestrian, bicycle and equestrian trails with linkages
to permit non-vehicular access to the Chino Hills State Park and surrounding open space areas. Fuel
modification areas have been identified and emergency access/evacuation plans have been defined in
cooperation with the Orange County Fire Authority. Two options for access to the community will be
analyzed: one with a primary connection going south to Stonehaven Drive and a second with a primary
connection going west from the community to Aspen Way. The community will be gate-guarded and a
homeowners' association will manage streets, landscaping, parks and other amenities. The project is in
the City of Yorba Linda's Sphere of Influence and it is anticipated that annexation may occur at a future
date.
Environmental Impact Report: The County of Orange has conducted an Initial Study for the subject
project and has determined that an Environmental Impact Report (EIR) is necessary. The County will be
the Lead Agency for the subject project and will prepare the EIR. This Notice of Preparation has been
prepared and distributed to solicit comments from potential Responsible and Trustee Agencies and other
public agencies so that Project-related concerns relevant to each agency's statutory responsibilities in
connection with the proposed Project can be addressed in the EIR. Interested individuals and groups are
invited to comment on the scope of the anticipated EIR. The EIR will be the environmental document of
reference for Responsible and Trustee Agencies when considering subsequent discretionary approvals.
Initial Study: The Initial Study is available for review at the County of Orange, Department of Public
Works, and on the County website at: http://www.ocl)lanning.net/CurrentProiects.asox. If you have
trouble accessing the Initial Study, an electronic copy is available by contacting Kevin Canning at the
above email address.
Pursuant to California Environmental Quality Act (CEQA) Guideline Section 15082, all comments must be
received as soon as possible but not later than 30 days after receipt of this notice. The comment
period for this Notice has been extended to 42 days; comments are due by the close of business on
February 1. All comments and responses to this NOP must be submitted in writing to the County
Project Contact listed above.
Public Review Period: December 22, 2012 - February 1, 2013 (at 5:00 P.M.)
Scoping Meeting: A public scoping meeting will be held as noted below to provide a description of the
project and to solicit comments relative to the content of the information analyzed in the EIR.
Thursday,January 31, 2013-6:30 p.m.to 8:00 p.m.
Travis Ranch Activity Center
5200 Via De La Escuela, Yorba Linda, CA 92887
Submitted by:
Mike Balsamo, Manager
OC Community Development
January , 2013
Planning& Development Services
County of Orange
300 N. Flower Street
Santa Ana, CA 92703
Re: Will Serve Letter—Water Service and Sanitary Sewer Service
Project Name: Esperanza Hills Specific Plan VTTM 17522 - 469 acres
Project Location: East of San Antonio Rd., North of Via del Agua, Yorba Linda
This letter will confirm that the project identified above ("Project") is located within the
jurisdictional boundaries of the Yorba Linda Water District ("District") and that the
District is prepared to provide water service, fire protection water, and sanitary sewer
service to the Project upon satisfaction of the District's requirements. The requirements
for extension of District water and sewer service to the Project shall be those
requirements duly adopted by the Board of Directors of the District from time-to-time
which are in effect on the date fees are paid for connections to the water and sewer
system, and nothing herein shall be deemed to exempt the Project from compliance with
terms and conditions for water and sewer service which may be adopted between the date
of this letter and the date on which the fees are paid.
Yorba Linda Water District currently requires, as a condition of extension of water and
sewer service, that the applicant for service enter into water and sewer service agreements
with the District and satisfy the following requirements:
1. Execute an Agreement with the District that establishes terms, conditions,
procedures and fees for development of water and sewer facilities to serve the
property.
2. Furnish, at applicant's expense, all required off-site water storage and
transmission facilities to bring water service to the applicant's property.
3 Furnish, at applicant's expense, all off-site sewer facilities required to connect
the Property to the District's existing sewer system and correct all existing
sewer mains that become deficient because of the Projects additional sewer
flows.
i
4. Furnish, at applicant's expense, those facilities necessary to provide service to
applicant's Project, including facilities to connect to the District's water
system, distribute water within the Project, and provide adequate fire flow
capability and storage, in conformance with the District's standards and
requirements, which facilities shall be dedicated to the District, along with the
necessary easements and fee parcels in a form satisfactory to the District.
5. Payment of all applicable fees and charges imposed by the District, including
plan check, engineering and inspection fees, meter installation charges, and
other fees applicable to new service.
