HomeMy WebLinkAbout2009-04-02 - Planning-Engineering-Operations Committee Meeting Agenda Packet Yorba Linda Water District PLANNING-ENGINEERING-OPERATIONS COMMITTEE MEETING Thursday, April 2, 2009,4:00 p.m. 1717 E. Miraloma Avenue, Placentia - Tel: (714) 701-3020 AGENDA COMMITTEE STAFF Director William R. Mills, Chair Ken Vecchiarelli, General Manager Director Paul R. Armstrong Steve Conklin, Engineering Manager Lee Cory, Operations Manager Ken Mendum, Operations Superintendent John DeCriscio, Chief Plant Operator PUBLIC COMMENTS Any individual wishing to address the Committee is requested to identify themselves and state the matter on which they wish to comment. If the matter is on this agenda, the Committee Chair will recognize the individual for their comment when the item is considered. No action will be taken on matters not listed on this agenda. Comments are limited to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to five minutes. ACTION ITEMS This portion of the agenda is for items where staff presentations and committee discussions are needed prior to formal committee action. 1. Change Order No. 6 for the Lakeview Reservoir Project Recommendation: That the Committee recommend the Board of Directors approve Change Order No. 6 adding 21 calendar days for construction of the Lakeview Reservoir Project, Job No. 200704. 2. Professional Services Agreement Amendment for Environmental Compliance Services for the Highland Reservoir Replacement Project Recommendation: That the Committee recommend the Board of Directors authorize an amendment to the Professional Services Agreement with Bon Terra Consulting in the amount of $15,700 for additional environmental compliance services for the Highland Reservoir Replacement Project, Job No. 200309. 3. Award of Geotechnical Engineering Services for the Hidden Hills Reservoir Project Recommendation: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement for Geotechnical Engineering Services with Leighton Consulting, Inc. for the Hidden Hills Reservoir Project in the amount of $94,558. 1 4. Resolution Supporting the Santa Ana River Watershed Integrated Regional Water Management Plan Recommendation: That the Committee recommend the Board of Directors adopt Resolution 09-05 supporting the "One Water One Watershed" Santa Ana River Watershed Integrated Regional Water Management Plan and its submittal to the Department of Water Resources for Proposition 84, Chapter 2 Program Funding, and direct the General Manager to send a response letter to Santa Ana Watershed Project Authority staff. 5. Shapell Pre-Annexation Acreage Fee Agreement Recommendation: That the Committee recommend the Board of Directors authorize the President and Secretary to execute an Acreage Fee Agreement with Shapell for Vesting Tentative Tract Map 16208, subject to prior execution of the Agreement by Shapell. DISCUSSION ITEMS This portion of the agenda is for matters such as technical presentations, drafts of proposed policies, or similar items for which staff is seeking the advice and counsel of the Committee members. This portion of the agenda may also include items for information only. 6. 2009/10 Preliminary CIP Budget (Report at Meeting) 7. Monthly Groundwater Production and Purchased Water Report (Update pending) 8. Monthly Preventative Maintenance Program Report (Report at Meeting) 9. Monthly MWDOC Managers Meeting Summary Report (Report at Meeting) 10. Monthly OC Groundwater Producers Meeting Summary Report 11. Status Report on Capital Projects in Progress 12. Plan for Expansion of Groundwater Supply (Report at Meeting) 13. Future Agenda Items and Staff Tasks ADJOURNMENT The next regularly scheduled meeting of the Planning-Engineering-Operations Committee will be held May 7, 2009 at 4:00 p.m. Items Distributed to the Committee Less Than 72 Hours Prior to the Meeting Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items and are distributed to the Committee less than seventy-two (72) hours prior to the meeting will be available for public inspection in the lobby of the District's business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870, during regular business hours. When practical, these public records will also be made available on the District's internal website accessible at http://www.ylwd.conV. Accommodations for the Disabled Any person may make a request for a disability-related modification or accommodation needed for that person to be able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and the type of accommodation requested. A telephone number or other contact information should be included so the District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should make the request with adequate time before the meeting for the District to provide the requested accommodation. 2 ITEM NO. AGENDA REPORT Committee Meeting Date: April 2, 2009 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, General Manager Staff Contact: Steve Conklin, Engineering Manager Joe Polimino, Project Engineer Reviewed by General Counsel: N/A Budgeted: Yes Total Budget: $ 11.5 Funding Source: District and Developer Funds CEQA Account No: 101-2700 Job No: 200704 Compliance: Mitigated Neg. Dec. Estimated Costs: N/A (No Cost) Dept: Eng Subject: Change Order No. 6 for the Lakeview Reservoir Project SUMMARY: On January 25, 2007, the District Board of Directors authorized the execution of an agreement with SSC Construction, Inc. (SSC) for construction of an 8-million gallon underground concrete reservoir, piping and appurtenances. The project also includes demolition of the existing Bastanchury Booster Pump Station and Reservoir (two steel storage tanks). The site is located north of Bastanchury Road off the new Lakeview Avenue extension, north of the Hover Development and south of Vista Del Verde's Village 4. When completed, the project will increase operational, fire and emergency storage capacity, retain better water quality through improved circulation and improve reliability of the water system. DISCUSSION: In accordance with the contract documents, SSC submitted a request for Change Order No. 6 which represents a no-cost change and a time extension of 21 calendar days. Change Order No. 6 • 21 calendar-days time extension due to rain, which prevented work on the site. The status of the construction contract with SSC Construction, Inc. is as follows: • The current contract is $11,006,911.61 and 642 calendar days starting June 18, 2007. • Total payments to date including retention are $10,423,908.37 (94.7% of the total contract amount). • As of February 28, 2009, 622 calendar days were used (96.9% of the contract time). • If approved, Change Order No. 6 increases the total calendar-days to 663. Staff and Butier, the District's construction manager for the project, have reviewed the contractor's request for Change Order No. 6 and recommend approval. A copy of Change Order No. 6 is attached for your review and consideration. i PRIOR RELEVANT BOARD ACTION(S): On January 25, 2007, the District Board of Directors approved and awarded a construction contract with SSC Construction, Inc. in the amount of $10,489,500 for construction of an 8 million gallon underground concrete reservoir, piping and appurtenances, and demolition of the existing Bastanchury Booster Pump Station and Reservoir. On April 10, 2008, the District Board of Directors approved Change Order No. 1 increasing the total contract amount to $10,639,500 and total contract calendar days to 547. On June 30, 2008, staff approved Change Order No. 2 in the net amount of $2,887.92 increasing the total contract to $10,642,387.92. On July 10, 2008, the Board of Directors approved Change Order No. 3 in the amount of $55,393.45 and an additional 27 calendar days to be added to the contract. On February 12, 2009, the Board of Directors approved Change Order No. 4 in the amount of $167,113.53 and an additional 49 calendar days to be added to the contract. At the same meeting, the Board of Directors also approved Change Order No. 5 in the amount of $142,016.71 and an additional 19 calendar days to be added to the contract. The Board has approved twenty two progress payments to date for this project, the most recent of which was approved on March 26, 2009. STAFF RECOMMENDATION: That the Committee support recommend the Board of Directors approve Change Order No. 6 adding 21 calendar-days for construction of the Lakeview Reservoir Project, Job No. 200704. YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 006 DATE March 18, 2009 Page 1 of 1 CONTRACT NAME: Lakemdew Reservoir CONTRACT AMT.: $ 11.008.911.81 DAYS: 642 CONTRACTOR: SSC Construction Inc. THIS CHANGE: $ 0.00 DAYS: 21 N OWNER: Yorba Linda Water District REVISED CONTRACT AMT: $11-00.911.81 DAYS: 889 This Change Order covers charges to to subject contract as described herein. The Contractor and constmd, hunish eqgpment aid materials. and perform at wank as necessary or required to aonpiraa the Chem Order Rom for a hump wan Vice agreed upon halvsen the Contractor and Yoft Ursa Water ObstrPC oturwbe refl. to as Ownw. HNCREASE CONTRACT /OR TIME DESCRIPTION OF CHANGES •EMENSION f -DECREASEIN OR'REDUCTION CONTRACT (DAYS) AMOUNT t$I 1.) Rain days tehkdh prevented work to be done on Critical Path Hernia. $0.90 + 21 NET CHANGE $0.00 + 21 Days REVISED CONTRACT AMOUNT AND TIME $111,000,911.61 as Days The smut of to Contract we be Increased / decreased by the sun of ACM and the ccraract mare shat be Increased by 21 caisnder days. The Contractor approves the fbreg ft Chace Outer as to the chwhges, t cry. In the omaac prize spedw for own Ilan Including costs and d supervision ompMm of Me arras h on acwLmt of said q ~ change In wak agrees kas a lsh do extension of fte alumed, If wry~ I Mor and vaterfols ard perform eff other neaasasry wank. InduNve of that directly or indhacty, related to Bra approved sere er0.wubn, ro*Asod to ownpbts the Change Ord tema. This domenem vdg beoome a stipplemem of the contract and and prvlelaa vA apply huerhdo. 8 isundersInOd gin ter Change Order armed be eteclIve Wm apVrovad by the Ovmer This Change Order corhf4htes full. Oral, and oomph comperis®ton to the Contractor foram costs. a penses, ow rhad, profit, and any damages of every kNd that the Contractor may Inew In owvtm*m vAth to above referenced charges In the %wk. Including ayimpac on the rdwenced vamk many cow wank under to a mraet, any changes In ao sequences : of any work, any delay to any work, any disruption of any wank, any msdh &ft of any work and any Wear affect an any of pre Wk under too coreract, ey to acemson Of the Ow4p ova. to Comractor arcepb to Contract piles Change end me contact Corhhplelim data Change, gay. and exiawalywaimm any Claim for cry additional oonV rsetlan, dernages mama adsrxdma, in Comedion molar the above-velarenced dermas. J~ ENOtNEER OR RECOMMENDED: ti LC A~j1J~s,c {`LR CONSULTANT DATE fiq 16q Jon hisanh Cmnstructlon umpor ACCEPTTr'.D. / ~ CONTRACTOR DATE: 3Nr~~aY eefderd-SSC Construction APPROVED. OWNER DATE: Kenneth R. Veccharefg, Gororel Manager ITEM NO. AGENDA REPORT Committee Meeting Date: April 2, 2009 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, General Manager Staff Contact: Steve Conklin, Engineering Manager Leon de los Reyes, Water Quality Engineer Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 11.2 M Funding Source: Water Revenue Bond CEQA Account No: 102-2700 Job No: 200309 Compliance: Mitigated Neg. Dec. Estimated Costs: $ 15,700 Dept: Eng Subject: Professional Services Agreement Amendment for Environmental Compliance Services - Highland Reservoir Replacement Project SUMMARY: BonTerra Consulting, submitted a contract amendment request (attached) for $15,700 for additional environmental services necessary to comply with the CEQA requirement beyond their original scope of work. The additional tasks provide Historic American Engineering Record photographs and documentation required for CEQA compliance. DISCUSSION: In the Mitigated Negative Declaration (MND) prepared for the project at its outset, an architectural evaluation was performed. It was determined that the reservoir, constructed in 1911, was significant as a key structure in an early 201h Century California water system that evolved from an irrigation colony into a major suburb. Accordingly, photographs and documentation of the existing reservoir are required to comply with the conditions of the Historic American Engineering Record (HAER). BonTerra Consulting, the District's consultant for CEQA documentation for the project, was of the understanding that the District possessed necessary historical photos and documentation to meet the requirements of (HAER), and did not include this in its work scope for services during the construction phase. It was later determined that the District did not have the extensive photos and documents required. It was also confirmed that since the Board approved the project MND that included compliance with HAER, that documentation must be provided to meet the conditions of the MND. At that time, the District asked BonTerra for a proposal for the necessary work to comply with HAER. PRIOR RELEVANT BOARD ACTION(S): The Board of Directors awarded a construction contract to Schuler Engineering on April 10, 2008 in the amount of $9,049,346 for construction of the project. On May 15, 2008, the Board approved execution of a Professional Service Agreement with Carollo Engineers in the amount of $605,856 for engineering support services, construction management and backup inspection services; a Professional Service Agreement with Leighton Consulting Engineers in the amount of $86,200 for geotechnical services, soils, concrete and materials testing; a Professional Service Agreement with BonTerra Consulting in the amount of $22,251 for environmental compliance services; and approved the construction budget in the amount of $11,200,000 for construction of the Highland Reservoir Replacement Project. The Board has approved 10 progress payments and 2 construction change orders to date, the most recent of which was approved on March 26, 2009, and March 12, 2009 respectively. