Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2008-12-04 - Planning-Engineering-Operations Committee Meeting Agenda Packet
Yorba Linda
Water District
PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING
Thursday, December 4, 2008, 4:00 p.m.
1717 E. Miraloma Avenue, Placentia - Tel: (714) 701-3020
AGENDA
COMMITTEE
Director William R. Mills, Chair
Director Paul R. Armstrong
STAFF
Ken Vecchiarelli, Asst. General Manager
Lee Cory, Operations Manager
Ken Mendum, Operations Superintendent
John DeCriscio, Chief Plant Operator
Steve Conklin, Consulting Engineer
INTRODUCTION OF VISITORS AND PUBLIC COMMENTS
Any individual wishing to address the Committee is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on this agenda, the Committee Chair will recognize the individual for their
comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are
. limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to
five minutes.
ACTION ITEMS
This portion of the agenda is for items where staff presentations and committee discussions are needed prior to
formal committee action.
1. Consider waiving construction meter fees and temporary construction water
charges for demolition of homes destroyed in wildfires.
2. Contract with General Pump Co. for Rehabilitation of Well No. 12.
3. Change Order to Professional Services Agreement with Psomas for Additional
Design Services for Zone Reconfiguration Project.
4. License Agreement with Orange County Water District for Access to Warner
Basin Complex to Collect Water Quality Samples.
DISCUSSION ITEMS
This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items
for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also
include items for information only.
5. Monthly Groundwater Production and Purchased Water Report.
6. Monthly Preventative Maintenance Program Report.
• 7. Monthly MWDOC Managers Meeting Summary Report.
8. Monthly OC Groundwater Producers Meeting Summary Report.
OR s NA.
4
7`
9. Status Report on Capital Projects in Progress.
ADJOURNMENT
The next regularly scheduled meeting of the Planning-Engineering-Operations
Committee will be held January 8, 2008 at 4:00 p.m.
Items Distributed to the Committee Less Than 72 Hours Prior to the Meetinct
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to the Committee less than seventy-two (72) hours prior to the meeting will be available for public
Inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870,
during regular business hours. When practical, these public records will also be made available on the District's
Internet website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning Michael A. Payne, General Manager, at 714-701-3020, or
writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature
of the disability and the type of accommodation requested. A telephone number or other contact information should
be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related
accommodation should make the request with adequate time before the meeting for the District to provide the
requested accommodation.
•
2
F
ITEM NO.
AGENDA REPORT
• Committee Meeting Date: December 4, 2008
To: Planning-Engineering-Operations Committee
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Steve Conklin, Consulting Engineer
Leon de los Reyes, Water Quality Engineer
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 1.2M
Funding Source: Water Revenue Bond
CEQA Account No: 101-2700 Job No: 200813
Compliance: N/A Estimated Costs: $ 71,150 Dept: Eng
Subject: Contract with General Pump for Rehabilitation of Well No. 12
SUMMARY:
As part of the District's plans to restore and maximize the full potential of its groundwater
production capabilities to its service area, bids were received for the cleaning and
redevelopment of Well No. 12. Following an evaluation of the two bids received, staff
recommends award to General Pump Company, Inc., at a cost of $71,150.
• DISCUSSION:
As previously reported to the PEO Committee, the District is experiencing diminishing
productivity from some of its wells and an overall drop in the combined production capability due
to the age, physical characteristics and configuration of the wells. This condition is exacerbated
by lower pumping water level in the groundwater basin. The District is addressing this issue
through its Well Optimization Plan. As a first step, Well No. 11 has been redeveloped and
provided with a new 1600-gpm capacity pump, replacing the former 2000-gpm pump. Well No.
11 is operating very well at 1600 gpm.
Thereafter, Well No. 12, which was operating with cascading water into the casing, was
removed from service and the casing was examined by video-camera. The video was reviewed
by staff of the District and by CDM the District's consultant. The inspection indicated that the
casing was in good shape and a redevelopment plan was recommended by CDM. The District
solicited bids for redevelopment from two firms that are experienced and qualified to perform
this type work. The bids are as follows:
General Pump Company: $71,150
Layne Christensen Company: $82,500
District staff reviewed the bids and recommends award to General Pump Company for $71,150.
A copy of the bid by General Pump Company is attached.
PRIOR RELEVANT BOARD ACTION(S):
September 11, 2008: Approve Professional Service Agreement with Camp, Dresser & McKee,
• Inc. in the amount not to exceed $54,390 to provide hydrogeologic and support engineering
services for optimization study and assistance for the District's water production wells.
STAFF RECOMMENDATION:
That the PEO Committee recommend that the Board of Directors authorize the General
Manager to execute a Purchase Order with General Pump Company, Inc., in the amount not to
• exceed $71,150, to provide well redevelopment and testing of Well No. 12.
•
0
U
•
•
i
Yorba Linda Water District
Well No. 12
Bid Shoat
Item Description Estimated Un
Quantity
Unit Price Total Price
I
Project mobilization and
1 Lump Sum
aZ j Aa a
$~a 000
demobilization including site
cleanup.
2
Furnish and maintain system to
1 Lump Sum
O© 0
$ 8100 o-
achieve NPDES compliance
including neutralizing acid and
laboratory analyses. Provide
description of your proposed
system-
3
Furnish and install by swabbing
1 Lump sum
3 5 y a
$ 3 550-
pre-mixed sulfamic acid
solution into perforated casing
intervals per manufacturers
direicrtions.
4
Wire brush well casing from top
8 Hours
lw
$3-700-
to bottom
5
Bail or airlift fill from bottom of
4 Hours
OQ
$ 1 ZOD -
well
6
Mechanical development with
40 Hours
2O0
$ 8 C>3p
double swab while
1
simultaneously airlifting
7a
Furnish, install and demobilize
1 Lump Sum
~ ~ ar3 0'0
I 000
pump equipment for well
development and test pumping.
Pump shall be equipped with an
open ended deep suction set at
approximately 240 feet and with
a packer above the bowls at
approximately 115 feet.
7b
Furnish, install and demobilize
1 Lump Sum
6
J p
$'3fj oa-
pump equipment for well ,
,
development and test pumping.
Pump shall be equipped with an
open ended deep suction set at
approximately 420 feet and with
a packer above the bowls at
approximately 115 feet.
8
Conduct pumping development
40 Hours
'd v O
$ Boo 0 -
(by surging and pumping ) with
pump with packer not inflated.
9
Conduct constant discharge
8 Hours
pumping.
_ CADocuments and SettingstbruneLGENPUMPlocal Settings\Temporary Intemet Files\Content.Outlook102WPKGP81Well 12 Bid
FormAsMeet1
•
Yorba Linda Water District
Well No. 12
Bid Sheet
Item Description Estimated Units
Quantity
10 Conduct pumping with pump 8 Hours
with packer inflated. Monitor
pressures both above and below
packer during pumping.
Conduct video camera survey.
Total
Unit Price Total Price
1010
1 Lump Sum 1 150 0 $ 1 O C>C.) -
$'71,150
Mobilization shall include but not be limited to providing all equipment necessary for the project including
compressor, neutralization trailer or tank, pipe and toilet rentals. Provide rossum sand tester.
Pumping rate 2,000,gpm
The rehabilitation should include the introduction of sulphamic acid by swabbing (mechanical development).
The entire using should be swabbed with additional swabbing in the perforated intervals so that the acid is
forced into the formation. The dosage of acid should follow the manufacturer's recommendations.
The bottom of the deep suction will be equipped with perforapons and placed in a blank section of the well to
reduce turbulence (228 to 253 feet and 340 to 483 feet) `
Prevailing wage rate required.
•
CADocuments and Settings\bbrunel.GENPUMPlocal Settings\Temporary Internet Files\Content.Outlook\02WPKGPB\Well 12 Bid
Form.)WSheetl
Yorba Linda Water District
~
A
`
Well No. 12
Bid Sheet
-C
6tAl k
^
C l ~ZANA d--'
• Item Description
I
Estimated Units Unit Price
Quantity
Total Price
1 Project mobilization and
1 Lump Sum $ 5,000
$ 5,000
demobilization including site
cleanup.
2 Furnish and maintain system to
1 Lump Sum $ 9,220
$ 9,220
achieve NPDES compliance
including neutralizing acid and
laboratory analyses. Provide
description of your proposed
system.
3 Furnish and install by swabbing
1 Lump Sum $ 9,200
$ 9,200
pre-mixed sulfamic acid solution
into perforated casing intervals
per manufacturers directions.
4 Wire brush well casing from top
8
Hours $
290 $
2,320
to bottom
1
5 Bail or airlift fill from bottom of
4
Hours $
290 $
1,1601
well
6 Mechanical development with
40
Hours $
375 $
15,000
double swab while
simultaneously airlifting
7a Fumish, install and demobilize
1
Lump Sum $
12,900 $
12,900
pump equipment for well
development and test pumping.
Pump shall be equipped with an
open ended deep suction set at
•
approximately 240 feet and with
a packer above the bowls at
approximately 115 feet.
7b Fumish, install and demobilize
1
Lump Sum $
12,900 $
12,900
pump equipment for well
development and test pumping.
Pump shall be equipped with an
open ended deep suction set at
approximately 420 feet and with
a packer above the bowls at
approximately If 5 feet.
8 Conduct pumping development
40
Hours $
250 $
10,000
(by surging and pumping) with
pump with packer not inflated.
9 Conduct constant discharge
8
Hours $
250 $
2,0001
pumping.
10 Conduct pumping with pump
8
Hours $
250 $
2,000
with packer inflated. Monitor
pressures both above and below
packer during pumping.
(Conduct video camera survey. 1
i
I Lump Sum 1 $
8001
800
I I
Total)
I I
I I
I
I $
82,5001
Mobilization shall include but not be limited to providing al
l equipment necessary
for the project including
•
compressor, neutralization trailer or tank, pipe and toilet rentals. Provide rossum
sand tester.
Pumping rate 2,000 gpm
-%I L....Lw..wLUw V1 %MMi A-rIlt,11 nnnnl.AirmcnHllAlin~in,uc\Tomnnran. In/nrnef MI-IN I<1A'AF\Nlnl1 A9 Rill Fnrm\ShAAN J
Yorba Linda Water District
Well No. 12
Bid Sheet
lam.
• Item Description Estimated Units Unit Price Total Price
Quantity
The rehabilitation should include the introduction of sulphamic acid by swabbing (mechanical development).
The entire casing should be swabbed with additional swabbing in the perforated intervals so that the acid is
forced into the formation. The dosage of acid should follow the manufacturer's recommendations.
The bottom of the deep suction will be equipped with perforations and placed in a blank section of the well
to reduce turbulence (226 to 253 feet and 340 to 483 feet)
Prevailing wage rate required.
•
•
u .....n~e~~.nen/t\MIin~IMUC~Tomnnrarv IntAmpt FPA%\OLK143E\Well 12 Bid Form\Sheetl
ITEM NO. 9
AGENDA REPORT
• Committee Meeting Date: December 4, 2008
To: Planning-Engineering-Operations Committee
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Joe Polimino, Project Engineer
Steve Conklin, Engineering Consultant
Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $ 1.5 Million
Funding Source: All Water Funds
CEQA Account No: 101-2700 Job No: 200710
Compliance: Exempt Estimated Costs: $ 43,125 Dept: Eng
Subject: Amendment No. 1 to Consultants Agreement with Psomas for
Zone 4C Reconfiguration Project
SUMMARY:
Design plans for the Zone 4C Reconfiguration Project are nearing completion. In a recent
design-review meeting, staff took a closer look at the existing San Antonio Pressure Reducing
Station (PRS) through which water will be fed to the reconfigured zone. It was determined that
an upgrade of the 27-year-old PRS would be appropriate. Psomas, the District's design
• consultant for the project, was asked to provide a proposal to expand its services to include
design of upgrades to the PRS. District staff reviewed the proposal by Psomas and
recommends award of Amendment No. 1 in the amount of $43,125.
