HomeMy WebLinkAbout2013-04-18 - Board of Directors Meeting Agenda PacketYorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS WORKSHOP MEETING
Thursday, April 18, 2013, 8:30 AM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
Gary T. Melton, President
Robert R. Kiley, Vice President
Michael J. Beverage
Ric Collett
Phil Hawkins
4. PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on the agenda, the Board will recognize the individual for their comment
when the item is considered. No action will be taken on matters not listed on the agenda. Comments are limited
to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five
minutes.
5. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action of the
Board of Directors at the meeting, such as technical presentations, drafts of proposed policies, or similar items for
which staff is seeking the advice and counsel of the Board of Directors. Time permitting, it is generally in the
District's interest to discuss these more complex matters at one meeting and consider formal action at another
meeting. This portion of the agenda may also include items for information only.
5.1. Budget Workshop Presentation for FYs 2013/14 thru 2016/17
6. ADJOURNMENT
6.1. A Special Board of Directors Meeting has been scheduled Friday, April 19, 2013 at 2:00
p.m. The next Regular Board of Directors Meeting will be held Thursday, April 25, 2013
at 8:30 a.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Board less than seventy -two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870,
during regular business hours. When practical, these public records will also be made available on the District's internet
website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 5.1
AGENDA REPORT
Meeting Date: April 18, 2013
Subject: Budget Workshop Presentation for FYs 2013/14 thru 2016/17
ATTACHMENTS:
Description: Type:
Budget Workshop FY2013- 14.pdf Budget Workshop FY2013 -14 Backup Material
CIP Budget.xlsx CIP Budget Backup Material
FY 2013 -
14 Travel Conferences Budget Analysis.pdf FY 2013 -14 Travel & Conference Budget Analysis Backup Material
Backup Material Distributed Less Than 72 Hours Prior to
Revised Budget Workshop FY2013- 14.pdf Backup Material
the Meeting
Yorba Linda
Water District
Proposed Draft Budget
FY 2013/14
Presented By: Stephen Parker, Finance Manager
1.
-Awwft�
Board Budget Workshop
c •Fi �r April 18, 2013
if
r
• FY13/14 & FY14/15 =We're Gonna Make It!
jP-
— $2.9M in CIP Deferrals
— $1.2M in Supplies &Services Cuts
11
Millions
$18
$16
$14
$12
$10
$8
$6
$4
$2
$0
FY 2013 FY 2014
Ending Balances 6 Minimum
FY 2015
Alert Balances
J _r
N.
• Future Years:--- with Annexation
— Significant CIPs = Reduced Reserves
— Borrowing Needed
— Rate Increase Needed
t � ,
1= �� Ad
Millions
$18
$16
$14
$12
$10 =
$8 =
$6 =
$4 =
$2 =
$0 =
FY 2013 FY 2014 FY 2015 FY 2016 FY 2017
_ — Ending Balances +Minimum
Alert Balances r 0 -;
y
1P'r yr- mss_ .��j� • f��� ! _
V
Dollars
Spent
$5.8M $4.7M $4.7M $5.1M $3.2M
* Includes-
• Annexation CIPs
• Delayed R &R
• YL Blvd BPS
• Lakeview Grade Separation
• 2012 Waterline Project
• YL High School Park
FY 17/18
Budget Ii
r
■
• Variable Water Costs &Water Revenue
— Budget of 20,000 AF Consumption
— Forecast of 20,800 AF for Current Year
— 3 Year Avg = 19,350 AF
• MWD
— MWD Rate Increase 5.0% _ $ 890 /AF (eff. January 1, 2014)
• OCWD
— BPP up to 70% with RA up to $276/AF (eff. July 1, 2013)
na-
` .. - "� � �. �+ ` ' � i.:� _ _ - ..•rte � ��s *'�
1%
4% 12
17%
11%
FY 2013/14
Variable Water Costs
Salaries & Benefits
Supplies & Services
Depreciation
Long Term Debt
VE &CO
CIP
TOTAL: $39,667,060
i'._
1 1 • -
71%
FY 2013/14
■ Import Water
■ Ground Water
Power
Total Budget: $ 13,767,658
$1,000
$800
$600
$579
$400 $249
$200
$249
$701
1
$744
$249
$255
$266
$847
FY 08/09 FY 09/10 FY 10/11 FY 11/12 FY 12/13
OCWD MWD
�1
$2761
I
FY 13/14
• $815,000 -- Total Variable Water Cost Increase
— Includes MWD & OCWD Pass - Through Costs, Power & Pumping
• $394,000 -- Supplies &Services Increase
— Detail: Explained Further in Presentation
• $256,000 -- Salary - Related Expenses Increase
— Effects from Funding 77 FTE's, plus 5 PTE
— Includes $100,000 Increase Due to Capitalized Salaries
• $336,000 -- Vehicle Equip. &Capital Outlay Decrease
— Includes 5 Previously Delayed Vehicles
— Includes Multiple SCADA Control Upgrades
• $295,000 -- Depreciation Increase
— _Completion of Improvement and Replacement Projects
�4L :
• Priority "A ": Required for Providing Service
— Ex: InfoSend /Postage, Legal Services, Software License Renewals, Etc.
• Priority "B ": Necessary for Achieving Strategic Plan Goals
— Ex: Training, Conferences & Certificate Reimbursement
TOTAL: $ 41243,779
0030/-
i r
z.- . '''* - = - �.r '
r
"A" Priority
"B" Priority
r-
Materials
$486,025
$587,775
$101,750
21%
Maintenance
$378,470
$479,150
$100,680
27%
Contractual Svcs.
$489,321
$542,840
$53,519
11%
Data Processing
$135,340
$170,730
$35,390
26%
Training
$46,100
$63,160
$17,060
37%
Travel & Conf.
