AGENDA
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Tuesday, April 15, 2014, 4:00 PM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. ROLL CALL
COMMITTEE STAFF
Director Gary T. Melton, Chair Steve Conklin, Acting General Manager
Director Michael J. Beverage John DeCriscio, Operations Manager
3. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
4. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
4.1. Construction Contract for the Deville Dr. Waterline Extension
Recommendation: That the Committee recommend the Board of Directors award
the Construction Contract for the Deville Dr. Waterline Extension for $43,500 to
Valverde Construction, Inc.
5. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
5.1. Revised Draft CIP for FY 2014/15 (To be provided at the meeting.)
5.2. Operations Department Increase to Supplies and Services Budget for Safety Equipment
and Signage
5.3. Monthly Groundwater Production and Purchased Import Water Report
5.4. Monthly Preventative Maintenance Report
5.5. Monthly Production Summary Report
5.6. Groundwater Producer Meeting Report for March 2014
5.7. Status of OCWD Annexation Process (Verbal Report)
5.8. Status of Cielo Vista and Esperanza Hills Development Projects (Verbal Report)
5.9. Status of Well Siting (Verbal Report)
5.10. Status Report on Capital Projects in Progress
5.11. Future Agenda Items and Staff Tasks
6. ADJOURNMENT
6.1. The next Planning- Engineering- Operations Committee meeting is scheduled to be held
Thursday, May 1, 2014 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
AGENDA REPORT
Meeting Date: April 15, 2014
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Acting General
Manager
Presented By: Steve Conklin, Acting General
Manager
Prepared By: Anthony Manzano, Senior
Project Manager
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Job No:
Dept:
Reviewed by Legal:
ITEM NO. 4.1
Yes
$50,000
$43,500
All Water Funds
101 -2700
J2013 -20
Engineering
Yes
CEQA Compliance: Exempt
Subject: Construction Contract for the Deville Dr. Waterline Extension
SUMMARY:
On March 25, 2014, bids were received from five contractors for construction of the Deville Dr.
Waterline Extension. Following review of the bids, staff recommends award to the low- bidder,
Valverde Construction, Inc. for $43,500.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors award the Construction Contract for the
Deville Dr. Waterline Extension for $43,500 to Valverde Construction, Inc.
DISCUSSION:
Per the attached 1964 Agreement, the District was paid by the original property owner in Deville
Drive, a private residential street north of Yorba Linda Blvd., just east of Avocado Ln., to install 115
feet of new waterline from it's existing location easterly. Per District documentation, the line was not
installed in the 1960s because of interference with a large tree. Recently, the current property
owner, Mr. Eric Helmle, contacted the District and requested that this line be installed. After
research and consultation with Legal Counsel, staff determined that the District is obligated to
complete this work. Staff notified the PEO Committee of this obligation in a recent meeting. Since
that time, staff proceeded to complete in -house plans and specifications and solicited bids.
On March 25, 2014, sealed bids were received from five contractors, as shown below. The bid
tabulation and bid documents from the low bidder, Valverde Construction, Inc., were reviewed and
confirmed by District staff and found to be responsive and fully in order. Accordingly, staff
recommends award to Valverde Construction, Inc.
No. Company Bid
1. Valverde Construction, Inc. $43,500.00
2. Lonerock, Inc. $45,750.00
3. Vido Samarzich, Inc. $49,780.00
4. JA Salazar Construction & Supply Corp. $66,000.00
5. TBU, Inc. $73,089.00
STRATEGIC PLAN:
SR 3 -A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011 -2015 with
adopted amendments
ATTACHMENTS:
Name:
Waterline Agreement 01- 30- 1964.pdf
Description:
1964 Waterline Agreement
Type:
Backup Material
APPLICATION TO AND AGREEMENT WITH
Page No. 1 of 3 pages
Agreement with - Ha11eY
---- �_T_fo199t4r Service.
Dated.
THE YORBA LINDA
COUNTY WATER DISTRICT FOR WATER SERVICE
Dated January 30, 1964 _
The undersigned, hereinafter referred to as Applicant, hereby requests the extension of certain water service by the
Yorba Linda County Water District, hereinafter referred to as the District, in accordance with the Rules and Regulations of
the District, as amended from time to time, to that certain real property located in the County of Orange, State of California,
consisting of approximately 0.436 _acres, and described as follows:
The Easterly 115 feet of the Southerly 165 Feet of the Northerly
330 feet of Lot 12 in Block 10 of the Yorba Linda Tract as said
Tract is shown on a Map recorded in Book 5, Pages 17 and 18 of
Miscellaneous Maps records of Orange County in California,
Said property being also shown as A.P. 076 - 230 -30 March 1963
Applicant hereby applies for that water service which can be provided by the facilities described below, in accordance
with the Rules and Regulations of the District, as amended from time to time, for the purpose of;
Single Family Dwelling
Applicant hereby agrees to deed any and all water rights which may be appurtenant to said property to the District.
Said extension will consist of the following facilities, and Applicant hereby agrees to pay the Extension Fees and
Charges, and Service Fees required by the Rules and Regulations of District in effect on the date of this application as tab-
ulated below:
EXTENSION
FEES
&
CHARGES
(FOR NEW FACILITICS
eenumen en
NO
Flo
NO. OF
UNITS
DESCRIPTION OF UNITS
UNIT
PRICE
FEES 8
CHARGES
1 ea.