DISCUSSION:
The Zone 4C Reconfiguration Project was conceived to raise the hydraulic grade line from 675
to 706 to solve low-pressure problems in three separate areas, totaling 120 homes. Psomas,
the District's design consultant for the project, is completing 100% design plans for review,
consisting of pipeline and valve improvements. It is anticipated that the project will be
advertised for bidding in late December 2008, with construction complete by December 2009.
The new Zone 706 (4C) is supplied through the existing San Antonio PRS, which was
constructed in 1981. In a recent meeting, staff reviewed the adjustments necessary in the
existing PRS to serve the new, smaller Zone 706. It was determined that the best approach
would be to upgrade the 27-year-old facility to current District design standards. This would
include new pressure-reducing valves, full-size access hatch, forced-air ventilation, lighting, and
controls to allow remote monitoring of pressure and flow. An important goal of the PRS upgrade
would be to complete the design and replacement of the valves and appurtenances in the
existing vault by the completion date of the Zone 706 pipeline work, planned for December
2009. That is, the PRS upgrade project would have its own design, bidding and construction
with completion by December 2009.
• At the District's request, Psomas provided a proposal to expand its project design services to
include the upgrade of the San Antonio PRS. The proposal included a realistic and achievable
project schedule for construction completion by December 2009. The proposal for services
includes the following:
• • Additional $40,465 for the design phase, including plans, specifications and estimate for
the PRS upgrade project.
• Additional $2,660 for bidding-phase assistance, including attendance in the pre-bid
meeting, preparation of addendums and bid evaluation assistance.
District staff reviewed the proposed services, staff-hours and fee and believe that they are
appropriate for the work required. Staff recommends authorization of Amendment No. 1 in the
amount of $43,125 for additional design services and bid-phase assistance, to upgrade the
existing San Antonio PRS as part of the Zone Reconfiguration Project. This would bring the total
for design and bid-phase services to $156,801.
PRIOR RELEVANT BOARD ACTION(S):
On June 28, 2007, the Board of Directors adopted Budgets for Fiscal Years 2007/08 and
2008/09 and approved the Current Five Year Capital Improvement Plan for FY 2007-2012. On
September 13, 2007, the Board of Directors authorized staff to modify the Current Five Year
Plan Capital Improvement Projects List and the Adopted Budget for Fiscal Years 2007-2009 by
adding the Zone 4 Reconfiguration Project for the Twin Peaks Area of East Lake Village. On
March 13, 2008, the Board of Directors received and filed the Zone Reconfiguration Study for
Areas 1, 2 and 3 prepared by RBF Consulting and authorized staff to solicit proposals for the
design of the combined projects identified as Alternative Six in this study. On May 15, 2008, the
Board of Directors authorized the President and Secretary to execute a Professional Services
Agreement with Psomas for a fee not to exceed $113,676 to provide design and bid services for
• the Zone Reconfiguration and Sub Zone Extension Projects, Job Nos. 200220 and 200710.
STAFF RECOMMENDATION:
Support staff recommendation for Amendment No. 1 to the Consultants Agreement with
Psomas, in the amount of $43,125 for additional work to provide design services and bid
assistance for upgrades to the San Antonio PRS, in conjunction with the Zone Reconfiguration
Project, Job No. 200710.
C7
Balancing the Natural and Built Environment
November 20, 2008
Mr. Joe Polimino
Project Engineer
YORBA LINDA WATEi R DISTRICT
1717 E. Miraloma Avenue
Placentia, CA 92870
Subject: Proposal for Professional Design Services
San Antonio Pressure Reducing Station Upgrade Project
Dear Mr. Polimino:
We are pleased to submit this Proposal for Professional Design Services to the Yorba
Linda Water District (District) for the San Antonio Pressure Reducing Station Upgrade
• Project.
PROJECT UNDERSTANDING
Psomas is currently preparing plans, specifications, and bidding documents for the Zone
Reconfiguration for Areas 1, 2, and 3 Water System Improvements Project. The San
Antonio Road Pressure Reducing Station (PRS) is located in Area 1 approximately 1,000
feet north of the intersection of Yorba Linda Boulevard and San Antonio Road.
Adjustment of the downstream pressure setting in the San Antonio Road PRS to raise the
downstream HGL from 675 to 706 is critical to the success of the zone reconfiguration
project. This adjustment of the downstream HGL, along with piping and valve
improvements in the distribution system, will improve service in areas currently
experiencing low water pressure. Additionally, installation of check valves and isolation
valves in the zone reconfiguration project will change the limits of the distribution system
served by the San Antonio PRS, thereby reducing maximum day demands served by the
PRS. Fire flow demands will remain consistent with the District's water master plan
requirements.
3187 Red Hill Avenue
•
Suite 150
Costa Mesa, CA 91826
Tel 714.751.7373
Fax 714.545.8883
sin mpsomas.com
PS O M A S
•
Yorba Linda Water District Page 2
Mr. Polimino November 20, 2008
The San Antonio PRS was constructed in 1981 using contemporary District standards,
including ladder access through a manhole, two large PRVs and one small PRV in
parallel, and a pressure relief valve. Power and telemetry is not available at the PRS
vault. The District desires to upgrade the San Antonio PRS to meet current design
standards and replace piping, valves, and equipment in sizes and configurations
appropriate to serve the new flows and pressures proposed in the zone reconfiguration
project. It is proposed to replace the three existing parallel PRVs with two new parallel
PRVs. Power and communications upgrades will be constructed to provide lighting,
forced air ventilation, intrusion detection, and SCADA signals for remote monitoring.
PROJECT APPROACH
Base Drawings
We will use District provided record drawings supplemented with site visits to prepare a
base drawing of the existing mechanical equipment (plan and section) and the existing
• improvements in the immediate vicinity of the vault, including the manhole access, curb,
gutter, vent pipes, pressure relief discharge piping, and other utilities and improvements
visible on the ground surface.
Calculations
The District will provide water model information to include average day, maximum day,
peak hour, and fire flow demands through the San Antonio PRS. Upstream and
downstream HGLs of 780 feet and 706 feet, respectively, will be used in the PRV
hydraulic calculations. We will recommend a combination of sizes for two new PRVs in
parallel to handle the expected range of flows from the lowest demands to fire flow
demands. Although cavitation is not expected to be an issue with pressure downstream
of the PRVs at about 70 psi and a relatively small pressure drop across the valves, we will
run calculations to determine if anti-cavitation trim should be included with the new
PRVs. The PRVs will include flow measuring trim.
Vault and Mechanical Design
The District has stated the following design features and vault modifications are desired:
► Remove all existing valves, piping, and fittings inside the vault to the wall
flanges;
► Clean and recoat the existing wall flanges and pipes penetrating the vault walls;
•
PSOMAS
.7
Yorba Linda Water District
Mr. Polimino
Page 3
November 20, 2008
► Install two new Cla-Val pressure reducing valves of the sizes needed for the
proposed flow ranges;
► Pressure reducing valves to include flow measuring capabilities;
► Install ductile iron pipe and fittings per current District standards, including
Victaulic couplings and gate valves (as seen at the Trentino PRS);
► Maintain existing pressure relief valve and piping;
► Remove the existing manhole access and provide non-traffic rated hatch with
recessed padlock hasp (hatch will be single leaf or double leaf depending on size);
► Install Lapeyre stair for station access (similar to stairs at the Lakeview flow
control station);
► Provide power to this station for;
o Lighting (automatic on when hatch is open)
• o Ventilation fan (automatic on when hatch is open)
o SCADA
► Provide SCADA to include the following equipment and signals;
o PLC
o RTU
o Pressure transducers with local digital readouts and transmitters to provide
signal for pressure upstream and downstream of PRVs
o Flow measurement through each PRV
o Intrusion alarm
Electrical/SCADA Design
Moraes/Pham & Associates, our electrical subconsultant, will provide plans for the
installation of power at the existing station. The plans will include a control sheet to show
1/0 wiring and Cla-Val control block diagrams. The electrical system will include wiring
for lights, a ventilation fan and intrusion alarm. The. lights and fan will be designed to
turn on when the vault hatch is opened. Detailed RTU drawings are not required and
therefore not included in the scope of work.
0
P S O M A S
•
Yorba Linda Water District Page 4
Mr. Polimino November 20, 2008
The District standard SCADA configuration is Wonderware software on Modicon PLCs.
PLC programming will be provided by the District and/or third party services and is not a
part of this contract.
A new electrical inter pedestal, an electrical panel, and a SCADA panel will be
constructed behind the curb in the landscaping in the vicinity of the PRS vault.
Traffic Control Design
Work at the PRS vault will require removal of a small length of curb and AC pavement
along San Antonio Road, as well as staging of materials and equipment in the "parking
lane". Depending on the location of nearby power and telephone improvements,
trenching along the gutter and/or across San Antonio might be required. The City has
stated traffic control plans will be required for construction. We recommend requiring the
Contractor to prepare traffic control plans and submittals to the City for encroachment
permitting. We have not included preparation of traffic control plans in the scope of
work for this project.
• Permitting/Right-q1 6T"i{v
The location of the City of Yorba Linda right-of-way and the status of existing District
easements at the San Antonio PRS are currently unknown. The area behind the existing
curb at the PRS is landscaped and includes a slope with ice plant and mature trees. Work
at the PRS vault will include limited excavation and materials and construction
equipment staging within City of Yorba Linda right-of-way, requiring a construction
encroachment permit. Work to construct underground power and communications lines
to the PRS from remote facilities will require an encroachment permit for trenching
parallel with and/or across San Antonio Road. The plans and specifications will require
the Contractor to prepare and submit an encroachment permit application to the City of
Yorba Linda and obtain the permit prior to construction.
Construction Plain Sheets
Following is a list of the constriction plan sheets we anticipate for this project:
1 Title Sheet
2 General Notes, Vicinity & Location Maps
3 Standard Symbols, Abbreviations, Basis of Bearing and Bench Mark
4 Demolition Plan
5 Site Plan and Vault Modifications
6 Hatch Structural Plan and Details
is
P S 0 M A S
•
Yorba Linda Water District
Mr. Polimino
7 Mechanical Plan and Section
8 Miscellaneous Details
9 Electrical Symbols and Standard Abbreviations
10 Electrical Plans
11 Electrical Schedules/Details
12 Controls
SCOPE OF SERVICES
Psomas will provide the following scope of services:
1.0 Design Phase
Page 5
November 20, 2008
1.1 Records Research - Perform a thorough review of available record drawings,
reports, and operating data obtained from YLWD, the City of Yorba Linda
• and other utility owners listed on .the Dig Alert website.
1.2 Calculations - Perform hydraulic calculations for the pressure reducing
valves and piping to determine sizes for the desired range of flows and to
check for the risk of cavitation. Perform structural calculations for the vault
roof modifications and installation of a new hatch and frame. Calculate
desired air turnover rate and size a ventilation fan for the vault.
1.3 Base Drawings - Create AutoCAD base drawings at a scale of 1/2"=1' using
all available vault and utility record drawing information supplemented with
site visits.
1.4 50% Design Submittal - Prepare 50% design construction plans showing the
preliminary vault mechanical and structural design. Plans will be provided at
1/2"=1' scale in plan and section views. We will provide five (5) sets of the
50% design plans for District review.
1.5 90% Design Submittal - Prepare 90% design submittal incorporating District
plan review continents, structural, and electrical design. Plans will be
provided at a horizontal scale of 1/2"=1'. Five (5) sets of project bid
documents, technical specifications and preliminary construction cost
estimate will be submitted with the 90% plans for District review and
is comment.