6. The Orange County Fire Authority will establish the fire flow and fire
protection requirements for the proposed Project. It is the responsibility of the
applicant to confirm with the Orange County Fire Authority whether the
District's existing facilities are of adequate size, capacity, and pressure to
satisfy the fire flow requirements, or what improvements are necessary to meet
those requirements and fees are paid.
7. Applicant shall comply with all other terms and conditions required by District
of applicants for water and sewer service in effect at the time connections are
requested.
Should you have any questions regarding this letter, please contact me at (714) 701-3102.
Sincerely,
Steve Conklin, P.E.
Acting General Manager
Yorba Linda Water District
Copy: Douglas Wymore, Yorba Linda Estates LLC
ITEM NO. 3.3.
YLWD SOURCE WATER SUMMARY
FY 2012-13
IN-LIEU ACTUAL ADJUSTED TOTAL MONTHLY YTD BUDGET
GW GW IMPORT DEMAND GW GW (Demand Est.) DELTA
MONTH (AF) (AF) (AF) (AF) (°ro) (°ro) (AF) (°ro)
Jul-12 785.3 1,622.6 2,407.8 32.6% 32.6% 2,354.0 2.3%
Aug-12 793.7 1,706.4 2,500.1 31.7% 32.2% 2,316.0 7.9%
Sep-12 730.6 1,590.0 2,320.6 31.5% 32.0% 2,032.0 14.2%
Oct-12 940.4 1,126.7 2,067.1 45.5% 35.0% 1,714.0 20.6%
Nov-12 1,078.3 533.2 1,611.5 66.9% 39.7% 1,354.0 19.0%
Dec-12 594.2 264.5 858.8 69.2% 41.8% 1,218.0 -29.5%
Jan-13 1,062.0
Feb-13 1,016.0
Mar-13 1,204.0
Apr-13 1,506.0
May-13 1,992.0
Jun-13 2,232.0
FYTD 4,922.6 6,843.4 11,765.9 41.8% 10,988.0 7.1%
Red denotes In-Lieu month
Allowable GW(YTD) 5,920.6 (AF)
Underpumped 998.0 (AF)
GROUNDWATER PERCENTAGE
80.0%
'MONTHLY GW(%)
75.0%
YTD GW(%)
70.0% -BPP GOAL 50.3%
65.0%
60.0%
55.0%
50.0%
45.0%
40.0%
35.0%
30.0%
Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13
Month
WATER SUPPLY
FY 2012-13
December 2012 Water Supply
IMPORT
30.8%
GW
69.2%
2012-13 YTD Water Supply
GW
41 .8%
IMPORT
58.2%
GW BPP GOAL
50.3%
2,600
2,400
2,200
2,000
1,800
1,600
Q 1,400
a�
E
c 1,200
1,000
800
600
t[sIt
200
0
TOTAL WATER USE
FY 2012-13
77.7 Monthly Average Mean Temperature (OF) M10-11 GW 010-11 IMPORT
73.071.4 72.91 m11-12GW r311-12 IMPORT
2-13 IMPORT
69.7 ffl I
11111
slim
I
I
5.
515 59.71
58.01
1911
BE
7.
5 1 6
I
EMMME10
Elm
I
I
101010
11
1
lolls
lolls
11101010
01
IN
11111111111
101010
01011
11111111111
1010
0101011
I
oil
. . . . . . . . . . . .
Month
�0`0�o'O Q, 'A�
22,000
1-291919A
16,000
14,000
UL
Q
Q 12,000
E
n
> 10,000
8,000
6,000
4,000
2,000
0
Jul-12
FY 2012-13 YTD Water Supply
Budgeted Total GW+Import
Actual Total GW+Import
--BPP GW Goal 50.3%
Actual GW Production
Actual Total GW+Import 2011-12
Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13
Month
ITEM NO. 3.4
AGENDA REPORT
Meeting Date: January 3, 2013
Subject: Monthly Production Summary Report
ATTACHMENTS:
Description: Type:
Monthly Production Division Status Report December 2012 Final.pdf Backup Material Backup Material
D
0 N
0
V) L w o 3
L 4- a) o
> a) a) s
V >
•> C C w-O L
w i X
Vf N -0 O C a) �
3 C0 Q f6 � ! N > +�+ •a
ao) o c a) (1) C: c
Q ° CL s c v �O w a) -0 °
O 4' c6 > co i 'a `� i6 O C
CJ E O ++ C CA vi C v
i a) cn w N N u (1) i
O > s U � ai
U
i N L ° o o O — c 3 °
0 'a Q >• N N O N a) M N 110 O rl N 0 y i
Q O C0 m a) t6 U Vf +O+tA
O O N R a m U- O N 0 N N O O O(w 6 0 a/
0
_ 3
� •i
>
L L i (a N
rn.O .O O V)
3
M N N a) m V) a) o a) o E *' 0 3
Z O r-4 Z O O N +O+ L > +� O t O
ar O N ar O N J U
CU CL a/ 3 y
° co U = ° CO E L Q _ Q to
}� a/ 0 0 2 a/ O 2 co ) N C C i O >•
V E bo N C E bo c V) > v Q o o t a
CL nz x T cn O O E CL '� *' *' Q.
