HomeMy WebLinkAbout2014-08-11 - Planning-Engineering-Operations Committee Meeting Agenda PacketYorba Linda
'"Water District
AGENDA
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Monday, August 11, 2014, 10:00 AM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. ROLL CALL
COMMITTEE STAFF
Director Gary T. Melton, Chair Steve Conklin, Acting General Manager
Director Michael J. Beverage John DeCriscio, Operations Manager
3. PUBLIC COMMENTS
Any individual wishing to address the committee is requested to identify themselves and state the matter on
which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for
their comment when the item is considered. No action will be taken on matters not listed on this agenda.
Comments are limited to matters of public interest and matters within the jurisdiction of the Water District.
Comments are limited to five minutes.
4. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
4.1. Amendment to Application to and Agreement with YLWD for Water Service with
Brandywine Homes
Recommendation: That the Committee recommend that the Board of Directors
authorize the Acting General Manager to approve the Amendment to Application to
and Agreement with YLWD for Water Service with Brandywine Homes, Job No.
201304.
4.2. Amendment No. 1 to the Professional Services Agreement with Stantec Consulting for
the Well 21 Wellhead Equipping Project
Recommendation: That the Committee recommend the Board of Directors approve
Amendment No. 1 to the PSA with Stantec Consulting Services, Inc., in the amount
of $87,966, which will increase the original contract amount of $147,258 to a total
revised contract amount not to exceed $235,224.
4.3. Brand Name Requirement for Richfield Gate Modifications
Recommendation: That the Committee recommend the Board of Directors approve
the Brand Name Requirement for the Richfield Gate Modifications Project for the
proposed gate shown on the attached Exhibit A.
4.4. Unbudgeted Sewer Pipeline and Manhole Capital Repairs
Recommendation: That the Committee recommend the Board of Directors
authorize staff to transfer an estimated $150, 000 from the Sewer Capital Reserve to
the Sewer Maintenance Account to fund these repairs.
4.5. Backhoe Purchase for Water Operations
Recommendation: That the Committee recommend the Board of Directors authorize
the Acting General Manager to make the purchase of (1) one Backhoe as listed
above and approved in the District's FY 2014115 Budget from Coastline Equipment
in the amount of $80,919.00.
4.6. Purchase of Ford F350 Service Truck
Recommendation: That the Committee recommend the Board of Directors authorize
the Acting General Manager to make the purchase of (1) one Cab & Chassis from
Elk Grove Ford in the amount of $25,017.74 and Service Body from Pacific Truck
Equipment in the amount of $33,800.90, as approved in the District's Budget for FY
2014 -2015.
5. DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar
items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda
may also include items for information only.
5.1. Status of Well Siting (Verbal Report)
5.2. Well Production Report (Verbal Report)
5.3. Monthly Groundwater Production and Purchased Import Water Report
5.4. Monthly Preventive Maintenance Report
5.5. Monthly Production Summary Report
5.6. Groundwater Producer Meeting Notes for July 2014
5.7. Status Report on Capital Projects in Progress
5.8. Future Agenda Items and Staff Tasks
6. ADJOURNMENT
6.1. The next Planning- Engineering- Operations Committee meeting is scheduled to be held
Thursday, September 4, 2014 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meetina
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the District's
internet website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 4.1
AGENDA REPORT
Meeting Date:
August 11, 2014
Budgeted:
N/A
Total Budget:
0
To:
Planning- Engineering-
Cost Estimate:
$25,000
Operations Committee
Funding Source:
Developer Funded
From:
Steve Conklin, Acting General
Account No:
1/2 -2600
Manager
Job No:
201304
Presented By:
Steve Conklin, Acting General
Dept:
Engineering
Manager
Reviewed by Legal:
N/A
Prepared By:
Ariel Bacani, Engineering
CEQA Compliance:
N/A
Technician II
Subject:
Amendment to Application to and
Agreement with YLWD for Water Service
with Brandywine Homes
SUMMARY:
Brandywine Homes is proposing to develop Tract 17548 into 51 condominium units on 5.12 acres.
The project is located near the southeast corner of Eureka Avenue and Yorba Linda Boulevard, as
shown in the attached Exhibit A. An amendment to the Application and Agreement with YLWD is
recommended to allow for replacement of a 1920s era 20 -inch steel transmission line.
STAFF RECOMMENDATION:
That the Committee recommend that the Board of Directors authorize the Acting General Manager
to approve the Amendment to Application to and Agreement with YLWD for Water Service with
Brandywine Homes, Job No. 201304.
DISCUSSION:
The District has existing Zone 2 water pipelines in Yorba Linda Boulevard and Eureka Avenue,
which are adequate in size and of sufficient pressure to serve the project. Staff requires the
applicant to extend the existing water main at Blair Drive to Eureka Avenue and provide a looped
water system from this extension to Yorba Linda Boulevard. The proposed development also
requires the abandonment of the onsite 1927 - installed 20 -inch steel transmission line.
The City of Yorba Linda issued its Grading Permit to Brandywine Homes in mid -June 2014. Prior to
grading, the applicant abandoned the onsite existing 20 -inch steel transmission line. During the
abandonment, it was revealed that the 20 -inch line was in poor condition. This same line extends
and terminates at the northern side of Yorba Linda Blvd. District Staff determined that approximately
50 ft. of the 20 -inch line needs to be replaced with a new 16 -inch ductile iron pipeline within the
Boulevard as shown in the attached Exhibit B. A meeting was held on July 28, 2014 where the
District and the applicant negotiated and agreed to share the replacement cost at a 65/35 ratio,
respectively. The design will be incorporated into the final Water and Sewer Improvement Plans and
an Amendment to the Application to and Agreement with YLWD for Water Service shall be executed
with Brandywine Homes.
The Amendment to Application to and Agreement with YLWD for Water Service with Brandywine
Homes are attached for your consideration.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors approved the Terms and Conditions for Water and Sewer Service with
Brandywine Homes on May 23, 2013.
ATTACHMENTS:
Name:
201304 Exhibit A.pdf
201304 Water Amendment DRAFT 07 -30 -14.0
Description:
Exhibit A
Amendment to Application to and Agreement with YLWD
for Water Service
Type:
Exhibit
Backup Material
201304 Exhibit B 2014- 07- 30.pdf Exhibit B Exhibit
EX. 16" WATER YORBA LINDA BLVD.
_��.w�. —_a .._
—-- 8"-5-- —
S —'6 -- --
EX.."—SEWER )
�� ®�iss�ss�s�a�ss�eb¢
gam_• --- - - - - --
-- {--- --Yr -. --
SSW
L�
JIM
PROPOSED
SEWER MAIN
PROPOSED
WATER MAIN
a
ro m, ss (V CCM311) OR GE D a
s r5
w --� 18083 18083
Z.VD VACM PRO ECT
" A �' LINDA LOC TION
teoea 3
fs
z
i
i e Q A
BLAIR
.. _ �74 =L= < ,
CALGARY A s o
-- o
— rt6°Y� -- -62* - -- 6
GLAIR DR (PRIVATE ST) I� EX. 6" WATER MAIN
PROPOSED SEWER MAIN
PROPOSED ^
WATER MAIN taoaz teoe2 18082 G' //jllflj� \v
EXTENSION EXIST. SERVICES TO VICINITY MAP
BE RELOCATED NOT M SCALE
5112 NORTH
EXIST. 20" /
PROPOSED TRANSMISSION
SEWER MAIN LINE TO BE _
EXTENSION ABANDONED /
/
EXIST. a.
;h
SEWER MAIN
cp
I
PREPARED BY:
YORBA LINDA WATER DISTRICT
1717 E. MIRALOMA AVENUE
PLACENTIA, CALIFORNIA 92870
(714) 701 -3100
EXHIBIT "A"
PROPOSED WATER AND SEWER IMPROVEMENTS
FOR TRACT 17548
BRANDYWINE HOMES
SCALE:
N.T.S.
DATE:
8/7/2014
FILENAME:
J- 201304
YLWD File J2013 -04
Page No. 1 of 1
Agreement with Covington Group, LLC
Date: 07/30/2014
Amendment to: "Application to and Agreement with the Yorba Linda Water District for Water Service ".
This amendment revises Section 1.1 to include the following
applicant:
facilities to be built by the
Approximately 54 feet of 16" DIP water line with restrain 20" X 16" DI reducer, two 16"
90° DI bends, thrust blocks and all required appurtenances onnec LWD's existing 16" waterline
(complete and in place) as shown on the attached Exhibit A. The Curren 1 construction cost estimate
is $38,303.00; the final dollar amount for this work will be negotiated be randywine and
Brandywine's contractor. Brandywine agrees to pay 35% of this total (curren imated to be $13,406)
and YLWD agrees to pay 65% of the final total (currently estimated to be $24,8 he District shall
reimburse Brandywine upon project com letion and review of submitted invoice /st nt.