Std. Fire Hydrant
385,00
385
>00
20
1 ea,
1° Service with 111 meter
143000
143.00
( to be installed at east end of
existing main approximately 230,
West of West line of property)
3,
1 ea.
Rate Deposit ._
15,00
15.00
TOTAL EXTENSION FEES & CHARGES S s�
W 13.1 11.63 D. P. t S.
Page No.- 2 of 3 pages
Agreement with Hal 1 r
Tan 30164 For Water Service.
ITEM
NO. S OF
UNITS
SERVICE
FEES
FEE
as follows:
1, 2, 31 & A
(FOR
USE
OF EXISTING FACILITIES
REQUIRED
FOR
SUCH
SERVICE)
ITEM
NO. S OF
UNITS
DESCRIPTION OF UNITS
UNIT
FEE
as follows:
1, 2, 31 & A
service shall
PRICE
784°50
A
115 feet
of 611 water line - to be installed at
TOTAL EXTENSION FEES & CHARGES & SERVICE FEES S 784. 50
future date to be determined by the
District
2,10
241.50
TOTAL SERVICE FEES $ 241a50
TOTAL EXTENSION FEES & CHARGES & SERVICE FEES S 7RLL Sn
NAME OF
APPLICANT
Applicant
also hereby agrees that said Extension
Fees and Charges and Service Fees for such water be
paid
as follows:
1, 2, 31 & A
service shall
NAME OF
APPLICANT
ITEM NUMBERS USED TO
CALCULATE APPLICANTS
PORTION
APPLICANT'S
PORTION
AMOUNT
APPLICANTS
TOTAL
Lawrence B. Hill Er
1, 2, 31 & A
100%
784o50
784°50
TOTAL EXTENSION FEES & CHARGES & SERVICE FEES S 784. 50
Applicant, also hereby agrees that such total Extension Fees and Charges and Service Fees will be paid to the Yorba
Linda County Water District before construction of the new facilities required for such service is begun, and that all facilities
described herein, are and will remain the property of the Yorba Linda County Water District and its successors and assigns
forever.
The amounts paid by Applicant as set forth above for the following items, or portions thereof, will be refunded in ac-
cordance with Section 3 and 7.10 of the Rules and Regulations of the District in effect on the date of this application, as
tabulated below:
)NOM I AMOUNT I PORTION REFUNDABLE I REFUNDABLE
10 I 385900 I 5/6 = 83% I 320.83
TOTAL AMOUNT REFUNDABLE $ 320.83
w 19.2 11 -69 D. P. & S.
Page No. 3 of 3 pages
Agreement with Haller
For Water Service.
Dated Jan> 30 , 1964
Applicant also hereby agrees that the amounts refundable as set forth above shall be refunded to applicant as follows:
WIINESS Imy) (our) hand(s) on the date following our signatures below:
(If a corporation the corporate seal shall b aff i near the signatures of the duly authorized officers).
By , t/jJ/
�'- f- Date 27
Laurence B. Haller —
The foregoing application and agreement provisions are hereby accepted and approved.
YORBA LINDA COUNTY WATER DISTRICT
-/
By
General Manager
ITEM NO.
TOTAL
AMOUNT REFUNDABLE
APPLICANTS* PORTION
REFUNDABLE
APPLICANTS' AMOUNT
REFUNDABLE
APPLICANTS'
TOTAL
FLawrence
Halle
1
320,83
100%
320o83
320 *83
TOTAL AMOUNT REFUNDABLE $
207,17 =466
320.83
WIINESS Imy) (our) hand(s) on the date following our signatures below:
(If a corporation the corporate seal shall b aff i near the signatures of the duly authorized officers).
By , t/jJ/
�'- f- Date 27
Laurence B. Haller —
The foregoing application and agreement provisions are hereby accepted and approved.
YORBA LINDA COUNTY WATER DISTRICT
-/
By
General Manager
W 13.3 1163 D. P. k S.
FOR
DISTRICT USE
ONLY
AMOUNT
ACCT. NO.
*DR /CR
*GEN. JRNL.
*REF. ACCT. REFERENCE
528 *00
223
207,17 =466
15.00
221
320,83 =327
241,50
455
Q---TOTAL
*JRNL. ENTRIES MADE BY ------------ -- --- - ....---_ DATE..- - - - -
W 13.3 1163 D. P. k S.
AGENDA REPORT
Meeting Date: April 15, 2014
ITEM NO. 5.1
Subject: Revised Draft CIP for FY 2014/15 (To be provided at the meeting.)