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize an amendment to the Professional Services Agreement with Bon Terra Consulting in the amount of $15,700 for additional environmental compliance services for the Highland Reservoir Replacement Project, Job No. 200309. PASADENA COSTA MESA C O N S U L T! N G 1: (714) 444-9199 F: (714) 444-9599 1151 Kalmus Drive. Suite E-200 w .BonTerraConsulting.com Costa MESO. CA 92626 March 17, 2009 Mr. Leon de los Reyes VIA EMAIL AND MAIL Water Quality Engineer Ide_los_reyes@ylwd.com Yorba Linda Water District 1717 East Miraloma Avenue Placentia, California 92870 Subject: Contract Amendment to Highland Reservoir Replacement Monitoring Services Project to Prepare Historic American Engineering Record (HAER) Photography and Documentation to Level II Standards for the Demolition of the Highland Reservoir in the City of Yorba Linda, Orange County, California Dear Mr. de los Reyes: In accordance with your request, BonTerra Consulting is submitting a request for a contract amendment to provide Historic American Engineering Record (HAER) Photographs and Documentation to Level II Standards. This documentation is required for compliance with the mitigation measures in the 2006 Mitigated Negative Declaration (MND) prepared for the demolition of the Highland Reservoir in Yorba Linda, California. Our existing contract is also associated with implementing the required mitigation measures from the MND. The focus of the existing work is bird surveys and paleontological monitoring. The proposed work effort for HAER photography and documentation is outside of our current scope. This effort would be headed up by Mr. Patrick Maxon, RPA, BonTerra Consulting's Director of Cultural Resources. BonTerra Consulting is available to initiate work immediately on the HAER Level II photography and documentation for the Highland Reservoir Replacement Project and will work closely with you to ensure its successful and timely completion. We appreciate the opportunity to work with the Yorba Linda Water district on this project. Please call me or Diane Barrett at (714) 4449199 with any questions or if you need additional Information. Sincerely, BONTERRA CONSULTING Thomas E SmI , r., AICP Diane E rrePrincipal-in-Ch a Senior Planner cc: Patrick Maxon, RPA Attachment A: Scope of Work and Fee Estimate for Contract Amendment r~ &kPMP0Ws%YLWDW0WWW Cwbkwd0.11708.0m 14 vre MR, At 7 * 4 b hiAO n rz a ~ EN s7 HiaMend Reservoir Replecem" Proposal for HAER ll Documentation ATTACHMENT A SCOPE OF WORK AND FEES HISTORIC AMERICAN ENGINEERING RECORD (HAER) PHOTOGRAPHY AND DOCUMENATION TO LEVEL II HIGHLAND RESERVOIR REPLACEMENT PROJECT March 17, 2009 PROJECT UNDERSTANDING As required in the mitigation measures for the Highland Reservoir Replacement Project Mitigated Negative Declaration (MND) in 2006, HAER Level II photography and documentation will be prepared under this contract amendment scope of work. TASK 1 PREPARATION OF HAER LEVEL 11 PHOTOGRAPHS $6,000.00 BonTerre Consulting will provide large-format photographs to satisfy the HAER II documentation requirements set forth in the CEQA documentation for the Highland Reservoir Replacement project. Photographic documentation of the historic Highland Reservoir; principal photography will include two (2) sets of photographs to be completed on large-format 4x5 black and white film, processed and contact printed to HAER archival standards. A corresponding photo description list will be produced per NPS format. Project management activities (I.e. project scheduling, billing, etc.) are included in the work product. Photography fee of $1,500.00 per day; 4x5 black and white negatives and contract prints of $20.00 per set (two sets of each will be produced). If the photographer takes photographs of the interior prior to roof removal, artificial lighting would be necessary at an additional cost. Total project fees, including miscellaneous costs such as project management, film purchase (including sales tax), number of days in the field and preparation of the corresponding photo description list shall not exceed $6,000.00 without prior client approval. TASK 2 PREPARATION OF HAER LEVEL II DOCUMENTATION $9,700.00 In association with our historical resources sub-consultant Daly & Associates, BonTerra Consulting will conduct a field survey to personally Inspect the setting, location and what may remain of the reservoir after demolition takes place. We will also conduct research to document the history of the Highland Reservoir, and the engineering history of early reservoir and Irrigation systems in California similar to the Highland Reservoir. Historic archives will be researched as a part of the project. These resources Include, but are not limited to the Orange County Archives, Santa Ana Library Special Collections, Los Angeles Times, Los Angeles Main Library, and California State Polytechnic, Pomona, CA. One complete archival document, with properly labeled large-format photos and negatives and three copies of the HAER II document, will be prepared for local history repositories. Please note that the fees for Task 2 do not include the costs of obtaining archival quality copies of the original engineering drawings. It is our understanding that the Yorba Linda Water District will provide BonTerra Consulting with copies of the original drawings. These sheets will then have to be copied according to HAER Level 11 specifications on Mylar sheets, and would involve additional reimbursable costs approximately $125.00 per sheet. At this time, BonTerra Consulting does not know how many sheets will need to be copied. These reimbursable costs will be billed on a time- and-materials basis; a separate budget augmentation request will be submitted for District approval prior to initiation of the copying process. TOTAL PROFESSIONAL FEES $15,700.00 MPra *mMYLwDPoW6OW centine"17MAx A-1 Scrape or Wodc and Fees ITEM NO. 3 AGENDA REPORT Committee Meeting Date: April 2, 2009 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, General Manager Staff Contact: Steve Conklin, Engineering Manager Joe Polimino, Project Engineer Reviewed by General Counsel: No Budgeted: Yes Total Budget: $ 9,000,000 Funding Source: I.D. No. 2 G.O. Bonds CEQA Account No: 401-2700 Job No: 200028 Compliance: Mitigated Neg. Dec. Estimated Costs: $ 95,000 Dept: Eng Subject: Award of Geotechnical Engineering Services for the Hidden Hills Reservoir Project SUMMARY: Bids have been received for construction of the Hidden Hills Reservoir and upgrades to the Santiago Booster Station, and the construction contract has been awarded to Pacific Hydrotech Corporation in a separate action. In anticipation of the project construction, the District solicited proposals for geotechnical engineering services for the project. Following its evaluation process, staff recommends award for these services to Leighton Consulting, Inc., as presented below. DISCUSSION: It is planned that construction of the two million gallon capacity Hidden Hills Reservoir and upgrades to the Santiago Booster Station will begin shortly. In anticipation of this, the District solicited proposals for geotechnical engineering services for the project from five firms. A committee of three District engineering staff individually reviewed two of five proposals, since three of the firms decided not to submit a proposal for this project. The two proposals received were each evaluated and scored, based on technical presentation, staff qualifications and experience. Following the technical evaluation and ranking, the committee met with the Engineering Manager to discuss the proposals and open the separately-provided envelope from each firm with their proposed fee for services. The combined evaluation score and proposed fee for each firm are as follows: Firm Total Evaluation Score Proposed Fee Leighton 23.05 $94,558 MTGL 21.50 $92,293 NMG 0 $ none Kleinfelder 0 $ none Associated 0 $ none Based on proposal presentation, staff qualifications, experience and relative fee for services, staff recommends award to Leighton for $94,558. A copy of the Proposal by Leighton is attached. PRIOR RELEVANT BOARD ACTION(S): February 12, 2004 Board adopted Negative Declaration for the Hidden Hills Reservoir and authorized the President and Secretary to execute the project. November 9, 2004, Board authorized staff to execute an agreement with Carollo Engineers for the design of the Hidden Hills Reservoir Project. November 22, 2005, Board authorized staff to execute an amendment to the PSA with Carollo for design of the Santiago Booster Station Upgrades. October 26, 2006, Board authorized staff to execute an amendment to the PSA with Carollo Engineers for $26,500 for additional services for the Hidden Hills Reservoir Project. On March 12, 2009, the Board awarded Pacific Hydrotech Corporation the construction contract in the amount of $5,012,458.00. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize execution of a Professional Services Agreement for Geotechnical Engineering Services with Leighton Consulting, Inc. for the Hidden Hills Reservoir Project in the amount of $94,558. Leighton Consulting, Inc. A LEIGHTON GROUP COMPANY March 10, 2009 Proposal No. P601-01136 Yorba Linda Water District 1717 East Miraloma Avenue Placentia, California 92870-6785 Attention: Mr. Joe Polimino Project Manager Subject: Fee Proposal For Geotechnical and Material Testing Services During Construction Yorba Linda Water District Proposed 2.0 Million-Gallon Hidden Hills (Zone 6) Reservoir 22955 Hidden Hills Road Yorba Linda, California YLWD Job No. 2000028 In response to your February 2009 Request For Proposal (RFP), Leighton Consulting, Inc. is pleased to present this fee proposal to provide geotechnical, concrete and asphalt pavement observation and materials testing services during construction of this proposed 2.0 million-gallon (MG) Hidden Hills (Zone 6) dual-bay hopper, buried reinforced concrete reservoir, associated pipelines and upgrades to the existing Santiago Booster Pump Station, in Yorba Linda. This proposal is valid through June 30, 2009 (more than 90 days). Our qualifications and technical proposal were submitted separately. ESTIMATED BUDGET Our hourly rates are based on the assumption that this is a California Prevailing Wage project. Our fees will be reduced if this is not a Prevailing Wage project. Our fee will be charged on a time and expense basis in accordance with attached 1007 Professional Fee Schedule for Prevailing Wage Projects, discounted specifically for Yorba Linda Water District (only). This fee estimate is valid for ninety (90) days from the date of this proposal. We understand that a construction schedule was not available at the time of preparing this proposal. We have prepared our estimate based solely on February 2009 RFP. A breakdown of our assumptions and estimated fees is provided in the attached Table 1, Breakdown of Estimated Fees. In