Loading...
HomeMy WebLinkAbout2014-09-04 - Planning-Engineering-Operations Committee Meeting Agenda PacketYorba Linda Hater District AGENDA YORBA LINDA WATER DISTRICT PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING Thursday, September 4, 2014, 4:00 PM 1717 E Miraloma Ave, Placentia CA 92870 1. CALL TO ORDER 2. ROLL CALL COMMITTEE Director Gary T. Melton, Chair Director Michael J. Beverage STAFF Marc Marcantonio, General Manager Steve Conklin, Engineering Manager John DeCriscio, Operations Manager 3. PUBLIC COMMENTS Any individual wishing to address the committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. 4. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 4.1. Status of Well Siting (Verbal Report) 4.2. Status of Cielo Vista and Esperanza Hills Developments (Verbal Report) 4.3. Monthly Groundwater Production and Purchased Import Water Report (To be provided at the meeting.) 4.4. Monthly Preventive Maintenance Report (To be provided at the meeting.) 4.5. Monthly Production Summary Report (To be provided at the meeting.) 4.6. Groundwater Producer Meeting Notes 4.7. Status Report on Capital Projects in Progress 4.8. Future Agenda Items and Staff Tasks 5. ADJOURNMENT 5.1. The next Planning- Engineering- Operations Committee meeting is scheduled to be held Thursday, October 2, 2014 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items and are distributed to a majority of the Committee less than seventy -two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internet website accessible at http: / /www.ylwd.com /. Accommodations for the Disabled Any person may make a request for a disability - related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714 - 701 -3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability - related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. AGENDA REPORT Meeting Date: September 4, 2014 ITEM NO. 4.3 Subject: Monthly Groundwater Production and Purchased Import Water Report (To be provided at the meeting.) ATTACHMENTS: Description: Import 2014 -15 Auq.pdf Backup Material Type: Backup Material Im Backup Material Distributed Less Than 72 Hours Prior to the Meeting YLWD SOURCE WATER SUMMARY FY 2014 -15 Allowable GW (YTD) 3,278.7 (AF) Underpumped 575.8 (AF) CUP Obligation rY 2014 -15 ADJUSTED GW (AF) ACTUAL IMPORT (AF) CUP (AF) TOTAL DEMAND (AF) MONTHLY GW ( %) YTD GW ( %) BUDGET (Demand Est.) (AF) DELTA ( %) MONTH Jul -14 Aug -14 Sep -14 Oct -14 Nov -14 Dec -14 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15 1,376.9 748.8 280.0 2,405.7 57.2% 57.2% 2,587.0 -7.0% 1,326.1 672.1 280.0 2,278.2 58.2% 57.7% 2,545.3 -10.5% 2,233.2 1,883.7 1,488.0 1,338.6 1,167.1 1,116.6 1,323.2 1,655.1 2,189.2 2,453.0 FYTD 2,702.9 1,420.9 560.0 4,683.9 57.7% 5,132.3 -8.7% Allowable GW (YTD) 3,278.7 (AF) Underpumped 575.8 (AF) CUP Obligation rY 2014 -15 2,741.0 (AF) Monthly CUP Pumping (AF) 280.0 (AF) YTD CUP Pumping (AF) 1,438.8 (AF) YTD CUP Achieved ( %) 52.5% GROUNDWATER PERCENTAGE 80.0% 75.0% 70.0% 65.0% 60.0% 55.0% 50.0% 45.0% 40.0% 35.0% 30.0% - MONTHLY GW ( %) -YTD G W (%) BPP GOAL 70 0% Jul -14 Aug -14 Sep -14 Oct -14 Nov -14 Dec -14 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15 Month 22,000 20,000 16,000 14,000 U- Q 12, 000 E 0 10,000 8,000 6,000 4,000 2,000 0 Jul -14 Backup Material Distributed Less Than 72 Hours Prior to the Meeting FY 2014 -15 YTD Water Supply t Budgeted Total GW + Import --41-- Actual Total GW + Import �r BPP GW Goal 70.0 t Actual GW Production --0-- Actual Total GW + Import 2013 -14 Aug -14 Sep -14 Oct -14 Nov -14 Dec -14 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15 Month AGENDA REPORT Meeting Date: September 4, 2014 ITEM NO. 4.4 Subject: Monthly Preventive Maintenance Report (To be provided at the meeting.) ATTACHMENTS: Description: PM 2014 -15 Auq.pdf Backup Material Type: Backup Material Backup Material Distributed Less Than 72 Hours Prior to the Meeting PREVENTATIVE AND REACTIVE MAINTENANCE FISCAL 2014/15 Fiscal 2014-15 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Percent of target 8% 25% 33% 42% 50% 58% 67% 75% 83% 92% 100% HYDRANTS 3,925 Target;all h drants to be serviced annual) . INSPECTED THIS MONTH 428 485 INSPECTED THIS YEAR 428 1 913 OF TOTAL 10.9 VALVES 11,162/2=5,581 Target;all valves to be o erated ever two ears OPERATED THIS MONTH 724 572 OPERATED THIS YEAR 724 M13.0%1 1296 OF TOTAL DEAD ENDS 155 X 2=310 Target;all dead ends to be flushed biannual) . FLUSHED THIS MONTH 01 0 FLUSHED THIS YEAR 01 0 OF TOTAL 0.0 AIR VACS 487 Target;all air/vacs to be serviced annual) . INSPECTED THIS MONTH 1 10 INSPECTED THIS YEAR 1 11 OF TOTAL 0.2% PRVs 261 Tar et;all PRVs to be serviced annually. INSPECTED THIS MONTH 1 341 16 INSPECTED THIS YEAR 1 341 50 OF TOTAL 1 13.0 WATER LEAKS Target;all leaks repaired at first available opportunity. MAIN REPAIRED 2 1 SERVICE REPAIRED 7 7 SERVICE REPLACED 12 19 AMS REPLACED 15 6 METERS Target;all meter