Loading...
HomeMy WebLinkAbout2008-07-03 - Planning-Engineering-Operations Committee Meeting Agenda PacketRL\ ~ / YORBA LINDA WATER DISTRICT PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING Thursday, July 3, 2008, 4:00 p.m. 1717 E. Miraloma Avenue, Placentia - Tel: (714) 701-3020 AGENDA COMMITTEE: STAFF: Director William R. Mills, Chair Ken Vecchiarelli, Asst. General Manager Director Paul R. Armstrong Lee Cory, Operations Manager John DeCriscio, Chief Plant Operator Ken Mendum, Operations Superintendent INTRODUCTION OF VISITORS AND PUBLIC COMMENTS Any individual wishing to address the Committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the Committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. DISCUSSION ITEMS: This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee Members. This portion of the agenda may also include items for information only. Preventative Maintenance Program Status Report. 2. Status Report on the Meter Replacement and Radio Read Retrofit Project. 3. Monthly Water Production and Purchased Imports through June 2008. 4. Monthly Orange County Groundwater Producers Meeting Summary Report. 5. Monthly MWDOC Managers Meeting Summary Report. 6. Status Report on Capital Improvement Projects in Progress. 7. Proposed Action Plan Responding to OC Grand Jury Report. ACTION ITEMS: This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee actions. 8. Consider Change Order No. 3 with SSC Construction, Inc. for the Lakeview Reservoir Project. Recommendation: Support approval of Change Order No. 3 in the amount of $55,393.45 and 27 calendar days and reduce retention to 5% to SSC Construction, Inc. for construction of the Lakeview Reservoir Project, Job No. 200704. ~ a l`d ADJOURNMENT: The next regularly scheduled Planning-Engineering-Operations Committee will be held August 7, 2008 at 4:00 p.m. Accommodations for the Disabled: Any person may make a request for a disability-related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning Michael A. Payne, District Secretary, at 714-777-3018, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. -2- PM PRuGRAM ITEM# / 2007/2008 Fiscal 2007/08 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Percent of target 8% 1 17% 1 25% 1 33% 1 42% 1 50% 1 58% 67% 75% 83% 100% HYDRANTS (3,765) Target; all hydrants to be serviced annually. INSPECTED THIS MONTH 175 527 4661 65 3231 3461 5301 4681 4651 3421 317 INSPECTED THIS YEAR 175 702 1,1681 1,233 1,556 1,902 2,432 2,900 1 3,365 1 3,707 1 4,024 % OF TOTAL 4.7% 18.7% 31.0%1 32.8% 41.3%1 50.5%1 64.6% 77% 89% 99%1 07% VALVES (10,00012= 5,000) Target; all valves to be operated every two years OPERATED THIS MONTH 152 4661 5671 6311 678 410 393 418 393 308 457 OPERATED THIS YEAR 152 6181 1,1851 1,816 2,817 3,227 3,620 4,038 4,431 4,739 5,196 % OF TOTAL 3.0% 12.4%1 24.0%1 36.3%1 56.3% 64.5% 72.4% 80.8% 89% 950/. 104% DEAD ENDS (487x2 =974) Target; all dead ends to be flushed twice each year. FLUSHED THIS MONTH 0 0 0 4871 0 0 01 01 01 487 0 FLUSHED THIS YEAR 0 0 0 487 0 0 0 0 0 974 974 % OF TOTAL 0.0% 0.0% 0% 50% 50% 50% 50% 50% 50%1 100% 100% AIR VACS (309) Target; all air /vacs to be serviced annually. INSPECTED THIS MONTH 39 331 51 2 57 261 371 181 391 821 110 INSPECTED THIS YEAR 39 721 771 79 136 '1621 1991 217 2561 3381 448 % OF TOTAL 12.6% 23.3%1 25.0%1 25.6% 44.0% 52.4%1 64.4%1 70.2% 83%1 109.0% i `-0, SEWER CLEANING (802,560) Target; all sewers to be cleaned annually. CLEANED THIS MONTH 52,826 68,523 54,8061 84,092 80,969 73,2841 44,3671 48,716 1 90,413 1 82,721 1 74,301 CLEANED THIS YEAR 52,826 