Loading...
HomeMy WebLinkAbout2005-01-12 - Planning-Engineering-Operations Committee Meeting MinutesITEM NO. MINUTES OF THE m YORBA LINDA WATER DISTRICT PLAN NING-ENGINERING-OPERATIONS COMMITTEE rA z January 12, 2005 - 4:00 p.m. o a 9 A meeting of the Planning-Engineering-Operations Committee was called to order by Corrr~n'Rtee o Chairman Michael J. Beverage at 4:00 p.m. The meeting was held at the District Headquarters, 4622 Plumosa Drive, Yorba Linda. DI}EC-QRS PRESENT STAFF PRESENT Mic ae ,J Beverage, Chair Michael A. Payne, General Manager Paul R. Armstrong Ken Vecchiarelli, Asst. General Manager Lee Cory, Operations Manager Diane Dalton, Lead Worker INFORMATION ITEMS Sewer Overflow Response. Mr. Cory and Sewer Leadworker, Diane Dalton reported on staff's response to a sewer overflow on Sunday, January 9, 2005 following heavy rain storms. Ms. Dalton left the meeting after this discussion. 2. Hydro-Excavator Bids. Mr. Cory reported staff received bids for a hydro-excavator to be used to safely excavate near other utilities. Staff is analyzing the bids and will present a purchase recommendation for the Board of Directors' consideration. 3. In-lieu Water Production. Mr. Vecchiarelli and Mr. Cory presented information on the District's December in-lieu water operations. Mr. Cory left the meeting following this discussion. ACTION ITEMS 4. Bastanchury Road Transmission Pipeline. Mr. Vecchiarelli reported on the completion of construction activity for the emergency replacement project. Final Board action is recommended for January 27, 2005. 5. Central Yorba Linda Pipeline Project. Mr. Vecchiarelli reported on status of negotiations with the contractor involving delays and cost impacts on the project. 6. Bastanchury Site Optimization Plan. Mr. Vecchiarelli presented a concept plan for the Bastanchury Reservoir and Booster Station Site Optimization Project. The committee discussed this concept plan at length. 7. Vista Del Verde Water Facilities Cash In Lieu Option. In conjunction with the discussions for the Bastanchury Site Optimization Plan, the committee discussed a cash in lieu option for the Vista Del Verde infrastructure improvements at the Bastanchury Site. The Committee Adjourned at 5:30 p.m.