HomeMy WebLinkAbout2018-06-26 - Board of Directors Meeting Agenda Packet (B)
AGENDA
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Tuesday, June 26, 2018, 6:30 PM
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
Al Nederhood, President
Brooke Jones, Vice President
Andrew J. Hall, Director
Phil Hawkins, Director
J. Wayne Miller, Director
4. ADDITIONS/DELETIONS TO THE AGENDA
5. INTRODUCTIONS AND PRESENTATIONS
5.1. Elected Official Liaison Reports
6. PUBLIC COMMENTS
Any individual wishing to address the Board is requested to identify themselves and state the matter on which
they wish to comment. If the matter is on the agenda, the Board will recognize the individual for their comment
when the item is considered. No action will be taken on matters not listed on the agenda. Comments are limited
to matters of public interest and matters within the jurisdiction of the Water District. Comments are limited to three
minutes.
7. CONSENT CALENDAR
All items listed on the consent calendar are considered to be routine matters, status reports, or documents
covering previous Board instructions. The items listed on the consent calendar may be enacted by one motion.
There will be no discussion on the items unless a member of the Board, staff, or public requests further
consideration.
7.1. Minutes of the Board of Directors Workshop Meeting Held April 26, 2018
Recommendation: That the Board of Directors approve the minutes as presented.
7.2. Minutes of the Board of Directors Special and Regular Meetings Held May 1, 2018
Recommendation: That the Board of Directors approve the minutes as presented.
7.3. Payments of Bills, Refunds, and Wire Transfers
Recommendation: That the Board of Directors ratify and authorize disbursements in
the amount of $1,708,448.93.
7.4. Amending List of Preauthorized Meetings and Events for Director Attendance
Recommendation: That the Board of Directors adopt Resolution No. 18-15
amending Section 9.1 (B) of the Board of Directors' Policies and Procedures
Manual.
7.5. Amending the Effective Dates of Employee Related Administrative Policies
Recommendation: That the Board of Directors:
(1) adopt Resolution No. 18-16 amending the effective dates of Exhibits A through F
included with the Memorandum of Understanding between the District and the
Yorba Linda Water District Employees Association for Fiscal Years 2019-2023 to
reflect the 1st day of July of the applicable fiscal year.
(2) adopt Resolution No. 18-17 amending the effective dates of Exhibits A through F
included with the Personnel Manual for Unrepresented Employees for Fiscal Years
2019-2023 to reflect the 1st day of July of the applicable fiscal year.
7.6. Appropriations Limit for Fiscal Year 2019
Recommendation: That the Board of Directors approve Resolution No. 18-18
adopting the Appropriations Limit for Fiscal Year 2019.
7.7. Water Development and Customer Service Fees
Recommendation: That the Board of Directors approve Resolution No. 18-19
adopting Water Development and Customer Service Fees and rescinding
Resolution No. 12-25.
7.8. Sewer Development and Customer Service Fees
Recommendation: That the Board of Directors approve Resolution No. 18-20
adopting Sewer Development and Customer Service Fees and rescinding
Resolution No. 08-06.
7.9. Fats, Oils, and Grease (FOG) Discharge Permit Fees
Recommendation: That the Board of Directors approve Resolution No. 18-21
adopting Fats, Oils, and Grease Fees and rescinding Resolution No. 13-11.
8. ACTION CALENDAR
This portion of the agenda is for items where staff presentations and Board discussions are needed prior to
formal Board action.
8.1. Sewer Rate for Fiscal Year 2019
Recommendation: That the Board of Directors approve Resolution No. 18-22
setting Sewer Rates effective August 1, 2018 and rescinding Resolution No. 17-19.
8.2. Operating Budget for Fiscal Year 2019 (Financial Summaries)
Recommendation: That the Board of Directors approve Resolution No. 18-23
adopting the Operating Budget for Fiscal Year 2019 (Financial Summaries).
8.3. Financial Reserves Policy for Fiscal Year 2019
Recommendation: That the Board of Directors approve Resolution No. 18-24
adopting a Financial Reserves Policy for Fiscal Year 2019 and rescinding
Resolution No. 17-31.
8.4. Reimbursement of Costs Incurred Before Issuance of Tax-Exempt Obligations for
Funding of District's Capital Improvement Program
Recommendation: That the Board of Directors approve Resolution No. 18-25
Regarding Intention to Issue Tax-Exempt Obligations for the purpose of permitting
the reimbursement of not to exceed $10,000,000 for incurred costs related the
current capital improvement program which ARE incurred before THE ISSUANCE
OF tax-exempt obligations.
