HomeMy WebLinkAbout2008-02-07 - Planning-Engineering-Operations Committee Meeting Agenda Packet/EL
w,
YORBA LINDA WATER DISTRICT
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, February 7, 2008, 4:00 p.m.
4622 Plumosa Drive, Yorba Linda - Tel: (714) 701-3020
AGENDA
COMMITTEE: STAFF:
Director Paul R. Armstrong Michael A. Payne, General Manager
Director William R. Mills Ken Vecchiarelli, Asst. General Manager
Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
INTRODUCTION OF VISITORS AND PUBLIC COMMENTS
Any individual wishing to address the Committee is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on this agenda, the Committee Chair will recognize the individual for their
comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are
limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to
five minutes.
ACTION ITEMS:
1. Purchase request for a portable emergency pump to be presented before the Board of
Directors.
Recommendation: That the Board of Directors authorizes the General Manager to enter
into a purchase agreement with Godwin Pumps for the purchase of a trailer mounted
portable pump for the total quoted price of $99,634.26.
2. Consider the Pressure Zone Reconfiguration and Extension Projects.
Recommendation: Review, discuss and consider recommendations for the Zone
Reconfiguration Project and its Extension into the Twin Peaks Area of the East Lake
Village Community, Jobs No. 200220 and 200710.
DISCUSSION ITEMS:
3. Preventative Maintenance Program Status Report.
4. Monthly MWDOC Managers Meeting.
5. Monthly Water Production and Purchased Imports through January 2008.
6. Status Report of Capital Improvement Projects in Progress.
INFORMATION ITEMS:
7. Low Pressure Trouble Shooting Flow Chart.
8. Construction Contract for Highland Reservoir.
9. Contract Amendment for Lakeview Reservoir Construction Management and Inspection.
ADJOURNMENT:
The next regularly scheduled Planning-Engineering-Operations Committee will be held March 6,
2008 at 4:00 p.m.
Accommodations for the Disabled:
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning Michael A. Payne, District Secretary, at 714-777-3018, or
writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature
of the disability and the type of accommodation requested. A telephone number or other contact information should
be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related
accommodation should make the request with adequate time before the meeting for the District to provide the
requested accommodation.
-2-
ITEM NO.
AGENDA REPORT
Committee Meeting Date: February 7, 2008
To: Planning-Engineering-Operations Committee
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Lee Cory, Operations Manager
John DeCriscio, Chief Plant Operator
Reviewed by General Counsel: No Budgeted: Yes Total Budget:
Funding Source: Water Operating Fund
CEQA Account No: Job No:
Compliance: N/A Estimated Costs: $ 99,634.26 Dept: Ops
Subject: 6" Trailer Mounted Portable Pump
SUMMARY:
Purchase request for a portable emergency pump to be presented before the Board of
Directors.
DISCUSSION:
This pump was approved for purchase in the budget year 2007/2008. This pump is similar to the
pump we used during the 2007 MET shutdown. The operations staff has set up installation
points throughout the distribution system where we can install this pump during emergency
outages from MET or existing pumping stations.
Staff has received two written quotes for this pump that are as follows:
Model Godwin Pumas Water Movers
6" Trailer Mounted Pump $99,634.26 $136,519.25
PRIOR RELEVANT BOARD ACTION(S):
N/A
STAFF RECOMMENDATION:
That the Board of Directors authorizes the General Manager to enter into a purchase agreement
with Godwin Pumps for the purchase of a trailer mounted portable pump for the total quoted
price of $99,634.26.
C]
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Percent of target 8% 17% 25% 33% 42% 50% 58% 67% 75% 83% 92% 0 5 °,:
Target; all hydrants to be serviced annually.
2,1191 2,55 2,650 2,919
OF i'aTA6
VALVES (10,000/2= 5,000) Target; all valves to be operated every two years
OPERATED THIS MONTH 190
150
971
109[--
09
181
240
152
4661
5671
6311
6781
410
OPERATED THIS YEAR 190
340
437
546
727
967
1,119
1,5851
2,1521
2,783
1 3,461
1 3,871
% OF TOTAL 3.8%
6.8%1
8.8%1
11.0%1
14.6%
19.4%
22.4%
31.7%1
44.0%1
55.7%1
69.2%1
77.0%
DEAD ENDS (476X2 =952) Target; all dead ends to be flowed twice each year.