Covington Group, LLC.
The foregoing Amendn
accepted and approved.
YORBA LINDA WATER DIS
Date
320
Steve Conklin, P.E. Date
Acting General Manager
hereby
EX. 20" STEEL CUT & PLUG-
CUT & PLUG
W6 W7 W9A
8 "W --i \/ k- f, 16 "W
( *)VERTICAL ( *)VERTICAL
EX. 16" ACP
DETAIL "A"
N.T.S.
I�EX. 16" ACP
CUT & PLUG AT
WATER CONSTRUCTION NOTES
W9B EX. 20 "x16" TEE
W2
REMOVE INTERFERING PORTION AND INSTALL 16" TEE
INSTALL 8" PVC (C900 CL305) WATER LINE PER YLWD STD.
DWG W -11
C° W9A W14
W5A
INSTALL 16" DIP (CL 350) WATER LINE WITH RESTRAINT JOINTS
AND PIPE JOINT BONDING PER YLWD STD. DWG. CP -10 AND
W5A t7 LF
WRAP WITH 2 LAYERS OF POLYETHYLENE ENCASEMENT
W6
INSTALL 8" GATE VALVE PER YLWD STD. DWG. W -8
±36 LF
W7
INSTALL 16" BUTTERFLY VALVE PER YLWD STD. DWG. W -8
W9
INSTALL 16 "x8" REDUCER
W9A
INSTALL 16" 90' ELBOW
W9B
INSTALL 20 "06" REDUCER WITH 20" INSULATING FLANGE KIT
PER YLWD STD. DWG. CP -13
W12
INSTALL 8" 45' ELBOW
W14
CONSTRUCT THRUST BLOCK PER YLWD STD. DWG. W -12
ITEM NO. 4.2
AGENDA REPORT
Meeting Date:
August 11, 2014
Budgeted:
No
Total Budget:
$150,000
To:
Planning- Engineering-
Cost Estimate:
$235,224
Operations Committee
Funding Source:
All Water Funds
From:
Steve Conklin, Acting General
Manager
Job No:
200922
Presented By:
Steve Conklin, Acting General
Dept:
Engineering
Manager
Reviewed by Legal:
N/A
Prepared By:
Alex Thomas, Water Quality
CEQA Compliance:
Pending
Engineer
Subject:
Amendment No. 1 to the Professional Services Agreement with Stantec
Consulting for the Well 21 Wellhead Equipping Project
SUMMARY:
Staff requested a letter proposal from Stantec Consulting Services, Inc. to provide additional
services for engineering design, bidding support and construction management of a well collection
pipeline running along Richfield Road from a tie -in location south of La Palma Avenue to a tie -in
location at the northeast boundary of the YLWD Richfield Plant. The existing 16 -inch collection main
along Richfield Road, servicing Well No. 11 & 20, cannot accommodate the estimated additional
flow of 3,000 gpm from Well No. 21 and therefore a parallel pipeline providing sufficient capacity for
Well No. 21 and future wells is necessary.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve Amendment No. 1 to the PSA with
Stantec Consulting Services, Inc., in the amount of $87,966, which will increase the original contract
amount of $147,258 to a total revised contract amount not to exceed $235,224.
DISCUSSION:
Based on the established production rate of Well No. 20 and the proposed production rate of Well
No. 21, the existing 16 -inch diameter pipeline in Richfield Road does not have sufficient capacity
between Well No. 21 and the YLWD Richfield Plant. Therefore, a new collection pipeline with
diameters of 20 -inch, 24 -inch and 36 -inch is required to accommodate flow from Well No. 21, future
well flows and increasing capacity of the existing well collection system at the YLWD Richfield Plant.
In addition, several proposed improvements will be designed for the chemical feed system at the
YLWD Richfield Plant to properly dose raw ground water collected from Well No. 21 and future
wells.
Staff has reviewed the letter proposal and finds the proposed scope of work and the cost of
$87,966.00 to be necessary and reasonable. A copy of the letter proposal with fee schedule is
attached for reference.
STRATEGIC PLAN:
SR 3 -B: Continue Planning for Long Term Capital Improvements and Replacements into the future
PRIOR RELEVANT BOARD ACTION(S):
On October 10, 2013, the Board of Directors authorized execution of a Professional Services
Agreement with Stantec Consulting Services, Inc. to provide engineering design, bidding
support services, and construction management for Wellhead Equipping of YLWD Well No. 21
in the amount not to exceed $147,258.
ATTACHMENTS:
Description: Type:
Stantec Consulting Amendment No. 1.pdf Stantec Consulting Amendment No. 1 Backup Material
Stantec Consulting Services Inc.
August 4, 2014
File: 2042496800
Attention: Alex Thomas, PE
Yorba Linda Water District
1717 E. Miraloma Avenue
Placentia, CA 92670
Dear Alex,
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline
and Richfield Plant Chemical Feed System Improvements
BACKGROUND
Stantec Consulting Services Inc. (Stantec) is currently providing the Yorba Linda Water District
(YLWD) with engineering design services for the wellhead equipping of Well No. 21. Our current
scope of work includes the design of a proposed 16 -inch diameter pipeline from the wellhead
facilities to an existing 16 -inch pipeline in Richfield Road along the northern edge of Conrock
Basin.
Based on the established production rate of Well No. 20 and the proposed production rate of Well
No. 21, the existing 16 -inch diameter pipeline in Richfield Road does not have sufficient capacity
between the Well No. 21 and the YLWD Richfield Plant. Therefore, a new transmission main is
required. We understand that the YLWD has determined that the new Richfield Road
transmission main should have a diameter of 2o- inches between the Well No. 2116 -inch
discharge pipeline and La Palma Avenue. It will then increase to a 24 -inch diameter between La
Palma Avenue and Miraloma Avenue. The pipeline will join an existing 24 -inch pipeline and
increase in diameter to 36- inches between this connection point and the northeast boundary of
the YLWD Richfield Plant. The northern terminus of this proposed Richfield Road 36 -inch
transmission main will connect to the existing 36 -inch CML &C steel pipeline near the northeast
boundary of the YLWD Richfield Plant. The total length of the proposed pipeline will be
approximately 2,000 lineal feet (LF).
In addition, several proposed improvements will be designed for the chemical feed system at the
YLWD Richfield Plant. These are summarized as follows:
• A northern system chemical feed line from the existing sodium hypochlorite building to an
existing, unused injection vault
• A northern feed system sampling line from the existing sodium hypochlorite building to
the proposed 36 -inch Richfield Road transmission main
Design with community in mind
38 Technology Drive Suite 100
Sta ntec
Irvine CA 92618 -5312
Tel: (949) 923 -6000
Fax: (949) 923 -6121
August 4, 2014
File: 2042496800
Attention: Alex Thomas, PE
Yorba Linda Water District
1717 E. Miraloma Avenue
Placentia, CA 92670
Dear Alex,
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline
and Richfield Plant Chemical Feed System Improvements
BACKGROUND
Stantec Consulting Services Inc. (Stantec) is currently providing the Yorba Linda Water District
(YLWD) with engineering design services for the wellhead equipping of Well No. 21. Our current
scope of work includes the design of a proposed 16 -inch diameter pipeline from the wellhead
facilities to an existing 16 -inch pipeline in Richfield Road along the northern edge of Conrock
Basin.
Based on the established production rate of Well No. 20 and the proposed production rate of Well
No. 21, the existing 16 -inch diameter pipeline in Richfield Road does not have sufficient capacity
between the Well No. 21 and the YLWD Richfield Plant. Therefore, a new transmission main is
required. We understand that the YLWD has determined that the new Richfield Road
transmission main should have a diameter of 2o- inches between the Well No. 2116 -inch
discharge pipeline and La Palma Avenue. It will then increase to a 24 -inch diameter between La
Palma Avenue and Miraloma Avenue. The pipeline will join an existing 24 -inch pipeline and
increase in diameter to 36- inches between this connection point and the northeast boundary of
the YLWD Richfield Plant. The northern terminus of this proposed Richfield Road 36 -inch
transmission main will connect to the existing 36 -inch CML &C steel pipeline near the northeast
boundary of the YLWD Richfield Plant. The total length of the proposed pipeline will be
approximately 2,000 lineal feet (LF).