$44,250
$52,450
$8,200
19%
District Activities
$18,600
$25,150
$6,550
35%
CA
• Materials: $101,750 / 21%'t
Line Item
••
Va Ive Re pa i r Pa its
Registers
Air -Vac Parts
Ops
Fin
N•
$80,000
$50,000
$12,000
$6,000
$146,000 $140,000
$77,000
$35,000
$17,000
$75,000
$25,000
$15,000
$60,000
$25,000
$13,000
$9,000
L
na �_ _ • �'
• Maintenance: $ 100,680/ 27%t
Line Item Dept.
Budget
Sewer Line Repairs
Concrete Repair
Electrical Repairs
& Maintenance
General Maint.
SCADA Radio
Repairs
Ops
$40,000
Ops
$20,000
Ops
$7,500
CY Proposed $ Increase
rojection Audget
$38,000
$30,000
$30,000
$54,000
$60,000
$20,000
$45,000
$35,000
$15,000
$7,700
$22,500
$15,000
Ops $0
$16,000
$13,000
$13,000
IT $5,000
$6,500
$8,500
$3,500
Reservoir Repairs Ops $0 $0
na-
f
$2,000 $2,000
• Contractual Services: $53,519 / 11% lt
Line Item Dept.
••- • 1 •
Mitigation
Arc Flash Assessments HR
qr
$o
• Data Processing: $35,390 / 26%t
CMMS Licensing
Software License
Renewals
na-
$43,000
$5,000
$50,000
$15,000
T� $0 -r $0 , $20,000
IT $123,080 $124,000 $140,380
$50,000
$15,000
$ Increase
$20,,000
00
r`
•
•
r O
Vehicle Expenses: $33,250 / 10%'t
rr Line
Stationary Engine Ops
Maintenance
$50,000 $84,000 $83,250 $33,250
Training: $17,060 / 37%t
Line Item
' Module
Verbal Judo
HR
ZIN
CPS HR Academy HR
$0
$0
$0
$0
$3,500
$0
$10,000 $10,000
$3,500 $4,500
$2,000 $2,000
• Travel & Conferences : $7,050 / 16%,t
Line Item
kk
Liebert, Cassidy,
Whitmore
Intersect (Coding)
NeoGov
Misc. Conferences
inm:.
HR $700
IT $0
HR $0
BOD $0
• District Activities $ 6,200 / 33%
CY
' • _ •
$1,300
$0
$0
$1,600
Online Item a
UF CY
Budget ' • -
Employee Picnic HR $0 $4,000
Retiree Events HR $2,000 $2,000
Proposed
$3,000 $2,300
$2,100 $2,100
$1,600 $1,600
$1,200 $1,200
$5,000 $5,000
$4,650 $2,650
. yr■ y, ...f" _�+i ►�� •
Total Operating Revenue
Total Non - Operating Revenue
Total Revenue
Current Forecast Budget
(FY 12/13) (FY 12/13) (FY 13/14)
$27,409,026
$1,908,757
$29,317,783
$29,190,855
$2,127,358
$29,984,760
$1,858,822
$31,318,213 $31,843,583
Variable Water Costs $12,953,024 $14,057,011 $13,767,658
Salary - Related Expenses $7,648,891 $6,838,394 $7,904,873
Supplies & Services $3,849,602 $3,759,768 $4,243,779
Total Operating Expenses $24,451,517 $24,655,173 $25,916,310
Total Non- Operating Expenses $2,135,605 $1,843,622 $1,841,209
Total Expenses $26,587,122 $26,498,795 $27,757,519
income Before Depreciation $2,730,661 $4,819,417 $4,086,064
Depreciation $6,602,339 $6,744,192 $6,897,941
income (Loss) ($3,871,678) ($1,924,775) ($2,811,877)
r
Budget
(FY 12/13)
Income Before Depreciation $2,730,661
Less:
CIP Spending $6,557,500
Vehicle Equipment & Capital Outlay $830,300
Principal Debt Service Payment $935,000
Annexation Amortization $418,413
Plus:
Draw on Line of Credit $0
income (Loss) - Cash Basis ($6,010,552)
na-
Forecast Budget
(FY 12/13) (FY 13/14)
$4,819,417 $4,086,064
$5,760,719
$4,645,000
$830,300
$444,000
$935,000
$965,000
$437,751
$439,186
$0 $0
($3,144,353) ($2,407,122)
Budget Forecast Budget
(FY 12/13) (FY 12/13) (FY 13/14)
Income Before Depreciation $2,730,661 $4,819,417 $4,086,064
Less:
CIP Spending $6,557,500 $5,760,719 $4,645,000
Vehicle Equipment & Capital Outlay $830,300 $830,300 $4441000
Principal Debt Service Payment $935,000 $935,000 $9651000
Annexation Amortization $418,413 $437,751 $439,186
Plus:
Draw on Line of Credit $6,557,500 $2,266,250 $4,645,000
income (Loss) - Cash Basis $546,948 ($878,103) $2,237,878
r-
Debt Service 7 1.9 MM 1.88
Ratio
Days Cash
on Hand
Reserve
Balances
209 or 243
days
$15.7M-
$17.8M
194 or 293
days
$13.1M-
$19.8M
280 days
$18.9M
UK
420 days
$28AM
430 days
$29.1M
* Rating Info is Median Data from Fitch's 2013 Water & Sewer Medians Report
f�
- elk -
��'
� its na -��
Water Capital Replacement ($1.8 Million)
Water Operating Fund ($2.4 Million)
Water Emergency Fund ($1 Million)
2008 COP Bond ($2.1 Million)
Maintenance Reserve ($200,000)
Employee Liabilities ($100,000)
TOTAL: $7.6M
(Total Reserve Minimum - Red Line on
Reserve Balances Graph)
Planned CIPs
Day -to -Day Payments
Catastrophes
Regulated
Unanticipated R &R
Retiree Payout of Vacation /Sick Time
• Use $7M Line of Credit Now
— Cash -on -Hand = Favorable to Rating Agencies
— Requires Payoff 2 years
• Further Borrowing Needed in FY 16/17
— May Affect Our AA+ rating
V- —
L
na-
Millions
$
$5
$0
15
$10
5
0
;V_ _L__
Chart 3 -Total Reserve Chart
•
FY 2013 FY 2014 FY 2015
40 0
FY 2016 FY 2017
Ending Balances AAA Rating 0 Minimum o Alert Balances
_ c
• Do Not Use $7M Line of Credit Now
— Capital Reserves Spent Down Quickly
• Borrowing Needed in FY 16/17
— CIP Reserves ($7.9M in Feb. '13) Fully Drawn by FY 16/17
— More likely to affect our AA+ rating
na-
Millions
0
Z5
$2-0
515
10
w
.