ATTACHMENTS:
v „ Description: Type
Draft CIP FY14- 15.pdf Backup Material Distributed Less Than 72 Hours Prior to Backup Material
the Meeting
FY 14/15
Water Capital Projects Reserve Balance @ March 31, 2014:
Less Draw Amount From Wells Fargo LOC as of March 31, 2014:
Net Water Capital Projects Reserve Balance Available for Future Capital Expenditures:
Backup Material Distributed Less Than 72 Hours Prior to the Meeting
$7,857,568
($3,405,408)
$4,452,160
2008 -17B
YL Blvd BPS (Booster Pump Station)
Total Project
Increase/
Total Project
Expenditures
FY 13/14
FY 13/14
FY 13/14
FY 13/14 Year-
2,075,000
FY 15/16
FY 16/17
FY 17/18
FY 18/19
5 Year Future
Project #
Project Description
Budget (13/14)
(Decrease)
Budget (14/15)
Through
Budget
(Jul -Mar)
Apr thru June
End Forecast
FY 14/15 Budget
Budget
Budget
Budget
Budget
Projected
$
2,306,789
$
44,832
$
6/30/2013
$
Expenditure
Forecast
$
1,085,970
$
940,790
$
235,197
Budgets
-
2008 -17B
YL Blvd BPS (Booster Pump Station)
$
3,115,000
(1,217,009)
$
1,897,991
$
602,885
$
2,075,000
$
1,151,918
$ 43,188
$
1,195,106
$
100,000
$
-
$
-
$
$
$
100,000
2009 -22 #21
S & W Well Project (Well No. 21)
$
1,750,000
556,789
$
2,306,789
$
44,832
$
1,000,000
$
140,353
$ 945,617
$
1,085,970
$
940,790
$
235,197
$
-
$
$
$
1,175,987
2009 -22 #22
S & W Well Project (Well No. 22)
$
2,500,000
-
$
2,500,000
$
2,742
$
-
$
870
$ 4,130
$
5,000
$
445,000
$
800,000
$1,247,258
$
$
$
2,492,258
2010 -02
Lakeview Grade Separation
$
600,000
-
$
600,000
$
275,689
$
300,000
$
4,863
$ 55,137
$
60,000
$
264,311
$
-
$
$
$
$
264,311
2013 -20
Deville Dr. Waterline Extension
$
50,000
-
$
50,000
$
-
$
-
$
-
$ 25,000
$
25,000
$
25,000
$
-
$
$
$
$
25,000
2010 -11B
Fairmont BPS Upgrade
$
6,300,000
-
$
6,300,000
$
142,012
$
500,000
$
236,128
$ 183,872
$
420,000
$
2,500,000
$
2,937,988
$
300,000
$
$
$
5,737,988
2012 -13
Yorba Linda High School Park
$
370,000
-
$
370,000
$
47,014
$
20,000
$
-
$ 45,000
$
45,000
$
325,000
$
-
$
-
$
$
- $
325,000
Rehabilitation & Restoration
*
Meter Replacement Program
$
2,500,000
(2,500,000)
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
$
$
-
Future Pipeline Project
$
2,690,000
-
$
2,690,000
$
-
$
50,000
$
-
$ 40,000
$
40,000
$
660,000
$
160,000
$
1,500,000
$
330,000
$
- $
2,650,000
Timber Ridge BPS Rehabilitiation
$
250,000
-
$
250,000
$
-
$
50,000
$
-
$ 10,000
$
10,000
$
240,000
$
-
$
-
$
-
$
- $
240,000
Richfield Campus Spoils
$
150,000
-
$
150,000
$
-
$
-
$
-
$ 20,000
$
20,000
$
130,000
$
$
-
$
$
$
130,000
Lakeview Booster Piping
$
100,000
-
$
100,000
$
-
$
$
-
$ -
$
-
$
100,000
$
$
-
$
$
$
100,000
Future PRS Rehabilitation
$
1,430,000
-
$
1,430,000
$
-
$
$
-
$
$
$
100,000
$
700,000
$
100,000
$
530,000
$
- $
1,430,000
Annual Routine Capital R &R
$
1,520,000 $
2,500,000
$
4,020,000
$
-
$
$
-
$ -
$
-
$
-
$
-
$
-
$
1,520,000
$
2,500,000 $
4,020,000
R & R Subtotal
$
8,640,000 $
-
$
8,640,000
$
-
$
100,000
$
-
$ 70,000
$
70,000
$
1,230,000
$
860,000
$
1,600,000
$
2,380,000
$
2,500,000 $
8,570,000
TOTAL
$
23,325,000 $
(660,220)
$
22,664,780
$
1,115,174
$
3,995,000
$
1,534,132
$ 1,371,944
$
2,906,076
$
5,830,101
$
4,833,185
$
3,147,258
$
2,380,000
$
2,500,000 $
18,690,544
2011 -20 2012 Waterline Project $ 1,645,000 404,629 $ 2,049,629 $ 1,135,006 $ 500,000 $ 514,623 $ 400,000 $ 914,623
2013 -12 Elk Mountain Booster Surge Tank $ 100,000 (10,000) $ 90,000 $ - $ 100,000 $ - $ 90,000 $ 90,000
TOTAL $ 1,745,000 $ 394,629 $ 2,139,629 $ 1,135,006 $ 600,000 $ 514,623 $ 490,000 $ 1,004,623
GRAND TOTAL $ 25,070,000 $ (265,591) $ 24,804,409 $ 2,250,180 $ 4,595,000 $ 2,048,756 $ 1,861,944 $ 3,910,699
Water Capital Outlay
Water Capital Projects Reserve Balance Available for Future Expenditures:
* Project Needs To Be Assessed in FY 17/18
$2,590,216
$ 449,000
($3,688,885) ($8,522,070) ($11,669,328) ($14,049,328) ($16,549,328)
Total Project
Over /(Under)
Actual Project
Expenditures
FY 13/14
FY 13/14 (Jul-
FY 13/14 Apr
FY 13/14 Year -
Project #
Projects Completed in FY 13/14
Budget (13/14)
Budget
Total
Through
Budget
Mar)
thru June
End Forecast
6/30/2013
Expenditure
Forecast
2011 -20 2012 Waterline Project $ 1,645,000 404,629 $ 2,049,629 $ 1,135,006 $ 500,000 $ 514,623 $ 400,000 $ 914,623