In addition, several proposed improvements will be designed for the chemical feed system at the
YLWD Richfield Plant. These are summarized as follows:
• A northern system chemical feed line from the existing sodium hypochlorite building to an
existing, unused injection vault
• A northern feed system sampling line from the existing sodium hypochlorite building to
the proposed 36 -inch Richfield Road transmission main
Design with community in mind
UN
August 4, 2014
Alex Thomas, PE
Page 2 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
• A northern feed system chlorine analyzer tap and pre -cast concrete vault in Richfield Road
• A northern feed system chlorine line from the existing sodium hypochlorite building to the
proposed 36 -inch Richfield Road transmission main
• A northern feed system chlorine injection tap and pre -cast concrete vault in Richfield Road
Based on our experience, different construction contractors are more proficient at pipeline
construction than those that construct mechanical and electrical improvements, such as the
wellhead facilities. Therefore, the construction will be separated into two bid packages. The first
bid package will include the wellhead facilities. The second bid package will include the Richfield
Road transmission main, the well discharge pipeline from Richfield Road to the well, and the
northern chemical feed system improvements.
PROPOSED SCOPE OF WORK
TASK 1: PRELIMINARY ENGINEERING
A. Data Review
We will review the record drawings of the District's pipelines in Richfield Road between the
Orange County Water District recharge basins and the northern boundary of the YLWD Richfield
Plant, and other miscellaneous and applicable reports necessary to prepare the project
documents.
Site Survey and Site Visit
We will complete a topographic survey map of Richfield Road from the proposed location of the
Well No. 21 discharge pipeline to the northern boundary of the YLWD Richfield Plant in the latest
version of AutoCAD. This survey data will be used to generate the base maps for the pipeline
alignment in Richfield Road and for the proposed chemical feed system improvements. The
survey data will have a suitable accuracy for 4o -scale design with 1 foot vertical contours.
We will conduct a site reconnaissance to identify existing conditions that may affect the design
and construction of the proposed pipeline and northern chemical feed system. All field culture
reviews in proximity of the work will be verified to ascertain that the field survey is complete.
C. Utility Coordination
We will conduct complete utility coordination to construct the new Richfield Road transmission
main. We will also perform USA Dig -Alert research. Additionally, we will request record drawings
for all existing and proposed facilities in vicinity of the proposed pipeline and the northern
chemical feed system. We will maintain a log that includes the dates that data requests are sent,
and received, and any second data requests are made.
Design with community in mind
(3
August 4, 2014
Alex Thomas, PE
Page 3 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
TASK 2: CEQA DOCUMENTATION
Task 2.1 - Prepare Administrative Draft IS /MND
Our current scope of work includes the preparation of an Administrative Draft Mitigated Negative
Declaration (MND) that complies with the CEQA Guidelines for the Well No. 21 wellhead and
pipeline to Richfield Road. This new task will include expanding the Administrative Draft MND to
include the proposed Richfield Road transmission main and the northern chlorination feed
system improvements.
Upon review of comments received during the public review period and consultation with the
District, the Final MND for the District will include the Richfield Pipeline and the chlorination
system improvements.
TASK 3: PREPARATION OF PLANS AND SPECIFICATIONS
A. Construction Drawings
We will prepare detailed design plans for construction. The plan and profile sheets will be
completed at a horizontal scale of 1" = 2o' and a vertical scale of 1" = 4'. The District's standard
details will be used where appropriate.
To support the construction, traffic control plans will be created for the work in Richfield Road.
These plans will be reviewed with the cities of Anaheim and Placentia.
B. Technical Specifications
We will prepare detailed technical specifications to support the transmission main drawings as
specified above and complete the project elements. We will integrate the existing District standard
specifications and standard drawings where applicable. For technical specifications not included
in the District's standard specifications, we will provide stand -alone CSI format specifications.
We will also incorporate the latest District front -end contract documents and general provisions.
We have assumed that the District will provide a digital copy of their front -end documents in
Microsoft Word for our review and modification for the construction bid package.
Last, we will develop project specific special provisions for the bid package. We will provide a
table of contents as part of our 70 percent complete submittal. We will provide the technical
specifications for the go percent and loo percent complete submittals.
C. Additional Project Status Meeting During Design Phase
We will attend, participate, and prepare meeting agendas and minutes for three additional project
status meetings with District staff. The agendas will be prepared and distributed at least three
days before the meeting. We will discuss the topics of discussion with the District's project
manager to make sure that the right District staff members are invited to each meeting. The
Design with community in mind
UN
August 4, 2014
Alex Thomas, PE
Page 4 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
meeting minutes will include all action items and team member responsibilities as well as the
discussion items. Draft minutes will be distributed for comment within three days of each
meeting.
TASK 4: LEGAL AND CONTRACT DOCUMENTS
A. Review and Incorporate Front -End Documents
We will review and complete the District's contract documents, bid forms, and general provisions.
We will incorporate the Special Provisions and Technical Specifications into a complete pipeline
and chemical feed system improvements bid package ready for competitive bidding.
TASK 5: ESTIMATES AND BID DOCUMENTS
A. Engineer's Opinion of Probable Construction Cost
We will prepare a detailed Engineer's Estimates of Probable Construction Costs for the new
Richfield Road transmission main and northern chemical feed system improvements. The
estimate will provide a one to one correspondence between the engineer's cost estimate and the
bid schedule in the contract specifications. Our estimate will be prepared by a senior engineer who
has extensive experience in the design and construction of water transmission mains.
B. Bid Documents
We will prepare a set of original Specifications and Contract Documents for the transmission
mains and chemical feed system improvements, suitable to be reproduced for receiving
competitive bids. The Bid Documents will include bid and contract documents, general, special
and technical provisions, standard plans and a complete set of full scale 24 inch by 36 inch
construction drawings.
C. Assist with Bidding Process and Award
We will assist the District in the bidding and award of the contract document for the pipeline
project. Our services will include the following:
• Answer contractors questions
• Issue addenda
• Review bids
• Assist the District in recommending award of contract
Design with community in mind
August 4, 2014
Alex Thomas, PE
Page 5 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
D. Project Deliverables
We will provide the following deliverables to the District:
• Plans including all utility information plotted onto the AutoCAD generated base maps with
a proposed pipeline horizontal alignment and locations for potential potholes for the 30
percent complete submittal stage
• Plans, design calculations, and outline of technical specifications for the 70 percent
complete submittal stage
• Plans, technical specifications, engineer's estimate of probable construction costs, and
special provisions for the go percent complete and loo percent complete submittals.
• Final Engineer's Estimate of Probable Construction Cost
• Signed Mylar drawings for the loo percent complete construction drawings and AutoCAD
format CD disks
• One set of 24 inch by 36 inch reproducible original Contract Documents suitable for the
District to reproduce for receiving competitive bids, including Specifications and Plans,
five full -size sets of 24 inch by 36 inch drawings, a CD disk, and five sets of ii inch by 17
inch reduced -size drawings
E. Potholes (Optiona�
Based on our initial research, Richfield Road is very congested with existing buried utilities
between Conrock Basin and the northeast boundary of the YLWD Richfield Plant. While the
contractor will be required to pothole existing utilities before installation of the transmission
main, it may be beneficial to pothole some of the proposed utility crossings during the design
phase. Until the utility research is completed and a pipeline alignment selected, it cannot be
determined which utilities should be potholed. As such, this proposed scope of work assumes that
six (6) potholes will be required. However, Stantec will not commence with this subtask until
written concurrence is obtained from YLWD.
TASK 6: CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
A. Meetings
We will attend the pre- construction meeting for the pipeline and chemical feed system
improvements, and assist the District in responding to questions related to the design.
We will attend, participate, and prepare meeting agendas and minutes for four project
construction progress meetings with the contractors and District staff. The agendas will be
Design with community in mind
August 4, 2014
Alex Thomas, PE
Page 6 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
prepared and distributed at least three days before the meeting. The meeting minutes will include
all action items and team member responsibilities as well as the discussion items. Draft minutes
will be distributed for comment within three days of each meeting.
B. Shop Drawing Review
We will review and process project shop drawings /submittals. For this construction project, we
have assumed 12 submittals and 6 re- submittals.
C. Construction Support Services
We will perform the following services to support the construction of Richfield Road transmission
main and northern chemical feed system improvements:
• Develop design modifications as requested by the District
• Provide construction staking services for the transmission main
• Review and respond to RFIs; for these construction projects, we have assumed 7 RFIs
• Evaluate the acceptability of substitute material and equipment proposed by the
contractor and provide recommendations to the District
• Identify, document, and mitigate field conflicts that are brought to our attention by the
contractor or the District's inspector
• Evaluate the contractors' change order requests and monthly progress payment requests,
and make recommendations to the District for approval; we will assist in the negotiation of
2 contractor change order requests and 6 monthly progress payment requests
• Prepare a final punch list items to be completed and corrected by the contractor
• Participate in the final walk through the project
• Provide a written recommendation for project acceptance
• Prepare record drawings along with the digital electronic file in the latest versions of
AutoCAD
Design with community in mind
(3
August 4, 2014
Alex Thomas, PE
Page 7 of 7
Reference: Change Order Request to Provide Design Services for Richfield Road Pipeline and Richfield
Plant Chemical Feed System Improvements
PROPOSED BUDGET
Stantec proposes to complete the scope of work described above as a change order to our existing
contract. We respectfully request an engineering budget of $87,966. A detailed project budget is
attached for your information.