summary, we have estimated a budget for these services as listed below: 17781 Cowan a Irvine, CA 92614.6009 949.253.9836 a Fax 949.250.1114 a wwwApightonconsufting corn YLWD 2 .0 MG Hidden Hills Reservoir Fee Proposal P601-01136 I Geoteclmical Services (soil density testing, etc.) $12,844 $15,413 2 Construction Materials Testing (concrete) $81,714 $98,057 TOTAL: 594,558 5113,470 Rates may increase commensurate with future mandated changes in the California prevailing wages as determined by the California Department of Industrial Relations. Future wage and rate escalations are likely. Actual scope and cost may vary from what was estimated, if additional time is required on site or if additional test cylinders are required. If the actual site visits or hours requested are less than assumed, our fee would be less than estimated. Conversely, if there are numerous small pours, numerous failed soil density or failed concrete tests, extensive standby or unnecessary site visits, this budget estimate may be insufficient to complete the project, and we will notify you that our budget needs to be augmented. Further, the contractor may require additional breaks to evaluate form-stripping scheduling. Breaks other than at 7 and 28 days were not budgeted. This fee estimate is also based on the assumption that our field services will be performed during normal weekday daylight-hours and does not include overtime. CLOSURE We appreciate the opportunity to be of additional service to Yorba Linda Water District. If you have any questions or information that would update our scope of work, please call us at your convenience. The undersigned can be reached at (949) 250-1421 at the extensions and e-mail addresses noted below. Respectfully submitted, LEIGHTON CONSULTING, INC. A'Owww TaeKuk Kim, P.E. Thomas C. Benson, Jr., PE, Project Engineer President and CEO Extension 4265, int lei8htonerouo.mm Extension 8771, tbenso QJeiehtonvoup.com TKITCB/lr Attachments: Table 1, Breakdown ofErthnated Fees 2007 Professional Fee Schedule for Prevailing Wage Projects (discounted for Yorba Linda Water District) Distribution: (5) addressee -2-14 Leightor Table 1. Breakdown of Estimated Fees Geotechnical Observation and Testing During Construction, Hidden Hills Reservob Meetine Hours Rate Amount Field Operations Manager 3 $152 $456 Vehicle 3 $11 Subtotal: $489 Backfill Density T Hours Rak Amo t RFP calls for 30 field tests, assumed 30 field visits and 2 hours per visits Field Soil Technician (prevailing wage) 60 S75 $4,500 Field Operations Manager 4 $152 $608 Vehicle and Nuclear Density Gauge 64 $22 n m Subtotsh $6,484 Geotechnical Laboratory Tests (20 Tests TotsD uan ' nit Ro Amount Maximum Density/Optimum Moisture 6 $182 $1,092 Sieve Analyses 6 $135 $810 Organic Contents 4 $63 $252 Expansion Index (EI) 4 $131 524 Subtotal: $2,678 Final Compacted Fill Report Preparation Hours Rate Amount Principal Engineer 4 $247 $988 Senior Staff Engineer 10 $131 $1,310 Word Processor 5 $74 $370 CADD/Drafting 5 $105 $525 Subtotal: UM Subtotal Geotechnical Observation and Testing Estimate Fee: $12,844 Geotechnical Observation and Testing Contingency (20%): $2,569 Total Geotechnical Observation and Testing Estimate Fee: $15,413 Leighton Consulting, Inc. Irvine, CA P601-01136 Table 1 Fee Estimate 3/10/2009 Table 1. Breakdown of Estimated Fees Concrete Sampling and Testing Estimated Budget, Hidden Hills Reservoir Concrete Sampling and Testine Unit Oulantilly Rate Cost ACI Technician (on-site) hours 560 $70 $39,200 ACI Technician (batch plant inspection) hours 160 $70 $11,200 Concrete Cylinders (ASTM C31) each 250 $25 $6,250 Drying Shrinkage (3 bars) sets 10 $400 $4,000 Cement Content of Hardened Hydraulic-Cement Concrete tests 10 $1,440 $14,400 Pick-up and Delivery - Standard trips 20 $50 $1.000 Subtotal: $76,050 nt Administrative Saville rt Aoan Rate Amon Project Management / Materials Inspection Manager hours 16 $110 $1,760 Administration/Secrctarial hours 28 $78 $2,184 Review of files for final letter of affidavit hours 8 $215 $1.720 Subtotal: $5.664 Subtotal Concrete Sampling and Testing Eastimated Fee: $81,714 Concrete Sampling and Testing Contingency (200/6): $16,343 Total Concrete Sampling and Testing Eastimated Fee: $98,057 Abovemtesmebawdm Cahfomiapte wifugwegm WachetgeamfnimamfmAmm.daily. Any boors worked in excess of the lour-havminimumwill be changed et the tight-hang daily rate. Ssme~day cancellations will be charged as a four-hour miaimomn. Omservimare depmdenf upon the connameswark schedule. Vmiencesto the consauchan schedule mulling in additional haurs,trips, or teas am subject to additional fees that rosy exceed this estuoate. Leighton Consulting, Inc. Irvine, G P601-01136 Table 1 Fee Estimate 3/10/2009 Leighton Consulting, Inc. A .UGHi ON GXOJ? COMPANY 2007 PROFESSIONAL FEE SCHEDULE* FOR PREVAILING WAGE PROJECTS FOR YORBA LINDA WATER DISTRICT PROFESSIONAL SERVICES Technical Staff Hourly Rate Laborer" $95 Soffield Technician*• 75 Staff Engineer/GeotogistiScienfisl/Field Supervisor 115 Senior Staff Engineer/Geologis7Scleri t ...............................................................................................................................131 Operations Manager/Equipment Operator .............................................................................................................................152 Project Engineer/GeologisttScientist ......................................................................................................................................152 Senior Project Engineer/Geologist/Scientist ...........................................................................................................................168 Associate 189 Principal 205 Senior Principal ......................................................................................................................................................................247 Technical Support Staff Hourly Rate AdministrativeAssistant/Word Processor $74 CAD Operator/Technical Illustrator/GIS Specialist ..................................................................................................................105 Enalneedria Equipment Unit Rates Vehicle Usage $11 per hour T9tmeter, Inclinometer Units 200 per day Nuclear Soil Gauge .....................................................................................................................................................84 per day GPS Station ...............................................................................................................................................................168 per day Other Equipment Upon Request OTHER TERMS AND CONDITIONS • Overtime for field personnel (all technician and staff levels) will be charged at 1.5 times basic hourly rate listed above. • Expert witness testimony will be charged at 2.0 &rces the above rates, with a minimum charge of four hours per day. • invoices are rendered monthly, payable upon reoelpt. • Proposals are valid for 30 days, unless otherwise stated in the proposal. • Heavy equipment, subcontractor fees and expenses, supplemental insurance, travel, shipping, reproduction, and other reimbursable expenses will be invoiced at cost plus 20%, unless billed directly to, and paid by client. Client agrees to provide all information in Client's possession about actual or possible presence of buried utilities and hazardous materials on the site, and agrees to reimburse Leighton Consulting for all costs related to their unanticipated discovery. • These rates are predicated on standard insurance coverage and a limit of liability to our fees for the project • For "paid when paid" contracted work, Leighton Consulting shall receive payment within 10 calendar days from when our Client receives payment for our services. • Minimum Hourly Charges for Field Technicians: 1. Monday-Fdday 2 hours minimum 2. Saturday and Sunday 4 hours minbnum Effective through December 31, 2008, after which remaining work will be billed at then-current rates. Subject to change based upon changes In California prevailing wage rates. 1-07-P-YLWD 17781 Cowan a Irvine, CA 926145009 949.250.1421 ■ Fax 949.250.1114 owww.leightonconsulting.can GEOTECHNICAL LABORATORY TESTING PER TEST RATES IdeMiflcation and Index Ptciperdes (ASTM) Unit Rate Shear Strength (AM Unit Rate Moisture Content $16 Pocket Penetrometer $16 Moisture and Density (ring samples) 26 Torvane 16 Moisture and Density (chunk samples) 58 Single Normal Load Direct Shear 105 Moisture Content & Density (Shelby tube/cutfing) 63 3 Load Direct Shear, consolidated Urdrained (2:0.05 in. /min.) 265 AtterbeM Limits (3 moisture points) 121 3 Load Direct Shear, Consolidated Drained (4.05 inlrrdn.) 305 Atterberg Limb (organic) 182 Remolding or Hand Trimming of specimens (3 points) 78 Single Poin"n-plastic 84 Residual Shear - price per additional one-way pass per point 58 Visual classification of point as non-plastic 11 Torsional Shear 620 Particle Size: Sieve (passing 1lie-inch to - #200) 74 Oriented or Bbd( Hand Trimming 58 Sieve (passing 6-inch to - #200) 135 Hydrometer only 110 Static Unlaxlal and Triaxial Strenath Tests (ASTM) 1 %-Inch Sieve and Hydrometer 158 Unconifmed Compression (xim aaasa/saain pbo $89 Dispersive Characteristics of Clay Soil (double bydmmeter) 89 UU Test- UnconsolidatedlUndrained lpersa®ss) 168 Speck Gravity: Fine (passing #4) 89 Consolidated Undralned (CU,R) (per sir) 347 Coarse (retained on #4) 84 Three Stage Triaxiai Tests 6D8 Taal Porosity - On Shelby tube sample - calculation only 137 Consolidation and Swell Tests (ASTM) Taal Porosity - On other sample - tabulation only 105 Consolidation (w/one time deformation curve) $194 Pholograplh of swnple 11 Each Additional Titre Deformation Curve 47 Shrinkage Limit (wax method) 126 Each add'Nonal kradlunbad w/o Time Deformation Curve 42 Frftfe Dispersfom 210 Expansion Index (El, ASTM D 4829.03) 131 Sand Equivalent (SE, CTM 217) 89 Expansion Index (UBC 18-12) 165 Percent Passing #200 Sieve, wash sieve, only (ASTM D 1140) 58 Swell/Collapse Test (A) to m imm rowtvioadswto rain acres 289 Single Load SwelliCollapse Test (B) seK wed arxibuder 105 Collapse Potential of Sod (ASTM D 5333.03) 194 Soil Chemlatry Laboratory Pormeability Tests pH $42 Permeability (Hydraulic Conductivity) Electra Resistivity - Single point - as-received moisture 42 - Undisturbed driven tube sample $194 Minimum Resistivity (mirdmum of 3 moisture points) 89 - Remolded specimen 236 PH and Minimum Resistivity 131 Triaxial Permeability (at one effective stress) 294 Suffate Content - Gratdmettic 68 - Each Additional Effective Stress 121 Suffate Screen 32 - Hand Trimming for Horizontal K 58 Cihbdde Content 68 - Dairy charge for Long Term Tssb 7 days) 47 Corrosion SUfte: pH, chloride, mrr&w mesW.