FLOWED THIS MONTH 24
1181
3341
0
0 0
01
01
0
4871
01
0
FLOWED THIS YEAR 24
142
476
4761
476 476
476
476
476
963
0
0
% OF TOTAL 2.5%
14.9%
50%
50%
50% 50%
50%
50%
50%1
100%
100%
100%
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 0
57--3151
65 83
491
391
331
51
2
5-7-r-
57
26
INSPECTED THIS YEAR 0
0
30
95 178
2271
266
299
3041
3061
363
389
% OF TOTAL 0.0%
0.0%1
9.7%1
30.7% 57.6%
73.5%1
86.1%1
96.8%1
98.0%1
99.0%1
100.0%1
100.0%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH 55,519
70,233
43,495
72,053
79,951
62,607
52,826
68,523
54,806
84,092
80,969
73,284
CLEANED THIS YEAR 55,519
125,752
169,247
241,300
321,251
383,858
436,684
505,207
560,013
644,105
725,074
798,358
% OF TOTAL 6.9%
15.7%
21.10%1
30.1%
40%
47.90%
54.40%
63%
70%
8011
90.40%
SEWER TELEVISING 160,512 Target; all sewers to be televised every 5 years
TELEVISED THIS MONTH 0
01
01
0
0
0
01
7,740
71759
7,280
2,648
4,655
TELEVISED THIS YEAR 0
0
01.
0
0
O
0
7,740
15,4991
22,779
1 25,427
30,082
% OF TOTAL 0
01
01
0
0
0
01
5%
10%j
14.2-/61
14.2°k
ITEM NO. !
MWDOC Managers Meeting
January 24, 2008
Topics of Interest to YLWD
1. MWD Allocation Plan for Shortage in Supply to be determined by April 8`h Board
Meeting.
A. MWD is considering a plan that would reduce water supplies to the region based on
the amount of water shortage they determine to have.
B. Met penalty structure.
1. For 100-110% of allocation amount- the penalty would be 3 times the tier 2 rate
_ $1347/AF.
2. For more than 110% of allocation 5 times the tier 2 rate = $2245/AF.
3. This plan will be going to MET Board for consideration in Februarys Board
Meeting.
4. Met goal is to establish an allocation level annually.
2. Golden Guardians 2008
A. A State wide drill will be conducted in October-2008. It will be a five day drill.
B. YLWD will be participating in this drill.
C. The Reserves will also be involved and even be available to bring out some of
there equipment. Water Treatment, Water Trucks, ect.
3. MWDOC has adopted a water conservation ordinance with the following steps and
message.
A. Interrupted replenishment water in May 2007 and cut back agricultural water 30%
by January 2008.
B. Met will be drawing water from storage
C. Implemented a major advertising campaign for voluntary conservation aiming for
a 5% reduction.
D. Updating the regional drought management plan.
E. Provide efficiency rebates for residence, businesses, and commercial customers.
•
YLWD SOURCE RTER SUMMARY
Fiscal Year 2007 -08
Allowable GW (YTD) 9
GW
(AF)
IMPORT
(AF)
TOTAL
DEMAND
(AF)
BUDGET
(Demand Est.)
(AF)
DELTA
(%)
MONTH
Jul -07
Aug -07
Sep -07
Oct -07
Nov -07
Dec -07
Jan -08
Feb -08
Mar -08
Apr -08
May -08
Jun-081
1,383.5
1,497.2
2,880.7
2,843.0
1.3%
1,525.0
1,382.8
2,907.8
1 2,797.0
4.0%
1,373.4
1,177.2
2,550.6
2,454.0
3.9%
1,315.9
959.1
2,275.0
2,070.0
9.9%
1,118.0
740.4
1,858.4
1,635.0
13.7%
777.2
471.9
1,249.1
1,471.0
-15.1%
707.7
421.4
1,129.1
1,283.0
.J
1,228.0
1,454.0
1,819.0
2,406.0
2,696.0
FYTDI
8,200.7T-
,200.7
6,650.0
1 14,850.7
13,270.0
11.9%
Allowable GW (YTD) 9
9,157.53 (
COMMENTS
ITEM NOR
Well 12 not operating; Wells 1 & 5 problematic.
