HomeMy WebLinkAbout2013-02-04 - Public Affairs-Communications-Technology Committee Meeting Agenda Packet Yorba Linda
Hater District
AGENDA
YORBA LINDA WATER DISTRICT
PUB AFFAIRS-COMMUNICATIONS-TECH COMMITTEE MEETING
Monday, February 4, 2013, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
COMMITTEE STAFF
Director Michael J. Beverage, Chair Steve Conklin, Acting General Manager
Director Ric Collett Art Vega, Interim IT Manager
Damon Micalizzi, Public Information Officer
1. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
2. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
2.1. Computerized Maintenance and Management System Project Status
2.2. YLWD Lobby Signage
2.3. Educational Kiosk (Verbal Report)
2.4. Spring Newsletter Draft Content (To be provided at the meeting.)
2.5. New Bottled Water Label Review (Verbal Report)
2.6. YLWD Campus Inspirational Messaging (Verbal Report)
2.7. Status of Public Outreach Activites
2.8. Status Report on Strategic Plan Initiatives
2.9. Future Agenda Items and Staff Tasks
3. ADJOURNMENT
3.1. The next Public Affairs-Communications-Technology Committee meeting will be held
Wednesday, February 20, 2013 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy-two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 2.1
AGENDA REPORT
Meeting Date: February 4, 2013 Budgeted: Yes
Total Budget: $388,000
To: Public Affairs-Communications-
Technology Committee
From: Steve Conklin, Acting General
Manager
Job No: 200915
Presented By: Art Vega, Acting IT Manager Dept: Information
Technology
Reviewed by Legal: N/A
Prepared By: Robyn Shaw, Info Sytm Tech CEQA Compliance: N/A
II/Programmer
Subject: Computerized Maintenance and Management System Project Status
SUMMARY:
Staff will update the Committee on the District's implementation of the Computerized Maintenance
and Management System (CMMS).
DISCUSSION:
District IT staff assessed the status and expenditures to date with regard to the Westin Engineering
agreement. The District has paid Westin Engineering 100% of the $ 248,626 professional services
contract to date for development, installation and initial training on the Cityworks CMMS software
system.
District IT staff assessed the final status of expenditures with regard to Task Release No. 2. The
district paid Westin Engineering $17,672.56 (46%) of the $38,000 for support services. The 12
month term of Task Release No. 2 has ended.
District IT staff assessed the status of expenditures to date with regard to Task Release No. 3. The
district has paid Westin Engineering $0 (0%) of the $20,327.44 for support services.
Training with the sewer crew will be scheduled the first week of February with additional training the
second week. After this training is complete, the sewer crews understanding of the work order
system will be assessed to determine the next step (going live or additional training). Going live with
the sewer crew is anticipated before the end of February. Laptops and vehicle equipment have
been ordered
Attached for the Committee's review is an updated projected cost estimate for the CMMS project.
STRATEGIC PLAN:
OE 1-B: Evaluate How Each Department Might Make Further Use of Existing Technology
PRIOR RELEVANT BOARD ACTION(S):
On July 22, 2010, the Board authorized the General Manager to execute a Professional Services
Agreement with Westin Engineering, in the amount of $248,626, to provide Computerized
Maintenance & Management System (CMMS) software and implementation services. The software
proposed by Westin Engineering was Azteca's CityWorks software solution.
On October 27, 2011, the Board authorized the General Manager to execute Task Release No. 2
amending the PSA with Westin, in the amount not to exceed $38,000 to provide for additional
support services on an on-call as-needed basis.
On December 19, 2012, the PACT Committee approved Task Release No. 3 amending the PSA
with Westin Engineering, extending support services for another year using remaining budgeted
funds in the amount not to exceed $20,327.44 (the amount remaining from Task Release No. 2) to
provide for additional support services on an on-call as-needed basis.
For the 2012/13 budget year the CMMS CIP project was increased by $50,000.