Please let me know if you would like any additional information. We look forward to adding these
important components to the Well No. 21 system.
Best regards,
STANTEC CONSULTING SERVICES INC.
; ro�L )6xv;e
Robert Reid, PE, CPA
Senior Associate
Phone: (949) 923 -6037
Fax: (949) 923-6121
Robert.Reid@stantec.com
Attachment: Proposed Pipeline and Richfield Plant Chemical Feed Improvements Budget
c. Steve Conklin
Bob Seeman
stante v:\projects \2o42496800 \management \contract \change orders \let_coi_draft.docx
YORBA LINDA WATER DISTRICT
Richfield Pipeline and Richfield Plant Chemical Feed Improvements
Proposed Project Budget
Hourly Rate
Task 1: Preliminary Engineering Services
i
Stantec
0
Engineering
M
LLJ
Stantec
Environmental
r
CA
UJ
Stantec
Survey
>]-6
0
A. Data Gathering and Review
1
3
4
$640
$640
B. Alignment Survey and Site Visit
1
4
3
1
4
9
22
$3,922
$4,400
$8,322
C. Utility Coordination
2
10
12
$1,470
$1,470
Task 1 Subtotal
0
2
9
13
0
0
0
0
0
0
1
4
9
38
$6,032
$4,400
$10,432
Task 2: CECIA Documentation
2
4
4
10
$1,514
$1,514
Task 3: Preparation of Plans and Specifications
A. Construction Drawings (13)
3
10
40
98
118
269
$30,272
$8,000
$38,272
B. Technical Specifications
1
4
8
2
15
$2,268
$2,268
C. Project Status Meetings during Design Phase (3)
6
6
12
$1,980
$75
$2,055
Task 3 Subtotal
4
20
54
98
118
2
0
0
0
0
0
0
0
296
$34,520
$8,075
$42,595
Task 4: Legal and Contract Documents
1
2
2
1
6
$786
$786
Task 5: Estimates and Bid Documents
A. Engineer's Estimate of Probable Construction Cost
2
6
4
12
$1,744
$1,744
B. Bid Documents
1
2
4
2
4
13
$1,401
$1,401
C. Assist with Bidding Process and Award
2
4
1
7
$1,039
$1,039
D. Project Deliverables
2
2
4
$314
$1,700
$2,014
E. Potholes (6) (Optional)
1
2
3
$485
$6,365
$6,850
Task 5 Subtotal
0
6
14
8
4
7
0 0
0
0
0
0
0
39
$4,983
$8,065
$13,048
Total Design Services (Tasks 1 -5)
4
31
79
121
122
10
4 4
0
9
389
$47,835
$20,540
$68,375
Task 6: Construction Management and Inspection Services
A. Meetings (4)
12
12
$2,100
$2,100
B. Shop Drawing Review (12)
2
6
6
14
$1,976
$1,976
C. Construction Support Services
8
37
8
18
0
2
8
18
99
$15,205
$310
$15,515
Task 6 Subtotal
GRAND TOTAL
0
22
43
14
18
0
0
0
0
0
2
1 8
18
125
$19,281
$310
$19,591
Meeting Date
To:
From:
Presented By
Prepared By:
Subject:
SUMMARY:
AGENDA REPORT
August 11, 2014
Planning-Engineering-
Operations Committee
Steve Conklin, Acting General
Manager
Steve Conklin, Acting General
Manager
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Job No:
Dept:
Reviewed by Legal:
Bryan Hong, Associate Engineer CEQA Compliance:
ITEM NO. 4.3
Yes
$55,000
$55,000
Operating Funds
2014 -10
Engineering
N/A
N/A
Brand Name Requirement for Richfield Gate Modifications
During the project design, District staff determined that the new swing gate operator at Richfield
Road should match the existing gate already in use at Miraloma Avenue. Previously, legal counsel
determined that per the Public Contract Code Section 3400, a Board finding is required to approve a
brand -name requirement.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors approve the Brand Name Requirement for
the Richfield Gate Modifications Project for the proposed gate shown on the attached Exhibit A.
DISCUSSION:
Prior to the design process, District staff determined that the existing gate at Richfield Road was not
installed with the proper setback from the street. It is also anticipated that traffic will be detoured to
Richfield Road when Lakeview Avenue is closed during construction of the Lakeview Avenue
Railroad Grade Separation Project. Therefore, District staff determined that the existing sliding gate
shall be replaced with a new swing gate at an appropriate location further away from the street.
During the design process, District staff determined that the new swing gate operator (the
manufacturer's reference cut -sheet is attached) at Richfield Road should match the manufacturer
and model type of the swing gate already in use at Miraloma Avenue. Previously, legal counsel
informed District staff that a brand -name requirement cannot be used unless the Board makes a
finding per Public Contracts Code Section 3400 that the brand name requirement is necessary in
order to match other products already in use by the District. An exhibit showing the proposed gate
for the Richfield Gate Modifications Project is attached.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors approved a budget in the amount of $55,000 for the Richfield Gate
Modifications Project, Job No. 2010 -14.
ATTACHMENTS:
Name: Description: Type:
Exhibit A.pdf J2014- 10_Exhibit A Backup Material
Cutsheet SwingRiser D0541.pdf Swing Gate Operator Cut -Sheet Backup Material
PROPOSED WROUGHT IRON FENCE
(MATCH EXISTING)
i
PROPOSED 14' WIDE SWING GATE
HYSECURITY SWINGRISER MODEL
PART NO. HRG 222 -B ST
I PROPOSED CONCRETE ISLAND
(00 oo
i PROPOSED 14' WIDE SWING GATE
HYSECURITY SWINGRISER MODEL
PART NO. HRG 222 -B ST
ro — — — — — —
PROPOSED WROUGHT IRON FENCE
(MATCH EXISTING)
BLDG #1
70'
PROPERTY LINE �I
I
/� REMOVE AND DISPOSE
----------REMOVE
EXISTING SLIDING GATE
' REMOVE EXISTING
i CONCRETE ISLAND
i
Q
ry
0
J
Lu
IL
2
U_
I I I-LIS IVI
• Moves up to 16 ft /3,000 lb
(5 m/1,361 kg) leaf with ease
• Graceful, smooth lift and swing
clears obstacles like snow, rocks,
curbs and road inclines
• Raises gate leaf a full 12 in
(30 cm) during the gate open cycle
• 14 to 30 second open /close time
• Lock gate mechanically with
optional locking pin that locks
into receptacle when gate gently
lowers at end of its cycle
• Seamless synchronization with
all HySecurity operators for dual
gate, sally port or sequenced
applications
i
1 �' n .�
v
I�
L
VIP Resident
M Post
nights
I PUMP
manual
:ion.
Swing Gate Operator
SMART TOUCH CONTROLLER provides the ultimate in
reliability, configurability and system troubleshooting.
VANDAL RESISTANT OPERATOR and remotely located
pump and electrical enclosure provide the highest
security swing gate operator available.
SwingRiser 14 single SwingRiser 19 single SwingRiser 30 single
SwingRiser 14 -twin SwingRiser 19 -twin SwingRiser 30 -twin
1,000 lb (453 kg) gate 1,600 lb (726 kg) gate 3,000 lb (1,361 kg) gate
14 second open 19 second open 30 second open
Up to 9 ft (3 m) wide each leaf Up to 16 ft (5 m) wide each leaf Up to 16 ft (5 m) wide each leaf
EXTREMELY RELIABLE
HYDRAULICS contain
i
only one gallon of
high performance
environmentally friendly
hydraulic fluid. Operates
without fail in hottest
INSIDE o
and coldest climates.
CONTROLS. &
HYDRAULIC
ENCLOSURE
INDUSTRIAL GRADE
COMPONENTS
ensure extremely low
�►
maintenance and
exceptionally long life.
VANDAL RESISTANT OPERATOR and remotely located
pump and electrical enclosure provide the highest
security swing gate operator available.
SwingRiser 14 single SwingRiser 19 single SwingRiser 30 single
SwingRiser 14 -twin SwingRiser 19 -twin SwingRiser 30 -twin
1,000 lb (453 kg) gate 1,600 lb (726 kg) gate 3,000 lb (1,361 kg) gate
14 second open 19 second open 30 second open
Up to 9 ft (3 m) wide each leaf Up to 16 ft (5 m) wide each leaf Up to 16 ft (5 m) wide each leaf
1 Distributed by: D
I ,
e
See the latest from HySecurity at www.hysecurity.com
HySecurity operators secure the world's critical
infrastructure and key assets where ultimate reliability
is vital. SwingRiser delivers uncompromising quality
to industrial customers worldwide, where ease of use,
consistent operation, low maintenance, long life and
high reliability is expected.