work completed no later than next working day. NEW INSTALL 151 8 STUCKS 1 231 54 SEWER CLEANING 304 M Target;all sewers to be cleaned annual) . CLEANED THIS MONTH 20.70 15.71 CLEANED THIS YEAR 20.70 36.41 % TOTAL 6.81%1 11.98 SEWER TELEVISING 61M Target;all sewers to be televised ever 5 vears. TELEVISED THIS MONTH 2.66 5.17 TELEVISED THIS YEAR 2.66 1 7.83 % TOTAL 4.36%1 12.84% OTHER SEWER WORK. S.S.OVERFLOWS 0 0 ROOT FOOTAGE 1,134 6,509 EMAs AND SYPHONS 2.11 4 SERVICE CALLS 0 0 REHAB FOOTAGE 0 0 MAIN REPAIRS 0 100 MANHOLE ROOT CLEANING 1 21 0 MANHOLE REPAIRS 1 31 0 AGENDA REPORT Meeting Date: September 4, 2014 ITEM NO. 4.5 Subject: Monthly Production Summary Report (To be provided at the meeting.) ATTACHMENTS: Description: Type: Production Summary Report Aug 2014.pdf Backup Material Backup Material Backup Material Distributed Less Than 72 Hours Prior to the Meeting Monthly Production Summary Report DATE: August 2014 Water Production Equipment Name • Groundwater 70.00% • Import Water 30.00% Max Day Consumption 26.2 MG Min Day Consumption 19.5 MG Average Day 23.5 MG Weather Conditions Max Temperature 102° F Min Temperature 57° F # of High Wind Days 0 # of Red Flag Days 0 Inches of Rain 0 Water Quality Location Average Cl2 Dose Richfield (North Loop) 1.4 Mg /I Richfield (South Loop) 1.2 Mg /I Lakeview Booster (Zone 2) 1.2 Mg /I Lakeview Booster (Zone 3) 1.3 Mg /I Well # 15 1.2 Mg /I Well # 20 1.1 Mg /I Location Average Cl2 Residual Highland Booster 1.2 Mg /I Valley View Booster 1.2 Mg /I Paso Fino Booster 1.3 Mg /I Hidden Hills Reservoir 1.2 Mg /I Camino de Bryant Reservoir 1.3 Mg /I Out of Service Equipment Equipment Name Reason for Out of Service Well #11 MCC Instrumentation Control problems Well #19 VFD Cooling system failure (Fans) Well #20 Cl2 Feed System Chemical feed pump failure Camino De Bryant Res. IC12 Analyzer unstable Richfied Cl2 System Acid Washes completed Returned to Service Equipment Name Date Hidden Hills Cl2 pump 8/5/2014 - Replaced and placed online Richfield Plant 8/5/2014 - Installed replacement Blacoh dampner Camino De Bryant Res. 8/14/2014 - Analyzer serviced and placed online Lakeview Booster #10 Sealed a water leak on the booster pump Water System Equipment Maintenance & Repairs General Maintenance Continue Oil Change on Motors and Gear heads Hidden Hills Reservoir Installed replacement chemical feed pump Well #20 Repaired a leak at the PSI gauge Well #1 Repaired a leak at the prelube line Lakeview Booster #10 Sealed a water leak on the booster pump Richfied Cl2 System Acid Washes completed Notes: Ground water continues to be served in zones 4 and 5 to comply with the CUP for FY 2014 -2015. The Production Department continues to operate the water system under SCE TOU restrictions for the summer months. The Production Staff is currently operating the new YLBPS under beneficial use. AGENDA REPORT Meeting Date: September 4, 2014 ITEM NO. 4.6 Subject: Groundwater Producer Meeting Notes ATTACHMENTS: Description: Type: GWP Mtq Notes Aug 2014.docx GWP Meeting for Aug 2014 Backup Material IMYorba Linda Water District MEMORANDUM DATE: August 14, 2014 TO: File FROM: Steve Conklin, Acting General Manager SUBJECT: Groundwater Producers Meeting August 13, 2014 I attended the Groundwater Producers (GWP) meeting on August 13, 2014 at Orange County Water District (OCWD). A summary of the item discussed is as follows: 1. MWDOC Water Reliability Study. OCWD staff reported that MWDOC is preparing to proceed with the said study. The study as envisioned is to consider county -wide reliability. The OCWD Board has raised concerns that OCWD should have a larger role. There will be further discussion on this in the coming weeks. 2. OCWD Outreach Program. Starting in August OCWD staff will be initiating meetings with civic groups and elected officials to provide updates on the activities related to the recent lawsuits in which OCWD is involved. Staff provided a 4 -page list of upcoming presentations to various civic organizations and other groups. OCWD staff indicated that they will provide notice ahead of time to GWP agency staff of upcoming presentations in the agency service area. OCWD staff also invited GWP agencies to request presentations to their governing bodies or civic groups. Lastly, they noted that they plan to have an Elected Officials Kickoff meeting on October 17, to brief elected on the basin cleanup projects and other issues. 3. OCWD Groundwater Basin Water Quality Policy. OCWD staff reported that on August 6, 2014, the OCWD Board approved said Policy. The Policy incorporates and integrates key provisions contained in policies adopted in 1984, 1987 and 2013 into a single policy. Also included is a provision regarding I consistency with the National Contingency Plan (NCP) in situations where OCWD is seeking cost recovery from responsible parties. 