P S O M A S
r1
U
Yorba Linda Water District
Mr. Polimino
Page 6
November 20, 2008
1.6 100% Design Submittal - Incorporate District's final review comments and
submit five (5) sets of 100% construction plans, contract documents,
technical specifications and construction cost estimate for District acceptance.
1.7 Final Deliverables - Deliver signed/sealed mylar drawings, final bid
documents and compact disk containing all documents in AutoCAD (latest
version) and MS Word for use in construction bidding. Reproduction of
construction documents for bidding purposes is not included.
1.8 Project Management and Meetings - Provide project management to ensure
adherence to the project schedule and budget and to document all
communication between Psomas and the District. Psomas will conduct and
document meetings at project kick-off, 50% and 90% design review
submittals. Agendas and minutes will be prepared for all meetings.
1.9 Permit Assistance - Standard City of Yorba Linda permit conditions will be
• included in the final contract documents and will require the Contractor to
obtain the encroachment permit. Plan submittals to the City during design are
not included in the scope of work.
2.0 Bid Phase
2.1 Attend Pre-Bid fleeting- Assist the District by attending the project pre-bid
meeting.
2.2 Prepare Addenda - Assist the District by preparing any required addenda to
clarify the construction documents.
2.3 Bid Evaluation Assistance - Assist the District in review and evaluation of
the contractor bids.
Project Schedule
Since the Zone Reconfiguration and San Antonio PRS Upgrade projects are hydraulically
related, it is important to coordinate the construction period of both projects to the same
time fratnc. We have prepared a project design schedule attached as Figure 1, which
includes the schedule for both projects. We are available to begin work on the project
immediately after receiving the notice-to-proceed from the District.
C,
PS ®MAS
•
Yorba Linda Water District
Mr. Polimino
Labor Horns and Fee
Page 7
November 20, 2008
We propose to provide engineering services to complete the work as discussed above on
an hourly basis with the total fee not to exceed that shown in Table 1 attached. Our Fee
Table lists the subject project as Variance No. 1 and shows the estimated labor hours and
fees by task and total fee. The fee is computed based on our Standard Hourly Rates in
effect at the time services are rendered. Our current Standard Hourly Rate Schedule is
also attached as Table 2.
In addition to specific exclusions stated previously, this proposal does not include
preparation of SCADA programming and integration, geotechnical studies, traffic control
plans, easement legal descriptions, surveying, potholing, construction phase services,
record drawings, and other services not specifically stated herein.
If you have any questions, please do not hesitate to call me at 714-481-8061.
• Sincerely,
PS®MAS
Je
Vernon R. Weisman, P.E.
Senior Project Manager
VRN:NG:vs
Encl.
2008-11-18_YLWD_Itr prpsl_VW-NG.doc
0
• • •
FIGURE 1
YORBA LINDA WATER DISTRICT
Design Services —Zone Reconfiguradon for Areas 1, 2, and 3 Water System Improvements Project and Son Antonio Road PRS Upgrade
Project Schedule
Task Warne Duration start Finish ems 7/08 8lOe 9/08 10/08 11/98 12108 1 /09 2/09 9109 4/09 5109 8/08 7/09 9/09 9/99 10/08 11/09
212
Variance No.1 - San Antonio Road PRS Upgrade 216 days Thu 12111/08 Thu 1018109
Notice to Proceed 1 day Thu 12111/08 Thu 12/11108 tent
Prepare 50% Design Plans 20 days Fri 12/12108 Thu 1 /8/09
District Review of 50% Design Plans 5 days Fri 1/9/09 Thu 1/15/09
Prepare 90% Design Plans 17 days Fri 1/160) Mon 219109
District Review of 90% Design Plans 10 days Tue 2/10109 Mon 2123/09
Prepare 100% Design Documents 10 days Tue 2/24/09 Mon 3/9/09
District Review of 100% Design Docs 5 days Tue 3110/09 Mon 3116109
Submit Final Mylars & Contract Does 5 days Tue 3117/09 Mon 3123/09
Bid Period 28 days Tue 3124109 Thu 4/30/09
Contract Award 10 days Fri 5/1/09 Thu 5/14109
Construction Period 105 days Fri 5115109 Thu 10/8/09
P S O M A S reek � Milestone 0 Notice to Proceed
�J
• •
TABLE 1
YORBA LINDA WATER DISTRICT
Zone Reconfiguration Project
Estimated Labor Hours and Fees
2.0 Bid Phase
- -
0 0 2 0 2 0 4
$524 $0 $13,200 $0. $0
$13,724
Subtotal Task 3.0
0 0 2 0 2 0 4
$524 $0 $13,200' $0 - $0
$13,724
P.E. - Project Engineer ($144ar)
S.E. - Staff Engineer ($117mv)
CADD - Lead CAD Designer ($1la"
2.1 Attend Pre -Bid Meeting
_... ...a._- -- - -- - --
-
0 2 2
- -. .._ _.
0
..
0
--
0
--
4
- -
$838
'--
$0
SO
$0
$p
$636
22 Prepare Addendum
0 2 8
0
2
0
12 _
$1,736
$0
--
$0
-
$0'
--
$0
$1,736
2.3 Assist in Evaluation of Bids
we
0 1 2
0
0
0
3
$462
$0
$0
$0
$0
$402
$0
Subtotal Task 2.0
0 5 12
0
2
0
19
$2,934
$0
$0
$0;
$0
$2,634
30 Palliating Services
3.1 PoMoOng of hosting utilities at 10 Locations
- -
0 0 2 0 2 0 4
$524 $0 $13,200 $0. $0
$13,724
Subtotal Task 3.0
0 0 2 0 2 0 4
$524 $0 $13,200' $0 - $0
$13,724
Variance No. 1 - San Antonio Road PRS Upgrade
peownas
P.I.G. - Principal In Charge 8 DAICC ($1968n)
Pothole (Widerwound Solutions)
P.M. - Project Manage (51741hr)
aectilol (Momeaftam)
P.E. - Project Engineer ($144ar)
S.E. - Staff Engineer ($117mv)
CADD - Lead CAD Designer ($1la"
Vt -1 - Design Phase
VI-1.1 I Utility Records Research
0
0
0
4
0
0
4
$468
$0.
$0
$0
we
$682
VIA-2 Perform Hydraulic and Structural Calculations
_ 0
1
16
0
0
0
17
$2,478
$0
$0
$0
$0
$2,478
V7 -1.3. Site Visit/ Prepare Base. Mapping -_
0
0
4
0
4
16
24
$2,552
$0
$D
$0
60
$2,552
Vt -1.4 Prepare PrNimbiary Design (50%) Plans
0
2
8
0
8
12 _
30
$3,572
$0
$0.
$7,650
$165
$5,387
V11-1.5 Prepare 90% Plans, Specifications and Estimate
0
4
24
0
12
32
72
$8,576
$0
$0
$8,050
5220
V1 -1.6 Prepare 100% Plans, Specifications and Estimate
0
2
10
0
8
20
40
$4,612
$0
$0
$3,190
$220
_$14,848
$8,022
VI-1.7 Provide I" Deliverables
0
2
2
0
4
6
18
$t,860
80
$0
-$0
$220
$2,080
VI-1.8: Project Management and Meetings
-
2
4
10
0
0
0
18
$2,528
$0
$0_
$0
$55
$2,599
V1 -1.9• Permit Assistants
0
1
4
8
0
0
13
$1,686'
$0
.so
$0
$110
$1,809
Sub -Total Task VIA
2
16
78
12
- 36
Be
232
$28,332
$0
$0
$10,890
$1,210
$40,465
1.2 - Bid Phase
V7-2.1 - Attend Pre -Bid Meeting
0
2
2
0
0
0
4
$636
$0
$0
$0
$0
$636
VI- 2.2 'PrepareAddendum
0
1
6
0_
2
0
11
$1,562
$0
$0
$0
$0
$1,562
Vi-2.3 Assist in Evaluation of Bids
0
1
2
0
0
0
3
$462
$0
$0
$0,
$0
$462
Sub -Total Task V1.21
0
4
12
0
2
0
18
$2,860,
$0
$o
$0
$0
$2,650
Subtotal Variance No. 1
2
20
12
0
2 -
0
18 1
$30,992
$0
$0
$10,890
$1,210
$43,125
Total Estimated Hours and Fee
11
75
170
82
194
170
684 1
$113,308
$15,270
$13,200
$10,890 -
$4,100
$156,801
Psomas
peownas
P.I.G. - Principal In Charge 8 DAICC ($1968n)
Pothole (Widerwound Solutions)
P.M. - Project Manage (51741hr)
aectilol (Momeaftam)
P.E. - Project Engineer ($144ar)
S.E. - Staff Engineer ($117mv)
CADD - Lead CAD Designer ($1la"
Des - Designer ($948u)
Psomas
• TABLE 2
HOURLY RATE SCHEDULE
For services by Psomas
Effective through December 31, 2008
Water and Wastewater Engineering Services
$
65-$ 85
Administrative Assistant
$
65-$ 90
Engineering Assistant
$
70 - $100
CAD Designer
$
80 - $120
Lead CAD Designer
$
80 - $125
Civil Engineer Designer
$ 90 - $130 Professional Engineer/Surveyor
$120-$160 Project Engineer/Project Surveyor/Senior Environmental Scientist
$120-$195 Senior Project Engineer
$150-$190 Project Manager
$165-$230 Senior Project Manager, QA/QC Manager, Principal-In-Charge
$210-$235 Two-Man Survey Crew
• . Standard computer and technology costs are incorporated into these hourly rates, as
well as direct labor, overhead, fringe benefits and fee.
• Survey and other specialty equipment will be charged at a per unit per day rate.
• Expert witness testimony is two times the normal rate.
• Per Diem is calculated at current State Department of Transportation rates (or other
appropriate Agency rate).
Reimbursables
Mileage at $0.585 per mile (or current IRS allowable rate) and parking expenses incurred by
office employees are charged at cost. Prints, plots, messenger service, subsistence, air travel, and
other direct expenses will be charged at cost plus ten percent. The services of outside consultants
will be charged at cost plus fifteen percent.
C7
ITEM NO.
AGENDA REPORT
• Committee Meeting Date: December 4, 2008
To: Planning Engineering Operations Committee
From: Michael A. Payne, General Manager
Staff Contact: Ken Vecchiarelli, Assistant General Manager
Leon de los Reyes, Water Quality Engineer
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 3.2M
Funding Source: Water Revenue Bond
CEQA Account No: 101-2700 Job No: 200711
Compliance: Assessment Pending Estimated Costs: $550.00 Dept: Eng
Subject: License Agreement with Orange County Water District for Access to
Warner Basin Complex to Collect Water Quality Samples
SUMMARY:
The District is required by the State Department of Public Health (DPH) to collect and analyze
water quality samples from Orange County Water District's (OCWD's) Conrock Basin. OCWD
requires the execution of a License Agreement in order to access its property for sample
collection.
is DISCUSSION:
As part of the District's long-term goal of increasing groundwater production, efforts continue to
gain approval to construct a second well at the site of Well No. 11, near to OCWD's Conrock
Basin. Per DPH requirements, the District must perform a series of water quality tests on Well
No. 11 and on nearby surface-water bodies, including the Santa Ana River and Conrock Basin.
OCWD requires the execution of a License Agreement, documentation of insurance and
payment of a license fee of $550 in order to access its property for sample collection.
A copy of the License Agreement is attached. Staff has reviewed the agreement and
recommends approval.
PRIOR RELEVANT BOARD ACTION(S):
September 11, 2008: Authorize a Professional Service Agreement with Camp, Dresser &
McKee, Inc. in the amount of $179,500 for hydrogeologic services to evaluate two potential well
sites, provide well-hole design, specifications, observation and inspection services for two new
groundwater wells.
