HomeMy WebLinkAbout2015-07-28 - YLWD-MWDOC-OCWD Interagency Committee Meeting Minutes MINUTES OF THE
YORBA LINDA WATER DISTRICT
INTERAGENCY COMMITTEE MEETING WITH MWDOC AND OCWD
Tuesday, July 28, 2015, 4:00 p.m.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The July 28, 2015 meeting of the Yorba Linda Water District's Joint Agency
Committee with MWDOC and OCWD was called to order at 4:00 p.m. The
meeting was held in the Admin Conference Room at the District's Administration
Building located at 1717 East Miraloma Avenue in Placentia, California 92870.
2. ROLL CALL
YLWD COMMITTEE MEMBERS YLWD STAFF
Director Ric Collett Marc Marcantonio, General Manager
Director Gary Melton Steve Conklin, Engineering Manager
Damon Micalizzi, Public Information Mgr
John DeCriscio, Operations Manager
MWDOC COMMITTEE MEMBER MWDOC STAFF
Director Brett Barbre Rob Hunter, General Manager
OCWD COMMITTEE MEMBER OCWD STAFF
Director Roger Yoh John Kennedy, Asst General Manager
OTHER ATTENDEES
None.
3. PUBLIC COMMENTS
None.
4. DISCUSSION ITEMS
4.1. State Water Resources Control Board's Drought Response Mandate and
Projection for Greater Conservation
Mr. Hunter reported that conservation results for June for Orange County
agencies have not been reported by the agencies or by the SWRCB. He
does not believe that all agencies met their goal, but did well. Mr. Hunter
indicated that Ms. Felicia Markus, Chair of the SWRCB, is still confirmed
as the speaker for the Water Policy Forum and Dinner on July 29, 2015.
1
4.2. MWDOC Member Agencies Response to Drought and Turf Replacement
Rebate Program
Per Director Barbre, all of the MWD turf-removal rebate funds (about
$400M) have been committed or reserved by applicants. Many of the
applicants will replace with drought-tolerant landscaping rather than
artificial turf. Rebate funds still available for water-saving devices.
4.3. MWD Water Supply Conditions and Outlook
Director Barbre reported that MWD recently approved an agreement with
Palo Verde Irrigation District that will transfer 50,000 AF of water from
PVID to MWD. He also noted that conditions have improved along the
Colorado River due to recent rains, and that reservoirs in northern
California have about 20% more water than they did a year ago.
4.4. MWDOC's OC Water Reliability Investigation
Mr. Hunter reported that work products are coming out over the next two
months, with a draft report expected in the fall. The timing on this is good
relative to OCWD's consideration of the Poseidon Project and the
preparation of the Urban Water Management Plans for MWDOC and its
member agencies.
4.5. OCWD Groundwater Basin Condition, Basin Production Percentage, and
Replenishment Assessment
Mr. Kennedy reported that demand on groundwater has reduced due to
mandated cutbacks on all producers by the SWRCB. OCWD projected a
basin overdraft in the range of 416,000 AF, which is now revised to be in
the range of 390,000 AF. He reported that GWRS production is just under
100 mgd at this time, limited by the availability of secondary effluent from
OCSD. As a result of the recent rains, there is a pool of about 1,000 AF of
storm water behind Prado Dam that will slowly be released for recharge.
Flow in the SAR is down, due to conservation and recycling by upstream
agencies. The BPP is 70%, with no projection on what it will be next year.
4.6. Huntington Beach Desalination Project and Next Steps
Mr. Kennedy reported that OCWD continues to study the costs and
options for 50,000 AF/year of desal water for groundwater recharge and/or
sale to water providers. He noted that Poseidon is getting close to
completing its reapplication to the Coastal Commission, which is expected
to be rejected by Commission staff, after which the application will be
resubmitted directly to the Commission Board for consideration in 2016.
4.7. Potential Projects for the Water Bond and Outlook for Bay Delta
Conservation Plan (BDCP)
Director Barbre reported that the BDCP has been split into two elements,
environmental mitigation and project implementation. There have also
been changes in proposed facilities, whereby pipe flow will be by gravity,
with pumping facilities and electrical at the downstream end of the pipes.
It is hoped that these changes will make it easier to meet environmental
2
concerns. Director Barbre also noted that Governor Brown, a strong
proponent for the project, only has two more years in office. If he cannot
get the project approved and in construction by then, it may likely die.
4.8. Status of North Basin and South Basin Projects
Mr. Kennedy reported that efforts continue for each project for
construction of interim facilities to arrest further spread of the plumes while
long-term solutions and projects are implemented. He also noted that
discussions continue with the regulatory agencies on oversight
agreements for each project.
4.9. YLWD Well Projects and Proposal for Dual-Use
Mr. Conklin reported that the Well 21 Equipping Project is out to bid at this
time. The goal is to award the construction contract by September and
complete construction in one year. This project includes a metered
turnout from the well discharge to provide water for landscape irrigation for
OCWD for the Warner Complex.
4.10. Future Agenda Items
None.
5. ADJOURNMENT
5.1. The meeting was adjourned at 5:20 p.m. The next
YLWD/MWDOC/OCWD Joint Agency Committee meeting is scheduled to
be held Tuesday, September 22, 2015 at 4:00 p.m.
SC
3