4. Update on North Basin and South Basin Water Quality Lawsuits. OCWD staff noted that negative court ruling were received for both lawsuits and that OCWD will appeal the rulings. OCWD is proceeding with the requirements of the NCP on the North Basin Project and is about 3- months into an 18 -month process to complete. Thereafter, they hope to return to construction of treatment facilities. Regarding the South Basin Project, OCWD is issuing an RFP for a consultant to provide services for the preparation of NCP documents. 5. GWRS Pipeline Inspection update. Staff reported on the results of the pipeline inspection. In the inspection of the pipeline, the District's contractor observed unusual amounts of coating loss in areas of the pipeline, particularly in Unit 2 (i.e., the central of the three pipeline sections constructed). Potential remedies are being addressed with test coatings to determine which material will be best for relining in the future. It is expected that a follow -up inspection and relining work may take place in two years. 6. Burris Pit Pump Station Replacement Project. OCWD reported that bids were received for Phase 2 of the Project, to replace a 200 -cfs capacity station to pump water from the Santa Ana River to the Santiago Basins in Orange for recharge. Nine bids were received, and Board approval is expected on Aug 20 for a $20 million construction contract to low- bidder, Pacific Hydrotech Corp. 7. Long -Term Facilities Plan Update. OCWD staff indicated that comments will be received until Aug 15 on the draft Plan, after which the Plan will be finalized and then brought to the Board to be received and filed. 8. Groundwater Management Plan Update. OCWD staff indicated that they are waiting for completion of state legislation on this matter before proceeding with preparation of the update to OCWD's Plan. 9. Response to Grand Jury Report. OCWD noted that they have drafted a response, which staff will present to the OCWD Administration - Finance Committee on August 14 and to the Board on Aug 20, followed by sending it to the Grand Jury. 10. Poseidon Resources Update. OCWD staff noted that the Financial Analysis is being prepared and is scheduled to go to the OCWD Board on Sept 17 as an Information Item. That is, the report and its findings will be for discussion and consideration, with no action to be taken. What happens after that depends on the findings of the analysis, what the Board wants to do with it, and what the Board wants to do next. It was also noted that Poseidon is working on its response to questions raised by the Coastal Commission and is expected to go back to the Commission by early 2015. 2 ITEM NO. 4.7 AGENDA REPORT Meeting Date: September 4, 2014 Subject: Status Report on Capital Projects in Progress ATTACHMENTS: Description: Type: CIP Rept Sep2014.pdf Status Report on Capital Projects in Progress Backup Material CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: September 1, 2014 New Information since Last Report is Shown in Red IN CONSTRUCTION Project Current Status Next Actions Comments 1 Yorba Linda Blvd. Pump Station Contractor continues work on Will demolish old Palm Project expected to be complete Budget: $2.65M Job No.: 200817B operational and electrical Ave. pump station when September 2014. Project Contact: Joe Polimino punchlist items. new one is completed. Planned Completion: July 2014 2 Lakeview Grade Separation (OCTA Project) Contractor continues new Contractor will complete Currently on schedule. Budget: $700,000 Job No.: 201002 waterline and service borings and pipe Project Contact: Joe Polimino installations. installations under the Planned Completion: Late 2016 railroad. 3 Elk Mountain Surge Tank Project complete. NOC Release retention 35 -days Project will be closed -out after Budget: $100,000 Job No.: 201312 recorded. Board authorized after recordation (early retention is released. Project Contact: Anthony Manzano final payment to Contractor. September) if no liens Planned Completion: July 2014 have been filed. CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: September 1, 2014 New Information since Last Report is Shown in Red IN DESIGN Project Current Status Next Actions Comments 1 YL High School Park Pipe Relocation Submittals approved. Staff to schedule Pre - Const. YLWD Pipeline relocation Budget: $350,000 Job No.: 201213 Awarded contractor, Vido meeting & issue NTP. work tentatively planned for Project Contact: Anthony Manzano Samarzich, tentatively set PYLUSD scheduled to begin late summer 2014. Planned Completion: Summer 2014 to begin late September. grading late- summer 2014. 2 Well 21 Equipping Project Staff reviewing PDR and The PDR and CEQA Estimated equipping design Budget: $150,000 Job No.: 200922 #21 CEQA. Richfield pipeline document comments shall be completion, winter 2014. Project Contact: Alex Thomas upgrade change is in returned to the consultant. Estimated construction Planned Completion: Late 2015 preliminary design. completion fall 2015. 