8.5. Approval of Change Order Number 3 for the Fairmont Booster Pump
Station Upgrade Project
Recommendation: That the Board of Directors approve Change Order No. 3 for
$57,033.11 and 6 additional calendar days to Pacific Hydrotech Corporation for
construction of the Fairmont Booster Pump Station Upgrade Project, Job No. 2010-
11B.
9. DISCUSSION ITEMS
This portion of the agenda is for matters that cannot reasonably be expected to be concluded by action of the
Board of Directors at the meeting, such as technical presentations, drafts of proposed policies, or similar items for
which staff is seeking the advice and counsel of the Board of Directors. Time permitting, it is generally in the
District’s interest to discuss these more complex matters at one meeting and consider formal action at another
meeting. This portion of the agenda may also include items for information only.
9.1. Status of Engineering Department Activities
9.2. Budget to Actual Reports for the Month Ending May 31, 2018
9.3. Cash and Investment Report for Period Ending May 31, 2018
10. REPORTS, INFORMATION ITEMS, AND COMMENTS
10.1. Directors' Reports
10.2. General Manager's Report
10.3. General Counsel's Report
10.4. Future Agenda Items and Staff Tasks
11. COMMITTEE REPORTS
11.1. Interagency Committee with MWDOC and OCWD
(Nederhood/Jones)
· Minutes of meeting held May 24, 2018 at 4:00 p.m.
· Next meeting scheduled July 26, 2018 at 4:00 p.m.
11.2. Joint Agency Committee with City of Yorba Linda
(Nederhood/Jones)
· Minutes of meeting held June 4, 2018 to be provided when available.
· Next meeting scheduled September 10, 2018.
11.3. Joint Agency Committee with City of Placentia
(Nederhood/Jones)
· Next meeting yet to be scheduled.
12. INTERGOVERNMENTAL MEETINGS
12.1. MWDOC Board - June 6, 2018 (Nederhood/Jones)
12.2. OCSD Operations Committee - June 6, 2018 (Jones)
12.3. OCWD Board - June 6, 2018 (Miller)
12.4. WACO - June 8, 2018 (Hawkins/Jones/Nederhood)
12.5. AWWA Annual Conference - June 12-14, 2018 (Jones/Miller/Nederhood)
12.6. YL Planning Commission - June 13, 2018 (Hawkins)
12.7. YL City Council - June 19, 2018 (Miller)
12.8. MWDOC Board - June 20, 2018 (Nederhood/Jones)
12.9. OCWD Board - June 20, 2018 (Miller/Jones)
12.10. UCI Water Resources Symposium - June 21, 2018 (Jones)
12.11. WaterNow Communications Workshop - June 26, 2018 (Jones/Miller/Nederhood)
13. BOARD OF DIRECTORS ACTIVITY CALENDAR
13.1. Meetings from June 27 - August 31, 2018
14. ADJOURNMENT
14.1. The next Regular Board of Directors Meeting will be held Tuesday, July 10, 2018.
Closed Session (if necessary) will begin at 5:30 p.m. and regular business at 6:30 p.m.
Items Distributed to the Board Less Than 72 Hours Prior to the Meeting
Pursuant to Government Code section 54957.5, non-exempt public records that relate to open session agenda items
and are distributed to a majority of the Board less than seventy-two (72) hours prior to the meeting will be available for
public inspection in the lobby of the District’s business office located at 1717 E. Miraloma Avenue, Placentia, CA 92870,
during regular business hours. When practical, these public records will also be made available on the District’s internet
website accessible at http://www.ylwd.com/.
Accommodations for the Disabled
Any person may make a request for a disability-related modification or accommodation needed for that person to be
able to participate in the public meeting by telephoning the Executive Secretary at 714-701-3020, or writing to Yorba
Linda Water District, P.O. Box 309, Yorba Linda, CA 92885-0309. Requests must specify the nature of the disability and
the type of accommodation requested. A telephone number or other contact information should be included so the
District staff may discuss appropriate arrangements. Persons requesting a disability-related accommodation should
make the request with adequate time before the meeting for the District to provide the requested accommodation.
ITEM NO. 7.1
AGENDA REPORT
Meeting Date: June 26, 2018
Subject:Minutes of the Board of Directors Workshop Meeting Held April 26, 2018
STAFF RECOMMENDATION:
That the Board of Directors approve the minutes as presented.
ATTACHMENTS:
Name:Description:Type:
2018-04-26_-_Minutes_-_BOD.doc Minutes Minutes
Minutes of the YLWD Board of Directors Workshop Meeting Held April 26, 2018 at 4:30 p.m. 1
2018-XXX
MINUTES OF THE
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS WORKSHOP MEETING
Thursday, April 26, 2018, 4:30 p.m.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The meeting was called to order at 4:30 p.m.