2013 -12 Elk Mountain Booster Surge Tank $ 100,000 (10,000) $ 90,000 $ - $ 100,000 $ - $ 90,000 $ 90,000
TOTAL $ 1,745,000 $ 394,629 $ 2,139,629 $ 1,135,006 $ 600,000 $ 514,623 $ 490,000 $ 1,004,623
GRAND TOTAL $ 25,070,000 $ (265,591) $ 24,804,409 $ 2,250,180 $ 4,595,000 $ 2,048,756 $ 1,861,944 $ 3,910,699
Water Capital Outlay
Water Capital Projects Reserve Balance Available for Future Expenditures:
* Project Needs To Be Assessed in FY 17/18
$2,590,216
$ 449,000
($3,688,885) ($8,522,070) ($11,669,328) ($14,049,328) ($16,549,328)
AGENDA REPORT
Meeting Date: April 15, 2014
ITEM NO. 5.2
To:
Planning- Engineering-
Operations Committee
From:
Steve Conklin, Acting General
Manager
Presented By:
John DeCriscio, Operations
Manager
Prepared By:
John DeCriscio, Operations
Manager
Subject:
Operations Department Increase to Supplies and Services Budget for Safety
Equipment and Signage
SUMMARY:
Operations Dept is bringing forward a request to increase its Supplies and Services budget in the
amount of $15,000, which will be applied to Account # 1- 5010 - 0750 -50. This request is the result of
a recent evaluation of the District's many "Confined Spaces" (vaults, reservoirs, sewer manholes,
etc.) into which our staff must enter and work, and recent updates to the our Confined Space
Program. In order for the District to be in compliance with the California Code of Regulations for
confined space entry, new signage and rescue items will need to be purchased, which we currently
do not have.
As we improve on our safety programs, staff expects there to be a need for further additional
equipment, signs, and training in the future.
ATTACHMENTS:
Description: Type:
5010 FY 2015 Budget.0 Supplies and Services Budget Backup Material
OPS 2015 budget summary worksheet.xlsx Suppplies and Services Budget exc. Backup Material
Section Detail Expense Budget
Dept /Section: Ops (Admin) (5010) FY 2015
Primary GL Category
M
Sub Acct No./Sub Category
M
Detail Item Description
w
1 -5010- 0710 -00
$9,000
1 -5010- 0710 -65
9,000
PPE Equipment
9,000
Materials
PPE Equipment
1 -5010- 0715 -00
$1,500
1 -5010- 0715 -50
1,500
Meeting Supplies
1,500
District Activities and Events
Meeting Supplies
1 -5010- 0750 -00
$15,000
1 -5010- 0750 -50
15,000
Safety Equipment (Regulatory Requirements)
15,000
Non - Capital Equipment
Safety Equipment
1 -5010- 0760 -00
$9,500
1 -5010- 0760 -00
3,500
Misc Supplies
3,500
Office Expense
OFFICE EXPENSE (E)
1 -5010- 0760 -10
400
Paper Supplies
400
Paper
1 -5010- 0760 -20
1,500
Printer Ink
1,500
Printer Ink
1 -5010- 0760 -30
100
Manuals /Books /Magazines
100
Books & Publications
1 -5010- 0760 -40
4,000
Breakroom Supplies
4,000
Breakroom Supplies
1 -5010- 0810 -00
$800
1 -5010- 0810 -00
500
Training
500
Professional Development
Professional Development
1 -5010- 0810 -40
300
Certificate Reimbursement
300
Certificate Reimbursment
1 -5010- 0830 -00
$900
1 -5010- 0830 -10
100
Travel
100
Travel & Conferences
Travel
1 -5010- 0830 -30
300
Meals
300
Meals
1 -5010- 0830 -40
500
Registration
500
Registration
Section Total
$36,700
Operations Department Supplies & Services Comparison
FY 2013/14
FY 2014/15
Budget
Budget
Expenses (Operating)
Supplies & Services
Communications
$
500
$
500
Contractual Services
$
153,900
$
176,500
Dues & Memberships
$
700
$
700
Fees & Permits
$
37,900
$
37,050
Materials
$
548,500
$
613,900
District Activities & Events
$
1,500
$
1,200
Maintenance
$
402,537
$
362,600
Non - Capital Equipment
$
34,100
$
32,100
Office Expense
$
9,500
$
7,500
Training
$
10,900
$
12,750
Travel & Conferences
$
4,150
$
5,600
Utilities
$
90,800
$
90,800
Vehicle Expense
$
367,150
$
358,400
Supplies & Services Sub -Total
$
1,662,137
$
1,699,600
Meeting Date
Subject:
ATTACHMENTS:
AGENDA REPORT
April 15, 2014
ITEM NO. 5.3
Monthly Groundwater Production and Purchased Import Water Report
„ Description: Type:
Import 2013 -14 Mar.pdf March 2014 Monthly Water Report Backup Material
YLWD SOURCE WATER SUMMARY
FY 2013 -14
Allowable GW (YTD) 8,503.7 (AF)
Underpumped 226.4 (AF)
IN -LIEU
GW
(AF)
ACTUAL
GW
(AF)
ADJUSTED
IMPORT
(AF)
TOTAL
DEMAND
(AF)
MONTHLY
GW
( %)
YTD
GW
( %)
BUDGET
(Demand Est.)