STAFF RECOMMENDATION:
That the Board of Directors authorize execution of the License Agreement with Orange County
Water District for access to the Warner Basin Complex to collect water samples, and to approve
payment of $550 license fee to OCWD.
4.
• LICENSE AGREEMENT
(YORBA LINDA WATER DISTRICT)
(WARNER BASIN COMPLEX)
This License Agreement ("License") is made and entered into as of ,
2008 by and between the ORANGE COUNTY WATER DISTRICT, a political subdivision of
the State of California organized under Chapter 924 of the Statut6k, of 1933, as amended
("OCWD"), and YORBA LINDA WATER DISTRICT, a special governmental district of
the State of California ("Licensee").
PART I
a
FUNDAMENTAL LICPPISE TERMS
1.1 License: OCWD hereby issues to Licensee a License togenter upon the following real
property owned by OCWD, for the purpose or activity specific in Paragraph 1.1.2:
1.1.1 Licensed Property: 4060 . La Palma Avenge, Anaheim, CA., Conrock Basin,
as shown on the map included as aft IV attached hereto ,and incorporated herein by this
reference ("Premises").
1.1.2. Use of Premises: For and during the :term of this License, and any extension or
• renewal thereof, Licensee shall use the i rdm ses solely and exclusively for the following
purpose(s) or activity(ies) to collect water samples.`
1.2 Term: Thig ILicense shall commence on December 17, 2008 ("Commencement Date")
and shall continue to and terminate of 11:59 yp.m. lgiral time on December 31, 2010 ("Expiration
Date"). This License and the Licensee's rireunder may not be extended beyond the
Expirationbate unless-such extension is set forth in writing and signed by both OCWD and the
Licensees Notwithstanding the foregoing or any other provision of this License, either OCWD or
Licensee, may terminate thi`s` License with or without cause, or for any reason, at any time, by
giving the' other party a ten (10) days written notice of termination.
BY PLACING ITS IN ITIALS HERE, LICENSEE ACKNOWLEDGES THAT IT
HAS REAM AND UDERSTANDS THE PROVISIONS OF THIS LICENSE
THAT ALLOW OCWD TO TERMINATE THIS LICENSE AT ANY TIME WITH
OR WITHOUT CAUSE AS SET FORTH HEREINABOVE.
Licensee:
1.3 License Consideration: As consideration for the issuance of this License, Licensee shall
pay to OCWD the sum of FIVE HUNDRED FIFTY DOLLARS ($550.00) payable prior to
entering the Premises ("License Fee") in accordance with Part II (General Provisions).
131/022499-0016
949607.01 al 1/18/08
k
1.4 Notices and Payments: All payments, notices and other writings required to be
• delivered under this License to either party shall be delivered in accordance with the provisions
of Part II ("General Provisions"), to OCWD at the address set forth in Part II, and to Licensee at
the address set forth in this Part 1.
•
1.5 Attachments: This License incorporates by reference the following Attachments to this
License:
By:.
Michael R. Markus P. t.'.
General Mhnager
i
x"
APPROVED AS TO ORM:
RUTAN & TUCKER, LLP.
Part I: Fundamental License Terms
Part 11: General License Provisions
Part III: Special License Provisions
Part IV: Map of the Premises
1.6 Integration: This License represents the entire ua si.ding of OCWD and Licensee as
to the License and all other matters contained herein. V 1pno?'oral or written understanding
shall be of any force or effect with regard to those nutters cov ed by this Licensed This License
supersedes and cancels any and all previous negotiations, arran t'. ents, agreemenWs or
understandings, if any, between the parties, and none shall' be use` interpret this License.
IN WITNESS WHEREOF, the parties have executed and entered into this License as of the date
first set forth above.
ORANGE COUNTY WATER DISTRICT ORBA,LINI A WATER DISTRICT
ti
B B°
Stephen R. Sheldon, President ,,VName:
Title:
General Counsel, Orange County Water
District
By:
Name:
Title:
[Note: Licenses issued to corporations
require the signature of two corporate
officers]
131/022499-0016
949607.01 all/18/08 -2-
4
Licensee Information:
• Address for Notices:
1717 E. Miraloma Ave.
P.O. Box 309
Placentia, CA 92885-0309
Attn: Ken Vecchiarelli
Telephone Number: (7ol,4) 701-3102
Fax No.: (714) 70,1 1084t~
Email Address: kvec@ylwd.com
P
Y. ~
•
131/022499-0016
949607.01 a11/18/08 -3-
•
•
PART II
GENERAL LICENSE PROVISIONS
2.1 Pavment of License Fee
2. 1.1 Transmittal of Pavments: Licensee shall make all License Fee payments, and pay
all other sums due under this License, in lawful money of the United States, by check
payable to "ORANGE COUNTY WATER DISTRICT," and sbill=personally deliver or
mail all payments without any notice or demand to OCWD, at the address set forth in
Paragraph 2.8.1 below. Licensee assumes all risk of loss`or late payment if any payment
is made by mail.
2.1.2 No Offsets: All License Fees and other, pms due`under this License shall be paid
I I, without offset or deduction, and shall be deemed payments on account. Neither the
payment by Licensee nor the acceptance lsy OCWD of any License Fee or other sum in
an amount which is less than the amount due andThyable pursuant to this License, nor
F
the issuance of a monthly statement showing as due and payable an amount less than is
properly due and payable pursuaiif to the terms of this License, shall constitute an
agreement by OCWD modifying this License or a waiver gf OWD's right to receive all
sums provided for in this License. No endoroerrtent or state ient on any check or any
letter accompanying any check or payment shall be deemed an accord or satisfaction, and
OCWD shall accept all checks and payml~ is from LWensee without prejudice to
OCWD's right to recover the'balance of 4amount due or to pursue any other remedy in
this Licensegor otherwise provided by law.3
2.2 Charizes for Pavment of License.Fee
f
X2.2:1 If any payment of any License Fee or any other sum due OCWD is not received
600 by;OCWD within ten (10) days after the due date, Licensee shall be deemed delinquent in
its -License Fee payment and elate charge of one and one-half percent (1.5%) of the
delinquent amount, plus+the sum of One Hundred Dollars ($100.00), shall become
immediately due and payable to OCWD. An additional charge of one and one-half
percent (1.56/o)' of such delinquent License Fee payment (excluding late charges) shall be
added for each additional calendar month (or portion thereof) that the delinquent sum
remains unpaid.
2.2.2 Licensee and OCWD hereby acknowledge and agree that such late charges do not
represent and shall not be deemed to be an interest payment, but that such late charges
represent a fair and reasonable estimate of the costs and expenses that OCWD will incur
by reason of Licensee's late payment.
•
131/022499-0016
949607.01 al 1/18/08
-4-
4
2.2.3 Acceptance by OCWD of any delinquent License Fee payment or late charge
. shall in no way constitute a waiver of Licensee's default with respect to such overdue and
delinquent payment, or in any way impair, prevent or restrict OCWD from exercising any
of its rights or remedies set forth in this License or otherwise provided at law.
2.3 Use of Premises
2.3.1 Conditions of Use: For and during the term of this License, and any extension or
renewal thereof, Licensee's use of the Premises shall be subject.to OIF following
conditions, covenants and restrictions:' `
2.3.1.1 Except as provided in this License, tl a Premiss shall be used only for
the purposes specified in Paragraph 1.1.2,a6bve, pd the Premises shall not be
used for any other use or purpose whatsoever, without the prior written consent of
OCWD.
2.3.1.2 Licensee shall not cause, permit: or suffer any "hazardousiaterial,"
"hazardous waste" or "hazardous chemicals" as: those terms are used in CERCLA
(42 U.S.C. § 9601(14)) or'j''ARA (42 U.S.C. §410211(e)) or any similar Federal,
State, or local law, statute, ordinance, regulation or orde° or otherwise determined
by OCWD, to be brought up( p, left, used®or abandoned on the Premises.
• 2.3.1.3 Licensee shall not ma in, commit or permit the maintenance or
commission of any waste or any isance (as defined in California Civil Code
sectigh 3479) on the Premises, and ~icensee shall not use or permit the use of the
Premises for any unlawful purpose.
2.5 OCWD or its authorized'representative shall have the right at all
reasonable times to enter upon the Premises and inspect the general condition of
,4g
the Premises to determine; if Licensee is complying with the terms, conditions,
requirements and provisions of this License.
2.3.2 Unties and Services: Licensee shall be solely responsible for obtaining all utility
service and for the p4ynent of all utility charges, including but not limited to water and
power, supplied tp-the Premises.
2.3.3 Permits and Annrovals: Licensee shall obtain any and all governmental permits,
approvals, licenses or other authorizations which may be required in connection with the
use of the Premises as set forth in this License. No approval or consent given under this
License by OCWD shall affect or limit Licensee's obligations hereunder, nor shall any
approvals or consents given by OCWD, in its capacity as a party to this License, be
deemed to be approval as to compliance or conformance with any applicable
• governmental codes, laws, orders, rules or regulations.
131/022499-0016
949607.01 all/18/08 -5-
2.4 Insurance: Without limiting Licensee's indemnification obligations, Licensee shall not
• enter or occupy the Premises until Licensee has obtained all of the insurance required herein
from a company or companies licensed to do business in the State of California and acceptable to
OCWD, and Licensee shall maintain all such insurance in full force and effect at all times during
the term of this License and any extension or renewal thereof. Insurance shall be placed with
insurers having a current A.M. Best rating of no less than A-:VII or equivalent or as otherwise
approved by OCWD.
+~~Y
2.4.1 Licensee shall take out and maintain the following ins
ance~~
2.4.1.1 Workers' Compensation and Emplov&,S Liabllity Insurance: Licensee
"',i IF ~
shall cover or insure under the applicable laws #,lating to , porkers' compensation
insurance all of its employees working on or dbott the Premises, in accordance
with the "Workers' Compensation andiTnsurance Act," Division 1'V, of the Labor
Code of the State of California andiany Acts am tidatory thereof." *ei see shall
provide worker's compensation insurance and . lbker's liability,insurance with
limits not less than One Million Dollars ($1;000,000) each occurrence, One
Million Dollars ($1,000,0PO)edisease policy limit,,and One Million Dollars
($1,000,000) disease each employee. Such policy of wgrkers compensation
insurance shall contain the following -separate endorsements:
(a) "Insurer waives1 ill rights of subrogation against the Orange
r 4 $
County Water District, its officerss;directors, employees, representatives and
volunteers."
(b) "This insurance poli
Ycy shall not be suspended, voided, reduced in
coverage or in limits, cancelled ignited, non-renewed or materially changed for
E
any reason by the insurer until thirty (30) days after receipt by the Orange County
Water District of a writtiotice of such cancellation, limitation or reduction of
"w
coverage.
2:4:1.2 Comiiiercial General Liabilitv Insurance providing coverage in the
E
follo!ving mimum limits:
nE gae~.
(a) Combined single limit of Two Million Dollars ($2,000,000) per
occurrence for Bodily Injury, Personal Injury or Death and Property.
(b) Damage Coverage shall be at least as broad as Insurance Services
Office (ISO) Commercial General Liability coverage (occurrence Form CG
0001).
(c) If Commercial General Insurance or other form with a general
• aggregate limit is used, either the general aggregate limit shall apply separately to
131/022499-0016
949607.01 al 1/18/08 -6-
the project/location (with the ISO CG 2503 or ISO CG 2504, or insurer's
• equivalent endorsement provided to OCWD), or the general aggregate limit shall
be twice the required occurrence limit.
2.4.1.3 Comprehensive Automobile Liabilitv Insurance. including owned, non-
owned, leased, hired, and borrowed automobiles and similar vehicles, providing
the following minimum limits:
(a) Combined single limit of One Million Dorllarq.($1,000,000) per
occurrence for Bodily Injury or Death and Property bammage.