SIMPLE. HySecurity strives for simplicity. Easy to
install. Easy to configure. Easy to maintain. Easy to
troubleshoot and repair.
RELIABLE. HySecurity operators last decades under
the harshest climates and user conditions.
SECURE. HySecurity is the most used operator on
critical infrastructure sites such as nuclear power
plants, high security government agencies, embassies,
ports, airports, and much more.
12 SwingRiser m Models
TROUBLESHOOT AND PROGRAM USING
SMART TOUCH CONTROLLER AND S.T.A.R.T.
■ Microprocessor -based (Non -PLC)
■ 21 field configurable inputs
■ 3 field configurable user relay outputs*
■ 4 plug -in HY -5A vehicle
detector sockets LCD
■ RS -485 and RS -232 Display
■ Date & time stamped fault ID
logs, errors and security
alerts I.
■ PC interface provided for
easy configuration and quick
troubleshooting using Smart
Touch Analyze and Retrieve
Tool(S.TA.R.T)
*Hy8Relay option available. Provides r
eight additional programmable Smart Touch Controller Keypad
user relay outputs
UPS Backup Models
SwingRiser 14 SwingRiser SwingRiser 19 SwingRiser SwingRiser 30 SwingRiser
UPS Backup* UPS* 14 -Twin UPS* UPS* 19 -Twin UPS* UPS* 30 -Twin UPS*
*1000 cycles /day, 3/4 hp
HY -SA Vehicle /
Detectors (up
to 4) plug into
sockets
Smart Touch Controller Board
SwingRiser TM Post
Auxillary Hinge
Access
Panels
Hydraulic +
and Electrical
Connections
12 "x12"
(30 x 30 cm)
Base
Operator mechanism
completely enclosed
in post
OPTIONAL ACCESSORIES: HY -5A intelligent vehicle detectors. Custom post height. Heater.
1,000 lb gate, 14
second open
1,600 lb gate, 19
second open
3,000 lb gate,
30 second open
"-'%
Single Leaf
Twin
Single Leaf
Twin
Single Leaf
Twin
Model
SwingRiser 14
SwingRiser
SwingRiser 19
SwingRiser
SwingRiser 30
SwingRiser
14 -Twin
19 -Twin
30 -Twin
Part #
HRG 220 -A ST
HRG 222 -A ST
HRG 220 -B ST
HRG 222 -B ST
HRG 220 -C ST
HRG 222 -C ST
Duty Cycle
Continuous
Horsepower
1 hp 2 hp 1 hp 1 2 hp 1 hp 2 hp
Drive
Hydraulic
Gate Length Max.
Up to 9 ft (3 m)
Up to 9 ft (3 m)
Up to 16 ft (5 m)
Up to 16 ft (5 m)
Up to 16 ft (5 m)
Up to 16 ft (5 m)
wide
wide each leaf
wide
wide each leaf
wide
wide each leaf
Gate Weight Max.
1,000 lb (453 kg)
1,000 lb (453 kg)
1,600 lb (726 kg)
1,600 lb (726 kg)
3,000 lb (1,361 kg)
3,000 lb (1,361 kg)
/ leaf
Open/Close Time
14 seconds
19 seconds
30 seconds
Temperature
-40° F to 158° F ( -40° C to 70° C) using environmentally friendly Uniflow fluid
Rating
115/208/230V
208/230V 60 Hz
115/208/230V
208/230V 60 Hz
115/208/230V
208/230V 60 Hz
1 Phase Power
60 Hz
220V 50 Hz
60 Hz
220V 50 Hz
60 Hz
220V 50 Hz
110/220V 50 Hz
110/220V 50 Hz
110/220V 50 Hz
3 Phase Power
208/230/460/575 60 Hz, 220/380 50 Hz
Communication
RS -232, RS -485, Ethernet option
User Controls
Smart Touch Controller with 70+ configurable settings.
Smart Touch keypad and display or a PC using S.T.A.R.T. software.
Relays
Three configurable user relays: one 30VDC, 3A solid state and two 250VAC, 10A electromechanical
ETL Listed (UL325)
Usage Class I, II, III, IV
Warranty
1 5 year
UPS Backup Models
SwingRiser 14 SwingRiser SwingRiser 19 SwingRiser SwingRiser 30 SwingRiser
UPS Backup* UPS* 14 -Twin UPS* UPS* 19 -Twin UPS* UPS* 30 -Twin UPS*
*1000 cycles /day, 3/4 hp
HY -SA Vehicle /
Detectors (up
to 4) plug into
sockets
Smart Touch Controller Board
SwingRiser TM Post
Auxillary Hinge
Access
Panels
Hydraulic +
and Electrical
Connections
12 "x12"
(30 x 30 cm)
Base
Operator mechanism
completely enclosed
in post
OPTIONAL ACCESSORIES: HY -5A intelligent vehicle detectors. Custom post height. Heater.
Gate rises a°, then
rotates while rising
Compatible with most access control devices, safety, vehicle detection, and other accessories.
an additional s° to
SYSTEM DESIGN SUPPORT Contact HySecurity for CAD drawings, tech manuals, help with
full open
1
custom site requirements or other specifications support. Download operator specifications
"-'%
online at www.hysecurity.com or call to speak with a HySecurity representative today.
(10 cm)
Contact HySecurity for an operator /parts distributor near you.
;a HySecurity phone 800 - 321 -9947 fax 888 - 321 -9946
Simple. Reliable. Secure.® www.hysecurity.com • info@hysecurity.com
Bracket
Bearing
Shaft and Cam
� Followers
'I Hydraulic
Cylinder
Limit Switches
HydraSupply
/ pin
1 12"
I (30 cm)
c (1� us
Intertek
D0541 031714
ITEM NO. 4.4
AGENDA REPORT
Meeting Date: August 11, 2014 Budgeted: No
To: Planning- Engineering- Operations Cost Estimate: $150,000
Committee
Funding Source: Sewer Capital
Reserves
From: Steve Conklin, Acting General
Manager
Presented By: John DeCriscio, Operations Dept: Operations
Manager
Reviewed by Legal: N/A
Prepared By: John DeCriscio, Operations CEQA Compliance: N/A
Manager
Subject: Unbudgeted Sewer Pipeline and Manhole Capital Repairs
SUMMARY:
The Operations Department has identified several small capital sewer repair projects that should be
addressed but were not included in the FY 2014/15 Capital Outlay Budget. Staff is estimating a cost of
$150,000 to perform these repairs. Because these repairs weren't identified in the 2014/15 Budget,
staff is required to receive Board authorization prior to transferring from the Sewer Capital Reserves to
Sewer Maintenance account. Currently the Sewer Capital Reserve Fund has $1,377,000 to cover
these type of repairs.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize staff to transfer an estimated
$150,000 from the Sewer Capital Reserve to the Sewer Maintenance Account to fund these repairs.
DISCUSSION:
While cleaning the main line sewer on Highland Avenue staff identified a sewer manhole that was
paved over. This manhole needs to be brought up to grade and completed per the District's manhole
standard specifications. This repair initiated a discussion within the Operations Department that
identified several other small sewer repair projects that staff would like to move forward with in FY
2014/15. These projects include Highland manhole repair, Kellogg manhole repair, and approximately
1000 linear feet of sewer pipe lining at four to six locations throughout the District. (Rose Dr., Village
Center, Yorba Linda Blvd., and the flood control channel in the western portion of the District).