Well 12 not operating; Well 1 & LVBPS problematic.
3500.0
3000.0
2500.0
2000.0
as
Q 1500.0
1000.0
.11 1
11
Total Water Use
S §'
5�
Month
■ADJ GW
❑ADJ IMPORT
WATER SUPPLY BY SOURCE
FY 2007 -08
January 2007 Water Supply
Import
37.3%
•
GW
62.7%
Year To Date 2007 -2008 Water Supply
Import GW BPP
44.8% 55.2%
•
GW BPP GOAL 61.5%
Yorba Linda Water District
Operations Department
Trouble Shooting Flow Chart
START HERE
IS HOUSE SHUT OFF
VALVE FULLY OPEN
YES OPEN VALVE FULLY
DID THIS IMPROVE FLOW
IS Y CORRECTLY
CHECK NOT SURE OPERATING YES DO YOU HAVE A
PRESSURE REGULATOR
ITEM NO.
� YES
CHECK REGULATOR FILTER IS CLEAN.
SWITCH THE UNIT INTO
CHECK FOR CORRECT PRESSURE
SETTING, AND THAT THE SETTING IS DO YOU HAVE ANY HOME YES
BY -PASS MODE.
ADJUSTABLE. WATER TREATMENT YES DID THIS INCREASE FLOW
DEVICES, RO UNIT,
THIS MAY REQUIRE A WATER SOFTENER ETC.
PLUMBER I NO
SERVICE UNIT II
I NO II
WHEN THE SPRINKLERS ARE ON
STAGGER SPRINKLER YES IS THE FLOW LOWER THAN
OPERATION TIMES NORMAL
tilSMI
MAKE SURE ALL FAUCET SHUT OFF VALVES
ARE FULLY OPEN AND ALL AERATORS ARE CLEAN
IF THE PROBLEM PERSISTS, CONTACT THE WATER 7JS/08
DISTRICT FOR FURTHER INVESTIGATION
ITEM NO. 9
AGENDA REPORT
Committee Meeting Date: February 7, 2008
To: Board of Directors
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Leon de los Reyes, Water Quality Engineer
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 10.0 M
Funding Source: Water Revenue Bond
CEQA Account No: 101-2700 Job No: 200309
Compliance: Mitigated Neg. Dec. Estimated Costs: $9,049,346 Dept: Eng
Subject: Award of Construction Contract for the Highland Reservoir Replacement Project
SUMMARY:
The Highland Reservoir is a critical element of the District's water supply chain. Increasing the
size and reliability of the Highland Reservoir, as recommended in the District's Water Master
Plan, enhances this role, secures flexibility in the District's service system, and further optimizes
groundwater production capabilities. In addition, the existing reservoir is a potential water
quality and maintenance liability.
DISCUSSION:
Carollo Engineers, the District's consulting engineer for the project, completed the final design
plans, specifications and contract documents for construction of the Highland Reservoir
Replacement Project. Staff advertised the notice inviting bids on November 16, 2007. The
engineer's estimate of probable construction cost for the project was $13,545,600. The District
received nine competitive bids which were opened at 2:00 P.M. on January 24, 2008. The bids
ranged from $9,049,364 to $12,191,050 as shown on the attached exhibits, with the three lowest
bids as follows:
Contractor Total Bid
Schuler Engineering Corporation $9,049,346
Pacific Hydrotech Corporation $9,702,500
Gateway Pacific Contractors $10,504,576
Staff determined that all bids were responsive in providing the required information specified in
the Notice Inviting Bids. Schuler Engineering submitted the low bid with a total cost of
$9,049,346. Schuler constructed the District's 3.75 MG Quarter Horse Reservoir project for
Pulte Homes along with the expansion of this reservoir to its ultimate capacity of 7.25 MG for
Shapell Industries. Schuler has also constructed the District's Paso Fino and Lakeview Booster
Pump Stations and has developed an excellent working relationship with the District. Their
reputation in the industry was confirmed through additional reference checks performed by
Carollo Engineers. Carollo Engineers and staff concur in recommending an award of a
construction contract to Schuler Engineering.