Chart 3 - TotaI Deserve Chart
FY 2013 FY 2014 ry 2015
4
0
FY 2016 FY 2017
� Fnding Kalanrp% —* —AA R2ting 0 Minimum 0 Alert Kalarrps
Staff Recommendation: Draw on line of Credit -
;�. PIP A�'�
Long
Term
Goals
• Take Full Advantage of Annexation (if applicable)
— Increased Water Cost Savings
• Update of Asset Management Plan (AMP)
— YL Sewers, Well R &R, New CIPs =More Accurate
Numbers
• Fully Fund AMP Recommendations
• Re -Build Reserves
• Increase Financial Rating Back to AAA
4L
• Pass - through of MWD & OCWD Increase (No Prop. 218)
V —
$.07 /Unit (Beginning July 1, 2013) = $2.64/ unit (YLWD)
ACTUAL
$.05 to $.06 /Unit (Beg. July 1, 2014) = $2.69 to $2.70 /unit (YLWD)
ESTIMATED
_ _
`i•_ _ + �I
Fixed Charge
FY 12/13 FY 13/14
3/ &5 /b in= $7.56 3/ &5 /bin =$8.80
1 in = $12.60 1 in = $14.67
1 % in
= $25.20
1 % in
-$29.34
t in
= $40.32
t in
= $46.94
r`
na
Agency Rate
East Orange CWD
$2.40 /ccf
$29.50
Mesa WD
$3.00 /ccf
$23.75
Serrano WD
$3.01 /ccf
$32.31
South Coast WD
Tiered
$49.69
Walnut Valley WD"
Tiered
$20.75
Yorba Linda WD#
$2.64 /ccf
$14.67
# -- YLWD Beginning in FY13/14, Other Agencies FY12/13 Fees
-- Based on 25 units, 1 inch meter
^ -- Zone 3 Elevation Charges Included (Comparable to YLWD Elevations)
$89.50
$98.75
$107.56
$152.78
$90.27
$80.67
CA
�_ _ Oil
• Direction Needed Today:
— Draw Down On Line of Credit? Yes /No?
• Draft Budget to Be Presented on May 23rd
Z� �i
dh
�� [ ■ �� 1
FY 13/14
2008 -17B YL Blvd BPS (Booster Pump Station)
$
Total Project
Increase/
Total Project
Expenditures
FY 12/13
FY 13/14
FY 14/15
FY 15/16
FY 16/17
FY 17/18
5 Year Future
Project
Project Description
Budget(12 /13)
(Decrease)
Budget(13 /14)
Through
I Expenditure
Budget
Budget
Budget
Budget
Budget
Projected
2009 -22 #22 S & W Well Project (Well No. 22)
$
2,500,000
$ -
$ 2,500,000
6/30/2012
Forecast
$ -
$ -
$ - $
245,000 $
2,250,000 $
Budgets
2010 -02 Lakeview Grade Separation
$
80,000
$ 520,000
$ 600,000
$ 82,176
$ 217,824
$ 300,000
$ -
$ - $
- $
- $
300,000
2008 -17B YL Blvd BPS (Booster Pump Station)
$
2,650,000
$ 465,000
$ 3,115,000
$ 112,924
$ 927,076
$ 2,075,000
$ -
$ - $
- $
- $
2,075,000
2009 -22 #21 S & W Well Project (Well No. 21)
$
2,300,000
$ (550,000)
$ 1,750,000
$ 33,337
$ 36,663
$ 1,000,000
$ 680,000
$ - $
- $
- $
1,680,000
2009 -22 #22 S & W Well Project (Well No. 22)
$
2,500,000
$ -
$ 2,500,000
$ 2,029
$ 2,971
$ -
$ -
$ - $
245,000 $
2,250,000 $
2,495,000
2010 -02 Lakeview Grade Separation
$
80,000
$ 520,000
$ 600,000
$ 82,176
$ 217,824
$ 300,000
$ -
$ - $
- $
- $
300,000
- Lakeview Landscaping
$
50,000
$ -
$ 50,000
$ -
$ -
$ -
$ 50,000
$ - $
- $
- $
50,000
2010 -11B Fairmont BPS Upgrade
$
5,500,000
$ 800,000
$ 6,300,000
$ 11,103
$ 148,897
$ 500,000
$ 2,500,000
$ 3,140,000 $
- $
- $
6,140,000
2011 -20 2012 Waterline Project
$
1,170,000
$ 475,000
$ 1,645,000
$ 41,336
$ 1,103,664
$ 500,000
$ -
$ - $
- $
- $
500,000
2012 -13 Yorba Linda High School Park
$
-
$ 370,000
$ 370,000
$ -
$ 55,000
$ 20,000
$ 295,000
$ - $
- $
- $
315,000
TOTAL $ 22,990,000 $ 2,080,000 $ 25,070,000 $ 282,905 $ 2,492,095 $ 4,645,000 $ 4,735,000 $ 5,100,000 $ 3,165,000 $ 4,650,000 $ 22,295,000
Rehabilitation & Restoration
Over /(Under)
Actual Project
Expenditures
FY 12/13
Project # Projects Completed in FY 12/13
Budget (12/13)
Budget
Total
Through
Expenditure
2011 -165
-
Meter Replacement Program
$ 350,000
$ 2,150,000
$ 2,500,000
$ - $
- $
50,000
$ -
$ 1,200,000
$ 1,250,000
$ -
$ 2,500,000
-
Future Pipeline Project
$ 2,560,000
$ 130,000
$ 2,690,000
$ - $
- $
50,000
$ 800,000
$ 160,000
$ 1,500,000
$ 180,000
$ 2,690,000
New
Elk Mountain Booster Surge Tank
$ -
$ 100,000
$ 100,000