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
DIRECTORS PRESENT STAFF PRESENT
Al Nederhood, President Brett Barbre, Assistant General Manager
Brooke Jones, Vice President John DeCriscio, Operations Manager
Phil Hawkins (Arrived 4:36 p.m.) Bryan Hong, Interim Engineering Manager
J. Wayne Miller Gina Knight, HR/Risk and Safety Manager (Arrived 7:05 p.m.)
Delia Lugo, Finance Manager
Art Vega, Information Services Manager
DIRECTORS ABSENT Annie Alexander, Executive Asst/Board Secretary
Andrew J. Hall Jennifer Hill, Meter Services Lead
Kelly McCann, Senior Accountant
Kaden Young, Management Analyst
ALSO PRESENT
Andrew Gagen, Parter, Kidman Gagen Law LLP
John Shafer, Account Manager, Aqua Metric
Jeff Randolph, Operations Sales Manager, Aqua Metric
4. PUBLIC COMMENTS
None.
5. DISCUSSION ITEMS
5.1. Benefits of Advanced Metering Infrastructure (AMI)
Staff provided an in depth review of the District’s historical and current
metering technology, benefits of migrating to AMI, and proposed locations
for phased implementation.
Minutes of the YLWD Board of Directors Workshop Meeting Held April 26, 2018 at 4:30 p.m. 2
2018-XXX
Discussion followed regarding the estimated costs, and the process and
time required for transitioning to AMI. Staff offered to bring back additional
cost and long-term savings information at the budget workshop scheduled
May 17, 2018.
5.2. Other Operating and Non-Operating Revenues and Schedule of
Water/Sewer Development, Customer Service, and Fats Oil and Grease
Fees for Fiscal year 2019
Staff reviewed the District’s costs for various services and the current and
proposed fees. Staff also noted the proposed fees had been utilized to
project the other operating and non-operating revenues for FY19 included
in the presentation. The group then discussed the proposed fees and
suggested revisions.
Terry Harris, resident, expressed his concerns regarding the proposed
fees.
Staff explained that discussion of the other operating and non-operating
revenues for FY19 would need to be deferred to the next workshop so that
the Board’s feedback regarding the proposed fees could be incorporated.
Discussion followed regarding projected revenues, proposed fees, and the
District’s financial model.
Director Hawkins left the meeting at 6:48 p.m.
Staff reviewed topics to be covered at the next budget workshop. The
Board then determined to schedule additional workshops as follows:
Wednesday, May 23, 2018 at 4:30 p.m.
Thursday, June 7, 2018 at 4:30 p.m.
Monday, June 18, 2018 at 4:30 p.m.
A recess was declared at 6:59 p.m.
The meeting reconvened at 7:05 p.m. HR/Risk and Safety Manager Gina Knight
joined the meeting at this time.
5.3. Strategic Plan Goals 4 – 5 (Community Partnership and Workforce
Engagement)
The attendees discussed goals 4 and 5 of the strategic plan including
associated initiatives and strategies and agreed on the following draft
language:
Minutes of the YLWD Board of Directors Workshop Meeting Held April 26, 2018 at 4:30 p.m. 3
2018-XXX
(4) Community Partnership
A. Brand Recognition
Timely and available communication, strategies, and
messaging
Establish annual tour of District facilities, coincide in May for
Water Awareness Month
Sponsorships, water donations, etc.
B. Public Awareness
Production of annual report; water usage, cost,
reconciliation, projects, etc.
Informative bill inserts
Monitor/communicate emerging water quality and sewer
issues/regulations
Host Federal/State/Local representatives for a tour and
briefing, with the Board, at YLWD offices
AMI, usage data, conservation
Regional impact (e.g. sewer services)
(5) Workforce Engagement
A. Employee Development
Retain highly skilled and capable workforce
Provide paths to training, develop management skills and
career progression
Succession planning
B. Employee Relations
Mentorship/internship programs
Equate to job satisfaction and employee of choice award
Employee appreciation week; water professionals
appreciation week (October)
Conduct annual employee satisfaction survey
6. ADJOURNMENT
6.1. The meeting was adjourned at 7:42 p.m.
Annie Alexander
Board Secretary
ITEM NO. 7.2
AGENDA REPORT
Meeting Date: June 26, 2018
Subject:Minutes of the Board of Directors Special and Regular Meetings Held May 1,
2018
STAFF RECOMMENDATION:
That the Board of Directors approve the minutes as presented.
