HomeMy WebLinkAbout2013-06-20 - Board of Directors Meeting Agenda PacketYorba Lind
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS WORKSHOP MEETING
Thursday, June 20, 2013, 8:00 AM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. ROLL CALL
Gary T. Melton, President
Robert R. Kiley, Vice President
Michael J. Beverage
Ric Collett
Phil Hawkins
3. PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which they wish to
comment. If the matter is on the agenda, the Board will recognize the individual for their comment when the item is
considered. No action will be taken on matters not listed on the agenda. Comments are limited to matters of public interest
and matters within the jurisdiction of the Water District. Comments are limited to five minutes.
4. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action of the Board of
Directors at the meeting, such as technical presentations, drafts of proposed policies, or similar items for which staff is
seeking the advice and counsel of the Board of Directors. Time permitting, it is generally in the District's interest to discuss
these more complex matters at one meeting and consider formal action at another meeting. This portion of the agenda
may also include items for information only.
4.1. Board of Directors Annual Tour of District Facilities and Construction Projects
5. ADJOURNMENT
5.1. The next Regular Board of Directors Meeting will be held Thursday, June 27, 2013 at 8:30 a.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items and are
distributed to a majority of the Board less than seventy -two (72) hours prior to the meeting will be available for public inspection in
the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business
hours. When practical, these public records will also be made available on the District's internet website accessible at
http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be able to
participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba Linda Water
District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and the type of
accommodation requested. A telephone number or other contact information should be included so the District staff may discuss
appropriate arrangements. Persons requesting a disability - related accommodation should make the request with adequate time
before the meeting for the District to provide the requested accommodation.
ITEM NO. 4.1
AGENDA REPORT
Meeting Date: June 20, 2013
Subject: Board of Directors Annual Tour of District Facilities and Construction Projects
ATTACHMENTS:
Description: Type:
Board Facilities Tour 062013.docx Itinerary Backup Material
BoardTourRoute 061213.pdf Route Map Backup Material
Yorba Linda Water District Facilities Tour
June 20, 2013
Location Facility
1 YLWD Administration Building (Starting Point). We will visit the District's
recently completed meter testing facility on site.
2 Well 21 Site at OCWD's water recharge complex. We executed an
agreement in 2012 with OCWD for this well site. We are preparing contract
documents for drilling of a test well Sept -Oct. After receipt of test results
(assuming good results) we will proceed with design of well -site equipment.
3 Well No. 20 site. Construction was completed in 2012 for Well No. 20, at
the site of the District's existing Well No. 11. We use Well No. 20 (3,200 gpm
flow) with Well No. 11 as a backup.
4 Richfield Rd. Pipeline Replacement. As part of our 2010 Pipeline
Replacement Project, we are replacing a 75 year old 26" steel pipeline with a
12" PVC pipeline.
5 Highland Booster Station. New pump station, with capacity to pump 18,000
gpm, with two engine- driven and three motor - driven pumps.
6 Yorba Linda Blvd. Pipeline and Booster Station. Location of new pipeline in
YL Blvd constructed in 2012, and new booster station under construction on
former Gun Club Road, to be complete in 2014.
7 Fairmont Reservoir and Booster Station site. Location of replacement with
larger and more diverse booster station, planned for completion in 2016.
Received proposals June 12 for engineering services for preliminary and final
design and for construction -phase services.
8 Timber Ridge Booster Station & Pressure - Regulating Station. Location of
recently rebuilt pressure - regulating station.
9 Vantage Points: Various vantage points for Cielo Vista Development and
Yorba Linda Estates Development.
10 Hidden Hills Booster Station. Existing District pumping facility and current
construction site for 2012 Pipeline Replacement Project.
11 Santiago Reservoir & Booster Station. District facilities and also a vantage
point for proposed developments.
12 YLWD Administration Building (Ending Point)