* and sukm (gm***) 221 Remolding of Test Specimens 58 Ogerdc Matter Content (ASTM D 2974) 63 Air Permeability (includes mature & density) 100 Air Permeability (modified for soils) 173 Comjoitilctfon (moisture and density curves) Standard Proctor (ASTM D 698) Compaction - 4 points CaRrans Tests (California Test Methods) 4 Inds diameter mold $182 R-Value, untreated soils (CTM 301, 3/2000) $289 6 inch diameter mob 215 R-Value, time or cement treated soils (57% additive) 338 Motfified Proctor (ASTM D 1557) - 4 points Samolina Eau)oonerd Charnes 4 Inch diameter mold 193 Box of Sample Rings (28 samples per box) $12&box 6 inch diameter mold 225 Daily Rig-Lined Drive Sampler Equipment Usage 37/day Cheri( Point 79 Relative Density (0.1 cubic foot mold) 236 As soil same should be nee of nezarmus amier Stallard b rtwoumd age Calrans Wet Density Compaction Curve (CTM 216) 215 for test results is 10 warheq days. swoes wa be dDred for a momdhs eMr whzh ' they will be discarded. Prior noaaraaonisrequired 0sampbsneed tobestored for a Caffomia Bearing Ratio (CBR) - 3 points 557 lager tine. A invuhy storage fee of $10 per bag and $5 per deeve will be applied. -1 point' 184 1.07-P 17781 Cowan s Irvine, CA 92614-M 949.250.1421 a Fax 949.250.1114 owww1eigMOnoonsulting.com possio~ / Leighton Consulting, Inc A LSIOH'ON GNOJP OOW~A4) MATERIALS TESTING & INSPECTION SCHEDULE OF SERVICES Task Professional Construction Materials Engineering Services Hourly Rate 6100 Project Management / Materials Inspection Manager $105 7100 Principal Engineer 168 7101 Registered Civil Engineer 127 7102 Staff Engineer 99 7103 Administration / Secretarial Time 74 7104 Reports - Test Results 17 each 7105 Review of Files for Final Letter of Affidavit (min. 2 tours) 144 7106 Expert Witness, Consultation and Court Appearances (min. 4 hours) 277 7107 Submittal Review for Compliance with Project Plans and Specifications 144 Task Special Inspec8on Services Hourly Rate 6200 Special Inspection Concrete ICC $70 6201 Special Inspection Post-Tension Concrete ICC 70 6202 Special Inspection Structural SteeUWeirfing & Bolting ICC 70 6203 Special Inspection Welding AWS/CW1 78 6204 Special Inspection Masonry ICC 70 6205 Special Inspection Masonry DSA 78 6207 Special Inspection Asphalt 70 6208 Special Inspection Fireproofing ICC 70 6211 Special Inspection Shotcuets ICC 70 6212 Special Inspection Shotcrete DSA 78 6213 Special Inspection Epoxy Injection & Anchors 70 6216 Building Inspection ICC 70 6217 Fabrication Inspection (Local) AWS/CWI, [CC, Glulam 78 6218 Fabrication Inspection (Outside Local Area) Quote 6219 Inspector Verified Report (DSA-8) 78 Task . Technician Services Hourly Rate 6230 Technician-Materiels (ACI Tech/Rebar Tag & Sample) $68 6232 Coring and Sizing (in house) 68 7120 Laboratory Technician 68 6233 Pachometer Survey - Technician 68 6234 Schmidt Hammer Survey -Technician 68 6235 Moisture Testing - Technician 68 6236 Grounding Rod Sal Resistance Test - Technician Quote 6237 Pult out Test on Embedded Bolts, Anchors and Dowels 65 6238 Earth Anchor Hold Down Test (4 Hour, Full Load Application with 5 minimum) Quote 6239 Earth Anchor Hold Down Test (Prelude / Short Tenn, w/Full Load) Quote 6240 Coring Concrete, Masonry or Asphalt in Field Quote 6241 Sawing Concrete, Masonry or Asphalt in Field Quote 6242 Pick-up and Delivery - Standard 40/trip 6243 Technician Travel Time (>40 mfle radius from Leighton Consulting laboratory) 71/hour Task Eauioment Charges Daily @3t? 6300 Skidmore-Wilhelm Bolt Cell $42 6301 Torque Wrench 16 6302 Air Meter 21 6303 Pachometer 53 6304 Schmidt Hammer 32 6306 Vibrating Probe (Concrete) 42 6307 110V,50A Generator 125 "7P 17781 Cowan a Irvine, CA 9261441109 949250.1421 a Fax 949.250.1114 ■ www.IdghlonoonsWgng.com Leighton Consulting, Inc. A L[16MTOp GROUO.;W'ANY Task Concrete Strength Characteristics Method Per Test 7200 Concrete Cylinders (6-Inch by 12-inch) - Compression ASTM 0-39 $23 7201 Gunite /Shotcrele Cores (Lab Coring & Testing Only) ASTM C-42 56 7202 Lightweight Fill Concrete (34nch by 64nch) ASTM C-495 36 7203 Compression, Concrete or Masonry Cores (testing only) 56-inch diameter ASTM C-42 36 7204 Splitting Tensile - 64nch by 12-inch cylinder ASTM C-496 42 7205 Flexural Strength of Concrete (Simple Beam with a pt. Loading) ASTM C-78 58 7206 Mix Design, Determination of Proportions 200 7207 Mix Design, Review of Existing 150 7208 Laboratory Trial Batch with Slump, Unit Weight & Air Content ASTM C-192 473 7209 64nch by 124nch Cylinder, Make and Test (lab trial batch) ASTM C-192 23 7210 34nch by 6-Inch Grout Prisms, Make and Test (lab trial batch) ASTM C-192 23 7211 64nch by 6-inch Flexural Beams, Make and Test pab trial batch) ASTM C-192 34 7213 Cylinder Molds, 64nch by 12-inch, 2-itch by 4-Inrh when not used with testing 3 7214 Unit Weight of Hardened Light weight Concrete ASTM C-567 34 7215 Rapid Cure Concrete Cylinders (Bog Method) ASTM C-684 34 7216 Drying Shrinkage (Four Readings, up to 90 days, 3 bars) ASTM C-157 263 7217 Modulus of Elaskily/Poisson's Ratio 34nch by 6-inch cores ASTM C-469 368 7374 Compressive StmrKA - Concrete Cylinder r CTM 521 23 7376 Flexural Strength of Concrete (simple beam w/ center point loading) t CTM 523 84 To Aggregate Properties Method Per Test 7240 Sieve Analysis of Fine and Coarse Aggregate ASTM C-136 $135 7241 Sieve Analysis-Finer than #200 (Wash) ASTM 0117 79 7242 LA Rattler-Smaller Coarse Aggregate c ASTM 0131 163 7243 LA Rattler-Larger Coarse Aggregate > ASTM C-535 189 7244 Soundness Magnesium, Sodknn ASTM C-88 215 7245 Organic Impurities ASTM C-40 68 7246 Clay Lumps, Friable Particles ASTM 0142 131 7370 Soil & Aggregate Preparation & Sieve (Firm & Coarse Aggregate) " CTM 201 & 202 263 7373 Grading & SpeaFic Gravity Calculation' CTM 105 79 7247 Durability Index CTM 229 131 7248 Cleanness Value of Coarse Aggregate CTM 227 105 Task Masonrv Method Per Test 7260 Mortar Cylinders (24nch by 4-inch) ASTM 0780 $23 7261 Mortar cubes (24nch by 2-Inch) ASTM C-109 23 7262 Grout Prisms (3-inch by 6-inch) ASTM 01019 23 7263 Compression, Concrete or Masonry Cores, s8-inch diameter (resting Only) ASTM C-42 34 7284 CMU Compression (3 required) to size 8-Inch by 8-Inch by 16-inch ASTM 0140 45 7265 CMU Compression (3 required) greater than 84nch by 8-Inch by 164nch ASTM C-140 50 7266 CMU Moisture Content, Absorption & Unit Weight (6 required) ASTM 0140 84 7267 Masonry Efflorescence (5 required) ASTM C-67 63 7268 CMU Linear Drying Shrinkage ASTM C-426 95 7269 CMU Grouted Prins (compression test s 8 inch by 8-inch by 164nch) ASTM E-447 158 7280 CMU Grouted Prima (compression test > 84nch by 84nch by 16-inch) ASTM E-447 210 7281 Masonry Core-Shear Title 24 (Test Only) 63 Task Brit Method PerT 7290 Compression (5 required) ASTM C-67 $40 7291 Modulus of Rupture (5 required) ASTM C-67 40 7292 Absorption, Soak (5 required) ASTM 067 32 7293 Absorption, Bail (5 required) ASTM C-67 32 7294 Absorption, Saturation Coefficient (5 required) ASTM C-67 47 7295 initial Rate of Absorption (5 required) ASTM 067 40 7296 Efflorescence (5 required) ASTM C-67 53 7297 Efflorescence with Mortar (5 required) ASTM 067 63 1-07P 17781 Cmran a Irvine, CA 92614-6009 949250.1421 a Fax. 949.250.1114 ■ www.leightonoonsulfing.com Leighton Consulting, Inc. A LEIGH70N C.AOJ° COV1 AAy Task Steel Reinforcement Method per Test 7300 Tensile Test, Up to No. 10 ASTM A-370 $42 7301 Tensile Test, No. 11 and over ASTM A-370 89 7302 Bend Test, Up to No. 8 ASTM A-370 34 7303 Bend Test, No. 9 and over ASTM A-370 50 Task Structural Steel Method Per T s1 7310 Tensile Strength, s100,000 pounds axial load ASTM A-370 $42 7311 Tensile Strength, 100,000 to 200,000 pounds axial load ASTM A-370 58 7312 Bend Test ASTM A-370 37 7313 Pipe Flattening Test ASTM A-370 Quote 7314 Machining and Preparation of Samples ASTM A370 50 7315 Brinell & Rockwell Hardness Test ASTM A-370 53 7316 Chemical Analysis, Carbon and Low Alloy Steel Quote Task Preoetressing Method Per Test 7320 Prestressing Wire ASTM A416 $158 7321 Sample Preparation (cutting) 50 7322 Prestressing Cable, 7 Wire (Breaking Strength/Modulus of Elasticity) ASTM A416 168 Weld Procedure and Welder Quallfications Until Raba 6320 Welder Certl6catlon Weld Procedure Review (AWS/CWI) $74/hour 7330 Weld Tensile Test 40 each 7331 Weld Bend Test 28 each 7332 Weld-Macro Etch 45 each 7333 Batt Tensile Test 50 each Task Fireproofing Method Per Test 7340 Unit Weight (Density) UBC Sid. 7.6 $53 7341 Cohesion/Adhesion UBC Std. 7-6 82 Task Asphalt Concrete. General Testing Method Per Test 7350 Extraction, Percent Asphalt and Gradation ASTM D 2172/ c 136 $194 7351 Extraction & Percent Asphalt (only) ASTM D 2172 75 7355 Extraction and Gradation Only ASTM D 2172/ C 136 152 7352 Unit Weight - Molded Specimen or Cores ASTM D-118 53 7353 Maximum Density - Hveem CTM 308 84 7354 Stabilometar Value CTM 366 263 7357 Bituminous Mixture Preparation CTM 304 79 7377 Moisture Content of Asphalt t CTM 370 58 7378 Sampling Highway Materials/Products (Roadway Structural Sections) t CTM 125 per pan Quote 7379 Extraction by Ignition Oven CTM 382 (8/2003) 55 Rubberized Asphalt add 25% Ink Mix DesionlControf Method ® To 7360 Mix Design - Hvemn Including Aggregate Tests per Design ASTM D 1560/CTM 366 Quote 7361 Mix Design - Marshall Including Aggregate Tests per Design ASTM D 1559 Quote 7362 Field Mix - Hveem Stability per point ASTM D 1560/CTM 366 $158 7363 Field Mix - Marshall Stability per point ASTM D 1559 158 Task Moisture Vapor Emission Rate (MVER1 Test Method Per Test 6325 Moisture Test Kit (excludes labor to perform test) ASTM E-1907 $57 Ink Outside Services Non-Destructive Testing (NDT) of Welds ANSI Quote Radiographic Testing Quote 'soil tmaterial **Soil& materials 1-07P 17781 Cowan ■ Irvine, CA 92614-M 949.250.1421 ■ Fax 949.250.1114 a www.le ghlonconsulling.wm Leighton Consulting, Inc. A LCIOHTON GROUP COMPANY BASIS OF CHARGES FOR MATERIALS INSPECTION & TESTING REGULAR WORK HOURS: First 8 hours between 6:00 a.m. and 5:00 p.m. Monday through Friday, except holidays. TIME AND ONE HALF: After 8 hours and up to 11 hours Monday through Friday and Saturdays. DOUBLE TIME: After 11 hours and Sundays. TRIPLE TIME: Holidays: New Years, Memorial Day, Independence Day, Veterans Day, Thanksgiving and the day after Thanksgiving, Christmas Day and Labor Day. MINIMUM HOURLY A. Special Inspector (Field Time Only) CHARGES- 1. Cancellation of Inspections not canceled by 4:00 p.m. on preceding day.......... _......2 Hours Inspectors & Technicians: 2. One-half working day or less 4 Hours 3. Over one-trsK working day/or begins before noon and extends into afternoon 8 Hours B. General Inspector (Field Time Only) 1. One-half working day or less ................................_...................................................4 Hours 2. Over one-half working daylor begins before noon and extends into afternoon ..........8 Hours C. Technician - Field/Concrete 1. Cancellation of Inspections not cancer by 4:00 p.m. on preceding day ..................2 Hours 2. One-half working day or less 4 Hours 3. Over one-half working daylor begins before noon and extends into afternoon 8 Hours CYLINDER HOLDS: After all designated 28-day breaks for a given set meet specified compressive strength, all "hold" cylinders will automatically be disposed of, unless specified in writing prior to the 28-day break. OUTSIDE SERVICES: Outside services performed by others and direct costs expended on the cffenrs behalf are charged at cost plus 20%. These expenses include equipment rental, parking. subsistence, photographs, co- insurance endorsement, etc. REPORT CHARGES: Secretarial time will be charged at $70 per hour. A maximum of 6 copies will be issued for each report. FILE SEARCH & Minimum $70 will be charged for Secretarial Time. REISSUE OF REPORT: REPORTING: All reports contracted for by the client will be considered confidential information and submitted directly to him. We will require the authorization of the dient prior to distribution to parties other than those designated in Section 1701 of the Uniform Building Code or Title 24, Part 1, California Administrative Code. PAYMENT TERMS: Payment for services is due upon presentation. If not paid within 30 days of the invoice date, they will be considered past due and a carrying charge of 1-11f2% per month (or the maximum rate allowed by law) will be added to the unpaid balance, until paid in full. Any Attorneys fees or other costs Incurred in collecting any delinquent accounts will be added to the amounts due and shall be paid by the party invoked. COMPLETION: Inspector will remain on job until discharged by designated competent authority. CANCELLATION: No Charge If made before 4:00 p.m. of the preceding work day. See Minimum Charge. PARKING: When not furnished for Inspector, parking will be charged at cost plus 20%. SUBSISTENCE: On remote jobs, subsistence, when not furnished for Inspector, will be charged at cost plus 20%. INSURANCE: We carry worker's compensation, general, auto and professional liability insurance. Additional cost of any special insurance required by the diets, including Increased policy limits, adding additional insured parties, and waivers of subrogation will be billed at cost plus 20 percent. LICENSES & PERMITS: The additional cost of any special licenses or permits for a project will be billed at cost plus 20 percent PREVAILING WAGE: The hourly rates provided are in compliance with prevailing wage requirements. As the rates for California Prevailing Wage increase, our hourly rates will increase accordingly. 