HomeMy WebLinkAbout2014-05-12 - YLWD-City of Placentia Joint Agency Committee Meeting MinutesMINUTES OF THE
YORBA LINDA WATER DISTRICT
JOINT COMMITTEE MEETING WITH CITY OF PLACENTIA
Monday, May 12, 2014 10:00 a.m.
401 E. Chapman Avenue, Placentia CA 92870
The May 12, 2014 meeting of the YLWD /City of Placentia Joint Agency Committee was
called to order at 10:03 a.m. The meeting was held in the Administrative Conference
Room at Placentia City Hall located at 401 E. Chapman Avenue Avenue in Placentia,
California 92870.
1. CALL TO ORDER
2. ROLL CALL
3.
4.
YLWD COMMITTEE MEMBERS
Michael J. Beverage, Director
Gary T. Melton, Director
CITY OF PLACENTIA MEMBERS
Scott W. Nelson, Mayor
Chad P. Wanke, Councilmember
PUBLIC COMMENTS
None.
ACTION CALENDAR
YLWD STAFF
Steve Conklin, Acting General Mgr
CITY OF PLACENTIA STAFF
Troy L. Butzlaff, City Administrator
4.1 Minutes of the YLWD /City of Placentia Joint Agency Committee Meeting
held February 3, 2014
The Council member and District board members had no changes or
corrections to the minutes from the prior meeting.
5. DISCUSSION ITEMS
5.1 Joint Turf Replacement Demonstration Project
City Administrator Butzlaff announced the completion of the Turf
Replacement Project. A time lapsed video was presented to the
Committee to show the beginning and end results of the project. City
Administrator Butzlaff recommended placing a permanent sign for the
Water Conservation Project. Director Beverage suggested that the City
look into a groomer for the upkeep of the replacement turf. City
Administrator Butzlaff continued to note the overall success of the project.
YLWD and City Staff discussed the advantages of the new replacement
turf including water and routine maintenance savings. YLWD inquired
about the rebates for the project. City Administrator Butzlaff noted that he
1
will have to meet with his Staff to go over the rebates. YLWD inquired
about the City's payments to the YLWD for the project. City Administrator
Butzlaff responded that the agreement originally established payments to
the YLWD for fifty (50) percent of the project over the next five (5) years.
City Administrator Butzlaff noted that the City has meet with Golden State
Water Company (GSWC) for potentially replacing the Placentia Civic
Center grass areas with the replacement turf.
5.2 Vehicle and Equipment Sharing
City Administrator Butzlaff noted that they are still researching an
agreement template used by other agencies for vehicle and equipment
sharing. City Administrator Butzlaff suggested a Memorandum of
Understanding (MOU) be drafted between the agencies to be used as a
standard schedule use for vehicle and equipment sharing between the
City and the YLWD. YLWD noted that the MOU should include an
operator for some of the equipment. YLWD and City Staff agreed to move
forward with the MOU.
5.3 Statewide Drought/Water Conservation
YLWD noted they strongly encourage water conservation, and are not in a
formal position by demanding cuts. They have in place 14 conditions for
water conservation and may enforce them if water levels continue to drop.
Councilmember Wanke inquired about who monitors the groundwater
levels. YLWD stated that the Orange County Water District (OCWD)
continually manages the water. They noted that once a year the OCWD
will check the status of each of the wells and the water levels as well as
the amount of water that is drawn from each of the wells. YLWD noted that
the OCWD is continually purchasing water from the Metropolitan Water
District to sustain water levels, and the ground water replenishment
system is sending over 70 million gallons a day back into the basin.
YLWD noted that it is one of the premiere water management systems in
the country.
5.4 Sewer Master Plan /Sewer Services
City Administrator Butzlaff noted that the City is currently in the process of
a Request for Proposals (RFP) for the Sewer Master Plan. He noted that
Willdan Company prepared the GIS layer as the base for the master plan.
City Administrator Butzlaff noted that they would look at the condition of
the current infrastructure and make recommendations of what needs to be
approved. Once the master plan is developed, it could be used as a
starting point for discussion for the District to take over sewer services
from the City. He noted current fee covers the cost for maintaining the
system, and sets aside funds for the future placements. He noted that fee
might not generate sufficient revenue to pay for the future placements. He
noted that the Master Plan would show this information.
2
6. Matters Initiated by Committee Members
6.1 City Administrator Butzlaff recommended signage for the Water
Conservation Project.
7. Items for the Next Agenda
7.1 YLWD and City Staff agreed that all items listed on the current agenda be
placed on the next scheduled meeting agenda for further discussion.
8. ADJOURNMENT
8.1. The meeting was adjourned at 10:32 a.m. The date and time of the next
YLWD /City of Placentia Joint Agency Committee meeting is yet to be
determined.
3