HomeMy WebLinkAbout2009-01-08 - Board of Directors Meeting Agenda PacketAgenda Packet
Regular Meeting of the
Board of Directors
January 8, 2009
6:30 p.m.
1717 E. Miraloma Avenue, Placentia, CA 92870
Yorba Linda
Water District
ODIGINAL
Yorba Linda
Water District
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Thursday, January 8, 2008, 6:30 P.M.
1717 E. Miraloma Avenue, Placentia, CA 92870 (714) 701- 3020
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
John W. Summerfield, President
William R. Mills, Vice President
Paul R. Armstrong
Michael J. Beverage
Ric Collett
ADDITIONS /DELETIONS TO THE AGENDA
PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which they
wish to comment. If the matter is on the agenda, the Board will recognize the individual for their comment when the
item is considered. No action will be taken on matters not listed on the agenda. Comments are limited to matters of
public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes.
SPECIAL RECOGNITION
Presentation of Proclamation to the following for their assistance during the Freeway
Complex Fire on November 15, 2008:
Water Emergency Response Organization of Orange County
Santa Margarita Water District
Arrowhead Water
Presentation of Proclamation to Michael A. Payne for 35 Years of Service to the District
CONSENT CALENDAR
All items listed on the consent calendar are considered to be routine matters, status reports, or documents covering
previous Board instructions. The items listed on the consent calendar may be enacted by one motion. There will be
no discussion on the items unless a member of the Board, staff, or public requests further consideration.
Minutes of the Regular Board of Directors Meeting Held December 23, 2008
Recommendation: Approve the minutes as presented.
2. Payment of Bills, Refunds, and Wire Transfers
Recommendation: Ratify and authorize disbursements in the amount of
$1,224,386.63.
3. Progress Payment No. 8 for the Highland Reservoir Replacement Project
Recommendation: Approve Progress Payment No. 8 in the net amount of
$388,819.53 to Schuler Engineering Corporation and 10% retention of
$43,202.17 deposited to Citizens Business Bank escrow account for
construction of the Highland Reservoir Replacement Project, Job No.
200309.
4. Amendment No. 2 to Consultants Agreement with Psomas for Zone 4C
Reconfiguration Project and San Antonio Pressure Reducing Station Project
Recommendation: Approve Amendment No. 2 to the Consultants
Agreement with Psomas, In the amount of $58,950 for construction -phase
services for the San Antonio PRS Upgrade and the Zone Reconfiguration
projects, Job No. 200710.
5. Highland Booster Station Gas Engine Replacement
Recommendation: Authorize the General Manager to execute a contract
with General Pump Company in the amount not to exceed $80,000 to
replace the existing electric motor and pump with the similar 200 hp
electric motor and 3000gpm pump combination used on pumps No. 3 and
4 at the Highland Booster Station.
6. Damage Claim filed by Hong Nguy, 19781 Verona Lane, Yorba Linda.
Recommendation: That the Board of Directors reject and refer the claim
to ACWA/JPIA.
ACTION CALENDAR
This portion of the agenda is for items where staff presentations and Board discussions are needed prior to formal
Board action.
7. None
DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action of the Board
of Directors at the meeting, such as technical presentations, drafts of proposed policies, or similar items for which
staff is seeking the advice and counsel of the Board of Directors. Time permitting, it is generally in the District's
interest to discuss these more complex matters at one meeting and consider formal action at another meeting. This
portion of the agenda may also include items for information only.
8. Freeway Complex Fire After Action Report
Recommendation: This is for information only. No action is required.
9. Status of Hidden Hills Reservoir Project
Recommendation: This is for information only. No action is required.
10. Status of Capital Improvement Projects
Recommendation: This is for information only. No action is required.
6
REPORTS, INFORMATION ITEMS AND COMMENTS
11. a. President's Report
b. Directors' Reports
C. General Manager's Report
d. General Counsel's Report
COMMITTEE REPORTS
12. a. Executive - Administrative - Organizational Committee
(Summerfield /Mills) Alternate: Collett
1) Meeting scheduled for January 20, 4:00 p.m.
b. Finance - Accounting Committee
(Beverage / Summerfield) Alternate: Mills
1) Meeting scheduled for January 13, 4:00 p.m.
C. Personnel -Risk Management Committee
(Armstrong /Collett) Alternate: Summerfield
1) Minutes of meeting held January 5, 4:00 p.m. (to be presented at
the meeting).
2) Meeting scheduled for February 9, 4:00 p.m.
d. Planning- Engineering- Operations Committee
(Mills /Armstrong) Alternate: Beverage
1) Minutes of meeting held January 7, 4:00 p.m. (to be presented at
the meeting).
2) Meeting scheduled for February 5, 4:00 p.m.
e. Public Information - Technology Committee
(Collett /Beverage) Alternate: Armstrong
1) Minutes of meeting held January 6, 4:00 p.m. (to be presented at
the meeting).
2) Meeting scheduled for February 3, 4:00 p.m.
f. MWDOC /OCWD Ad Hoc Committee
(Mills /Collett) Alternate: Summerfield
1) Meeting scheduled for January 27, 4:00 p.m.
3
g. City of Placentia Ad Hoc Committee
(Beverage /Vecchiarelli)
1) Meeting to be scheduled.
INTERGOVERNMENTAL MEETINGS
13. a. MWDOC /MWD Workshop, January 7 (Staff)
b. OCWD Board, January 7 (Staff)
C. Yorba Linda City Council, January 6 (Mills)
BOARD OF DIRECTORS ACTIVITY CALENDAR
Authorization to attend meetings scheduled after January 8, 2009. Agenda is available in the District office prior to
meeting.
January 2009
Holiday, Jan 1
District Offices Closed
Personnel -Risk Management Committee, Jan 5, 4:00 p.m.
Armstrong/Collett
Public Information-Technology Committee, Jan 6, 4:00 p.m.
Collett/Beverage
Yorba Linda City Council, Jan 6, 6:30 p.m.
Mills
MWDOC /MWD Workshop, Jan 7, 7:30 a.m.
Staff
Planning-Engineering-Operations Committee, Jan 7, 4:00 p.m.
Mills/Armstrong
OCWD Board, Jan 7, 5:00 p.m.
Staff
District Board Meeting, Jan 8, 8:30 a.m.
Finance-Accounting Committee, Jan 13, 4:00 p.m.
Bevera a /Summerfield
Yorba Linda Planning Commission, Jan 14, 7:00 p.m.
Collett
Executive - Admin -Or anizational Committee, Jan 20, 4:00 p.m.
Summerfield /Mills
Yorba Linda City Council, Jan 20, 6:30 p.m.
Armstrong
MWDOC Board, Jan 21, 8:30 a.m.
Staff
OCWD Board, Jan 21, 5:00 p.m.
Staff
District Board Meeting, Jan 22, 8:30 a.m.
MWDOC /OCWD Ad Hoc Committee Meeting, Jan 27,4:00 p.m.
Mills /Collett
Yorba Linda Planning Commission, Jan 28, 7:00 p.m.
Summerfield
CONFERENCES AND SEMINARS
Authorize attendance of Directors and such staff members of the District as approved by the General Manager to
attend the following conferences and seminars.
14. ACWA Spring Conference — May 19 -22, 2009
ADJOURN TO CLOSED SESSION
The Board may hold a closed session on items related to personnel, labor relations and /or litigation. The public is
excused during these discussions.
15. Conference with Legal Counsel — Liability Claims
Pursuant to Section 54956.95 of the California Government Code
a. Claimants: Mohamad and Fatima Itani
Shannon Lew
Agency Claimed Against: Yorba Linda Water District
Fall
ADJOURNMENT
The next regular meeting of the Board of Directors will be held January 22, 2009, at
8:30 a.m., at 1717 E. Miraloma Avenue, Placentia 92870.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non - exempt public records that relate to open session agenda items
and are distributed to a majority of the Board less than seventy -two (72) hours prior to the meeting will be available
for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA
92870, during regular business hours. When practical, these public records will also be made available on the
District's internet website accessible at http: / /www.ylwd.com /.
Accommodations for the Disabled
Any person may make a request for a disability - related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning Michael A. Payne, General Manager, at 714 - 701 -3020, or
writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309. Requests must specify the nature
of the disability and the type of accommodation requested. A telephone number or other contact information should
be included so the District staff may discuss appropriate arrangements. Persons requesting a disability - related
accommodation should make the request with adequate time before the meeting for the District to provide the
requested accommodation.
5
2009 BOARD OF DIRECTORS CALENDAR
JAN
S M T W T F S
]6
1 2 3
4 5 6 7 9 10
11 12 13 14 15 16 17
18 19 20 21 - 23 24
25 26 27 28 29 30 31
APR
S M T W T F S
1 2 3 4
5 6 7 80 10 11
12 13 14 15 16 17 18
19 20 21 22M 24 25
26 27 28 29 30
JUL
S M T W T F S
1 2 3 4
5 6 7 80 10 11
12 13 14 15 16 17 18
19 20 21 220 24 25
26 27 28 29 30 31
OCT
S M T W T F S
1 2 3
4 5 6 7- 9 10',
11 12 13 14 15 16 17'
18 19 20 21 . 23 24
25 26 27 28 29 30 31
. Board Meeting
Activities
Holiday
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11M 13 14i
15 16 17 18 19 20 21
22 23 24 25 a 27 28
MAY
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 - 15 16
17 18 19 20 21 22 23
24 25j 26 27 29 30
311
NOV
S M T W T F S
1 2 3 4 5 6 7
8 9 10 117M 13 14
15 16 17 18 19 20 21
22 23 24 25 - 27 28
29 30
MAR
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11M 13 14
15 16 17 18 19 20 21
22 23 24 25M 27 28
29 30 31
AUG
S M
S
M
T W T F
S
3 4 5 6
7 8
9
1
2
3
4 5 6 7
8
10
11
12 13 . 15
15
16
17
18 19 20 21
22
23
24
25 26= 28
29
30
31
NOV
S M T W T F S
1 2 3 4 5 6 7
8 9 10 117M 13 14
15 16 17 18 19 20 21
22 23 24 25 - 27 28
29 30
MAR
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11M 13 14
15 16 17 18 19 20 21
22 23 24 25M 27 28
29 30 31
SEP
S M T W T F S
1 2 3 4 5
617 8 9011 12
13 14 15 16 17 18 19
20 21 22 230 25 26
27 28 29 30
DEC
S M T W T F
1 2 3 4 5
6 7 8 9 V 11 12
13 14 15 16 17 18 19
20 21 22 23 25 26
27 28 29 30 31
Feb 24 -26, 2009 - ACWA 2009 Washington, D.C. Conference
May 19 -22, 2009 - ACWA Spring Conference, Sacramento
Dec 1 -4, 2009 - ACWA Fall Conference, San Diego
Dec 9 -11, 2009 - CRWUA 2008 Annual Conference, Las Vegas
Rev. 12/30/08
JUN
S M
T
W T F
1
2
3 4 5 6
7 8
9
10M 12 13
14 15
16
17 18 19 20
21 22
23
24 26 27
28 29
30
SEP
S M T W T F S
1 2 3 4 5
617 8 9011 12
13 14 15 16 17 18 19
20 21 22 230 25 26
27 28 29 30
DEC
S M T W T F
1 2 3 4 5
6 7 8 9 V 11 12
13 14 15 16 17 18 19
20 21 22 23 25 26
27 28 29 30 31
Feb 24 -26, 2009 - ACWA 2009 Washington, D.C. Conference
May 19 -22, 2009 - ACWA Spring Conference, Sacramento
Dec 1 -4, 2009 - ACWA Fall Conference, San Diego
Dec 9 -11, 2009 - CRWUA 2008 Annual Conference, Las Vegas
Rev. 12/30/08
AOFT D
HE ORBA LINDA WATER DISTRICT
S
BY.
MINUTES OF THE
JAN - 8 2009 YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
December 23, 2008
ITEM NO. '
The December 23, 2008 regular meeting of the Yorba Linda Water District Board of
Directors was called to order by President Summerfield at 8:33 a.m. The meeting was
held at the District's offices at 1717 E. Miraloma Avenue, Placentia, CA.
DIRECTORS PRESENT AT ROLL CALL
John W. Summerfield, President
William R. Mills, Vice President
Michael J. Beverage
Ric Collett
DIRECTORS ABSENT AT ROLL CALL
Paul R. Armstrong
STAFF PRESENT
Michael A. Payne, General Manager
Kenneth R. Vecchiarelli, Asst. G.M.
Arthur G. Kidman, General Counsel
Lee Cory, Operations Manager
Diane Cyganik, Finance Director
Cindy Botts, Assistant Administrator I
Mike Kiddie, Senior Fleet Mechanic
Ron Talbert, Mechanic III
Doug Baker, Mechanic I
John DeCriscio, Chief Plant Operator
Joe Polimino, Project Engineer
Annie Alexander, Executive Secretary
INTRODUCTION OF VISITORS AND PUBLIC COMMENTS
President Summerfield introduced the following visitors:
Mark Schwing, Mayor
Nancy Rikel, Council Member
Brett Barbre, Director
Erin Welch, Writer
Mark Schock, Resident
Larry Goodnough, Resident
City of Yorba Linda
City of Yorba Linda
MW DOC
OC Register
President Summerfield opened the meeting to public comments.
Mr. Goodnough addressed the Board regarding the meeting times, the after action
report for the firestorm event and the proposed raises. Mr. Goodnough congratulated
Mr. Payne on his retirement.
Mr. Barbre addressed the Board regarding the current drought, the after action report
for the firestorm event and provided a MWDOC monthly water usage report to staff.
Mr. Schock addressed the Board regarding the meetings, water pressure issues in the
Hidden Hills area and the after action report for the firestorm event.
SPECIAL RECOGNITION
The Board of Directors recognized the following staff for completion of Air Quality
Management District training:
Mike Kiddie, Senior Fleet Mechanic
Ron Talbert, Mechanic III
Doug Baker, Mechanic I
The Board of Directors presented a Proclamation to the following employees for their
leadership efforts in the Golden Guardian Exercise held November 13, 2008:
John DeCriscio, Chief Plant Operator corrected
Joe Polimino, Project Engineer
Harold Hulbert, Operations Secretary was also recognized but was not in
attendance at the meeting.
CONSENT CALENDAR
Director Mills requested that Item 1 be corrected to reflect that he did not attend the
Yorba Linda City Council meeting held December 2, 2008.
On a motion by Director Mills, seconded by Director Collett, the Board voted 4 -0 to
approve the Consent Calendar with a correction to Item 1. Director Collett abstained
from voting on Check No. 50646 of Item 2 as he had a business relationship with the
vendor. Director Beverage abstained from voting on Check No. 50595 of Item 2 as he
had a business relationship with the vendor.
1. Minutes of the Regular Board of Directors Meeting Held December 11, 2008
2. Payment of Bills, Refunds and Wire Transfers
ACTION CALENDAR
3. Financial Statements for the First Quarter of Fiscal Year 2008 -09 for the Period
Ending September 30, 2008
Mr. Vecchiarelli explained that this item was typically on the Consent Calendar
and responded to questions from the Board.
On a motion by Director Collett, seconded by Director Beverage, the
Board voted 4 -0 to receive and file the financial statements.
4. Approve Resolution No. 08 -17 for Employer Paid Member Contributions
Ms. Cyganik presented the item and explained that the Resolution was simply a
housekeeping item required by CalPERS. Adoption of this resolution would not
result in any increased cost to the District and could be rescinded or amended at
any time.
On a motion by Director Mills, seconded by Director Collett, the Board
voted 4 -0 on a Roll Call vote to approve Resolution No. 08 -17 for
Employer Paid Member Contributions.
01
DISCUSSION ITEMS
5. Triangle Complex Fire After Action Report
Mr. Vecchiarelli provided a brief overview of the status of the report which will be
presented at the next Board meeting. Mr. Vecchiarelli responded to questions
from a member of the public regarding the report. Mr. Vecchiarelli also reported
that the Orange County Fire Authority had provided himself and Senator Bob
Huff with a helicopter ride to survey the damage from the firestorm event.
REPORTS, INFORMATION ITEMS AND COMMENTS
6. a. President's Report
President Summerfield thanked the public in attendance and expressed
his appreciation to Mr. Payne for his service to the District.
b. Directors' Reports
Director Mills reported on his attendance at the recent ACWA/JPIA and
ACWA conferences. A brief discussion regarding existing ULF toilet and
shower head replacement programs followed.
C. General Manager's Report
Mr. Vecchiarelli reported on staff's efforts on the Hidden Hills reservoir.
COMMITTEE REPORTS
7. a. Executive - Administrative - Organizational Committee
(Summerfield /Mills) Alternate: Collett
1) Minutes of the meeting held December 16 were presented at the
meeting. Directors Summerfield and Mills attended. Items
discussed during the meeting were as follows: recommendations
for waiving customer service fees and conditions for payment
extensions; reports on legislative and grant activities; General
Counsel's billing report; and MWDOC's Governance Study being
prepared by LAFCO.
2) Meeting scheduled for January 20, 4:00 p.m.
b. Finance - Accounting Committee
(Beverage /Summerfield) Alternate: Mills
1) Meeting scheduled for January 13, 4:00 p.m.
C. Personnel -Risk Management Committee
(Armstrong /Collett) Alternate: Summerfield
1) Meeting scheduled for January 5, 4:00 p.m.
41
d. Planning- Engineering- Operations Committee
(Mills /Armstrong) Alternate: Beverage
1) Meeting scheduled for January 7, 4:00 p.m.
e. Public Information - Technology Committee
(Collett /Beverage) Alternate: Armstrong
1) Meeting scheduled for January 6, 4:00 p.m.
f. MWDOC Ad Hoc Committee
(Mills /Collett) Alternate: Summerfield
1) Meeting scheduled for January 27, 4:00 p.m.
g. City of Placentia Ad Hoc Committee
(Beverage /Vecchiarelli)
1) Meeting to be scheduled.
INTERGOVERNMENTAL MEETINGS
8. a. MWDOC Board, December 17 (Staff)
Staff did not attend.
b. OCWD Board, December 17 (Staff)
Staff did not attend.
C. Yorba Linda City Council, December 16 (Armstrong)
There was no report.
BOARD OF DIRECTORS ACTIVITY CALENDAR
Authorization to attend meetings scheduled after December 22, 2008. Agenda is available in the District office prior
to meeting.
December 2008
MWDOC Ad Hoc Committee Meeting, Dec 23, 4:00 p.m.
CANCELED
Yorba Linda Planning Commission, Dec 24, 7:00 p.m.
CANCELED
Holiday, Dec 25 -26
District Offices Closed
January 2009
Holiday, Jan 1
District Offices Closed
Personnel -Risk Management Committee, Jan 5, 4:00 p.m.
Armstrong/Collett
Public Information-Technology Committee, Jan 6, 4:00 p.m.
Collett/Beverage
Yorba Linda City Council, Jan 6, 6:30 p.m.
Mills
MWDOC /MWD Workshop, Jan 7, 7:30 a.m.
Staff
Planning-Engineering-Operations Committee, Jan 7, 4:00 p.m.
Mills/Armstrong
OCWD Board, Jan 7, 5:00 p.m.
Staff
District Board Meeting, Jan 8, 8:30 a.m.
Finance-Accounting Committee, Jan 13, 4:00 p.m.
Bevera a /Summerfield
Yorba Linda Planning Commission, Jan 14, 7:00 p.m.
Collett
Executive - Admin -Or anizational Committee, Jan 20, 4:00 p.m.
Summerfield /Mills
Yorba Linda City Council, Jan 20, 6:30 p.m.
Armstrong
MWDOC Board, Jan 21, 8:30 a.m.
Staff
OCWD Board, Jan 21, 5:00 p.m.
Staff
District Board Meeting, Jan 22, 8:30 a.m.
MWDOC /OCWD Ad Hoc Committee Meeting, Jan 27, 4:00 p.m.
Mills /Collett
Yorba Linda Planning Commission, Jan 28, 7:00 p.m.
Summerfield
CONFERENCES AND SEMINARS
9. Authorize attendance of Directors and such staff members of the District as
approved by the General Manager to attend the following conferences and
seminars.
a. None.