Staff is currently soliciting proposals for geotechnical and construction materials testing services
and will interview engineering teams from firms that submitted proposals for construction
management and inspection support services. Upon completion of these efforts, staff will
prepare a construction budget for the project and recommendations to the full Board of
Directors.
PRIOR RELEVANT BOARD ACTION(S):
• The Board adopted the District's current two-year budget on June 23, 2005, which
authorizes expenditures for the replacement of the Highland Reservoir.
• The Board awarded a design contract to Carollo Engineers on December 13, 2005 to
prepare engineering plans and specifications for the Highland Reservoir Replacement,
Job No. 200309.
• The Board adopted the Mitigated Negative Declaration on July 13, 2006 to comply with
environmental regulations pertaining to the construction of the reservoir.
• The Board of Directors authorized the General Manager to execute a Professional
Services Agreement with Tetra Tech on September 28, 2006, to provide value-
engineering services for the Highland Reservoir Replacement Project and approved a
contract amendment with Carollo Engineers to provide additional services to support the
value engineering effort.
• The Board of Directors authorized the General Manager to execute an Agreement with
Harbor Resources, Inc. on January 24, 2008 to properly abandon two oil wells on the
District's Highland Reservoir site in compliance with the State Department of Oil, Gas and
Geothermal Resources (DOGGR)and the Mitigated Negative Declaration.
6.a,P.• ® ®.�
Engineers... WorWng Wwidera With Water"
Summary of Bids Received
for the Highland Reservoir Replacement Project
Yorba Linda Water District
Bid Date: 1124120
Opening: Time: 2:00 PM
Place: riwD Office
Bid
Nom
Description
Unit
Quantity
1
2
3
4
5
Schuler Eng. Corp.
Pacific Hydmtech Corp.
Gateway Pacific Contractors,
Inc.
Pascal and Ludwig Constructors
SSC Construction, lee.
Unit Pries
Extended
Amount
Unit Price
Extended
Amounts
Price
Extended
Amount
Unit Price
Extended
Amount
Amount
Unit Prise
Extended
Amount
1
Insurance premium for Ads of God
LS
1
$ 75,000.00
$ 75,000.00
$ 65,000.00
$ 65,000.00
$ 125,000.00
$ 125,000.00
$ 125,000.00
$ 125,000.00
$ 75,000.00
$ 75,000.00
2
Sheet, shoring, and bracing
LS
1
$ 12,500.00
$ 12,500.00
$ 20,000.00
$ 20,000.00
$ 300,000.00
$ 300,000.00
$ 1,000.00
$ 1,000.00
$ 250,000.00
$ 250,000.00
3 IMobiketion
LS 1
1
$ 443,419.00
$ 443,419.00
$ 450,000.00
$ 450,000.00
$ 500,000.00
$ 500,000.00
$ 50,000.00
$ 500,000.00
$ 525,000.00
$ 525,000.00
4
Site dearing/grubbing, SWPPP
LS
1
$ 62,000.00
$ 62,000.00
$ 56,000.00
$ 56,000.00
$ 100,000.00
$ 100,000.00
$ 50,000.00
$ 50,000.00
$ 250,000.00
$ 250,000.00
5
Potholing and surveying
LS
1