3 Fairmont BPS Upgrade Staff is currently 90% design review Design estimated to be Budget: $6,000,000 Job No. 201011B reviewing 90% design comments to be returned to complete fall 2014. Project Contact: Bryan Hong submittal. consultant; meeting with Construction estimated to be Planned Completion: Mid 2016 consultant on 9/3/14. complete late -2016. CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: September 1, 2014 New Information since Last Report is Shown in Red IN PLANNING Project Current Status Next Actions Comments 1 Well 22 Site Acquisition Researched several potential Finalize a site location, seek Staff's goal is to procure a Budget: $450,000 Job No. 2009 -22 #22 locations. Currently focusing on Board authorization, site by late 2014 and Project Contact: Alex Thomas a site near southerly end of Fee negotiate terms and enter prepare to drill pilot hole. Planned Completion: Late 2014 Ana Avenue. into an Agreement. CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: September 1, 2014 New Information since Last Report is Shown in Red PROPOSED DEVELOPMENT Project Current Status Next Actions Comments 1 Olson Co. T17489 (N. of Golden Ave., Placentia) Developer continuing Developer shall complete Estimate 33 -unit condo tract Job No.: 201301 home construction & District Final Inspections & completion by late 2014 /early Project Contact: Ariel Bacani water service installation. Closing Forms. 2015. 2 Brandywine Homes T17548 (S. of Nixon Lib.) District approved Water & District to amend water Developer completed onsite Job No.: 201304 Sewer Plans. Contractor agreements and approve rough grading and is waiting Project Contact: Ariel Bacani started offsite water & W &S Improvement Plans. for storm drain material. sewer construction. 3 Buy -Buy Baby (Savi Ranch) Contractor continuing District to prepare job Estimate building completion Job No.: 201309 water & sewer closing forms. mid to late 2015. Project Contact: Ariel Bacani construction. 4 Costco Gas Station/Mirage Street Vacation District approved final District to monitor Costco's Costco to complete new gas Job No. 201310 water plans and attended Contractor and require const. station & improvements by late Project Contact: Anthony Manzano pre - construction meeting. mitigation measures. 2014. 5 Yavitz Company — Valley View Retail District approved Water & Developer to schedule Pre- Anticipate water improvement Job No.: 201313 Sewer Improvement Plans. Construction Meeting with completion late 2014 & retail Project Contact: Ariel Bacani District. center completion late 2015. 6 Shapell Homes T17652 (West of YLHS) Contractor started water District to prepare job Estimate construction start date Job No.: 201315 and sewer construction. closing forms. mid 2014 & 49 -lot housing Project Contact: Ariel Bacani tract completion by 2018. 7 Shapell Homes T16208 (North of YLHS) Continuing plan check. District staff to prepare Estimate 40 -lot housing tract Job No.: 201406 Water & Sewer agreements, construction start date early Project Contact: Ariel Bacani fees and surety bonds. 2015. 8 Shapell Homes T17653 (North of YLHS) Continuing plan check. District staff to prepare Estimate 21 -lot housing tract Job No.: 201407 Water & Sewer agreements, construction start date early Project Contact: Ariel Bacani fees and surety bonds. 2015. 9 Shapell Homes T17654 (North of YLHS) Continuing plan check. District staff to prepare Estimate 58 -lot housing tract Job No.: 201408 Water & Sewer agreements, construction start date early Project Contact: Ariel Bacani fees and surety bonds. 2015. CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: September 1, 2014 New Information since Last Report is Shown in Red PROPOSED DEVELOPMENT (Continued) 10 Western Pacific Housing T17617 (N. of YL Blvd.) Continuing plan check. District staff to prepare Estimate 80 -unit townhome Job No.: 201409 Water & Sewer agreements, tract construction start date Project Contact: Ariel Bacani fees and surety bonds. early 2015. 11 City Ventures, LLC T17547 (E. of Rose) Continuing plan check. District staff to prepare Estimated 18 unit condominium Job No.: 201405 Water & Sewer agreements, Tract. Construction start date Project Contact: Ricardo Hipolito Jr. fees and surety bonds. early 2015. Material Distributed Less Than 72 Hours Prior to the Meeting AGENDA REPORT Meeting Date: September 4, 2014 To: Plan ning -E ngineering- Operations Committee From: Steve Conklin, Engineering Mgr Presented By: Steve Conklin, Engineering Mgr ITEM NO. 4.9. Budgeted: $350,000.00 Total Budget: $350,000.00 Cost Estimate: $345,780.00 Funding Source: Water Funds Account No: 101 -2700 Job No: J2012 -13 Dept.: Engineering Reviewed by Legal: Yes Prepared By: Steve Conklin, Engineering Mgr. CEQA Compliance: Exempt Subject: YLHS Park Pipeline Relocation Project - Right of Entry Agreement SUMMARY: A Right of Entry Agreement (Agreement) was recently submitted