$ - $
- $
100,000
$ -
$ -
$ -
$ -
$ 100,000
New
Timber Ridge BPS Rehabilitiation
$ -
$ 250,000
$ 250,000
$ - $
- $
50,000
$ 200,000
$ -
$ -
$ -
$ 250,000
New
Richfield Campus Spoils
$ -
$ 150,000
$ 150,000
$ - $
- $
-
$ 150,000
$ -
$ -
$ -
$ 150,000
New
Lakeview Booster Piping
$ -
$ 100,000
$ 100,000
$ - $
- $
-
$ -
$ -
$ 100,000
$ -
$ 100,000
New
Future PRS Rehabilitation
$ -
$ 1,430,000
$ 1,430,000
$ - $
- $
-
$ 60,000
$ 600,000
$ 70,000
$ 700,000
$ 1,430,000
-
Annual Routine Capital R &R
$ 5,830,000
$ (4,310,000)
$ 1,520,000
$ - $
- $
-
$ -
$ -
$ -
$ 1,520,000
$ 1,520,000
R & R Subtotal
$ 8,740,000
$ -
$ 8,740,000
$ - $
- $
250,000
$ 1,210,000
$ 1,960,000
$ 2,920,000
$ 2,400,000
$ 8,740,000
TOTAL $ 22,990,000 $ 2,080,000 $ 25,070,000 $ 282,905 $ 2,492,095 $ 4,645,000 $ 4,735,000 $ 5,100,000 $ 3,165,000 $ 4,650,000 $ 22,295,000
2007 -11
Total Project
Over /(Under)
Actual Project
Expenditures
FY 12/13
Project # Projects Completed in FY 12/13
Budget (12/13)
Budget
Total
Through
Expenditure
2011 -165
Green Crest Dr. Sewer Lift Stn Upgr*
2011 -235
Sewer Facilities GIS Conversion*
6/30/2012
Forecast
2007 -11
Well No. 20
2008 -14
Highland BPS Upgrade*
2008 -17
YL Blvd Pipeline*
2009 -15
Computerized Maint & Mgmt Syst.
2010 -11
Fairmont Reservoir Site Improvement*
2011 -08
Press. Reg. Stations Upgrade*
2011 -165
Green Crest Dr. Sewer Lift Stn Upgr*
2011 -235
Sewer Facilities GIS Conversion*
2012 -15
Richfield Chlorine System PLC*
-
Disinf. Bstr. Sta. at Hidden Hills Res. **
-
GIS- Phase II **
-
GIS- Phase II (Sewer) **
$ 2,300,000 $ (300,000) $
$ 6,100,000 $ (127,000) $
$ 2,250,000 $ - $
$ 410,000 $ (62,500) $
$ 500,000 $ (130,000) $
$ 1,000,000 $ (120,000) $
$ 140,000 $ 30,000 $
$ 22,500 $ 8,000 $
$ - $ 24,000 $
$ 200,000 $ (200,000) $
$ 97,000 $ (97,000) $
$ 36,000 $ (36,000) $
2,000,000 $
5,973,000 $
2,250,000 $
347,500 $
370,000 $
880,000 $
170,000 $
30,500 $
24,000 $
1,879,459 $ 120,541
5,676,955 $ 296,045
375,426 $ 1,874,574
325,109 $ 22,391
287,676 $ 82,324
110,036 $ 769,964
97,583 $ 72,417
24,132 $ 6,368
$ 24,000
TOTAL $ 13,055,500 $ (1,010,500) $ 12,045,000 $ 8,776,376 $ 3,268,624
GRAND TOTAL $ 36,045,500 $ 9,059,281 $ 5,760,719
*Project Due to be Completed and Capitalized in FY 12/13
* *Project Moved to Vehicle Equipment & Capital Outlay
FY 2013/14 Budget Analysis
Travel & Conferences
Colorado River Water Users
4 Directors
3 -Day Conference on Local Water Issues
Las Vegas, NV
$1,700 Reg.
Association Annual Conference
$2,300 Travel
$4,000
ACWA (Fall)
2 Directors
3 -Day Conference on Current Water
Los Angeles, CA
$1,020 Reg.
Industry Trends. Allows for Agency
$980 Travel
Networking
$2,000
ACWA (Spring)
1 Director
3 -Day Conference on Current Water
Monterey, CA
$510 Reg.
Industry Trends. Allows for Agency
$490 Travel
Networking
$1,000
Board of Directors
Independent Special Districts of
1 Director
% Day Conference /Meeting on Current
Orange County,
$200 Reg.
Orange County Quarterly Meeting
Water Industry Trends. Allows for Agency
CA (Various)
0 Travel
Networking
$200
California Special District
2 Directors
1 -Day Conferences for Continuing
California
$1,600 Reg.
Association's Leadership Academy
Education on Comprehensive Special
(Various)
$1,400 Travel
Courses
District Governance
$3,000
Other Local Conferences
5 Directors
Various
Various
$1,200 Reg.
0 Travel
$1,200
TOTAL
$11,400
FY12 -13
$10,20(
ACWA Conference
Steve Conklin
3 -Day Conference on Current Water
Los Angeles, CA
$510 Reg.
Industry Trends. Allows for Agency
$490 Travel
Networking
$1,000
California Utility Exec.
Steve Conklin
1 -Day Conference for General Managers of
Northern
$350 Reg.