S9dy.,
'h
E&d
(b) Coverage shall be at least as brdhd' as Insurance Services Office
(ISO) Business and Auto Coverage (Form,(,'&Ql) covering any auto.
2.4.2 Endorsements: The policies of liability insurance provided for''iri Paragraphs
2.4.1.2 and 2.4.1.3 shall specify that this specif c Licens6js insured and that coverage for
injury to participants resulting from Licensee's actitritie 4s not excluded, and shall be in a
form satisfactory to OCWD and contain the following separate endorsements:
(a) "The Orange County Water District, its officers, directors,
employees, representatives and volunteers, are declared to be additional insureds
on all of the above policies with respects to the operations and activities of the
named insured at or from the prrnes of the Orange County Water District. The
• coverage shall contain no special` limitations on the scope of protection afforded
to the, Orange County Water Distri g,its officers, directors, employees,
representatives, and volunteers."
(b) "This insurance policy shall not be suspended, voided, reduced in
,z
coverage or in limits, canceled, limited, non-renewed, or materially changed for
any reason until thirty (3l) "days after receipt by the Orange County Water District
of a written notice of such cancellation, limitation or reduction of coverage."
(c) 'This insurance policy is primary insurance and no insurance held
or owned by-the designated additional insureds shall be called upon or looked to
cover a,lo,s' under said policy; the Orange County Water District shall not be
liable for the payment of premiums or assessments on this policy."
(d) "Any failure to comply with reporting or other provisions of the
policies including breaches of warranties shall not affect coverage provided to the
Orange County Water District, its officers, directors, employees, representatives,
or volunteers."
•
131/022499-0016
949607.01 all/18/08 -7-
(e) "This insurance shall apply separately to each insured against
• whom claim is made or suit is brought, except with respect to the limits of the
insurer's liability."
2.4.3 Evidence of Coverage: Licensee shall at the time of the execution of the License
present to OCWD the original policies of insurance required by this Paragraph 2.4 or a
certificate of the insurance, with separate endorsements (Insurance Services Office Form
CG 2026, or equivalent), showing the issuance of such insurance and the additional
insured and other provisions and endorsements required hereio,ano'copies of all
endorsements signed by the insurer's representative. All policies shall contain the
Licensee's name and location of the Premises on the cerfif cate. At least thirty (30) days
prior to the expiration of any such policy, a signed coi*ete certificate of insurance, with
all endorsements provided herein, showing that Stich insurance coverage has been
renewed or extended, shall be filed with OGWD. Licensee's insurance shall apply
separately to each insured against whom claim is made o~ Auit is brought, except with
respect to the limits of the insurer's liability.
2.4.4 Review of Coverase: OCWD shall have the right at any time to review the
coverage, form, and limits of insurance required under this License. If, in the sole and
absolute discretion of OCWD, the insuranceepirovisions in this License do not provide
adequate protection for OCWD, OCWI? shall'have~ the ri&bl to require Licensee to obtain
• insurance sufficient in coverage, form aud:l mits to provide adequate protection and
Licensee shall promptly eoply with anysuch requirement. OCWD's requirements shall
not be unreonable, but shah be adequateh,the sole opinion of OCWD to protect
against the kind and extent of risks which may exist at the time a change of insurance is
required,~pr thereafter.
2A.5 Deductibles:, Any and all deductibles must be declared and approved by OCWD
prior to execution of this License. '
2.4 .6 .License Contingent Unon Coverage: Notwithstanding any other provision of this
License;t'10 '1s License Ali 11 be null and void at all times when the above-referenced
original policies of insurance or Certificate of Insurance or Renewal Certificates or
Endorsements` aro'not on file with OCWD.
2.5 Indemnification
2.5.1 OCWD not Liable: OCWD shall not be liable at any time for any loss, damage or
injury whatsoever to the person or property of any person or entity whatsoever, including
but not limited to any employee, agent or contractor of Licensee, resulting from or arising
out of any act or omission of Licensee or of any person or entity holding under Licensee,
or the occupancy or use of the Premises or any part thereof by or under Licensee, or any
• act or omission in the exercise of any right or the performance of any obligation under
131/022499-0016
949607.01 al 1/18/08 -8-
this License, or directly or indirectly from any state or condition of the Premises, or any
• part thereof.
2.5.2 Indemnification: Irrespective of any insurance carried by Licensee for the benefit
of OCWD, and notwithstanding any other provision of this License to the contrary,
Licensee shall indemnify and hold OCWD, its officers, directors, employees,
representatives and volunteers harmless from and against any and all actions, claims,
demands, judgments, attorneys fees, costs, damages to persons pr.property, penalties,
obligations, expenses or liabilities of any kind that may be asserted br claimed by any
person or entity (including, but not limited to, any employed agent or contractor of
Licensee) in any way arising out of or in connection w A4 this License, the operations
carried on by Licensee on the Premises or any landsJohich Lic e i ` ee has access
w; >
hereunder, or the occupation or use of the Premt es bydUcensee or erson or entity
holding under Licensee (collectively, "Clainas whether or not there is concurrent active
or passive negligence on the part of OCV , and/or acts + r which the OCWD'would be
held strictly liable, but excluding the sole active negligence' find willful misconduct of
OCWD. In connection therewith:
2.5.2.1 Licensee shall defend and, hold OCWDits off gers, employees, agents,
representatives and volunteers, harmless from any and all Claims, whether caused
in whole or in part by OCWD's,actiyo, obf passive ,negligence, and/or acts for
• which OCV D"Would be held strictly liable, but excluding any Claim that results
from the sole active negligence or willful misconduct of OCWD, its officers,
employees, agents, ororepresentatives; and Licensee shall pay all expenses and
costs, including attorneys' fees, incurred in connection therewith.
2.5.2.2 ' Licensee si all promptly pay any judgment rendered against Licensee or
OCWD,covering any Claim, and hold and save OCWD harmless therefrom,
whether such.Claim was caused in whole or in part by OCWD's active or passive
negligence, and/or acts for which OCWD would be held strictly liable, but
excluding the S le active negligence and willful misconduct of OCWD.
g~
2.5.2.3' In the event OCWD is made a party to any action or proceeding filed or
prosecuted' for or arising out of or in connection with any Claim, Licensee shall
pay to OCWD any and all costs and expenses incurred by OCWD in any such
action or proceeding, together with reasonable attorneys' fees.
2.5.2.4 All of the indemnity obligations of Licensee under this Paragraph 2.5.2,
or as otherwise set forth in this License, shall survive the expiration or earlier
termination of this License.
•
131/022499-0016
949607.01 a11/18/08 -9-
2.6 Legal Relations and Responsibilities
• 2.6.1 Nature of Relationship: OCWD and Licensee understand and agree that the only
relationship between them created by this License is that of Licensor and Licensee, and
that this License does not create, and shall not be construed to create, any agency,
partnership, joint venture, landlord-tenant or other relationship between OCWD and
Licensee.
@L33
2.6.2 Compliance with Laws: Licensee shall keep itself ful yhi"ed of all existing
and future state and federal laws and all county and city ordinances and regulations which
in any manner affect the activities of Licensee under this, Licge or the possession or
use of the Premises by Licensee, and of all such orders,#nd deci 0'of bodies or tribunals
having any jurisdiction or authority over the sam Licensee shall a1411 times observe
and comply with all such existing and future laws, ordinances, regulation, orders and
decrees, and shall protect and indemnify, p required he in, OCWD, its ofticors,
directors, employees and agents against any claim.gr liability, arising from,r based on the
violation of any such law, ordinance, regulation, order or decree, whether by Licensee or
any person or entity holding undo Licensee.
2.6.3 Assignment: The License granted hereby is personal toLicensee and any
assignment of said License by Licensee, voluntarily or by operation of law, shall
• automatically terminate this License, unless Licensee has obtained the prior written
consent of OCVVI, which may be withheld, in its sole and absolute discretion, for any
reason or no reason at all.
71
2.6.4 Acknowledment,of OCVVD's Title,, Licensee hereby acknowledges the title of
OCWD in and to the PV!3mjses, nclud t the real property fixtures and improvements
existing or erected thereon,> d Licensee hereby covenants and promises never to assail,
contest or resist OCVVD's titt c le Premises.
2.6.5, d Liens: Licens etshall ~rnaintain the Premises free from and clear of any claims,
obligations, liabilities, liens, encumbrances and charges, including but not limited to any
claims, liens or charges arising out of or in connection with the furnishing of materials or
the performance offhabor on the Premises. Licensee further shall protect and indemnify
OCWD and the, Premises from and hold them, and each of them, harmless against any
and all such claims, obligations, liabilities, liens, encumbrances and charges.
2.6.6 Possessory Interest Taxation: A possessory interest subject to property taxation
may be created by this License. It is understood and agreed that if such a possessory
interest is created, Licensee shall be responsible for the payment of all property taxes
levied on such interest, and that OCWD shall have no responsibility therefor.
•
1311022499-0016
949607.01 a11/18/08 -10-
A-
2.6.7 OCWD's Reservations
• 2.6.7.1 OCWD hereby reserves the right to grant easements and rights-of-way
for pole or tower lines for transmission of electricity, and easements, leases and
rights-of-way for telephone, telegraph, telecommunication facilities, gas, water,
sewer and oil lines, for roads and highways, and for other similar uses over and
across the Premises at any location or locations within the Premises. In the event
Licensee determines that the granting or exercise of any, such easement, lease, or
right-of-way significantly interferes with Licensee's possession or use of the
Premises, Licensee's only remedy shall be to termitte•this License upon thirty
(30) days written notice to OCWD. Licensee shall no'ftiterfere with any
easements or rights-of-way pertaining to or affeO ng the'Aremises.
2.6.7.2 OCWD hereby reserves the right to sell, transfer or otherwise dispose of
any portion of the Premises at any time.; In the &ent of such sale, fer or
disposition, and notwithstanding any oiheiproviWrt of this Licens "this License
shall, upon the close of escrow or the convey'ain
of title, terminate as to the
portions of the Premises §ld,, transferred or dispspd of, and Licensee shall
release the same from the terms of this License and $omjany encumbrance which
results from this License.
2.6.7.3 OCWD reserves the right nto itself to.fierform any and all work
• involved itiAprotecting, replenishing and/or cofiserving the basin groundwater
supply and any other, Work necessAt'y to the functions or purposes of OCWD, as
set forth in the Orange County Water District Act, Chapter 924 of the California
Statutes of 1933; as ame4dd, upon any portion or all of the Premises at any time.
Su~k~ wmrk may be performed without incurring any liability of any nature
whatsoever to Licensee, and Licensee hereby releases OCWD from, and
covenants not to sue OCW~ for, any such liability. OCWD further reserves unto
1 6
itself the righ of ingress and egress over all or any portion of the Premises.
2.6.8 Waiver of C1 s: As a material part of the consideration to OCWD under the
License, Licensee heeby waives any and all claims that it may have against OCWD
during the term, this License, or any extension or renewal thereof, for any damage to
goods, wares afid merchandise upon or about the Premises, and for any injury to
Licensee, its employees, agents, invitees, or to third parties in or about the Premises, from
any cause arising at any time.
2.6.9 Surrender of Possession: At the expiration or termination of this License, whether
with or without cause, Licensee shall promptly quit and surrender the Premises in a good
state of repair.
•
131/022499-0016
949607.01 al 1/18/08 -11-
2.6.10 Disposition of Abandoned Pronertv: If Licensee abandons or quits the Premises
• or is dispossessed thereof by process of law or otherwise, title to any personal property
left on the Premises for fifteen (15) or more days after such event shall at OCWD's
opinion, be deemed to have been abandoned and transferred to OCWD. OCWD shall
have the right to remove and dispose of any and all such property without liability
therefor to Licensee or to any person or entity claiming under Licensee, and OCWD shall
have no duty to account for such property. Licensee agrees to reimburse OCWD for any
and all costs associated with OCWD transferring or disposing,otticensee's personal
property pursuant to this Section.