ATTACHMENTS:
Description: Type:
Protected Cost for CMMS 2012 - 2013.xlsx Projected Cost for CMMS 2012-2013 Backup Material
CMMS Projected Costs
(updated January 29,2013)
Project Total to Date: $329,143.55
EQUIP
$0.00
$0.00
INVENTORY
$0.00
$8,646.38
LABOR
$0.00
$7,943.67
OUTSIDE SVC
$388,000.00
$284,341.00
SUPPLIES
$0.00
$28,212.50
Project Total to Date: $329,143.55
Projected Remaining Costs for Supplies&Outside Services $64,790.00
Project Total to Date $329,143.55
$393,934
*Total amount of annual service contract may not be used. 1-year term.
** 16-20 licenses $2995/each, 21-100 licenses$1,995/each. Total amount of licenses needed still to be determined.
*** Does not include monthy verizon card fee of$37.99 plus applicable taxes per card per month.
Remaining amount in Westin Contract
$0.00
Task Release No. 3 with Westin Engineering *
up to$20,327
$20,327
CityWorks User Licenses (currently 15). 5 additional licenses **
5 x$2,995
$14,975
Laptops with Verizon cards (15 Total 7 already purchased)***
8 X$2,365
$18,920
Vehicle mounts for laptops (purchased 7)
8 x$1,3211
$10,568
Projected Remaining Costs for Supplies&Outside Services $64,790.00
Project Total to Date $329,143.55
$393,934
*Total amount of annual service contract may not be used. 1-year term.
** 16-20 licenses $2995/each, 21-100 licenses$1,995/each. Total amount of licenses needed still to be determined.
*** Does not include monthy verizon card fee of$37.99 plus applicable taxes per card per month.
CMMS Projected Costs
(updated November 27,2012)
Project Total to Date: $329,143.55
EQUIP
$0.00
$0.00
INVENTORY
$0.00
$8,646.38
LABOR
$0.00
$7,943.67
OUTSIDE SVC
$388,000.00
$284,341.00
SUPPLIES
$0.00
$28,212.50
Project Total to Date: $329,143.55
Projected Remaining Costs for Supplies&Outside Services $64,790.00
Project Total to Date $329,143.55
$393,934
*Total amount of annual service contract may not be used. 1-year term.
** 16-20 licenses $2995/each, 21-100 licenses$1,995/each. Total amount of licenses needed still to be determined.
*** Does not include monthy verizon card fee of$37.99 plus applicable taxes per card per month.
Remaining amount in Westin Contract
$0.00
Task Release No. 2 with Westin Engineering *
up to$38,000
$20,327
CityWorks User Licenses (currently 15). 5 additional licenses **
5 x$2,995
$14,975
Laptops with Verizon cards (15 Total 7 already purchased)***
8 X$2,365
$18,920
Vehicle mounts for laptops (purchased 7)
8 x$1,3211
$10,568
Projected Remaining Costs for Supplies&Outside Services $64,790.00
Project Total to Date $329,143.55
$393,934
*Total amount of annual service contract may not be used. 1-year term.
** 16-20 licenses $2995/each, 21-100 licenses$1,995/each. Total amount of licenses needed still to be determined.
*** Does not include monthy verizon card fee of$37.99 plus applicable taxes per card per month.
ITEM NO. 2.2
AGENDA REPORT
Meeting Date: February 4, 2013
Subject: YLWD Lobby Signage
SUMMARY:
Submitted for consideration by the Committee are proofs for signage for the District's Lobby
detailing our Mission, Vision & Core Values.
ATTACHMENTS:
Name: Description: Type:
est22551 v3 PROOF Pg1 Core Values.pdf core values Backup Material
est22551 v3 PROOF Pg2 Mission Statement.pdf mission Backup Material
est22551 v3 PROOF Pg3 Vision Statement.pdf vision Backup Material
Option A: Arial Bold font
60 in
14
CORE VALUES
INTEGRITY ACCOUNTABILITY
M
RESPONSIBILITY
TRANSPARENCY TEAMWORK
Option B: Myriad Pro Bold
j b
CORE VALUES
INTEGRITY ACCOUNTABILITY
RESPONSIBILITY
TRANSPARENCY TEAMWORK
7/8"dia.
stand-off
:j
CORE VALUES � CORE VALUES
INTEGRITY ACCOUNTABILITY INTEGRITY ACCOUNTABILITY
wow
I
RESPONSIBILITY RESPONSIBILITY
TRANSPARENCY TEAMWORK TRANSPARENCY TEAMWORK
Moir, rw f i
*Simulated view *Simulated view
1 ea.36"h x 60"wx 114"thick non-glare clear acrylic with first surface black vinyl text.