A recess was declared at 9:53 a.m.
ADJOURN TO CLOSED SESSION
The Board entered into Closed Session at 10:05 a.m. All Directors were present. Also
present were Mr. Vecchiarelli, Mr. Kidman and Ms. Knight.
10. Conference with Legal Counsel — Liability Claims
Pursuant to Section 54956.95 of the California Government Code
a. Claimant: Paul and Gillian Johnson
b. Claimant: Dennis Winzen
Agency Claimed Against: Yorba Linda Water District
11. Conference with Real Property Negotiators
Pursuant to Section 54956.8 of the California Government Code
Property: 4622 Plumosa Drive, Yorba Linda, CA
Agency Negotiators: Michael A. Payne and Ken Vecchiarelli
Negotiating Parties: To Be Determined
Under Negotiation: Price and Terms of Payment
12. Public Employee Appointment
Pursuant to Section 54957 of the California Government Code
Title: General Manager
5
CLOSED SESSION REPORT
The Board reconvened in Open Session at 10:51 a.m. Mr. Kidman reported that the
Board had voted 4 -0 to return the claim submitted by Mr. and Mrs. Johnson as it was
insufficient. The Johnson's will be given 15 days to resubmit their claim. The Board
also voted 4 -0 to reject the claim submitted by Mr. Winzen as required by the District's
insurance company. Mr. Winzen's claim will be referred to ACWA for further
processing. In addition, the Board also voted 4 -0 to appoint Mr. Vecchiarelli as the new
General Manager. The Ad Hoc Committee formed to negotiate the terms and
conditions for the position will work with Mr. Vecchiarelli in developing an employment
contract.
ADJOURNMENT
On a motion by Director Beverage, seconded by Director Mills, the Board voted to
adjourn at 10:57 a.m. to a regular meeting of the Board of Directors scheduled for
January 8, 2009 at 6:30 p.m., at 1717 E. Miraloma Avenue, Placentia 92870.
n
AGENDA REPORT
Board Meeting Date: January 8, 2009
To: Board of Directors
From: Kenneth R. Vecchiarelli, General Manager
Staff Contact: Diane Cyganik, Finance Director
Reviewed by General Counsel: N/A Budgeted:
Funding Source:
CEQA Account No:
Compliance: N/A Estimated Costs:
ITEM NO. �—
APPROVED BY THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
JAN - 8 2009
BY
�rA/1.sc� G✓h9 /jYI,Q
Yes Total Budget: N/A
All Funds
N/A Job No: N/A
$1,224,386.63 Dept: Bus
Subject: Payments of Bills, Refunds, and Wire transfers
SUMMARY:
Section 31302 of the California Water Code says the District shall pay demands made against it
when they have been approved by the Board of Directors. Pursuant to law, staff is hereby
submitting the list of disbursements for Board of Directors' approval.
DISCUSSION:
The major items and wire transfers on this disbursement list are as follows: A wire of $82,802.92
to ACWA -HBA for January 2009 health premium; a wire of $261.96 to ACWA -EAP for January
2009 EAP; a check of $61,018.30 to Hardy & Harper for September 2008 billing; and, a check of
$388,819.53 to Schuler Engineering Corporation for Job 200309 progress payment. The
balance of $209,681.20 is routine invoices.
ADP is now issuing our payroll checks, with the exception of the third party checks, listed below.
In summary, the check register total is $742,583.91; payroll No. 25 and 26 totals are
$242,038.27 and $239,764.45, respectively; and, the disbursements of this agenda report are
$1,224,386.63. A summary of the checks is as follows:
Payables:
Void Check
Check
No.
50598
Manual Check
Check
No.
50674
Void Check
Check
No.
50675
Computer Checks
Check
Nos.
50676 - 50744
Payroll #25:
Manual Check
Check
No.
4221
Void Check
Check
No.
4222
Manual Checks
Check
Nos.
4223 - 4228
Payroll #26:
Manual Checks
Check
Nos.
4229 - 4233
The disbursement total for the current period is $1,224,386.63, distributed as follows:
Water $1,216,847.45
Sewer $ 6,039.18
ID #1 $ 0.00
ID #2 $ 1,500.00
TOTAL $1,224,386.63
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors approves bills, refunds and wire transfers semi - monthly.
STAFF RECOMMENDATION:
That the Board of Directors ratify and authorize disbursements in the amount of $1,224,386.63.
CHECK NUMBERS
50598
50674 TO 50744
WIRES:
W- 122408 ACWA -HBA
W- 122408A ACWA -EAP
January 08, 2009
$ 0.00
$ 659,519.03
$ 82,802.92
$ 261.96
$ 83,064.88
TOTAL OF CHECKS AND WIRES:
PAYROLL NOS. 25 AND 26:
CHECK NUMBERS:
4221 TO 4228
4229 TO 4233
--------------------------------------------------------------------------
TOTAL:
------------------------------------------
------------------------------------------
$ 742,583.91
$
242,038.27
$
239,764.45
-------------------------------------
$
---------------------
---------------------
1,224,386.63
APPROVED BY THE BOARD OF DIRECTORS MINUTE ORDER AT BOARD
MEETING OF JANUARY 8, 2009
------------------------------------------------------------------
------------------------------------------------------------------
TOTAL DISBURSEMENTS ARE DISTRIBUTED TO THE FUND ACCOUNTS
AS FOLLOWS:
WATER $1,216,847.45 SEWER $ 6,039.18
ID # 1 $ 0.00 ID # 2 $ 1,500.00
TOTAL: $1,224,386.63
Yorba Linda Water DistrictCHECK REGISTER
FOR CHECKS DATED 12 -24 -08 THRU 01 -08 -09
Check.
Check...
Posting.
Vendor Name ...................
Check.....
No
Date
Date
Amount
50681
01 -08 -09
01 -08 -09
ABIGAIL ABBOTT STAFFING SVC
3,695.40
50682
01 -08 -09
01- 08- 09.ACWA
-ASSN OF CA WATER AGENCIES
1,130.00
122408
12 -24 -08
12 -24 -08
ACWA -HBA
82,802.92
22408A
12 -24 -08
12 -24 -08
ACWA -HBA
261.96
50598
12 -23 -08
12 -24 -08
ACWA /JPIA
- 271.35
50683
01 -08 -09
01 -08 -09
ADVANCED INFRASTRUCTURE
1,192.25
50684
01 -08 -09
01 -08 -09
AGB - AMERICAN GEOPHYSICAL
855.38
50685
01 -08 -09
01 -08 -09
ANSWER ONE COMMUNICATIONS
1,190.01
50686
01 -08 -09
01 -08 -09
AQUA- METRIC SALES CO.
75.51
50687
01 -08 -09
01 -08 -09
AQUATIC INSPECTIONS
7,675.00
50688
01 -08 -09
01 -08 -09
ARTISTIC MAINTENANCE, INC
3,995.60
50689
01 -08 -09
01 -08 -09
AT & T - CALNET2
3,676.84
50690
01 -08 -09
01 -08 -09
AT & T MOBILITY
73.10
50691
01 -08 -09
01 -08 -09
AT &T
45.19
50692
01 -08 -09
01 -08 -09
AT &T /MCI
1,250.74
50676
01 -08 -09
01 -08 -09
BENJAMIN F KNIGHT
52.32
50693
01 -08 -09
01 -08 -09
C & L REFRIGERATION CORP.
3,175.19
50694
01 -08 -09
01 -08 -09
CADET UNIFORM SERVICE
2,937.90
50695
01 -08 -09
01 -08 -09
CAROLLO ENGINEERS
9,624.45
50696
01 -08 -09
01 -08 -09
CDW -G GOVERNMENT, INC
577.45
50697
01 -08 -09
01 -08 -09
CHARLES P. CROWLEY CO.
528.75
50698
01 -08 -09
01 -08 -09
CITIZEN'S BUSINESS BANK
43,202.17
50699
01 -08 -09
01 -08 -09
CLA -VAL CO.
2,011.42
50700
01 -08 -09
01 -08 -09
CLINICAL LAB. OF SAN BERN.
2,485.00
50677
01 -08 -09
01 -08 -09
DEBBIE KOTTMAN
350.08
50701
01 -08 -09
01 -08 -09
DICK'S LOCK & SAFE INC.
324.00
50702
01 -08 -09
01 -08 -09
ECONOMY RADIATOR REPAIR
95.00
50678
01 -08 -09
01 -08 -09
EILEEN ANDERSON
31.08
50703
01 -08 -09
01 -08 -09
ELLIOTT ROOF MAINTENANCE
260.00
50704
01 -08 -09
01 -08 -09
EMPLOYEE RELATIONS, INC.
153.75
50705
01 -08 -09
01 -08 -09
FAIRWAY FORD SALES, INC.
185.52
50706
01 -08 -09
01 -08 -09
FRY'S ELECTRONICS
36.82
50707
01 -08 -09
01 -08 -09
HARDY & HARPER INC.
61,018.30
50708
01 -08 -09
01 -08 -09
INFOSEND
8,684.28
50709
01 -08 -09
01 -08 -09
INTERIORS BY JANI -TRESS
3,768.00
Yorba Linda Water DistrictCHECK REGISTER
FOR CHECKS DATED 12 -24 -08 THRU 01 -08 -09
Check. Check... Posting. Vendor Name ................... Check.....
No Date Date Amount
50710
01 -08 -09
01 -08 -09
J & S CONSTRUCTION
3,426.75
50711
01 -08 -09
01 -08 -09
KENNY GRAFF
65.00
50712
01 -08 -09
01 -08 -09
LAER PEARCE
45,553.38
50679
01 -08 -09
01 -08 -09
LIGHTHOUSE REALESTATE
5.54
50680
01 -08 -09
01 -08 -09
MARIPOSA PLACENTIA
8.35
50713
01 -08 -09
01 -08 -09
MIKAEL BECKER
150.00
50714
01 -08 -09
01 -08 -09
MOBILE HOSE & HYDRAULIC SUPPLY
47.50
50715
01 -08 -09
01 -08 -09
MORTON SALT
2,464.63
50716
01 -08 -09
01 -08 -09
MUZAK OA
268.53
50717
01 -08 -09
01 -08 -09
NICKEY PETROLEUM CO
2,881.36
50718
01 -08 -09
01 -08 -09
PETE'S ROAD SERVICE INC
151.68
50719
01 -08 -09
01 -08 -09
PRESSURE SYSTEMS /KPSI
1,002.90
50720
01 -08 -09
01 -08 -09
PSOMAS & ASSOCIATES
11,123.27
50721
01 -08 -09
01 -08 -09
R J SERVICES, INC
3,800.00
50722
01 -08 -09
01 -08 -09
RED WING SHOE STORE - ORANGE
131.02
50723
01 -08 -09
01 -08 -09
SC FUELS
551.41
50724
01 -08 -09
01 -08 -09
SCHULER ENGINEERING CORP.
388,819.53
50725
01 -08 -09
01 -08 -09
SECURITY SOLUTIONS
1,481.08
50726
01 -08 -09
01 -08 -09
SELMAN CHEVROLET COMPANY
3,255.54
50727
01 -08 -09
01 -08 -09
SHAPE PRODUCTS CO.
332.35
50728
01 -08 -09
01 -08 -09
SHRED -IT LOS ANGELES
68.60
50729
01 -08 -09
01 -08 -09
SKILLPATH INC.
199.00
50730
01 -08 -09
01 -08 -09
SOUTHERN CALIF EDISON CO.
32.95
50731
01 -08 -09
01 -08 -09
SOUTHERN CALIF GAS CO.
9,171.20
50732
01 -08 -09
01 -08 -09
STAPLES BUSINESS ADVANTAGE
1,695.05
50733
01 -08 -09
01 -08 -09
STATE CHEMICAL MANUFACTURING
224.22
50734
01 -08 -09
01 -08 -09
STATE OF CA, DEPT OF PARKS
1,500.00
50735
01 -08 -09
01 -08 -09
STEVEN ENTERPRISES
100.11
50736
01 -08 -09
01 -08 -09
TIME WARNER CABLE
187.38
50737
01 -08 -09
01 -08 -09
TOSHIBA INTERNATIONAL CORP
2,632.18
50738
01 -08 -09
01 -08 -09
UNITED INDUSTRIES
1,020.78
50739
01 -08 -09
01 -08 -09
VERIZON WIRELESS
423.31
50740
01 -08 -09
01 -08 -09
WELLS SUPPLY CO
10,605.59
50741
01 -08 -09
01 -08 -09
WESTSIDE BUILDING MATERIAL
137.91
50674
12 -24 -08
12 -24 -08
WILLIAM MILLS
271.35
Yorba Linda Water DistrictCHECK REGISTER
FOR CHECKS DATED 12 -24 -08 THRU 01 -08 -09
Check. Check... Posting. Vendor Name ................... Check.....
No Date Date Amount
50742 01 -08 -09 01 -08 -09 YORBA LINDA AUTO PARTS 502.28
50743 01 -08 -09 01 -08 -09 YORBA LINDA HARDWARE 64.75
50744 01 -08 -09 01- 08- 09'ZEP MANUFACTURING 1,077.40
742,583.91
ITEM NO. �_
AGENDA REPORT
APPROVED BY THE BOARD OF DIRECTORS
Board Meeting Date: January 8, 2009 OF THE YORBA LINDA WATER DISTRICT
To: Board of Directors JAN - 8 2009
From: Steve Conklin Consulting 9 — Engineer BY -
Staff Contact: Leon de los Reyes, Water Quality Engineer
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 11.2M
Funding Source: Water Revenue Bond
CEQA Account No: 102 -2700 Job No: 200309
Compliance: Mitigated Neg. Dec. Estimated Costs: $ 11.2M Dept: Eng
Subject: Progress Payment No. 8 for the Highland Reservoir Replacement Project
SUMMARY:
The Board of Directors awarded a contract to Schuler Engineering for construction of the
Highland Reservoir Replacement Project on April 10, 2008 and approved a project construction
budget of $11.2M on May 15, 2008. Submitted for consideration is construction Progress
Payment No. 8.
DISCUSSION:
In accordance with the contract documents, Schuler Engineering Corporation submitted a
request for Progress Payment No. 8 for the period ending December 31, 2008. This progress
pay request includes small percentage payments for Builder's Risk, shoring and sheet bracing,
mobilization including project related office expenses and submittals, potholing and utilities
surveys, temporary tank interior works, 15% of electrical and instrumentation, 35% for below and
above ground yard piping, and 37.2% for change order related tasks.
The status of the construction contract with Schuler Engineering is as follows:
• Original contract amount is $9,049,346 and 730 calendar days starting June 2, 2008.
• Authorized change order to date amount is $183,648.89 (2.03% of the original contract
amount) and 10 calendar days (1.37% of original contract calendar days)
• The revised construction contract amount and period are $9,232,994.89, and 740
calendar days respectively.
• If approved, Progress Payment No. 8 is $432,021.70 (4.7% of the revised contract
amount less 10% retention of $43,202.17 for a net payment of $388,819.53
• If approved, total progress payments to date including retentions are $3,383,585.71
(36.6% of the revised contract amount).
• As of December 31, 2008, 213 calendar days were used (28.8% of the revised contract
time).
Staff and Carollo Engineers, the District's construction management consultant, reviewed the
progress payment request and recommend payment. A copy of Progress Payment No. 8 is
attached for your information.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors awarded a construction contract to Schuler Engineering on April 10,
2008 in the amount of $9,049,346 for construction of the project. On May 15, 2008, the Board
approved execution of a Professional Service Agreement with Carollo Engineers in the amount
of $605,856 for engineering support services, construction management and backup inspection
services; a Professional Service Agreement with Leighton Consulting Engineers in the amount
of $86,200 for geotechnical services, soils, concrete and materials testing; a Professional
Service Agreement with BonTerra Consulting in the amount of $22,251 for environmental
compliance services; and approved the construction budget in the amount of $11,200,000 for
construction of the Highland Reservoir Replacement Project. The Board has approved 7
progress payments and one change order to date, the most recent of which was approved on
December 11, 2008.
STAFF RECOMMENDATION:
Staff recommends the Board of Directors approve Progress Payment No. 8 in the net amount of
$388,819.53 to Schuler Engineering Corporation and 10% retention of $43,202.17 deposited to
Citizens Business Bank escrow account for construction of the Highland Reservoir Replacement
Project, Job No. 200309.
YORBA LINDA WATER DISTRICT PROGRESS PAY REPORT
PROJECT Highland Reservoir PROGRESS PAY REQUEST NO. 8
LOCATION Yorba Linda PROJECT NO. J- PAGE 1 OF 1 PAGES
200309
CONTRACTOR Schuler Engineering DATE Dec. 31,2008
ORIGINAL CONTRACT AMOUNT: $ 9,049,346.00
AUTHORIZED CHANGE ORDERS: $ 183,648.89
REVISED CONTRACT AMOUNT: $ 9,232,994.89
PROGRESS PAY ESTIMATE FOR PERIOD
VALUE OF WORK COMPLETED
CHANGE ORDER WORK COMPLETED
TOTAL VALUE OF WORK COMPLETED
LESS RETENTION 10%
LESS OTHER DEDUCTIONS
AMOUNT DUE THIS ESTIMATE
LESS AMOUNT PREVIOUSLY PAID
BALANCE DUE THIS ESTIMATE
NOTICE TO PROCEED
COMPLETION TIME
APPROVED TIME EXTENSIONS
TOTAL CONTRACT TIME
TIME EXPENDED TO DATE
TIME REMAINING
REQUESTED BY:
December 1, 2008
TO December 31, 2008
PREVIOUS
THIS MONTH
740
TO DATE
213
$ 2,951,564.01
$ 271,546.51
$
3,223,110.52
$ -
$ 160,475.19
$
160,475.19
$ 2,951,564.01
$ 432,021.70
$
3,383,585.71
$
338,358.57
$
3,045,227.14
$
2,656,407.61
$
388,819.53
June 2,2008
730
CALENDAR DAYS
10
CALENDAR DAYS
740
CALENDAR DAYS
213
CALENDAR DAYS
527
CALENDAR DAYS
DATE:
(_., C CMENGINEERING= CONTRACTOR
Chas Wic
APPROVED BY: 7 DATE:
CAROLLO- OWNER'S- REPRESENTATIVE
Brian Wilso
APPROVED BY: DATE:
YLWD- OWNER
Ken Vecchiarelli
/,)- — Z3-oy
ITEM NO. q
AGENDA REPORT
APPROVED BY THE BOARD OF DIRECTORS
Board Meeting Date: January 8, 2009 OF THE YORBA LINDA WATER DISTRICT
To: Board of Directors JAN - g 2009
From: Steve Conklin, Engineering Consultant BY
Staff Contact: Joe Polimino, Project Engineer
Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $ 1.5 Million
Funding Source: All Water Funds
CEQA Account No: 101 -2700 Job No: 200710
Compliance: Exempt Estimated Costs: $ 58,950 Dept: Eng
Subject: Amendment No. 2 to Consultants Agreement with Psomas for Zone 4C
Reconfiguration Project and San Antonio Pressure Reducing Station Project
SUMMARY:
The Zone 4C Reconfiguration Project has been advertised for construction bids, which are due
January 20, 2009. At the same time, design work is proceeding for upgrading the San Antonio
Pressure Reducing Station (PRS), through which higher pressure water will be supplied to the
new Zone 4C. The PRS Upgrade Project is planned to go to bid by April 2009. Both projects
are scheduled for completion of construction in December 2009. District Engineering
Department staff will provide construction inspection for both projects. Psomas, the Consulting
Engineer that designed both projects, submitted a District - requested proposal to provide other
necessary construction -phase services. Following review of the proposal, District staff
recommends approval of an agreement amendment for $58,950 for said services for the two
projects.
DISCUSSION:
The Zone 4C Reconfiguration Project will raise the hydraulic grade line from 675 to 706 to
mitigate low- pressure problems in three separate areas, totaling 800 homes. That pipeline
project is currently out to bid. Last month the Board approved Amendment No. 1 to the
Professional Services Agreement for Psomas, the District's design consultant for the project, to
design improvements to the San Antonio PRS. The higher pressure water will be provide
through that facility to the new Zone 4C. The PRS was constructed in 1981 and needs to be
upgraded to current District standards. It is planned that construction of the pipeline project and
the PRS Upgrade Project will begin in March and June 2009, respectively, with both complete
by December 2009.