_ °
O W (n > 2 W (n 2 O_ U D' > 2 2 O_ U O_ t.7
3
Z y0 a;:.
Q
C 0) i
0 0 CL w CL
r O CL
O
(1) a) V) - O t
l0 Ol ° 00 00 N Ln C C a/ Ln r- O a) M m y ++
O O a? O 00 � 0 M O c-I � - J OL c-I c-I m 00 O 0 to .�
N O O
I� M Ol N N cI cI cI cI ` ` N rl cI O O cI a/
U O O U m
O O
to bo +�—' 0)
O O m m
>
a' a' 't
a,
° U C a m
d N M 0
4a > 4a
+�+ 4a fC a) a) L ° O a/
N Q Q O O ` O y Y
V) O O N N
O O O i i t6
N
` L •f6 O N a a) C
� �
V) V) 0 L i Q s s �
O N 6 O
bio
12 m m co
O O O O
a/
O
O N m
CL CL: > > E E s o ° 3 3 Ln ° ° -0 a) 0 2 bo ai
O M M tw ao V c a) a) a) O C > � C O O a m >i 1,2 a>i x x m s o '� �° i
PREVENTATIVE AND REACTIVE MAINTENANCE ITEM NO. 3.5.
FISCAL 2012/13
Fiscal 2012.13 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 58% 67% 75% 83% 92% 100%
HYDRANTS(3,881) Target;all hydrants to be serviced annually.
INSPECTED THIS MONTH 361 67 11 1531 2771 371
INSPECTED THIS YEAR 361 4281 4291 582 1 859 1 1,230
OF TOTAL 9.3%1 11.0%1 11.1%1 15.0%1 22.1%1 31.7
VALVES(10,706/2=5,353) Target;all valves to be operated every two years
OPERATED THIS MONTH 486 4961 557 1,007 502 445
OPERATED THIS YEAR 486 982 1,539 2,5461 3,048 1 3,493
OF TOTAL 9.1%1 18.3%1 28.8%1 47.6%1 56.9
DEAD ENDS(155 X 2=310) Target;all dead ends to be flushed biannually.
FLUSHED THIS MONTH 0 11 0 1551 01 0
FLUSHED THIS YEAR 01 11 11 1561 1561 156
OF TOTAL 0.0%1 0.3%1 0.3%1 50.3%1 50.3
AIR VACS(525) Target;all air/vacs to be serviced annually.
INSPECTED THIS MONTH 0 249 1401 1361 11 0
INSPECTED THIS YEAR 0 249 389 525 526 526
% TOTAL 0.0% 47.4%1 74.1%1 100.0%1 100.2% _0.2%
PRVs(150 x 2 per Yr=300) Target;all PRVs to be serviced biannually.
INSPECTED THIS MONTH 4 5 31 141 43 1 2
INSPECTED THIS YEAR 4 9 12 26 69 71
OF TOTAL 1.3% 3.0%1 4.0%1 8.7%1 23.0%1 23.7
WATER LEAKS Target;all leaks repaired at first available opportunity.
MAIN REPAIRED 1 2 01 21 1 0
SERVICE REPAIRED 4 1 31 81 5 3
SERVICE REPLACED 11 11 131 181 9 8
AMS REPLACED 6 10 61 61 17 11
METERS Target;all meter work completed no later than next working day.
NEW INSTALL 6 1 5 1 21 1 15 1 10 0
STUCKS 1 41 01 21 21 141 6
SEWER CLEANING(235 M) Target;all sewers to be cleaned annually.
CLEANED THIS MONTH 25.72 20.06 21.501 21.651 12.031 18.58
CLEANED THIS YEAR 25.721 45.781 67.281 88.931 100.961 119.54
OF TOTAL 10.94%1 19.48%1 28.63%1 37.84%1 43.00%1 50.87
SEWER TELEVISING(39.17M) Target;all sewers to be televised every 6 years.