$ 31,000.00
$ 31,000.00
$ 10,000.00
$ 10,000.00
$ 50,000.00
$ 50,000.00
$ 55,000.00
$ 55,000.00
$ 120,000.00
$ 120,000.00
6
Excavation, badfill, grading, compaction,
disposal, retaining walls, pavement, fences,
and additional site work
LS
1
$ 548,000.00
$ 548,000.00
$ 1,375,000.00
$ 1,375,000.00
$ 2,400,000.00
$ 2,400,000.00
$ 784,602.00
$ 784,602.00
$ 1,750,000.00
$ 1,750,000.00
7
Yard piping
LS
1
$ 2,457,762.00
$ 2,457,762.00
$ 2,156,000.00
$ 2,156,000.00
$ 2,000,000.00
$ 2,000,000.00
$ 2,653,460.00
$ 2,653,460.00
$ 2,000,000.00
$ 2,000,000.00
8
Elee4ical, telemetry, instrumentation and
controls
LS
1
$ 432,000.00
$ 432,000.00
$ 313,000.00
$ 313,000.00
$ 350,000.00
$ 350.000.00
$ 468,200.00
$ 468,200.00
$ 335,000.00
$ 335,000.00
9
Bolted steel tanks
LS
1
$ 660,000.00
$ 660,000.00
$ 583,000.00
$ 583,000.00
$ 600,000.00
$ 600,000.00
$ 897,690.00
$ 897.690.00
$ 600,000.00
$ 600,000.00
10
Field repair of bolted steel tank coatings:
A. Interior coating
B. Exterior painting
SF
8,000
$ 9.40
$ 75,200.00
$ 5.00
$ 40,000.00
$ 3.00
$ 24,000.00
$ 10.00
$ 80,000.00
$ 7.00
$ 56,000.00
SF
5,500
$ 8.70
$ 47,850.00
$ 5.00
$ 27,500.00
$ 2.00
$ 11,000.00
$ 9.50
$ 52,250.00
$ 7.00
$ 38,500.00
11
Demolition of existing reservoir
LS
1
$ 200,000.00
$ 200,000.00
$ 55,000.00
$ 55,000.00
$ 200,000.00
$ 200,000.00
$ 155,000.00
$ 155,000.00
$ 250,000.00
$ 250,000.00
12
Construction of 6.0 MG reservoir, piping and
appurtenant work
LS
1
$ 3,751,615.00
$ 3,751,615.00
$ 4,311.000.00
$ 4,311,000.00
$ 3.604,576.00
$ 3,604,576.00
$ 4,383,416.00
$ 4,383,416.00
$ 4,266,000.00
$ 4,265,000.00
13
Hydrostatic testing and disinfection of steel
tanks, reservoir, and pipelines
LS
1
$ 43,000.00
$ 43,000.00
$ 5,000.00
$ 5,000.00
$ 20,000.00
$ 20,000.00
$ 167,000.00
$ 167,000.00
$ 35,000.00
$ 35,000.00
14
Landscaping
LS
1
$ 150,000.00
$ 150,000.00
$ 170,000.00
$ 170,000.00
$ 150,000.00
$ 150,000.00
$ 152,815.00
$ 152,815.00
$ 175,000.00
$ 175,000.00
15
Demolition of bolted steel tanks
LS
1
$ 10,000.00
$ 10,000.00
$ 16,000.00
$ 16,000.00
$ 20,000.00
$ 20,000.00
$ 125,800.00
$ 125,800.00
$ 1.00
$ 1.00
16
IField orders
LS
1
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
Total
; 9,049,346.00
1
E 8702500.00
$10,604,676.00
$10,70 1,233.00
$ 10,775,501.00
'Total" reported in Pacific Hydroteffs bid sdredule was $9,1545M
Corrections to the total are made as shown.
= Pre -bid estimate: $13,545,600
Computed by: JED
CM 106 (1128/08) Sheet 1 of 2
Choneers...Kt,*,Bg Wonders With Wader"
Summary of Bids Received
for the Highland Reservoir Replacement Project
Yorba Linda Water District
Bid Date: 1!24/2008
Opening: Time: 2:00 PM
Place: YLWD Office
Bid
Item
Description
Unit
Quantity
6
7
8
9
Macro-Z- Technology
TC Construction Co., Inc
Los Angeles Engineering, Inc.
SEMA Construction, Inc.
