HomeMy WebLinkAbout2008-08-05 - Public Information-Technology Committee Meeting Agenda PacketEL
W
01
YORBA LINDA WATER DISTRICT
PUBLIC INFORMATION - TECHNOLOGY COMMITTEE MEETING
Tuesday, August 5, 2008, 4:00 p.m.
1717 E. Miraloma Avenue, Placentia, CA 92870 - Tel: (714) 701-3020
ITEMS DISTRIBUTED TO THE BOARD COMMITTEE LESS THAN 72 HOURS
PRIOR TO MEETING
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda
items and are distributed to a majority of the Board less than seventy-two (72) hours prior to the meeting will be
available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue,
Placentia, CA 92870, during regular business hours. When practical, these public records will also be made
available on the District's internet website accessible at hfD://www.vlwdB-vlwd.com.
AGENDA
COMMITTEE: STAFF:
Director Ric Collett, Chair Michael A. Payne, General Manager
Director Michael J. Beveraae Ken Vecchiarelli, Asst. General Mgr
Alternate: Paul R. Armstrong Pat Grady, Information Technology Director
Cindy Mejia, Management Analyst
INTRODUCTION OF VISITORS AND PUBLIC COMMENTS:
Any individual wishing to address the committee is requested to identify themselves and state the
matter on which they wish to comment. If the matter is on this agenda, the committee Chair will
recognize the individual for their comment when the item is considered. No action will be taken
on matters not listed on this agenda. Comments are limited to matters of public interest and
matters within the jurisdiction of the Water District. Comments are limited to five minutes.
ACTION ITEMS:
This portion of the agenda is for items where staff presentations and committee discussions are needed
prior to formal committee actions.
1. Public Information Campaign
Recommendation: That the Committee recommend to the Board of
Directors that the Public Campaign on Water Conservation be approved
and to authorize the President and Secretary to execute a Professional
Services Agreement with Laer Pearce & Associates for an amount not to
exceed $140,000.
2. Updates to the 2005 Urban Water Management Plan
Recommendation: That the Committee recommend to the Board of
Directors that Resolution No. 08-10, A Resolution of the Yorba Linda
Water District Amending the 2005 Urban Water Management Plan be
adopted.
DISCUSSION ITEMS:
This portion of the agenda is for matters such as technical presentations, drafts of proposed
policies, or similar items for which staff is seeking the advice and counsel of the Committee
Members. This portion of the agenda may also include items for information only.
3. Meeting with City of Yorba Linda - Landscape Watering
4. Water Lines - Summer 2008 edition
5. Customer Survey Results
ADJOURNMENT:
The next meeting of the Public Information Technology Committee is scheduled
for September 2, 2008 at 4:00 p.m.
Accommodations for the Disabled:
Any person may make a request for a disability-related modification or accommodation needed for that
person to be able to participate in the public meeting by telephoning Michael A. Payne, District Secretary, at
714.701.3020 or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309.
Requests must specify the nature of the disability and the type of accommodation requested. A telephone
number or other contact information should be included so the District staff may discuss appropriate
arrangements. Persons requesting a disability-related accommodation should make the request with
adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. I
AGENDA REPORT
Committee Meeting Date: August 5, 2008
To: Public Information-Technology Committee
From: Michael A. Payne, General Manager
Staff Contact: Cindy Mejia, Management Analyst
Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $
Funding Source: Water Operating Fund
CEQA Account No: 121580 Job No:
Compliance: N/A Estimated Costs: $ 140,000 Dept: Admin
Subject: Fiscal Year 2008/2009 Public Outreach Campaign
SUMMARY:
California has had one of the driest years on record, with eight of the past ten years
meeting drought-level conditions and low storage in the Colorado River system and the
California Aqueduct. Coupled with a regulatory law of reducing the amount of import
water from northern California by 30% due to the Delta smelt and the high probability of
water allocations being imposed by the Metropolitan Water District, the Board of Directors
has instructed the Public Information-Technology Committee to develop a Public
Information Campaign. The campaign will inform District customers about the upcoming
allocation, voluntary and mandatory action levels and possible corresponding rate
increases contributed to the regulatory drought, a possible raid on District share of the
property taxes and substantial rate increases from SCE. This campaign will be achieved
through a number of planned phases, methods and dates.
DISCUSSION:
Laer Pearce & Associates has prepared a public relations and outreach proposal based
on informing District customers about the current water crisis, as well as the possibility
of allocations through Metropolitan Water District and corresponding rate increases.
This plan and proposal is geared to run through fiscal year 2008/2009.
The consultants proposed plan is divided into two phases with events planned for each
month through June of 2009. A copy of the proposal is attached for the Committee's
consideration.
Phase One: Leading up to a possible rate increase caused by others
Phase Two: Building on the Foundation
The phases, events and timetable are included in the Consultants proposal.
In accordance with the District's purchasing policy, the District shall solicit competitive
bids. Due to the anticipated approval by Metropolitan Water District to implement a
water allocation Plan in January of 2009 instead of July 2009, staff recommends that
the Board of Directors declare this a high priority project and to waive the requirement of
soliciting competitive proposals.
The Consultant has successfully worked for the District in the past on crisis issues since
1997. They have conducted customer surveys, provided news releases, prepared new
s articles and have represented the District during meetings.
The consultant has estimated an eleven month program to cost approximately
$140,156. All work is done on a time and material basis based on set hourly rates.
Each month, the staff and committee will monitor and adjust the workload to meet the
current issues. This would give the District the greatest flexibility to address the issues
as they arise.
The 2008/09 adopted Budget identified funds toward the Public Information Program.
Staff is recommending using authorized funds from this program. To fund the difference,
staff proposes using unspent salaries and benefits allocated from the vacant Assistant
Administrator I position and for the first six months of a budgeted safety officer.
The Consultant will make a presentation of their proposal. Future public information
program projects and programs will be identified in the next 2009-10 Budget.
PRIOR RELEVANT BOARD ACTION(S):
This issue was discussed at the Public Information Technology Committee meeting on
July 30, 2008. The issue of a Public Outreach Campaign has been also discussed with
the Board of Directors.
STAFF RECOMMENDATION:
That the Committee recommend to the Board of Directors that the Fiscal Year
2008/2009 Public Outreach Campaign be approved and to authorize the President and
Secretary to execute a Professional Services Agreement with Laer Pearce & Associates
for an amount not to exceed $140,000.
LAIR 9 E A R C E
& Associates
Consultants in Strategic Communications
Communicating Conservation,
Rate Increases and Allocation
Outreach Proposal or the Remainder of YL WD's FY 08-09
July 30, 2008
This fiscal year will bring two difficult challenges to the
Yorba Linda Water District: Pressure to increase rates, and
the possible implementation of MWD's new water
allocations. Both are largely or entirely out of YLWD's
control, so it is important that customers understand both
the circumstances and how they can contribute to a
solution.