121,349 176,1551 260,247 341,216 414,5001 458,867 507,573 1 597,986 1 680,707 1 755,008 % OF TOTAL 6.6% 15.1% 22.0%1 32.4% 43% 51.7%1 57.2%1 63.20% 75% 85%1 1 SEWER TELEVISING (160,512) Target; all sewers to be televised every 5 years. TELEVISED THIS MONTH 0 7,740 7,759 1 7,280 2,648 1 4,6551 1,7271 700 1 1,261 1 01 3,414 TELEVISED THIS YEAR 0 7,740 15,499 1 22,779 1 25,4271 30,082 1 31,809 1 32,509 1 33,770 1 33,770 1 37,184 OF TOTAL 0 4.80k 10%1 14.2%1 15.8%1 18.7%1 19.8%1 20.300k 21% 21%1 1 0 ITEM # PM PAGRAM 2007/2008 0 JAN FEB MAR APR MAY JUN JULY Percent of tar et 14% 28% 43% 57% 72% 86% 100% REPLACED THIS MONTH 181 90 1091 641 721 74 REPLACED THIS YEAR 181 lool 2171 2811 3531 427 % OF TOTAL 4%1 22% 43% 56% 70% 85% JAN 1 FEB 1 MAR 1 APR 1 MAY 1 JUN 1 JULY Percent of target 14% 1 28% 1 43% 1 57% 1 72% 1 86% 1 100% REPLACED THIS MONTH 111 131 211 631 311 32 REPLACED THIS YEAR ill 241 4SI 981 1291 161 % TOTAL 7%1 16% 28%1 61..0% 80%1 100% JAN FEB MAR APR MAY JUN JULY 14% 28% 43% 57% 72% 86% 100% REPLACED THIS MONTH i 3211 1 6731 16 1181 REPLACED THIS YEAR 321 994 1010 2291 % OF TOTAL I 15% 45% 45% 99% TO BE COMPLETED BY JUNE 30th 2004 20081 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Percent of tare 6% 11% 1 17% 22% 28% 33% 38% 44% 50% 569/6 61% 67% REPLACEMENT PROG... 2600 REPLACED THIS MONTH 571 11 721 271 ill 66 REPLACED THIS YEAR 571 681 1301 1571 1681 234 % OF TOTAL 2% 2% 5% 6% 7% g-/.I I 20091 JAN 1 FEB 1 MAR 1 APR 1 MAY 1 JUN Percent of target 72% 1 78% 1 83% 1 88% 1 94% 1 100% REPLACED THIS MONTH REPLACED THIS YEAR % OF TOTAL • WESTERN &ICE AREA METER REPLACEMENT PROGRAM SKIPS WEEKLY AVE. RETROS WEEKLY AVE. RETROS WEEKLY AVE. - - WE - NEEDED TO REACH Commercial. NEEDED TO REACH Residential. NEEDED TO REACH 5 �„�,,,4 DONE TO DO TARGET DONE I TO DO TARGET DONE TO DO TARGET 502 161 2210 S 3 499 19 0 161 6 2' 8- - 24 475 19 0 161 6 17 458 19 0 161 7 �2�1 18 440 19 1 160 7 26 414 19 4 156 7 28 366 18 3 163 7 1 22 364 18 7 146 7 27 337 18 6 140 7 29 308 17 1 139 8 321 1889 105 6 302 18 25 114 7 71 1818 107 18 284 18 13 101 6 130 1688 106 5 8 13 271 18 9 92 6 438 1250 83 SSA 21 250 18 2 90 6 34 1216 87 13 237 18 6 84 6 16 1200 92 16 221 18 5 79 7 0 1200 100 22 199 18 9 70 6 0 1200 109 35 164 16 4 66 7 0 1200 120 0 a 15 149 17 13 53 6 0 1200 133 6 30 119 15 34 19 2 109 1091 136 8 111 16 12 7 1 273 818 117 w 23 88 15 1 6 1 601 217 36 12 76 15 7 -1 (0) 208 9 2 0 I 0 0 0 w #DIVIOil 9DIV 101 • • YLWD SOURCE WATER SUMMARY Fiscal Year 2007-08 MONTH Jul-07 Aug-0i Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Thru 6/26 FYTD 70.0% 65.0% 60.0% - - 55.0% 50.0% 45.0% -0--MONTHLY GW *'"YTD GW BPP GOAL 60.2% 40.0% , , Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Thru 07 07 07 07 07 07 08 08 08 08 08 6/26 Month TOTAL MONTHLY YTD GW IMPORT DEMAND GW GW (AF) (AF) (AFl (%1 (%I ITEM NO. 3 BUDGET (Demand Est.) DELTA (AF1 MI1 1,383.5 1,497.2 2,880.7 48.00/6 48.0% 2,843.0 1.3% 1,525.0 1,382.8 2,907.8 52.4% 50.2% 2,797.0 4.0% 1,373.4 1,177.2 2,550.6 53.8% 51.3% 2,454.0 3.9% 1,315.9 959.1 2,275.0 57.8% 52.7% 2,070.0 9.9% 1,118.0 740.4 1,858.4 60.2% 53.8% 1,635.0 13.7% 777.2 471.9 1,249.1 62.2% 54.6% 1,471.0 -15.1% 707.7 421.4 1,129.1 62.7% 55.2% 1,283.0 -12.0% 561.8 527.6 1,089.4 51.6% 55.0% 1,228.0 -11.3% 860.7 942.2 1,802.9 47.7% 54.2% 1,454.0 24.0% 1,166.5 950.0 2,116.5 55.1% 54.3% 1,819.0 16.4% 1,325.0 A 998.5 2,323.5 57.0% 54.6% 2,406.0 -3.4% 1,340.5 717.4 2,057.9 65.1% 55.5% 2,696.0 -23.7% 13,455.2 10,785.7 24,240.9 55.5% 24,15650 0.40/6 Allowable GW (YTD) 14,619.8 (AF) Underpumped (AF) 1,164.6 (AF) Operating