ATTACHMENTS:
Kellogg Dr. Manhole Repair.pdf
Description:
Kellogg Dr. Manhole Repair
Highland Ave. Missing Manhole k -9 -80 thru k- 9- 81.pdf Highland Ave. Manhole Repair
Type:
Backup Material
Backup Material
Yvrba U!"cia Water District
T 3 1995
g 90, cA
965785
4 \ ° 011V 00 0 �oo2y6
IV ' 1975 T- @
\ 2� 200
MH -Jll -045
1990
'�
\ w
921781
954154
2
i cbo
T- @
o 50
T -10' S/O
/ o) 45
MH -Jll -045 �,
M H -J l l -045
5 ¢� o� o°' 5111 5131
t� 3
\..
m
43 roo ,� -
1970
°�° oo,�.
cb 9358726 915550
h ryN T -21T NE /O
T
°�
2 1955 `�
943930
-190' -048 MH -Jll -048 5151
6 <n -
o cV ° \° MH -J11 -048 4
925153 a o
T -89' N/O
lle�l
T -14' S/O
MH -J11 -045
�0 Q) "? 5 01 v� 952519
c+� `V "�
NEIO Q' T -222' NE /O 5171 5
�V
MH -J11 -044 - �
CO ^
1950
7
-114' MH -Jl l -048
va a MH -Jll -048 938302
1935 ^0 933694 V ^ 917239 O�
co T -59' N/O 'I cb PA$E� T -22T NE /0
967990 965854 /�, `b
T -4' N/O % N M H -J 11 -044
275.84
coy MH- J11048
47 o 51
5191
1 MH -J11 -044 -
49 VCP J -1004 JUN 1979
934666
T- @
923551
f T -147' SW g 284.7 —
MH -J11 051
— — - - - - 1
184' 0.4% MH -J11-
47
3
275:26 -235 1920
BRANDON CIR
1921 8" VCP J -8808 1988
cn �
10
48 �. 946795
11
960745 _ 08 1988
88
.M V
° 1913
N
8
T -26' S/0 "VCP 0.4%
50
^rn �
^� a � 912772
1909
1917
'
M H -J 11 -048
3
`�' to 0 931 069 ir � 9
917809
59
�g70 5, p 32°'° p
46
299.49 I
I
<° v LU + 1908 4 1909
a,
° C a 2 805 _ 962566 951709
6
J -52 267 05 82VCP 3-526 197
Y > 946561 w 1
`
0.32 °�O
N
'- '
1901 -�- - - -- � 960700 5 81905
60 1 �
48310 U 1900 929980 6
JI
o
948700 6 4901 O
N
co
`' <
!
O0 , 946621 �v
/ 1
w
- -_ .� _
190 -%
o
DISCLAIMER: This map represents a visual aid intended to assist Public Utility Department personnel with the
Wednesday, July 30, 2014
management of Water System Facility. Data provided hereon is not a guarantee of actual field conditions nor a
10:58:16
AM
substitutefor
record drawings and field verification.
Yvrba U!"cia Water District
5742
1 cb �`�
18032 93536
���
915196
10135'
S/O `�� cb 1
T- 32.89' E/O T -57.89 E/
MH- K09
H -K09 -060 X0-N, /63
-06
MH -K09 -066
T -103 NE /O
W/O
GQ ���o MH -K09 -080
077
CO
2
12
5787 6" VCP J -9001 MAY 1991
5799
973033 35' 1 %
T NE /O `1'j / 5791
932455
-4' 13 / /
/
077
MH -K09 -080 Q/ / / > 929854
12 T-UNKNOWN
5815
13 / /80 t A
924433
5785 11b / / / �s 6,
s''
T- UNKNOWN
/O
T- @ 97303C�// ��o / 5793 ♦ � �o,
077
MH- K09 -08( / 0 918862 ��� ,
X,9
`
T- UNKNOWN �'�p♦
13 JO // VIA RANCHERO (PVT.STREET) 'g,
cb 8" VCP J- 200406 JAN 2006 , �2•
8" VCP J- 200406 JAN 2006
`
78 / 254.6 14' 0.3643% 249.5 —
/ // 96 8" VCP J- 200406 JAN 2006 97 83
r, 79inn - - - -- --
—2
N
555 6 252' 7.07% 273 24
A
DISCLAIMER: This map represents a visual aid intended to assist Public Utility Department personnel with the
Wednesday, July 30, 2014
management of Water System Facility. Data provided hereon
substitutefor record drawings and field verification.
is not a guarantee of actual field conditions nor a
10:30:23 AM
AGENDA REPORT
Meeting Date: August 11, 2014
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Acting General
Manager
Presented By: John DeCriscio, Operations
Manager
Prepared By: Harold Hulbert, Operations
Assistant
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Job No:
Dept:
Reviewed by Legal:
CEQA Compliance:
Subject: Backhoe Purchase for Water Operations
SUMMARY:
ITEM NO. 4.5
Yes
$90,000
$80,919
All Water Funds
1- 0010- 2150 -00
N/A
Operations
N/A
N/A
The Yorba Linda Water District's purchasing policy requires staff to submit vehicle and major
equipment purchases to the Board of Directors for approval when the cost of said equipment
exceeds $25,001. The policy also provides direction for the methods which must be followed for
procurement of vehicles and equipment. The District's procedures for acquiring quotes for this
vehicle have been adhered to and the results of the quotes are listed below.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the Acting General Manager to
make the purchase of (1) one Backhoe as listed above and approved in the District's FY 2014/15
Budget from Coastline Equipment in the amount of $80,919.00.
DISCUSSION:
In the Board - adopted budget for FY 2014/15, funds where included for the purchase of a backhoe to
replace Unit #92 which is a 1987 John Deere 210C. This piece of equipment has exceeded its
useful life and is in need of replacement.
The District's Mechanical Services Division has reviewed the needs of the Maintenance staff for the
equipment specifications. Staff then developed the specification and submitted them to several
vendors, requesting a quote for the purchase of a backhoe that would meet these specifications.
The District received (3) three acceptable quotes meeting the requirements of the District
Purchasing Policy:
1. Coastline Equipment - $ 80,919.00
2. Quinn - $ 85,212.00
3. RDO - $ 90,961.36
After reviewing the quotes staff is recommending we purchase the Backhoe from Coastline
Equipment in the amount of $80,919.00.
PRIOR RELEVANT BOARD ACTION(S):
The Board approved the 2014 -2015 budget which included the cost for (1) one Backhoe with an
estimated price of $90,000.00.
AGENDA REPORT
Meeting Date: August 11, 2014
To: Planning-Engineering-
Operations Committee
From: Steve Conklin, Acting General
Manager
Presented By: John DeCriscio, Operations
Manager
Prepared By: Harold Hulbert, Operations
Assistant
Budgeted:
Total Budget:
Cost Estimate:
Funding Source:
Account No:
Dept:
Reviewed by Legal:
CEQA Compliance:
Subject: Purchase of Ford F350 Service Truck
SUMMARY:
ITEM NO. 4.6
Yes
$72,000
$58,818.64
Sewer Operating
Fund
2- 0010 - 2200 -00
Operations
N/A
N/A
The Yorba Linda Water District's purchasing policy requires staff to submit vehicle and major
equipment purchases to the Board of Directors for approval when said equipment exceeds $25,001.
The policy also provides direction for the methods which must be followed for procurement of
vehicles and equipment. The District's procedures for acquiring quotes for this vehicle have been
adhered to and the results of the quotes are listed below.
STAFF RECOMMENDATION:
That the Committee recommend the Board of Directors authorize the Acting General Manager to
make the purchase of (1) one Cab & Chassis from Elk Grove Ford in the amount of $25,017.74 and
Service Body from Pacific Truck Equipment in the amount of $33,800.90, as approved in the
District's Budget for FY 2014 -2015.
DISCUSSION:
In the Board - adopted budget for FY 2014 -15, funds where included for the purchase of a new
service truck to replace Unit #134 which is a 1999 Ford F250 Super Duty with a service body. This
piece of equipment has exceeded its useful life and is due for replacement.
The District's Mechanical Services Division reviewed the needs of the Maintenance staff for the
equipment specifications. Staff then developed the specification and submitted them to several
vendors, requesting a quote for the purchase of a Ford F350 Cab & Chassis and also a Service
Body that would meet these specifications.
The District received (3) three acceptable quotes for the Cab & Chassis and (3) three acceptable
quotes for the Service Body meeting the requirements of the District Purchasing Policy:
Cab & Chassis
1. Elk Grove Ford - $25,017.74 (tax included)
2. Fairway Ford - $25,844.40 (tax included)
3. Carmenita Truck Center - $33,185.00 (tax not included)
Service Body
1. Pacific Truck Equipment - $33,800.90 (tax included)
2. California Truck Equipment - $38,944.61 (tax included)
3. Phoenix Truck Body - $42,860.00 (tax not included.)
After reviewing the quotes staff is recommending we purchase the Cab & Chassis from Elk Grove
Ford in the amount of $25,017.71 and the Service Body from Pacific Truck Equipment in the amount
of $33,800.90.
The total purchase cost for the Cab & Chassis and Service Body is $58,818.64.
PRIOR RELEVANT BOARD ACTION(S):
The Board approved the 2014 -2015 budget which included the cost for (1) one 1 -ton truck with
service with an estimated price of $72,000
Meeting Date
Subject:
ATTACHMENTS:
AGENDA REPORT
August 11, 2014
ITEM NO. 5.3
Monthly Groundwater Production and Purchased Import Water Report
Description: Type:
Import 2014 -15 Jul.pdf July 2014 Monthly Water Report Backup Material
YLWD SOURCE WATER SUMMARY
FY 2014 -15
Allowable GW (YTD) 1,684.0 (AF)
Underpumped 307.1 (AF)
CUP Obligation FY 2014 -15
ADJUSTED
GW
(AF)
ACTUAL
IMPORT
(AF)
CUP
(AF)
TOTAL
DEMAND
(AF)
MONTHLY
GW
( %)
YTD
GW
( %)
BUDGET
(Demand Est.)