In a recent YLWD survey,
45% of District customers
feel the Governor's
drought proclamation
means they should be
conserving more water.
The following proposal outlines a strategy for YLWD to
initiate a stronger, more consistent communications program in order to increase
customer awareness of issues and build customer trust in the board and its decisions.
Strictly for planning purposes, it assumes that rates might be increased in early 2009, and
that MWD might implement its new water allocations in mid-2009. The program stresses
the following:
• The District operates in a fiscally conservative manner and has long been protective
stewards of public funds
• Local water rates and supply availability are tied to factors largely outside the
District's control (energy prices, Met allocations, regulatory drought), but YLWD has
taken measures to limit the local impacts of this state-wide issue
• Conservation is the answer for both the rate and allocation issues We propose an initial six-month program to communicate the messages above to
customers in the following manner, so they can more fully understand the reasons why the
board must consider a rate increase:
• Three issues-based quarterly customer newsletters (Aug., Oct., Jan.)
• Two rounds of presentations by board members and/or staff to cities and large
water users on 1.) the status of water situation and the need to conserve, and 2.) an
update on rates and district finances
• Six monthly issues-based employee newsletters (they're your main ambassadors)
• Three bi-monthly op/eds in the Yorba Linda Star
• Two bi-monthly native plant columns in the Yorba Linda Star
22892 Mill Creek Dr., Laguna Hills, CA 92653 o, 949.599.1212 lo- www.laer.com
Laer Pearce & Associates
YLWD 2005-09 Communications Proposal
Page 2 of 7
• Two quarterly customer workshops (native plants and water 101) with the
necessary publicity to ensure participation
• Production of a conservation brochure (for use as a leave-behind for presentations
and workshops)
• Updating Web site with conservation and issues messaging
• Regular positive, proactive media relations
• Six conservation-themed bill stuffers
• Five monthly eblasts to interest database on relevant YLWD and water issues
• Letter to customers should the board decide to consider a rate increase (timed
around hearing)
• Production of a PowerPoint for staff, should there be a rate-increase hearing
f
Progressing into 2009, we would continue all the regular communication vehicles
established in Phase One (quarterly newsletter, op/eds, plant columns, quarterly
workshops, etc.), and add the following new elements through the end of the fiscal year,
reinforcing the District's conservation, rate and allocation messages:
• Coordinated participation in the MWDOC/Discovery Science Center student program
within service area
• VIP tours of District facilities
• Promotion and participation in regional Water Awareness Day celebration
• Participation in MWDOC regional advertising campaign
If allocation measures are announced by MWD, we would include the following additional
components in the weeks leading up to a reduction in supplies:
• Staff presentations to cities and large water users on the allocation situation
• Update Web site with allocation messages
• Letter to customers discussing allocation
• One op/ed in Yorba Linda Star on allocation
• Media relations on allocation issue
• Production of door hangers directed at homeowners seen over-using water
Laer Pearce Associates
YL D 2005-09 Communications Proposal
Page 3 of 7
~.yW~'iR bra •~V ~
Dedication event
Employee newsletter
Headquarters media
New infrastructure media
Board approves plan
Revised customer newsletter
Outreach planning
Employee newsletter
Issues messaging
Qtly customer newsletter
VIP conserve presentations
Secure 1st plant column
Employee newsletter
Conservation bill stuffier
Monthly a-blast
Potential Rate Increase: I
Jan.
Qtly customer newsletter
VIP rate presentations
Rate op/ed or plant col.
Hearing PPT for staff
Rate media relations
Conservation bill stuffier
Employee newsletter
Monthly a-blast
Qtly customer newsletter
VIP allocation
presentations*
VIP tours
Student presentations
Conservation bill stuffier
Plant column
WAD materials preparation
Employee newsletter
Monthly a-blast
VIP rate presentations
Qtly customer workshop
Op/ed
Employee newsletter
Conservation bill stuffier
Monthly a-blast
Qtly customer workshor
Plant column
Conservation bill stuffer
Key collateral kit
Employee newsletter
Monthly a-blast
allocation presentat
Qtly customer
workshop/tour
Allocation Web update*
Customer allocation letter*
Allocation media relations*
Allocation op/ed*
Conservation bill stuffier
Student presentations
Regional WAD
Employee newsletter
VIP conserve presentations
Customer workshop
Secure 1st op/ed
Web update
Employee newsletter
Conservation brochure
Conservation bill stuffier
Monthly a-blast
VIP rate presentations
Customer rate letter
Rate media relations
Rate op/ed or plant col.
Rate Web update
Conservation bill stuffier
Plant column
Employee newsletter
Monthly a-blast
Student brochure
Op/ed
Conservation bill stuffier
Runoff brochure
Employee newsletter
Monthly a-blast
presentations*
Allocation media relations*
Door hangers*
Plant column
Employee newsletter
Conservation bill stuffier
Monthly a-blast
Potential Allocation: July 1
Laer Pearce Associates
YL D 2008-09 Communications Proposal
Page 4• of 7
100th event
Monthly a-blast
* If necessary, assumes July 1 allocation.
~~US:t~~St1ti18t~~
The chart on the following pages summarizes anticipated fee billings (including vendor
expenses) for the campaign outlined above. Should the scope of work change, we will
provide a revised estimate at that time. The estimated vendor costs are based upon
LP&A's regular vendors. This nrooosal and budget is oreliminarv: items may be added,
eliminated or refined after further discussion with the District.
LP&A bills for its time by the minute to ensure the highest fairness and accuracy; YLWD
will only be invoiced for the actual time spent working on the District's behalf. LP&A
reserves the right to transfer funds between tasks, as necessary and with YLWD's
knowledge, to complete the approved scope of work within the total budget.
Quarterly
Drafting content and managing design of two
Customer
quarterly customer newsletters, utilizing template
Newsletter
created in earlier efforts. Does not include printing
(October, January)
and distribution.
Fees
Vendors
VIP Conservation
Production of a PowerPoint presentation and script
Presentation
on conservation and water situation for delivery to
VIPs and large water users.
VIP Rate Increase
Production of a PowerPoint presentation and script
Presentation
on potential rate increase for delivery to VIPs and
large water users.
Monthly Employee
Drafting content and managing layout and
Newsletter
distribution of six monthly e-newsletters to
(Aug: Jan.)
employees.
Fees
Vendors
Media Placements Drafting content and securing placement of three
op/eds and two native plant columns; establishing
program with newspaper.
Media Relations Proactively pitching three positive news stories to
local press and trades.
Quarterly Preparation of a plan to host two customer
8,000
2,000
6,000
4,000
6,000
1,200
6,600
4,200
4,500
increase and Met allocation.
Laer Pearce Associates
YLWD 2008-09 Communications Proposal
Page 5 of 7
Customer workshops. Includes minimal time for materials
Workshops (Sept., production (TBD) and attendance at first customer
Nov.)
workshop.