Unit Price
Extended
Amount
Unit Price
Extended
Amount
Unit Price
Extended
Amount
Unit Price
Extended
Amount
1
Insurance premium for Ads of God
LS
1
$ 66,000.00
$ 0,000.00
$ 120,000.00
$ 120.000.00
$ 13,000.00
$ 13,000.00
$ 24,500.00
$ 24,500.00
2
Sheet, shoring, and bracing
LS
1
$ 354,000.00
$ 354,000.00
$ 10,000.00
$ 10,000.00
$ 210,000.00
$ 210.000.00
$ 120,000.00
$ 120,000.00
3 IMobilbuition
LS 1
1
$ 555,000.00
$ 555,000.00
$ 450,000.00
$ 450,000.00
$ 561,000.00
$ 561,000.00
$ 607.000.00
$ 607,000.00
4
Site clearing/grubbing, SWPPP
LS
1
$ 397,000.00
$ 397,000.00
$ 140,000.00
$ 140,000.00
$ 450,000.00
$ 450,000.00
$ 385,000.00
$ 385,000.00
5
Potholing and surveying
LS
1
$ 52,000.00
$ 52,000.00
$ 20,000.00
$ 20,000.00
$ 50,000.00
$ 50,000.00
$ 15,000.00
$ 15,000.00
6
Excavation, badd'i0, grading, compaction,
disposal, retaining walls, pavement, fences,
and additional site work
LS
1
$ 370,000.00
$ 370,000.00
$ 899,999.00
$ 899,999.00
$ 1,607,000.00
$ 1,607,000.00
$ 134,800.00
$ 134,800.00
7
Yard piping
LS
1
$ 2,067,000.00
$ 2,067,000.00
$ 2,550,000.00
$ 2,550,000.00
$ 2,500,000.00
$ 2,500,000.00
$ 2,384,000.00
$ 2,384,000.00
8
Electrical, telemetry, instrumentation and
centrals
LS
1
$ 235,000.00
$ 235,000.00
$ 500,000.00
$ 500,000.00
$ 406,000.00
$ 406,000.00
$ 388,000.00
$ 388,000.00
9
Bolted steel tanks
LS
1
$ 1,074.000.00
$ 1,074,000.00
$ 1,100.000.00
$ 1,100,000.00
$ 950,000.00
$ 950,000.00
$ 562,000.00
$ 562,000.00
10
Field repair of bolted steel tank coatings:
A Interior coating
B. Exterior painting
SF
8,000
$ 3.80
$ 30,400.00
$ 8.00
$ 64,000.00
$ 7.60
$ 60,800.00
$ 6.50
$ 52.000.00
SF
5,500
$ 1.80
$ 9,900.00
$ 7.00
$ 38,500.00
$ 7.10
$ 39,050.00
$ 6.50
$ 35,750.00
11
Demolition of existing reservoir
LS
1
$ 254,000.00
$ 254,000.00
$ 150,000.00
$ 150,000.00
$ 110,000.00
$ 110,000.00
$ 1,214,000.00
$ 1,214,000.00
12
Construction of 6.0 MG reservoir, piping and
appurtenant work
LS
1
$ 5.181,000.00
$ 5,181,000.00
$ 4,850,000.00
$ 4,850,000.00
$ 3,814,000.00
$ 3,814,000.00
$ 5,960,000.00
$ 5,960,000.00
13
Hydrostatic testing and disinfection of steel
tanks, reservoir, and pipelines
LS
1
$ 75,000.00
$ 75,000.00
$ 70,000.00
$ 70,000.00
$ 100,000.00
$ 100,000.00
$ 10,000.00
$ 10,000.00
14
Landscaping
LS
1
$ 144,000.00
$ 144,000.00
$ 160,000.00
$ 160,000.00
$ 235,000.00
$ 235,000.00
$ 133,000.00
$ 133,000.00
15
Demolition of boiled steel tanks
LS
1
$ 76,000.00
$ 76,000.00
$ 20,000.00
$ 20,000.01)
$ 65,000.00
$ 65,000.00
$ 116,000.00
$ 116,000.00
18
1 Field orders
LS
1
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
Total
$10,990,300.00
$11,192499.00
$11,210,850.00
$12,191,050.00
T °Toter reported in Pacific Hydrotec h's bid schedule was $9,752,5W.
Corrections to the total are made as shown.
= Pre -bid estimate: $13,545,600
Computed by: JED
CM 106 (1/28108) Sheet 2 of 2
ITEM NO.