Cost Affect $ 174,700 (At $150/AF Delta) Operating Cost Affect $ 232,900 (At $200/AF Delta) GROUNDWATER PERCENTAGE 0 • YEARLY WATER SUPPLY BY SOURCE 16,000- 14,000 12,000- 10,000- 4) U. 8,000 L Q 6,000 - 4,000 2,000 ®GW N IMPORT 0- o~~o,~ Fiscal Year (Tlllu 8126) • Fsc. Yr GW IMPORT TOTAL % GW % IMP 97/98 9,034.3 9,141.2 18,175.5 49.7% 50.3% 98/99 10,208.6 10,119.1 20,327.7 50.2% 49.8% 99/00 10,875.1 11,945.1 22,820.2 47.7% 52.3% 00/01 9,618.0 11,852.7 21,470.7 44.8% 55.2% 01/02 12,065.2 11,100.2 23,165.4 52.1% 47.9% 02/03 9,951.6 12,345.2 22,296.8 44.6% 55.4% 03/04 10,564.1 13,568.1 24,132.2 43.8% 56.2% 04/05 10,703.5 10,908.0 21,611.5 49.5% 50.5% 05/06 11,062.4 11,970.5 23,032.9 48.0% 52.0% 06/07 13,298.5 12,358.0 25,656.5 51.8% 48.2% Thru 6/26 07/08 13,455.2 10,785.7 24,240.9 55.5% 44.5% 0 • • • YLWD YEARLY WATER DEMANDS 30,000.0 25,000.0 20,000.0 15,000.0 ■ IMPORT a ® GW 10,000.0 5,000.0 0.0 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 Fiscal Year (Thru 6/26) • • YLWD FISCAL YEAR 2007 -2012 WATER SYSTEM CAPITAL PROJECTS ITEM N* /J' Projects in Design Phase Projects in Construction Phase Construction Completed Updated: June 11, 2008 Page A -1 Note: Project Number corresponds to order in Project Description List WATER SYSTEM CAPITAL IMPROVEMENTS Cost Estimate Cumulative District Cost by Fiscal Year No. Project Name $ Cost, $M FY 2007 -08 FY 2008 -09 FY 2009 -10 FY 2010 -11 FY 2011 -12 5, S4,500,000 54-50 51- 89�gg9 _ - 20. S?�94,8A8 &7-30 - 13. 53,08009 59-90 15. Zone 4 Transmission S &S, R 5 (36 inch) $1,700,000 $11.60 $1,190,000 9. 51- 340004 51? S9 1�.g"w - - - 14. 7.,.,e 1 T«,.,. missies S&S D 5 ( O nel,l (t llnl nnn C7 39 nW - - - - 28. 95-2---OW C 1 25. E4is...Re;.ye -Pole Dele...,.: as 9-25 o, 514-54 SNtl,Q y - - 3. Lakeview Reservoir (8MG) $11,500,000 $26.08 $6,900,000 $4,600,000 L Highland Reservoir Replacement (6MG) $11,200,000 $37.28 $6,720,000 $4,480,000 18. Zone 4C Reconfiguration $1,070,000 $38.35 $267,500 $802,500 21. Water Meter Replacement Project, Phase 2 $1,000,000 $39.35 $500,000 $500,000 29. GIS Implementation Pro'ect $700,000 $40.05 $380,000 $320,000 26. 5.354,4W 544-40 53I X989 $35,000 27• 5?38�84 540:3 5- 3?i;004 $25,000 23. Fairmont Booster Pump Station Site Improvements $300,000 $40.95 $200,000 $100,000 - 12. OC -51 Upgrade $242,000 $41.19 .$60,500 $181,500 22. Radio Read Water Meter Conversion Project, Phase 1 $160,000 $41.35 $80,000 $80,000 2. Hidden Hills Reservoir (2MG) and Santiago Booster Upgrades $6,400,000 $47.75 $2,240,000 $2,880,000 $1,280,000 - _ 6. IPalm Ave. BS Upgrade & YL Blvd Pipelines $5,400,000 $53.15 $540,000 $2,160,000 $2,700,000 - _ 10. Well No. 20 $2,000,000 $55.15 $500,000 $1,300,000 $200,000 - _ 11. Groundwater Capacity Restoration $1,000,000 $56.15 $150,000 $550,000 $300,000 - _ 30. Extension of Pressure Zone 4C Reconfiguration $1,000,000 $57.15 $100,000 $400,000 $500,000 16. Anaheim Intertie Connection Improvements $500,000 $57.65 - $62,500 $187,500 - _ 7. Zone 5 (1000 ) Booster Station $1,080,000 $58.73 $270,000 $2- 70,000 $540,000 - 8. Fairmont Booster Pump station Reconfiguration $400,000 $59.13 - - $200,000 $200,000 - 19. Foxtail Drive Pipeline $245,000 $59.38 - - $49,000 $196,000 - 4. Elk Mountain Res. Site Improvements $300,000 $59.68 - - - $300,000 - 17. Fire Flow Improvement Via Sereno & Ohio) $125,000 $59.80 - $25,000 $100,000 Total Water Projects $59,801,000 $24,304,200 $18,746,500 1 $5,686,500 $1,261,000 $100,000 Water CIP`s $50,098,200 Projects in Design Phase Projects in Construction Phase Construction Completed Updated: June 11, 2008 Page