Conservation
Managing copy, design and printing of a tri-fold
Brochure
conservation brochure (qty. 3,000 each). Includes
creation of new illustrations.
Fees
4,500
Vendors
4,000
Web Site Update
Reviewing and updating content on Web site to
2,000
incorporate new key messages.
Bill Stuffers
Design of three 8.5"x3.5" bill inserts promoting
conservation. Note: Does not include printing.
Fees
2,000
Vendors
1,200
Customer Rate
Drafting content and managing production of two-
Letter
page letter discussing rate increase. Note: Does
not include printing.
Fees
1,500
Vendors
200
Revisions to Rate
Revising earlier rate-increase PPT for delivery to
750
PPT for Hearing
YLWD board at hearing.
Blast Email
Drafting content and managing layout and
Program
distribution of five blast emails to outreach
database; includes creation of eblast template.
Fees
4,000
Vendors
1,750
Issues
Attending select local and regional water meetings,
8,200
Management
monitoring industry news and trends, keeping
YLWD abreast of issues.
Total Phase One Fees I
$63,750
Total Phase One Vendors
$10,350
Total for Phase One
i
$74,100
Quarterly Drafting content and managing design of quarterly
Customer customer newsletter, utilizing template created in
Newsletter (April) earlier efforts. Does not include printing and
distribution.
Fees 4,000
Vendors 1,000
Monthly Employee Drafting content and managing layout and
Newsletters (Feb: distribution of five monthly e-newsletters to
June) employees.
Fees
Vendors
5,000
1,000
Blast Email Drafting content and managing layout and
Laer Pearce Associates
YL D 2008-09 Communications Proposal
Page 6 of 7
Program
distribution of five blast emails to outreach
database.
Fees
4,000
Vendors
1,000
Media Placements
Drafting content and securing placement of two
5,500
op/eds and three native plant columns.
Quarterly
Coordination of program content for two customer
2,000
Customer
workshops. Does not include LP&A attendance at
Workshops (Feb.,
workshops.
May)
Student
Coordination of MWDOC presentations at schools
1,500
Presentations
in YLWD service area; includes minimal materials
production.
VIP Tours
Coordination of invitations and content for VIP
4,500
tours of key District facilities; includes attendance
at event.
WAD Coordination
Preparation of materials for YLWD promotion and
1,000
participation in regional Water Awareness Day
celebration.
MWDOC
Customization of MWDOC conservation ad;
Advertising
placement of eight quarter-page ads in YL Star
over four-month period.
Fees
400
Vendors
4,956
Issues
Attending select local and regional water meetings,
6,700
Management
monitoring industry news and trends, keeping
YLWD abreast of issues.
Total Phase Two Fees
$34,600 l
Total Phase Two Vendors°
( $7,956
Total for Phase Two
I $42,556
VIP Allocation
Production of a PowerPoint presentation and script
4,000
Presentation
on allocation for delivery to VIPs and large water
users.
Web Update
Reviewing and updating content on Web site to
1,000
incorporate new allocation messages.
Customer
Drafting content and managing production of two-
Allocation Letter
page letter discussing rate increase. Note: Does
not include printing.
Fees
1,500
Vendors
200
Allocation Media
Preparation of a press release on local allocation
5,000
Relations
implications; coordination of meeting with reporter
to discuss issue; responding to media Inquiries.
Water-Wise Door
Managing content, design and printing of a 7'x18"
Laer Pearce & Associates
YLWD 2008-0 Communications Proposal
Page 7 of 7
Hangers door hanger with conservation messaging. (qty.
10,000)
Fees 1,000
Vendors 3,000
Total Allocation Period Fees 1 $8,000
Total Allocation Period Vendors I $3,200
Total for Allocation Period $11,200
Meetings and strategic counsel; attending minimal "account 10,000
Consultations maintenance" meetings and council hearings in
person; conference calls and phone meeting
attendance; general project support; reporting.
Expenses Mileage; copies. Based on two percent of fees. 2,300
ITEM NO.
AGENDA REPORT
Committee Meeting Date: August 5, 2008
To: Public Information-Technology Committee
From: Michael A. Payne, General Manager
Staff Contact: Cindy Mejia, Management Analyst
Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $
Funding Source: Water Operating Fund
CEQA Account No: 121580 Job No:
Compliance: N/A Estimated Costs: $ Dept: Admin
Subject: Amendments to the action levels of the 2005 Urban water Manager Plan.
SUMMARY:
Following two straight years of below-average rainfall, very low snowmelt runoff and the
largest court-ordered water transfer restrictions in state history, Governor Arnold
Schwarzenegger recently proclaimed a statewide drought and issued an Executive Order,
which takes immediate action to address a dire situation where California communities are
being forced to mandate water conservation or rationing.
DISCUSSION:
The Executive Order proclaims a statewide drought and directs the Department of Water
Resources (DWR) and other entities to take immediate action to address the situation. The
Executive Order directs the DWR to:
• Facilitate water transfers to respond to emergency shortages across the state.
• Work with local water districts and agencies to improve local coordination.
• Help local water districts and agencies improve water efficiency and
conservation.
• Coordinate with other state and federal agencies and departments to assist water
suppliers, identify risks to water supply and help farmers suffering losses.
• Expedite existing grant programs to help local water districts and agencies
conserve.
The Executive Order also encourages local water districts and agencies in the state to
promote water conservation. Agencies are encouraged to work cooperatively on the
regional and state level to take aggressive, immediate action to reduce water consumption
locally and regionally for the remainder of 2008 and prepare for potential worsening water
conditions in 2009. The Executive Order further requires the DWR to work with local
agencies to conduct aggressive water conservation and outreach campaigns.
On June 18, 2008, the Board of Directors adopted Resolution No. 08-07, A Resolution of
the Board of Directors of the Yorba Linda Water District Implementing Level 1 of the 2005
Urban Water Management Plan calling for a voluntary 10% water conservation reduction
District wide.
The Board of Directors also instructed staff to bring back a report and Resolution that would
amend the Action Stage Levels identified in Chapter 8.1.1 and Chapter 8.4.2 of the Water
Shortage Contingency Plan in the 2005 Urban Water Management Plan.
A Resolution and attachments are included with this report.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors adopted updates to the Urban Water Management Plan in 1990,
1995 and 2000, with the latest update to the Plan being adopted on December 22, 2005.
The Board of Directors also adopted Resolution No. 08-07, A Resolution of the Board of
Directors of the Yorba Linda Water District Implementing Level 1 of the 2005 Urban Water
Management Plan calling for a voluntary 10% water conservation reduction District wide.
STAFF RECOMMENDATION:
That the Committee recommends to the Board of Directors:
1. That the 2005 Urban Water Management Plan, Chapter 8.1.1 of the Water Supply
Shortage Stages and Conditions Levels 1 through Level 4, be updated as shown on
Attachment "A" to this Resolution.