by the Placentia Yorba Linda Unified School District (PYLUSD). PYLUSD requires this Agreement to be executed prior to YLWD's Contractor, Vido Samarzich, Inc., starting the YLHS Park Pipeline Relocation Project work, which is anticipated to begin September 29, 2014. STAFF RECOMMENDATION: That the Planning- Engineering- Operations Committee recommend that the Board of Directors authorize the General Manager to execute the PYLUSD Right of Entry Agreement. DISCUSSION: As previously discussed, the proposed YLHS Park, within PYLUSD property located south of Yorba Linda High School, includes proposed grading with nearly 18 -feet of fill over our existing 39 -inch diameter Bryant Cross Feeder (BCF) pipeline. See attached map. The BCF pipeline will be unable to support the additional fill, and must be replaced with a new line with approximately 5 -feet of cover. Per the Pre - Annexation Agreement with PYLUSD, the District is responsible for design and construction costs for replacing approximately 520 lineal feet of the BCF pipeline. Late 2013, PYLUSD stated that the District is required to complete the BCF relocation work independent from their park work. Consequently, District staff completed Material Distributed Less Than 72 Hours Prior to the Meeting specifications in -house and solicited bids in early 2014 after the PYLUSD established a construction schedule. On June 21, 2014, the Board awarded the Construction Contract for the YLHS Park Pipeline Relocation Project to Vido Samazich, Inc. (Vido) for $345,780. On August 27, 2014, PYLUSD Director of Maintenance and Facilities, Rick Guaderrama, emailed District staff the attached Agreement and stated that it must be executed prior to Vido starting the pipeline relocation work. District staff is currently working on procurement of the additional insurance required per the Agreement. STRATEGIC PLAN: SR 3 -A: Complete Implementation of Five Year Capital Improvement Plan from FY 2011 -2015 with adopted amendments. PRIOR RELEVANT BOARD ACTION(S): On June 21, 2014, the Board awarded the Construction Contract for the YLHS Park Pipeline Relocation Project to Vido Samazich, Inc. for $345,780. ATTACHMENTS: YLHS Park Map Draft Right of entry Agreement RIGHT OF ENTRY AGREEMENT BETWEEN PLACENTIA - YORBA LINDA UNIFIED SCHOOL DISTRICT AND YORBA LINDA WATER DISTRICT THIS AGREEMENT ( "Agreement ") is approved tered into as of , 2014, by and between the Placentia -Yorba Linda Unified istrict, a public school district duly organized and existing under Chapter 1 of Divisi Title 2 of the Education Code of the State of California ( "District ") and Yorba Linda r ct, a California water district ( "YLWD "). WHEREAS, District owns certain roperty located a 00 Bastanchury Rd., Yorba Linda, CA 92886, commonly known a District's Yorba Lin igh School site and more particularly described on Exhibit "A" at d her d inc herein by this reference ( "District Property "); Ahkh, WHEREAS, YLWD has an relocate the existing easement to a di; WHEREAS, of the District Prom construction, mstalla as ingress and egre connection `_" District Property and desires to lct Property; W13 desires to enter upon a portion pu s of, at YLWD's sole expense, pipeline end related appurtenances, as well employed by or on behalf of YLWD in V. tenance of the water pipeline and related n as Exhibit "B" is a map depicting the herein as Exhibit "C" are the plans and ion of the water pipeline and related appurtenances in License A?=�`PlanN WHE the construction, installation and maintenance of the water pipeline and related appurten ursuant tol the Plans, as well as ingress and egress of equipment and persons employed by behalf of YLWD in connection with the construction, installation and maintenance of the water pipeline and related appurtenances are referred to as "the Work;" WHEREAS, subject to the terms and conditions set forth below, District desires to authorize YLWD to enter the License Area on the District Property for the limited purpose of performing the Work. NOW THEREFORE, the parties hereto agree as follows: Section 1. Grant of Entry. Pursuant to the terms of this Agreement, in exchange for valuable consideration, the receipt and sufficiency of which are hereby acknowledged, District grants YLWD, including YLWD's agents, employees, contractors, and consultants, a non- exclusive license to enter upon the License Area at reasonable times for the limited purpose of 005633.00005 12402947.1 performing the Work. The access granted herein is on an "AS -IS" basis and the District makes no representation or warranty of any kind regarding the condition of the District Property or License Area. Section 2. Term. The Agreement shall commence on the Effective Date and shall remain in effect until the parties execute and record a Grant of Easement for the License Area, or months from the Effective Date whichever occurs first. This Agreement may be terminated by