Management Assoc. - Mini - Summit
Water Agencies
California
$650 Travel
$1,000
General Field Trips
CAC Members
Exposure of CAC to Water Topics
Various
Reg.$2,500
0 Travel
Administration
$2,500
CA Assoc. of Public Info. Officers-
Damon Micalizzi
3 -Day Conference on Crisis Communication
Northern
$400 Reg.
Annual Conference
Training specific to PIOs
California
$1,000 Travel
$1,400
Public Relations Society of
Damon Micalizzi
3 -Day Conference on New Trends in
New York City,
$1,195 Reg.
America- Annual PR & Media
Journalism, PR and Media Relations
NY
$1,405 Travel
Relations Summit
$2,600
Colorado River Water Users
Damon Micalizzi
3 -Day Conference on Local Water Issues
Las Vegas, NV
$425 Reg.
Association Annual Conference
$575 Travel
$1,000
General Mileage
Damon
Various
Various
$2,500 Travel
Micalizzi
TOTAL
$12,000
Y12 -13
$15,00,
Emergency Response Planning
Nicki Hill
New Trends in Emergency Response
Southern CA
$250 Reg.
Conference
Planning
(TBD)
$550 Travel
$800
Western States Corrosion Seminar
Ariel Bacani
2 -Day Conference on Corrosion and
Pomona, CA
$450 Reg.
Cathodic Protection- Impacts Longevity of
50 Travel
YLWD Facilities
$500
Water Education Foundation's
Derek Nguyen
1 -Day Conference/ Board Meeting
Los Angeles, CA
$0 Reg.
Engineering
Water Leaders Program
$100 Travel
$100
Water Education Foundation's
Derek Nguyen
3 -Day Tour
Sacramento, CA
$545 Reg.
Water Leaders Program
$1,355 Travel
$1,900
TOTAL
$3,300
FY12 -13
$3,650
California Society of Municipal
Stephen Parker
Annual Board Meeting. Provides
Monterey, CA
$0 Reg.
Finance Officers- Board Meeting
Information on Upcoming Policy Issues.
$500 Travel
$500
CalPERS Educational Forum
Delia Lugo
3 -Day Conference on Changes to the
San Jose, CA
$300 Reg.
CalPERS Calculation System
$700 Travel
$1,000
California Society of Municipal
Stephen Parker
3 -Day Conference on Responsibilities and
Oakland, CA
$650 Reg.
Finance Officers Annual
Delia Lugo
Challenges Specific to Municipal Finance
$750 Travel
Finance
Conference
$1,400
Government Finance Officers
Stephen Parker
4 -Day Conference on Responsibilities and
Minneapolis, MN
$380 Reg.
Association Annual Conference
Challenges Specific to Municipal Finance
$1,120 Travel
$1,500
ACWA Conference
Jennifer Hill
3 -Day Conference on Current Water
Los Angeles, CA
$510 Reg.
Industry Trends. Allows for Agency
$190 Travel
Networking
$700
General Mileage
Accounting Staff
Various
Various
$200 Travel
TOTAL
$5,300
FY12 -13
$4,150
National Public Employer Labor
Gina Knight
1 -Day Conference on Changes in CalPERS
Costa Mesa, CA
$450 Reg.
Relations Assoc. (CA) Mini - Summit
Amelia Cloonan
valuations and Labor Relations
$150 Travel
Bryan Melton
$600
Liebert, Cassidy Whitmore Annual
Gina Knight
2 -Day Conference on Current Trends in
Northern
$1,245 Reg.
Conference
Amelia Cloonan
Employment Law, Retirement Issues &
California
$1,755 Travel
Bryan Melton
Labor Relations
$3,000
NEOGOV Annual User Conference
Bryan Melton
3 -Day Conference on Changes in the
Las Vegas
$749 Reg.
NEOGOV Products & Applications. Also
$851 Travel
Human Resources
Provides Training
$1,600
Public Retirement Seminar
Gina Knight
1 -Day Conference on the Public
Los Angeles, CA
$570 Reg.
Amelia Cloonan
Employees' Pension Reform Act of 2013
$230 Travel
Bryan Melton
$800
Public Agency Risk Management
Gina Knight
3 -Day Conference on Workers'
San Jose, CA
$275 Reg.
Association Annual Conference
Compensation & Liability
$725 Travel
$1,000
TOTAL
$7,000
FYiz -ls
$2,50u
CityWorks User Conference
Robyn Shaw
3 -Day Conference on Changes in the
Salt Lake City,
$0 Reg. $1,000
CityWorks program (CMMS)
Utah
Travel
$1,000
Dev Intersection Conference
Robyn Shaw
3 -Day Conference on Code Changes for
Las Vegas, NV
$1,495 Reg.
Internet Browser Updates- Impacts YLWD
$605 Travel
Intranet /Databases
$2,100
AWWA Conference
Rick
3 -Day Conference on Current Water
Sacramento, CA
$895 Reg.
Walkemeyer
Industry Trends. Allows for Agency
$505 Travel
Instrum. Tech.
Networking. Provides Contact Hours for
$1,400
Information
Distribution & Treatment Required
Licenses
Technology
Interop Conference
Art Vega
5 -Day Conference on Changes in Network
Las Vegas, NV
$200 Reg.
Infrastructure & IT Security (Hardware)
$1,000 Travel
$1,200
WinConnections Conference
Art Vega
5 -Day Conference on Changes in IT
Las Vegas, NV
$1,595 Reg.
Systems Management (Software)
$905 Travel
$2,500
Esri User Conference
Anh Nguyen
5 -Day Conference on Changes in GIS
San Diego, CA
$0 Reg.
Technology & Applications
$500 Travel
$500
General Mileage
Robyn Shaw
Various
Various
$600 Travel
Anh Nguyen
TOTAL
$9,300
FY12 -13
$6,000
AWWA Conference
2 Supervisors
3 -Day Conference on Current Water
Anaheim, CA
$3,000 Reg.