ATTACHMENTS:
Name:Description:Type:
2018-05-01_-_Minutes_-_BOD_(A).doc Minutes Minutes
2018-05-01_-_Minutes_-_BOD_(B).docx Minutes Minutes
Minutes of the YLWD Board of Directors Special Meeting Held May 1, 2018 at 5:30 p.m. 1
2018-XXX
MINUTES OF THE
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS SPECIAL MEETING
Tuesday, May 1, 2018, 5:30 p.m.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The meeting was called to order at 5:34 p.m.
2. ROLL CALL
DIRECTORS PRESENT STAFF PRESENT
Al Nederhood, President Marc Marcantonio, General Manager
Brooke Jones, Vice President Brett Barbre, Assistant General Manager
Andrew J. Hall Gina Knight, HR/Risk and Safety Manager
Annie Alexander, Executive Asst/Board Secretary
DIRECTORS ABSENT ALSO PRESENT
Phil Hawkins Andrew Gagen, Partner, Kidman Gagen Law LLP
J. Wayne Miller
3. PUBLIC COMMENTS
None.
4. CLOSED SESSION
The meeting was adjourned to Closed Session at 5:34 p.m. All Directors were
present with the exception of Directors Hawkins and Miller. Also present were
General Manager Marcantonio, Assistant General Manager Brett Barbre,
HR/Risk and Safety Manager Gina Knight, and General Counsel Andrew Gagen.
4.1. Conference with Labor Negotiators
Pursuant to Section 54957.6 of the California Government Code
Agency Designated Representatives: Marc Marcantonio, General Manager
Brett Barbre, Asst General Manager
Gina Knight, HR/Risk and Safety Manager
Vivian Lim, Human Resources Analyst
Employee Organization: YLWD Employees Association
Minutes of the YLWD Board of Directors Special Meeting Held May 1, 2018 at 5:30 p.m. 2
2018-XXX
4.2. Conference with Legal Counsel – Existing Litigation
Pursuant to Paragraph (1) of Subdivision (d) of Section 54956.9 of the
California Government Code
Name of Case: State of California et al., ex rel. OnTheGo Wireless,
LLC vs. Cellco Partnership, doing business as
Verizon Wireless, et al. (Sacramento County Superior
Court – Case No. 34-2012-00127517)
The Board reconvened in Open Session at 6:04 p.m. General Counsel Gagen
reported that no action was taken during Closed Session that was required to be
reported under the Brown Act.
5. ADJOURNMENT
5.1. The meeting adjourned at 6:05 p.m.
Annie Alexander
Board Secretary
Minutes of the YLWD Board of Directors Regular Meeting Held May 1, 2018 at 6:30 p.m. 1
2018-XXX
MINUTES OF THE
YORBA LINDA WATER DISTRICT
BOARD OF DIRECTORS REGULAR MEETING
Tuesday, May 1, 2018, 6:30 p.m.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The meeting was called to order at 6:30 p.m.
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
DIRECTORS PRESENT STAFF PRESENT
Al Nederhood, President Marc Marcantonio, General Manager
Brooke Jones, Vice President Brett Barbre, Assistant General Manager
Andrew J. Hall Gina Knight, HR/Risk and Safety Manager
Delia Lugo, Finance Manager
DIRECTORS ABSENT Annie Alexander, Exec Asst/Board Secretary
Phil Hawkins Mike Carreon, Facilities Maint Worker
J. Wayne Miller Bryan Hong, Interim Engineering Manager
Javier Martinez, Water Production Superintendent
Kaden Young, Management Analyst
ALSO PRESENT
Andrew Gagen, General Counsel, Kidman Gagen Law LLP
4. ADDITIONS/DELETIONS TO THE AGENDA
None.
5. INTRODUCTIONS AND PRESENTATIONS
5.1. Elected Official Liaison Reports
None.
6. PUBLIC COMMENTS
None.
Minutes of the YLWD Board of Directors Regular Meeting Held May 1, 2018 at 6:30 p.m. 2
2018-XXX
7. CONSENT CALENDAR
Director Hall made a motion, seconded by Director Jones, to approve the
Consent Calendar. Motion carried 3-0-0-2 with Directors Hawkins and Miller
being absent.
7.1. Minutes of the Board of Directors Special Meeting Held April 24, 2018
Recommendation: That the Board of Directors approve the minutes as
presented.
7.2. Payments of Bills, Refunds, and Wire Transfers
Recommendation: That the Board of Directors ratify and authorize
disbursements in the amount of $458,841.61.