TELEVISED THIS MONTH 3.75 4.03 1.53 1.23 2.06 1.04
TELEVISED THIS YEAR 3.75 7.78 9.31 10.54 12.60 13.64
OF TOTAL 9.57%1 19.86%1 23.77%1 26.95%1 32.17
OTHER SEWER WORK.
S.S.OVERFLOWS 0 0 0 0 0 0
SERVICE CALLS 0 2 0 1 0 0
ROOT CONTROL 0 6,316 330 0 660 1,076
REHABFOOTAGE 15 482 0 0 596 0
MAIN REPAIRS 1 2 0 3 8 1
MANHOLE ROOT CLEANING 2 0 0 0 0 0
MANHOLE REPAIRS 1 31 31 11 31 71 2
MAINTENANCE DIVISION 2012
Our Preventative Maintenance program resulted in the following:
FIRE HYDRANT SECTION
The system comprises;
3,881 fire hydrants, all to be serviced annually.
525 air/vacs, all to be serviced annually.
150 PRVs, all to be serviced annually.
155 dead end mains, all to be flushed twice each year.
During the year the section completed the following;
• Serviced 4,998 fire hydrants.
• Repaired 63 fire hydrants.
• Replaced 31 fire hydrants.
• Serviced 507 air/vacs.
• Repaired 8 air/vacs.
• Replaced 16 air/vacs.
• Serviced 231 PRVs.
• Repaired 32 PRVs.
• Assisted in 20 fire flows.
• Flushed all system dead ends twice.
• Resolved 1,019 customer service calls.
VALVE SECTION
There are 10,706 valves in the system, all to be serviced every two years.
During the year the section completed the following;
• Turned 6,809 valves.
• Repaired 33 valves.
• Replaced 53 valves.
LEAK SECTION
• Replaced 131 leaking service lines.
• Repaired 33 leaking service lines.
• Repaired I 1 main line leaks.
• Replaced 129 faulty angle meter stops.
• Installed 125 meters on new services.
• Replaced 112 stuck meters.
COLLECTIONS SECTION
There are 235 miles of sewer in the system, to be cleaned annually and 39 miles to be televised annually.
During the year the section completed the following;
• Cleaned 232 miles of sewer main.
• Televised 39 miles of sewer main.
• Carried out 26 sewer main repairs.
• Repaired 42 sewer manholes.
• Cleaned 26 miles of sewer siphons and enhanced maintenance areas.
• Removed roots from 3.25 miles of sewer main.
• We had no sewer overflows during the year.
STANDBY
Standby personnel responded to an average of 13 emergency calls per week.
OTHER HAPPENINGS
Three people obtained a Class A drivers license.
Three people increased their Distribution certification.
Two people increased their Treatment certification.
At present we have one person on probation and expect him to be full time in May.
We have had three people on extended medical leave and one person on six weeks of military leave.
Maintenance has been operating two people short for almost half the year.
ITEM NO. 3.7
AGENDA REPORT
Meeting Date: January 3, 2013
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Description: Type:
CIP Rept Jan2013.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: January 1, 2013
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
Fairmont Reservoir Valve Replacement
Inlet valves not working
Replace inlet valves early
Contractor negotiating valve
Budget: $210,000 Job No. 201011
correctly; staff working with
2013 when demands are
replacement with manufacturer.
Project Contract: Derek Nguyen
Contractor for replacement
lower.
District staff to issue 2nd letter if
Planned Completion: May 2012
issue is not resolved soon.
2
Yorba Linda Blvd. Pipeline
Project substantially complete;
Contractor to complete
Beneficial use achieved; punch
Budget: $1.6M Job No. 2008-17
contractor completing minor
minor items and punch list
list items expected to be
Project Contact: Joe Polimino
items including final grading at
to be issued.
complete January 2013.
Planned Completion Date: November 2012
future pump station.
3
Pressure Regulating Stations Upgrade
Additional change order work
Complete final change
Seek Board approval to issue
Budget: $1,000,000 Job No.: 201108
to be completed pending Board
order work and conduct
Notice of Completion and make
Project Contact: Derek Nguyen
approval.
final walk through.
final payment, after work is
Project Completion: November 2012
complete.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: January 1, 2013
New Information since Last Report is Shown in Red
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Lakeview Grade Separation (OCTA Project)
Negotiating OCTA cost
OCTA's consultant to submit
Awaiting final cost sharing
Budget: $700,000 Job No. 201002
sharing.
final design for staff review.
decision and design submittal
Project Contact: Anthony Manzano
from OCTA's consultant.