2.6.11 Premises "As-Is": Licensee acknowledges tthe Premises are being provided
to Licensee on an "as-is" basis, and Licensee takes,and'ccupies the, Premises without
reliance upon any representation by OCWD, or any of its officers, employees, agents or
representatives, or any other person, concerning the Premises, their fitness for Licensee's
intended use or any other particular purpose of use, them income-producing history,
potential or capabilities, their value, or any other promise,'rehresentation of inducement
not expressly set forth in this License.
2.6.12 No Representation or Warrantv,Concernins Premises -,,o Licensee acknowledges
that neither OCWD, nor any of its officers, employees, agents or representatives, has
made any written or oral representation, promise, or vvarrgnty, expressed or implied,
• concerning the Premises, their fitness for Licensee's intended use or any other purpose or
use, their income producing history, potential or capabilities, their value, or any other
matter not e?~Oressly set forth in this Licen e.
2.6.13 Disputes: In4he event that any action is commenced by a party to this License
against the other to enforce its rights or obligations arising from this License or seeking
to interpret this License, the prevailing party in such action, in addition to any other relief
ar d recovery ordered by the court, shall be entitled to recover all statutory costs, plus
reasonable attorneys'; fees. Shbuld OCWD be named in any suit brought by any third
party against License in connection with or in any way arising out of Licensee's
occupancy or.use of the Premises under this License, Licensee shall pay to OCWD its
costs and expenses incurred in such suit, including reasonable attorneys' fees.
2.6.14 Security Measures: Licensee acknowledges that the Premises are licensed to
and accepted by Licensee in an "as-is" condition, and that the License Payments and
other sums payable from Licensee to OCWD hereunder do not include the cost of
security guard or any other security services or measures. Licensee further acknowledges
that OCWD makes no representation or warranty, express or implied, regarding the
security of the Premises or the need for or propriety of any security measures at the
Premises; and Licensee further acknowledges that OCWD shall have no obligation
• whatsoever to provide guard service or any other security measures. Licensee expressly
131/022499-0016
949607.01 a11/18/08 -12-
assumes all responsibility for the protection and security of the Premises, Licensee, its
• agents, employees, invitees and property within the Premises from any and all acts of any
third party.
2.6.15 No Obligation to Third Parties: Execution and issuance of this License shall not
be deemed to confer any rights upon, directly, indirectly or by way of subrogation, nor
obligate either of the parties hereto to, any person or entity other than OCWD and
Licensee.
2.6.16 Waiver: Any waiver by any party of a breach of any provision of this License
shall not be deemed a continuing waiver or a waiver of any subsequent breach whether of
the same or of another provision hereof.
2.6.17 OCWD's Liabilitv on Termination: Lieensee hereby waives all-damages or
claims for damage that maybe caused by any action of~OCWD in terming,g.this
License (either with or without cause), ortaking possession of the Premise Aas provided
in this License or at law, and Licensee waives alltclaims for damages to or loss of such
property of Licensee as may be in, or upon the Premises upon the termination of this
License.
2.7 Maintenance and Repair of Premises
2.7.1 Licensee's Obliption to Mamt'ano*emises: Licensee shall at all times during the
• term of this License, and any extension ors renewal thereof, at its sole cost and expense,
removes allcfash and debris from the Preriles. Licensee shall also keep and maintain in
good condition and h. substantial repair (ally p the satisfaction of OCWD in its sole
discretion),.tl a Premises 'and ally ppurten ° ces and every part thereof, including
im ovements of any kind `erected, installed or made on or within the Premises. Licensee
shall at all times in the maintenance, and use of the Premises and the buildings, structures,
facilities, improvemz is and equipment thereon, comply with all laws, ordinances and
regulations pertaining thereto, and all conditions and restrictions set forth herein.
Licensee' expressly agrees to maintain the Premises in a safe, clean, wholesome, and
sanitary condition and~ free of trash and debris, to the complete satisfaction of OCWD and
in compliance v iitll all applicable laws.
2.7.2 Licensee's Default of its Maintenance Duties: In the event that Licensee fails,
neglects or refuses to remove trash or debris deposited by Licensee or its invitees on the
Premises or to maintain or make repairs or replacements as required by this License,
OCWD shall notify Licensee in writing of such failure or refusal. Should Licensee fail or
refuse to correct such default within ten (10) days of receipt of such written notice from
OCWD, OCWD may, but shall not be required to, itself or by contract, undertake the
necessary maintenance, repair or replacements; and the cost thereof, including but not
• limited to the cost of labor, materials and equipment and procurement of insurance, plus
131/022499-0016
949607.01 al 1/18/08 -13-
an administrative fee in the amount of fifteen percent (15%) of the sum of such costs,
• shall be paid by Licensee to OCWD within ten (10) days of Licensee's receipt of a
statement of such costs from OCWD. Any such maintenance, repair or replacement by or
on behalf of OCWD shall not be deemed to be a waiver of Licensee's default under this
License, and shall not in any way impair, prevent or restrict OCWD from exercising any
of its rights or remedies set forth in this License or otherwise provided at law.
2.8 Miscellaneous
2.8.1 Notices: Any notice, payment or instrument requ r d or permitted to be given or
delivered by this License may be given or delivered by#iso4#delivery or by depositing
the same in any United States mail depository, first cuss postage praid, and addressed
as follows:
jq,
~a
If to OCWD:
If by mail: ORANGE COUNTY WATER DISTRICT
P.O. Box 8300
If by personal delivery:
•
If to Licensee:
is
Fountain Valley, CA, 92728-8300
Attn: Property Managdmght
ORANGE COUNTXIVVATER DISTRICT
1h0 Ward Street
Fountain Valley, CA 92708
Attn I Property Management
To sucli name and address set forth for Licensee in
Part I of this License,
f
or such other person or address as either party may direct in writing to the other;
provided, however, that such new or different person or address shall not become
effec0e,until acknowl aged in writing by the party to who directed. Except where
service`iq y personatolivery or by registered or certified mail, return receipt requested,
service of `any instrument or writing shall be deemed completed forty-eight (48) hours
after deposit in a. United States mail depository.
w
2.8.2 Warrantv of Authoritv: Each officer of OCWD and Licensee affixing his or her
signature to this License warrants and represents by such signature that he or she has the
full legal authority to bind his or her respective party to all of the terms, conditions and
provisions of this License, that his or her respective party has the full legal right, power,
capacity and authority to enter into this License and perform all of its provisions and
obligations, and that no other approvals or consents are necessary in connection
therewith.
131/022499-0016
949607.01 all/18/08
-14-
2.8.3 Headings: The titles and headings of Sections and Paragraphs of this License, as
• herein set forth, have been inserted for the sake of convenience only, and are not to be
taken, deemed or construed to be any part of the terms, covenants or conditions of this
License, or to control, limit or modify any of the terms, covenants or conditions hereof.
2.8.4 Time of Essence: Time is of the essence of this License. Failure to comply with
any requirement, including but not limited to any time requirement, of this License shall
constitute a material breach of this License.,
2.8.5 Construction and Amendment: This License shall be construed, interpreted,
governed and enforced in all respects according to the l vs of tlip. State of California and
as if drafted by both OCWD and Licensee. No amend*nt, char 6 or modification of
this document shall be valid unless in writing, stafli glq t it amends, changes or modifies
this License, and signed by all of the parties hereto.
2.8.6 Successors: Subject to the provisions' Paragrap*g.6.3 above, thi s s License, and
~
all of the terms, conditions and provisions herein; %shall inure 'lo the benefit of, and be
binding upon, OCWD, Licensee, and their respective successors and assigns.
2.8.7 Re-Entry: No entry or re-entry into the Premises by'Gi WD shall be construed as
an election to terminate this License,.unless prior thereto or oncurrently therewith
written notice of intent to terminate is tivenby OCWDAQ1Licensee. OCWD's entry into
• possession of the P mise9 without hav!4 elected to terminate shall not prevent OCWD
from making s u fi an election and giving'Licensee notice thereof.
2.8.8 Partial Inv dity: )'faany term, covenant, condition or provision of this License is
held by,a;court of competent jurisdictio t~ be invalid, void, illegal, or unenforceable, the
re trader of the provisions hereof shall remain in full force and effect and shall in no
4ay affect, impair,. or invalidate any other term, covenant, condition or provision
t contained in this License.
2.8.9 ? Further Assurances: Each of the parties hereto shall execute and deliver any and
all additinna.ypapers, documents and other assurances and shall do any and all acts and
10
things reaso 4ly r c
essary in connection with the performance of their obligations
hereunder and to,carry out the intent of the parties hereto.
ti'
2.8.10 Precedence: In the event of any conflict between Parts of this License, Part I
shall prevail over Parts II, III and IV, and Part III shall prevail over Part II.
•
131/022499-0016
949607.01 al 1/18/08 -15-
t
s
PART III
• SPECIAL LICENSE PROVISIONS
3.1 Additional Conditions of Use: The following are added to Paragraph 2.3.1, as additional
conditions to the use of the Premises:
2.3.1.5 Licensee shall provide OCWD with a copy of the Water Quality reports for
samples taken from the Premises.
3.2 Additional Insurance: The following are added to Paragral'~.4, as additional conditions
of Insurance of the Premises:
2.4.7 Licensee may submit a letter of self-insure On lieu of a cartaificate of insurance
in a form acceptable to OCWD.
F
~ +e
ax
e~`1
•
131/022499-0016
949607.01 all/18/08 -16-
s
r
•
C7
•
;r
131/022499-0016
949607.01 a11/18/08
PART IV
MAP OF THE PREMISES
-17-
ITEM NO.
AGENDA REPORT
Committee Meeting Date: December 4, 2008
To: Planning-Engineering-Operations Committee
From: Ken Vecchiarelli, Assistant General Manager
Staff Contact: Leon de los Reyes, Water Quality Engineer
Steve Conklin, Contract Engineer
Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 11.2M
Funding Source: Water Revenue Bond
CEQA Account No: 102-2700 Job No: 200309
Compliance: Mitigated Neg. Dec. Estimated Costs: $ 11.2M Dept: Eng
Subject: Progress Payment No. 7, and Change Order No. 1 for the Highland Reservoir
Replacement Project
SUMMARY:
The Board of Directors awarded a contract to Schuler Engineering for construction of the
Highland Reservoir Replacement Project on April 10, 2008 and approved a project construction
budget of $11.2M on May 15, 2008. Submitted for consideration are construction Progress
Payment No. 7 and Change Order No. 1.
DISCUSSION:
In accordance with the contract documents, Schuler Engineering Corporation submitted a
request for Progress Payment No. 7 for the period ending November 30, 2008. This progress
pay request includes small percentage payments for shoring and sheet bracing, mobilization
including project related office expenses and submittals, 26 % of electrical and instrumentation,
47% underground yard piping including piping connections to the Highland Booster Pump
Station, and 24% of temporary tank related tasks such as tank #2 assembly, and overflow and
drain piping structures.
Moreover, in accordance with the contract documents, Schuler Engineering submitted Change
Order No. 1 due to modifications and field-changed conditions encountered during the course of
construction from June to October 2008. Change Order No. 1 comprises credits to the District
for changed and deleted mobilization, office equipment deletions, material substitution and
addition under the sloped portion of foundation, deletion and substitution of construction
materials under the temporary tanks, and a credit to the District for payment of Schuler's
geotechnical services cost due to the latter's delay in executing a geotechnical contract.