2. That the District Actions, identified in Chapter 8.4.2 of the Water Supply Shortage
Stages and Conditions Levels 1 as shown in the adopted 2005 plan, be updated as shown
on Attachment "B" to this Resolution.
CHAPTER 8.0: WATER SHORTAGE CONTINGENCY
PLAN
With population growth, energy shortages, earthquakes, and the threat of terrorism experienced
by California; maintaining the gentle balance between water supply and demand is a
complicated task that requires planning and forethought. In the event that a water shortage
occurs, simple measures can be implemented to conserve the water supply at a public level.
Urgency Ordinance No.91-02 (Appendix E) enables the YLWD Board of Directors to adopt an
emergency water management program if the necessity is found. In addition, the California
legislature enacted in 1949 specific statutory authority for rationing applicable to all public water
supply distributors (California Water Code, Sections 350-358). The water supplier does not
have to be in an actual drought condition where there is not enough water for human
consumption, sanitation, and fire protection; merely the threat of the condition occurring is
enough. Once a local agency has declared the existence of an emergency condition or a water
shortage, it is empowered to adopt regulations and restrictions on the delivery and consumption
of water to conserve the water supply for the greatest public benefit. Service can, if necessary,
be discontinued to customers who willfully violate established regulations.
The following conditions characterize urgency and require the Ordinance to take effect:
1. California is in the fifth consecutive year of drought conditions; and,
2. Precipitation for the current water year is substantially below normal in the watersheds of the
water supplies serving Southern California; and,
3. The completion of the State Water Project to Southern California are being cutback; and,
4. Metropolitan has instituted water conservation goals with severe monetary penalties for not
meeting the goal; and,
5. MWDOC, as a member agency of Metropolitan, has also instituted water conservation goals
with severe monetary penalties for YLWD.
6. YLWD has broad authority to enact water conservation rules under the laws of the State of
California; and,
7. The public's adoption of water conservation measures is now, or may be, necessary to
avoid or minimize the effects of the water shortage in Southern California.
Risk Management Professionals
8.1.1 Stages of Action
In Table 8.1-1: Water Supply Shortage Stages and Conditions, stages are discussed during
which various conservation measures will be imposed by Ordinance No. 91-02, beginning with
voluntary conservation and leading to various stages of mandatory compliance in the event that
the water supply experiences shortages up to a 30 690/6 reduction of the water supply.
Water Supply Conditions
Percent Shortage
Level 1: Voluntary Conservation Measures (Targeted 10% Reduction)
Level 1 measures may be declared by the Board of The Board of Directors shall, by separate
Directors when, in their judgment, the possibility exists Resolution, establish voluntary conservation
YLWD may not be able to meet all of the demands of goals and advise customers of ways to
its customers without punitive surcharges levied conserve water.
against YLWD due to restrictions on imported supply.
Leven 2: Mandatory Conservation - Water Watch (Targeted 10 ~/o ---1 Formatted; Stikethrough
Level 2 measures, hereinafter referred to as "Water
Watch", may be declared by the Board of Directors
when, in their judgement, the probability exists that
YLWD will not be able to meet all of the water
demands of its customers without punitive surcharges
levied against YLWD due to restrictions on imported
supply.
The Board of Directors shall, by separate
Resolution, determine the extent of
conservation required by setting a percentage
of the Base Target Amount for high priority and
low priority water use, advise customers of
ways to save water and may enforce such
allocation by mandating certain practices......
Stage 3: Mandatory Reduction - Water Warning (Targeted 2U6 Re lcn) { Formatted: Strikethrough
Level 3 measures, hereinafter referred to as "Water
Warning", may be declared by the Board of Directors
when, in their judgment, YLWD will not be able to meet
all of the water demands of its customers without
punitive surcharges levied against YLWD due to
restrictions on imported supply.
Risk Management Professionals
The Board of Directors shall, by separate
resolution, determine the extent of conservation
required, set a percentage of the Base Target
Amount for high priority and low priority water
use, advise customers of ways to save water
and may enforce such allocation by mandating
certain practices.....
Water Supply Conditions Percent Shortage
Stage 4: Water Emergency (Targeted 30.68°~ Reduction { Formatted: striketnrougn
Level 4 measures, hereinafter referred to as "Water
Emergency", may be declared by the Board of
Directors when the failure of any supply or distribution
facility, whether temporary or permanent, occurs in the
water distribution system of the State Water Project,
Metropolitan Water District of Southern California,
The Board of Directors shall, by separate
Resolution, determine the extent of
conservation required, set a percentage of the
Base Target Amount for high priority and low
priority water use, advise customers of ways to
save water and may enforce such allocation by
Municipal Water District of Orange County, Orange certain practices.
County Water District or Yorba Linda Water District
may seriously affect the ability to supply water to
customers.
8.1.2 Discussion of the Base Target Amount
1 A Base Target Amount shall be established for each connection in the YLWD corresponding
to the average water consumption by meter size for areas with similar land uses, lot or home
size, landscape sophistication and economic location for each two month billing cycle in
fiscal year 1989-1990.
2 The Base Target Amount for the residential customers may be adjusted to account for
families larger than the YLWD wide average of three (3) persons per household at the rate
of 100 gallons per day per additional person for four (4) to a maximum of seven (7) persons
per household.
3 Customers with multiple metered connections in the same revenue classification, serving
similar land uses may, upon approval in advance by the YLWD, allocate the Base Target
Amount between their connections.
4 In cases where there is insufficient historical data to establish a Base Target Amount, YLWD
shall establish a Base Target Amount by comparing water users similar as to type, lot or
home size, landscape sophistication and economic location.
5 The Base Target Amount may be established and adjusted based upon a determination by
the Board of Directors of high priority and low priority water uses.
Risk Management Professionals M
In order to prepare for and prevent water supply shortage, it is useful to estimate the future
minimum supply. The minimum water supply available to the Yorba Linda Water District for
next three years is estimated based upon the driest three year historic sequence, and is
compared to a normal three year estimate. To balance the effects of multiple dry years, more
water will be imported from MWDOC resulting in an increase in the minimum supply during
multiple dry years compared to normal years.
Through regional modeling efforts, MWDOC has determined minimum water supplies available
for the Yorba Linda Water District for each of the next three years, 2006 - 2008. Table 8.2-1:
Three-Year Estimated Minimum Water Supply compares supplies available under normal
conditions and supplies available under a hypothetical repeat of the historical driest three year
period for the Yorba Linda Water District, 1959-1961.
During multiple-dry years, less local supplies are available for retail consumption and retail
demands increase, resulting in the use of increased imported supplies from Metropolitan, via
MWDOC, to offset the reduction in local supplies. Even with the decrease in local supplies,
Yorba Linda Water District is expected to meet all retail consumption during a three-year dry
period of 2006-2008 based on the three driest years on record. In addition, Metropolitan is
expected to be able to supply all of MWDOC's imported water during the same period.