(AF)
DELTA
( %)
MONTH
Jul -14
1,376.9
748.8
280.0
2,405.7
57.2%
57.2%
2,587.0
Aug -14
- MONTHLY GW N
YTD GW ( %)
�BPP GOAL 70.01,
2,545.3
Sep -14
2,233.2
Oct -14
1,883.7
Nov -14
1,488.0
Dec -14
1,338.6
Jan -15
1,167.1
Feb -15
1,116.6
Mar -15
1,323.2
Apr -15
1,655.1
May -15
2,189.2
Jun -15
2,453.0
FYTD
1,376.9
748.8
280.0
2,405.7
1 57.2%1
2,587.0
-7.0%
Allowable GW (YTD) 1,684.0 (AF)
Underpumped 307.1 (AF)
CUP Obligation FY 2014 -15
2,741.0 (AF)
Monthly CUP Pumping (AF)
280.0 (AF)
YTD CUP Pumping (AF)
1,158.8 (AF)
YTD CUP Achieved ( %)
42.3%
GROUNDWATER PERCENTAGE
80.0%
75.0%
70.0%
65.0%
60.0%
55.0%
50.0%
45.0%
40.0%
35.0%
- MONTHLY GW N
YTD GW ( %)
�BPP GOAL 70.01,
30.0%
Jul -14 Aug -14 Sep -14 Oct -14 Nov -14 Dec -14 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15
Month
22,000
20,000
i 111
16,000
14,000
a
12,000
E
0 10,000
8,000
6,000
4,000
2,000
0
Jul -14
FY 2014 -15 YTD Water Supply
--"—Budgeted Total GW + Import
Actual Total GW + Import
--a--BPP GW Goal 70.0%
---*— Actual GW Production
--@— Actual Total GW + Import 2013 -14
Aug -14 Sep -14 Oct -14 Nov -14 Dec -14 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15
Month
AGENDA REPORT
Meeting Date: August 11, 2014
ITEM NO. 5.4
Subject: Monthly Preventive Maintenance Report
ATTACHMENTS:
Name: Description: Type:
2014 -15 fiscal.pdf Monthly Preventive Maintnenance Report Backup Material
PREVENTATIVE AND REACTIVE MAINTENANCE
FISCAL 2014/15
Fiscal 2014 -15 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target
Old Data
8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100
Target; all hydrants to be serviced annually.
HYDRANTS (3,925)
3266
INSPECTED THIS MONTH
428
INSPECTED THIS YEAR
428
OF TOTAL
10.9
Target; all valves to be operated every two years
VALVES (11,162/2 = 5,581)
822
OPERATED THIS MONTH
724
OPERATED THIS YEAR
724
OF TOTAL
Target; all dead ends to be flushed biannually.
DEAD ENDS (155 X 2 = 310)
FLUSHED THIS MONTH
0
FLUSHED THIS YEAR
01
1
OF TOTAL
Target; all air /vacs to be serviced annually.
AIR VACS (487)
INSPECTED THIS MONTH
1
INSPECTED THIS YEAR
1
OF TOTAL
Target; all PRVs to be serviced annually.
PRVs (261)
INSPECTED THIS MONTH
34
INSPECTED THIS YEAR
34
OF TOTAL
Target; all leaks repaired at first available opportunity.
WATER LEAKS
MAIN REPAIRED
2
SERVICE REPAIRED
7
SERVICE REPLACED
12
AMS REPLACED
15
Target; all meter work completed no later than next working day.
METERS
NEW INSTALL
15
STUCKS
23
Target; all sewers to be cleaned annually.
SEWER CLEANING (304 M)
CLEANED THIS MONTH
20.701
1
CLEANED THIS YEAR
20.70
OF TOTAL
Target; all sewers to be televised every 5 years.
SEWER TELEVISING (61M)
Z
TELEVISED THIS MONTH
2.66
TELEVISED THIS YEAR
2.66
OF TOTAL
OTHER SEWER WORK.
S.S. OVERFLOWS
0
ROOT FOOTAGE
1,134
EMAs AND SYPHONS
2.11
SERVICE CALLS
0
REHAB FOOTAGE
0
MAIN REPAIRS
0
MANHOLE ROOT CLEANING
2
MANHOLE REPAIRS
1 3
Meeting Date
Subject:
ATTACHMENTS:
Name:
August 11, 2014
AGENDA REPORT
Reviewed by Legal:
Monthly Production Summary Report
Description:
Copy of Monthly Production Summary Report July 2014.0f July Report
ITEM NO. 5.5
N/A
Type:
Backup Material
Monthly Production Summary Report
DATE: July 2014
Water Production
Equipment Name
• Groundwater
70.50%
• Import Water
29.50%
Max Day Consumption
27.97 Mg
Min Day Consumption
21.29 Mg
Average Day
24.56 Mg
Weather Conditions
Max Temperature
102°
Min Temperature
57°
# of High Wind Days
0
# of Red Flag Days
0
Inches of Rain
0
Water Quality
Location Average Cl2 Dose
Richfield (North Loop)
1.3 mg /L
Richfield (South Loop)
1.2 mg /I
Lakeview Booster (Zone 2)
1.1 mg /L
Lakeview Booster (Zone 3)
1.2 mg /L
Well # 15
1.2 mg /L
Well # 20
1.1 mg /L
Location Average Cl2 Residual
Highland Booster
1.3 mg /L
Valley View Booster
1.2 mg /L
Paso Fino Booster
1.2 mg /L
Hidden Hills Reservoir
1.1 mg /L
Camino de Bryant Reservoir
1.3 mg /L
Notes:
Out of Service Equipment
Equipment Name
Reason for Out of Service
Hidden Hills Reservoir
Chemical Feed Pump Failure
Richfield C12 System
Blacoh Dampener Failure
Well #11 MCC
Electrical Equipment Failure
Returned to Service
Equipment Name
Date
Well #1
7/14/2014
Fairmont Booster #2
7/1/2014
Box Canyon BPS
7/2/2014
Water System Equipment Maintenance & Repairs
Well #15 Cl2 System Injection line leak repair
Hidden Hills Reservoir Cathotic Protection Project
Well #15 Cl2 System Generation Cell leak(shipped to contractor for repair).
Hidden Hills BPS Fire mitigation irrigation system project.
Ground water continues to be served in zones 4 and 5 to comply with the CUP for FY 2014 -2015. The Production Department continues to operate the
water system under SCE TOU restrictions for the summer months. The Production Staff has started the installation of the irrigation system at the
Hidden Hills BPS as part of the fire mitigation project. Well #1 has been installed by the contractor and is operating to the system. Box Canyon Booster
#1 has been installed by the contractor and currently in operation. SCE will schedule a date to conduct an efficiency test on the new application. Static
and Pumping water levels were conducted on District wells for OCWD. The Production Staff is currently operating the new YLBPS under beneficial use.
The project to install cathotic protection at the Hidden Hills Reservoir has been completed.
Meeting Date
Subject:
ATTACHMENTS:
AGENDA REPORT
August 11, 2014
Groundwater Producer Meeting Notes for July 2014
ITEM NO. 5.6
Description: Type:
GWP Mtq Notes July 2014.docx GWP Meeting for July 2014 Backup Material
Yorba Linda
Water District
MEMORANDUM
DATE: July 9, 2014
TO: Steve Conklin, Acting General Manager
FROM: John DeCriscio, Operations Manager
SUBJECT: Groundwater Producers Meeting July 9, 2014
Steve Conklin and I attended the Groundwater Producers (GWP) meeting on July 9,
2014 at Orange County Water District, (OCWD). A summary of the item discussed is
as follows:
1. Accumulated Overdraft /FY14 -15 Water Purchases: OCWD staff issued a
report projecting possible incremental decreases in the Basin Production
Percentage for next fiscal year. If there is another dry winter, OCWD will need to
take measures to insure the basin doesn't get over drafted for an unacceptable
level. OCWD is projecting the basin to be at an over -draft of 342,000 acre feet
as of June 2014; data is still being tabulated. In an effort to stabilize the water
levels in the groundwater basin, OCWD is planning to purchase 65,000 acre feet
of import water to add to the basin by December. If the winter is dry they
consider additional purchase, if the water is available.