As noted above, District Engineering Department staff will provide construction inspection for
both projects. In addition to inspection, other construction -phase services are necessary that
are typically provided by the design firm for continuity and to assure design intent. Accordingly,
at the request of District staff, Psomas submitted a proposal to provide other necessary
construction -phase services. A copy of the proposal is attached.
The proposal is for services for the two construction projects that will proceed separately with
planned completion for each in December 2009. The same project manager and project
engineer that designed the two projects will be responsible for the construction -phase services
provided.
District staff reviewed the proposal, including services, staff -hours and fee and believe that they
are appropriate for the work required. Staff recommends authorization of Amendment No. 2 in
the amount of $58,950 for construction -phase services. This would bring the total for design -,
bid- and construction -phase services to $215,751.
PRIOR RELEVANT BOARD ACTION(S):
On June 28, 2007, the Board of Directors adopted Budgets for Fiscal Years 2007/08 and
2008/09 and approved the Current Five Year Capital Improvement Plan for FY 2007 -2012. On
September 13, 2007, the Board of Directors authorized staff to modify the Current Five Year
Plan Capital Improvement Projects List and the Adopted Budget for Fiscal Years 2007 -2009 by
adding the Zone 4 Reconfiguration Project for the Twin Peaks Area of East Lake Village. On
March 13, 2008, the Board of Directors received and filed the Zone Reconfiguration Study for
Areas 1, 2 and 3 prepared by RBF Consulting and authorized staff to solicit proposals for the
design of the combined projects identified as Alternative Six in this study. On May 15, 2008, the
Board of Directors authorized the President and Secretary to execute a Professional Services
Agreement with Psomas for a fee not to exceed $113,676 to provide design and bid services for
the Zone Reconfiguration and Sub Zone Extension Projects, Job Nos. 200220 and 200710. On
December 11, 2008, the Board of Directors authorized the President and Secretary to execute
Amendment No. 1 to the Professional Services Agreement with Psomas for a fee increase not
to exceed $43,125 to provide design and bid services for San Antonio Pressure Reducing
Station Upgrade Project.
STAFF RECOMMENDATION:
Support staff recommendation for Amendment No. 2 to the Consultants Agreement with
Psomas, in the amount of $58,950 for construction -phase services for the San Antonio PRS
Upgrade and the Zone Reconfiguration projects, Job No. 200710.
COMMITTEE RECOMMENDATION:
The Planning- Engineering- Operations Committee will discuss this item at its meeting being held
January 7`h. Staff will report the Committee's recommendation at the Board meeting.
December 19, 2008
Mr. Steve Conklin, PE
YORBA LINDA WATER DISTRICT
1717 E. Miraloma Ave.
Placentia, CA 92870
Subject: Engineering Services Proposal for Construction Phase Services for Zone
Reconfiguration Areas 1, 2 & 3 and San Antonio PRS Upgrade Projects
Dear Mr. Conklin:
INTRODUCTION
In accordance with your request, we are pleased to submit this proposal to provide
construction phase engineering services for two projects: the Zone Reconfiguration Areas 1,
2, & 3 Project and the San Antonio PRS Upgrade Project in the City of Yorba Linda.
PROJECT BACKGROUND
In May 2008 Yorba Linda Water District (District) contracted with Psomas to prepare
construction plans and specifications for the Zone Reconfiguration Areas 1, 2 & 3 Water
Systems Improvement Project. On December 11, 2008 the District authorized Amendment
No. 1 to our professional services agreement to provide design and bidding support services
for the San Antonio PRS Upgrade Project. The Zone Reconfiguration Project is currently
being advertised for bids and the San Antonio PRS Upgrade Project design is underway. In a
memorandum dated December 11, 2008, the District requested a proposal to provide
construction phase engineering services for both projects.
PROPOSED STAFFING
Our same project manager (Vernon Weisman) and project engineer (Neha Gajjar) responsible
for the design of the Zone Reconfiguration and San Antonio PRS Upgrade Projects will also
be responsible for all construction phase services for these projects. Significant involvement
of our design team during construction will help provide a seamless transition from design
and bidding to construction. 3187 Red Hill Avenue
Suite 250
Costa Mesa, CA 92626
714.751.7373
714.545.8883 Fax
(PS4MAS
Yorba Linda Water District Page 2
Mr. Conklin December 19, 2008
SCOPE OF ENGINEERING SERVICES
The following scope of services is based on our understanding of the construction
engineering support requested by the District.
Zone Reconfiguration Areas 1, 2 and 3
1. Pre- Construction Meeting —Attend pre - construction meeting at a date, time and place
set by the District. Prepare an agenda and document meeting minutes for the pre -
construction meeting summarizing the participating personnel, key discussion
comments and decisions, documents delivered or received and action(s) required.
2. Respond to RFls— Review and respond to requests for information (RFI's). We have
estimated twenty -five (25) RFIs during the course of construction.
3. Review Shop Drawings— Review construction shop drawings, samples, and supporting
data for conformity with the contract plans, specifications, and contract documents.
Psomas will review and provide recommendations regarding contractor requested
materials or equipment substitutions. Psomas will provide submittal responses to the
Contractor and the District. Psomas has budgeted for review up to twenty -five (25)
shop drawings, including review of one resubmittal per each shop drawing.
4. Evaluate Change Order Requests — Evaluate contractor change order requests, provide
recommendations, and assist the District with preparing change orders.
5. Attend Construction Site Meetings — Psomas will attend up to six (6) construction
meetings on site to address construction issues or questions, as requested by the
District. Prepare and submit minutes for each construction meeting attended
summarizing the participating personnel, key discussion comments and decisions and
action(s) required.
6 Review Contractor's Progress Payments— Review Contractor's monthly progress
payments and provide recommendations to District.
7. Prepare Record Drawings— Prepare construction "record" drawings based on
Contractor - furnished marked -up construction plans, sketches, and field records
received from the District's construction manager. Deliver one (1) fiill -size original
Mylar reproducible set of construction "record" drawings and an electronic copy of
the AutoCAD file to the District.
1
�S 0 BIAS
Yorba Linda Water District Page 3
Mr. Conklin December 19, 2008
San Antonio PRS Upgrade Project
1. Pre - Construction Meeting — Attend pre - construction meeting at a date, time and place
set by the District. Prepare an agenda and document meeting minutes for the pre -
construction meeting summarizing the participating personnel, key discussion
comments and decisions, documents delivered or received and action(s) required.
2. Respond to RFls— Review and respond to requests for information (RFI's). We have
estimated fifteen (15) RFIs during the course of construction.
3. Review Shop Drawings— Review construction shop drawings, samples, and supporting
data for conformity with the contract plans, specifications, and contract documents.
Psomas will review and provide recommendations regarding contractor requested
materials or equipment substitutions. Psomas will provide submittal responses to the
Contractor and the District. Psomas has budgeted for review up to twenty -five (25)
civil, mechanical, and electrical shop drawings, including review of one resubmittal
per each shop drawing. All electrical and SCADA shop drawings will be reviewed by
our electrical engineer, Moraes /Pharr and Associates.
4. Evaluate Change Order Requests— Evaluate contractor change order requests, provide
recommendations, and assist the District with preparing change orders.
S. Attend Construction Site Meetings — Psomas will attend up to four (4) construction
meetings on site to address construction issues or questions, as requested by the
District. We have budgeted for up to two (2) construction site meetings for our
electrical engineer. Prepare and submit minutes for each construction meeting
attended summarizing the participating personnel, key discussion comments and
decisions and action(s) required.
6 Review Contractor's Progress Payments— Review Contractor's monthly progress
payments and provide recommendations to District.
7. Prepare Record Drawings— Prepare construction "record" drawings based on
Contractor - furnished marked -up construction plans, sketches, and field records
received from the District's construction manager. Deliver one (1) full -size original
Mylar reproducible set of construction "record" drawings and an electronic copy of
the AutoCAD file to the District.
P S O M A S
Yorba Linda Water District Page 4
Mr. Conklin December 19, 2008
LABOR HOURS AND FEES
We propose to provide construction phase engineering services to complete the scope of
work as outlined above on an hourly basis with the total fee not to exceed that shown in
Table 1 attached. Table 1 lists our estimated labor hours and fees by task and total fee for
each project computed based on our Standard Hourly Rates in effect at the time services are
rendered. Our current Standard IIourly Rate Schedule is also attached as Table 2.
Printing and reproduction during execution of the project will be billed as "Direct Costs" and
will not exceed the amounts stated in Table 1. We will bill for our services monthly with
invoices due and payable upon presentation.
In addition to any specific exclusions previously stated, this proposal does not include
geotechnical engineering and testing services, traffic control plans, construction survey,
potholing, field utility locating, and other services not specifically stated herein.
Thank you for the opportunity to submit this proposal. Our proposal represents a firm offer
for a period of 90 days. We look forward to providing continuing services to Yorba Linda
Water District. Should you have any questions concerning our proposal, please contact me at
(714) 481 -8060.
Sincerely,
PSOMAS
Joseph L. B`dy`Ie P,
Senior Project Manager /Vice President
JLB:VRW:vs
End.
2008 -12 -19 SanAntonio Const Ph_JB.doc
TABLE I
Yorba Linda Water District
Construction Phase Engineering Services for
Zone Reconfiguration Areas 1, 2, & 3 and San Antonio PRS Upgrade Projects
ESTIMATED LABOR HOURS AND FEES
Note: Billing Rates Effective Through 12/31/2009
In -House Staff Subconsultants
A /OC - Senior Project Manager (Joseph Boyle) Electrical Engineering - Moraes /Pham & Associates
P.M. - Senior Project Manager (Vernon Weisman) Direct Costs - Reproduction 8 other direct costs
E. - Project Engineer (Neha Gajjar)
'of E - Professional Engineer (Nancy Heim)
- CAD Designer
n - Administrative
Scope of Work Tasks
•• .
P-M
TOTAL
C c's,
Electrical
HOURS
COSTS
FEE
Tasks
196
17*47$144
$
Zone Roconfiguration Areas 1, 2 & 3 Construction Phase Services
1
Attend Pre - Construction Mtg
0
4
6
0
0
1
11
$1,625
0
So
11
S55
S1,680
2
Respond to RFIs
2
8
25
0
6
2
43
$6,054
0
so
43
$165
$6,219
3
Review Shop Drawings
0
2
7
35
0
11
55
56,166
0
s0
55
$220
$6,386
4
Evaluate Change Order Requests
2
8
18
0
0
2
30
S4,506
0
s0
30
S55
54,561
5
Attend Construction Site Meetings
0
6
14
0
0
2
22
$3,190
0
SO
22
$165
$3,355
6
Review Contractors Progress Payments
1
4
18
0
0
0
23
$3,484
0
so
23
S55
53,539
7
Prepare Record Drawings
1
2
0
24
2
30
$2,948
0
so
30
5605
53,553
Subtotal
6
33
90
35
30
20
214
$27,973
0
so
214
51,320
$29,293
San Antonio PRS Upgrade Project Construction Phase Servicos
1
Attend Pre - Construction Mtg
0
4
6
0
0
1
11
51,625
4
5638
15
S55
$2,318
2
Respond to RFIs
2
6
15
0
4
2
29
$4,086
4
5638
33
$220
S4,944
3
Review Shop Drawings
1
3
12
36
0
10
62
S7,308
6
$957
68
$220
$8,485
4
Evaluate Change Order Requests
1
8
16
0
0
2
27
$4,022
2
$319
29
S55
S4,396
5
Attend Construction Site Meetings
0
3
10
0
0
2
15
$2.092
8
$1,276
23
5165
53,533
6
Review Contractor's Progress Payments
1
4
12
0
0
0
17
$2,620
0
s0
17
S55
52,675
7
Prepare Record Drawings
1
1
2
0
16
2
22
52.228
6
$528
28
1 S5501
53.306
Subtatall
6
29
73
36
20
19
183
$23,981
30
S4,3561
213
1 $1,3201
$29,657
Total Estimated Hours and Feel
12
62
163
71
50
39
397
$51,9541
30
$4,356
427
2,640
$2,640T--
$58,950
Note: Billing Rates Effective Through 12/31/2009
In -House Staff Subconsultants
A /OC - Senior Project Manager (Joseph Boyle) Electrical Engineering - Moraes /Pham & Associates
P.M. - Senior Project Manager (Vernon Weisman) Direct Costs - Reproduction 8 other direct costs
E. - Project Engineer (Neha Gajjar)
'of E - Professional Engineer (Nancy Heim)
- CAD Designer
n - Administrative
P S O M A S
TABLE 2
HOURLY RATE SCHEDULE
For services by Psomas
Effective through December 31, 2009
Water and Wastewater Engineering Services
$
65-$ 85 Administrative Assistant
$ 65 -$ 95 Engineering Assistant
$ 70-$100 CAD Designer
$ 80-$125 Lead CAD Designer
$ 80-$125 Civil Engineer Designer
$ 90-$130 Professional Engineer /Surveyor
$120-$160 Project Engineer /Project Surveyor /Senior Environmental Scientist
$120-$195 Senior Project Engineer
$150-$190 Project Manager
$165 - $230 Senior Project Manager, QA/QC Manager, Principal -In- Charge
$210-$242 Two -Man Survey Crew
► Standard computer and technology costs are incorporated into these hourly rates,
as well as direct labor, overhead, fringe benefits and fee.
► Survey and other specialty equipment will be charged at a per unit per day rate.
► Expert witness testimony is two times the normal rate.
► Per Diem is calculated at current State Department of Transportation rates (or
other appropriate Agency rate).
Reimbursables
Mileage at $0.550 per mile (or current IRS allowable rate) and parking expenses incurred by
office employees are charged at cost. Prints, plots, messenger service, subsistence, air travel, and
other direct expenses will be charged at cost plus ten percent. The services of outside consultants
will be charged at cost plus fifteen percent.
AGENDA REPORT
Board Meeting Date: January 8, 2008
To: Board of Directors
From: Lee Cory, Operations Manager
ITEM NO. 6-
APPROVED BY THE BOARD OF DIRECTORS
OF THE YOR BA LINDA WATER DISTRICT
JAN - 8 2009
BY
C"o.V �A-cyllt"-Q
Staff Contact: John DeCriscio, Chief Plant Operator
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 80,000
Funding Source: Water Operating Fund
CEQA Account No: 151 -710 Job No:
Compliance: N/A Estimated Costs: $ 80,000 Dept: Ops
Subject: Highland Booster Station Gas Engine Replacement
SUMMARY:
As part of the District's Operating Plan to maximize the full potential of its groundwater
production capabilities to its service area, it is necessary to replace a pump to increase the
pumping capabilities and reliability from Highland Booster Station.
DISCUSSION:
In a monthly report to the PEO Committee, District staff informs the committee of its goal to
maximize its ground water production. This year's goal has been set at 60.2% of the total district
production. This percentage represents the maximum basin production percentage set forth by
OCWD, plus an additional 2100AF commitment to Metropolitan Water District (MWD) for the
conjunctive use program. To meet this commitment it is imperative that the Highland Booster
Station operate to its full potential during the warmer months of the year starting in May 2009.
Highland Booster Station has four electric -motor pumps and one gas- engine pump. The gas -
engine- driven pump provides 3,500 gpm capacity, the most production of any pump during the
summer months. Unfortunately, the Cummins gas engine has needed almost continuous
repairs during the last couple of summers. The engine is no longer reliable and the Cummins
Company no longer supports it with repair parts. The district has replaced most of its other
engines with Caterpillar brand engines and has found the Caterpillar Company to provide better
support and parts availability.
Staff has investigated replacing the existing gas engine at Highland with a new Caterpillar
engine, and found an engine available locally. Unfortunately at this time the Air Quality
Management District (AQMD) restrictions on all new gas- driven engines are such that replacing
these older engines becomes very expensive and extremely time - consuming, obtaining
emission credits and various permits.
Because of these issues, District staff has looked at two options: 1) the cost and regulatory
effort of replacing the gas engine, or 2) the cost and timing to replace an existing electric motor
and pump with a larger electric motor and pump. At this time staff has determined it would be a
more cost - effective and expedient approach to replace the existing 125hp electric -motor driven
2,000gpm pump with a larger 200hp electric motor and 3,000gpm pump.
Staff has contacted General Pump Company and determined that the larger electric motor and
pump can be provided in relatively short- order, and could be installed by May 2009. The
estimated cost of providing the new pump and motor in the existing Highland Booster Station is
$80,000. Staff recommends proceeding with the pump replacement so as to maintain and
assure our groundwater pumping capability.
At the same time, staff will continue to look into the regulatory and reliability issues of the
natural -gas engine for the existing 3,500gpm pump.
PRIOR RELEVANT BOARD ACTION(S):
N /A.
STAFF RECOMMENDATION:
That the Board of Directors authorize the General Manager to execute a contract with General
Pump Company in the amount not to exceed $80,000 to replace the existing electric motor and
pump with the similar 200 hp electric motor and 3000 gpm pump combination used on pumps
No. 3 and 4 at the Highland Booster Station.
COMMITTEE RECOMMENDATION:
The Planning- Engineering- Operations Committee will discuss this item at its meeting being held
January 7th. Staff will report the Committee's recommendation at the Board meeting.
AGENDA REPORT
Board Meeting Date: January 8, 2009
To: Board of Directors
From: Ken Vecchiarelli, General Manager
Staff Contact: Gina Knight, Human Resources Manager
Reviewed by General Counsel: No Budgeted:
Funding Source:
CEQA Account No:
Compliance: N/A Estimated Costs:
Subject: Damage Claim
ITEM NO. CL
ROVED BY THE BOARD OF OIRECTORS
AOFTHE YORBA LINDAWATER DISTRICT
JAN - 8 2009
BY
e �,��- wrr► /rr� �3
No Dept: Admin
Water Operating Fund
N/A Job No: N/A
Claim is under $25,000
SUMMARY:
The District received the attached written Application for Leave to Present a Late Claim on
December 31, 2008 along with the original claim seeking reimbursement for property related
damages as a result of flooding caused when a 12" water main line broke behind the property.
DISCUSSION:
On October 13, 2008, the District received a claim from Ms. Hong Nguy requesting
reimbursement in the amount of $4,820 for property damages caused by flooding to her back
yard when a 12" water main line broke behind her property. The incident occurred at
Ms. Nguy submitted the claim lacking the exact date of
the incident and location.
Staff investigated and reviewed the submitted claim and located a copy of a Yorba Linda Water
District Customer Service Report indicating the incident occurred on January 30, 2008. Staff
returned the claim to claimant because it was not presented within the time required by law (six
(6) months from the date of the incident).
Based on the written Application to Present a Late Claim submitted by claimant and review of
the Customer Service Report, staff is recommending the claim be rejected and referred to
ACWA -JPIA for further processing.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors reviews all claims not settled by staff. Any claims and accompanying
staff reports are presented to the Board of Directors for consideration as they are received.
STAFF RECOMMENDATION:
Staff recommends the Board of Directors reject the claim filed by Ms. Hong Nguy for the
property located at and refer to ACWA -JPIA.
Yorba Linda
Water District
Freeway Complex Fire
Disaster Response &
Water System Assessment
January 8, 2009
A report of facts and findings of the November 15, 2008 Freeway Complex Fire
Yorba Linda
Water District
Table of Contents
Chapter1 - Purpose & Objective ................................................................................................ ............................... 3
Chapter 2 — Executive Summary ................................................................................................. ............................... 3
Chapter 3 - Water System Background ....................................................................................... ...............................
4
Chapter 4 - Water System Design Standards .............................................................................. ...............................
5
Chapter 5 - Mobilization of YLWD Personnel and EOC Activation .............................................. ...............................
5
Chapter 6 - Incident Timeline Summary ..................................................................................... ...............................
6
Chapter 7 - Water System Demands ........................................................................................... ...............................
8
Chapter8 - Hidden Hills Area ...................................................................................................... .............................13
Chapter 9 - Issuance of Boil Water Advisory ............................................................................. ...............................
16
Chapter 10 - Fire Hydrant Preventative Maintenance & Servicing Program ............................ ...............................