1-07P 17781 Cowan ■ Irvine, CA 92614) 949.250.1421 n Fax 949.250.1114 s wwaulsighmnconsulling.com ITEM NO. AGENDA REPORT Committee Meeting Date: April 2, 2009 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, General Manager Staff Contact: Steve Conklin, Engineering Manager Reviewed by General Counsel: Yes Budgeted: N/A Total Budget: N/A Funding Source: N/A CEQA Account No: Job No: Compliance: N/A Estimated Costs: N/A Dept: Eng Subject: Resolution Supporting SAWPA Integrated Regional Water Management Plan SUMMARY: On January 29, 2009, the Santa Ana Watershed Project Authority (SAWPA) released the draft Santa Ana River Watershed "One Water One Watershed" (OWOW) Integrated Regional Water Management Plan (IRWMP). According to SAWPA, the process is designed to update the Santa Ana River Watershed IRWMP, and will help secure significant funding for resources in the Watershed Region. SAWPA has requested that the Yorba Linda Water District Board of Directors adopt a resolution of support for the OWOW IRWMP. DISCUSSION: Attached is a letter dated March 12, 2009, from SAWPA, briefly describing the draft IRWMP and the pursuit for funding under Proposition 84. The letter also requests a resolution of support and a response letter based on review of the draft plan. Staff has reviewed the Executive Summary and the Chapter 11 Summary and Next Steps of the draft plan, and endorses the plan and efforts of SAWPA. Copies of the Executive Summary are available from staff, or copies of the draft report can be viewed or downloaded from www.sawpa.org. Attached are copies of a draft resolution of support by the Board and a draft response letter from the General Manager for consideration by the Board. PRIOR RELEVANT BOARD ACTION(S): None. STAFF RECOMMENDATION: The Committee recommend the Board of Directors adopt Resolution 09-05 supporting the "One Water One Watershed" Santa Ana River Watershed Integrated Regional Water Management Plan and its submittal to the Department of Water Resources for Proposition 84 Funding, and direct the General Manager to send a response letter to SAWPA staff. RESOLUTION NO. 09-05 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE YORBA LINDA WATER DISTRICT SUPPORTING THE "ONE WATER ONE WATERSHED" SANTA ANA RIVER WATERSHED INTEGRATED REGIONAL WATER MANAGEMENT PLAN AND ITS SUBMITTAL TO THE DEPARTMENT OF WATER RESOURCES FOR PROPOSITION 84, CHAPTER 2 PROGRAM FUNDING WHEREAS, the Santa Ana Watershed Project Authority (SAWPA), working with stakeholders and partners throughout the Santa Ana River Watershed has prepared the "One Water One Watershed" (OWOW) Santa Ana River Watershed Integrated Regional Water Management Plan (IRWMP); and WHEREAS, the OWOW IRWMP represents one of the most significant and innovative collaborative planning efforts to date in addressing water resources in the Santa Ana River Watershed; and WHEREAS, the OWOW planning process was conducted in a fair and transparent process working closely with stakeholders in the watershed in a bottom-up approach in preparing the Santa Ana River Watershed OWOW IRWMP; and WHEREAS, the OWOW IRWM Plan also will help secure significant funding for resources in the Santa Ana River Watershed through the California Department of Water Resources, Proposition 84, Chapter 2 Integrated Regional Water Management Program. NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Yorba Linda Water District hereby supports the "One Water One Watershed" Santa Ana River Watershed Integrated Regional Water Management Plan and agrees to support SAWPA in its submittal of the Plan, on behalf of the Santa Ana River Watershed, for the DWR Proposition 84, Chapter 2 Integrated Regional Water Management Program funding for the benefit of the residents of the entire Santa Ana River Watershed. PASSED AND ADOPTED this day of , 2009 by the following called vote: AYES: NOES: ABSENT: ABSTAIN: John W. Summerfield, President ATTEST: Kenneth R. Vecchiarelli, Secretary Reviewed as to form by General Counsel: Arthur G. Kidman, Esq. McCormick, Kidman and Behrens 1 March 31, 2009 Ms. Celeste Cantu Santa Ana Watershed Project Authority 11615 Sterling Avenue Riverside, CA 92503 Subject: Draft Integrated Regional Water Management Plan for OWOW Dear Ms. Cantu Thank you for the opportunity to review the subject document prepared by SAWPA. As a member agency of OCWD that borders and depends on the Santa Ana River to replenish the groundwater basin as a well water source, Yorba Linda Water District is vitally concerned with the river and its watershed. We have reviewed the Draft Integrated Regional Water Management Plan (IRWMP) and applaud your efforts in creating a significant and innovative collaborative planning tool. We are faced with major water challenges that will require collaboration and cooperation of the many stakeholders in the watershed. The Yorba Linda Water District looks forward to working with SAWPA and other concerned agencies in the development of water resource management strategies to address the challenges at hand. Sincerely, Kenneth R. Veechiarelli General Manager + Gt i A United Voice for the Santa Ana Watershed March 12, 2009 Steering Commiaee i2~CiV-r, Members Mr. Ken Vecchiarelli General Manager Yorba Linda Water District MAR 13 2009 P.O. Box 309 SAWPA Yorba Linda, CA 92885-0309 YOR?ALIND;t.kGr?:=2+""r`` Ron Sullivan Re: Santa Ana River Watershed's "One Water One Watershed" IRWMP SAWPA Wyatt Troxel Dear Mr. Vecchiarelli: supervisor On January 29, 2009, the Santa Ana Watershed Project Authority (SAWPA) released the draft Santa Bill Campbell Ana River Watershed "One Water One Watershed" (OWOW) Integrated Regional Water Management (range County Plan (IRWMP). This draft Plan represents the culmination of one of the most significant and innovative collaborative planning efforts to date. Over 350 experts and community leaders from throughout the Supervisor watershed contributed to this planning process. This process is designed to update the Santa Ana River Marion Ashley Watershed IRWMP, and will help secure signficant funding for resources in the Santa Acre River Riverside County Watershed Region. Supervisor We invite all interested parties to review the draft IRWMP and email comments to SAWPA by Josie San Bernardino March 31, 2009, at comments; sawoa.ore. Individually, no one has sufficient resources to address County the sustainability issues we face. No one person has enough understanding, credibility, or authority to connect the larger networks of people and organizations to do this work. We must do it together. The Mayor Plan can be downloaded at w%vw.sawna org. Beth Krum City of Irvine We request that your governing board adopt a resolution of support for the OWOW IRWMP. A Mayor template is attached for your convenience. Ron Loverldge City of Riverside With the fiscal and water crises, now is the time to set aside our specific job titles and, as citizens of the Watershed, collaborate across boundaries. Together, we can create a new shared vision of how the Mayo Santa Ana River Watershed works in order to ensure a sustainable water supply, improve water quality, Pat Morris and manage storm flows in the most affordable way possible. City of San Bernardino Development The State requires this and it is the promise of Proposition 84, Chapter 2 Integrated Regional Watershed All Sababi Management Program. The State, using Proposition 84, Chapter 2 and SB 1 as a catalyst, has created a SE Corporation framework for addressing integrated regional watershed management planning and has established a financial incentive for watersheds to do this hard work. The first round of expedited funding, Environment $100,000,000 statewide, has been appropriated to implement water resource projects across the State. Garry Brown As the initial step in this expedited process, the DWR has defined the desirable characteris icsl of an ounty Orange County IRWM Region as follows: Santa Ana Watershed Project Authority 11615 Sterling Avenue • Riverside, CA 92503 • (951) 354-4220 ommm_ www.sawpa.org • Administration FAX (951) 785-7076 • Planning FAX (951) 352-3422 Page 2 • The IRWM region is the largest defined contiguous geographic area encompassing the service areas of multiple local agencies, and it is defined to maximize opportunities to integrate water management activities related to natural and man-made water system(s) including water supply reliability, water quality, environmental stewardship; and flood management. • The IRWM region is inclusive and utilizes a collaborative, multi-stakeholder process that provides mechanisms to assist disadvantaged communities (DAC); address water management issues; and develop integrated, multi-benefit, regional solutions that incorporate environmental stewardship to implement the IRWM plan. • The IRWM region encompasses a water system containing natural and man-made components with diverse water management issues that are included in a single collaborative water management portfolio, prioritized on regional goals and objectives. • The IRWM region should demonstrate a reasonable and effective governance structure for developing and implementing its IRWM plan. 1 DWR Draft IRWMRegion Acceptance Process, pg 3 of 12 Through the completion of the draft OWOW IRWMP, with its emphasis on a fair and transparent process guided by a diversified Steering Committee, the Santa Ana River Watershed IRWMP will very effectively meet the desired requirements of the DWR. In the months ahead, we will be working together with stakeholders in conducting a call for IRWMP projects to be funded from Proposition 84, Chapter 2. However, unlike other projects eligible for funding in other chapters of the Proposition 84, the types of projects that we will be seeking are multi- beneficial integrated projects that address watershed problems. We encourage all interested parties to review the priority goals and objectives defined in the OWOW IRWMP and work with other agencies in submitting water resource-related projects that address multiple water resource management strategies in an integrated fashion. Once a portfolio of projects for Proposition 84 funding is developed for the Santa Ana River Watershed Region, SAWPA will review, ratify, and support this portfolio that the Steering Committee submits in the application process to the DWR. Our Steering Committee meetings are open to the public and all stakeholders are invited to attend and participate. All have the responsibility to bring their water challenges, resources and solutions to the table so that efficiencies and synergies can be created. This is the mission of Proposition 84, Chapter 2 Integrated Regional Watershed Management Program. In light of the planning efforts to date and of the pressing needs of the region, we request your support and partnership in supporting the Santa Ana River Watershed OWOW IRWMP. Sincerely, Santa Ana Watershed Project Authority Celeste Cantu General Manager CC:pb Attachment: Resolution January 29, 2009 Dear Watershed Member, Four times in recent years, the Santa Ana Watershed Project Authority has completed an Integrated Watershed Plan. The plans have all looked at the Santa Ana River Watershed as a single region. With each iteration, the process was broadened and the voices of more stakeholders were added. We've learned how the water resources in the Watershed are linked, and how our success depends on careful planning that properly values water. Working as a region, we can maintain our quality of life for a growing population, protect our remarkable natural resources, and ensure safe, reliable water for all residents. Contained here is a draft document that serves as the beginning of the next phase of the Integrated Watershed Planning process. The One Water One Watershed (OWOW) program is a departure from our previous planning efforts. In this phase, the planning was driven from the ground up. The stakeholders were asked to roll up their sleeves and identify the resources, problems and opportunities in this region. They described the watershed as a whole system, and collaborated across boundaries, geographic, functional, and political. They suspended old assumptions and balanced advocacy and inquiry to foster a new collective understanding of the watershed. This planning is guided by a Steering Committee made up of representatives from general government, water agencies, and the business and environmental communities. This group enlisted the aid of ten volunteer pillar leaders, local experts on a particular aspect of water. The pillar leaders organized group meetings, led discussions and produced reports that begin to lay the groundwork of our regional water future. The pillar leaden have developed strategies to reach those common goals identified in the process. The process is not complete. All good plans require constant refinement and this one is no different. Next, we will create an improved water future. This is more than mere problem solving, making what you don't want go away new partnerships and ways of doing business need to be developed. Creating involves bringing something new about. We must not leap to superficial quick fixes or to advocating for our favorite projects. We will guard against falling into the familiar trap of optimizing