A -1 Note: Project Number corresponds to order in Project Description List ITEM NO. ? AGENDA REPORT is Committee Meeting Date: July 3, 2008 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, Assistant General Manager Staff Contact: Joe Polimino, Project Engineer Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $ 11.5M Funding Source: District and Developer Funds CEQA Account No: 101-2700 Job No: 200704 Compliance: Mitigated Neg. Dec. Estimated Costs: $ 11.5M Dept: Eng Subject: Change Order No. 3 to SSC Construction, Inc. for the Lakeview Reservoir Project SUMMARY: On January 25, 2007, the District Board of Directors authorized the execution of an agreement with SSC Construction, Inc. (SSC) for construction of an 8-million gallon underground concrete reservoir, piping and appurtenances. The project also includes demolition of the existing Bastanchury Booster Pump Station and Reservoir (two steel storage tanks). The site is located north of Bastanchury Road off the new Lakeview Avenue extension, north of the Hover • Development and south of Vista Del Verde's Village 4. When completed, the project will increase operational, fire and emergency storage capacity, retain better water quality through improved circulation and improve reliability of the water system. DISCUSSION: In accordance with the contract documents, SSC has submitted requests for various change order items incorporated in Change Order No. 3, which represents an increase in the contract amount of $55,393.45 and a time extension of 27 calendar days. SSC also requested that YLWD reduce the retention on the project to 5 percent and release one half of the retention currently held in a joint escrow account. Change Order No. 3 consists of $18,548.29 and 5 days for additional backfill to the South and West retaining walls; $36,845.16 and 5 days for removal of 2,620 cubic yards of material from the site; and 17 rain days through the winter months. SSC is currently installing inlet piping, backfilling slopes, constructing intermediate retaining walls and beginning installation of mechanical controls. To date, the project is over 77% completed. SSC has requested that the District release half of their retention and reduce the remaining retention to 5% on the project. In good faith with this request, SSC has proposed a minor project revision for the District's consideration that could compress the project schedule and accelerate the completion by up to two months, thereby allowing beneficial use of the new reservoir much sooner than anticipated. This proposal is well-timed with the abandonment and demolition phase of the Highland Reservoir Replacement Project, which will soon be at full pace. The earlier timing of the additional storage at the Lakeview Reservoir site will assist the District in maintaining operational efficiencies and assist in providing water storage for District • customers that the Highland Reservoir usually provides. The status of the construction contract with SSC Construction, Inc. is as follows: • The original contract was $10,489,500 and 487 calendar days starting June 18, 2007. • The current contract is $10,642,387.92 and 547 calendar days. • If approved, Change Order No. 3 adds $55,393.45 (0.5% of the original contract) and 27 calendar days. • If approved, Change Order No. 3 increases the total contract amount to $10,697,781.37 and 574 calendar days. Staff, Butier and Parsons, the Districts Construction management team have reviewed the contractor's request for Change Order No. 3 and recommend approval. A copy of Change Order No. 3 