17
Chapter11 - Mutual Aid .............................................................................................................. .............................18
Chapter 12 - Capital Improvement Program /Hidden Hills Reservoir Project ........................... ...............................
19
Chapter 13 - Public Outreach and Communication .................................................................. ...............................
22
Chapter 14 - Damages & Cost Reimbursement ........................................................................ ...............................
23
Chapter15 — Conclusions .......................................................................................................... ...............................
24
AcronymDefinitions ................................................................................................................. ...............................
25
Exhibit "A" — Reservoir Zones Area Map (Attached) ................................................................ ...............................
26
Exhibit "B" — Dispatched Calls Area Map ( Attached) ................................................................ ...............................
27
Exhibit "C" — Hidden Hills Water Pressure Areas ...................................................................... ...............................
28
Exhibit "D" — Hidden Hills Contour Elevation Map ................................................................... ...............................
29
Exhibit „E" — Boil Water Advisory ............................................................................................. ...............................
30
Exhibit"F" — Reverse 911 Message ........................................................................................... ...............................
31
Exhibit "G" — Area of Significant Structure Damages (Overall Map) (Attached) ...................... ...............................
32
Exhibit "G -1" — Area of Significant Structure Damages (West) ( Attached) ............................... ...............................
32
Exhibit "G -2" —Area of Significant Structure Damages (Central) (Attached) ........................... ...............................
32
Exhibit "G -3" — Area of Significant Structure Damages (East) (Attached) ................................ ...............................
32
Page 2 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Freeway Complex Fire Report
Chapter 1 - Purpose & Objective
The primary purpose and objective of this report is to provide information on the events and facts
surrounding the Freeway Complex Fire as they relate to the Yorba Linda Water District
(YLWD). This report was prepared internally by YLWD staff and includes information derived
by multiple sources including the YLWD's Emergency Operation Center (EOC) log, employee
interviews, employee logs, Supervisory Control and Data Acquisition (SCADA) logs, and other
sources to ensure the facts contained herein are presented in as accurate a manner as possible.
Chapter 2 - Executive Summary
The Freeway Complex Fire was a fire storm like no other that the Yorba Linda area has ever
experienced. The weather conditions including the wind speed and direction, temperature, and
relative humidity were all contributing factors that along with the fire, formed a destructive
combination. The fire burned 30,305 acres (at a rate of 1,000 acres /hour for the first 24 hours) in
total, threatening some 9,500 homes, destroying 118 and damaging another 60 within the Yorba
Linda Community.
Upon commencement of the Freeway Complex Fire, the staff of the Yorba Linda Water District
responded by mobilizing and activating the EOC in a timely manner. During the EOC activation
period, every effort was made to ensure water supplies were available within the areas with the
highest water demands for firefighting activities. YLWD personnel were dispatched to various
YLWD facilities throughout the event to confirm the operation of booster pump stations, to
perform damage assessments of the water system and to make necessary repairs where possible.
During the fire emergency, YLWD staff skillfully managed the system's complex infrastructure
to maximize water flow under extremely difficult circumstances. YLWD also requested and
received assistance from Mutual Aid partners which supplied extra pumps that staff employed
effectively in strategic areas of the water distribution system. Overall, water supplies were
sufficient throughout YLWD's water system. The system as a whole delivered about 20 million
gallons to the fire fight which primarily threatened the highest elevations and some service areas
received six to nine times their normal volume of water within a very narrow time period.
However, YLWD's preliminary internal review conducted for this assessment determined that
during the peak of the fire storm water service appears to have been interrupted in a limited
number of streets in the Hidden Hills Upper Service Area.
Page 3 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
All of these issues are discussed in more detail in the following report.
Chapter 3 - Water System Background
YLWD provides water service to over 24,000 homes and businesses within a 23 square -mile
territory serving the cities of Yorba Linda, portions of Brea, Anaheim, and Placentia, and a small
unincorporated area in the County of Orange. The elevations and topography within YLWD
vary from approximately 250 feet above mean sea level to approximately 1,300 feet, thus
creating the need for multiple water pressure zones (service areas) to ensure water flow and
pressure are provided that meet general guidelines and standards developed by the American
Water Works Association (AWWA). For the purpose of this report, 12 service areas, which
overlie YLWD, will be discussed and referenced to. These areas are outlined in Table 3 -1 and
illustrated in Exhibit "A ".
Table 3 -1: Reservoir Service Areas
Highland Reservoir
428
Lakeview Reservoir
570
Valley View & Fairmont Reservoirs
675
Bryant Ranch Reservoir
680
Gardenia Reservoir
780
Springview Reservoir
780
Elk Mountain Reservoir
780
Little Canyon Reservoir
1,000
Santiago Reservoir
1,000
Quarter Horse Reservoir
920
Chino Hills Reservoir
1,300
Camino de Bryant Reservoir
1,165
Water pressure and water flow throughout the distribution system are accomplished through the
combination of storage reservoirs, which create a gravity -fed system, and booster pump stations,
which pump water from one pressure zone to another. This movement of water is typically
pumped from a lower elevation zone to a higher elevation zone. In all, there are 13 storage
reservoirs within YLWD with a total capacity of 49.9 million gallons.
Water is supplied from two sources, imported water from Metropolitan Water District through
three physical connections into the distribution system, and nine groundwater wells capable of
Page 4 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
producing approximately 14,000 gallons per minute, cumulatively. Currently, YLWD uses both
sources on an equal basis with approximately 50% imported water and 50% groundwater serving
the needs of the residents.
Chapter 4 - Water System Design Standards
Water agencies within the United States typically use design standards established by the
American Water Works Association (AWWA). These standards apply to the construction of
storage reservoirs, installation of transmission and distribution pipelines, fire hydrants, valves,
and other appurtenances. YLWD uses and conforms to these standards when designing and
constructing water systems.
Chapter 5 - Mobilization of YLWD Personnel and EOC Activation
The Freeway Complex Fire began at 9:05 a.m., November 15, 2008 in Riverside County at the
edge of the 91 Freeway at Green River, and expanded rapidly into Orange County. Shortly after
reaching the Orange County boundary, the fire split into two separate paths; the first into the
Santa Ana Riverbed, continuing west and south into Anaheim Hills, and the second west and
north into the hills of Yorba Linda. The fire continued to Olinda Ranch along Carbon Canyon
Road in Brea, burned through much of Chino Hills, then spread north into the Diamond Bar area.
A Red Flag Warning was issued by the National Weather Service for areas including Orange
County and was in effect 24 -hours preceding the start of the Freeway Complex Fire on
November 15, 2008. This warning was then extended through 10:00 a.m. on the 15th. The
Freemont Canyon Remote Automated Weather Station reported a wind speed of 43 mph, with
gusts to 61 mph at 9:00 a.m., the day of the fire. The temperature was 75 degrees with a relative
humidity level of 8 %.
YLWD Staff became aware of the fire situation at 10:40 a.m. November 15, 2008, and mobilized
the YLWD Emergency Operations Center (EOC). At 10:54 a.m., YLWD's Production Plant
Operators, who have the responsibility of operating and controlling water supply throughout the
distribution system, began overriding the normally automated water delivery system and reported
directly to the EOC. At 12:00 p.m. the EOC was officially activated by the General Manager.
Between 12:45 and 12:50 p.m. YLWD sent representatives to act as liaisons to the City of Yorba
Linda's EOC and to the Orange County Fire Authority (OCFA) Incident Command Post, which
was established at the Yorba Regional Park.
Throughout the day and into the evening, YLWD personnel continued to arrive at the EOC for
duty. The EOC was active for a total of 26 hours and officially de- activated at 2:00 p.m. Sunday
Page 5 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
November 16, 2008, by the General Manager. Documentation indicates a total of 659 hours were
worked by YLWD personnel during the EOC activation period.
Chapter 6 - Incident Timeline Summary
YLWD compiled a detailed log of all activities that occurred on November 15 and 16, 2008. This
log represents all EOC activities that transpired during the fire storm event. The complete EOC
log is available from YLWD upon request.
The following timeline summarizes and highlights the significant events that transpired at the
EOC.
Saturday, November 15, 2008
9:05 a.m. Commencement of the Freeway Complex Fire
10:40 a.m. YLWD Staff first became aware of the fire situation once the YLWD on -duty
standby operator was notified that the fire had started in the Yorba Linda area.
10:54 a.m. The on -duty operator notified Metropolitan Water District and requested an
additional 50% supply increase of imported water into YLWD's water system.
Additionally, multiple pump stations were placed in manual mode and turned `on'
to further fill reservoirs in anticipation of additional water needs for fire fighting.
12:00 p.m. YLWD's EOC was officially activated at the Operations Center located at
YLWD's headquarters. An evaluation of the entire water system for damage and
water supply commenced immediately.
12:05 p.m. The Water Emergency Response Organization of Orange County (WEROC) was
notified of YLWD's official EOC activation.
12:45 p.m. YLWD dispatched a supervisor to act as liaison at the City of Yorba Linda EOC.
12:50 p.m. A team of senior level operators were dispatched to act as liaisons with the
Orange County Fire Authority's (OCFA) Unified Command established at the
Incident Command Post located at Yorba Regional Park.
1:19 P.M. SCADA communications at Santiago Booster Pump Station (BPS) was disrupted
due to the fire storm. Remote communications to the Hidden Hills Booster Pump
Station (BPS) and Santiago Reservoir were also lost at this time.
Page 6 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
1:30 p.m. An operator was dispatched to both the Hidden Hills BPS and the Santiago BPS.
Upon arrival at the Hidden Hills BPS, the operator confirmed the pumps were
running, and were providing water to the Santiago Lower Zone and up to the
Santiago Reservoir as needed. The severity of fire storm prevented YLWD
personnel from traveling to the Santiago BPS at this time.
3:20 p.m. At the EOC, unconfirmed reports were heard of water loss in the Hidden Hills area
through the television media.
3:50 p.m. YLWD personnel were dispatched to the Hidden Hills area with a police escort.
4:00 p.m. A transmission pipeline (cross feeder) valve was opened by YLWD Operators to
supplement the Santiago Lower Zone with water from Area 8 (Little Canyon
Reservoir).
4:00 p.m. YLWD personnel arrived at the Hidden Hills BPS and confirmed all pumps were
in operation.
4:15 p.m. YLWD personnel reached the Santiago BPS. They reported all pumps were shut
down, including the gas engine pump, which had shut down due to overheating as
indicated by a sensor on the engine. YLWD personnel manually started two electric
motor pumps and the gas engine pump.
5:10 P.M. YLWD officials issued a Boil Water Advisory (Exhibit "E ") for residents in the
entire Hidden Hills area due to the temporary loss of water pressure in the Upper
Zones and the rapid draw down of water in the Santiago Reservoir supplying both
the Santiago Upper and Lower Zones.
6:10 p.m. Through WEROC and YLWD requests for mutual aid, a fire pumper truck from
OCFA was dispatched to Mazanita and Smoketree to augment water supplies
from Area 6 (Springview Reservoir) to Area 8 (Little Canyon Reservoir).
6:20 p.m. YLWD personnel arrived at the Santiago BPS to investigate and restore SCADA
communications. Air in the pipelines at the pump station was observed and
reported. This was an indicator that the Santiago Reservoir was being drawn
down to a level that would not provide sufficient water to flood the booster
pumps' suction tubes. As a protective measure to avoid damage to the pumps, the
decision was made to shut down all pumps until such time as water levels were
restored in the Santiago Reservoir.
6:22 p.m. A mobile water pump from Laguna Beach County Water District arrived at
YLWD's EOC staging area and was dispatched to Pepper and Mazanita to
Page 7 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
augment water supplies from Area 6 (Springview Reservoir) to Area 8 (Little
Canyon Reservoir).
6:50 p.m. An additional fire pumper truck from the City of Garden Grove arrived at the
District's Fairmont Booster Pump Station to augment water supplies from Area 6
(Springview Reservoir) to Area 8 (Little Canyon Reservoir).
7:00 p.m. A mobile water pump from Santa Margarita Water District arrived at YLWD's
EOC staging area and was dispatched to Umbria and Trentino to augment water
supplies from Area 10 (Quarter Horse Reservoir) to Area 8 (Little Canyon
Reservoir).
11:00 p.m. YLWD personnel traveled to the Santiago BPS and reported the Santiago
Reservoir remained empty.
Sunday, November 16, 2008
12:45 a.m. The cross feeder valve originally opened to supplement the Santiago Lower Zone
with water from Area 8 (Little Canyon Reservoir) was closed allowing the
Santiago Reservoir and the Little Canyon Reservoirs to operate independently and
recover separately as needed.
8:00 a.m. YLWD personnel arrived at the Santiago BPS and reported a level of eight feet of
water. All pumps were subsequently turned on and the Santiago Upper Zone was
restored to normal water pressure shortly thereafter.
8:00 a.m. YLWD crews began shutting down water services to homes where damage or
destruction had occurred or where water leaks were observed.
2:00 p.m. YLWD's EOC was deactivated.
Chapter 7 - Water System Demands
At 12:00 p.m., November 15, 2008, YLWD's EOC was officially activated. YLWD proceeded to
complete an analysis of the water system, which included the evaluation of all the storage
reservoirs and the amount of water available in storage. At 12:18 p.m., all reservoirs combined
were at 56% capacity, which represented a total storage of 27.9 million gallons of water. Table
7 -1 provides a detailed breakdown of each reservoir and its status at 12:18 p.m.
Page 8 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
The water maintained in storage is typical as YLWD balances anticipated seasonal water
demands with daily water quality requirements. YLWD operators must regularly cycle the water
in storage to insure high quality drinking water is supplied throughout the distribution system at
all times. An engineering study conducted in September 2002, entitled "Water Reservoir
Nitrification Prevention and Control ", by Corollo Engineers, recommended cyclical storage
practices to prevent water nitrification from occurring in the chloraminated water supplies.
Chloramination is the disinfection process typically used by the Metropolitan Water District in
their imported water supplies. If chloraminated water remains in storage for an extended period
of time, nitrification can occur, which potentially causes the presence of bacteria and could result
in rapid degradation of water quality.
Table 7 -1: Water in Storage
Reservoir
Name
Capacity
Storage
,
storage
all
�
gallons)
Highland
4.6
68%
3.1
Lakeview
8.0
48%
3.8
Valley View
2.0
70%
1.4
Fairmont
7.4
66%
5.0
Bryant Ranch
2.5
58%
1.4
Gardenia
2.0
91%
1.8
Springview
8.0
56%
4.5
Elk Mountain
6.2
46%
2.8
Little Canyon
0.8
63%
0.5
Santiago
1.1
80%
0.9
Quarter
3.5
49%
1.7
Horse
Chino Hills
0.6
42%
0.2
Camino de
3.2
23%
�'$
Bryant
r��TOtals
49.9 mg
56%
27.9 mg
During the two 24 -hour periods of Saturday, November 15, and Sunday, November 16, the water
demands combined for both days exceeded typical demands from the previous two weeks by
over 20 million gallons. Figure 7 -1 indicates that the combined water demand throughout the
Page 9 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
water system on November 15th and 16th, encompassing all reservoir service areas, was
approximately 60 million gallons. When compared to the previous two weeks for a combined
total of 40 million gallons, this amounts to a 50% increase or 20 million gallons above normal.
Figure 7 -1: Water System Demands
T
70
60
50
c
° 40
tv
C7
0
30
20
10
0
Nov 1st & 2nd Nov 8th & 9th Nov 15th & 16th
The demands experienced throughout the water system can be further evaluated and analyzed to
determine which areas demanded higher water supplies for firefighting needs. Each reservoir
service area was analyzed utilizing data from YLWD's SCADA system, which continued to
gather data during the fire storm event, with the exception of the Hidden Hills area as addressed
further in this report. This data was then compared to the previous two weeks, Table 7 -2.
YLWD's SCADA system is a computerized network designed to operate and monitor the
groundwater wells, import water connections, booster pump stations, and reservoirs. Each
facility within YLWD is automated by its integration into the SCADA system. Operating within
pre - programmed parameters, the system self regulates, monitors and notifies operators through a
sophisticated alarm system controlling the amount of water to be pumped into each reservoir and
service area. Conversely, all facilities may also be controlled remotely from YLWD's
headquarters through the SCADA system. All SCADA transactions are logged into a database
for future retrieval and analysis. This database was utilized in determining water demands
during the fire storm event.
The magnitude of the impact for each area is best illustrated in the "% Increase" column of Table
7 -2. This value represents the percentage increase of water demand for a particular area over and
above the demand of the average from the previous two weeks. Figure 7 -2, provides a graphical
representation of these effects.
Page 10 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Table 7 -2: Water Demands Der Area (million gallons)
Area
Nov 1 st & 2nd
Nov 8th & 9th
Nov 15th & 16th
% Increase
1 (Highland Reservoir)
4.6
4.7
5.2
12%
2 (Lakeview Reservoir)
10.7
10.5
12.1
15%
3 (Valley View &
Y_ Fairmont Reservoir)
8.6
8.7
11.0
27%
4 (Bryant Ranch Reservoir)
3.0
3.1
4.8
57%
5 (Gardenia Reservoir)
1.7
1.6
2.3
39%
6 (Springview Reservoir)
3.6
4.2
5.9
51%
7 (Elk Mtn. Reservoir)
1.6
1.9
4.0
129%
8 (Little Canyon Reservoir)
2.0
2.0
4.2
110%
9 (Santiago Reservoir)
2.3
2.0
5.1
137%
10 (Quarter Horse Reservoir)
0.6
0.6
1.3
117%
11 (Chino Hills Reservoir)
0.7
0.7
1.8
157%
12 (Camino de Bryant Reservoir)
1.2
0.9
3.3
214%
Totals
40.6 mg
40.9 mg
61.0 mg
50%
Another key factor when evaluating system and pressure demands is peaking. Peaking is the
maximum amount of water produced within a particular reservoir service area over a specified
length of time. The top three reservoir service areas that displayed significant increase over
normal are illustrated in Figure 7 -2, identified as Areas 8, 9 and 12. The peaking data of these
zones was further analyzed to determine the magnitude of demands placed on these particular
areas:
• Area 8 (Little Canyon Reservoir) - YLWD records indicate that peaking occurred
between 4:30 p.m. and 8:30 p.m., November 15, with a total production of 686,820
gallons. The week prior, total production for this area between 4:30 p.m. and 8:30 p.m.
was 108,978 gallons. The result is a peaking factor of 630% of typical demand.
• Area 9 (Santiago Reservoir) - While communications were severed with the Santiago
Reservoir at 1:19 p.m., November 15, as discussed further in this report, YLWD
personnel were able to confirm operation of the Hidden Hills BPS, which pumps to the
Santiago Reservoir. All pumps within this pump station were in full operation during the
fire storm event. Calculations therefore indicate that peaking occurred between 1:30 p.m.
and 7:00 p.m., November 15, with a total production of 1,568,808 gallons. The week
Page 11 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
prior, total production for this area between 1:30 p.m. and 7:00 p.m. was 261,294
gallons. The result is a peaking factor of 600% of typical demand.
• Area 12 (Camino de Bryant Reservoir) - SCADA records indicate that peaking
occurred between 11:50 a.m. and 1:50 p.m., November 15, with a total production of
533,715 gallons. The week prior, total production for this area between 11:50 a.m. and
1:50 p.m. was 56,655 gallons. The result is a peaking factor of 940% of typical demand.
The peaking demands described within these areas can be further correlated with Exhibit `B ",
which illustrates the number of fire crew dispatches /calls occurring between the hours of 10:20
a.m., November 15, 2008 and 4:00 a.m., November 16, 2008. These dispatched calls were
derived by documents provided by OCFA. Table 7 -3 provides the quantity of fire crew
dispatches per area.