8.0 DISCUSSION ITEMS
8.1. Projected Expenditures from Conservation Reserve for FY18 (Nederhood)
Staff reviewed the status of the District’s Conservation Reserve account
including the current balance, projected expenses, and proposed
activities. Discussion followed regarding the proposed activities, the
District’s water conservation policies and associated community outreach
efforts, and the state’s proposed permanent framework for water
conservation. The Board determined to discuss this matter further
following adoption of the FY19 budget.
8.2. Continued Review of Strategic Plan Goals 4 – 5 (Community Partnership
and Workforce Engagement)
Staff explained that the final draft of the strategic plan, including feedback
previously provided regarding Goals 4 – 5, would be presented to the
Board for consideration at the next regular meeting.
9. REPORTS, INFORMATION ITEMS, AND COMMENTS
9.1. Directors' Reports
Director Hall suggested the Board consider evaluating the District’s budget
and strategic planning processes following conclusion of the budget
workshops. This matter will be placed on a future agenda for discussion.
Minutes of the YLWD Board of Directors Regular Meeting Held May 1, 2018 at 6:30 p.m. 3
2018-XXX
9.2. General Manager's Report
General Manager Marc Marcantonio invited the managers (or their
designees) to report on activities within their respective departments. He
then inquired as to the Board’s interest in utilizing an energy services
company (ESCO) for the management of an energy service performance
contract, and participating in a tour of IRWD. He then commented on his
own meeting attendance and undertakings.
9.3. General Counsel’s Report
None.
9.4. Future Agenda Items and Staff Tasks
Director Hall requested an action item on the next agenda for the Board to
determine whether or not to move forward with utilizing an ESCO.
President Nederhood requested an item on the agenda for the next
interagency meeting with MWDOC and OCWD to discuss PFOS/PFOA
concerns. He also requested an item on a future agenda to discuss the
District’s water conservation ordinance and pertinent information
contained in the Urban Water Management Plan. Staff offered to arrange
a presentation from MWDOC regarding the agency’s water conservation
initiatives at a future Board meeting. Director Hall suggested that the
Board discuss the District’s current and future water conservation policies
and outreach efforts separately at future Board meetings.
Ryan Gunstream from Honeywell commented on his company’s support of
the competitive bid process for selection of an ESCO.
10. COMMITTEE REPORTS
10.1. Interagency Committee with MWDOC and OCWD
(Nederhood/Jones)
Next meeting scheduled May 24, 2018 at 4:00 p.m.
10.2. Joint Agency Committee with City of Yorba Linda
(Nederhood/Jones)
Next meeting scheduled June 4, 2018 at 4:00 p.m. at YL City Hall.
Minutes of the YLWD Board of Directors Regular Meeting Held May 1, 2018 at 6:30 p.m. 4
2018-XXX
10.3. Joint Agency Committee with City of Placentia
(Nederhood/Jones)
Next meeting yet to be scheduled.
11. INTERGOVERNMENTAL MEETINGS
The Directors present noted their attendance at the following meetings and
events.
11.1. YL Chamber of Commerce First Responders Breakfast – April 25, 2018 (Hawkins)
11.2. MWDOC/OCWD Joint Planning Committee – April 25, 2018 (Jones/Nederhood)
11.3. OCSD Board – April 25, 2018 (Jones)
11.4. ISDOC Executive Committee – May 1, 2018 (Nederhood)
12. BOARD OF DIRECTORS ACTIVITY CALENDAR
12.1. Meetings from May 2 – July 1, 2018
The Board made no changes to the activity calendar.
13. ADJOURNMENT
13.1. The meeting was adjourned at 8:13 p.m.
Annie Alexander
Board Secretary
ITEM NO. 7.3
AGENDA REPORT
Meeting Date: June 26, 2018 Budgeted:Yes
To:Board of Directors
Funding Source:All Funds
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Reviewed by Legal:N/A
Prepared By:Richard Cabadas, Accounting
Assistant I
CEQA Compliance:N/A
Subject:Payments of Bills, Refunds, and Wire Transfers
SUMMARY:
Section 31302 of the California Water Code says the District shall pay demands made against it
when they have been approved by the Board of Directors. Pursuant to law, staff is hereby
submitting the list of disbursements for Board of Directors’ approval.
STAFF RECOMMENDATION:
That the Board of Directors ratify and authorize disbursements in the amount of $1,708,448.93.
DISCUSSION:
The items on this disbursement list includes: A wire of $20,415.22 to So. California Gas Co. for May
2018 gas charges at multiple locations; a wire of $40,462.03 to So. California Edison for May 2018
electricity charges at multiple locations; a wire of $574,399.04 to MWDOC for April 2018 water
purchases; and a check of $132,284.65 to Pacific Hydrotech Corporation for Fairmont booster pump
station progress payment #18. The balance of $355,565.64 is routine invoices.