District upon thirty (30) days' notice for a material breach of the Agreement, unless YLWD cures such default within the thirty (30) days, provided that YLWD shall have such extended period as may be required beyond the thirty (30) days if the nature of the cure is such that it reasonably requires more than thirty (30) days YLWD commences the cure within the thirty (30) day period and thereafter continuou diligently pursues the cure to completion. The District may terminate the Agreeme ediately if, in the District's sole discretion, there is an actual or potential threat to roperty or in the event that a natural disaster or emergency makes it necessary the ct to use the Facilities for alternative purposes. The District may terminat 'Agreement ut cause upon ninety (90) days written notice. befefe t4&4". A. Xactiare ation cces uirements. Prior to entering upon the License Area, YLWD shae with t e District, either telephonically or in writing, in order to ensure that Distric not cjlipted. The main point of contact at the District Property is [name and position of District contact] who shall be contacted at [phone number) at least one (1) week prior to com ri'y work on the License Area. YLWD acknowledges and agrees that access during school urs, may be restricted or limited, as determined by the District in the District's sole discretion. YLWD hereby agrees that all of YLWD's employees, agents, contractors and subcontractors, who enter onto the District Property or License Area for any reason or at any time when children are present, shall submit or have submitted their fingerprints and performed all necessary background checks, without exception, as proscribed by Education Code Section 45125.1. YLWD hereby waives any right, if any, to challenge the imposition by District of said fingerprinting requirement. B. Repairs and Replacements. YLWD shall be responsible for and shall pay for any repairs or replacements of any character whatsoever which are occasioned or are made necessary because of the use of the License Area or District Property by YLWD's agents, employees, 005633.00005 12402947.1 contractors, and consultants. In the event that YLWD fails to repair the License Area or District Property during the term of the Agreement, District may, at District's sole discretion, undertake any repair of the License Area or District Property and YLWD shall reimburse District for the costs of such repairs or maintenance within thirty (30) days of invoice by District. C. Restoration of License Area. Within thirty (30) days of the date of expiration of this Agreement, or upon notice that this Agreement is terminated, YLWD shall, at its sole expense, remove from the License Area and District Property all of YLWD's property, equipment, and fixtures, including the water pipeline and related appurtenances ( "YLWD Improvements "), and place License Area and District Property in the same order and condition as existed at the commencement of this Agreement, reasonab wear and tear excepted. In the District's sole discretion, in lieu of removing the YLW Vork ements, District may allow YLWD to cap the water pipeline. At the conclusion of n the License Area, YLWD shall remove all rubbish and debris of the License A t Property. In the event that YLWD fails to repair and clean up the License Or an Property, District may, at District's sole discretion, undertake any clean a ititenance an epair of the License Area and District Property and YLWD shall re' e District for th sts of such clean up, maintenance and /or repair within thirty (3 0) d invoice by District. D. Inspection of Work. istrict retains, ut not the Omwon, to inspect any work upon completion. If Dis cts the wo ct may elect to h e YLWD bring the work into compliance with the to s Agreem d any applicable laws, ordinances, rules, and regulations, or may require k ove the and return the License Area to the same order and condition as existed at th ence of this Agreement, both at YLWD's sole cost YLWD shall m ' d re License Area and YLWD Improvements durian erm 's Agree Section 6. review.] risk manager and insurance provider should Gene bilit Pro e YLWD agrees to maintain in full force and e throughout dura Nne he greement a suitable policy or policies of comprehelNi& general lia rty damage in surance, insuring against all bodily injury, propfxty damage, pers d other loss or liability caused by or connected with YLWD's use of the District Property, including License Area, under this Agreement. Such insurance shall be in amounts not �ess than $5,000,000 per occurrence; $5,000,000 for property damage and $15,000,000 for neral aggregate. (B) Automobil ili . YLWD also agrees to maintain in full force and effect with regard to any vehicles which YLWD brings onto the District Property, including License Area, a suitable policy or policies of automobile liability insurance with a combined single limit of $1,000,000 per accident. (C) Pollution Liability. YLWD agrees to maintain in full force and effect throughout the duration of the Agreement a suitable policy or policies of comprehensive pollution liability coverage. Such insurance shall be in amounts not less than $1,000,000 per occurrence and $2,000,000 for general aggregate. 