3 Maint. Op.
Industry Trends. Allows for Agency
$900 Travel
1 Prod. Op.
Networking. Provides Contact Hours for
$3,900
Distribution & Treatment Required
Operations
Licenses
General Mileage
Chief Plant
Various
Various
$250
Operator
TOTAL
$4,150
FY12 -13
$4,900
GRAND TOTAL
$52,450
FY12 -13
$44,250
Cy
lawnhok-
�r
Yorba Linda
Water District
Proposed Draft Budget
V Materia
". -I I-
FY 2013/14
Presented By: Stephen Parker, Finance Manager
Board Budget Workshop
April 18, 2013
" •�� .ow- Ow
Distributed Less Th 72 Ho
ad the Me in r
_ "0101
�.
REVISED
• FY13/14 & FY14/15 =We're Gonna Make It!
— $2.9M in CIP Deferrals
— $1.2M in Supplies &Services Cuts
Millions
$16
$14
$12
$10
$g
$6
$4
$2
$0
FY 2013 FY 2014 FY 2015 FY 2016 FY 2017
Ending Balances Minimum - Alert Balances
t -%--Naffkrgp Material Drstrihuted Less Than 72 Hours Prior to the Meeting-
`r
r %� ■ Tr_
REVISED
• Future Years:
C —
4W
— Significant CIPs = Reduced Reserves
— Borrowing Needed
— Rate Increase Needed
Millions
$16 -
$14 -
$12 -
$10 -
$8 -
$6 -
$4 -
$2 -
$0 -
.1 f ".
FY 2013
Ending Balances
FY 2014
$5
$2
FY 2015 FY 2016 FY 2017
4 Minimum
Alert Balances
-r
Tior to Ine meeting
^�
REVISED
FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Forecast Budget Budget Budget Budget Budge
Dollars $5.8M $4.7M
Spent
$4.7M $5.1M $3.2M $4.7M
* Includes:
• Fairmont BPS
• Wells 21 and 22
• Delayed R &R
• YL Blvd BPS
• Lakeview Grade Separation
• 2012 Waterline Project
• YL High School Park
tp
rip Material D�strihuted Less Than Hours Prior to the Meeting- _� �► ��`
REVISED
• Variable Water Costs &Water Revenue
— Budget of 20,000 AF Consumption
— Forecast of 20,800 AF for Current Year
— 3 Year Avg = 19,350 AF
• MWD
— MWD Rate Increase 5.0% _ $ 890 /AF (eff. January 1, 2014)
• OCWD
— BPP up to 70% with RA up to $276/AF (eff. July 1, 2013)
V — — Ir
t r-a�rgp Material D�strihuted Less Than 72 Hours Prior to the Meeting- _� _ •
`Z
12%
11%
�
L —"Mon
7
REVISED
FY 2013/14
4%
1%
Variable Water Costs (35 %)
Salaries & Benefits (20 %)
Depreciation (17 %)
CIP (12 %)
Supplies & Services (11 %)
Long Term Debt (4 %)
VE &CO (1 %)
TOTAL: $39,667,060
_ Ir
ok &V p
rip Material Distributed Less Than Hours Prior to the Meeting- _� �► ��`
REVISED
71%
7%
FY 2013/14
22
MVIIIW-
0
Import Water
■ Ground Water
Power
Total Budget: $ 13,767,658
p
rip Material D�strihuted Less Than Hours Prior to the Meeting- _� �► ��`
REVISED
$1,000
$800 $701 $744 $794
$600 $579
$400 $249 $249 $249 $255
$200
$266
$847
$2761
FY 08/09 FY 09/10 FY 10/11 FY 11/12 FY 12/13 FY 13/14
OCWD MWD
_ 4 _
Backup Material Dis ri to bess'T H i rs r- etii jr
REVISED
• $815,000 -- Total Variable Water Cost Increase
— Includes MWD & OCWD Pass - Through Costs, Power & Pumping
• $394,000 -- Supplies & Services Increase
— Detail: Explained Further in Presentation
• $156,000 -- Personnel - Related Expenses Increase
— New = % year 1 FTE, 1 PTE + 3 reclasses in CY, 5 proposed in FY 13/14
— Plus $100,000 Transfer of Capitalized Salaries from CIP to Personnel
• $336,000 -- Vehicle Equip. & Capital Outlay Decrease
— Includes 5 Previously Delayed Vehicles
— Includes Multiple SCADA Control Upgrades
• $295,000 -- Depreciation Increase
., - _. Ir
Completion of Improvement and Replacement Projects`'
�� `r- as rip Material D strihuted Less Than -,72 Hours Prior to the Meeting_ _� ��' *t�
REVISED
• Priority "A ": Required for Providing Service
— Ex: Legal Services, InfoSend /Postage, Software License Renewals, Etc.
• Priority "B ": Necessary for Achieving Strategic Plan Goals
— Ex: Training, Conferences & Certificate Reimbursement
92
TOTAL: $ 41243,779
-14M
-!!! ✓✓✓
� j z
la$;rial Distributed Less Than 72 Hours Prior to the Meeting_ -,
IQ-
"A" Priority
"B" Priority
. \�$
r �� • Tom_
i
REVISED
Materials
$486,025
$587,775
$101,750
21%
Maintenance
$378,470
$479,150
$100,680
27%
Contractual Svcs.
$489,321
$542,840
$53,519
11%
Data Processing
$135,340
$170,730
$35,390
26%
Training
$46,100
$63,160
$17,060
37%
Travel & Conf.
$44,250
$52,450
$8,200
19%
District Activities
$18,600
$25,150
$6,550
35%
rip Material D�strihuted Less Than Hours Prior to the Meeting- _� _ •
REVISED
• Materials: $101,750 / 21%'t
Line Item
Valve Repair Parts
Registers
Air -Vac Parts
Fin
Ops
Fin
s•
$80,000
$50,000
$12,000
$6,000
$146,000 $140,000
$77,000
$35,000
$17,000
$75,000
$25,000
$15,000
$60,000
$25,000
$13,000
$9,000
rip Material D�strihuted Less Than Hours Prior to the Meeting- _� _ •
REVISED
• Maintenance: $ 100,680/ 27%t
Line Item Dept.