The Accounts Payable check register total is $1,123,126.58; Payroll No. 11 total is $291,157.53;
Payroll No. 12 total is $294,164.82 and the disbursements for this agenda report is $1,708,448.93.
A summary of the disbursements is attached.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors approves bills, refunds and wire transfers semi-monthly.
ATTACHMENTS:
Name:Description:Type:
18-CS_0626.pdf Cap Sheet Backup Material
CkReg062618.pdf Check Register Backup Material
18_CC_0626.pdf Credit Card Summary Backup Material
Summary of Disbursements
June 26, 2018
CHECK NUMBERS & WIRES:
Computer Checks 72349—72499 $ 487,850.29
____________
$ 487,850.29
WIRES:
W 061318 Gas Company $ 20,415.22
W061418 So. California Edison $ 40,462.03
W061518 MWDOC $ 574,399.04
____________
$ 635,276.29
TOTAL OF CHECKS & WIRES $1,123,126.58
PAYROLL NO. 11:
Direct Deposits $ 190,071.20
Third Party Checks 6962—6968 $ 13,794.77
Payroll Taxes $ 49,447.29
EFT – CalPERS Payroll #11 $ 37,844.27
$ 291,157.53
PAYROLL NO. 12:
Direct Deposits $ 189,040.71
Third Party Checks 6969—6975 $ 16,772.26
Payroll Taxes $ 49,856.57
EFT – CalPERS Payroll #12 $ 38,495.28
$ 294,164.82
TOTAL OF PAYROLLS $585,322.35
----------------------------------------------------------------------------------------------------------------------
DISBURSEMENT TOTAL: $1,708,448.93
==================================================================
APPROVED BY THE BOARD OF DIRECTORS MINUTE ORDER AT BOARD
MEETING OF JUNE 26, 2018
==================================================================.
Check No.Date Vendor Name Amount Description
72380 06/26/2018 Al Nederhood 816.61 TRAVEL EXPENSE - ACWA CONFERENCE & MILEAGE
72378 06/26/2018 Albert A. Webb Associates 4,149.85 J09-22#22 - PRELIMINARY DRAWINGS
72379 06/26/2018 Alhambra Foundry Company 4,450.67 SEWER MAIN REPAIR PARTS
72381 06/26/2018 Anaheim Wheel & Tire 60.00 VEHICLE MAINTENANCE - UNIT #214
72382 06/26/2018 Annie Alexander 224.18 REIMBURSEMENT - OFFICE SUPPLIES & AUDIO RECORDER FOR BOD MEETINGS
72383 06/26/2018 Anthony Manzano 99.00 HEALTH & WELLNESS FY18
72384 06/26/2018 Aqua-Metric Sales Co.36,882.22 OPERATION WORK MATERIAL
72385 06/26/2018 Aramark 580.36 UNIFORM SERVICE
72496 06/26/2018 ARC 530.66 PW DOC MANAGEMENT
72371 06/26/2018 ARDEN L HODGINS 157.88 CUSTOMER REFUND
72386 06/26/2018 Armando Raya 100.00 HEALTH & WELLNESS FY18
72387 06/26/2018 Art Vega 20.00 TRAVEL EXPENSE - COLOCATION SWITCH TOUR
72389 06/26/2018 AT & T - Calnet3 1,035.22 ATT CALNET 3
72388 06/26/2018 ATS Communications 2,415.00 PROFESSIONAL SERVICES - MARCH, APRIL & MAY 2018
72390 06/26/2018 Autoscribe Corporation 861.25 PAYMENT VISION GATEWAY
72391 06/26/2018 Bee Busters, Inc 150.00 COLONY ABATEMENT - COMMERCIAL
72392 06/26/2018 BrightView Tree Care Services Inc.1,824.70 LANDSCAPE MAINTENANCE - JUNE
72393 06/26/2018 Brooke Jones 46.11 MILEAGE REIMBURSEMENT - MAY 2018
72394 06/26/2018 CalCard US Bank 30,234.26 CREDIT CARD TRANSACTIONS - MAY & JUNE 2018