our own piece of the puzzle rather than building a shared understanding and a larger vision. We continue to invite people representing diverse views to join us and we ask all to listen to one another in new ways. Whether or not you chose to participate in the development of this plan, we invite you to read the draft document and provide written comments to comments@sawpa.org, by February 26, 2009. We have extended the comment period to March 16, 2009 to invite greater participation. The document is posted on the SAWPA website (www.sawpa.org). It is formatted for electronic posting and reading, so we may revise, update and improve our work. Please provide up to five pages of written comments in a readily readable format (e.g. MS word). Over the years, the SAWPA Integrated Watershed Plan has provided a unique 30,000 foot elevation view of our Watershed, so we may better see how the more detailed plans, programs and projects link together. The past watershed plans have been extraordinarily successful in establishing a template for Statewide integrated water resource management planning, as well as resulting in over $275 M in funding in this watershed. We begin the ' process of seeking projects that continue the goal of a sustainable water future in 2009. We expect to expand on this success. The needs of the region are great, but interest in the process is great as evidenced by the nearly 1,000 stakeholders that attended our first ever One Water One Watershed conference. We are bound together u by our deep recognition of the importance of water, our spirit and lt-i !,I" trust in the collaborative process, and the stakehotders' excellent planning work to build upon; we have the necessary tools to meet our regional water challenges. This watershed is our life boat; if is leaks, we all go down together. When it holds, we will establish a new water ethic for the 21st Century. Sincerely, - Download the Plan ~4- (79.9 Melts) Celeste Cantu SAWPA ITEM NO. AGENDA REPORT Committee Meeting Date: April 2, 2009 To: Planning-Engineering-Operations Committee From: Ken Vecchiarelli, General Manager Staff Contact: Steve Conklin, Engineering Manager Reviewed by General Counsel: Yes Budgeted: N/A Total Budget: N/A Funding Source: Developer Funded CEQA Account No: 1025676 Job No: 0121 Compliance: N/A Estimated Costs: N/A Dept: Eng Subject: Shapell Pre-Annexation Agreement Acreage Fee Agreement SUMMARY: Shapell Industries, a local developer, requested the preparation of an Acreage Fee Agreement for Vesting Tentative Tract Map 16208. This action will not create any new obligations. The purpose is to formalize the existing understanding of the Pre Annexation Agreement in light of past changes in the scope of Sewer obligations that were required due to construction issues. DISCUSSION: The Pre-Annexation Agreement with Shapell Industries that was signed July 25, 2006 required YLWD sewer improvements in Del Caballo and Palm Avenue that would facilitate sewer drainage from the Shapell development plus provide an opportunity for existing septic users in the general area to connect to the sewer system. Although the sewer was designed, Shapell and YLWD found significant opposition to the planned construction by the residents along Del Caballo, a private street, that precluded construction. Shapell found an alternative route for the development that required permission from only one resident and utilized the Gun Club Road easement already controlled by Shapell. This was both more cost effective and could be completed in 6 months. YLWD management allowed this route to be built on the condition that Shapell would need to pay the standard acreage fee required of all new users in lieu of constructing the Del Caballo and Palm sewer that would have broader benefit to YLWD. This was memorialized in the attached letters dated January 15, 2008 and November 13, 2007. The sewer system was constructed on time and has been working effectively. With the change in management at Shapell last year, Shapell requested to formalize the letter agreement in a document that will be signed by both Shapell and YLWD. Shapell lawyers wrote the agreement, the YLWD Engineering Department negotiated with Shapell representatives to maintain continuity with existing YLWD practices and agreements. YLWD lawyers reviewed and revised the agreement to limit the scope to the intent of the letter agreements. The Acreage Fee Agreement is attached for review and consideration. i PRIOR RELEVANT BOARD ACTION(S): The Pre-Annexation Agreement with Shapell Industries that was approved by the board and signed July 25, 2006. STAFF RECOMMENDATION: That the Committee recommend the Board of Directors authorize the President and Secretary to execute an Acreage Fee Agreement with Shapell for Vesting Tentative Tract Map 16208, subject to prior execution of the Agreement by Shapell. i EL W January 15, 2008 TOIRBA LINDA Mr. Alan Cummins WATER Shapell Industries,, Inc. DISTRICT 8383 Wilshire Blvd., #700 Beverly Bills, California 90211 DIUCTORS PaulR: Mnstron$ SUBJECT: Memo Update of November 1, 2007 Meeting, Between Mike Payne; and 'duel j. Peerage Alan Cummins Re: Pre-Annexation Agreement Sewer Trunk Sub-Trunk Ric P. Collett Sewer Obligations 1025475,-0120 William R Mills An W: Summer£ield Dear Alan,. To recap our discussion for the retard, the sewer acreage fee that will be charged for GFXMAL AIAWER North Yorba Linda Estates Site A will apply to all S&S property except the high school site. Thefee will be calculated at $1660 per acre. The acreage fee is due on plan MiebaelA Payne approval before signed drawings are released by phase of development. Please do not hesitate to call me at 701-3022 if you have questions. Sincerely,, ®Mi ael A. Payne ~ General Manager CC: Ken Vecchiarelli Dave Hasson Curtis Thielbar Scott Moulton Earl Hamanaka 4622 Plumosa Drive FA, Box 309 YorbaSinda, CA 92855 Tel: (714)7777=9593 Fax: (X14)'¢1-6413 Email: ylwd@yiw&com Web: +vwwylwd.com HL ) 65%1 W November 13, 2007 YORBA LINDA Mr. Alan Cummins WATER Shapell Industries, Inc. DISTRICT 8383 Wilshire Blvd., #700 Beverly Hills, California 90211 DIRECTORS Paul R. Armstrong SUBJECT: Memo Update of November 1, 2007 Meeting Between Mike Payne and Alan Cummins Re-- Lock Ranch Trunk Sewer Obligations 1025675-0120 Michael J. Beverage Riot. Collett Dear Alan, William R. Mills John W Suimnertield To recap our discussion for the record, the acreage fee that will be charged for-North Yorba Linda-Estates Site A will apply to all S&S property to be developed by S&S. This covers approximately 126 acres, The fee will be calculated at $1660 per acre. The GENERAL MANAGER total amount will be $209,160.00. The acreage fees due on plan approval before signed drawings are released by phase of development. The portion of Site A that is under Michael A.Payne development for a high school will not incur an acreage fee. This covers, approximately 50 acres. YLWD processed an acreage fee for 8.62 acres of $14,309.20 for the SiteB portion of `tract 16987, Phase 1. This was less than the total acreage of 1 i.52 because the prior agreement excluded Site A. With the changes mentioned above all S&S property to be developed by S&S shall pay the acreage fee.. Therefore the balance of 2.9 acres in Phase 1 is due: In addition, the acreage fee for Phase 2 is now due. A recent update of Phase 2 acreage is 23.93 acres. Previous correspondence had referenced 22.2 acres; but this has been recalculated by Hunsaker. In total, 26.83 acres are due to be paid. This yields a net remaining payment due for both. Phases of $44,537.80. This information will appear in an updated exhibit from Earl Hamanaka. Please do not hesitate to call me of 701-3022 if,you have questions. Since ely, 4622 Ptuniasa Drive A Michael A, Payne P.O. Box 309 General Manager , ECrz-Ii LEn Yorba Linda, CA 92885 CC: Ken Vecchiarelli Tel. (714) 777•.9593 1 2007 Fox: (714) 7AI.0413 Dave Hasson Curtis Thielbar Scott MoultonE e,tW~ ~[€lw.c:Ed€m Email: ylwd@plnd.colti Earl Hamanaka deb: ww lwd.com 1 ACREAGE FEE AGREEMENT THIS ACREAGE FEE AGREEMENT ("Agreement") is made as of March 2009 (the "Effective Date"), by and between YORBA LINDA WATER DISTRICT, a public agency ("District"), and SHAPELL INDUSTRIES, INC., a Delaware corporation ("Shapell"). RECITALS A. Shapell is the owner of land located in the City of Yorba Linda, Orange County, California, entirely encompassed within the area covered by Vesting Tentative Tract Map 16208 which is attached hereto as Exhibit A (the "Proper which land does not include that certain land owned by the Placentia-Yorba Linda Unified School District, more particularly described on Exhibit B attached hereto (the "School Site"). B. Shapell is developing a residential project on the Property (the "Project") in a number of phases. C. District is responsible for delivering water and sewer services to the Property. D. District intends to impose a per acreage fee on Shapell, which fee is designated to offset the cost of the District's existing sewer infrastructure investment in connection with the Project. Each of District and Shapell desire to enter into this Agreement to evidence their mutual agreement as to the amount and timing of payment of said per acreage fee (the "Acreage Fee"). E. hi connection with each phase of the Project, Shapell must execute an "Application to and Agreement with Yorba Linda Water District for Sanitary Sewer Service" which sets forth the Acreage Fee for that phase of the Project. F. Shapell has already paid District an Acreage Fee in the amount of Fifty Eight Thousand Eight Hundred Forty Seven and No/100 Dollars ($58,847.00) for Phases I and II of the Project. G. This Agreement sets forth the amount and timing of payment of the Acreage Fee for remaining phases of the Project. NOW, THEREFORE, in consideration of the above recitals and terns and conditions set forth herein and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Shapell and District agree as follows: 1. Truth of Recitals. The foregoing Recitals are true and correct. 2. Calculation of Acreage Fee. District agrees to impose, for the remaining phases of the Project, an Acreage Fee at the rate of One Thousand Six Hundred Sixty and No/100 Dollars ($1,660) per acre of the Property. For the avoidance of doubt, District and Shapell acknowledge and agree that no fee, charge, exaction or dedication including, without limitation any Acreage Fee, shall be payable by Shapell to District with respect to the School Site. 3. Payment of Acreage Fee. The Acreage Fee for each respective phase of the Project (calculated at the rate of One Thousand Six Hundred Sixty and No/100 Dollars ($1,660) per acre) shall be due and payable by Shapell on plan approval before signed drawings are released for that phase. 4. Entire Extent of Shapell's Payment Obligations. The satisfaction of Shapell's obligations under this Agreement shall constitute the entire extent of Shapell's obligations to pay Acreage Fees to District with respect to the Property. District agrees that even in the event that District may be authorized by law to impose a higher per acreage fee District shall not impose or seek to impose any higher acreage fee than provided for herein. Any Acreage Fee payable hereunder shall not be subject to adjustment for inflation during the term of this Agreement. 