(AF)
DELTA
( %)
MONTH
Jul -13
1,286.5
1,105.4
2,391.8
53.8%
53.8%
2,477.9
-3.5%
Aug -13
824.9
1,581.0
2,405.8
34.3%
44.0%
2,437.9
-1.3%
Sep -13
-
762.2
1,521.2
2,283.4
33.4%
40.6%
2,139.0
6.8%
Oct -13
45.0%
1,048.7
941.6
1,990.3
52.7%
43.2%
1,804.2
10.3%
Nov -13
948.9
661.9
1,610.7
58.9%
45.6%
1,425.3
13.0%
Dec -13
844.1
612.8
1,456.9
57.9%
47.1%
1,282.1
13.6%
Jan -14
-
944.4
689.0
1,633.3
57.8%
48.4%
1,117.9
46.1%
Feb -14
752.6
519.7
1,272.3
59.2%
49.3%
1,069.5
19.0%
Mar -14
-
865.2
506.6
1,371.8
63.1%
50.4%
1,267.4
8.2%
Apr -14
1,585.3
May -14
2,096.9
Jun -14
2,349.5
FYTD
-
8,277.4
8,139.1
16,416.4
50.4%
15,021.3
9.3%
Allowable GW (YTD) 8,503.7 (AF)
Underpumped 226.4 (AF)
GROUNDWATER PERCENTAGE
80.0%
MONTHLY GW (% )
75.0%
YTD GW (%)
70.0% -BPP GOAL 51.8%
65.0%
60.0%
55.0%
50.0%
45.0%
40.0%
35.0%
30.0%
Jul -13 Aug -13 Sep -13
Oct -13 Nov -13 Dec -13 Jan -14 Feb -14 Mar -14 Apr -14 May -14 Jun -14
Month
22,000
20,000
16,000
14,000
LL
a
12,000
E
M
0 10,000
8,000
6,000
4,000
2,000 7--
0
Jul -13
FY 2013 -14 YTD Water Supply
—*--Budgeted Total GW + Import
--M--Actual Total GW + Import
tBPP GW Goal 51.8%
Actual GW Production
tActual Total GW + Import 2012 -13
Aug -13 Sep -13 Oct -13 Nov -13 Dec -13 Jan -14 Feb -14 Mar -14 Apr -14 May -14 Jun -14
Month
Meeting Date:
To:
From:
Presented By:
Prepared By:
Subject:
ATTACHMENTS:
Name:
AGENDA REPORT
April 15, 2014
Planning- Engineering-
Operations Committee
Steve Conklin, Acting General
Manager
John DeCriscio, Operations
Manager
Ken Mendum, Water
Maintenance Superintendent
Monthly Preventative Maintenance Report
Copy of 2013 -14 fiscal March 2014.pdf
ITEM NO. 5.4
Description: Type:
Monthly Preventative Maintenance Report Backup Material
PREVENTATIVE AND REACTIVE MAINTENANCE
FISCAL 2013/14
Fiscal 2013 -14 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 83% 92% 100%
HYDRANTS (3,966) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH 3191
2851
2521
349 3451
1051
381
3221
3191
1
INSPECTED THIS YEAR 3191
6041
8561
1,205 1,550
1,655
1,693
2,015
2,334
% TOTAL 8.0%1
15.2%1
21.6%1
30.4% 39.1%1
41.7%1
42.4%1
50.8%1
VALVES (11,822/2 = 5,911) Target; all valves to be operated every two years
OPERATED THIS MONTH 5181
5821
6441
654 6611
7301
8591
6411
554
OPERATED THIS YEAR 518
11001
1,7441
2,398 3,059
1 3,789
1 4,6481
5,289
1 5,843
OF TOTAL 8.8%1
18.6%1
29.5%1
40.1 % 51.8%1
64.1%1
78.6%1
89.5
DEAD ENDS (155 X 2 = 310) Target; all dead ends to be flushed biannually.
FLUSHED THIS MONTH 01
01
01
155 01
01
01
01
01
1
FLUSHED THIS YEAR 01
01
01
155 1551
1551
1551
1551
1551
1
% TOTAL 0.0%1
0.0%1
0.0%1
50.0% 50.0%1
50.0%1
50.0%1
50.0
AIR VACS (499) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 31
01
1
1 11
105
4001
4
1
INSPECTED THIS YEAR 31
31
4
5 61
1111
5111
5151
5161
1
OF TOTAL 0.6%1
0.6%1
0.8%1
1.0% 1.2%1
22.2%1
102.4%1
103.2
PRVs (150) Target; all PRVs to be serviced annually.