Budget
Sewer Line Repairs Ops
Concrete Repair
Electrical Repairs
& Maintenance
General Maint.
SCADA Radio
Repairs
Reservoir Repairs
Ops
Ops
Ops
IT
Ops
$40,000
$20,000
$7,500
$0
$5,000
$0
CY Proposed $ Increase
rojection Audget
$38,000
$30,000
$30,000
$54,000
$60,000
$20,000
$45,000
$35,000
$15,000
$7,700
$22,500
$15,000
$16,000
$13,000
$13,000
$6,500
$8,500
$3,500
$3,200 $2,000 $2,000
PIP
A *- kaf$rgp klat`rial Dtstritwted Less Than-72 Hours Prior to the Meeting_
AZM-
'1111, ti'p-
REVISED
Contractual Services: $53,519 / 11% lt
Line Item Dept. CY CY Proposed $ Increase
Budget Projection Budge
Hidden Hills Enviro.
Mitigation
Arc Flash Assessments
Eng.
$43,000 $50,000 $50,000
HR $0 $11,000 $15,000 $15,000
Data Processing: $35,390 / 26%t
CMMS Licensing
Software License
Renewals
Dept. 01 CY Proposed $ Increase
Budget Projection &udget
mr� $0 -r $0 , $20,000
IT $123,080 $124,000 $140,380
$20,000
$17,300
^ • 1 1 x 4PV
,af$rgp klaterial Dtstritwted Less Than 72 Hours Prior to the Meeting-
.1 � �� �i�— . � � �te� a •z 3..71'"" �'� ��r � 'r' r �� � r �_'��'�1. • r i
REVISED
Training: $17,060 / 37%t
Line Iternp
GP- HR Module HR $0 $10,000 $10,000
Verbal Judo HR $0 $3,500 $3,500 $4,500
CPS HR Academy HR $0 $0 $2,000 $2,000
District Activities: $6,550 / 35% t
Retiree Events
HR
$2,000
$2,000
$4,650
$2,650
Meeting Supplies
All
$4,100
$7,500
$6,050
$2,050
Service Recognition
HR
$0
$0
$1,000
$1,000
Benefits Fair
HR
$1,000
$1,600
$2,000
$1,000
rz
a8$rgp klaterial Distributed Less Than 72 Hours Prior to the Meeting_ -
'
.1 — �� �i�— . � �
�te� a •z
3..71'"" �'�
��r �
'r' r �.� 1 r �;��'�1. ■ f
REVISED
• 1 1
Line Item Dept. CY CY Proposed $ Increa!
Budget Projection Budget
Liebert, Cassidy, HR
$700
$1,300
$3,000
$2,300
Whitmore
Intersect (Coding) IT
$0
$0
$2,100
$2,100
NeoGov HR
$0
$0
$1,600
$1,600
Misc. Conferences BOD
$0
$1,600
$1,200
$1,200
• District Activities $ 6,200 / 33%
Online Item a
UF CY
Budget ' • -
Employee Picnic HR $0 $4,000
Retiree Events HR $2,000 $2,000
-Nqw —1
$5,000 $5,000
$4,650 $2,650 Ir
rip Material Distributed Less Than -,72 Hours Prior to the Meeting_ _� �' ►i
!"' z
.1 � �i.- � �tet .rte- z i..� 1'''" �'_ ��� � '�' r ��{�'"� � r �� -1�a3. • _ �►
REVISED
Total Operating Revenue
Total Non - Operating Revenue
Total Revenue
Variable Water Costs
Personnel - Related Expenses
Supplies & Services
Total Operating Expenses
Total Non- Operating Expenses
Total Expenses
Income Before Depreciation
Depreciation
income (Loss)
Current
(FY 12/13)
$27,409,026
$1,908,757
$29,317,783
Forecast
(FY 12/13)
$29,190,855
$2,127,358
Budget
(FY 13/14)
$29,984,760
$1,858,822
$31,318,213 $31,843,583
$12,953,024
$14,057,011
$13,767,658
$7,648,891
$6,838,394
$7,904,873
$3,849,602
$3,759,768
$4,243,779
$24,451,517
$24,655,173
$25,916,310
$2,135,605
$1,843,622
$1,841,209
$26,587,122
$26,498,795
$27,757,519
$2,730,661
$4,819,417
$4,086,064
$6,602,339 $6,744,192 $6,897,941
($3,871,678) ($1,924,775) ($2,811,877)
c
t—'�ft.qp Material Distributed Less Than 72 Hours Prior to the Meeting_
Z • i� r _ - r
'- � � �1 � t � i..� 1•. � •-r � � Jeri
REVISED
Budget
(FY 12/13)
Income Before Depreciation $2,730,661
Less:
CIP Spending $6,557,500
Vehicle Equipment & Capital Outlay $830,300
Principal Debt Service Payment $935,000
Annexation Amortization $418,413
Plus:
Draw on Line of Credit $0
Forecast Budget
(FY 12/13) (FY 13/14)
$4,819,417 $4,086,064
$5,760,719 $4,645,000
$830,300 $444,000
$935,000 $965,000
$437,751 $439,186
$0 $0
income (Loss) - Cash Basis ($6,010,552) ($3,144,353) ($2,407,122)
c
rip Material Di'tstributed Less Than 72 Hours Prior to the Meeting_ _� �' ►�
REVISED
Income Before Depreciation
Less:
CIP Spending
Vehicle Equipment & Capital Outlay
Principal Debt Service Payment
Annexation Amortization
Plus:
Draw on Line of Credit
income (Loss) - Cash Basis
Budget Forecast Budget
(FY 12/13) (FY 12/13) (FY 13/14)
$2,730,661 $4,819,417 $4,086,064
$6,557,500 $5,760,719 $4,645,000
$830,300 $830,300 $4441000
$935,000 $935,000 $9651000
$418,413 $437,751 $439,186
$6,557,500 $2,266,250 $4,645,000