In addition, it also includes:
• a 4-inch diameter French drain work, as recommended by our geotechnical engineer, to
mitigate wet soil condition encountered around Temporary Tank No. 1,
• a changed field condition related to the existing 30" Zone-1 pipeline connection. This
eliminates the siphon design condition at 3.6 feet (about 360,000 gallons) reservoir water
level, thereby increasing reliability and maximum use of reservoir capacity
• encasement of the 30" storm drain due to its proximity to the Temporary Tank #1
r
• two air relief valves due to pipeline alignment changes in the bypass and meter vaults
See attached Summary of Change Order No. 1 for additional details regarding the items
included in the change order. If further information is desired beyond that attached, a more
detailed breakdown of items in the change order is available at the office of the staff contact for
the project.
The status of the construction contract with Schuler Engineering is as follows:
• The current contract is $9,049,346 and 730 calendar days starting June 2, 2008.
• If approved, Change Order No. 1 adds $183,648.89 (a 2.03% cost increase) and 10
calendar days (a 1.37% time extension).
• If approved, the revised construction contract amount is $9,232,994.89, and 740
calendar days.
• If approved, Progress Payment No. 7 is $409,918.62 (4.5% of total contract amount less
10% retention of $40,991.86, for a net payment of $368,926.76
• If approved, total progress payments to date including retentions are $2,951,564.01
(32.6% of the total contract amount).
• As of November 30, 2008, 182 calendar days were used (25% of the contract time).
Staff and Carollo Engineers, the District's construction management consultant, reviewed the
progress payment request, change order, and recommend payment and approval respectively.
A copy of Progress Payment No. 7 and Change Order No. 1 are attached for your information.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors awarded a construction contract to Schuler Engineering on April 10,
2008 in the amount of $9,049,346 for construction of the project. On May 15, 2008, the Board
approved execution of a Professional Service Agreement with Carollo Engineers in the amount
of $605,856 for engineering support services, construction management and backup inspection
services; a Professional Service Agreement with Leighton Consulting Engineers in the amount
of $86,200 for geotechnical services, soils, concrete and materials testing; a Professional
Service Agreement with BonTerra Consulting in the amount of $22,251 for environmental
compliance services; and approved the construction budget in the amount of $11,200,000 for
construction of the Highland Reservoir Replacement Project. The Board has approved six
progress payments to date, the most recent of which was approved on November 12, 2008.
STAFF RECOMMENDATION:
Staff recommends the Board of Directors approve Progress Payment No. 7 in the net amount of
$368,926.76 to Schuler Engineering Corporation and 10% retention of $40,991.86 deposited to
Citizens Business Bank escrow account, and Change Order No. 1 for $282,102.89 for
construction of the Highland Reservoir Replacement Project, Job No. 200309.
COMMITTEE RECOMMENDATION:
YORBA LINDA WATER DISTRICT PROGRESS PAY REPORT
PROJECT Highland Reservoir PROGRESS PAY REQUEST NO. 7
LOCATION Yorba Linda PROJECT NO. ,1- PAGE 1 OF 1 PAGES
200309!
CONTRACTOR Schuter Engineering DATE Nov. 30,2008
ORIGINAL CONTRACT AMOUNT: $ 9;040,348
AUTHORIZED CHANGE ORDERS $
REVISED CONTRACT AMOUNT: S 9,049,340
PROGRESS PAY ESTIMATE FOR PERIOD
VALUE OFWORK'COMPLETED
CHANGE ORDER WORK COMPLETED
TOTAL VALUE OF WORK COMPLETED
LESS RETENTION 1"0°%
LESS OTHER DEDUCTIONS
AMOUNT DUE THIS ESTIMATE
LESS AMOUNT PREVIOUSLY-PAID
BALANCE DUE THIS ESTIMATE
November 1.2008 TO November 30, 2008
PREVIOUS TEAS MONTH TO DATE
$ 2;541,845.391 S 409,918.62 $ 2;951,564.01
$ - IS -
3 2541.645.3'91 $ 4091918.6211 1851.564:01
$ 295.156.40
:S -
$ 2,656,407.61
$ 2;287:480AS
$ 3W,928.7.6
NOTICE TO PROCEED- June Z2008
COMPLETION TIME 730 CALENDAR DAYS
APPROVED TIME EXTENSIONS CALENDAR DAYS
TOTAL CONTRACT TIME 730 CALENDAR DAYS
TIME EXPENDED TO DATE 182 CALENDAR DAYS
TIME REMAINING 848 CALENDAR DAYS Ilk
REQUESTED BY-
C U ER ENGINES IR NGCDNTRACTO,R
APPROVED 8Y:
CAA)5LLO-OWNER°S- REPRESENTATIVE
APPROVED BY:
' YLWD- OWNER
DATE: //A (s1 f c/
DATE ! 7
DATE:
+INCREASE
CONTRACT
f OR
TIME
EXTENSION
- DECREASE IN
OR -RE[IUCWN
CONTRACT
(DAYS)
AMOUNT
($i
-$8,121.81
0 days
-$9,172.00
0 days
-$3,308.00
0 days
$14,424.00 2 days
$143,763.00 7 days
$19,274.00 1 days
-$3,010.50 0 days
$29,800.00 0 days
NET CHANGE $183,648.89 10 days
7
REVISED CONTRACT AMOUNT AND TIME $9,232,894.89 7 40 days
~ 1 ~-zG-oy
YORBA LINDA WATER DISTRICT
CHANGE ORDER NO. 1
DATE 11126108
Page 1 of 2TM
CONTRACT NAME: Highland Reservoir CONTRACT AMT.: ~ 9,049,348.00 DAYS: 7,30
Replacement
CONTRACT NO.: J-200309 PREV. APPRVD. CHANGES: $ 0.00 DAYS: 0
CONTRACTOR: Schuler Engineering THIS CHANGE: $183,648.89 DAYS: 10
OWNER: Yea Linda Water District REVISED CONTRACT $9,232,994.89 DAYS: 740
This Change order covers changes to the subject contrail as described herein. The Contractor shall construct furnish equipment and mater>als.
and perform' all wont as necessary or required to complete the Change Order items for a dump sum price agreed upon between the Contractor
and Yorbs Linda Water District otherwise referred to as Owner.
DESCRIPTION OF CHANGES
COP 1`: Credit for Specification Section 01500 deletions and changes
COP- 8: Credit for Class 11 Base on slopes
COP 8: Credit for deletion of oiled sand under TT1 & 7172
COR 2: French drain at TT1 due to possible reservoir leak
COR 3: potholing tie-in changes
COR 8: SD lines near TT1 encasement
COP 13: Geotechnical cost
COP 15: Air relief valves @ Bypass & Meter vaults
YORBA LINDA WATER DISTRICT
CHANGE ORDER NO.
DATE 11126108
Page 2 of 2
The amount of the contract wtit be increased by the sum of $ 181848.89 and the contract time shat! be increased by ten (101 calendar
days. The undersigned Contractor approves the foregoing Change Order as to the changes, If any. in the contract price specitled for each item
Induding any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of dame allowed, if
any, for completion of the entire work on account of said Change Order. The Contractor agrees to fumisth all labor and materials and perform all
other necessary work, Inclusive of Utah directly or Indirectly retated to the approved time extension, required to complete the Change Order
Items. This document will beoomea supplement of the contract and all provisions wiltapplyhereto. it is understood 8nat the Change Ord& shall
be effective wtien approved by the Owner. This change order constitutes Ul, final. and complete compensation to the contractor far all costs.
expenses, overhead, profit and any damages of ever Idnd that the contractor may Incur in connection with the above referenced dianges in
the work, including any impsof on .tine referenced "rk of any other work under the cw*g4 any changes in the sequences of any wok any
delay to any work, any disruption of 'any work, any rescheduling of any vm k, end any,01her effect-on any of the wont under this contract- By
the execution of the change order the contractor accepts the contrary price donge and the contract compfedw data change, if any, and
expressly welves any daims for any ditional comp ationt, do 77 a extensions, In connection with the above"Iwe oed changes.
RECOMMENDED: / Carollo DATE:
r / Engineers f/ 2 C -Or
ACCEPTED:
APPROVED:
i
Schuler
Engineering
Water DisWCt
DATE: --e' U .o
DATE: f;;L
Summary of Construction Change Order No. 1
Highland Reservoir Replacement Project
COP 1: Credit for Specification Section 01500 deletion and changes ($8.121.61 credit)
The contract documents require the contractor to provide computer and software credit,
shared office trailer, and miscellaneous office equipment for use by construction
management staff during construction. These were deleted from the requirements after
award and a credit was provided by the contractor.
COP 6: Replacement of Class II Base on Slopes ($9.172.00 credit)
This is a substitution of Class II Base for Class II Permeable Base on the sloped portions
of the foundation. It also requires the installation of filter/drainage fabric between the
interface of the two base materials.
COP 9: Credit for replacement of oiled sand under temporary tank-1 (TT 1) and
temporary tank-2 (TT2) with crushed rock ($3.308.00 credit)
The Contractor (Schuler) suggested that 6" layer of oiled sand under the two temporary
tanks be replaced with layer of 3/4" crushed rock, which was approved by the design
engineer (Carollo).
COR 2: French Drain at TT1 due to possible reservoir leak ($14.424.00 added cost)
A gravel and perforated-pipe drain was required around the west side of TT-1 due to the
wet soil condition encountered approximately 5 feet outside of the tank pad, believed to
be caused by leakage from the existing reservoir. District geotech engineer (Leighton)
reviewed the existing condition and made the recommendation.
COR 3: Pipeline Tie-in Changes ($143.763.00 added cost)
Based on the District's as-built pipeline information, the District's project engineer,
Carollo, designed the reservoir discharge pipeline to the 30" Zone 1 pipeline connection
with a depressed section or "siphon condition" in order to make available the full storage
volume of the new reservoir. This is a standard, long-utilized design, if gravity-flow
cannot be provided. The drawback of this design is if the siphon-flow condition is lost
due to air in the line, the remaining water in the tank below the elevation of the siphon
could not be drawn out for use. In this unlikely event for the new Highland Reservoir,
3.6 feet of water, approximately 360,000 gallons, would be left unusable until the siphon
condition was re-established.
After construction started, the contractor potholed the connection point and found that the
existing pipeline was lower than indicated in the District's as-built plans. Following
consultation with District staff and the contractor, the District's project engineer
evaluated the new information and recommended lowering about 150 feet of pipeline to
make the outlet a full gravity-flow condition, eliminating the siphon. This will improve
reliability for use of the full 6-MG volume of the'reservoir.
COR 8: Storm drain Lines near Temnorarv Tank-1 (TT 1) ($19.274.00 added cost)
This change is for concrete encasement of two storm drain lines near TT1 due to their
close proximity to the temporary tank. No encasement was called out in the original
plans.
COP 13: Geotechnical Costs ($3.010.50 credit)
Credit for geotechnical engineering service costs paid by the District which have been
determined to be the responsibility of the contractor. The issue of responsibility for these
costs for additional services has been resolved.
COP 15: Air Relief Valves at bvnass and meter vaults ($29.800.00 added cost)
Due to existing conditions in the field, alignment changes at the meter vaults and the re-
alignments of the bypass piping was required at existing pipelines south of the reservoir.
These changed conditions required the addition of air relief valves at high points and
changes in the meter vaults.
NOTE:
Detailed cost breakdowns are available for review.
I•
YLWD SOURCE WATER SUMMARY
Fiscal Year 2008-09
MONTH
Jul-08
Aug-08
Sep-08
Oct-O8
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
FYTD
GW
AF
IMPORT
AF
TOTAL
DEMAND
AF
MONTHLY
GW
%
YTD
GW
%
BUDGET
(Demand Est.)