2. OCWD meetings with elected officials and other groups: Starting in August
OCWD staff will be initiating meetings with elected officials to provide updates on
the activities related to the recent lawsuits in which OCWD is involved. OCWD
would like to keep each presentation to around thirty minutes. Before proceeding
with plans for a presentation, agency staff will be notified.
3. GWRS Pipeline Inspection update: Staff reported on the results of the pipeline
inspection. At this time the pipeline inspection is complete and the plant is back
on line and delivering water into the recharge basins. In the inspection of the
pipeline, the District's contractor observed unusual amounts of coating loss in
areas of the pipeline. Potential remedies are being addressed with test coatings
to determine which material will be best for relining in the future. It is expected
that a major relining project will need to take place in the next four to five years.
4. Seawater Intrusion Prevention Policy: Although seawater intrusion prevention
has always been an important function, OCWD have never had a formal policy to
lay out the objectives, performance goals and results of the program. The intent
of the policy, as prepared by staff, is to: Prevent groundwater quality degradation,
effectively operate and evaluate the performance of the seawater barrier, identify
and track trends in seawater intrusion, and take action as needed to stop the
progression. The policy is being brought to OCWD Board and is expected to get
approval.
ITEM NO. 5.7
AGENDA REPORT
Meeting Date: August 11, 2014
Subject: Status Report on Capital Projects in Progress
ATTACHMENTS:
Description: Type:
CIP Rept Aug20l4.pdf Status Report on Capital Projects in Progress Backup Material
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2014
New Information since Last Report is Shown in Red
IN CONSTRUCTION
Project
Current Status
Next Actions
Comments
1
2012 Waterline Repl., Ph. II: Tamarisk, Hidden
The Notice of Completion
Staff will release retention
Project is complete.
Hills, Catalina Ct., Gordon Ln. & Richfield Rd.
(NOC) has been filed.
35 days after NOC if no
Budget: $1.17M Job No.: 201120
claims against the project.
Project Contact: Joe Polimino
Planned Completion: June 2014
2
Yorba Linda Blvd. Pump Station
Contractor continues work on
Will demolish old Palm
Project expected to be complete
Budget: $2.65M Job No.: 200817B
electrical installations and
Ave. pump station when
August 2014.
Project Contact: Joe Polimino
punchlist items. District has
new one is completed.
Planned Completion: July 2014
Beneficial Use of pump station.
3
Lakeview Grade Separation (OCTA Project)
Contractor continues new
Contractor will then move
Currently on schedule.
Budget: $700,000 Job No.: 201002
waterline installation on the
to the north side of
Project Contact: Joe Polimino
south side of Atwood Channel.
Orangethorpe Ave. to
Planned Completion: Late 2016
continue the installation.
4
Well 21 Drilling Project
Contractor completed drilling,
Staff is preparing project
Retention will be released to
Budget: $800,000 Job No.: 200922 #21
well development and pump
close -out.
contractor on August 4, 2014.
Project Contact: Alex Thomas
testing. Consultant's pumping
Planned Completion: Mid 2014
recommendation is 3000 GPM.
5
Elk Mountain Surge Tank
Project complete. Board
Release retention 35 -days
Project will be closed -out after
Budget: $100,000 Job No.: 201312
authorized final payment &
after recordation if no
retention is released.
Project Contact: Anthony Manzano
filing Notice of Completion
liens have been filed.
Planned Completion: July 2014
(NOC). NOC recorded.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2014
New Information since Last Report is Shown in Red
IN DESIGN
Project
Current Status
Next Actions
Comments
1
YL High School Park Pipe Relocation
I" Submittals approved.
Staff to schedule Pre - Const.
YLWD Pipeline relocation
Budget: $350,000 Job No.: 201213
Board awarded to low bid
meeting & issue NTP.
work tentatively planned for
Project Contact: Anthony Manzano
contractor, Vido
PYLUSD scheduled to begin
late summer 2014.
Planned Completion: Summer 2014
Samarzich, June 2014.
grading late - summer 2014.
2
Well 21 Equipping Project
Staff provided design and
Awaiting 1St design
Estimated equipping design
Budget: $150,000 Job No.: 200922 #21
pumping rate information
submittal. Awaiting letter
completion, fall 2014.
Project Contact: Alex Thomas
to consultant, Stantec.
proposal for designing a
Estimated construction
Planned Completion: Late 2015
parallel collection main up
completion fall 2015.
Richfield Ave.
3
Fairmont BPS Upgrade
90% design submittal
Review 90% design
Design estimated to be
Budget: $6,000,000 Job No. 201011B
deadline pushed out to
submittal upon receipt and
complete fall 2014.
Project Contact: Bryan Hong
August 4th.
issue review comments by
Construction estimated to be
Planned Completion: Mid 2016
August 18th.
complete mid -2016.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2014
New Information since Last Report is Shown in Red
IN PLANNING
Project
Current Status
Next Actions
Comments
1
Well 22 Site Acquisition
Researched several potential
Finalize a site location, seek
Staff's goal is to procure a
Budget: $450,000 Job No. 2009 -22 #22
locations. Currently focusing on
Board authorization,
site by late 2014 and
Project Contact: Alex Thomas
a site near southerly end of Fee
negotiate terms and enter
prepare to drill pilot hole.
Planned Completion: Late 2014
Ana Avenue.
into an Agreement.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2014
New Information since Last Report is Shown in Red
PROPOSED DEVELOPMENT
Project
Current Status
Next Actions
Comments
1
Olson Co. T17489 (N. of Golden Ave., Placentia)
Developer continuing
Developer shall complete
Estimate 33 -unit condo tract
Job No.: 201301
home construction &
District Final Inspections &
completion by late 2014 /early
Project Contact: Ariel Bacani
water service installation.
Closing Forms.
2015.
2
Brandywine Homes T17548 (S. of Nixon Lib.)
Continue plan check
District to amend water
Developer started onsite
Job No.: 201304
process. Developer
agreements and approve
grading & storm drain work.
Project Contact: Ariel Bacani
executed W &S
W &S Improvement Plans.
agreements, fees & bonds.
3
Buy -Buy Baby (Savi Ranch)
Contractor started water &
District to prepare job
Estimate building completion
Job No.: 201309
sewer construction.
closing forms.
mid to late 2015.
Project Contact: Ariel Bacani
4
Costco Gas Station/Mirage Street Vacation
Easement Agreement &
Costco's engineer paid fees
Costco to complete new gas
Job No. 201310
Terms & Conditions
and submitted improvement
station & improvements by late
Project Contact: Anthony Manzano
approved by Board.
plans.
2014.
5
Yavitz Company — Valley View Retail
Developer submitted final
Developer to execute Deed
Anticipate water improvement
Job No.: 201313
Improvement Plans.
of Easement before District
completion late 2014 & retail
Project Contact: Ariel Bacani
approves Improvement
center completion late 2015.
Plans.
6
Shapell Homes T17652 (West of YLHS)
District approved Water &
District to prepare job
Estimate construction start date
Job No.: 201315
Sewer Improvement Plans.
closing forms.
mid 2014 & 49 -lot housing
Project Contact: Ariel Bacani
Contractor started sewer
tract completion by 2018.
construction.
7
Shapell Homes T16208 (North of YLHS)
Board approved T &Cs.
District staff to prepare
Estimate 40 -lot housing tract
Job No.: 201406
Started plan check process.
Water & Sewer agreements,
construction start date early
Project Contact: Ariel Bacani
fees and surety bonds.
2015.
8
Shapell Homes T17653 (North of YLHS)
Board approved T &Cs.
District staff to prepare
Estimate 21 -lot housing tract
Job No.: 201407
Started plan check process.
Water & Sewer agreements,
construction start date early
Project Contact: Ariel Bacani
fees and surety bonds.
2015.
9
Shapell Homes T17654 (North of YLHS)
Board approved T &Cs.
District staff to prepare
Estimate 58 -lot housing tract
Job No.: 201408
Started plan check process.
Water & Sewer agreements,
construction start date early
Project Contact: Ariel Bacani
fees and surety bonds.
2015.
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: August 1, 2014
New Information since Last Report is Shown in Red
PROPOSED DEVELOPMENT (Continued)
10
Western Pacific Housing T17617 (N. of YL Blvd.)
Board approved T &Cs.
District staff to prepare
Estimate 80 -unit townhome
Job No.: 201409
Started plan check process.
Water & Sewer agreements,
tract construction start date
Project Contact: Ariel Bacani
fees and surety bonds.
early 2015.
11
City Ventures, LLC T17547 (E. of Rose)
Board approved T &Cs.
District staff to prepare
Estimated 18 unit condominium
Job No.: 201405
Started plan check process.
Water & Sewer agreements,
Tract. Construction start date
Project Contact: Ricardo Hipolito Jr.
fees and surety bonds.
early 2015.