6 ea.718"dia.solid aluminum stand-offs for mounting to wall.
J
PME.RICgs 1265 Manassero St. #309-310 oK as is I ZQ
Anaheim, CA 92807 Date: Rev. 01.24.13 Job #: est22551_3-pg 1 -Core Values (50
Phone: (714) 693-2989 OK with NO
corrections a
INSTANT
i �i Fax: (714) 693-2925 Contact: Cody Peterson - Yorba Linda Water District Not OK send W M
cikz Americas InstantSigns.com another proof Qa
This is an original unpublished drawing created by America's Instant Signs in co junction with a pr ject being planned for the client It is not to be copied,reproduced or exhibited in any fashion to or by anyone outside of the clients organization,in whole or in part without the express written authorization of America's Instant Signs
Option A: Arial Bold font F---18 in I
F
M
LO
L El
OUR MISSION
YORBA LINDA WATER DISTRICT WILL PROVIDE RELIABLE, HIGH QUALITY WATER
C) AND SEWER SERVICES IN AN ENVIRONMENTALLY RESPONSIBLE MANNER,WHILE
N
MAINTAINING AN ECONOMICAL COSTAND UNPARALLELED CUSTOMER SERVICE
TO OUR COMMUNITY.
IM h
96 in
OUR MISSION
YORAA LINDAWATER DISTRICT WILL PROVIDE RELIABLE,NIGH QUALITY WATER
AND SEWER SERVICES IN AN ENVIRONMENTALLY RESPONSIBLE MANNER,WHILE
MAINTAINING AN ECONOMICAL COSTAND UNPARALLELED CUSTOMER SERVICE
TO OUR COMMUNITY.
'Slmufatedview
Option B: Myriad Pro Bold
YL,
W
� J
J J
OUR MISSION
YORBA LINDAWATER DISTRICT WILL PROVIDE RELIABLE,HIGH QUALITY WATER
AND SEWER SERVICES IN AN ENVIRONMENTALLY RESPONSIBLE MANNER,WHILE
MAINTAINING AN ECONOMICAL COSTAND UNPARALLELED CUSTOMER SERVICE
TO OUR COMMUNITY.
J J
7/8"dia.
stand-off
M 0
OURMISSION
YORBA LINDAWATER DISTRICT WILL PROVIDE RELIABLE,HIGH QUALITY WATER
AND SEWER SERVICES IN AN ENVIRONMENTALLY RESPONSIBLE MANNER,W HILE
MAINTAINING AN ECONOMICAL COSTAND UNPARALLELED CUSTOMER SERVICE
TO OUR COMMUNITY.
1 ea.20"h x 96"wx 114"thick non-glare clear acrylic with firstsurface black vinyl text. Logo:TBD.
6 ea. 718"dia.solid aluminum stand-offs for mounting to wall.
KlmulatedvJew
J
NMERICgs 1265 Manassero St. #309-310 OK as is ! ZQ
Anaheim, CA 92807 Date: Rev. 01.24.13 Job #: est22551_3-pg2-Mission Statement Art: BLM OK with
�N
Phone: (714) 693-2989 corrections Na
N STA NT El
i i Fax: (714) 693-2925 Contact: Cody Peterson - Yorba Linda Water District Not OK send W0
1 V -
Americas InstantSigns.com another proof Qa
JSiNCE This is an original unpublished dmv,g created by America's Instant Signs in conjunction with a pnoiject being planned for the client It is not to be copied,reproduced or exhibited iu any fashion to or by anyone outside of the clients organization,in whole or iu part without the express written authorization of America's Instant Signs.