72395 06/26/2018 California Newspaper Partnership 936.00 PUBLIC NOTICE - UNCLAIMED REFUND
72396 06/26/2018 Carlos Murillo 100.00 HEALTH & WELLNESS FY18
72368 06/26/2018 CARRIE PHILLIPS 225.00 CUSTOMER REFUND
72397 06/26/2018 CDM Smith 7,267.00 J09-22#22 - PROFESSIONAL ENGINEER SERVICES - WELL 22
72398 06/26/2018 CDW Government, Inc 15.09 J18-10 - CISCO DIRECT CAB-9K12
72399 06/26/2018 Chambers Group Inc.607.75 PROFESSIONAL SERVICES - FEB-APRIL 2018
72400 06/26/2018 Chameleon Beverage Company, Inc.925.70 YLWD PROMOTIONAL PRODUCTS - BOTTLED WATER
72401 06/26/2018 City Of Anaheim 3,187.96 LAKEVIEW -ELECTRICITY FEES- 04/12-05/14
72402 06/26/2018 Complete Paperless Solutions 13,124.00 LASERFICHE SUPPORT - 1 YEAR
72403 06/26/2018 Culligan of Santa Ana 2,298.00 EQUIPMENT PE SOFTENER
72373 06/26/2018 CYPREXX SERVICES LLC 396.78 CUSTOMER REFUND
72405 06/26/2018 Danielle Logsdon 90.00 HEALTH & WELLNESS FY18
72404 06/26/2018 Daniels Tire Service 535.97 VEHICLE MAINTENANCE - UNIT #214
72412 06/26/2018 Dean Criske Trucking 2,356.57 ROAD MATERIAL DISPOSAL
72406 06/26/2018 Dell Marketing L.P.22,270.29 VLA WINDOWS SERVER DATA CENTER & CMMS COMPUTER
72407 06/26/2018 Delta Wye Electric, Inc.6,735.80 J18-06-RTU PLC CABINET-WELL 10, CONDUIT & WIRING INSTALL
72408 06/26/2018 deRose Promos 2,713.79 PROMOTIONAL PRODUCTS - OPEN HOUSE
72409 06/26/2018 Diane Dalton 100.00 HEALTH & WELLNESS FY18
72367 06/26/2018 DINA ZELINSKI 39.93 CUSTOMER REFUND
72411 06/26/2018 Dion & Sons, Inc.5,374.41 STATIONARY ENGINE MAINTENANCE
72413 06/26/2018 Eisel Enterprises, Inc.4,133.84 METER BOX & LIDS
72414 06/26/2018 Elite Equipment Inc 348.35 TOOLS & EQUIPMENT
72415 06/26/2018 Enthalpy Analytical, Inc.2,990.00 WATER QUALITY LAB SAMPLES
72417 06/26/2018 EyeMed 1,382.28 EYE MED PREMIUM - JUNE 2018
72416 06/26/2018 Federal Express 19.55 SHIPPING CHARGES
72418 06/26/2018 Flex Advantage 135.00 FLEX ADVANTAGE - MAY 2018
72419 06/26/2018 Fry's Electronics 462.79 IT HARDWARE SUPPLIES
72420 06/26/2018 Fullerton Paint & Flooring 258.09 CLEANING/PAINTING SUPPLIES
72421 06/26/2018 George Baltierra 100.00 HEALTH & WELLNESS FY18
72422 06/26/2018 Georgina Knight 60.00 HEALTH & WELLNESS FY18
72356 06/26/2018 GINA-MARIE LIBERIO 26.13 CUSTOMER REFUND
72374 06/26/2018 GRANT JEFFERY BENNET 126.38 CUSTOMER REFUND
72377 06/26/2018 GRAY CONSTRUCTION 547.85 CUSTOMER REFUND
72423 06/26/2018 Graybar Electric Co 253.50 J18-06 & J18-07 - PLC'S AND PANELS
72369 06/26/2018 GREG SCHLINGER 158.07 CUSTOMER REFUND
72424 06/26/2018 Haaker Equipment Co.502.78 VEH. MAINTENANCE - UNIT #197 & #210
72363 06/26/2018 HAEIN KIM 100.14 CUSTOMER REFUND
72498 06/26/2018 Harrington Industrial 737.93 CL2 REPLACEMENT PARTS
72351 06/26/2018 HELEN RHO 441.59 CUSTOMER REFUND
72425 06/26/2018 Hi-Line Electric Co., Inc.139.56 MECHANIC SHOP SUPPLIES
72426 06/26/2018 Hydrex Pest Control 175.00 PEST CONTROL
72357 06/26/2018 IDRIS BAWAHAB 132.11 CUSTOMER REFUND
72427 06/26/2018 Infosend Inc.4,852.98 BILLING & POSTAGE - CUSTOMER BILLS
72428 06/26/2018 Inland Group 716.54 J18-11 - SUPPLIES FOR OPEN HOUSE
