Loading...
HomeMy WebLinkAbout2007-10-04 - Planning-Engineering-Operations Committee Meeting Minutes• • ITEM NO. Ia Cl. MINUTES OF THE YORBA LINDA WATER DISTRICT PLANNING-ENGINEERING-OPERATIONS COMMITTEE October 4, 2007, 4:00 P.M. A meeting of the Planning-Engineering-Operations Committee was called to order by Committee Chair Paul Armstrong at 4:00 p.m. The meeting was held at the District Administrative Office at 4622 Plumosa Drive, Yorba Linda. DIRECTORS PRESENT: Director Paul R. Armstrong, Chair Director William R. Mills, Member STAFF PRESENT: Mike Payne, General Manager Ken Vecchiarelli, Assistant GM Lee Cory, Operations Manager John DeCriscio, Chief Plant Operator Stacy Bavol, Customer Service Supervisor VISITORS PRESENT: None. ACTION ITEMS: (Items were discussed out of sequence as shownl 7. Ground Lease Agreement with STC One LLC for the installation and use of communication systems at the District's Highland Reservoir site. Mr. Payne outlined proposed business deal points and terms and conditions for lease agreements with companies interested in installing communications equipment at District's sites such as the Highland and Quarterhorse Reservoir sites. General Counsel is drafting the agreements with the first potentially ready for the Board of Directors consideration at the second meeting in October. Mr. Payne left the meeting following this discussion. DISCUSSION ITEMS: 4. Status Report on the Meter Replacement Project through September 2007. Stacy Bavol presented a report summarizing the status of the meter replacement project with the contractor now completed with the installations in the first phase of the project. The Committee discussed the second phase of the project and made recommendations for assessing staff's costs and the cost benefit of the project overall. Stacy left the meeting following this discussion. Preventative Maintenance Program Status Report. Mr. Cory handed out a spreadsheet with the monthly maintenance activities updated and led a brief discussion on these activities. 2. Monthly MWDOC Managers Meeting. John DeCriscio presented a summary report of the items on the meeting agenda held September 27 as communicated through MWDOC staff. 3. Monthly Orange County Groundwater Producers Meetings. John DeCriscio presented the summary outline of items discussed at the Meeting held on September 12 including annexation discussions. 0 • 5. Monthly Water Production and Purchased Imports for September 2007. Staff handed out a pie chart showing groundwater production under the basin production percentage and under the yearly goal. The Committee briefly discussed the projects that would need to be accelerated to meet the allowable BPP for the year. Director Mills presented information on the basin characteristics and local recharge basins. 6. Progress of Capital Improvement Projects in Progress Status Report. No report was presented. ADJOURNMENT: The Committee adjourned at 5:20 p.m. The next regularly scheduled Planning- Engineering-Operations Committee will be held November 1, 2007. • • -2-