AGENDA REPORT
Committee Meeting Date: February 7, 2008
To: Planning-Engineering-Operations Committee
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Joe Polimino, Project Engineer
Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $ 11.5M
Funding Source: District and Developer Funds
CEQA Account No: 101-2700 Job No: 200704
Compliance: Mitigated Neg. Dec. Estimated Costs: $ 2,500,000 Dept: Eng
Subject: Amendment to Consultants Agreement with Parsons Water & Infrastructure Inc.
SUMMARY:
On September 8, 2005, Parsons Water & Infrastructure Inc. (Parsons) was authorized to provide
engineering design, construction management, inspection, and engineering construction support
services (geotechnical and engineering survey) for the 8 million gallon (MG) component of the
12 MG Lakeview Reservoir and for the 5,000 gallon per minute (GPM) Lakeview Booster Pump
Station, a multiple valve pressure reducing station and a sodium hypochlorite disinfection
booster system. The total authorized amount was estimated at $1,689,458 based on previous
projects of similar complexity and a combined project under one construction contract using a
single set of plans and specifications.
DISCUSSION:
Parsons currently is providing construction administration and inspection services for the 8 MG
Lakeview Reservoir Project, which is being built by SSC Construction, Inc., as part of the capital
improvements required for the Vista Del Verde development. The project began on June 18,
2007, to be completed in 487 consecutive calendar days. Parsons was contracted to provide
construction administration and inspection services for both the reservoir and the new 5,000
GPM Lakeview Booster Pump Station, which had two different contractors and overlapping
schedules. Parsons budget and time was originally estimated based on these two project
schedules. Since the Lakeview Reservoir Project started later than originally anticipated, and
will also have some non-compensable days added for rain delays, the completion date is now
estimated to be in early December 2008. To provide full support construction management
services for this additional time, the current Parsons contract will need to be extended.
Authorization for these additional funds will provide the budget for continued construction
management services through completion of the reservoir project and allow Parsons to be
compensated for their additional work efforts:
• An additional $239,206 for administrative costs of managing the project, including
meetings, reports, responding to design clarifications and project close-out.
• Additional hours added for on-site inspection, including resident civil inspections, and
special inspections to include structural, electrical and instrumentation for $272,470.
• An additional amount of $110,000 for the geotechnical sub-consultant for concrete and
soils inspection.
Parsons has requested this additional authorization, in the total amount of $621,676 for
Construction Administration and Inspection services provided at the District's request and on
behalf of the District, to complete the Lakeview Reservoir Project. The duration for this
extension is estimated at approximately 47 weeks, or $59,000 per month. This will bring the total
for Construction Administration and Inspection services to $1,770,332.
PRIOR RELEVANT BOARD ACTION(S):
On January 27, 2005, the Board authorized staff to proceed with the Bastanchury (now
Lakeview) Reservoir and Booster Station Site Optimization Plan and on February 24, 2005, the
Board authorized execution of a Consultants Agreement with Parsons Water Infrastructure Inc.
for $88,508 to commence with a Project Feasibility / Basis of Design Report for the project. On
September 8, 2005, the Board authorized the General Manager to issue an amendment to the
Consultants Agreement with Parsons Water & Infrastructure Inc., in the amount not to exceed
$1,689,458 for the design, construction management, inspection, and construction geotechnical
and survey services for the 8 MG Bastanchury (Lakeview) Reservoir and the 5,000 gallon per
minute Booster Pump Station. On June 22, 2006, the Board approved Amendment No. 2, to the
Consultants Agreement with Parsons Water & Infrastructure Inc., in the amount of $110,680 for
additional work to complete the design of the 8 MG Lakeview Reservoir (now Job No. 200704)
and the 5,000 gallon per minute Lakeview Booster Station Pump Station, Job No. 200505.
STAFF RECOMMENDATION:
Approve Amendment No. 3, to the Consultants Agreement with Parsons Water & Infrastructure
Inc., in the amount of $621,676 for additional work to complete the Construction Administration
and Inspection of the 8 MG Lakeview Reservoir, Job No. 200704.