rssl
Option A:Arial Regular font
80 in
F OUR VISION
YORBA LINDA WATER DISTRICT WILL BECOME THE LEADING, INNOVATIVE
L AND EFFICIENT SOURCE FOR HIGH QUALITY RELIABLE SERVICES.
a J
U8"dia.
stand-off
OUR VISION
YORBA LINDAWATER DISTRICT WILL BECOME THE LEADING,INNOVATIVE
AND EFFICIENT SOURCE FOR HIGH QUALITY RELIABLE SERVICES.
000
all
Option B: Times New Roman Bold
J J J
OUR VISION
YORBA LINDAWATER DISTRICT WILL BECOME THE LEADING,INNOVATIVE
AND EFFICIENT SOURCE FOR HIGH QUALITY RELIABLE SERVICES.
� y
OUR VISION
YORBA LINDA WATER DISTRICT WILL BECOMETHE LEADIM,INNOVATIVE
AND EFFICIENT SOURCE FOR NIGH QUALITY RELIABLE SERVICES.
■ D
J
1 ea. 14"h x 80"wx 114"thick non-glare clear acrylic with first surface black&blue vinyl text.
6 ea.7 18"dio.solid aluminum stand-offs for mounting to wall.
PMERICgs
1265 Manassero St. #309
J
oK as is ! ZQ
1] (50
-310
Anaheim, CA 92807
Rev. 01.24.13 Vision Statement
Date: Job #: est22551_3-pg3-
Art: BLM OK with
El
Phone: (714) 693-2989
corrections Na
INSTANT
i �i
Fax: (714) 693-2925
Contact: Cody Peterson - Yorba Linda Water District
Not OK send
W
cikz
AmericasInstantSigns.com
another proof
Qa
This is an original unpublished d,--g created by America's Instant Signs in co junction with a pr ject being planned for the diem It is not to be copied,reproduced or exhibited iu any fashion to or by anyone outside of the clients organization,in whole or in
part without the express written authorization of America's Instant Signs
ITEM NO. 2.7
AGENDA REPORT
Meeting Date: February 4, 2013
Subject: Status of Public Outreach Activites
ATTACHMENTS:
Description: Type:
PACT - Public Outreach Activities FY 12-13.docx Public Outreach Activities Backup Material
Special Events
Date
Description
Business
Materials
Notes
07/03/12
Community
Fundraiser
East Lake Eagle Rays Swim Team
120 Water Bottles
07/05/12
Community Event
The Cal South Outreach Program for Soccer
600 Water Bottles
07/18/12
School Fundraiser
YLHS Men's Basketball
144 Water Bottles
07/26/12
Community Event
YL Chamber of Commerce- Taste of YL
1,200 Water Bottles
07/26/12
Community Event
Project 999 (Supporting Fallen Police
Officers)
288 Water Bottles
08/03/12
School Fundraiser
El Dorado HS Football Golf Tournament
120 Water Bottles
08/10/12
Community
Fundraiser
YL Relay for Life
750 Sports Bottles,Water Truck,
Booth
08/16/12
School Fundraiser
5th Annual Ryan Bousquet Memorial Fun
Run
264 Water Bottles
08/30/12
Community Event
National Charity League Father/Daughter
Event
384 Water Bottles
09/10/12
Community
Fundraiser
"Tee It Up For the Troops" Golf Tournament
168 Water Bottles
09/13/12
Community Event
Kids' Community Swap Meet
360 Water Bottles
09/20/12
Health Expo
Costco
200 Water Bottles/250 Squirt
Bottles 350 YoYos 100 Frisbees
09/29/12
Community
Fundraiser
East Lake Village
200 Water Bottles
10/03/12
Community Event
Littlest Angel Guild Annual Home Tour&
Gift Fair
240 Water Bottles, 8 Traffic Cones
10/03/12
Fundraiser
YL Pop Warner Football
340 Water Bottles
10/04/12
Fundraiser
Es eranza High School PTSA
720 Water Bottles
10/12/12
Community Event
Yorba Linda Girl Scout association.