Planned Completion Date: Late 2013
2
2012 Waterline Repl.,Ph. II.: Tamarisk,Hidden
Notice of Award issued to
Issue Notice to Proceed after
Construction expected to start
Hills, Catalina Ct., Gordon Ln. &Richfield Rd.
TBU, Inc. (TBU); pre-
pre-construction meeting
February 2013, with Richfield
Budget: $13M Job No. 201120
construction meeting set
w/TBU is complete.
Road work starting first. Work
Project Contact: Anthony Manzano
for January 15, 2013.
expected to be complete by
Planned Completion Date: Early 2014
early 2014.
3
Yorba Linda Blvd. Pump Station
Issued Notice of Award to
Execute Agreement, conduct
Construction anticipated to start
Budget: $2.3M Job No. 200817B
Environmental
pre-construction meeting and
early 2013.
Project Contact: Hank Samaripa
Construction Inc.
issue NTP.
Planned Completion Date: Dec 2013
4
YL High School Park Pipe Relocation
Issued 90%plan
Complete plans and specs.
Anticipate submitting contract
Budget: $350,000 Job No.: 201213
comments. Completing
Execute PYLUSD-YLWD
documents to PYLUSD by mid
Project Contact: Hank Samaripa
draft PYLUSD—YLWD
Agreement
January.
Planned Completion Date: December 2013
Agreement.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: January 1, 2013
New Information since Last Report is Shown in Red
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Northeast Area Planning Study
Carollo completing hydraulic
Complete calibration, TM
Anticipate late January
Budget: $120,000 Job No. 201011B
and water quality model
and final Planning Study.
2013 TM submittal and
Project Contact: Anthony Manzano
calibration and Technical
February 2013 Model
February 2013 Planning
Planned Completion Date: January 2013
Memorandum (TM).
training session for staff.
Study completion.
2
Fairmont BPS & Site Improvements
Prepare conceptual site plan, to
Prepare draft RFP for
NE Area Planning Study
Budget: $6,000,000 Job No. 201011B
be part Fairmont BPS upgrade
Engineering, Design, and
to provide key data.
Project Contact: Hank Samaripa
RFP.
Construction Services.
Planned Completion Date: Jan 2014/15
3
Well 21 Project
Well site Lease Agreement
Execute Professional
Anticipate drilling to
Budget: $2,300,000 Job No. 200922#21
approved by OCWD and YLWD
Services Agreement with
begin mid 2013.
Project Contact: Anthony Manzano
Boards. Board awarded Drilling
CDM and start
Planned Completion Date: TBD
consulting services to, CDM
hydrogeologic work.
Smith (CDM).
ITEM NO. 3.8
AGENDA REPORT
Meeting Date: January 3, 2013
Subject: Status of Strategic Plan Initiatives
ATTACHMENTS:
Description: Type:
Strat PI Tracking- Dec20l2.xlsx Strategic Plan Tracking Dec 2012 Backup Material
Strategic Plan Initiatives Status Report
Planning-Engineering-Operations Committee
Strategies
Start Date
Completion
Lead Party
December 2012 Progress
Date
FR 2: Increase Reserve Funding
Analyze the Asset
Annual Review
Completed construction of upgrades to
FR 2-B
Management Plan to
Dec-11
Prior to Budget
Engineering
Greencrest Sewer Lift Station. Completed
Determine Future
and CIP
Manager
GIS database for eastside sewers.
Needs
Update
SR 1: Work Toward Service Reliabilitv and Efficiency
Service Demand Projections were examined
SR 1-13
Forecast Service
Oct-10
Jun-11
Engineering
and incorporated into the District's 2010
Demand Projections
Manager
Urban Water Management Plan (dated May
2011) out to Year 2035
Well 21 site lease agreement approved by
SR 1-E
Develop Additional
Mar-11
Jun-12
Engineering
OCWD and YLWD Boards in Dec. PSA for
Well Sites
Manager
Hydrogeologic Services for Drilling of Well
No. 21 approaved by Board Dec 20.
SR 3: Continue
Implementation of Ca itaI Im rovement Project Plan 2007-2012
Complete
Implementation of
Current status is approximately$8.7
Five-Year Capital
Engineering
million of projects in construction phase
SR 3-A
Improvement Plan
On-going
On-going
Manager
and $18.3 million in the planning and
from FY 2007-2012
design phases.
with Adopted
Amendments
Continue Planning for
Draft of Northeast Area Planning Study due
SR 3-13
Long-Term Capital
On-going
On-going
Engineering
by Feb 1. Reviewed CEQA NOP for
Improvements and
Manager
Esperanza Hills Projects.
Replacements