Metropolitan's 2005 Regional Urban Water Management Plan indicates that Metropolitan can
provide 100% of the supply demanded by its member agencies until 2030.
Source
Normal Year
Multiple Dry Year
2006
2007
2008
2006 2007
2008
Groundwater
(Orange County Basin)
12,555
13,876
14,721
12,795 13,833
15,491
Wholesale Water
Metropolitan (via MWDOC)
12 372
'
11,346
10,796
13,804 12,327
11,447
Total
24,926
25,222
25,517
26,599 26,160
26,939
Risk Management Profess
ionals
As a California jurisdiction, the Yorba Linda Water District could experience a catastrophic
interruption in the water supply as a result of a regional power outage, earthquake, terrorism, or
other event. A successful recovery plan is dependent upon an in-depth understanding of the
vulnerability of each source of supply, delivery system, and distribution system to potential
catastrophes. Possible catastrophes are listed in Table 8.3-1 and preparation actions being
taken to reduce the severity of each event are discussed below.
Possible Catastrophe Check If Discussed
Regional Power Outage
Earthquake
Terrorism -I(
8.3.1 Regional Power Outage
The operation of YLW D's groundwater wells and booster pump stations is dependent on the
energy source. Backup sources of energy such as propane tanks, emergency generators, and
natural gas supplies, are available at many of YLWD's facilities. These alternative energy
sources improve the reliability of YLWD's water supply. Additionally, the existence of multiple
wells within YLWD's facilities creates redundancy and reduces the likelihood that all wells will be
out of service simultaneously.
8.3.2 Earthquake
The Yorba Linda Water Distract has implemented seismic criteria (e.g., seismically actuated
valves, flexible piping, etc.) into the design of new reservoirs as the standard since 1997. In
addition, flexible piping is used for the gas lines providing power to booster pumps and well
sites.
Risk Management Professionals M
YLWD has developed a comprehensive Emergency Response Plan to address the specific
responses to earthquakes, damage assessments, evacuations, and major line breaks. The
Emergency Response Plan also identifies agency and mutual aid contacts to help restore
YLWD's critical water system infrastructure.
8.3.3 Terrorism
To address terrorism catastrophes, YLWD has completed an extensive Security Vulnerability
Assessment according the Sandia National Laboratories Risk Assessment Methodology for
Water Systems (RAM-Wsm). As part of this project, YLWD prioritized criteria, prioritized
facilities, characterized high priority facilities, developed threat scenarios based upon threat
assessment methodologies, and used a Scenario-Based Assessment approach to develop
recommendations in the form of prioritized lists of security countermeasures. YLWD is currently
implementing these recommendations; however, due to the security sensitive nature of the
information these recommendations are not included in this Urban Water Management Plan
Risk Management Professionals M
YLWD is organized pursuant to the provisions of County Water District law under Division XII of
the California Water Code (Section 30000 et seq.). Accordingly, YLWD has the authority to
adopt Ordinances and Rules and Regulations to:
1. Restrict the use of water during any emergency situation caused by drought or other
conditions.
2. Prohibit the waste of water or the use water during such periods for any purposes other
than household, restricted, or nonessential uses as determined by the district.
8.4.1 Water Shortage Planning
8.4.1.1 Metropolitan
In November, 1990, as a result of limited supplies, Metropolitan developed a water conservation
program called the Incremental Interruption Conservation Program (IICP), intended to reduce
the amount of water delivered to its member agencies under severe deficiencies. The IICP
established six levels of reduction by up to 50% depending on drought and water supply
conditions. Metropolitan's IICP is no longer in effect.
Revisions of the IICP and deletion of the voluntary stage (Stage 1) were adopted by
Metropolitan's Board of Directors in the Metropolitan 1995 Drought Management Plan (DMP).
This plan included step-by-step strategies for evaluating supply and demand conditions and
utilizing Metropolitan's available options. Several phases are incorporated into the DMP with
the final phase being the implementation of mandatory stages of the IICP. The 1995 DMP was
not implemented in 1995 because of the above normal statewide precipitation in January and
February of that year and because Metropolitan received a 100 percent allocation of its State
Water Project supply.
As part of the implementation of the regional Integrated Resources Planning (IRP), Metropolitan
developed a Water Surplus and Drought Management (WSDM) Plan for Southern California in
April 1999. The guiding principle of the WSDM Plan is to manage Metropolitan's water
resources and water management programs to minimize the adverse impacts of water supply
shortages to retail customers. The WSDM Plan contains specific actions to be taken in drought
conditions to meet consumptive demands for water. This plan directs Metropolitan's resource
operations to help attain the region's 100% reliability goal. The WSDM Plan was updated in
Risk Management Professionals M
2004 to account for changes impacting supplies from the Colorado River and California's Bay-
Delta. In the past, Metropolitan has developed drought management plans that simply
addressed shortage actions and primarily focused on issues of short-term conservation and
allocation of imported water. The WSDM Plan recognizes the interdependence of reliability.
The overall goal of the WSDM Plan is to ensure that shortage allocation of Metropolitan's
imported water supplies is not required.
8.4.1.1 Yorba Linda Water District
YLWD has implemented many of the voluntary and mandatory programs identified in Chapter 6
of this Plan. These programs are designed to either increase local supply and/or reduce
consumption during short term and/or long term deficiency periods. YLWD's response to water
supply shortages is only part of a coordinated effort that includes, but is not limited to, planning
by Metropolitan, MWDOC, OCWD, other agencies adjacent to the District, the City of Yorba
Linda and other cities in YLWD's jurisdiction.
Yorba Linda Water District has many water conservation programs and practices in place. A
decrease in the reliable water supply from imported sources and the yearly increases in
population require that Yorba Linda Water District encourage the best and most efficient use of
water within the service area. Toward this end the measures, programs and practices
described in this Chapter have been implemented by the District.
The precise timing to implement the voluntary or mandatory programs and the extent to which
these programs are implemented will depend upon the best available facts at the time a
decision needs to be made. Implementation may vary according to the perceived need,
confirmation of the severity of an actual shortage and anticipated duration of the shortage.
Reference is made to the 2005 Urban Water Management Plans adopted by Metropolitan Water
District of Southern California and Municipal Water District of Orange County, and to Orange
County Water District's "2020 Plan".
Risk Management Professionals M
8.4.2 Consumption Reduction Methods and Mandatory Prohibitions
Exhibit W of Ordinance 91-02 urges residential, commercial, and public water consumers to
adopt voluntary water conservation measures. The Water Conservation Practices contained in
the Ordinance are listed below in Table 8.4-2: Consumption Reduction Methods. Voluntary
water conservation goals (i.e. reduction percent) shall be established by the Board of Directors
by a Resolution in the event that urgency exists. As addressed in Table 8.1-1: Water Supply
Shortage Stages and Conditions, the Board of Directors has the authority to mandate such
conservation practices by separate Resolution. The resolution shall address the extent of
conservation required by setting a percentage of the Base Target Amount for high priority and
low priority water use, and advise customers of ways to save water.