INSPECTED THIS MONTH 1 101
18
ill
2 1
141
34
24
22
INSPECTED THIS YEAR 1 101
281
391
41 43
571
91
115
1 137
OF TOTAL 6.7%1
18.7%1
26.0%1
27.3 % 28.7%1
38.0%1
60.7%1
76.7
WATER LEAKS Target; all leaks repaired at first available opportunity.
MAIN REPAIRED 1
11
01
01
1 0
1
1
1
SERVICE REPAIRED 10
3
21
21
1 1
2
3
4
SERVICE REPLACED 11
15
18
29
12 12
11
6
8
AMS REPLACED 12
11
10
15
12 10
9
7
13
METERS Target; all meter work completed no later than next working day.
NEW INSTALL 13
33
31
30
19
10 10
30
30
STUCKS 4
41
21
51
161
51 9
101
191
1
SEWER CLEANING (235 M) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 1 20.351
19.561
16.73
31.56 21.46
13.021
18.62
23.31
13.52
CLEANED THIS YEAR 1 20.351
39.911
56.641
88.20 109.66
122.681
165.691
189.001
202.521
1
OF TOTAL 1 8.70%1
16.98%1
24.10%1
37.53% 46.66%1
52.20%1
70.51%1
80.43%1
86..'E v
SEWER TELEVISING (29.38M) Target; all sewers to be televised every 8 years.
TELEVISED THIS MONTH 4.08
1 3.47
1 1.64
3.60 2.98
3.42
5.20
6.26
6.31
TELEVISED THIS YEAR 4.08
1 7.55
1 9.19
12.79 15.77
19.19
24.39
30.65
36.96
OF TOTAL 13.90%1
25.70%1
31.28%1
43.53 % 53.68%1
65.32%1
83.00%1
104.32%1
125.80
OTHER SEWER WORK.
S.S. OVERFLOWS
0
0
0
0
0
0
0
0
2
ROOT FOOTAGE
4,020
0
335
0
0
2,511
5,783
2,231
1,900
EMAs AND SYPHONS
4.46
2
3.12
1.23
2.32
6.35
0
2.42
6.3
SERVICE CALLS
3
2
0
1
2
1
0
0
6
REHAB FOOTAGE
0
0
0
0
498
491
0
0
0
MAIN REPAIRS
0
0
0
9
1
0
3
1
1
MANHOLE ROOT CLEANING
0
219
1
2
6
3
6
8
2
MANHOLE REPAIRS
1 61
21
81
01
01
01
11
81
41
1
206
AGENDA REPORT
Meeting Date: April 15, 2014
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Acting General
Manager
Presented By: John DeCriscio, Operations
Manager
Prepared By: Javier Martinez, Water Prod.
Superintendent
Subject: Monthly Production Summary Report
ATTACHMENTS:
Name:
Description:
Monthly Production Summary Report March 2014.pdf Monthly Production Summary Report
ITEM NO. 5.5
Type:
Backup Material
Monthly Production Summary Report
DATE: March -2014
Water Production
Equipment Name
• Groundwater
64%
• Import Water
35%
Max Day Consumption
19.5 MG
Min Day Consumption
7.7 MG
Average Day
14.1 MG
Weather Conditions
Max Temperature
89
Min Temperature
60
# of High Wind Days
0
# of Red Flag Days
1
Inches of Rain
1.37"
Water Quality
Location Average C12 Dose
Richfield (North Loop)
1.40 Mg /I
Richfield (South Loop)
1.30 Mg /I
Lakeview Booster (Zone 2)
1.00 Mg /I
Lakeview Booster (Zone 3)
1.20 Mg /I
Well # 15
off
Well # 20
1.10 Mg /I
Location Average C12 Residual
Highland Booster
1.30 Mg /I
Valley View Booster
1.20 Mg /l
Paso Fino Booster
1.00 Mg /I
Hidden Hills Reservoir
1.50 Mg /l
Camino de Bryant Reservoir
1.40 Mg /I
Notes:
Out of Service Equipment
Equipment Name
Reason for Out of Service
Well 18
Murphy Panel Failure
Fairmont Pump #1
Murphy Panel Failure
Returned to Service
Equipment Name
Date
Well 18
3/8/2014
Fairmont Pump #1
3/18/2014
Water System Equipment Maintenance & Repairs
Lakeview C12 System I Repair chemical feed line
Highland Pump Station lChange gearhead oil
Wells 11, 15, and 20 ISCE efficiency testing
Hidden Hills Pump Station ISCE efficiency testing
Keith Lyons from MWDOC confirmed that MET was calling for YLWD to pump Ground Water from the CUP account starting on April 1, 2014. In
anticipation of the possible CUP account call out, the Production Staff developed a proactive strategy to make the necessary water system adjustments
in order to comply. On March 19, the Production Staff conducted water system adjustments in order to meet the request. Currently, Valley View
Reservoir, Gardenia Reservoir, and Quarter Horse Reservoir are storing and serving ground water to Zone 4 and Zone 5. On March 28, the district
experienced an earthquake event. District Staff responded and performed a damage assessment and found the system to be in good order. Staff
continues to work with SCE to perform efficiency testing at the District pump stations.