005633.00005 12402947.1 (D) Workers' Compensation. YLWD shall also maintain, in full force and effect throughout the term of this Agreement, Workers' Compensation insurance in accordance with the laws of California, and employers' liability insurance with a limit of not less than $1,000,000 per employee and $1,000,000 per occurrence. (E) Notice, Additional Named Insureds. All insurance required under this Agreement shall be issued by a company or companies lawfully authorized to do business in California as admitted carriers. YLWD shall require all subcontractors to maintain the same policies and coverage amounts listed above. District shall be designated as an additional named insured. Prior to entry, YLWD shall provide District with Certificates of Insurance. All insurance required under this Agreement shall be primary and shall wa* all rights of subrogation. Any insurance carried by District is excess and non- contributory �uch primary insurance. Section 7. Indemnification. YLWD be answerable or accountable in any manner for, injury to person or property, or both, arising employees, or invitees, or resulting from YL Area or from any cause whatsoever arising performance of activities to construct, install other use of and operations on the 'strict Prop District, its officers, agents, empl V inv each of them harmless from any tii penalties, obligations or liabilities (c, any person, firm, association, entitatic arising out of or in co *th act the performance of ies struct, any other use of an tions o e DistriJDi concurrent passive neg e on art of the extent tb��es are a nea 005633.00005 12402947.1 1 Bible for, and District shall not 1 or ex by reason of any damage or the acts o WD, its agents, officers, ctivities on the ct Property or License or in connection this Agreement, the 4intain YLWD vements, and any Area. YL all indemnify t and will hold an save them and damages to persons or property, t may be asserted or claimed by L l 1%. ision, or other organization e t Property or License Area, Mma the YLWD Improvements, and rty or Lic*se Area, whether or not there is its agents, employees or officers, except to ice or willful misconduct of District, and in all defend any action or actions filed in damages, penalties, obligations or liabilities, ises, including attorneys' fees incurred in (b) Jud Rend e d. YLWD shall promptly pay any judgment rendered against YLWD or Distri t covering such claims, damages, penalties, obligations and liabilities arisMWut of or in connection with such use of and operations on the District Property or License Area referred to herein and agrees to save and hold District harmless therefrom; and (c) Costs and Expenses, Attorneys' Fees. In the event District is made a party to any action or proceeding filed or prosecuted against YLWD for such damages or other claims arising out of the use of and operations on the District Property or License Area referred to herein, YLWD agrees to pay District any and all costs and expenses incurred by them in such action or proceeding together with reasonable attorneys' fees. In the event of the release or discharge of any hazardous materials onto the District Property subject to the indemnification obligations of this Section , the indemnity obligation includes, but is not limited to, remedial, removal, response, abatement, cleanup, legal, investigative, and monitoring costs, penalties, fines and disbursements, (including, without limitations, reasonable attorneys', consultants', and experts' fees) of any kind whatsoever, which may at any time be imposed upon or incurred by the District under this Section arising, directly or indirectly, (i) from requirements of any federal, state or local environmental law; (ii) in connection with claims by government authorities or third parties related to the condition of the District Property, and /or (iii) from the failure of YLWD, its agents, officers, employees, or invitees, or any other party connected with YLWD, to obtain, maintain, or comply with any environmental permit. The term "hazardous materials" means any hazardous, containment, pollutant, gas or material, including, wi other petroleum products and constituents thereof, under any federal, state or local statute, regulatio�p effect. 