Page 12 of 32
Freeway Complex Fire
January 8, 2009
Figure
7 -2: Water Demands
per Area
14.0
■ Nov 1st & 2nd
12.0
■ Nov 8th & 9th
_
0.0
■ Nov 15th & 16th
N
C
°
8.0
(O
6.0
0
4.0
2.0
0.0
ro
N m
� �
1:t Ln (D r-
rs � m co
oc M
� �
o N
•� •� •�
v
iJ iJ
v d N it
Q: v
ro co �a
Q
Q Q
Q Q Q Q
Q Q Q
The peaking demands described within these areas can be further correlated with Exhibit `B ",
which illustrates the number of fire crew dispatches /calls occurring between the hours of 10:20
a.m., November 15, 2008 and 4:00 a.m., November 16, 2008. These dispatched calls were
derived by documents provided by OCFA. Table 7 -3 provides the quantity of fire crew
dispatches per area.
Page 12 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Table 7 -3: Dispatches by Area
Areas Location
Area 3 (Fairmont & Valley View)
o. of Dispatches/Calls
4
Area 4 (Bryant Ranch)
16
Area 6 (Springview)
26
Area 7 (Elk Mountain)
8
Area 8 (Little Canyon)
23
Area 9 (Santiago)
22
Area 11 (Chino Hills)
9
Area 12 (Camino de Bryant)
9
The number of fire hydrants used simultaneously during the fire storm, within each area, cannot
be confirmed. Exhibit "B" is intended to illustrate the potential magnitude of the fire services
required during the event. Each dispatch/call within Exhibit `B" reflects the areas most
impacted by the fire storm as it continued to travel in a westerly direction. This is further evident
as the dispatches /calls are at times clustered in certain areas.
Chapter 8 - Hidden Hills Area
The Hidden Hills area consists of approximately 240 homes and of those, approximately 180 homes
are within Area 9 (Santiago Reservoir). This particular area can be further defined with two distinct
pressure zones, which shall be referred to as Santiago Lower Zone and Santiago Upper Zone as
illustrated in Exhibit "C ".
Water pressure within the Santiago Lower Zone is maintained in combination by the Santiago
Reservoir, with a capacity of 1.1 million gallons, through a conventional gravity -fed system and
secondly through a series of four electric pumps at the Hidden Hills BPS. This pump station is
capable of producing 1,900 gallons per minute fed from YLWD's connection with Metropolitan
Water District and YLWD's Area 6 (Springview Reservoir). On the day of the fire, the Santiago
Reservoir was approximately 80 percent full (See Table 7 -1). Figure 8 -1 provides a schematic
diagram of the Hidden Hills area.
Page 13 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Figure 8 -1: Hidden Hills Schematic Diagram
Santiago Lower Zane 1 Santiago Upper Zone
1
1
1
1
1
1
1
1
1
SANTIAGO 1
1
RESERVOIR 1
1 SANTIAGOBOOSTER
1 PUMP STATION
1
1
- 1
Water Flow Dire
PROPOSED HIDDEN
HILLS RESERVOIR
1
1
1
♦,
� LOWER HIDDEN HILLS
`--------- - - - ---
UPPER HIDDEN HILLS
F %0
MISSION HILLS
HIDDEN HILLS BOOSTER
PUMP STATION
The Santiago Upper Zone's water pressure is provided by the Santiago BPS consisting of three
electric pumps, capable of producing 900 gallons per minute, and one gas engine pump, with a
capacity of 1,200 gallons per minute for a combined capacity of 2,100 gallons per minute. The
Santiago BPS is located adjacent to the Santiago Reservoir. This particular upper zone area is a
closed zone and water pressure is maintained by the pumps, specifically one with a Variable
Frequency Drive (VFD), which continuously adjusts its flow to meet actual demands at any given
time. On a typical day, e.g. prior to the fire storm, the maximum peak demand required in the
Santiago Upper Zone is less than 500 gallons per minute.
Pumping water into this closed zone results in an elevation climb of approximately 300 feet from the
base of the Santiago BPS to the north -east corner of this particular zone, which is illustrated in
Exhibit "D ". The Santiago BPS is located at an elevation of 1,000 feet, and is required to provide
water pressure and flow to the highest home at approximately 1,310 feet in elevation.
Page 14 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
At 1:19 p.m., November 15, the fire storm reached the Santiago Reservoir, where SCADA
communications to the reservoir, the Santiago BPS, and the Hidden Hills BPS were lost. Cable
damage from the fire created an electrical short, damage to a SCADA component known as a PLC
and subsequently a power outage of SCADA equipment housed in the Santiago BPS. No pump
damage occurred due to the fire.
The damaged SCADA PLC at the Santiago BPS forced a shut -down of all electric pumps providing
water pressure to the Santiago Upper Zone. However, the gas engine has a mechanical pressure
sensor, independent of the SCADA control system and may have continued to operate.
Immediately following the loss of communications, YLWD personnel were dispatched at 1:30 p.m.
to both the Hidden Hills BPS and the Santiago BPS. Upon arrival at the Hidden Hills BPS, YLWD
personnel confirmed all pumps were running and providing water to the Santiago Lower Zone and
the Santiago Reservoir. YLWD personnel were not able to reach the Santiago BPS due to the life
threatening conditions of the fire storm.
At 3:20 p.m. at the YLWD EOC, staff first heard unconfirmed reports of water loss in the Hidden
Hills area through the television media. With the assistance of a police escort, YLWD personnel
arrived at the Hidden Hills BPS at 4:00 p.m. and once again confirmed all pumps were in operation.
YLWD personnel were finally able to reach the Santiago BPS at 4:15 p.m., and reported all pumps
were shut down, including the gas engine pump, which had shut down between 1:19 p.m. and 4:15
p.m. due to overheating as indicated by a sensor on the engine. The exact time the gas engine shut
down is unknown due to the loss of SCADA communications and it is not known how much water
the gas engine pump was able to supply to the Santiago Upper Zone before it ceased operating.
YLWD personnel started two electric and the gas engine pumps manually. The third electric pump,
with the VFD, was not able to start due to the power loss of SCADA equipment at the time.
Following the manual startup of the pumps at the Santiago BPS, shortly after 4:15 p.m., YLWD
personnel proceeded upwardly within the Santiago Upper Zone to bleed fire hydrants of entrapped
air. Water pressure was noted on four fire hydrants located on Greencrest, leading over to Hidden
Hills Road. At the top of Hidden Hills Road, water pressure was not yet present. It was also reported
that multiple fire engines were located at Mission Hills and Skyline extracting water from fire
hydrants.
At 6:20 p.m., YLWD personnel arrived at the Santiago BPS to investigate and restore
communications. It was reported that air was present in the pump station, an indicator that the
Santiago Reservoir was empty, although the Hidden Hills BPS continued to operate. As a protective
measure to avoid damage to the pumps, YLWD decided to shut down all pumps at the Santiago BPS
until such time water was restored in the Santiago Reservoir. YLWD proceeded to shift its focus and
efforts westerly as water demands began to increase within Area 6 (Springview Reservoir) and Area
8 (Little Canyon Reservoir). The Santiago reservoir was drained completely some time between
4:15 and 6:20 p.m.
Page 15 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
At 11:00 p.m., YLWD personnel once again traveled to the Santiago Reservoir and reported the
reservoir remained empty. The water demands within the Santiago Lower Zone prevented the
Santiago Reservoir from filling during the late hours of November 15. During this time, the
demands placed on the Santiago Reservoir and the Hidden Hills BPS were a combination of fire
fighting activities at the Santiago Lower Zone and Area 8 (Little Canyon Reservoir), as the cross
feeder valve remained in the opened position until 12:45 a.m., November 16. The following day at
8:00 a.m., November 16, YLWD personnel arrived at the Santiago Reservoir and reported a level of
eight feet of water, or approximately 376,000 gallons. All pumps were subsequently turned on and
the Santiago Upper Zone was restored to normal water pressure shortly thereafter.
During the fire storm event, YLWD did not receive any reports of water loss within the Santiago
Lower Zone. Water demands within this zone were met by both the Hidden Hills BPS and the water
flowing from Area 8 (Little Canyon Reservoir) through the cross feeder valve.
Chapter 9 - Issuance of Boil Water Advisory
At 5:10 p.m., November 15, YLWD officials issued a Boil Water Advisory (Exhibit "E ") for
residents in the Hidden Hills area due to the loss of water pressure, for both the Santiago Upper and
Lower Zones. Although no reports of water outages had been reported in the Santiago Lower Zone,
this area was included as a precautionary measure. The media was contacted and asked to broadcast
the Boil Water Advisory. The notice was also posted on YLWD's web site soon thereafter.
A Boil Water Advisory is a public statement advising customers to boil tap water before
consuming it. Advisories are issued when an event has occurred, such as the loss of water
pressure, allowing the possibility for the water distribution system to become contaminated. An
advisory does not mean that the water is contaminated, but rather that the possibility exists.
As no other water outages were reported throughout other parts of YLWD's water distribution
system, the issuance of additional Boil Water Advisories was not necessary. This was confirmed
through routine water quality sampling taken throughout YLWD's distribution system the following
week.
Following the issuance of the Boil Water Advisory in the Hidden Hills area, YLWD conducted
multiple water bacteriological tests throughout the affected area as required by state law. Lifting of
the Boil Water Advisory can only be approved by the State Department of Public Health with
bacteria free results confirmed by a State certified third -party laboratory. YLWD collected water
samples at 15 different locations on two separate occasions and were submitted to the laboratory for
testing. Results are obtained following an incubation period of 48 hours, which is the required time
for the sample to exhibit any possible contamination.
Page 16 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
During the Boil Water Advisory period, as YLWD waited for the laboratory results, YLWD
delivered bottled water to the residents affected by the Advisory. Bottled water was purchased and
additionally donated by a bottled water supplier. Additional reserves of bottled water not needed
during the Boil Water Advisory have been donated to local food banks and other non -profit
organizations.
On November 20, 2008, the State Department of Public Health granted authorization to lift the Boil
Water Advisory. Residents were notified by a reverse 911 system that contacts residents by
telephone. Contact with 13,400 residential accounts reaching a population estimated at 42,900
(13,400 accts x 3.2 people /acct) was confirmed, Exhibit "F ".
Chapter 10 - Fire Hydrant Preventative Maintenance & Servicing Program
YLWD has more than 3,850 fire hydrants located in both residential and commercial areas
throughout its service boundaries. The district's preventative maintenance program requires that
all fire hydrants be serviced on a yearly basis. This servicing encompasses flushing, testing water
pressure, cleaning, and lubricating the hydrant threads. YLWD's Operations Department
maintains records of these procedures and the maintenance performed on each hydrant.
During the fire storm event, it was reported that a number of fire hydrants were inoperable at the
time, primarily in the Hidden Hills area. On November 16, 2008, YLWD personnel drove to the
Hidden Hills area and observed that three fire hydrants were in a `bagged' or `taped' condition.
These hydrants were placed into this condition by individuals other than YLWD crews. Two of
the hydrants were located at 22476 Mission Hills Road and 22255 Mission Hills Road, and the
third was located at 3510 Fairmont Avenue. The three hydrants were in need of repairs, which
were completed the following day on November 17, 2008.
A fourth fire hydrant located at Juniper and Smoketree was also `bagged' during the fire storm
event by individuals other than YLWD personnel. Upon arrival on November 17, 2008, YLWD
crews confirmed full operation of this particular hydrant and it was placed into operation
immediately.
YLWD maintenance records confirm that the two fire hydrants on Mission Hills Road were
serviced on January 22, 2008, and the fire hydrant at 3520 Fairmont Avenue was serviced on
February 5, 2008. At that time, all three fire hydrants were completely operational.
All three fire hydrants are of a type known as "dry barrel ". The advantage that this type of
hydrant provides is that they restrict water loss and prevent a water geyser effect in the event the
hydrant is severed from its base, as would occur if a vehicle strikes the hydrant. The design of
these hydrants incorporate a type of coupling that can be damaged if inexperienced users attempt
to open or close the hydrant incorrectly. Although only YLWD personnel and fire crews have
Page 17 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
authorized access to hydrants, it is possible that unauthorized and inexperienced persons may
have used and damaged the YLWD fire hydrants without YLWD's knowledge and not reported
the damage to YLWD. It is also possible that the hydrants were damaged during the fire storm
event.
Chapter 11 - Mutual Aid
During the fire storm event, YLWD submitted requests, through WEROC, for mutual aid on
November 15, 2008. These requests, common practice in emergency situations of this
magnitude, were for water pumps to augment certain areas of the water distribution system
where demands began to compromise existing system capabilities. Figure 11 -1 shows the
locations of mutual aid, provided by the following:
1. Laguna Beach County Water District — At 3:00 p.m., YLWD officials requested a
large capacity pump (2,000 gallons per minute) which arrived at 6:22 p.m. and was
dispatched to Pepper and Mazanita to augment water supplies from Area 6 (Springview
Reservoir) to Area 8 (Little Canyon Reservoir).
2. Santa Margarita Water District — At 4:45 p.m., YLWD officials requested a large
capacity pump (2,000 gallons per minute) which arrived at 7:00 p.m. and was dispatched
to Umbria and Trentino to augment water supplies from Area 10 (Quarter Horse
Reservoir) to Area 8 (Little Canyon Reservoir).
3. Orange County Fire Authority — At approximately 5:30 p.m., YLWD officials
requested a fire pumper truck from the Operation Area of WEROC which arrived at 6:10
p.m. and was dispatched to Mazanita and Smoketree to augment water supplies from
Area 6 (Springview Reservoir) to Area 8 (Little Canyon Reservoir).
4. City of Garden Grove Fire Department — A secondary fire pumper truck arrived at
6:50 p.m. and was dispatched to Fairmont Pump Station to augment water supplies from
Area 6 (Springview Reservoir) to Area 8 (Little Canyon Reservoir).
Page 18 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Chapter 12 - Capital Improvement Program /Hidden Hills Reservoir Project
YLWD has a five year capital improvement program for fiscal years 2007 -12 totaling $70.8
million. The following is a summary list of the projects and the current status for each:
Project Name
Projects Completed:
Lakeview Booster Pump Station (5000 GPM)
Meter Replacement Program, Phase 1
2005 C.I. Replace (Ohio /Buena Vista /Grandview)
Zone 4 Transmission S &S, R 5 (36 inch)
Cost
Estimate
$4,500,000
$2,804,000
$2,600,000
$1,700,000
Page 19 of 32
Freeway Complex Fire
January 8, 2009
Project Name (con't)
Cost
Estimate
Well No. 19 Long Term Storage Program
$1,200,000
Zone 3 Transmission S &S, R 5 (18 inch)
$1,000,000
Miraloma Storm Drain Pipeline
$525,000
Edison Power Pole Relocations
$250,000
Richfield Road Widening
$350,000
Miraloma Through Street Improvements
$250,000
S &S TTM 16209 Downstream Improvements (Rio del Oro)
$93,000
YLWD /S &S Kellogg Sewer Improvements
$1,500,000
Grandview Sewer
$260,000
New Administration Building
$7.700.000
Sub -total
$24,732,000
Projects in Construction Phase:
Lakeview Reservoir (8MG) (90% complete and in service)
$11,500,000
Highland Reservoir Replacement (6MG) (30% complete)
$11,200,000
Zone 4C Reconfiguration
$2,070,000
Water Meter Replacement Project, Phase 2 (50% complete)
$1,000,000
GIS Implementation Project (95% complete)
$700,000
Radio Read Water Meter Conversion Project, Phase 1 (50 %)
$160,000
Sub -total
$26,630,000
Projects in Design Phase:
Fairmont Booster Pump Station Site Improvements
$300,000
OC -51 Upgrade
$242,000
Hidden Hills Reservoir (2MG) and Santiago Booster
$9,000,000
Upgrades
Wells No. 20 & 21
$2,000,000
Lakeview Sewer Lift station Upgrades
$200,000
Groundwater Capacity Restoration
$1,000.000
Sub -total
$12,742,000
Projects not yet Started:
Anaheim Intertie Connection Improvements
$500,000
Yorba Linda
Water District
Page 20 of 32
Freeway Complex Fire
January 8, 2009
Project Name (con't)
Highland BPS Replacement Project
Zone 5 (1000) Booster Station
Fairmont Booster Pump station Reconfiguration
Foxtail Drive Pipeline
Elk Mountain Res. Site Improvements
Fire Flow Improvement (Via Sereno & Ohio)
Sub Total
Total Projects
w
Cost
Estimate
$4,000,000
$1,080,000
$400,000
$245,000
$300,000
$125,000
$6,650,000
$70,754,000
Yorba Linda
Water District
Among the top priority projects for the Five -Year Capital Improvement Plan is the Hidden Hills
Reservoir Project. YLWD is now in the final permitting process for the project, which will
supplement the existing water supply and provide reserve capacity to both the Santiago Lower
and Upper Zones. The proposed project consists of a new two - million gallon capacity Hidden
Hills Reservoir and improvements to the existing Santiago BPS at an estimated construction
cost of $9 million dollars.
In 2000, Shapell Industries purchased nearly 1,300 acres in Improvement District No. 2,
planning for further development. However, until developer design plans are finalized, the
District is unable to determine either the size or the location of any necessary infrastructure,
e.g. the reservoir.
YLWD's 2005 Master Plan identified fire flow requirements for the Hidden Hills area,
specifically the Santiago Upper Zone based on the decision to serve the current population in
that area, rather than waiting for the finalized housing tract plans for future development.
In 2006, Shapell Industries dedicated nearly 1,280 acres of its original planned development to
the Chino Hills State Park. This allowed the District to confirm that the Hidden Hills Reservoir,
initially designed to serve the entire track of homes with a capacity of 4 million gallons could
now serve the existing area of Hidden Hills Estates, at half the size.
The re- design of the project is now essentially complete, and it is anticipated that the
construction bidding process could take place in March 2009, with award of the contract in May
2009. Construction could be complete by September 2010.
Page 21 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
However, in order to proceed with the bidding process and meet this proposed schedule, YLWD
must secure two permits, one from a local private developer known as Shapell Industries, and a
second from the State of California Department of Parks and Recreation. YLWD Staff is
completing negotiations with staff of Shapell Industries and anticipates receipt of the required
document by February 2009.
Concerning the second permit, YLWD Staff met on September 10, 2008 with staff of the State
of California to discuss permit issues. The State requested additional design details concerning
the access road and requested an updated biological survey of the proposed construction area.
On October 31, YLWD submitted the new design drawings and the updated biological survey to
the State. At a meeting on December 5, the State indicated that approval of the permit was
contingent upon review and input by the State of California Department of Fish & Game and
the U.S. Fish & Wildlife Service to ensure environmental compliance. By December 15,
YLWD Staff had separate discussions with each of these two agencies and has provided follow -
up information for their review. Additional discussions are planned with these state and federal
agencies throughout January 2009.
Chapter 13 - Public Outreach and Communication
Following the fire storm event, YLWD focused on providing information to the public
concerning the water system, the status of the Boil Water Advisory, and other news and
information that was deemed pertinent. The primary means of communication was YLWD's
web site. As information became available, the web site was updated on a timely basis as it
provided the best means of communication under the circumstances. Additionally, YLWD
utilized its electronic sign which was posted at the entrance of the Hidden Hills area to notify
residents of the Boil Water Advisory and the subsequent lifting of the advisory.
As previously discussed, a reverse 911 system was also utilized to notify residents regarding the
lifting of the Boil Water Advisory. Contact with 13,400 residents was confirmed from the
reverse 911 system (Exhibit "F ").
To date, the web site continues to be updated with the latest fire information which can be found
at www.ylwd.com.
Page 22 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Chapter 14 - Damages & Cost Reimbursement
Physical damage to YLWD facilities from the fire storm event includes the following:
• (2) Air vac devices
• (3) Fire hydrants
• SCADA equipment at the Santiago Reservoir site
• Replaced damaged conduit
• Re- painting of the Quarter Horse Reservoir site fencing
YLWD officials are currently finalizing documents for submission to the Federal Emergency
Management Agency (FEMA) for reimbursement for these losses. Additionally, other costs for
which YLWD officials will be seeking FEMA reimbursement include the following:
• Incident Response $ 100,000
• YLWD labor
• General provisions for the EOC activation
• Water quality notification and support $ 60,000
• Bottled water distribution
• Communications expenditures
• Reverse 911 notification
• Sand and erosion control for the following sites: $ 25,000
• Gardenia Reservoir
• Quarter Horse Reservoir
• Little Canyon Reservoir
• Chino Hills Reservoir
• Copper Canyon Drive /Bryant Cross Feeder 16" and 24" pipeline
• Santiago Reservoir and Santiago BPS
• Slope stabilization for the following sites: $ 23,000
• Gardenia Reservoir
• Quarter Horse Reservoir
• Little Canyon Reservoir
• Santiago Reservoir
As of the date of this Report, YLWD will be seeking a total of $236,000 from FEMA.