Consumption Reduction Methods and Prohibitions Actuation
Stage
Customer Actions
Check monthly for plumbing leaks and any leaks found should be repaired
1 immediately. Levell
Irrigate commercial nurseries, golf oourses, parks, school yards, traffic
medians and other public open space and other non residential landscaped
2. areas no more often than every third day, and only between the hours of Level 1
6:00 p.m. and 5:00 a.m.
Reduce outside irrigation schedules to the absolute minimum to keep
3. important plants alive. Withhold fertilizer to inhibit new growth. Level 1
Residential customers with addresses ending with an even number water
lawns, landscaping and other turf areas only on even number days of the
month and between the hours of 4:00 p.m. and 10:00 a.m. Residential
4. Level 1
customers with addresses ending with an odd number water lawns,
landscape, and other turf areas only on odd number days of the month and
between the hours of 4:00 p.m. and 10:00 a.m.
Risk Management Professionals M
Consumption Reduction Methods and Prohibitions Actuation
Stage
Adjust sprinklers to avoid "watering" sidewalks and gutters, and lower
5. Level 1
pressure to avoid creating a wasteful mist.
Eliminate washing of sidewalks, walkways, buildings, walls, patios,
driveways, parking areas or other paved surfaces, or walls except to
6. eliminate conditions dangerous to public health or safety or when required Level 1
as surface preparation for the application of architectural coating or painting,
and to alleviate immediate fire hazards.
Curtail water use to clean, fill or maintain levels in decorative fountains,
7. ponds, lakes, or other similar aesthetical structures unless such water use is Level 1
approved in advance by YLWD.
Curtail water used for the initial filling or refilling of swimming pools, spas or
8. ponds unless such water use is approved in advance by YLWD. Level 1
Replacement due to evaporation is permitted.
Curtail washing of motor vehicles, trailers, boats and other types of
equipment unless a bucket and a hose equipped with a positive shutoff
9. nozzle for quick rinses is used. Washing of vehicles may be done by a Level 1
commercial car wash that uses recycled water.
Display notice that water will be served only upon request at all restaurants,
10. hotels, cafes, cafeterias or other public place where food is sold, served or Level 1
offered for sale.
Water should only be served when requested by a customer in restaurants,
11. hotels, cafes, cafeterias or other public places where food is sold or offered Level 1
for sale.
Risk Management Professionals
Actuation
Consumption Reduction Methods and Prohibitions
Stage
Post notice of the water supply shortage in each room of hotels, motels,
inns, guest houses, bed and breakfast facilities and short-term commercial
12
Level 1
lodgings along with an explanation of necessary compliance measures
taken by the establishment.
Install low-flow shower heads, toilet dams or low-flow toilets, and faucet
13.
flow restrictors in each room of hotels, motels, inns, guest houses, bed and
Level 1
breakfast facilities and short-term commercial lodgings.
14.
Hand water plants with a positive shut-off hose nozzle.
Level 1
15.
Place a plastic bottle, bag or dam in all toilets.
Level 1
16.
Use automatic dish and clothes washers for full loads only.
Level 1
Insulate hot water pipes to reduce waiting time for hot water. Install
17.
Level 1
circulating hot water system or point-of-use water heater.
18.
Turn off the water while brushing teeth, washing hands and/or shaving.
Level 1
19.
Install water saving shower heads and/or flow restrictors.
Level 1
Take shorter showers. Turn off the water when lathering, shampooing, or
20
Level 1
shaving. Turn the shower back on to rinse.
Capture bath/shower warm-up water in buckets and use the water to irrigate
21
Level 1
plants or to flush toilets.
22.
Use garbage disposers sparingly.
Level 1
23.
Do not plant any annuals or new plants that will require extra watering.
Level 1
Risk Management Professionals M
Actuation
Consumption Reduction Methods and Prohibitions
Stage
Place mulching material in landscaped areas to decrease soil moisture
24. Level 1
evaporation.
25. Use a broom to clean outside patios, porches and sidewalks. Level 1
Cover spas and swimming pools when not in use. If spa or pool will not be
26. used, make necessary preparations for not refilling the spa or pool while Level 1
shortage lasts.
District Actions
Limit use of water from fire hydrants to fire fighting, approved construction
1. activities or other activities as approved by YLWD as necessary to maintain Level 1
the health, safety and welfare of the public.
Turn off all construction meters until the condition(s) causing the shortage
2. Level 1
are abated to the satisfaction of the General Manager.
{ Formatted: Strikethrough
• = Level 1
-
{ Formatted: Strikethrough
Level 1
Risk Management Professionals M
8.5.1 Penalties
The following enforcement measures shall apply to any customer who willfully disregards any of
the mandated and/or prohibited water management practices.
Penalties
Warning
Letter Explaining Violation
Flow Restricting Orifice
Charges
Excess Water Use Rate
One-Time Charge of Two Times the Latest
Water Bill
Charge for Costs of installation and Removal
of Flow Restricting Orifice
Stage When Penalty Takes Effect
16` Violation
2nd Violation
3rd Violation
Stage When Penalty Takes Effect
Any Violation
2nd Violation
3rd Violation
8.5.1.1 First Violation
A written warning shall be mailed to the customer. The warning shall state the violation and that
if the matter is not corrected, additional enforcement measures may be taken.
8.5.1.2 Second Violation
A letter shall be mailed to the customer explaining the violation and a one time charge equal to
two times the most recent water bill will be charged to the customer.
8.5.1.3 Third Violation
An orifice flow restrictor will be inserted into the customer's meter to reduce the rate of flow.
The orifice will remain in the service line for one billing cycle. The customer shall pay the cost to
insert and remove the orifice flow restrictor.
Risk Management Professionals M
8.5.1.4 Fourth and Subsequent Violations
Service of water will be subject to further restriction with an orifice or termination of service. The
term is at the General Manager's discretion so as to minimize the health and safety affects to
the customer.
8.5.1.5 Excess Water Use Rate
Water consumption in excess of the Base Target Amount or percentage of the Base Target
Amount established or as modified by the Board of Directors will be charged to YLWD's current
water rate plus a surcharge equal to the accumulative cost per acre foot of any penalty rate
adopted by Metropolitan plus any penalty rate adopted by MWDOC plus any penalty rate
adopted by OCWD converted to a unit cost per on hundred cubic feet.
8.5.2 Due Process Procedures
8.5.2.1 Notification
The General Manager shall notify a customer that YLWD intends to surcharge water usage or to
restrict or shut off water service. In the cases of flow restriction or shut off, the notice shall be
delivered at least 72 hours in advance. The General Manger shall provide an opportunity to the
customer within that time to dispute YLWD's determination of non-compliance with Ordinance
No. 91-02 (Appendix E) or to demonstrate that compliance has been achieved subsequent to
the notice.