0 This Section 7 shall survive the Section 8. Compliance m local laws, ordinances, rules, an License Area, or to the Work and s be necessary pertaining to YLWD' License Area, and shall ensure, and p with all applicable kfed or 1 Division of the St "L possession of any c sub Property at any time pro Upon rea19 YLWD ma3 immediately lien or claim rr dangerous substance, waste, tation, gasoline, waste oil and iow or may become regulated 6her law now or hereafter in mply with deral, state or ie District Praferty, including any and all permits which may ie District Property, including anon, that the Work complies including compliance with ts, if applicable. The use or )bacco products on the District I'D will not permit any mechanics' I against the District Property for labor or IS iy wor performed by YLWD under this Agreement. such lien or claim delivered to YLWD by District, ty and the amount of such lien, but YLWD will will pay all proper costs and charges, and will have the Section 10. D shall be solely responsible for the payment of all YLWD's possessory interest taxes, ,during the term of the Agreement. Pursuant to Section 107.6 of the California Revenue and Taxation Code, District hereby notifies YLWD that: (i) the License Area subject to possessory interest taxes, and that such taxes shall be paid by YLWD; and (ii) YLWD may be subject to the payment of property taxes levied on the possessory interest obtained by YLWD. The parties acknowledge that during the term of this Agreement, YLWD shall be solely responsible for any and all possessory interest taxes and related charges and expenses (collectively, "Possessory Interest Taxes ") imposed with respect to the License Area, and shall indemnify, defend and hold harmless District against all possessory interest taxes. This statement is intended to comply with Section 107.6 of the Revenue and Taxation Code. 005633.00005 12402947.1 Section 11. Notices. All notices or other communications provided herein shall be in writing and shall be effective upon (a) personal delivery to any party hereto, as the case may be, (b) facsimile transmission with a hard copy deposited in overnight mail, (c) one (1) business day after deposit with an overnight courier service (i.e., Federal Express) or (d) when received if deposited in the United States mail, certified, postage fully pre -paid and addressed to the respective parties as follows: To YLWD: Yorba Linda Water District 1717 E. Miraloma Ave. Placentia, CA 92870 Attn: TelenhaM Linda Unified School ange e Ave. :A 928 Guaderr a, Director of ,e and Facilities 985 -8434 or Section 12. Le al InterpretWn trumen e parties expressly understand and agree that this Agreement constitut non- ve lic for use of the License Area, and is neither intende rties, n% shall it co ed to convey, a leasehold, easement, or other i in r roperty. kn '**th es that a license is a valid form of agreement and sh t contest the valid ee form i s Agreement in any action or proceeding brought by WD against the Dis or by the District against YLWD. Should either parry be compelled to institute arbitration, e , or other proceedings against the other for or on ac unt of the other party's failure or refusa perform or fulfill any of the covenants or condi ' f this Agreem nt o part to be performed or fulfilled, the parties agree that the rules nciples app le to licenses shall govern such actions or proceedings. This Agreemen 11 be gove y thes of the State of California with venue in Orange County. terms or conditions tees. If any legal action is necessary to enforce any of the ent, each party shall bear their own attorneys' fees. Section 14. EntiyAmement; Amendment. This Agreement constitutes the entire understanding between the parties with respect to the subject matter hereof, superseding all negotiations, prior discussions and preliminary agreements made prior to the date hereof. This Agreement may not be changed except in writing executed by both parties. Section 15. Successors, Assignment. This Agreement shall be binding and inure to the benefits of the successors of the respective parties. This Agreement may only be assigned upon the written consent of both parties. Section 16. Exhibits. The following exhibits which are attached hereto are incorporated herein and made a part of this Agreement: 005633.00005 12402947.1 Exhibit "A" - Map of District Property Exhibit "B" - Legal Description of License Area Exhibit "C" - Plans and Specifications and Schedule Section 17. Recitals. The Recitals are incorporated into this Agreement as though fully set forth herein. Section 18. Execution in Counterpart. This Agreement may be executed in several counterparts, and all so executed shall constitute one agreem t binding on all parties hereto, notwithstanding that all parties are not signatories to the orig* the same counterpart. IN WITNESS WHEREOF, the parties set forth above. Dated: , 2014 PLACENTIA - YORBA LINDA UNIFIED SCHi an Dated: , 2014 YORBA LINDA WAT$R DISTRICT By: 1 V am,,, anu -, 1 Llli 005633.00005 12402947.1 Agreement as of the day EXHIBIT "A" MAP OF DISTRICT PROPERTY 005633.00005 12402947.1 EXHIBIT `B" LEGAL DESCRIPTION OF LICENSE AREA 005633.00005 12402947.1 EXHIBIT "C" PLANS AND SPECIFICATIONS AND SCHEDULE 005633.00005 12402947.1