500 Water Bottles
10/13/12
Community Event
Placentia Heritage Festival
3,000 Sports Bottles
10/18/12
0 -a-thon
Fairmont Elementary
1,200 Water Bottles
10/18/12
0 -a-thon
Glenknoll Elementary
520 Water Bottles
10/25/12
Community Event
City of Y.L. Parks & Rec. Senior Health Faire
504 Water Bottles, 500 Sports Bottles
10/25/12
Community
Fundraiser
St. Martin de Porres Catholic Church
Halloween Fundraiser
504 Water Bottles
10/26/12
0 -a-thon
Lakeview Elementary
528 Water Bottles
10/26/12
0 -a-thon
Mable Paine Elementary
528 Water Bottles
11/01/12
0 -a-thon
Van Buren Elementary
720 Water Bottles
11/01/12
0 -a-thon
Glenview Elementary
480 Water Bottles
11/08/12
0 -a-thon
Rose Drive Elementary
432 Water Bottles
11/10/12
Community Event
City of YL Fiesta Days
1,500 Sport Bottles
11/17/12
Fundraiser
YLHS Basketball
312 Water Bottles
11/22/12
Community Event
Plymouth Rock'N Run
2,000 Sp ort Bottles, Frisbees,YoYos
12/08/12
School Fundraiser
Es eranza Dance Team
480 Water Bottles
02/04/13
School Fundraiser
Baseball Booster Club Golf Tournament
432 Water Bottles
02/14/13
Jo -a-thon
Bryant Ranch Jo -a-thon
600 Water Bottles
03/16/13
School Event
YLHS PTSA Mustang Pride Day
216 Water Bottles
03/17/13
Community
Fundraiser
R.E.A.C.H. Foundation, ShamRock n' Run
504 Water Bottles
03/28/13 ,
Community Event
Cross ointe Church Easter Eggstravaganza
1,800 Water Bottles
06/01/13
Community Event
Church of Jesus Christ of LDS
504 Water Bottles
As of January 29, 2012, 21,412 Water Bottles Scheduled/Donated
ITEM NO. 2.8
AGENDA REPORT
Meeting Date: February 4, 2013
Subject: Status Report on Strategic Plan Initiatives
ATTACHMENTS:
Description: Type:
PACT - Strategic Plan Trackinq.xlsx Strategic Plan Tracking Backup Material
Strategic Plan Initiatives Status Report
Public Affairs-Communication-Technology Committee
Strategies
Start Date
Completion
Lead Party
December Progress
January Progress
Date
OE 1: O timize Use of Existing Technologies
Negotium work and training for
Reviewed by Legal. Awaiting
Identify the Current Functionality of
Dynamics GP pending legal.
insurance information and
OE 1-A
Existing Technology and Determine if
Jul-11
Sep-11
IT Director/EPIC Committee
Reviewed by PACT in November.
request for extra services letter
it is Being Utilized to Full Capacity
Tentatively scheduled to start
from Negotium.
this work on January
Evaluate How Each Department Might
EPIC Committee/ Executive
OE 1-B
Make Further Use of Existing
Sep-11
Dec-11
Staff
Sta
Technology
CP 1: Increase Brand Recognition within the Communit
Enhance Resources for Public
Signage for Board Room
CP 1-A
Information&Governmental Affairs
Jul-11
Dec-11
Public Information Officer
Approved and Ordered
Division
CP 1-B
Develop a Public Relations Master
Jul-11
Jun-12
Public Information Officer
Public Affairs Workshop
Plan with Measurable Goals
Scheduled for 3/21.
CP 1-E
Effectively Use Broad Spectrum
On-going
On-going
Public Information Officer
Communication Opportunities
CP 2: Increase Public Awareness of Water and Wastewater Related Issues
Develop and Expand a Youth
Exploring Options for replacing
CP 2-13
Education Program
Jul-11
On-going
Public Information Officer
MWDOC/DSC education
program with YLWD program.