5. Miscellaneous. (a) Notices. Any notice required or permitted to be given under this Agreement shall be in writing and shall be deemed to have been given when delivered by U.S. mail, registered or certified, return receipt requested, postage prepaid, or by overnight delivery service showing receipt of delivery, or by personal delivery, or by facsimile transmission during normal business hours and shall be addressed as follows: If to District: Yorba Linda Water District 1717 E. Miraloma Avenue Placentia, California 92870 Attention: General Manager Facsimile: (714) 701-3108 If to Shapell: Shapell Industries, Inc. Wilshire-San Vicente Plaza 8383 Wilshire Boulevard Suite 700 Beverly Hills, California 90211 Attention: Thomas Ingram, General Counsel Facsimile: (323) 653-4345 Notices as aforesaid shall be effective upon the earlier of actual receipt, or twenty-four (24) hours after deposit with the messenger or delivery service, or the next business day after delivery to an overnight delivery service, or within three days after the deposit in the U.S. mail, or upon machine-printed confirmation of transmission by facsimile. Each party shall notify the others of any change of its address by one of the aforementioned means no later than ten (10) days prior to the effective date of such change of address. (b) Governing Law. This Agreement shall be governed by, construed and enforced in accordance with, the laws of the State of California. (c) Entire Agreement. This Agreement constitutes the entire agreement between the parties relating to the subject matter hereof and supersedes all prior agreements and understandings between the parties relating to the payment of per acreage fees with respect to the Property. (d) Enforcement. If either party hereto fails to perform any of its obligations under this Agreement or if a dispute arises between the parties hereto concerning the meaning or interpretation of any provision of this Agreement, then the party not prevailing in such dispute shall pay any and all reasonable costs and expenses incurred by the other party on account of such default and/or in enforcing or establishing its rights hereunder, including, without limitation, costs and expenses incurred in any bankruptcy proceedings, costs of arbitration and reasonable attorneys' fees and costs. Any such reasonable attorneys' fees and other expenses incurred by either party in [HOW DNIAAOTIOd No -dVgddV SM LVNE)IS] aao a 'puauznjpsul ;n;i;suoo Hugs jagpaBo; uaNt'; g3lgm3o lit put' `sisulBuo pauiaop aq Ilt'gs golgm jo goea suedia;unoo azow io onu m pa;noaxa aq Am puauxaai2v slgZ •s;aed xa;nnoo (l) pae andlwado SI[n3 sm iuoux=2V slgp o;al pa;mjodjooul Sgazaq axe o;oja a mar ssued and;oaua g P q mpit' plglgxg tis Pue puauxaw2v slip ul pa;t';s siu;Toag agZ •s;iglgx:q pull sie;Iaag;o nogluodaoaul (T) m3o;uauxaojo3ua uxoqm isuleBu 'IgSnos sl.xanlem Sumd 3q;3o and;e;uasaxdax pazuoq;ne Ajnp a Xq pau&s pue gul;pm ul ssolun anl;oajja aq Ilt'gs;uauxaa. 2V slg;3o uaslnoid AUt';o janit'm olq •janxe AA (g) jo `uxo$ Bulsuu 'luauxaaj2v slip `o; papt'laj iVp Sas anmq o; jo unslo .tut, ast'q o; °Sgoajlpm jo Sl;oazip `pal;i;ua aq Ilt'gs uosjad pjlq; on `IladugS Pas;ou;slQ uutp ix q;o `put IladugS pue;ou;s1Q3o igauaq aql jo; Halos;uauxaa SV sup opal pazaiua aneq opajag saluud aU •SUt'd pjlq;,tut, op;q2p Sus Balplnoid io Bu. gauaq st' 11 panjpsuoo jo pauiaap aq you hugs puaulaojBV stu •sattelaUe-H 'ud Pilq,L ox (B) ';oaga puu aojo3 lIB ul uluulaj Ilt'gs saous;suxnono pus saould `suosjad jag;o o; pallddu su suolslnojd lions pus;uauxaoi2v slq;3o japult'uxaj oq; `pion jo alquaojojuaun `Piimnul oq o; uol;otpsunf;ua;admoo jo unoo u Sq ploq aq Ilt'gs `oous;sumojio io `ooeld `uouad Sas 013oazagp uoi;soildde aqp jo 1puaxaaaj2V slq;3o umslnojd,tuu3I' Illgejanag (3) •japunajaq suolptMigo spl Uxoj3 panallaj aq,flluogsuxo;ne Ilt'gs lladsgS `;oupslQ o; aogou uauum gons;o Sjanllap agp uodrl ;ou;slQ o; paplnojd aq Ilt'gs ;uauxuBxsst' gons;o aogou put' Bulpum ul aq llsgs;uauiaaj8V slq; japan uolpeBggo jo;qSu Suu jo;uautaisse aq,L 'ig2!1 IMP paslojaxa aneq plnoa IladugS Impjua;xa aums aq; o;;qBu;eq;3o oauBxssu ag;,iq paslojaxa aq Seux IgBu Imp `IgBbi m q;lM lladsgg sopinojd;uauxaaj2V slip janauagm •;uauxaaj2V slq; ul quo3 ;as suolpmgilgo aq;3o ojugs apmumpodojd s;l ouinsss Sllt'og wopne Iluqs aauBissu aqp puu `oauBlsse uu o; Suadojd aq;3o uoluod Xuu jo aauutanuoo aq; gpim Buols `;uouxaal2V slgp japun aoquSigo jo;qSp Suu aisse of jg2p Ieuoq!puooun aqp ant'q ilugs Iladt'gS ;uamu iss-v (a) •puouiSpnf gons ,Sus o;ul p3&ow oq;ou puu anlAjns o; puu luaa m2V siq;3o suolsmaid jag;o aqp uxoag alqujanas aq o; papuapul sl uol;uBxlgo saa3,siauio;ps lions puu `;uauiBpnf lions ul papnloul;unouxu jag;o Sum op uolpippu ul Put' mog Sla;sjudas algmjanooaj aq Ilt'gs puauxaaaV slip japun jons3 spl ui;uaaxBpnf s Bulaiojua IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first set forth above. SHAPELL: SHAPELL INDUSTRIES, INC. a Delaware corporation By: Name: Its: DISTRICT: YORBA LINDA WATER DISTRICT a public corporation By: Ken Vecchiarelli General Manager EXHIBIT A VESTING TENTATIVE TRACT MAP 16208 g h a _ 4 a<a: sYct it _y h � . z NU d g h a _ 4 a<a: sYct it _y h � . z NU d .. w MOTATIve TRACT EXHIBIT B LEGAL DESCRIPTION OF THE SCHOOL SITE PARM 1: In the City of Yorba Ianda, County of Omugc, State of California, being a portion of Section 23, Township 3 South, Range 4 West, San Renlaulino Meridian, as sbown an a Record of Survey Med in Book 74, Page 37, of Records of Surrey in the office of the County Recorder of said County, described as follmvs: Beginning at the northwest comer of Tract No. 16510 as per map filed in Book 849, Pages 48 and 49, of Miscellancaus Maps in the office of said County Recorder; thence along the westerly boundary of the iaads of Samuel Kraemer a shoum on a Record of Survey filed in Book 2, Page 21 of Records of Survey in the office of said County Recorder North 01°19°13° West 24&28 feet to Ilse "B" of agreement recorded November 5, 1962 in Book 63110 Page 439, Metal Records of said County; thence along said Une °B" and its westerly prolongation North 89°39'53" Wrst 18W.26 feet to the cmterly boundary of Parcel 3B as described in a grant decd to the Metropolitan Water District of Southern California, recorded as Instrument No. 19970331781, of said Official Retotds; thence gong said easterly boundary North WIWIS" East 136248 feet to a paint on a non-tangent curve ountave southerly hating a radius of 1653.0D feet on the southerly boundary of Tract No. 16913 as per map fried in Book , Pages through , inetosim of Miscellaneous Maps in the office of said County Recorder, a radial line to said point bears North 07'58'47" Fast; thence along said motherly boundary the following cows= easterly 94.42 feet along said non-taognat curve through o central angle of 03°IC=, North 11°15'09" Fats 5.00 tent, easterly 12292 feet along a non-tangent save concave southerly having a radius of 1698.00 @at through a central angle of 04"14'51", South 74°300"' Batt 400.00 feet„ easterly 39024 feet along a taugent curve concave northerly having a radius of 15470D fat through a antral angle of 14.30"00", South S9°0nV East 570, 1 feet. easterly 216.43 feet along a tangent curve concave southerly having a radius of 19MOD feet through a central angle or06°20'Ofl°, South 82°40'00'° East i 41730 feet, easterly 178.77 feet along a tangent curve concave northerly having a radius 1542.00 feet through a moral angle of 06'38340, South 89'1814" Fast 80.13 feet, South 441831" Fast 3818 feet and South 89'1814" Fast 4110 feet to the v msterly boundary of Panel 1 of that certain grant deed, recorded on August 19, 1986 as lastrutaent No. 86.770190, of said Official ReeoMS; thence along the said acstedy boundary and its southery prolongation South 00'41'26" West 184.69 feet to the northerly boundary of the fifth exception to Parcel 1 as described in that certain Grant Decd, recorded on February 25, 1998 as lnstnunent No. 199SD10353Z of old Official Records: thence along the boundary of mid esaption the following eoumw. North 89'0.'56" West 266.09 feet, North 40'16'26' West 132.72 North 75116'0.4" West 562A2 feet, South 6$°12111" West 271.99 feet, South 22048'45" West 470.70 feet, South 00'38'01" East 79.13 feet, South 87'14'50" East 534.68 feet, Nosh 86'"0 Eau 46.41 feet, North 88°21'20" Fast 63.59 feet, South 57 49'10" East 9295 feet, southeasterly 208,21 feet along it tangent curve concave nordmastaty having a radius of 375.00 fret thrnegh a erntral angle of 31649'02", South V*M'1T' Fast 85.19 fact, easterly 51.75 feet along a tangent nave concave southerly having a radius of 150.00 feet through a central angle of 19'45'54", South 65°52'19' Fau 300 feet, sautbeastedy 33.99 feet along a tangent cum. concave southwesterlyhaving a radius of 80.00 fees through a central angle of 24°2091" and South 68'12'09" Fast 52.20 feet to the northerly prolongation of the easterly boundaty of said Tma No. 16510; thence along said nnrtherly prolongation South 21°04'37" Eau 41.41 fact to tiro northerly corner of said Tract No. 16510: dater along the eorthaestety boundary of said Tract No. 16510 the following courses: southwesterly 672.54 feet along a non4angent curve caucave northwesterly having a radius of 1150.00 feet through a central angle of 33630'28" and South 60'1719" West 36.53 feet to the Point of Beginning. YLWD SOURCE WATER SUMMARY ITEM NO. Fiscal Year 2008-09 ESTIMATE ONLY TOTAL MONTHLY YTD BUDGET GW IMPORT DEMAND GW GW (Demand Est.) DELTA MONTH AF % % AF % Jul-08 1,535.2 1,170.0 2,705.2 56.7% 56.7°/6 2,997.8 -9.8% Aug-08 1,610.9 1,112.0 2,722.9 59.2% 58.0% 2,949.4 -7.7% Sep-08 1,481.3 974.4 2,455.7 60.3% 58.7% 2,587.8 -5.1% Oct-08 1,473.7 916.6 2,390.3 61.7% 59.4% 2,182.8 9.5% Nov-08 1,170.1 756.2 1,926.3 60.7% 59.6% 1,724.3 11.70/6 Dec-08 747.4 359.1 1,108.5 67.5% 60.3% 1,551.1 -28.7% Jan-09 1,011.3 459.2 1,470.5 68.8% 61.1% 1,352.5 8.7% Feb-09 772.5 193.4 965.9 80.0% 62.3% 1,293.9 -25.4% Mar-09 1,081.3 322.6 1,404.0 77.0% 63.5% 1,533.3 -8.4% Apr-09 1,917.9 May-09 2,536.8 Jun-09 2,842.5 FYTD 10,883.8 6,263.5 17,147.31 1 63.5% 18,172.8 Allowable GW (YTD) 8,897.4 (AF) CUP Obligation FY 2008-09 2,166.0 (AF) Monthly CUP Pumping (AF) (AF) YTD CUP Pumping (AF) 1,960.8 (AF) YTD CUP Achieved 90.5% GROUNDWATER PERCENTAGE 85.0% 80.0%- 75.0% --*-MONTHLY GW 70.0% -+-YTD GW 65.0% -BPP GOAL 52.0% CUP ADJ GOAL 60.0% 60.0% 55.0% 50.0% Jul-08 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- 08 08 08 08 08 09 09 09 09 09 09 Month I WATER SUPPLY FY 2008-09 ESTIMATE ONLY March 2009 Water Supply CUP IMPORT 0.0% 23.0% " GW 77.0% Year To Date 2008-2009 Water Supply YTD CUP Achieved 90.5%of2,166 AF CUP Obligation 11.4% GW IMPORT 52.0% 36.5% GW BPP GOAL 52.0% 3500 K111 2500 111, CD LL V Q 1500 1000 500 ESTIMATE ONLY Total Water Use ■06 -07 GW ❑ 06 -07 IMPORT Monthly Average Mean Temperature ( °F) ■ 08 -09 GW 3.1 72.7 74.8 ®08-09 IMPORT ■ 07 -08 GW 72.2 72.4 73.6 007 -08 IMPORT 70.2 70.5 72.1 67.3 70.4 69.8 1 65.1 67.41 . 6a.0 ' 62.8 161 55.2 56.4 57.3 54.0 1 1 ■ 55.4 056.3 59.5 60.1 63.3 A6 p1 0 ,�o p'1 p0 O(o Q1 A0 A6 Al A0 000 p6 P p0 '� 0 p0 A'1 0 A0 Al A0 Q9 Al p0 A0 Al p0 p0 A'1 0 A0 OmcO�Omc �ac�acPao Qm�Q0�0� �Oc Month YLWD SOURCE WATER SUMMARY ITEM NO. Fiscal Year 2008-09 TOTAL MONTHLY YTD BUDGET GW IMPORT DEMAND GW GW (Demand Eat.) DELTA MONTH AF AF AF % % (AF) Ne Jul-08 1,535.2 1,170.0 2,705.2 56.7% 56.7% 2,997.8 -9.8% Aug-08 1,610.9 1,112.0 2,722.9 59.2% 58.0% 2,949.4 -7.7% Sep-08 1,481.3 974.4 2,455.7 60.3% 58.7% 2,587.8 -5.1% Oct-08 1,473.7 916.6 2,390.3 61.7% 59.4% 2,182.8 9.5% Nov-08 1,170.1 756.2 1,926.3 60.7% 59.6% 1,724.3 11.7% Dec-08 747.4 359.1 1,106.5 67.5% 60.3% 1,551.1 -28.7% Jan-09 1,011.3 459.2 1,470.5 68.8% 61.1% 1,352.5 8.7% Feb-09 772.5 193.4 965.9 80.0% 62.3% 1,293.9 -25.4% Mar-09 1,170.9 359.5 1,530.4 76.5% 63.5% 1,533.3 -0.2% Apr-09 1,917.9 May-09 2,536.8 Jun-09 2,842.5 FYTD 10,973.3 6,300.4 17,273.71 1 63.5% 18,172.8 -4.9% Allowable GW (YTD) 8,963.0 (AF) CUP Obligation FY 2008-09 2,166.0 (AF) Monthly CUP Pumping (AF) (AF) YTD CUP Pumping (AF) 1,960.8 (AF) YTD CUP Achieved 90.5% GROUNDWATER PERCENTAGE 85.0% 80.0% 75.0% MONTHLY GW 70.0% tYTD GW 65.0% -BPP GOAL 52.0% CUP ADJ GOAL 60.0% 60.0% 55.0% 50.0%- T Jul-08 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- 08 08 08 08 08 09 09 09 09 09 09 Month WATER SUPPLY FY 2008-2009 March 2009 Water Supply CUP IMPORT 0.0% 23.5% GW 76.5% 2008-2009 YTD Water Supply YTD CUP Achieved 90.5% of 2,166 AF CUP Obligation 11,4% GW IMPORT 52.2% 36.5% a GW BPP GOAL 52.0% 3500 3000 2500 a 2000 a E 0 > 1500 1000 500 Monthly Average Mean Temperature ( °F) 78.1 72.7 74.8 " 72.2 72.4 ' 73.6 70.2 70.5 0 m 72.1 65.167 62.8 161 Total Water Use 55.2 56.4 62.6 57.3 54.0 �•0 54.3 55.4 I 1 I 056.3 60.2 59.5 60.1 ■ ■ 06 -07 GW 006 -07 IMPORT ■08-09 GW 208-09 IMPORT ■07 -08 GW 007 -08 IMPORT 67.3E 70.4 :6 64.0 A6 A� 4 _A� S3° � P� A A� A`O A ArO A� A� PLO P � A0 P cA9 A�oA�oA°j A^ A� A°' A� A$ A°' A� P� P°' cA� PJP Pia 5e o eQ Z`o�` Month 2008 -2009 YTD Water Supply 20,000 111 16,000 14,000 12,000 10 LL Q v E 10,000 O 8,000 • 111 4,000 2,000 0 —$—Projected Total GW + Import (Actual Total GW + Import -16—CUP-Adjusted GW Goal (60% of Actual Total GW + Import) Actual GW Production Jul -08 Aug -08 Sep -08 Oct -08 Nov -08 Dec -08 Jan -09 Feb -09 Mar -09 Apr -09 May -09 Jun -09 Month ITEM # 'V PM PROGRAM 2008/2009 Fiscal 2008109 1 JUL I AUG I SEP I OCT I NOV I DEC I JAN I FEB MAR APR MAY JUN Percent of tar et 8% 1 17% 1 25% 1 33% 1 42% 1 50% 1 58% 1 67% 75% 83% 1 92% 100% HYDRANTS 3,BS9 Ta ; all h drants to be serviced annual) . INSPECTED MONTH 220 - 66B 392 192 Sol 1791 364 "31 220 INSPECTED THIS YEAR 1 220 776 1,1681 1,3901 1,4261 1,605 1,868 1 2,422 1 2,642 % TOTAL 5.7%1 20.1%1 30.3%1 36.2%1 36.9%1 41.6%1 51.0%1 62.8%1 6B.5 %a VALVES 10.00012=5,000 Tar ;all valves to be o rated eve two ears OPERATED THIS MONTH 328 436 340 5921 90 3061 38111 6141 429 OPERATED THIS YEAR 1 3291 164 1,104 1,6"1 1,7881 2,0921 2AT31 2.9871 3416 % TOTAL I 6.6% 16.3%1 22.11%j 33.9%1 35.7%1 41.6'4 49.6%1 69.7%1 68.3% DEAD ENDS 1487x2 �J74 Tar et all dead ends to be flushed twice each ear. FLUSHED THIS MONTH 0 0 0 487 01 0 i 01 01 of FLUSHED THIS YEAR 1 81 01 0 4971 4871 487 4871 4871 497 % TOTAL 0.0%1 0.0% 0%1 60% 60% 60% 50% 60% 50% VACS! ! Target; all au/vacs to be serviced annually. INSPECT .