HomeMy WebLinkAbout2014-01-06 - Planning-Engineering-Operations Committee Meeting MinutesMINUTES OF THE
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Monday, January 6, 2014,12:30 p.m.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The January 6, 2014 meeting of the Yorba Linda Water District's Planning -
Engineering- Operations Committee was called to order by Director Melton at
12:30 p.m. The meeting was held in the Admin Conference Room at the
District's Administration Building located at 1717 East Miraloma Avenue in
Placentia, California 92870.
2. ROLL CALL
KJ
4.
COMMITTEE MEMBERS PRESENT STAFF PRESENT
Director Gary T. Melton, Chair Steve Conklin, Acting General Manager
Director Michael J. Beverage John DeCriscio, Operations Manager
Joe Polimino, Construction Supervisor
PUBLIC COMMENTS
None.
DISCUSSION ITEMS
4.1. Anticipated Change Order on 2012 Pipeline Replacement Project
Mr. Conklin reported that work has started on the "bore and jack" segment
of the pipeline installation into the Yorba Linda Country Club.
Approximately 65 -feet of pilot tube was bored when a large obstruction,
probably a rock, was encountered. Work has stopped while staff
considers alternative means to proceed. Mr. Conklin and Mr. Polimino
discussed the situation and various options that will be considered in a
meeting on January 9, 2014 with the design consultant, the construction
contractor and District staff. Mr. Conklin indicated that he will keep the
Committee apprised of the situation, and will bring recommendations to
the Board for consideration. At the completion of this item, Mr. Polimino
departed from the meeting.
4.2. Project Recap and Forward Planning for Engineering Department
Mr. Conklin reviewed the above document with the Committee, discussing
projects in 2013 that completed construction, reports completed, projects
currently in construction, and those in planning and design. Included for
each was the estimated schedule and cost. This was followed by a
discussion of Forward Planning Objectives for 2014 +.
4.3. Status of OCWD Annexation Process (Verbal Report)
Mr. Conklin reported that there are no new developments, and that the
process is going though LAFCO at this time, with approval hoped for this
spring.
4.4. Status of Cielo Vista and Esperanza Hills Development Projects (Verbal
Report)
Mr. Conklin reported that both projects have draft EIRs out for public
comment, with the comment period ending for Cielo Vista and Esperanza
on January 22, and February 3, 2014, respectively. He described the
meeting that President Kiley and he had with Supervisor Spitzer on
December 23, 2013, to discuss the two projects.
4.5. Response to Draft EIR for Cielo Vista Project
Mr. Conklin reviewed the draft response letter from the District to the
County with the District's comments on the draft EIR for Cielo Vista
Project. He noted that the County had just extended the close of the
comment period from January 7 -22, 2014. As such, he will withhold
sending the District's response until January 21, 2014, in case there are
other developments that could impact the response letter.
4.6. Project Recap and Forward Planning for Operations Department
Mr. DeCriscio provided a report to the Committee on maintenance and
operations activities completed in 2013 for the Operations Department.
Included was a summary of District assets and maintenance and repair
work performed by staff in the Fire Hydrant Section, Valve Section, Leak
Section, and Sewer Collections Section. He also described services
performed by the Production Division and the Mechanical Services
Division.
4.7. Monthly Groundwater Production and Import Water Report
Mr. DeCriscio reported that water production for December was 13.6%
more than projected, due to continuing warm and dry weather. For July
through December, demand is cumulatively 4.9% over the projection.
Groundwater production was 57.9% for December, and cumulatively
47.1 % for the FY to date, as we work to achieve our groundwater BPP of
51.8 %.
4.8. Monthly Preventative Maintenance (PM) Report
Mr. DeCriscio reported on PM to date, noting that our crews are on target
to achieve PM goals for the year.
4.9. Monthly Production Summary Report
Mr. DeCriscio reviewed the above report with the Committee, describing
water production, weather conditions, water quality, equipment taken out
and restored to service, well gas- engine utilization, and after -hours
response calls.
2
4.10. Groundwater Producer Meeting Notes
Messrs. Conklin and DeCriscio reported on the subject meeting on
December 11, and items discussed at OCWD.
4.11. Status Report on Capital Projects in Progress
Mr. Conklin reported on the status of capital projects currently in planning,
design and construction.
4.12. Status of Strategic Plan Initiatives
Mr. Conklin reported on the status of strategic plan initiatives relating to
engineering and operations.
4.13. Future Agenda Items and Staff Tasks
None.
5. ADJOURNMENT
5.1. The meeting was adjourned at 2:55 p.m. The next Planning-Engineering-
Operations Committee meeting is scheduled to be held Thursday,
February 6, 2014 at 4:00 p.m.
3