Page 23 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Chapter 15 - Conclusions
Based on objective measurements, the water system functioned well, given the demands placed
on it. During the peak of the fire, when water was being drained from the system in extraordinary
volumes, service was interrupted in a limited area of upper Hidden Hills. It should be noted that
water supply problems are not uncommon in catastrophic fires such as the Freeway Complex
fire. It also is important to note that the vast majority of homes that were damaged or destroyed
were in areas where water pressure and water flows were available during the firefighting
activities. (Attached are Exhibits "G ", "G -1 ", G -2 ", and "G -3 ", which illustrates homes that were
damaged or destroyed during the fire storm event within the boundaries of YLWD.)
Furthermore, though construction of the proposed Hidden Hills Reservoir will supplement water
supplies in the Hidden Hills Upper Zone, the effects of the additional supply in that particular
zone if the reservoir had been in operation, are difficult to assess with any certainty. There is no
way to guarantee that the magnitude of a natural disaster such as the Freeway Complex Fire will
not overwhelm even the most robust water system.
It has been the policy and practice of YLWD to continually upgrade and expand the water
system in an effort to provide the best possible service to its customers. Consistent with that and
with the findings of this assessment, YLWD is proceeding with the Hidden Hills Reservoir
project, as well as the other above mentioned projects to maximize the capacity and efficiency of
the water system.
Upon release of the OCFA final report, YLWD may amend this report or develop an additional
report that may update information based on OCFA facts and analysis.
Page 24 of 32
Freeway Complex Fire
January 8, 2009
Acronym Definitions
AWWA — American Water Works Association
BPS — Booster Pump Station
EOC — Emergency Operations Center
OCFA — Orange County Fire Authority
PLC — Programmable Logical Control
PSI — Pounds per Square Inch
SCADA — Supervisory Control and Data Acquisition
WEROC — Water Emergency Response of Orange County
YLWD — Yorba Linda Water District
Yorba Linda
Water District
Page 25 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Exhibit "A" - Reservoir Zones Area Map (Attached)
Page 26 of 32
Freeway Complex Fire
January 8, 2009
elYgorYba Lf"cl$ "Water 1114strict
Reservoir Service Area Map
EXHIBIT "A''
- e 'fiJIRC[WIA, ipE@•ERV9!IR - ., � *�
4 r
�` y •4i rW ; 2JI Md G�IIN4 HULLS RESERV+ ??r
s IL t� ELFY. 7E 1 e. -...ti WE M
�ry rr M1 is
ter, "v'a11wy'di -w8PS LITTLEGAINTOMRESERWGIR
QUARTER NORSE RESERVGIR 4.0 *G
F'3 �Lryrhi''!+d :tk7j ��YtA9'4 15 �i 5ef4P➢O�P
ELEV. iA06
'' ?+.{ i 4 -�, .LA16E'wIEM! RE,LERV!'OIR ■ __ „
LY _. L
COL 'E14 G _ � - S -Q M a•s :- i'1 _ s;
9PRIN-GV1EW RESERVOIR T'rr her Ridge BPS
�ELEW.. 70 iv sAn.huryBPS by{�r1�IrHorsa ELE'V.TS17
t
- 'Paso F no 3PS 215T.k1IGli'_RY -Serve h'y L ne Can',+on Reservoir
Chioo Hills Bran Park 'J" Ys:
BAGT• - y FAIRMOHT RESERVOIR 7 ' °ea,' 2.F3
_.- ..
. IA Fairmont BIBS i�9t4 t [�
ELEV.&75 _
_ Orr.
Served by ValleyWew Reservoir �t � 4 �
SAPITIAGO RESERVIGPIR 71 -It.
r I
' • CA11111YIJ4 p76 ERY�JVR'L�RE-5
a a Served' 7j 5prtngi.{iew ReserelaE ELEV. iiprJ f
Santiago BPS 'R,�Ilnr' Irs
Szrued 6y sartiago ',servoir Booster Station . ` {'
r
• *wow Loww41r I
A4 - Served by Santiago Reservoir
CREA
- - -- -- ` f - -- Servers Gy C'rnlno De "ant Reservoir
R fv a
�. Dahl Ave- a B: .. p ,'
HI 141L04D R E5 EP'ti 0 IF
iid,df•.n `II Is B'3 �
. ti
Served by Fairmont Reser"r Y._ . ELK NFOUIi j 41M�wEffER4'� IR
ELE4
y ,•,a
d o rS
• I I Highland BPS I - ELE'Il.7Sr1
4 I
_Box a o a FS t -i _1
C.fr of Yor�ba Lit a l y. Elk I�ICLInts'til° ?FS
;-
�- Served Elk Moun
by E
by L ' '�' ERYA,N7 RANCHO RES ERV[7IR
twin R•eseracir
IfSTA,16 I .. I - F5. " - `• �* 5. Z_3 M{: -
= - r..••'_. �= Served by Highland Reserwair _, r *,a ` �•' { ELEV_ (5110
'fir €�y ofplacenrra �: ±�' r�krr.a
'41 Ij °i•�is �F P
• - Y.,r rt • , I � .i�ci. .r v • -
,.1 �- � - eWr °;1 .. -_. ° I , -- '�, s .� - _ • ._•�ce�lolrATeac 'Nlater�eatrr�o-c
.CRANGETHORPE.. �! -`rte y 6DGTEP pSTp'71 N
I
r
- -•_ A� ars
�.f:.G AREA # f1 iaun;&i. NEZAkt+SOMp
- :. I,+ liz �'WS.F "1 Tr , - - - EIFMwnldn 7R.5
,
PAIg+LLO2Mq rr 'P - AP' L1 I ^.Illr�xll ore
k 1�
.� y90 =yam. .I "• 1 ac i, L , .6',
,
r�
1 ..rte e^*1 �• •� I YS r
y....
t }�
- '•^�•° jr
� .
bruEA 3 Q+.RrRNCSxt a vAu.9 om-A ne 7- 'rq -'f41
0
Iwr4cin hi l. ars
t'°
0
jr. K 9f'9
bnu {'IERYAMTr{aPdCM neeenvv r!p
r<r.r-.in_.ars
7� p _ ,
yI1;J4 d IL FROrw; IICSGS�r`3RIi
�`�1
PISC Ph® eFe
is J
'�pll
, 56
bnzr, F 17�.+PFi:YSC54 RC6Gn Y91Rp
*5 41rn•!c� u
T:rnb•� Rl�er 6r�
�"Uu
11.
�
W
4IpELlt li+[] "NTFW 4-01 R[TCRAOIR'.
TLL ft
LYIIrF VIir 6&`•
."MA a ILJT C,a WUN 5ERYDir I
ar7JI, P 19ANTiRti 9 Rleell'u91R
=;3.+.AmP.F
PniS I : ER rex:e! }SC9ER VD RI
arra II ReeCa'Y41P.1
ICIIIMI].ILLe
yr: •_R I -;_AST M1L L'L. L'I Yoh" IIL�J +t4 -I,'.
CrI: e. EY: f
NDt Scale Mali
Yorba Linda
Water District
Exhibit "B" - Dispatched Calls Area Map (Attached)
Page 27 of 32
Freeway Complex Fire
January 8, 2009
ElYorrba Lt" a Water District
Dispatched Calls by Service Area
(Based on Orange County Fire Authority Emergency Communications Center)
EXHIBIT "B"
is GHIN4_ NIL S RESERVIDIR �r a t 4+ L n
•, • ;N ti..'' '
35 Water Features
j_'� rGL. E.as f MG
E . n7 3D0
. i, <� i '� - L• 4Eh { �%F7+E$EPrGI' 0 1 Boaster Stations
-i ESEPV EA2( -4 ._ -I ;i i • � Jaii flew
BP S
+ 4 'ice - - -i' � �EA3fzrAl1�M'JNT 8. 44LLEt".'1= 'R'.. =8 =1�MR) 0 - Inl�,}er RIC�G�'° B Pr:
- ...
A
LITTLE CANYON RESERVOIR ` `�. �: �. AAEA4MIRVANTPA,NGi RE2ERY0;, -, 0 Spring '- .'Iiew
0.0 MG MG - 0 Santiago BPS
E LEV. 1000 -
QUARTER HORSE RE5ERVOIR
z° 3 P; t " ter s
yEUEV 11�a
- n7ber Ridge BPS ■ f '.7���
SPRINGVIEW RESERVOIR
R VOI rt ,
7 S Ma -.--. � ELEL`�7� 9.
rAl RM p�NT;• REBE
k Q'°
Area
Number of Dispatched Calls
3.
4
16
k1
A= s- :IAA(BP !N441EWREtE -CeDIR
7
8
a
23
9
Lower Zone: 14
Upper Zane.
11
9
1
9
spring Ie4Y kS » h 'w �., s", _ REa 9 I ARrER H13RIF REEDi I 695tanchllTy 13P.`:
p Fairmont BPS «, MV
n
a
FY „1.e. * . +'y ° • • ' �r4 _ a5 • AREA 11 4rHM HI LB RESERVW-
1 ,
u
fi .
`'L �' - II• .'ys _ o -"' • - . ,i�3 AREA 12 IaaMrs DE 9RYAJ3TS= R'a'*.71R,1
1 - -, i - "'S a •olY' S.y,� .r, •.,fir. - .,.N
DISPATCHED CALL6
'LEI �,�•tJ
1�
SANTIAGO RESERVOIR
z.
r !
GA,MI OE BRYANT RESERVOIR
j 1 ��i kF 1� I,�' r�i ' R
C ELEV.,.1CYiF b 3,2 MG
_ ras' - ELE V. 1155
'S.3lltiago BPS t ° n
lo
-ti
1 •. ,'. ^Ld � P ° f - Iv � 1.y +i+uLrlLa,.� 1 4
,
,
.,
C7
Y 1 Lni
,Lie ,° v' v �fr ''I' �•!�'
, r b
Hidden H,, :s BPS sti
- .
n _LK 14OLMNTAPH RE5ER n' 9
°
' I . E:£i M1 �.
�z ` ELEV I
' Q
l l �. ^�TLRAiIGYitREAERWWR Ip ' ar
LI
r:j Q -
- x n
in rw
r , I E i Elk MoLlntaiii BPS
F B
}
` Canyon r lip Box I.:
I .9 R � _, I ! , 15, 1, c • "'Ir'i Ll
I
,,, M1 • r� < • �r`^, ' +a...,' `1f��4yup'� -� �?�" "I' �-,. -
r 1+
. 1
i yq
,
J
ri
. G
Crea-;,ed y: YLWD
Date. Jars. 8, 3
A:t -�, €•I iARGENI., S.�IfcR'd£IIRI
*Paso Fino BPS
A= s- :IAA(BP !N441EWREtE -CeDIR
Pal rTb Avenue 6 P-9
A ::2 71_LM• MOUNTA.N REBEF{VOR:,
0 High land BPS
A:;EAZ i TTLE CANYON REBE +.L'OIRI
0 Hidden Hli is BPS
A . ;atiBAN'TIAGORElERVOIRI
0 Fairrroont BPS
3emect}E:sn[k%,DJpoerZmes
Elk Mountain BP.-=
Z-mec by 3an113;b .srker Zones
0 B ox C Snyon B P S
spring Ie4Y kS » h 'w �., s", _ REa 9 I ARrER H13RIF REEDi I 695tanchllTy 13P.`:
p Fairmont BPS «, MV
n
a
FY „1.e. * . +'y ° • • ' �r4 _ a5 • AREA 11 4rHM HI LB RESERVW-
1 ,
u
fi .
`'L �' - II• .'ys _ o -"' • - . ,i�3 AREA 12 IaaMrs DE 9RYAJ3TS= R'a'*.71R,1
1 - -, i - "'S a •olY' S.y,� .r, •.,fir. - .,.N
DISPATCHED CALL6
'LEI �,�•tJ
1�
SANTIAGO RESERVOIR
z.
r !
GA,MI OE BRYANT RESERVOIR
j 1 ��i kF 1� I,�' r�i ' R
C ELEV.,.1CYiF b 3,2 MG
_ ras' - ELE V. 1155
'S.3lltiago BPS t ° n
lo
-ti
1 •. ,'. ^Ld � P ° f - Iv � 1.y +i+uLrlLa,.� 1 4
,
,
.,
C7
Y 1 Lni
,Lie ,° v' v �fr ''I' �•!�'
, r b
Hidden H,, :s BPS sti
- .
n _LK 14OLMNTAPH RE5ER n' 9
°
' I . E:£i M1 �.
�z ` ELEV I
' Q
l l �. ^�TLRAiIGYitREAERWWR Ip ' ar
LI
r:j Q -
- x n
in rw
r , I E i Elk MoLlntaiii BPS
F B
}
` Canyon r lip Box I.:
I .9 R � _, I ! , 15, 1, c • "'Ir'i Ll
I
,,, M1 • r� < • �r`^, ' +a...,' `1f��4yup'� -� �?�" "I' �-,. -
r 1+
. 1
i yq
,
J
ri
. G
Crea-;,ed y: YLWD
Date. Jars. 8, 3
Yorba Linda
Water District
Exhibit "C" - Hidden Hills Water Pressure Areas
Santiago Upper Zone
1.1 N4 Ta.�sowae l
bL i.01
Santiago Lower Zone
OA)
0
t
6
NP%q
LegonO
let
8008TER STATtONI
Ina
A— So—d
44. 'UMMENVII-W-1 S I .4&--AF5,
Page 28 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Exhibit "D" - Hidden Hills Contour Elevation Map
mo ,off ICM
V31:10
1%30
of,,
so
Z-40
END OF HIDDEN HILLS RD
ELEVATION: 1.310 FT
Sao W0 1300 ZON-E (6C)
Fx SANTIAGO RESERVOIR
i.1 r
ELEV. 1000
Santiago BPS
FAR END OF GREEN CREST DR
•. ...... EL 1.000 FT
ME (5BRI) 120
rl
Hidden 1- ills •BP
S
C
- — -----------------
1S.ZO_%7E.(.1CR11 4
7E 131111
tsox ft;anyomni
AT. RANCH RESERVOIR
.0 0
0
0
E3
Page 29 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Exhibit "E" - Boil Water Advisory
For Immediate Release (addendum to the earlier press release)
November 15, 2008
WATER QUALITY ADVISORY
Due to the continuous drop in water pressure as a result of the fire- fighting efforts to extinguish the fire, the Yorba Linda Water District has
issued a boil order of tap water to the residents located at:
Hidden Hills Estates -- -ONLY,
in Yorba Linda, specifically the following streets:
• Hidden Hills Road
• Green Mount Place
• Hidden Glen Lane
• Rolling Hills Drive
• Fairwood Circle
• Skyline Drive
• Greencrest Drive
• Starwood Place
• Sun Beam Lane
• Starlight Drive
• Sky Ridge
• Westwood lane
• High Tree Circle
• Brentwood
• Crescent Drive
• Mission Hills
Methods of Disinfection
Chlorination: Add 1/8 teaspoon ( -0.75 mL) of unscented household chlorine bleach to one gallon of clear water and mix. If the water is
cloudy, add 1/4 teaspoon (-1.50mL) and mix. Chlorine bleaches are inexpensive and can be secured from most grocery, discount, or drug
stores. However, check the label to ensure that the active ingredient, sodium hypochlorite, is 5.25 percent.
Wait thirty (30) minutes after adding chlorine before using the water for drinking or cooking purposes.
Boiling: The water used for drinking and cooking may also be purified by boiling. In this method, bring the water to a full boil for at least
one (1) minute (at altitudes above one mile, boil for three minutes). Cool and aerate the boiled water by pouring it through the air from one
clean container to another, or mixing rapidly with a clean utensil. Aeration will reduce the flat taste caused by boiling.
Water purification tablets may also be used by following
the manufacturer's instructions.
NOTE: Water filtering or treatment units may not remove all of the contaminants that the advisory or notice is targeting.
Failure to follow this advisory could result in stomach or intestinal illness.
The Yorba Linda Water District will notify residents as soon as can be determined that
the water is safe to drink.
For more information call YLWD at 714 701 -3000 or 714 701 -3100
California Department of Health Services: 714 558 -4997 or 714 547 -0430
Page 30 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Exhibit 'T' - Reverse 911 Message
"Hello, this is Michael Payne, General Manager of the Yorba Linda Water District with a water quality and safety
alert. The Yorba Linda Water District in conjunction with the California Department of Public Health has
determined all Yorba Linda Water District water is safe to drink right out of the tap. As a safety precaution
residents in a small portion of the Yorba Linda Water District service area Hidden Hills had been notified to boil
tap water for drinking or cooking purposes. That order went into effect November 15 but has now been lifted.
Again, all Yorba Linda Water District water is safe to drink right out of the tap. I also caution residents not to
operate or tamper with fire hydrants. The District inspects and tests all fire hydrants annually. Improper
operation can cause severe injury or death. It can also damage the water system. Thank you for allowing us to
serve your community."
PROBOISKY
RESEARCH
L -A
STRATEGIC MEMORANDUM
TO: Michael A. Payne
Yorba Linda Water District
FROM: Adam D. Probolsky
Probolsky Research LLC
SUBJECT: Water Alert Message Broadcast Calls
DATE: November 20, 2008
On Thursday November 20. 2008 Probolsky Research delivered water alert message
broadcast calls on behalf of the Yorba Linda Water District (YLWD) to District customers.
Out of 17,414 phone numbers that were dialed, 13.404 received the message either via
answering machine or a live person answering the phone (representing a 77% message
completion rate). The following graph illustrates a detailed distribution of activity:
Answering Machines
Live Answers
Disconnected numbers
No Answer
Fax Machines
Hang Ups
Busy Signals
8,929
Page 31 of 32
Freeway Complex Fire
January 8, 2009
Yorba Linda
Water District
Exhibit "G" - Area of Significant Structure Damages (Overall Map) (Attached)
Exhibit "G -1" - Area of Significant Structure Damages (West) (Attached)
Exhibit "G -2" - Area of Significant Structure Damages (Central) (Attached)
Exhibit "G -3" - Area of Significant Structure Damages (East) (Attached)
Page 32 of 32
Freeway Complex Fire
January 8, 2009
EBYmrba UnclaWaterDistrict
- h -
Z,
Ozy of Brea ."
r -r— - -C --
I
I
I'I
i
I
I
i
I
GARDENIA RESERVOIR
2.0 Ma3
ELEV_ 790
WALLEY VIESH RESERVOIR
2.0 MG
ELEV. G7a
ille'14View BPS
mraoffyGARIMM11111mm
LA:_KEVIEW RE'�ERV -DIR
'• I-6 DIG
_" EELE' =k:
I
j =• I
I r.l
s I
I �I
SERVED BY
1 ,
' I
l� FIG :HL APIU RE5ERVUIR
MG
ELEV.. S2II
Highlai'd
BLIC'i = 1 VI-5 -A
Giry of lacenFill
r
F_
-- -- r F
I �
I
I
i
I I
� I
aERVED EV H 0H -AN D REII EP413II
I
I '
I
L
A N C IT _3P :r'C
-e
I
ti._VA I I
I I
— .- rAL4rA
wi
Water Features
:
Q
,I
1
'
I
I
I
I
Area of Significant Structure Damages (Overall Map)
EXHI BIT "G "r
UHI NO HILLS REaEAV -UlR
9S M34
ELEV. 71[I13
LITTLE GANYON RESERVOIR Lam.