8.5.2.2 Compliance Period
The General Manager may revoke, modify, or extend time for compliance with a notice of intent
to surcharge water usage or to restrict or shut off water service if the General Manager is
reasonably satisfied that such action will be consistent with the best interests of YLWD and/or
the purposes of Ordinance No. 91-02 (Appendix Q.
8.5.2.2 Restoration of Service
The General Manager shall provide for restoration of restricted or shutoff service upon a
determination that appropriate steps to assure compliance with Ordinance No. 91-02 (Appendix
E) have been taken. The customer shall be responsible, as a precondition of service
restoration, to pay YLWD's normal and usual shutoff and turn-on fees and to comply with such
other YLWD Rules and Regulations as apply to customers' service shutoff for nonpayment of
water bills.
Risk Management Professionals M
In the event that a decrease in water supply occurs for an extended period of time, YLWD could
face a potential loss requiring the water enterprise to draw from any reserves and also re-
examine the revenue stream in order to balance the budget. It is thus important to consider
possible measures to overcome revenue and expenditure impacts.
8.6.1 Measures to Overcome Revenue Impacts
Names of Measures Check if Discussed
1. Rate Adjustment -I!
2. Water Fund Balance -I(
3. Bonds ,1
1. Rate Adjustment
Should YLWD experience a significant decrease in water supplies for an extended period of
time, the Board of Directors would consider a water rate increase or water fee surcharge to
cover any revenue shortfall due to water shortages or conservation measures.
2. Water Fund Balance
YLWD maintains a Water Fund Balance that can be drawn upon for minor revenue shortfalls
that need to be addressed immediately from decreased water supplies. The Board of Directors
would consider a rate increase to restore this fund for future unexpected emergency situations.
3. Bonds
YLWD maintains a high bond rating in order to secure bonds for unexpected facility
replacements and repairs.
Risk Management Professionals M
8.6.2 Measures to Overcome Expenditure Impacts
Names of Measures Check If Discussed
1. Capital Improvements Program %f
1. Capital Improvements Program
The Yorba Linda Water District is committed to increasing their ability to produce groundwater
from the Santa Ana Basin by means of improvements to their water system. These
improvements will reduce YLWD dependency on more expensive water purchased from
MW DOC.
Risk Management Professionals N
Mechanisms for Determining Actual Type of Data Expected
Reductions
1. Production Meter Readings
2. Imported Water Metering
GPD
GPD
3. Residential Water Metering and Site GPD
Monitoring
1. Production Meter Readings
YLWD has meters on all wells that provide access to daily water use readings. An analysis of
the daily production meter readings will provide values for actual reductions in water use.
2. Imported Water Metering
YLWD has meters on all imported water connections that provide access to readings of daily
quantities of imported water.
3. Residential Water Metering and Site Monitoring
During stages of mandatory conservation, YLWD will conduct monthly residential meter
readings and site monitoring, as necessary. Site monitoring will be prioritized based upon the
amount of water consumed. For those customers not in compliance with the mandatory
conservation, YLWD will manually shut-off the connection until compliance is confirmed.
Risk Management Professionals M
RESOLUTION NO. 08-10
RESOLUTION OF THE BOARD OF DIRECTORS
OF YORBA LINDA WATER DISTRICT AMENDING
CHAPTERS 8.1.1 AND 8.4.2 OF THE ADOPTED 2005 URBAN WATER
MANAGEMENT PLAN
WHEREAS, in semi-arid Southern California it is imperative that every reasonable
measure be taken to manage precious local and imported water
supplies, and
WHEREAS, the Board of Directors of Yorba Linda Water District adopted an Urban
Water Management Plan in 1985 pursuant to the requirements of the
Urban Water Management Plan Act of 1983, and
WHEREAS, the purpose of the plan is to provide a perspective and analysis of
current and alternative water management activities of the District, and
WHEREAS, the Board of Directors adopted an update to the Urban Water
Management Plan in 1990, 1995, 2000, with the latest update to the
Plan being adopted in December of 2005, and
WHEREAS, the Yorba Linda Water District Urban Water Management Plan
incorporates by reference regional plans approved by the Metropolitan
Water District of Southern California and Municipal Water District of
Orange County, and
WHEREAS, the Board of Directors adopted Resolution No. 08-07, A Resolution of
the Board of Directors of the Yorba Linda Water District Implementing
Action Level 1 of the Water Shortage Contingency Plan established by
the 2005 Urban Water Management Plan calling for an immediate
voluntary ten percent reduction in water use, and
WHEREAS, the Board of Directors has reviewed and desires to amend the Action
Stage Levels identified in Chapter 8.1.1 and Chapter 8.4.2 of the Water
Shortage Contingency Plan established by the 2005 Urban Water
Management Plan.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Yorba Linda
Water District as follows:
Section 1. That the 2005 Urban Water Management Plan - Chapter 8.1.1 of the
Water Supply Shortage Stages and Conditions Levels 1 through Level 4
be updated to the Stages and Conditions Levels as shown on
Attachment "A" to this Resolution.
Section 2. That the District Actions identified in Chapter 8.4.2 of the Water Supply
Shortage Stages and Conditions Levels 1 through Level 4 as shown in
the adopted 2005 Urban Water Management Plan be amended to those
District Actions as shown on Attachment "B" to this Resolution.
PASSED AND ADOPTED this 14th day of August 2008 by the following called vote:
AYES:
NOES:
ABSENT:
ABSTAIN
President, John W. Summerfield
Yorba Linda Water District
ATTEST:
Secretary, Michael A. Payne
Yorba Linda Water District
RESOLUTION NO. 08-10
ATTACHMENT "A"
TO RESOLUTION OF THE BOARD OF DIRECTORS
OF YORBA LINDA WATER DISTRICT AMENDING
CHAPTERS 8.1.1 AND 8.4.2 OF THE ADOPTED 2005 URBAN WATER
MANAGEMENT PLAN
8.1.1 Stages of Action
In Table 8.1-1: Water Supply Shortage Stages and Conditions, stages are discussed
during which various conservation measures will be imposed by Ordinance No. 91-02,
beginning with voluntary conservation and leading to various stages of mandatory
compliance in the event that the water supply experiences shortages up to a 30%
reduction of the water supply.
Level 1: Voluntary Conservation Measures (Targeted 10%o Reduction)
Level 1 measures may be declared by the Board of The Board of Directors shall, by separate
Directors when, in their judgment, the possibility exists Resolution, establish voluntary conservation
YLWD may not be able to meet all of the demands of goals and advise customers of ways to
its customers without punitive surcharges levied conserve water.
against YLWD due to restrictions on imported supply.