__ 1NON1iH- .16 SPECTO THIS,YEAR '21 131 146 1$1 1T¢ ' A64 T$7 -loaf a%OF i kFNkl 6 4 4"%f ' 4 3k 9$894 - * til.1% .6 444 a SE99ER CLEAND& 6837.560 �_ .:� Ta t; all sewers to be cleaned annuall . CL ED' i14M4NTH; `` - BZ643' ,..7.6'173, - `45,64D "•7$ 358 . - ":,` ,297;' CLEANEQ THIS;YEAft;.'? ; =' .,. 67y643 „'8ylbfd ,w,F' t'(2t1, 507 " ;;,=163;591. ;:290 254`.,,., ... °ZS$; 437, " %303:4T?7 ,'37 %,,. ';; ,`.; 3$f,836 ,.478 %,..''' �.,x F435,132, ?530.' /ocaa'' ..,•;.:18665,1,.. ..; '' -,' ,. .r •,a'., ., ., ,.„ - „t.EVJ$ING "?�¢Q,a51 �-; Tar et• all sewers to be televised eve 6 ears. 7EL'E5/LS"EDT'Fi135Mitlli%,`"x E ':.H..I^anYE�11x:��7�� >' Y2684e' ,.'.. -�`i2 .&3 'rJ.%!^,gl 16,62$.. `.;�rr„611A..n ���.z,- 'x'„,4,'9Y'(1`, � sA„5±?8f': ?;.; ' -+4'FI TIMOR -38234 tYnf X12, 993 ; v; F67„ ;9�.�:.'�>p,F�,' WON 8,xN '<ly 4' xs ;o s9 A23 87,db2.�..... �41.8°,Jy A 9Y rr 14 ;9$ �®1366.`n .' w, •. a,.af. r ,,,2x:857 Y`'' ;�153;2sk °aria' r!x �N.4 i'" ri :f0"3tIZ .14=�fi.65fixt N ;�,, ,�#8, `8,0612 x�.' {kk"r' -� ..,, ,� f>3 .�ax.•,.,.a y'i�'��<'",i,�%��r.:.�:_. ITEM NO. /0 MEMORANDUM DATE: March 12, 2009 TO: Ken Vecchiarelli, General Manager FROM: Steve Conklin, Engineering Manager COPY: Lee Cory, Operations Manager John DeCriscio, Chief Plant Operator SUBJECT: Groundwater Producers Meeting, March 11, 2009 Items presented and discussed at the Groundwater Producers (GWP) Meeting on March 11 at OCWD included the following: 1. Water Quality Report. The schedule was presented for the preparation of the Consumer Confidence Reports. Steps for the preparation of the "Triggered Source-Water Monitoring Plan" were presented. 2. OCWD FY09-10 Draft Budget. Elements of the draft budget currently being prepared were presented. It was indicated that the Replenishment Assessment (RA) will remain unchanged for the new FY at $249 per AF. The Basin Production Percentage (BPP) is expected to be 60 to 64%, most likely at the lower end of that range. They expect to keep the RA at $249 regardless of the BPP selected. 3. Long-Term Facilities Plan (LTFP) Update. It was noted that originally the plan (several years ago) was to complete the LTFP, related EIR and the Annexations together. These have since come "un-coupled" and the new plan is for the OCWD Board to "receive and file" the LTFP and its EIR. Separately, the annexations will be considered on their own time frames. It was suggested by the GWP that the final LTFP show the current basin demand and the projected basin demand with the completion of all annexations. It was noted that OCWD is having continuing discussions with Irvine and Anaheim regarding annexation issues. 4. Met Pre-purchase Water Deal Update. The deal suggested is to pay Met now for water at today's price for delivery at a later date when available. Goal would be to buy at replenishment-water-rate, or as a fall-back, at full-service untreated-water rate. This is still under discussion, but Met showing reluctance. Mr. Ken Vecchiarelli March 12, 2009 Page 2 of 2 5. Projections of Santa Ana River future base flows. SAWPA is collecting information from upstream dischargers re their plans for recycling and discharge to the river in the future. The long-term plans show a strong push for recycling using reverse osmosis to reduce salinity. The plans show river baseflow reducing from approx 120,000 to 100,000 AF/Yr, in the most optimistic case of upstream recycling development. 6. Mesa Consolidated WD Colored Water Treatment Plant Update. Mesa is proceeding with plans to replace its existing ozone-based colored water treatment system with either membrane treatment (like IRWD) or coagulation-sedimentation-filtration treatment (like Long Beach). Mesa will increase colored groundwater pumping from 5,000 AF/Yr to 8,700 AF/Yr. There is some concern that there may be increased draw of higher salinity shallow groundwater to the area near the 405 Fwy in Costa Mesa. They plan to mitigate this by installing packers in the two wells to limit draw to the deep aquifer. 7. Santiago Basin Pumping Study. The GWP noted that the OCWD Board Committee expressed reluctance to proceed with this project due to benefit and cost questions. The GWP suggested that this project for a facility to pump out the Santiago Recharge Basins in Orange appears to have significant benefits for improved recharge and asked if OCWD staff wanted a letter from the GWP expressing support for continued consideration of the project. OCWD staff will review the issues expressed by the Board and get back to the GWP with further thoughts on this. CAPITAL IMPROVEMENT PROJECTS STATUS REPORT Date: April 1, 2009 New Information Since Last Report is Shown in Red IN CONSTRUCTION i Project Current Status Next Actions Comments 1 Zone 3 & 4 Trans Pipelines, Reach 5 Pipeline complete and in Completion of punch - list Pipeline is in operation. However, Budget: $1,700,000 Job No. 200421 operation. Extra Work billing items, such as air - release project completion is subject to the Project Contact: Joe Polimino has been reviewed and revised valves and valve cans, await developer (Shapell) finishing the Planned Completion Date: 2 "d Qtr 2009 to eliminate overcharges. completion of road by the road and parkway construction. It developer. was noted in a field investigation that road work has started up again. 2 Lakeview Reservoir The new reservoir is in The contractor completed Estimated completion date is mid to Budget: $11,500,000 Job No. 200704 operation. SSC Construction backfill operation, besides fine late April 2009, due to rain delays. Project Contact: Joe Polimino finalizing backfill of reservoir grading. Electrical contractor Planned Completion Date: Apr 2009 site and began work on curb to complete wiring and and gutter for access road. programming to prepare for Halcyon Electric continues to operational test which has been install electrical components. moved to mid April. 3 Highland Reservoir Demolition of the existing Grading for the new reservoir A paleontologist will be at the site Budget: $11,200,000 Job No. 200309 reservoir is almost complete. to start April 6. during grading and excavation as Project Contact: Leon de los Reyes Concrete from the reservoir is mandated by CEQA requirements. Planned Completion Date: July 11, 2010 currently being crushed and hauled from the site. A meeting with the City and Miscellaneous pipe, president of the equestrian club is appurtenances and electrical set for 3/31/09 regarding the work is being completed at the opening of the horse trail on the vaults. south side of Hi land reservoir. 4 Well Capacity Optimization General Pump prepared the After CDM's review, staff will Assuming a successful installation Budget: $1,000,000 Job No. 200813 preliminary well liner bid request cost proposals from of the liner, and pump testing, staff Project Contact: Leon de los Reyes items. Staff reviewed, and General Pump and Layne to will prepare pump and column, and Planned Completion Date: TBD forwarded it to CDM for perform the tasks. other mechanical well components further review. bid items. i 5 Zone 4C Reconfiguration Pipeline construction Pipeline construction will The planned construction 1 Budget: $1,500,000 Job No.200710 contractor, Ken Thompson Inc begin in April. Bids for completion date for the pipeline and Project Contact: Joe Polimino is preparing to start work. For pressure reducing station the upgraded pressure reducing Planned Completion Date: Dec 2009 upgrade of pressure reducing upgrade will be opened April station is December 2009. (no Planned Completion Date: TBD station, project is out to bid. 22. change) 6 Hidden Hills Res & Santiago BPS Construction awarded to Easement agreement with Anticipate that construction will Budget: $7,000,000 Job No.200028 Pacific Hydrotech on March Shapell has been approved and begin by May 2009. (no change) Project Contact: Joe Polimino 12. Submitted final Habitat is being executed. In contact Planned Completion Date: Sept 2010 Mitigation Plan to State Parks, with State Parks on final issues DFG & USFWS. for permit. Contractor has construct Well 21 on La been notified of award, and is Palma, fronting the Santa Ana now gathering bond and River Lakes. insurance documentation to 2 OC -51 Connection Upgrade Completed application for submit for District review. Design modifications to turnout will IN DESIGN 2 Project Current Status Next Actions Comments 1 New Wells 20 & 21 The results of 4 MPA test for Awaiting response from CDPH Staff's sampling program at Budget: $2,000,000 Job No.200711 proposed Well 20, during high regarding approval to construct Conrock Basin is ongoing. Project Contact: Leon de los Reyes river flow following rainstorm Well 20 on YLWD's property Planned Completion Date: TBD as required by CDPH, was near to Well 11. Will meet with OCWD to discuss received, and results were feasibility good - -no surface water Awaiting response from constituents were detected. OCWD regarding approval to Letter sent to OCWD construct Well 21 on La Palma requesting approval to Ave. construct Well 21 on La Palma, fronting the Santa Ana River Lakes. 2 OC -51 Connection Upgrade Completed application for Waiting for response from Design modifications to turnout will Budget: $242,000 Job No. 200815 upgrade and submitted to MET to schedule project be performed by MET staff to Project Contact: Steve Conklin MWDOC to forward to MET. meeting increase capacity from about 5 cfs Planned Completion Date: TBD to a max of 20 cfs 2 3 Lakeview Sewer Lift Sta Upgrades Design 90% complete. Tetra Once pump is selected staff Meet with property- owners if SCE 1 Budget: $200,000 Job No. Ops. Project Tech evaluating options for will contact SCE for required facilities require conduit changes. Project Contact: Hank Samaripa chopper pump. facilities. on selected option. Worse case Planned Completion Date: TBD Feasibility Study in progress. project completion 2nd.Q 2011. IN PLANNING CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING 1. Zone 5 (1000) Booster Station ($1,080,000) 2. Fairmont Booster Station Reconfiguration ($400,000) 3. Foxtail Drive Pipeline ($245,000) 4. Elk Mountain Reservoir Site Improvements ($300,000) 5. Fire Flow Improvements - -Via Sereno and Ohio ($125,000) Project Current Status Next Actions Comments 1 Highland Booster Station Upgrade Three prelim options presented Internal review of design Construction scheduling dependant Budget: $TBD Job No. 200814 by Tetra Tech as part of options with Operations staff. on selected option. Worse case Project Contact: Hank Samaripa Feasibility Study in progress. project completion 2nd.Q 2011. Planned Completion Date: TBD 2 Fairmont Site Improvements Proposed "deal points" settled Prepare AR for FFDCA Review construction sequence with Budget: $300,000 (YLWD share) and agreement is being drafted between S &S and YLWD and S &S Construction. Job No. 200803 present to PEO committee. Project Contact: Hank Samaripa Prepare AR for Board Planned Completion Date: TBD Approval. 3 Irrigation Water Study Preliminary application Continuing to look at options Waiting for info on status of grant Budget: $TBD Job No. 200807 submitted for grant funding. for development of non - potable funding application. Project Contact: Steve Conklin and recycled water use options. Planned Completion Date: TBD 4 Anaheim Intertie Conn Imprvmts Meeting with Anaheim staff Review existing intertie Budget: $250,000 (YLWD Share) being planned for mid April to agreement and locations for Job No. initiate project. interties. Project Contact: Hank Samaripa Planned Completion Date: TBD CAPITAL IMPROVEMENT PROJECTS APPROVED BY THE BOARD (2007 -2012) THAT ARE STILL PENDING 1. Zone 5 (1000) Booster Station ($1,080,000) 2. Fairmont Booster Station Reconfiguration ($400,000) 3. Foxtail Drive Pipeline ($245,000) 4. Elk Mountain Reservoir Site Improvements ($300,000) 5. Fire Flow Improvements - -Via Sereno and Ohio ($125,000)