0.9 MG
QUARTER MORSE RESERVOIR ELEV, -
7.3 MG YL - --
ELEV. 92.0 iY IQ HILLS IRS
SPRIihC �'1 5ERV41
r4 1'r 41111 t■111GIIr1®141 - -• - -`- e..D MG RTimber Rid RP`S
f �
-E V- 7430SER'p EG 9V LITTLE CANYON RESERV11•
Pas InD BPS
. FAI Ri4!I E} NTJR "sERU l51R S.RrI "�J' View BPS ;
ELEV_6T°3
I'
. "� SERVED Eff SPRI. L'IEIV RE3 ERVGIR •I
LL
SEE EXHIBIT " - Ir
LEGEND
Water Features
Reservoir Areas
E3 AREA 1 ND RESEFMOIR)
Booster Stations
(HIGHL
AREA 2
4alVey Vie,-,' BPS
(LAKE"E+RESER4C}RI
a AREAS(FM ONT&VALLEYMENRESEM RI
OTriber Ridge BP S
-U
a NZEA 4 (BRYANT RANCH RESER'a°OIRI
3p ri ng Viigw BPS
MIA 5 (GARDENIA RESERYUR)
03antiago BPS
NZEA 6 (SPRING01!0 RESUNURI
4b aso Fino BPS
AREA F (ELK MOLRYTAJN RESERVURI
O?alim ,Avenue BPS
AREA 9 ( LnTLE CANYON RESEH%,'OIRI
*Highland BPS
" S (SANTIAGORESER""OITI
Hidden Hills BPS
SEr&*J t� Carr_a .- L r ZmEs
Fairmont BPS
Uer4'Et1t La"- a s _:, +ae' °;nee
0EIk
AREA 15 (QUAKER F USE RESERVOIRI
MQUntaln BPS
Box CLqnyon BD3
AREA 11 (CHINO HI _LS RESERVURj
Bast rlCl°ILIr'y BPS
AREA 12 (C.AMD, L' DE EAYANT RESER4rOIFC�
Houses
Structure Condition
SINGLE FAMILY RESIDENCE DAMAGED
SINGLE FAMILY RESIDENCE DESTROYED
A "1G
ELEV lull "
f SERVED 6Y SANTLAGO RESERVOIR
Santiaao BPS s
4 I f
3ER.VEDSY3ANTIAOGRESERVOIR
4--'lf
P Avenue BP'S
SEE EXHIBIT "G.111
r I I
�11��1"11i1�1�'1®1101 =�
ff d
City of Ycrba Zh)da
�I
r I IN Llkf�Nm
} J
' r .
Hidden Hills B
Cky of Anaheim
IF
PS
LRYANT RA.
2.3 .3 Fi
MI
ELEV. 4
BD a .
r
�i
BEE EXHIBIT "G-311
CAM IND CE BRYA.NT RESERVOIR
3.2 M1
PUiIP lTi4TID1Y =LE'J. 1105
3ERV EC SY CAMIND 3EERYA' -47 RESERVOIR.
ELM. r- 'vL1r,dAIN RESERVOIR .�
l•.D MG
IR ELEV.,7II0
Elk Mountain BPS
Y ELK MOUHTAIN
�I�I �IF�If1t MAN �4E
L�
1 1
y4
Not Scale Mail Date= Jarl.�F 20091
Yorba Linda Water District Area of Significant Structure Damages (West}
EXHIBIT "G-1"
POT
L..___�
ITTLE CANYON RE9ER40I111'
0.9 Nli
f
* -
I .
s
gUARTER HORSE RESERVOIR
r T.
ELEV
�r '
`rl,rilsf;n�s-
j'
s -+
>' A' -
W
1
Served by Chino Fllins Reservoir
, ps..■
V--* Le FANtum km .
- 9
i
, "
IIWI:W. ,Y, - ' _ �' Ir a. Ta .• {•:f I -,� .3 `9j ,� G� +t �' II'�,
-t SPRIG'' GVIEW RE.SERV+LIIR 1�. k r 1,''1� -+ryr ac f ,• t° ��
e.
113. 0 FAG K.^ L ELEV. 780 . ►• ti 4 y c:• .x .
4
I � � � ri g� Vi&W + BPS
FAIRMONT R „ t 1. -'A
9' ■': "* ► ` th o£
5 ,k. �
t, 7. MC'a
, ■, a�
a - Y► ,I. f-'f F ry4 ■r Ife `a # �ti. °y A.� ?fl® p yY 4.
Fairrl�vnt g
MAT
S- .rxk xLT+ ;x, Pis • ;, I,n�
:r a OL Ilk
T.
Ilk
,
_
I _ . ,,.r . ' - .. � w3 r+ ,. +fix i� _ � � , I � r�iy�' x •e� yrry,[ ° k ._ �� ,�
,
o .
�. � i_ A 4
�.. ° _ '1'•T°�a .M1 , - ..' T �Yy !s _ ." .. 9 4�' ` 'l ■� If '�. _ � j "' u ,
de
Ike
, p��y . � a �^ 351,► y
M11
i:� J Imo... , ' � a- ' _ �' ' -ls r..l'IIJ?L' •' Y.+ r' _. � � �. • -,- � -
ro
T, ":, ''4, "� � i . f a,al• ��. 4 s � �, � ,,� � "may* g� .r 1
-46 4d, .3
'P'.�
I ►�, J , °; `.'° Sery -ed by Springview eservoir
tr ,.
r
i,
n �. d c'�' ,- . � ua :. ati .' � sal � ,, � � ' ,�, '# •
F
Lj
_ -K I ', . {� '■J'' • " a ' ,'Td °I1'1AM1 11 " lT lJ'
rrY � l
f+, � , "7 - , 5 el ,.y�. �•-.T�.t _. �
fir°. . '.m$G.•:.. •,_,. , al =Id_aMh° '� - - -, '•^9"'r- I�'yr s Rte_ T �. ,
•al j 7e _ hr_re . Y F S ..: r r ' , r ' i�' „ -. � :f. ':' f n Y I ■ I
y`u3 r • ' t'r L T - - d �L s
i ■ _ y�S `�" �e7. -' 'n �. fF' y r y.' f i ,.■
t
a
.ypt Lr i I
"-,
, r
X11 ..
L3 W- 'ldYr 'h -
■
- T. --F,-
9 w
d 93F k5
.. a _, S. . - n
� r � �" � ' a � °" d � } n I I lr " " .7, r i41S,,.q °I 'a �`�'y�`.T "I,,x r .ct �I IT q�11 �' s1, ..�. � 1' �„� ►,
,
fI
_
i
• YLM
Not Scale Map Date: W' e: ,Jan, 5, 2009
•.�
4' 1
dot
LEGEND
Water Features
Res ervoi r: Areas
E3 AREA RESER-,'U Rl
Booster Stations
IHIGHLAND
AREA 2JLH16Ew "IEIA' RESER'a'aRi
4delley1 "Ie'AI' BPS
AREA 3 OIff!
Timber Ridge BP?
,iFAIRN9.Hr&VALLEY'w'IEWRESER'
ARE 41BRYANTR4NCH RESER,1CIRI
Spring View BPS
AREA 5 IGARDENLA RESERgOIRI
OSantiago g::'S
AREA 6ISPF G- AEViRESER:UN-
*Faso Finn BPS
j AREA 7JELKMOU14TAINRESER'.OIN,
*Palm Avenue BPS
_•I AREAS JLFTTLE CANYON RESER"Olffi
BP
AREA 5 j8ANTMGO RESEEi�%Mj
"'�iighland
OHidden Fillis BF;-' -'
Ll SeNLE-10, S-Up Lamer Z-ee
FaIrmQ'fl° BBB
.arvE] by'SartaT_Mer ME-S
° =Ik FYI III "ItDiGI BPS
AREA1tl lOU.IRTERHORSEREFER',(OIRj
Box C3nyorl BPS
AREAM CHINO HILLS RESEFNUR)
*Bastarrch -ry BPS
AREA 12 ICNMNO UE HRYANT RESERY'C lRI
Houses
Str:atureCur►di on
FIRE HYDRANT'S
SINGLE FAY I .n RES IDENCE DAMAGED
SlM_LE FAY I -, RESIDERCE'DESTRQYED
X11 ..
L3 W- 'ldYr 'h -
■
- T. --F,-
9 w
d 93F k5
.. a _, S. . - n
� r � �" � ' a � °" d � } n I I lr " " .7, r i41S,,.q °I 'a �`�'y�`.T "I,,x r .ct �I IT q�11 �' s1, ..�. � 1' �„� ►,
,
fI
_
i
• YLM
Not Scale Map Date: W' e: ,Jan, 5, 2009
1-9 Ycwba Lir d4m'Dater'District
Area of Significant Structure Damages (Central)
EXHIBIT "G-2'"
'
I � ° � of I ' I rF�•..; � -
s� S•
r
,
< i
SANT mci 011RESERVOIR, �.
,
is ma y. 51
._p
} ELE1l,
luau
r
° .. ilk i �y, LEG E4�L �jj I.y sp 1-pp o yy rrr°....iY�ateF r e.9tu I�1TY, s , 1 Rese'rv'oir Areas Y! �R Served k� Santki o Reservoir Booster PLI1111) St��tion ooster tations
� ,1 � � � AREA 1 IHIGHLSM!] RE;SEii'4�IR;1 - ��+ � ARE1i2 IL:rI£Ea1E54'REJgEFia+E51R) vy � } ": E AREA3IFAIRMCNT EPOALLEYVE1� RE°.ER41(�IRI r7i�a °� �f��� �P'�T ' AREA4 IBRYANr RANCH FMIE i',U) O.Sprlllg Vie'v BP , kR[llF,. F+�fAREA5IGARCENIARESERVOIRd 08antiago BPS
R 7 - a a r r "" �AREA. RiWG'�IE'P'RE °ER`"C7 PaSQ PInO BF�S
Served l� mitia o Reservoir ,AREA7IELl{M�UN AINF SER'r'OIR� 8 {LITTLE 4N'iOWRESER.01 P,�7 . -6 P [ l • r' A R•' �Hl+�h��r�d B erve�l I��+ ar>Itia�� Res.ry -ir C�Hi+��d�nHills'�P_� *��d �tl3•y�a .lope Z res 'a I . i _ Ec • 1 "Suved by .S3rll ago La's u Zoge5� F��irrr�ont �P�
-'s y 'c§ s r' ' _ r a - .. ' ' U Y AREAW [GMRTER HORSERESERVOIRI Edk IDUrltaln PP OBox Canyor, BPS
~ AREA 11 (CHIN' HILLS RESffW01R)
'0Basnehur� BPS
ARE1e 1 IC�h11W0 CE HRY4Wl RESER4'CAR1
}''�H_ t s es FIRE HYDRANTS
g- -uature Candetlu^ S1NCLEFAMILYRESIDENCEDAMAGED
L E ra 5.7 VY40 '4'. .•r ULY N ¢ 1.0 ervcl l� grin V1eI >eservolr e
R .
� � r �� -. . l � e AI y , p yj r7 �' k l• � � ° : � $ Vk Ira
.P` . fi n �' - ii T net P r -
� ° r �4vecl b Fail '�rlt �x�SPr+4filrr ° _ - r p •r ' '� ; � ��: ,Rr ",I l3 : i69Can'rc,I1,jBP iGFI Ii 1 "{ � IL
77*7 'No" - .' „ �. _ . . ' - � +'* � LC V. k.! �ltLEj
ti °qty- r„ ti r t l`�I
c�J ^gip �a i+C r"_r h-
w
� p.lMr.i'•i' ^��.ne'l,_��
cL
r
; „ k, r
1
w } . M a . 1 IL .
Wt Scale Map DatstJanr° C�] + I
Ycwba Li"d4m'I atear'Distriict
Aroma of Significant Stiructure Damages (East)
EXHIBIT "G-3"
r14MIH4 BE BRIPANT FtE ERVOIR
3.2 MG
- 4
ELEV. 1165 i, � -. � - ■, � � e �
ING
x ., • , - ._ _ . , t _ � _ . is °�: ., rya
v �x1'T'yl _.!I' !�`a. 'i . ,�..,1i1 � . r � 1� - , 7- I�H_'n. -e ' /q� ' S- �i a `,1 ,�,;}tA l,•, _.
e
r 1 4, ke
Water Feature's
ar IResiervoir A�Lreas
-iL -, yk `' «* ' ' . p ` � AREA (H�FJL?ND RESEFL Dl�ca Booster Stations
!
s-
.1a
'1L `?l 1i � a�4 l ", "' AFiE�+2�L4a{°wlEy1PRESERailtil l'll- ley�f�le'y"i BPS
'rV 4A _:a
br
AREA 3 ffA'IRMONT& VALLEY'd1E4'i RZ.- M- ,ID1R5 OTimber Ridge BP
AIWA,.4(RKYL.NTRAWH RE�EFigUR1 priing Vi�8'+"� BPS
P
i�, L- �> AJREAk5 {G4RDENK RESEri' CXRI antiag0 BP';
1
of e l b i e�hC De f (1 1t Re.
ry i r AREA s�IaIwG,yE�v R�sEa ':a�IR; Waco Finn BPS
% I 1
AREA 7 DELIS M41.'NTAM RESEIR '1{74RV
Walm iAvenue BPS
AIWA 11 � L M LE NYON FES ER'Q R
C-.}
# `': . -. � �.� 1,; r � *Highland BPS
a.
` 31 - ! l+ 1 ._ 5 (SANT AGO RESER-11 RI
- F'
Hidden Hills BPS
.
'Fairnt BPS
4t'Y v r' ,`" ; 1 &ErYE4J bN $ I -comer Z F-E
+' A
fpCZArAIN RESERVOIR, -- - ,�'; , _ ;� � I -_�k ML�Untc�aFi BPS
0 M+ Y `.1 � AREA 17 QUARTER MORSE RES E4'DIRj ,F
nbj PO}nyOr BPS
FLEY 7$0.
AREA 1I 4 HLLSHEEdMIF B t 1-Cltiry BPS
AREA INDDEBRYAWRESERYDIfil
FL
r.
� E - I I`.`.A b r wj , + _ , Structure ouses L7 FItE HYDRANTS
.I e C]PdlFSP
,
�
N- a r _, u�n-oA9 i4 SINGLE FAWLY RESIDE NCEDESTRDYED
� "'�, �
SINGLE FAMILY RESIDENCE DAMAGED
O4YANT'11�k1iCif° JR� ��a'„�g
P r
t ; "Served by Elk Mountain Reservoir �
`iS.MG ...�:' "'L •. _ u. _ ... i, =u3 - $ �' (�""� .,s �4 ' ,.," i �.,. J�- #�� ,fir, a a "- a• � °r -�7'�r.
f #r ELEY, °6E ! c ^ r N .•' a i'.' f , i_'a } s €. — _
d
•
'J,,, �A 4 ,� z > !• "I 'r z.4 'e "B *�'.'r� Hy
s
!- _ Il` ,. - °•"i a is � r.f ;4G - FF_� -`'tea _ *� J -
- ,
e� i al IV .. .. .,
' a
Y
,
a
'9, i ' �� 1 =a -e O'
Ilk, r }T
Ara c y r_ d., ti WN d
1
•� lid' -. r°�,
-
"'P ,i'� I. .. ,sAq - k ;far _,(, I A .� i i'- � , �'h. L�
t ,il p
r+ ti } _` i. �' r -• �, - rs � �i•. � -�. •� i r J al - _ i �1' � T 'T! � } ,i •„�' _ � �,�. ! - ,.� ., ..
ti• - a 1 _
hy 1 � #' - e r j _ y :_w �.5 , °, - 3 _i ,, �` , - � • "� 4 ' � 1' r - ' y,�i%fi � - � - -�
5��' r, ';i :. - 7,�, :I. e� , -"1 tip '. ,a - ",Y�` •' � 1 � i y. �.1
,• x
I,
r� Ak
Li -: - 1 ie1p •� -e L -µ. - �7 ��' '•G
F -
C
n
tl! �: +/'�`' s - '� I' w "y.. ! +� § •° l`ill 'R ' r . �. , I i.... + Y
c `,: t - 111 °.rr r gw"1,— V r•Y I al'�� �- �.,; " , `w i4 u i
Y i.. ,sue ° -•- 't-1 .�.... - - '� - i„ i _ S
- r wry.. r. •�I'� v _
•ire .. ". s
IF
yq � _ _
s-
f
� • � ��� � +i
., 4.- � � �IIYJ 4.y..lv,?ril r� 6� '.. 9,. v. i,..a !- F: i,��s : . "f� �'1�, 9 - �. _. �'fi l��.r:. i•s. -ems - a .. F',F - '�=i, � �,w� .� � „ r r_
'
Nc S03 _ IA3P Date: Jan� CP39 I
tsYorba Linda
Water District
P.O. BOX 309
YORBA LINDA CA 92885
Dear Customer:
On January 8, 2009, the Yorba Linda Water District will release a comprehensive
assessment of how your water system performed during the Freeway Complex Fire, the
worst fire disaster ever to strike our community. We invite you to read the full assessment
on our website, or to review copies at the District office or your local library. In the
meantime, we want to summarize our findings directly to you — and ask for your active
support in helping make our system better.
In summary, the Freeway Complex Fire Water System Assessment (Assessment) revealed
that:
• The fire threatened 9,500 homes and destroyed 187 within the YLWD service
area. Of those, as many as five homes were claimed to have been lost in part
due to a lack of water.
• Reports of widespread problems in the water system were either false or
exaggerated. The system delivered enormous volumes of water to the fire -
fight without interruption- except in a few cases- and those volumes far
exceeded the standard capacity of the water system.
• The system operated substantially more effectively because of a series of
major infrastructure improvements over the past 10 years that have largely
kept pace with the dramatic population growth in our community.
• We can and must do more to continue our improvement program and ensure
we have in place as strong a water delivery system as possible.
Water System Performance: Based on objective measurements, the water system
functioned well during the fire. During the fire, our system delivered an additional 20
million gallons of water, primarily to the highest elevations within our service area.
Our Assessment concluded that water flows were briefly interrupted in some portions of
an area encompassing eight streets and 118 homes in the highest elevations of Hidden
Hills. This limited interruption in water service occurred after flames swept through the
District's Santiago Booster Pump Station, which serves this neighborhood. Because of
its elevation, this area in the -District gets water directly from the booster pump station.
We have not yet been able to determine exactly the extent of the water service
interruption in that area in part because the fire destroyed our telecommunications links
to these facilities. We expect to have more detailed information when the Fire Authority
completes its own review in March 2009, and we will make this information available to
Yorba Linda
Water District
the public. In the meantime, we are moving forward with previously planned projects —
including construction of a new reservoir in this area — that will add capacity to our water
system to maintain and enhance our service during both normal usage and emergency
situations. We'll discuss these steps later in this report.
Finally, our Assessment looked carefully at the reports that some fire hydrants were
inoperable during the fire. The District conducts annual inspections and tests of all 3,850
hydrants and repairs or replaces any inoperable or broken hydrants. In the wake of the
fire our crews found three fire hydrants that had been damaged. The District has not yet
been able to determine how those hydrants were damaged- or by whom. The three
damaged hydrants have either been repaired or replaced. The Assessment found no
evidence that the damage to these three hydrants affected the outcome of the fire fighting
efforts, in part because nearby hydrants were working.
System Improvements — Past, Present & Future: In the past 10 years, to keep pace
with population growth and the spread of residential neighborhoods along the boundaries
of the wild lands, the District has completed millions of dollars worth of infrastructure
improvements. These projects include over 15 million gallons of new reservoir storage at
four sites; 8,300 gallons per minute (gpm) of additional booster pump station capacity to
pump water up to and from these reservoirs; two new groundwater wells with combined
capacity of nearly 4,000 gpm; and tens of miles of transmission pipelines ranging from
12 -inch to 36 -inch diameter to convey both local and imported water supplies throughout
our service area. In addition to new projects, the District has replaced and upgraded miles
of old distribution and transmission pipelines, thousands of aging meters and hundreds of
service connections. Combined, these projects have improved our ability to reliably
supply a rapidly- increasing amount of water throughout our entire service area for
consumption, irrigation and fire protection purposes.
The District is constantly upgrading and improving the community's water system. The
current five -year capital improvements program for 2007 -2012 calls for an aggressive list
of projects estimated at nearly $58 million worth of additional system improvements,
including: construction of the new Hidden Hills Reservoir; replacement of the nearly
100 -year old Highland Reservoir; new and upgraded booster pump stations, new
groundwater production wells; improved interconnections with other local water
purveyors; additional meter replacements and more pipeline replacements.