Level 2: Mandatory Conservation - Water Watch (Targeted 10 % Reduction
Level 2 measures, hereinafter referred to as 'Water The Board of Directors shall, by separate
Watch", may be declared by the Board of Directors Resolution, determine the extent of
when, in their judgement, the probability exists that conservation required by setting a percentage
YLWD will not be able to meet all of the water of the Base Target Amount for high priority and
demands of its customers without punitive surcharges low priority water use, advise customers of
levied against YLWD due to restrictions on imported ways to save water and may enforce such
supply. allocation by mandating certain practices......
Stage 3: Mandatory Reduction - Water Warning (Targeted 20 % Reduction)
Water Supply Conditions Percent Shortage
Water Supply Conditions Percent Shortage
Level 3 measures, hereinafter referred to as "Water
Warning", may be declared by the Board of Directors
when, in their judgment, YLWD will not be able to meet
all of the water demands of its customers without
punitive surcharges levied against YLWD due to
restrictions on imported supply.
The Board of Directors shall, by separate
resolution, determine the extent of conservation
required, set a percentage of the Base Target
Amount for high priority and low priority water
use, advise customers of ways to save water
and may enforce such allocation by mandating
certain practices.....
Stage 4: Water Emergency (Targeted 30% Reduction)
Level 4 measures, hereinafter referred to as "Water The Board of Directors shall, by separate
Emergency', may be declared by the Board of
Directors when the failure of any supply or distribution
facility, whether temporary or permanent, occurs in the
water distribution system of the State Water Project,
Metropolitan Water District of Southern California,
Municipal Water District of Orange County, Orange
County Water District or Yorba Linda Water District
Resolution, determine the extent of
conservation required, set a percentage of the
Base Target Amount for high priority and low
priority water use, advise customers of ways to
save water and may enforce such allocation by
certain practices.
may seriously affect the ability to supply water to
customers.
RESOLUTION NO. 08-10
ATTACHMENT "B"
TO RESOLUTION OF THE BOARD OF DIRECTORS
OF YORBA LINDA WATER DISTRICT AMENDING
CHAPTERS 8.1.1 AND 8.4.2 OF THE ADOPTED 2005 URBAN WATER
MANAGEMENT PLAN
Consumption Reduction Methods and Prohibitions Actuation
Stage
.Aid":i ;k•rv'` i'~~I'i', 35
3 ' 4f. YM III a"Iii~iiia e.tT Pi'4j~,°..x q
~:Ftz°Yd t ~.i.
yy '.alt nR1. m~Y 'aVI'r'4."i.m
..1'k' id~u Cll,~
x y
S'
4 r
a"w.. 4 ~`i'x:~°^~I "i 3 Ir u,~a~ r ,[~~i I'.. '.I..li„,.: "~'•^t; t <a „i a;t
1
1 Check monthly for plumbing leaks and any leaks found should be repaired Level 1
immediately.
Irrigate commercial nurseries, golf courses, parks, school yards, traffic
medians and other public open space and other non residential landscaped
2. Level 1
areas no more often than every third day, and only between the hours of
6:00 p.m. and 5:00 a.m.
Reduce outside Irrigation schedules to the absolute minimum to keep
3. important plants alive. Withhold fertilizer to Inhibit new growth. Level 1
Residential customers with addresses ending with an even number water
lawns, landscaping and other turf areas only on even number days of the
month and between the hours of 4:00 p.m. and 10:00 a.m. Residential
4. Level 1
customers with addresses ending with an odd number water, lawns,
landscape, and other turf areas only on odd number days of the month and
between the hours of 4:00 p.m. and 10:00 a.m.
Adjust sprinklers to avoid "watering" sidewalks and gutters, and lower
5. Level 1
pressure to avoid creating a wasteful mist.
Actuation
Consumption Reduction Methods and Prohibitions
Stage
Eliminate washing of sidewalks, walkways, buildings, walls, patios,
driveways, parking areas or other paved surfaces, or walls except to
6. eliminate conditions dangerous to public health or safety or when required Level 1
as surface preparation for the application of architectural coating or painting,
and to alleviate immediate fire hazards.
Curtail water use to clean, fill or maintain levels in decorative fountains,
7. ponds, lakes, or other similar aesthetical structures unless such water use is Level 1
approved in advance by YLWD.
Curtail water used for the initial filling or refilling of swimming pools, spas or
8. ponds unless such water use is approved in advance by YLWD. Level 1
Replacement due to evaporation Is permitted..
Curtail washing of motor vehicles, trailers, boats and other types of
equipment unless a bucket and a hose equipped with a positive shutoff
9, nozzle for quick rinses is used. Washing of vehicles may be done by a Level 1
commercial car wash that uses recycled water.
Display notice that water will be served only upon request at all restaurants,
10. hotels, cafes, cafeterias or other public place where food is sold, served or Level 1
offered for sale.
Water should only be served when requested by a customer in restaurants,
11 hotels, cafes, cafeterias or other public places where food is sold or offered Level 1
for sale.
Post notice of the water supply shortage In each room of hotels, motels,
inns, guest houses, bed and breakfast facilities and short-term commercial
12. Level 1
lodgings along with an explanation of necessary compliance measures
taken by the establishment.
Consumption Reduction Methods and Prohibitions
Actuation
Stage
Install low-flow shower heads, toilet dams or low-flow toilets, and faucet
13., flow restrictors in each room of hotels, motels, inns, guest houses, bed and
Level 1
breakfast facilities and short-term commercial lodgings.
14. Hand water, plants with a positive shut-off hose nozzle.
Level 1
15. Place a plastic bottle, bag or dam in all toilets.
Level 1
16, Use automatic dish and clothes washers for full loads only.
Level 1
Insulate hot water pipes to reduce waiting time for hot water. Install
17_ Level 1
circulating hot water system or point-of-use water heater.
18. Turn off the water while brushing teeth, washing hands and/or shaving. Level 1
19. Install water saving shower heads and/or flow restrictors. Level 1
Take shorter showers. Turn off the water when lathering, shampooing, or
2U• Level l
shaving. Turn the shower back on to rinse.
Capture bath/shower warm-up water in buckets and use the water to irrigate
21. plants or to flush toilets. Level 1
22. Use garbage disposers sparingly. Level 1
23. Do not plant any annuals or new plants that will require extra watering. Level 1
Place mulching material in landscaped areas to decrease soil moisture
24. Level 1
evaporation.
25. Use a broom to dean outside patios, porches and sidewalks. Level 1
Cover spas and swimming pools when not in use. If spa or pool will not be
26. used, make necessary preparations for not refilling the spa or pool while Level 1
shortage lasts.
District Actions
Limituse of water from fire hydrants to fire fighting, approved construction
1. activities or other activities as approved by YLWD as necessary to maintain Level 1
the health, safety and welfare of the public.
Turn off all construction meters until the condition s) causing the shortage
2, Level 1
are abated to the satisfaction of the General Manager.
Actuation
Consumption Reduction Methods and Prohibitions
Stage