ITEM NO. 5.6
AGENDA REPORT
Meeting Date: April 15, 2014
Subject: Groundwater Producer Meeting Report for March 2014
ATTACHMENTS:
Description: Type:
GWP Mtq Notes March 2014.docx GWP Meeting for Mar 2014 Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: March 13, 2014
TO: File
FROM: Steve Conklin, Acting General Manager
SUBJECT: Groundwater Producers Meeting March 12, 2014
I attended the Groundwater Producers (GWP) meeting on March 12, 2014 at Orange
County Water District (OCWD). A summary of the item discussed is as follows:
1. Water Quality Issues. Nlra Yamachika of OCWD provided an update on the
status of the 2014 Consumer Confidence Report (CCR), the status of testing
required for the Unregulated Contaminant Monitoring Report Phase 3 (UCMR3),
and the status of the establishment of the Chrome 6 MCL by the State
Department of Health, which is anticipated to be 10 parts per billion.
2. Proposed Draft OCWD FY 14/15 Budget. John Kennedy of OCWD presented
the draft budget, which is $206 million, an increase of $20 million over the current
FY13/14 budget of $185.5. Included in the draft budget is a CIP of $74.3 million,
of which $59.5 million is for the construction of the GWRS Initial Expansion. The
water budget is $29.3 million for the purchase of 40,000 AF of MWD untreated
full- service water for recharge. In addition, they propose to purchase an
additional 25,000 AF of MWD water using $16.7 million Commercial Paper debt,
to take advantage of the currently - available water. Proposed is an RA of $294/AF
and a BPP of 72 %. April 16 Board meeting is planned to consider approval of the
RA, BPP and budget.
3. MWD Conjunctive -Use Program (CUP) Call for Water. John Kennedy
presented the water budget and indicated that they estimate that demand from
the basin will be approximately the same as the recharge at about 327,000 AF.
The basin overdraft will remain at approximately 322,000 AF. MWD is making a
call for its water stored in the basin under the CUP. Under the program, MWD
can store up to 66,000 AF; they currently have about 48,000 AF stored. The
program calls for a max draw of 22,000 AF per year, but MWD has requested
that all of its water be extracted as soon as practicable, not waiting until July 1 to
start. However, with OCWD planning to buy 65,000 AF of MWD untreated water
for recharge and MWD planning to extract approx. 45,000 AF from the basin,
MWD is suggesting that the two agencies swap water or perform a paper
exchange rather than "put and take" in the basin. OCWD will be pursuing this
with MWD and will provide direction to the GWPs as soon as decided.
4. East Newport Mesa Groundwater Investigation. Roy Herndon of OCWD
reported that monitoring well information from the South Basin Groundwater
Contamination investigation has indicated that poor quality groundwater in the
shallow aquifer is moving south. The only route from there is for the water to
move downward through breaks in the aquitard into the deeper Principal Aquifer.
In order to confirm this assumption and, if confirmed, determine its impact on the
Principal Aquifer, OCWD will be drilling 4 monitoring wells in public parks and
other public land in areas in the vicinity of the 405/55 Freeway interchange. The
budget for this proposed investigation is $573,000.
5. Update on the North and South Basin Lawsuits. Mike Markus of OCWD
reported that there is no news; they are awaiting a decision from the judge.
Otherwise, he noted that AB 2712 (Daly) is a new bill that would require oversight
by a state regulatory agency before OCWD could act on a groundwater
contamination issue. He noted that OCWD will be looking to meet with the author
or proponents of the bill to discuss amendments or to curtail it.
6. Ocean Desalination Update. Mike Markus reported that the Board did not take
action concerning the hiring of three consultants to prepare studies concerning
the costs and issues relating to development, construction and implementation of
an ocean desalination plant in HB. In a lengthy discussion, it was suggested by
several of the GWPs that OCWD include a review of projects in its Long -Term
Facilities Plan, and the cost and benefits of those projects relative to ocean
desalting, as part of the decision process for the HB project. It was noted that a
decision is needed soon by OCWD relative to the HB project because of the
permit issue for Poseidon.
7. Consolidation Update. No progress to report.
Next Meeting: Wednesday April 9, 2014 at 9:30 a.m.
ITEM NO. 5.10
AGENDA REPORT
Meeting Date: April 15, 2014
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Description: Type:
CIP Rept Apr20l4.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 1, 2014
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
2012 Waterline Repl., Ph. II: Tamarisk, Hidden
Contractor completed open
Contractor to install the
Project expected to be complete
Hills, Catalina Ct., Gordon Ln. & Richfield Rd.
trench work from golf course to
Press. Regulating Station
by April 2014.
Budget: $1.17M Job No.: 201120
Sunwood Ln. and is currently
in Sunwood Ln. after pipe
Project Contact: Joe Polimino
finishing pipeline installation.
is installed.
Planned Completion: Early 2014
2
Yorba Linda Blvd. Pump Station
Contractor continuing with
Contractor will soon begin
Submittals nearly complete.
Budget: $2.65M Job No.: 200817B
electrical conduits and wiring.
grading and curb, gutter,
Project expected to be complete
Project Contact: Joe Polimino
SCE installed the transformer.
paving installation around
mid -2014.