The new Hidden Hills Reservoir will be located at the eastern edge of Yorba Linda,
within the Chino Hills State Park. It will be at a higher elevation than the homes in the
Hidden Hills area, so it can rely on gravity to deliver water to that area.
We also wanted to take this opportunity to clear up some possible confusion. There has
been an assertion made that the Hidden Hills Reservoir may have been delayed because
of the recently completed construction of the District headquarters. The headquarters was
long planned and necessary to accommodate the growth in our staff, which paralleled the
growth of our community. This building, located on land that has been owned by the
District for nearly 100 years, offered a more cost - effective option for the District over the
long term when compared with other alternatives. It also allowed us to house all of our
Yorba Linda
Water District
Departments on one central site, increased efficiency for all personnel. This construction
was separately funded and it did not cause us to delay water projects such as the Hidden
Hills Reservoir.
The construction of the Hidden Hills Reservoir was delayed for several years while we
waited for a real estate developer to complete plans for that area. Until the developer
finalized those plans, we were unable to determine exactly where to locate the reservoir
and exactly how large it needed to be. If the District had started construction on the basis
of a "best guess" the reservoir might have been built with serious design flaws (for
example, when a reservoir is too big, water stands for long periods and water quality
suffers) or a substantial waste of public funds through overbuilding or locating it in the
wrong spot.
Once the developer's plans were finalized, we sited and designed this reservoir. We hope
to be able to begin construction in April 2009, with completion slated for May 2010.
This start date, however, depends on the successful completion of the long and complex
permitting process almost every major project faces in California. This project faces an
additional challenge: we must obtain permits from the State of California — as the State is
charged with ensuring this project satisfies environmental concerns at Chino Hills State
Park. We invite you to help the District with its efforts to obtain the necessary State
approvals by contacting your state legislators and asking for their assistance.
Your Water District continues to review its response to this traumatic fire and the steps
we can take to provide the best possible service to our community. Over the past decade
we have dramatically increased the capacity of the water system to meet the rapidly
growing needs of our community. We will continue to report to you on our efforts to
improve our community's water system for the future.
Please do not hesitate to contact us via email at infokylwd.com or by phone at 714 -701-
3000 if you have any questions.
Sincerely,
Kenneth R. Vecchiarelli
General Manager
Freeway Complex Fire
Disaster Response &t Water System
Assessment
Yorba Li
Water IE
Purpose Et Objective of Report
• Provide YLWD events and facts
• Report prepared by Staff
ii Sources of information within the report:
• Emergency Operation Center (EOC) log of events
• Employee interviews
• Supervisory Control &Data Acquisition (SCADA)
logs
• Other various sources
Executive Summary
• Fire storm started at 9:05 a.m. Nov 15, 2008 in Riverside
County and expanded rapidly into OC
• Split into 2 separate paths
x Anaheim Hills
. Hills of • ;. Linda
• Weather conditions — "Perfect Storm"
•d Flag Warning
• Wind speeds 43 mph, •' 61 mpI
• Threatened 9,50o homes, destroyed 118, damaged 6o
homes in Yorba Linda
Area of Significant Structure Damage (East)
1 • ,' I
I ME
Area of Significant Structure Damage (West
Executive Summary (con't)
•
Delivered2oMG specifically to the fire fight
• Higher elevation areas received 6 -9 times
normal supplies
• Mutual aid supplied mobile pumps — placed in
strategic locations
• Water service within a limited number of streets
in the Hidden Hills area was interrupted
Water System Background
• 24,000 services, 23 square miles
• Service elevations from 250 feet to 1,300 feet
Multiple o
(reservoir
pressure
1:1. �.a ,r �� i 1'. through ' E
fed system
• 13 storage reservoirs — 49.9MG combined
• 13 booster pump stations
Water System Background (con't)
• Water sources
9 groundwater wells - 14,000GPM eu
Imported connect-ions with MWD 1
potable o•• '
non-potable - 1 ioo '
Water System Design Standards
• Standards established by American Water
Works Association (AWWA)
• Apply to storage reservoirs, transmission and
distribution pipeline, fire hydrants, valves and
other appurtenances
• YLWD follows these standards when designing
and constructing water systems
Mobilization of YLWD Personnel
• Mobilized EOC at 10:54 a.m.
• Production plant operators first to take action (operate
and control distribution of water supply)
• EOC officially activated at 12:00 P.M.
• Reps sent to City of YL EOC and OCFA Incident
Command Post
• EOC active for 26 hours — deactivated 2:00 P.M.
November 16
• 659 hours worked during EOC activation
Water System Demands
70
6o
50
40
30
20
10
0
Nov 1st & 2nd Nov 8th & 9th Nov 15th & 16th
Water System Demands (con't)
Water System Demands (con't)
14.0
12.0
10.0
8.o
C
O
6.0
c
0
4.0
2.0
•.
c� M It to NO n 00 a O cl
Dispatched Calls by Area
Hidden Hills Area
• ApprOX 24o homes
•. , in Santiago Lower Zone (Santiago Reservoir
Hidden Hills BPS)
• 6o in Santiago Upper Zone
• Santiago Lower Zone served by:
o Santiago Reservoir (1.1 million gallons)
0 4 electric pumps at the Hidden Hills BPS
(1,qooGPM)
Pumped 2,200 2,7OoGPM during event
Hidden Hills Area (con't)
• Santiago Upper Zone served by:
o Santiago BPS (2,looGPM)
typical 3 electric pumps (9ooGPM)
1 gas engine pump (1,20oGPM)
ii Closed zone, with Variable Frequency Drive (VFD)
o On a day, peak demand
than 0 , o. >:..
Hidden Hills Water Pressure Areas
Hidden Hills Schematic Diagram
PROPOSED HIDDEN
HILLS RESERVOIR
UPPER HIDDEN HILLS
ro;
MISSION HILLS
Water Flow Direction
HIDDEN HILLS BOOSTER
PUMP STATION
Hidden Hills Area (con't)
• 1:19 p.m:
storm • Fire created electrical short
• Severed SCADA communications •
Santiago Reservoir and Hidden Hills BPS
• Electric pumps at Santiago BPS were forced to shut
down (serving Santiago Upper Zone)
• Gas engine pump at Santiago BPS may have continued to
operate (independent of SCADA)
• 1:30 p.m: Dispatched to Hidden Hills BPS & Santiago
BPS
• Hidden Hills BPS — all pumps were operating
• Personnel could not reach Santiago BPS — life threatening
conditions of fire storm
Hidden Hills Area (con't)
• 3:20 p.m: Unconfirmed reports from television media of
water loss in Hidden Hills area was heard at the EOC
• 3:50 p.m: Dispatched to Hidden Hills BPS and Santiago
BPS with police escort
pumps 11 Hidden Hills BPS — all pumps operating
0 Santiago BPS — all
• Gas engine pump shut • • overheated • f •' (unknown
• 2electric and gas engine pumps manually started I
Hidden Hills Area (con't)
• 6:2o p.m: Arrived at Santiago BPS to repair SCADA
communications
restored —all pumps turned on
Issuance of Boil Water Advisory
• Delivered bottled water to the affected area
• Department of Public Health - lifted advisory on
November 20
• Residents notified of the lifting through reverse 911
system
Fire Hydrant Servicing Program
• 3,80o fire hydrants in residential and
commercial areas
22476 Mission Hills ,• Jan22, 2oo8)
22255 Mission Hills Rd (serviced ian22,20o8)
3510 Fairmont ,
• All repaired /replaced on November i7, 2008
Fire Hydrant Preventative Maintenance
Et Servicing Program (con't)
• All three hydrants damaged prior to or during
the fire storm
• Hydrants were "dry barrel"
o Prevents geyser effect if struck by vehicle
, "Inn
• Hydrant located at Juniper & Smoketree
service "Bagged" - in working condition on November 17,
20o8 — placed into
Mutual Aid
• YLWD submitted requests through WEROC for mobile
pumps to augment the water system
o Laguna Beach Water i'
7,NRM93re
Public Outreach and Communication
• Public outreach methods
Web site updates (Ylwd.com)
Electronic sign pasted at entrance to Hidden Hills
Media
o Reverse 911 system (reached 42,900 population)
Damages Et Cost Reimbursement
• Slope stabilization -$23,000
Conclusions
• The water system functioned well overall, considering
the overwhelming demands placed on it
• Water was being drained from the system in
extraordinary volumes
• The majority of homes damaged or destroyed were in
areas where water service was not interrupted
• YLWD policy and practice is to continuously upgrade
and eland the water system
End of Presentation
ITEM NO. /;-C
MINUTES OF THE
YORBA LINDA WATER DISTRICT
PERSONNEL -RISK MANAGEMENT COMMITTEE MEETING
January 5, 2009
A meeting of the Personnel -Risk Management Committee was called to order by
Chairman Armstrong at 4:00 p.m. The meeting was held at the District Administrative
Office at 1717 E. Miraloma Ave. Placentia, California.
COMMITTEE
Director Paul Armstrong, Chair
Director Ric Collett
PUBLIC COMMENTS
None.
ACTION ITEMS
STAFF
Ken Vecchiarelli, General Manager
Gina Knight, Human Resources Manager
1. Approval of Salary Adjustments
The Committee discussed the results of the salary survey and made a
recommendation to be presented to the Board of Directors at January 22, 2009
Board Meeting.
2. Damage Claim filed by Hong Nguy, 19781 Verona Lane, Yorba Linda.
The Committee discussed the claim filed by Hong Nguy. The committee will
recommend to the Board of Directors that the claim filed by Hong Nguy be
rejected and referred to ACWA -JPIA for further handling at the January 8, 2009
Board Meeting.
DISCUSSION ITEMS
3. Status of Recruitments
Staff gave an update on current recruitments.
CLOSED SESSION
On a motion by Director Armstrong, seconded by Director Collett the Committee
entered into Closed Session at 4:43 p.m.
4. Public Employee Discipline /Dismissal /Release
Pursuant to Section 54957 of the California Government Code
1
5. Conference with Legal Counsel — Liability Claims
Pursuant to Section 54956.95 of the California Government Code
a. Claimants: Mohamad and Fatima Itani
Shannon Lew
Agency Claimed Against: Yorba Linda Water District
The Committee reconvened in Open Session at 5:10 p.m. There were no reportable
items from Closed Session.
ADJOURNMENT
The Committee adjourned at 5:10 p.m. The next Personnel -Risk Management
Committee will be held February 9, 2009 at 4:00 p.m.
I
r
ITEM NO. 1,
MINUTES OF THE
YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
January 7, 2009
A meeting of the Planning- Engineering- Operations Committee was called to order by
Chairman Mills at 4:00 p.m. The meeting was held at the District Administrative Office
at 1717 E. Miraloma Ave, Placentia, California.
COMMITTEE
Director William R. Mills, Chair
Director Paul R. Armstrong
PUBLIC COMMENTS
None.
ACTION ITEMS
STAFF
Ken Vecchiarelli, General Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
Steve Conklin, Consulting Engineer
1. Amendment No. 2 to Consultants Agreement with Psomas for Zone 4C
Reconfiguration Project and San Antonio Pressure Reducing Station Project
Mr. Conklin briefly described the two related projects, their status, and the need
for construction -phase engineering services. The Committee reviewed the report
and engineering services proposal, and support recommending approval of
Amendment No. 2 to the consultants agreement.
2. Highland Booster Station Gas Engine Replacement
Mr. Cory described the District's mix of electric- motor - driven and gas- engine-
driven pumps for wells and boosters, and particularly the existing engine- driven
pump at Highland Booster Station. He noted that the Highland engine has been
rebuilt several times, and due to its age, replacement parts are no longer being
supplied by Cummins, the manufacturer. Staff was able to locate a new,
replacement Caterpillar engine, but found that the permitting regulations of the
South Coast Air Quality Management District make replacement very costly and
time - consuming. Mr. Cory noted that an operable pump is needed by May 2009
to meet the increased pumping demands of summer. Therefore, as an
alternative to the gas engine, staff recommends purchase of a new, larger
electric- motor - driven pump to replace an existing electric unit at Highland. Mr.
Cory indicated that staff has requested three written cost quotations for a new
electric motor and pump, but unfortunately, those were not received in time for
the PEO meeting. The Committee discussed the issue and the District's written
Procurement Policy. The Committee recommended that, in accordance with the
policy, if three written cost quotes are received and the cost is less than $75,000,
the General Manager is authorized to proceed with the issuance of a purchase
order for the new pump and motor. However, if the lowest acceptable cost quote
exceeds $75,000, staff will bring the item to the Board for consideration.
1
3. Sewer Connection Requirement for Mr. John Breedon
Mr. Breedon was present to discuss this item with the Committee. Mr.
Vecchiarelli opened the discussion by describing the District's understanding of
the existing and proposed conditions at Mr. Breedon's home. He also described
the District's Sanitary Sewer Rules and Regulations which state that
"...connection to a public sanitary sewer operated by the District is required
provided such public sewer is within 200 feet of an existing or proposed building,
or private sewer disposal system ". Mr. Breedon described the situation and
made his request for a variance from the District's requirements. The Committee
discussed the issue with Mr. Breedon and staff and recommended that he
connect his home sewer to the public sewer system in accordance with District
policy.
DISCUSSION ITEMS
4. Monthly Groundwater Production and Purchased Water Report
The Committee reviewed the Source Water Summary, current production values
and water use.
5. Monthly Preventative Maintenance Program Report
Mr. Mendum described the status of the PM Program as summarized in the
Agenda Report. He indicated that now that we are past the holidays and
responding to issues from the fire, he expects that maintenance staff will catch-
up on inspection and maintenance. The Committee reviewed the data provided
and acknowledged the need to get back on schedule.
6. Monthly MWDOC Managers Meeting Summary Report
There was no report.
7. Monthly OC Groundwater Producers Meeting Summary Report
There was not report.
8. Status Report on Capital Projects in Progress
Mr. Conklin briefly described the Capital Improvement Projects Status Report.
The Committee reviewed the information and asked that staff highlight changes
from the prior month for the convenience of the Committee. Mr. Conklin also
provided a preview presentation of the Status Report on the Five -Year CIP 2007-
2012 planned for the January 8th Board meeting. The Committee provided
review comments for staff.
ADJOURNMENT
The Committee adjourned at 6:00 p.m. The next meeting of the Planning- Engineering-
Operations Committee will be held February 5, 2009 at 4:00 p.m.
6
ITEM NO.
MINUTES OF THE
YORBA LINDA WATER DISTRICT
PUBLIC INFORMATION - TECHNOLOGY COMMITTEE MEETING
January 6, 2009
A meeting of the Public Information - Technology Committee was called to order by
Chairman Collett at 4:00 p.m. The meeting was held at the District Administrative Office
at 1717 E. Miraloma Ave, Placentia, California.
COMMITTEE
Director Ric Collett, Chair
Director Michael J. Beverage
PUBLIC COMMENTS
None
ACTION ITEMS
1. None
DISCUSSION ITEMS
STAFF
Ken Vecchiarelli, General Manager
Pat Grady, Information Technology Director
Cindy Mejia, Management Analyst
2. Update on Current Public Relations Activities
a. New GM Press Release
The Committee reviewed the press release sent to Erin Welch of the
Yorba Linda Star naming Mr. Vecchiarelli as the newly appointed General
Manager of the District. The Committee was also informed that as part of
this press release, a phone interview was conducted. The story is
expected to be released in the Yorba Linda STAR on January 15, 2008.
b. Freeway Complex Firestorm Video
The Committee discussed the feasibility of producing a three to five
minute video about the Freeway Complex fire for educational purposes.
C. Customer Letter Regarding Freeway Complex Fire After Action Report
The Committee discussed changes that were to be incorporated into the
letter summarizing the Freeway Complex Fire After Action Report and
were informed that the Report would be available to the General Public at
the January 8, 2008 Board meeting.
ADJOURNMENT
The Committee adjourned at 5.57 p.m. The next meeting of the Public Information -
Technology Committee will be held February 3, 2009 at 4:00 p.m.
1
Special 2009 Spring Conference & Exhibition Early Bird Registration
Sacramento Convention Center and Surrounding Hotels
May 19 - 22, 2009
Online Registration Now Available: www.acwa.com
Early bird registration deadline is January 2, 2009. Those received after
January 2 will be charged the preregistration price. Deadline to preregis-
ter is April 17, 2009. Deadline to cancel and receive credit voucher refund
is April 17, 2009.
Fill in Completely - Please Print/Type Clearly
Name on Badge to Read *Spouse/Companion ($30 fee if attending)
rte
rganization
Address
City State Zip
Telephone: Bus. (
Attendee E -Mail Address:
Confirmation E -Mail Address:
FAX ( )
OFFICE USE ONLY - SC09
E PKG _
B
T DATA
Please check those tracks which interest you.
❑ Attorneys (n) ❑ Human Resources m)
❑ Finance (m) ❑ Small Agencies (r4)
❑ Groundwater (r) ❑ Water Trends Cn)
❑ Other (please list)
Credit Card Payment Information
Please charge my fee to my credit card:
❑ ® ❑®
Credit CI arld NI umI beI r:
Expiration Date: I I I ( I Amount: $
If you have questions, please contact ACWA at
(916) 441 -4545, toll free (888) 666 -2292,
or e-mail events @acwa.com.
Preregistration PACKAGE - ACWA public agency members, affiliates & associates only Farly Bird Prereg. Amounl
(Includes all meal functions; does not include spouse registration.) (20 /EP) $585 $595 $
Registration for Conference Only (21/E3)
(Meals not included)
Early Bird I Prereg. Amounl
Advantage................................. ............................... $440 $450
Standard................................... ............................... $665 $675 $
*Spouse /Companion (Non- refundable) ( 22) ....... ............................... $30 $30 $
Daily Conference Registration Early Bird Prereg. Amount
(Meals not included) (Advantage) (Standard) (Advantage) (Standard)
❑ Tues., May 19/Wed., May 20 (23/13 1) .............. $225 5340 $235 $350 $ _
❑ Thurs., May 21/Fri., May 22 (24/El) .............. $225 $340 $235 $350 $_
MEAL FUNCTIONS Quantity
Prereg.
�nnnuu
Wednesday, May 20
Opening Breakfast (30) ....... ...............................
$40
$-
Luncheon(31) ..............................................
$45
$
Thursday, May 21 .
Networking Continental Breakfast (35) ..........................
$25
$
Luncheon(32) ............... ...............................
$45
$
Dinner( 33) ................. ...............................
$75
$
Friday, May 22
Hans Doe Forum Breakfast - sponsored by
Boyle Engineering Corporation 34
$40
APPROVED BY THE BOARD F D1
OF THE YORBA LINDA WA
Ethics Training Registration (Choose ONE - No additional fee required if registered for conference.)
❑ Tues., May 19 (50) ❑ Wed., May 20 (51) ❑ Thurs., May 21 (52)
BY v.�e_ cL M'3 /wnti-
Make checks payable to ACWA, and send to: ACWA, P.O. Box 2408, Sacramento, CA 95812 -2408. TOTAL $
FAX (916) 325 -2316. Do not fax AND mail this form.
State Legislative
Welcome
Reception
Thursday, January 15, 2009
6:00 — 8:00 pm
Foxfire Restaurant in Anaheim Hills
(By Invitation Only)
Hosted Hors D'Oeuvres / Cash Bar
ITEM NO. A
APPROVED
OFTHE ORBA LINDA WATER DSTRICTS
JAN - 8 009
BY
You are cordially invited to a special water community reception welcoming
newly elected Orange /Riverside County Assemblymen Curt Hagman (AD 60) and
Jeff Miller (AB 71), and honoring recently retired Senator Bob Margett (SD 29).
Date: Thursday, January 15, 2009
Time: 6:00 — 8:00 pm
Location: Foxfire Restaurant
5717 E. Santa Ana Canyon Road, Anaheim Hills
(91 Freeway /Imperial Highway)
Hosts: Municipal Water District of Orange County
and Western Municipal Water District
RSVP: David Cordero (MWDOC) by Tuesday, January 13th
714.593.5012 or dcordero@mwdoc.com
MUN=IPAL
WATER
a18TRIGT
OF
ORANGE
COUNTY
WESTERN
MUNICIPAL
WATER
DISTRICT