AF
DELTA
1,535.2
1,170.0
2,705.2
56.7%
56.7%
3,005.5
-10.0%
1,610.9
1,112.0
2,722.9
59.2%
58.0%
2,954.5
-7.8%
1,481.3
974.4
2,455.7
60.3%
58.7%
2,597.9
-5.5%
1,473.7
916.6
2,390.3
61.7%
59.4%
2,190.4
9.1%
1,170.1
756.2
1,926.3
60.7%
59.6%
1,732.0
11.2%
I I I I 1 1,553.71
1 1 1 1,349.91
1 1 1,299.01
1 I 1 1 1,528.21
1 I 1 1 1,910.31
1 1 1 2,547.0 1
Allowable GW (YTD) 6,330.6 (AF)
CUP Obligation FY 2008-09 2,166.0 (AF)
Monthly CUP Pumping (AF) 361.8 (AF)
YTD CUP Pumping (AF) 1,690.7 (AF)
YTD CUP Achieved 78.1%
•
GROUNDWATER PERCENTAGE
70.0%
65.0%
60.0% j
55.0%
50.0%
45.0%
40.0% .
Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun-
08 08 08 08 08 08 09 09 09 09 09 09
Month
o MONTHLY GW
{-YTD GW
- BPP GOAL 52.0%
--CUP ADJ GOAL
60.0%
0
WATER SUPPLY
FY 2008-09
November 2008 Water Supply
CUP
7 g_g~~n
•
IMPOR
39.3%
IW
.0%
GW 6PP GOAL
52.0%
Year To Date 2008-2009 Water Supply
YTD CUP Achieved
78.1% of 2,166 AF
Obligation
GW
45.7%
IMPOR'
40.4%
GW BPP GOAL
52.0%
0
CUP
13.9%
Total Water Use
3,500.0 -
3,000.0 -
2,500.0 -
a, 2,000.0 ■ 08 -09 GW
1008-09 IMPORT
■ 07 -08 GW
Q 1,500.0 ❑ 07 -08 IMPORT
1,000.0
500.0 - - - - -- -
0.0
oA o0 0A o�
Month
i
• • •
PM PROGRAM
ITEM # �/
2008/2009
Fiscal 2008/09 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Percent of target 8% 1 17% 1 25% 33% 42 °/: 50% 58% 67% 75% 83% 92% 100%
HYDRANTS (3,859) Target; all hydrants to be serviced annually.
INSPECTED THIS MONTH
2201
556
392
192
65
INSPECTED THIS YEAR
220
776
1,168
1,360
1,425
% OF TOTAL
5.7%1
20.1%
30.3%
35.2%1
36.9%
VALVES (10,00012= 5,000) Target; all valves to be operated every two years
OPERATED THIS MONTH 329
4351
3401
5921
90
OPERATED THIS YEAR 329
7641
1,1041
1,696
1,786
% OF TOTAL 6.6%
15.3%1
22.1%1
33.9%1
35.71!,
DEAD ENDS (487x2 =974) Target; all dead ends to be flushed twice each year.
FLUSHED THIS MONTH
0
01
01
4871
0
FLUSHED THIS YEAR
0
0
0
487
487
% OF TOTAL
0.0%
0.0%
0%1
50%
50%
AIR VACS (309) Target; all air /vacs to be serviced annually.
INSPECTED THIS MONTH 21
110
15
5 3
INSPECTED THIS YEAR 21
131
146
151 1541
1
% OF TOTAL 6.4%
42.4%
47.3%
48.9% 49.8%
SEWER CLEANING (802,560) Target; all sewers to be cleaned annually.
CLEANED THIS MONTH
67,643
53,264
42,684
66,673
28,173
CLEANED THIS YEAR
67,643
120,907
163,591
230,264
258,437
% OF TOTAL
8.4%
15.1%
20.4%
28.7%
SEWER TELEVISING all sewe rs to be televised every 5 years.
TELEVISED THIS MO 684 16,52$ 6.174 ': 9.423
j(U1D�51jTargejt;
TELEVISED THIS YEA . -22 39,1121 45,286 i 67,202
• • • 'Z
PM PROGRAM
ITEM
2008/2009
TO BE COMPLETED BY JUNE 30th 2009
EAST SIDE
2008
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Percent of target
6%
11%
17%
22%
28%
33%
38%
44%
50%
56%
61%
67%
REPLACEMENT PROG. (2500)
REPLACED THIS MONTH
57
1
721
271
ill
661
44
? ??
REPLACED THIS YEAR
57
58
130
157
1681
278
% OF TOTAL
2%
2%
5%
6%
7%
9%1
11.10%1
1
2009
Percent of target
REPLACED THIS MONTH
REPLACED THIS YEAR
% OF TOTAL
JAN
72%
FEB
78%
MAR
83%
APR
88%
MAY
94%
JUN
100%
? ?? Program suspended.
•
IN CONSTRUCTION
•
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: December 1, 2008
3
z
0
Project
Current Status
Next Actions
Comments
1
Zone 4 Trans Pipeline, Reach 5
Pipeline complete and in
Completion of punch - list
Pipeline is in operation. However,
Budget: $1,700,000 Job No. 200421
operation. The Contractor
items, such as air- release
project completion is subject to the
Project Contact: Joe Polimino
continues working on minor
valves and valve cans, await
developer (Shapell) finishing the
Planned Completion Date: TBD
punch list items.
completion of road by
road and parkway construction.
developer.
2
Lakeview Res & Pump Station
New reservoir is in operation.
Backfill has commenced in the
State Health Dept has raised
Budget: $11,500,000 Job No. 200704
Contractor has removed old
area where steel tanks used to
questions regarding the CEQA
Project Contact: Joe Polimino
Bastanchury steel water tanks
be. Retaining wall construction
documentation completed for
Planned Completion Date: 01 -11 -09
and has begun backfill in this
work continues with footings
project. Staff has submitted a
area. Sealing roof of new
where possible.
response letter that no fin-ther
reservoir.
documentation is required per
CEQA code and guidelines.
3
Highland Reservoir
Yard piping 85% complete.
Completion of yard piping,
Piping tie -ins may result in minor
Budget: $11,200,000 Job No. 200309
Temporary tanks are about
electrical and instrumentation
impacts on Zone 1 customers.
Project Contact: Leon de los Reyes
90% structurally complete.
system, and temporary tanks.
Operations and Customer Service
Planned Completion Date: June 2010
Electrical, communication and
Connection of existing piping
staff are working to address any
instrumentation work is
to new yard piping and
impacts or concerns. Following
currently making good
temporary tanks is still
completion of tie -ins, demolition of
progress.
scheduled for mid - December.
the old reservoir should occur
around mid- February 2009. State
health inspector will look at the two
temporary tanks prior to issuing a
temporary operating permit.
4
Well Capacity Optimization
Comparative cost quotes were
Following Committee and
Based on outcome of remedial work
Budget: $1,000,000 Job No. 200813
obtained from two firms to
Board approval, cleaning and
on Well 12, type of remedial work
Project Contact: Leon de los Reyes
clean and test Well 12. Award
testing of Well 12 will begin.
proposed for Wells 1 and 5 will be
Planned Completion Date: TBD
recommendation will be made
reviewed with District's consultant.
to PEO Comm on Dec 6.
3
z
0
CAPITAL IMPROVEMENT PROJECTS STATUS REPORT
Date: December 1, 2008
IN DESIGN
Project
Current Status
Next Actions
Comments
1
Zone 4C Reconfiguration
A Class I Categorical
Psomas to submit 100% plans
The PRS addition to project would
Budget: $2,070,000 Job No.200710
Exemption will be filed to
and specs for pipeline work
go out as a separate construction
Project Contact: Joe Polimino
meet CEQA guidelines.
December 5 for review. Staff
contract, in order to maintain the
Planned Completion Date: 12 -19 -08
Psomas has prepared a
will review proposal for PRS
original construction completion
proposal for San Antonio
upgrades and submit Agenda
date for the pipeline of Dec 2009.
Pressure Reducing Station
Report to the PEO with
(PRS) upgrades and staff is
recommendation.
reviewing.
2
New Wells 20 & 21
A 2nd Microscopic Particulate
The 3rd and 4 State - required
Results of the 1St and 2"d MPA, and
Budget: $2,000,000 Job No.200711
Analysis (MPA) at Well 11
MPA tests, with considerable
current and historical well
Project Contact: Leon de los Rios
pursuant to State requirements
water flow at the Santa Ana
information will be sent to State
Planned Completion Date: TBD
and recommendation for new
River and during a heavy
Health for preliminary review.
well was performed, and
rainfall, will be timed with a
indicated no surface -water
forecasted storm later this
Regarding new Well 21, staff has
influence. This time, it's for
storm season.
had preliminary discussions with
"full percolation basin" water
other pumpers to the west, but more
condition.
discussions arc needed.
3
Hidden Hills Reservoir
The Nov 15/16 fires destroyed
An on -site meeting has been
Awaiting response from State. Goal
Budget: $6,400,000 Job No.200028
the vegetation on the proposed
requested with State Parks staff
is to obtain State approval to
Project Contact: Steve Conklin
project site and vicinity.
to discuss steps to proceed with
proceed with construction as soon
Planned Completion Date: TBD
Project.
as possible.
4
OC -51 Connection Upgrade
Completed application for
Waiting for response from
Design modifications to turnout will
Budget: $242,000 Job No. 200815
upgrade and submitted to
MET to schedule project
be performed by MET staff to
Project Contact: Steve Conklin
MWDOC to forward to MET.
meeting
increase capacity from about 5 cfs
Planned Completion Date: TBD I
I
I
to a max of 20 cfs
• •
5
Lakeview Sewer Lift Sta Upgrades
Design complete. Right -of-
Staff is investigating right -of-
_
1
Budget: $200,000 Job No. Ops. Project
way issue delaying project.
way alternatives.
Feasibility study will be used to
Project Contact: Lee Cory
recommendation to proceed
engineering feasibility study of
determine proposed improvements,
Planned Completion Date: TBD
with Highland Booster Station
options for Highland BPS
budget and schedule for Highland
IN PLANNING
CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING
1. Anaheim Intertie Connection Improvements ($500,000)
2. Zone 5 (1000) Booster Station ($1,080,000)
3. Fairmont Booster Station Reconfiguration ($400,000)
4. Foxtail Drive Pipeline ($245,000)
5. Elk Mountain Reservoir Site Improvements ($300,000)
6. Fire Flow Improvements- -Via Sereno and Ohio ($125,000)
M
Project
Current Status
Next Actions
Comments
1
Highland Booster Station Upgrade
Board approved staff
Staff completing RFP for
Feasibility study will be used to
Budget: $TBD Job No. 200817
recommendation to proceed
engineering feasibility study of
determine proposed improvements,
Project Contact: Hank Samaripa
with Highland Booster Station
options for Highland BPS
budget and schedule for Highland
Planned Completion Date: TBD
Upgrade Project
Upgrade Project
booster station upgrades.
2
Fairmont Site Improvements
Reviewed S &S Construction
Meet with S &S Construction to
Scott Moulton is working on the
Budget: $300,000 Job No. 200803
Co. cost est. internally and
establish construction schedule
formal agreement for cost sharing
Project Contact: Hank Samaripa
with Operations. Made final
and sequence for construction.
and project responsibilities for both
Planned Completion Date: TBD
recommendation for the
parties. Design of Fairmont Site
project.
Improvements completed by S &S.
3
Irrigation Water Study
Draft feasibility study has been
Final report expected in early
Conclusions of feasibility study and
Budget: $TBD Job No. 200807
reviewed and returned to
December.
proposed next steps to be discussed
Project Contact: Steve Conklin
consultant to be finalized.
with PEO Committee at January
Planned Completion Date: TBD
2009 meeting.
CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING
1. Anaheim Intertie Connection Improvements ($500,000)
2. Zone 5 (1000) Booster Station ($1,080,000)
3. Fairmont Booster Station Reconfiguration ($400,000)
4. Foxtail Drive Pipeline ($245,000)
5. Elk Mountain Reservoir Site Improvements ($300,000)
6. Fire Flow Improvements- -Via Sereno and Ohio ($125,000)
M