Planned Completion: April 2014
Painting of interior pipe and
building; roofing work
structural steel continues.
continues.
3
Well 21 Drilling Project
Pilot -hole drilling complete.
Install well casing, gravel
Anticipate drilling to finish May
Budget: $800,000 Job No.: 200922 #21
Water quality samples analyzed
filter pack, seal well and
2014.
Project Contact: Derek Nguyen
and passed. Casing design in
perform test pump to
Planned Completion: Early 2014
progress, installation to follow.
determine design capacity.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 1, 2014
New Information since Last Report is Shown in Red
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Lakeview Grade Separation (OCTA Project)
OCTA awarded contract.
Utility relocation work to
Bridge work requires complete
Budget: $700,000 Job No.: 201002
OCTA scheduled an April
begin late June 2014.
closure, after completion of
Project Contact: Anthony Manzano
81h, 2014 utilities
Assume 1 yr. for all utility
utility relocations.
Planned Completion Date: Early 2014
preconstruction meeting.
relocations.
2
YL High School Park Pipe Relocation
YLWD work must be
PYLUSD scheduled to begin
YLWD Pipeline relocation
Budget: $350,000 Job No.: 201213
independent of PYLUSD
grading summer 2014.
work tentatively planned for
Project Contact: Anthony Manzano
work. YLWD project
YLWD bids due May 14th.
late summer 2014.
Planned Completion Date: Summer 2014
currently out to bid.
3
Well 21 Equipping Project
PSA executed with Stantec
Awaiting 1St design
Estimated equipping design
Budget: $150,000 Job No.: 200922 #21
Consulting. District
submittal.
completion, summer 2014.
Project Contact: Derek Nguyen
provided design
Estimated construction
Planned Completion Date: Late 2015
information to Stantec.
completion spring 2015.
4
Elk Mountain Surge Tank
Construction Agreement
Tank requires a minimum 4
Anticipate completion early
Budget: $100,000 Job No. 201312
executed with Pascal &
month lead. Will issue NTP
summer 2014.
Project Contact: Anthony Manzano
Ludwig (P &L). Approved
with a May 2014 start date.
Planned Completion Date: January 2014
submittal returned to P &L.
5
Fairmont BPS Upgrade
Staff approved Preliminary
70% design submittal due
Design estimated to be
Budget: $6,000,000 Job No. 201011B
Design Report and
mid - April, 2014.
complete mid -2014.
Project Contact: Anthony Manzano
reviewed portion of 70%
Construction estimated to be
Planned Completion Date: Mid 2016
submittal.
complete mid -2016.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 1, 2014
New Information since Last Report is Shown in Red
IN PLANNING
Project
Current Status
Next Actions
Comments
Well 22 Site Acquisition
Staff completed preliminary
Select a site, seek Board
Staff's goal is to procure a
Budget: $450,000 Job No. 2009 -22 #22
water quality, geotechnical and
authorization, negotiate
site by late 2014 and
Project Contact: Anthony Manzano
field research for several
terms and enter into an
prepare to drill pilot hole.
Planned Completion Date: Late 2014
potential locations.
Agreement.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: April 1, 2014
New Information since Last Report is Shown in Red
PROPOSED DEVELOPMENT
Project
Current Status
Next Actions
Comments
1
Olson Co. T17489 (N. of Golden Ave., Placentia)
Developer continuing
Prepare Declaration of
Estimate 33 -unit condo tract
Budget: TBD Job No.: 201301
water facility construction.
Restrictive Covenants for
completion by 2016 -17.
Project Contact: Ariel Bacani
water main easement run.
2
Brandywine Homes T17548 (S. of Nixon Lib.)
Completed 1st Plan Check.
Continue plan check process,
Developer will negotiate
Budget: TBD Job No.: 201304
Generate Agreements & fee
easement acquisitions.
Project Contact: Ariel Bacani
schedule for execution.
3
Buy -Buy Baby (Savi Ranch)
Improvement Plans were
Developer's contractor will
Estimate construction start date
Budget: TBD Job No.: 201309
approved by District.
schedule preconstruction
early 2014 & building
Project Contact: Ariel Bacani
meeting with District.
completion early 2015.
4
Costco Gas Station /Mirage Street Vacation
After gas station design is
Seek Board approval for
Costco to complete new gas
Budget: TBD Job No. 201310
submitted, Agreement to
easement execution. Review
station & improvements by mid
Project Contact: Anthony Manzano
be executed.
design early to mid -2014.
to late 2014.
5
Yavitz Company — Valley View Retail
Developer submitted final
Developer to finalize Parcel
Estimate construction start date
Budget: TBD Job No.: 201313
Improvement Plans.
Map before District approves
in early 2014 & retail center
Project Contact: Ariel Bacani
Improvement Plans.
completion by 2015.
6
Shapell Homes T17652 (West of YLHS)
Received executed
Seek General Manager
Estimate construction start date
Budget: TBD Job No.: 201315
Agreements & payments.
approval of Plans.
mid 2014 & 49 -lot housing tract
Project Contact: Ariel Bacani
Awaiting Improvement
completion by 2018.
Plan mylars & Tract Map.