HomeMy WebLinkAbout2008-01-11 - Planning-Engineering-Operations Committee Meeting Agenda PacketW W
• YORBA LINDA WATER DISTRICT
PLANNING - ENGINEERING - OPERATIONS COMMITTEE MEETING
Friday, January 11, 2008, 8:30 a.m.
4622 Plumosa Drive, Yorba Linda — Tel: (714) 701 -3020
COMMITTEE:
Director Paul R. Armstrong
Director William R. Mills
AGENDA
STAFF:
Michael A. Payne, General Manager
Ken Vecchiarelli, Asst. General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
INTRODUCTION OF VISITORS AND PUBLIC COMMENTS
Any individual wishing to address the Committee is requested to identify themselves and state the matter
on which they wish to comment. If the matter is on this agenda, the Committee Chair will recognize the
individual for their comment when the item is considered. No action will be taken on matters not listed on
this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the
Water District. Comments are limited to five minutes.
ACTION ITEMS:
1. Consider the Pressure Zone Reconfiguration and Extension Projects.
Recommendation: Review, discuss and consider recommendations for the Zone
• Reconfiguration Project and its Extension into the Twin Peaks Area of the East Lake
Village Community, Jobs No. 200220 and 200710.
DISCUSSION ITEMS:
2 Preventative Maintenance Program Status Report.
3 Monthly MWDOC Managers Meeting.
4 Monthly Orange County Groundwater Producers Meetings.
5 Status Report on the Meter Replacement Project.
6 Monthly Water Production and Purchased Imports through December 2007.
7 Status Report of Capital Improvement Projects in Progress.
ADJOURNMENT:
The next regularly scheduled Planning- Engineering- Operations Committee will be held February
7, 2008 at 4:00 p.m.
Accommodations for the Disabled:
Any person may make a request for a disability - related modification or accommodation needed for that
person to be able to participate in the public meeting by telephoning Michael A. Payne, District Secretary,
at 714 - 777 -3018, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885 -0309.
Requests must specify the nature of the disability and the type of accommodation requested. A
telephone number or other contact information should be included so the District staff may discuss
appropriate arrangements. Persons requesting a disability - related accommodation should make the
request with adequate time before the meeting for the District to provide the requested accommodation.
•
4 WATER DISTRICT
►ONFIGURATION
,674 gpm
4
ft
5
3
9
9
ITEM NO. 1
Preliminary P Estimate
YLWD Zone Reconfiguration Project for Areas 1, 2 and 3
(Alternative A)
ITESP- 1
Description
Quantity
Unit
Unit Cost
Total Cost
Area 1
Area 2
Area 3
Grand Total
Mobilization 5 %
-
LS
-
$89,230
$316,000
Total Cost for Individual Booster Pumps Initial Installation
$89,230
12" Pipeline
6,500
LF
$174
$345,000
$17,500
$770,000
$1,132,500
8" Pipeline
2,275
LF
$135
$67,500
$240,000
$307,500
Check Valve 111
2
EA
$75,000
$150,000
$150,000
Zone Isolation Valve
26
EA
1 $2,769
$40,000
$14,400
$17,600
$72,000
House Pressure Regulators
147
EA
$800
$97,600
$20,000
$117,600
Commissioning
-
LS
-
$5,000
$5,000
Subtotal
$644,330
$31,900
$1,197,600
$1,873,830
Conti enc 15 %
$267,690
$267,690
Engineering 10 %
$178,460
$178,460
Construction Management and Inspection (10 %)
$178,460
$178,460
Grand Total
$1,268,940
$31,900
$1,197,600
$2,498,440
Notes:
[1] Cost assumes check valve includes an 8" check valve, associated isolation valves, piping and vault with no
electrical or telemetry.
Preliminary Cost Estimate
for
YLWD Zone Reconfiguration Project for Areas 1, 2 and 3
(Individual Booster Pump Option)
Descri lion
I Quantity
Unit
Unit Cost
Total Cost
Initial Installation Cost for Homes Equipped with Booster Pump Plumbing
40
EA
$3,000
$120,000
Initial Installation Cost for Homes Not Equipped with Booster Pum Plumbing
79
EA
$4,000
$316,000
Total Cost for Individual Booster Pumps Initial Installation
$436,000
60-yr Life Cycle Cost for Area 3 Pump Alternative
$1,864,000
Notes:
1. Assumes pumps are replaced every 15 years.
2. Assumes 3% Inflation.
3. Assumes 31/6 Cost of Money.
AREA 3
"'East
Lake
~z�
�c
V
I�
1 AREA 2
✓ 5
Pa5eo _l
I
AREA 1
nio.P_RSJ-
11�
V
a
c
R
m
Existing Pressure
Reducing Station
Existing Pipes
Pressure Zone
Adjusted 780 -3 Zone (4C)
Proposed Zone Boundary
® Existing 675 Zone (3A)
Existing Pressure
r—'71 Less Than 40 PSI
Between 41 - 50 PSI
Parcels Converted
– To New Pressure Zone
0 250500 1,000
SCALE IN FEET
l y�
v
Road
Za CONB: LTIN6
esperan C i N
LOW PRESSURE AREAS
1,2 & 3
(EXISTING CONDITIONS)
EXHIBIT 1
Source: ESRI Online Database
M:\Mdata \10106043 \Exhibit 1.mxd 12/20/07 dj
:l
AREA 3
3
0
I
c
East
Lake
Village.Center P
C
�m
AREA 2
Paseo O l
m
m
n
m
v
1
AREA 1
t
U
c
m
ca
.Q
`o
Y:
o PRSJ-
a
v
c
m
m
01
�spe�arZa Road
� J
Existing Pressure
Reducing Station
Existing Pipes
Pressure Zone
Adjusted 780 -3 Zone (4C)
Proposed Zone Boundary
Existing 675 Zone (3A)
Existing Pressure
_ More than 80 PSI
- Between 54 - 79 PSI
0 250 500 1,000
SCALE IN FEET
O�IN.14
LOW PRESSURE AREAS
1,2 & 3
(PROPOSED CONDITIONS)
EXHIBIT 2
Source: ESRI On Database
M:\Mdata \10106043 \Exhibit 2.mxd 1/2/08 di
ki
.l 8•• i
AREA 3
d
a
3
0
s�
sp
a
Proposed
Check Valy
AREA 1
' VIII � �������'►` ��
�m
AREA 2
East
La ke
`oma
I .oOe�asPa
Val
c
San Antonio -P_RS4-
a
t
U
c
m
m
a
�5pe�anZa Roa�1
J
Legend
X11 Proposed Check Valve
Existing Pressure
Reducing Station
Existing Pipes
8" Proposed Water Main
12" Proposed Water Main
OParcels Converted
To New Pressure Zone
Pressure Zone
Adjusted 780 -3 Zone (4C)
Proposed Zone Boundary
Existing 675 Zone (3A)
0 250 500 1,000
SCALE IN FEET
,, aNSULTi�
PROPOSED
IMPROVEMENTS
EXHIBIT 3
Source: ESRI Online Database
M\Mdata \10106041Exhibit_3.mxd 112108 dj
YLWD SOURCE *TER SUMMARY
Fiscal Year 2007 -08
Allowable GW (YTD) 8,461.26 (AF)
Underpumped (AF) 968.3 (AF)
Operating Cost Affect $ 145,200 (At $150 /AF Delta)
Operating Cost Affect $ 193,700 (At $200 /AF Delta)
COMMENTS
ITEM NCR
Well 12 not operating; Wells 1 & 5 problematic.
Well 12 not operating; Well 1 & LVBPS problematic.
GW
(AF)
IMPORT
(AF)
TOTAL
DEMAND
(AF)
BUDGET
(Demand Est.)
(AF)
DELTA
(°/,)
MONTH
Jul -07
Aug -07
Sep -07
Oct -07
Nov -07
Dec -07
Jan -08
Feb -08
Mar -08
Apr -08
May -08
Jun-081
1,383.5
1,497.2
2,880.7
2,843.0
1.3%
1,525.0
1,382.8
2,907.8
2,797.0
4.0%
1,373.4
1,177.2
2,550.6
2,454.0
3.9%
1,315.9
959.1
2,275.0
2,070.0
9.9%
1,118.0
1 740.4
1 1,858.4
1,635.0
13.7%
777.2
471.91
1,249.1
1,471.0
-15. ~ `-
1,283.0
1,228.0
1,454.0
1,819.0
2,4 06.0
2,696.0
FYTDI
7,493.0 1
6,228.6 1
13,721.6 1
1 13,270.0
3.4%
Allowable GW (YTD) 8,461.26 (AF)
Underpumped (AF) 968.3 (AF)
Operating Cost Affect $ 145,200 (At $150 /AF Delta)
Operating Cost Affect $ 193,700 (At $200 /AF Delta)
COMMENTS
ITEM NCR
Well 12 not operating; Wells 1 & 5 problematic.
Well 12 not operating; Well 1 & LVBPS problematic.
3500.0
3000.0
2500.0
2000.0
m
L
a 1500.0
1000.0
500.0
Me
•
P�&-
�a5
Month
•
■ADJ GW
❑ADJ IMPORT
WATER SUPPLY BY SOURCE
FY 2007 -08
•
December 2007 Wate
Import
37.8%
0
GA
62.2'
Year To Date 2007 -2008 Water Supply
Import GW BPP
45.4% 54.6%
GW BPP GOAL 61.5%
•
•
•
N pK C--
5v5rn �CRroc -vic
I El, r/i�r ✓A✓iv�
tlTA (/A Q'T D VAK fJ1f4) z i Vr�t r v� f2
ALT
I
c2 p '-O c) VIA
o all -if-
Vt
Hkof
enid
�6-(-)itu.°I\ @ Iv�a��, EC�Lk