is attached for your reference. PRIOR RELEVANT BOARD ACTION(S): On January 25, 2007, the District Board of Directors approved and awarded a construction contract with SSC Construction, Inc. in the amount of $10,489,500 for construction of an 8 million gallon underground concrete reservoir, piping and appurtenances, and demolition of the existing Bastanchury Booster Pump Station and Reservoir. On April 10, 2008, the District Board of Directors approved Change Order No. 1 increasing the total contract amount to $10,639,500 and total contract calendar days to 547. The Board has approved twelve progress payments to date for this project, the most recent of which was approved on May 29, 2008. STAFF RECOMMENDATION: Support approval of Change Order No. 3 in the amount of $55,393.45 and 27 calendar days and reduce retention to 5 percent to SSC Construction, Inc. for construction of the Lakeview Reservoir Project, Job No. 200704. 0 • YORBA LINDA WATER DISTRICT CONTRACT NAME: Lakeview Reservoir CONTRACTOR: SSC Construction Inc. CHANGE ORDER NO. 003 DATE July 10, 2008 Page 1 of 1 CONTRACT AMT THIS CHANGE: $ 10,642,387.92 DAYS: 547 $55,393.45 DAYS: 27 (0.5%) U NET CHANGE + $55,393.45 27 Days REVISED CONTRACT AMOUNT AND TIME $10,697,781.37 574 Days L._J OWNER: Yorba Linda Water District REVISED CONTRACT AMT: $ 10,697,781.37 DAYS: 574 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and Yorba Linda Water District otherwise referred to as Owner. +INCREASE CONTRACT DESCRIPTION OF CHANGES / OR TIME +EXTENSION / - DECREASE IN OR -REDUCTION CONTRACT (DAYS) AMOUNT 1.) Additional work for backfill required behind the Hover South and West retaining walls. I + $18,548.29 I 5 2.) Removal of 2100 cubic yards of material that was on site. I + $29,705.92 I 5 3.) Removal of additional 520 cubic yards of material on site placed there by a previous + $7,139.24 0 contractor. 4.) Rain days which prevented work on site through the winter months of the project. I + $0.00 I 17 5.) Reduce retention for the project to 5 percent and release 50% of funds currently held in + $0.00 0 retention. The amount of the contract will be increased 4deweased> by the sum of $ 55,393.45 and the contract time shall be increased edesreased> by 27 calendar days. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of fime allowed, if any, for completion of the entire worts on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order Items. This document will become a supplement of the contract and all provisions will apply hereto. It Is understood that the Change Order shall be effective when approved by the Owner. This Change Order constitutes full, final, and complete compensation to the Contractor for all costs, expenses, overhead, profit, and any damages of every kind that the Contractor may incur in connection with the above referenced changes in the work, including any impact on the referenced work of any other work under the contract, any changes in the sequences of any work, any delay to any work, any disruption of any work, any rescheduling of any work, and any other effect on any of the work under this contract. By the execution of the Change Order, the Contractor accepts the contract price change and the contract completion date change, if any, and expressly waives any claims for any additional compensation, damages or time extensions, in connection with the above-referenced changes. RECOMMENDED: /ENGINEER OR DATE: nONCLILTONT Joe Pollmino, Project Engineer ACCEPTED: /CONTRACTOR DATE: Greg Larkin, President APPROVED: /OWNER DATE: Mike Payne, General Manager