$546,948 ($878,103)
-14M
—!!! ✓✓✓
t r-�aa rip Material Distributed Less Than 72 Hours Prior to the Meeting_
�� .f [ ��- �t,■� .rte- z �'_ � �
$2,237,878
i
4
r %� ■ Tr_
REVISED
Debt Service 1.9 1.88 1.5 1.9 2.7
Ratio
Days Cash 209 or 243 194 or 293 280 days 420 days 430 days
on Hand days days
Reserve $15.7M- $13.1M- $18.9M $28.4M $29.1M
Balances $17.8M $19.8M
* Rating Info is Median Data from Fitch's 2013 Water & Sewer Medians Report
4%ar —
i. 'p- -
i
`r- as rip
Material Distributed Less Than 72 Hours Prior to the Meeting_
*t�
.1 � [ �i �- � �tet .rte— z y� � �'� �� � r r �� � r �«1'i1. ■ _ �►
REVISED
Water Capital Replacement ($1.8 Million)
Water Operating Fund ($2.4 Million)
Water Emergency Fund ($1 Million)
2008 COP Bond ($2.1 Million)
Maintenance Reserve ($200,000)
Employee Liabilities ($100,000)
TOTAL: $7.6M
(Total Reserve Minimum - Red Line on
Reserve Balances Graph)
Planned CIPs
Day -to -Day Payments
Catastrophes
Regulated
Unanticipated R &R
Retiree Payout of Vacation /Sick Time
t r-'L�ftrgp Material Distributed Less Than 72 Hours Prior to the Meeting- _� �► �`
REVISED
• Use $7M Line of Credit Now
— Cash -on -Hand = Favorable to Rating Agencies
— Requires Payoff 2 years
• Further Borrowing Needed in FY 16/17
— May Affect Our AA+ rating
V — — V,
t r-%_ Material D�strihuted Less Than 72 Hours Prior to the Meeting -1
� _ •
'
`Z � � 7 J r
� � x
REVISED
Millions
$
$5
$0
15
$10
5
0
Chart 3 -Total Reserve Chart
•
FY 2013 FY 2014 FY 2015
FY 2016 FY 2017
� Ending Balances AA Rating 0 Minimum o Alert Balances
Material D�strihuted Less Than 72 Hours Prior to the Meeting_ _� �► �_`�y�
.t � �i.- � �t,et .rte- z 3..� 1'''" �'_ �,r � 'r' r �� � r ���1�a3. � r_ �►
REVISED
• Do Not Use $7M Line of Credit Now
— Capital Reserves Spent Down Quickly
• Borrowing Needed in FY 16/17
— CIP Reserves ($7.9M in Feb. '13) Fully Drawn by FY 16/17
— More likely to affect our AA+ rating
V — — V,
t r-a�rgp Material D�strihuted Less Than 72 Hours Prior to the Meeting -1 _ •
`Z
REVISED
0
Z5
$2-0
515
10
5
0
Chart 3 - TotaI Deserve Chart
fY 2013 FY 2014 ry 2015
4
0
FY 2016 FY 2017
� Fnding Kalanrp% —* —AA R2ting 0 Minimum 0 Alert K;il;kncp.q
Staff Recommendation: Draw on Line of Credit _
r- as rip Material Drstrihuted Less Than 72 Hours Prior to the Meeting- _� ►ice`
- � � �1 � t � i..� 1•. � •-• r �{� � Jeri
REVISED
• Take Full Advantage of Annexation (if applicable)
— Increased Water Cost Savings
• Update of Asset Management Plan (AMP)
— YL Sewers, Well R &R, New CIPs =More Accurate
Numbers
• Fully Fund AMP Recommendations
• Re -Build Reserves
• Increase Financial Rating Back to AAA
t r-�a�rgp Material D�strihuted Less Than 72 Hours Prior to the Meeting- _ •
'
Meeting-
--& -
`Z � � � 7 J r
REVISED
• Pass - through of MWD & OCWD Increase (No Prop. 218)
$.07 /Unit (Beginning July 1, 2013) _ $2.64/ unit (YLWD)
ACTUAL
$.05 to $.06 /Unit ( Beg. July 1, 2014) _ $2.69 to $ 2.70 /unit (YLWD)
ESTIMATED
C — — Ir
t r-a�rgp Material D�strihuted Less Than 72 Hours Prior to the Meeting -1
� _ •
'
`Z � � 7 J r
REVISED
Fixed Charge
FY 12/13 FY 13/14
&5 /b in= $7.56 3/ &5 /bin =$8.80
1 in = $12.60 1 in = $14.67
1 % in
= $25.20
1 % in
-$29.34
t in
= $40.32
t in
= $46.94
C m . .
t r-�a�rgp Material D�strihuted Less Than 72 Hours Prior to the Meeting- _ •
'
Meeting-
--& -
`Z � � � 7 J r
REVISED
East Orange CWD $2.40 /ccf
Mesa WD $3.00 /ccf
Serrano WD $3.01 /ccf
South Coast WD Tiered
Walnut Valley WD" Tiered
Yorba Linda WD# $2.64 /ccf
a -- YLWD Beginning in FY13/14, Other Agencies FY12/13 Fees
$29.50
$23.75
$32.31
$49.69
$20.75
$14.67
-- Based on 25 units, 1 inch meter
//���✓✓
A__ Zone 3 Elevation Charges Included (Comparable to YLWD Elevations)
rip Material Distributed Less Than Hours Prior to the Meeting_
$89.50
$98.75
$107.56
$152.78
$90.27
$80.67
■
r �� • Tom_
i
REVISED
• Direction Needed Today:
— Draw Down On Line of Credit? Yes /No?
• Draft Budget to Be Presented on May 23rd
t r-�a rip Material D�strihuted Less Than 72 Hours Prior to the Meeting- _� _ •
'
z
`Z 7 J r