The August 11, 2014 meeting of the Yorba Linda Water District's Planning -
Engineering- Operations Committee was called to order by Director Melton at
10:00 a.m. The meeting was held in the Admin Conference Room at the
District's Administration Building located at 1717 East Miraloma Avenue in
Placentia, California 92870.
ROLL CALL
COMMITTEE MEMBERS PRESENT
Director Gary T. Melton, Chair
Director Michael J. Beverage
OTHER ATTENDEES
STAFF PRESENT
Steve Conklin, Acting General Manager
John DeCriscio, Operations Manager
Alex Thomas, Water Quality Engr.
PUBLIC COMMENTS
None.
ACTION CALENDAR
4.1. Amendment to Application to and Agreement with YLWD for Water
Service with Brandywine Homes
Mr. Conklin reported on the Brandywine Tract 17548 project and the
removal of the circa 1920s 20 -inch steel line through the site and
extending into YL Blvd. He described the determination that the poor
condition of the section in YL Blvd necessitates its removal and that
District staff negotiated a cost - sharing for this replacement work with the
developer. Following discussion, the Committee supported the staff
recommendation that the Board authorize the Acting General Manager to
approve the amendment to the application for water service, whereby the
District will pay 65% of the estimated $38,300 cost to replace the section
of 16" pipe and valves in YL Blvd.
4.2. Amendment No. 1 to the Professional Services Agreement with Stantec
Consulting for the Well 21 Wellhead Equipping Project
Mr. Conklin reported that staff requested a proposal from Stantec
Consulting to provide additional services for engineering design, bidding
support and construction management for a proposed well- discharge
collection pipeline as part of the Well 21 design project. The pipeline will
be in Richfield Rd, beginning south of La Palma and extending north
1
approximately 2,000 feet, providing transmission capacity for Well 21, and
proposed wells 22 and 23, to the Richfield Plant. Following discussion the
Committee supported the staff recommendation that the Board approve
Amendment 1 to the PSA with Stantec in the amount of $87,966 for the
described services.
4.3. Brand Name Requirement for Richfield Gate Modifications
Mr. Conklin reported that staff is beginning design of modifications to the
Richfield Gate, moving it inward to create a larger area for large District
trucks and delivery vehicles awaiting opening of the gate. Moving the gate
inward provides space so that the vehicles are not blocking the street
while waiting. He noted that staff is requesting Board approval for a
specific manufacturer of the mechanical swing -gate operator, so that it
matches that installed for the swing -gate on Miraloma. Following
discussion the Committee supported the staff recommendation for Board
approval of the described operator.
4.4. Unbudgeted Sewer Pipeline and Manhole Capital Repairs
Mr. DeCriscio reported that Operations Dept staff identified several small
capital sewer repair projects that should be addressed but were not
included in the FY 2014/15 Capital Outlay Budget. The estimated cost of
the repair projects is $150,000. Because these repairs were not identified
in the new Budget staff is required to obtain Board authorization prior to
transferring from the Sewer Capital Reserves to the Sewer Capital Outlay
account. Following discussion, the Committee supported the staff
recommendation that the Board authorize the said transfer.
4.5. Backhoe Purchase for Water Operations
Mr. DeCriscio reported that staff obtained quotes for the purchase of a
new backhoe, which was an approved item in the FY 14/15 budget.
Following discussion and review of the written quotes received, the
Committee supported the staff recommendation for the purchase of a new
backhoe for $80,919.
4.6. Purchase of Ford F350 Service Truck
Mr. DeCriscio reported that staff obtained quotes for the purchase of a cab
and chassis and purchase of a service body, which will be joined to
provide a new service truck for the sewer division. This was an approved
item in the new budget. Following discussion and review of the written
quotes received, the Committee supported the staff recommendation for
the purchase of the new components with a combined cost of $58,818.64.
5. DISCUSSION ITEMS
5.1. Status of Well Siting (Verbal Report)
Mr. Conklin reported that he provided information to and made a request
for the lease of a new well site (at the southerly end of Fee Ana) from
2
OCWD on July 22 at the OCWD /MWDOC/YLWD joint agency meeting.
He made the request to OCWD Director Roger Yoh and General Manager
Mike Markus. Mr. Markus said that he will forward the information to his
staff for consideration. Mr. Conklin indicated that he will be at OCWD on
Aug 13 and will pursue status of his request with Mr. Markus.
5.2. Well Production Report (Verbal Report)
Mr. Conklin reported that Mr. Alex Thomas, our Water Quality Engineer,
has prepared a new Well Water Blending Report. He and Mr. Thomas
briefed the Committee on the report, which will be submitted to the State
Health Department. Mr. Thomas described the flow of the various District
wells, with the inclusion of Well 20, which was added last year. He noted
that blending was required to meet water quality parameters established
by the State Health Department. The report was provided as an
information item for the Committee.
5.3. Monthly Groundwater Production and Purchased Import Water Report
Mr. DeCriscio reported on import and groundwater demand for July 2014,
noting that demand for the month is 7% less than budgeted. He also
noted that our groundwater production was 57 %, and to date, we have
met 42% of our CUP obligation.
5.4. Monthly Preventive Maintenance Report
Mr. DeCriscio reported on PM work one -month into the new FY. He noted
that for several of the reporting categories, new quantities are listed, which
have been updated based on better information available from GIS.
5.5. Monthly Production Summary Report
Mr. DeCriscio reported on water production, weather conditions, water
quality, and equipment removed and returned to service for the month of
July.
5.6. Groundwater Producer Meeting Notes for July 2014
Mr. Conklin reported on items discussed at the OCWD Groundwater
Producers meeting on July 9. He noted that OCWD reported that the
basin overdraft was estimated to be 342,000 AF as of June 30, 2014.
OCWD plans to purchase 65,000 AF of untreated MWD water to the end
of the year for recharge. Even with this recharge, it is anticipated that the
overdraft may increase to 400,000 AF.
5.7. Status Report on Capital Projects in Progress
Mr. Conklin updated the Committee on projects currently in planning,
design and construction.
5.8. Future Agenda Items and Staff Tasks
None.
6. ADJOURNMENT
3
6.1. The meeting was adjourned at 11
Operations Committee meeting
September 4, 2014 at 4:00 p.m.
12
30 a.m. The next Planning- Engineering-
is scheduled to be held Thursday,