Yorba Linda Water District
Check Register
For Checks Dated: 06/06/2018 thru 06/26/2018
72429 06/26/2018 Irma Munguia 100.00 HEALTH & WELLNESS FY18
72430 06/26/2018 Jackson's Auto Supply - Napa 609.49 VEHICLE MAINTENACE - UNIT #197, #208, #210 & #213
72431 06/26/2018 Jacqueline Segura 137.93 MEETING SUPPLIES, MILEAGE REIMBURSEMENT & HEALTH & WELLNESS FY18
72361 06/26/2018 JEREMY MAYO 26.74 CUSTOMER REFUND
72432 06/26/2018 Jesse Diaz 100.00 HEALTH & WELLNESS FY18
72355 06/26/2018 JESSICA MERRILL 120.28 CUSTOMER REFUND
72364 06/26/2018 JOHN D ROGERS 46.55 CUSTOMER REFUND
72433 06/26/2018 John Todd Howard 100.00 HEALTH & WELLNESS FY18
72434 06/26/2018 Kaden Young 428.98 TRAVEL EXPENSE - CAL WEP PEER TO PEER & HEALTH & WELLNESS
72354 06/26/2018 KATHLEEN HERNANDEZ 38.78 CUSTOMER REFUND
72435 06/26/2018 KELLY MCCANN 100.00 HEALTH & WELLNESS FY18
72436 06/26/2018 Kidman Law 29,973.29 LEGAL SERVICE
72437 06/26/2018 Kimball Midwest 298.77 MECHANIC SHOP SUPPLIES
72438 06/26/2018 Lee & Ro, Inc.1,570.00 J10-11B - FAIRMONT PUMP STATION UPGRADE
72439 06/26/2018 Liebert Cassidy Whitmore 11,120.55 LEGAL SERVICE - FEBRUARY - APRIL 2018
72366 06/26/2018 LOAY HELES 23.68 CUSTOMER REFUND
72440 06/26/2018 Malissa Muttaraid 100.00 HEALTH & WELLNESS FY18
72441 06/26/2018 Managed Health Network 177.75 EAP - JUNE 2018
72442 06/26/2018 Marc Marcantonio 30.19 MILEAGE REIMBURSEMENT - MAY 2018
72443 06/26/2018 Marie Pagenkopp 100.00 HEALTH & WELLNESS FY18
72350 06/26/2018 MARSHELL MONTGOMERY 17.11 CUSTOMER REFUND
72352 06/26/2018 MARTIN ZAPATA 144.71 CUSTOMER REFUND
72444 06/26/2018 Matt Ostiz 100.00 HEALTH & WELLNESS FY18
72445 06/26/2018 Mc Fadden-Dale Hardware 83.96 MECHANIC SHOP SUPPLIES
72446 06/26/2018 Mc Master-Carr Supply Co.755.13 SHOP SUPPLIES
72447 06/26/2018 Miller Spatial Services LLC 15,000.00 YLWD GIS/CITYWORKS SUPPORT
72497 06/26/2018 Mobile Modular Portable Storage 6,938.25 J17-34 - STORAGE CONTAINER
W061518 06/15/2018 Municipal Water District 574,399.04 WATER PURCHASES - APRIL 2018
72375 06/26/2018 NATIONSTAR MORTGAGE 428.97 CUSTOMER REFUND
72353 06/26/2018 NEASE PROPERTY MGMT 392.98 CUSTOMER REFUND
72448 06/26/2018 Nicholas A. Hollon 100.00 HEALTH & WELLNESS FY18
72449 06/26/2018 Nickey Kard Lock Inc 5,338.47 FUEL - 05/16/18 - 05/31/18
72450 06/26/2018 Nicole Dalton 100.00 HEALTH & WELLNESS FY18
72358 06/26/2018 NORMA HELM 107.84 CUSTOMER REFUND
72452 06/26/2018 O.C. Driveline 193.78 MAINTENANCE PARTS- VALLEY VIEW
72451 06/26/2018 Occu-Med, Ltd.165.50 PRE EE PHYSICALS (1)
72453 06/26/2018 Office Solutions 1,456.81 TONER & OFFICE SUPPLIES
72454 06/26/2018 Omni Enterprise Inc.2,990.00 JANITORIAL SERVICE - MAY 2018
72455 06/26/2018 Orange County Register 92.31 OC REG -M-F- 8 WEEKS
72456 06/26/2018 Oscar Ortega 100.00 HEALTH & WELLNESS FY18
72457 06/26/2018 OUR FIRST AID COMPANY 117.23 FIRST AID KITS
72464 06/26/2018 P.T.I. Sand & Gravel, Inc.348.35 ROAD MATERIAL
72458 06/26/2018 Pacific Hydrotech Corporation 132,284.65 J10-11B - FAIRMONT PUMP STATION UPGRADE - PROGRESS
72459 06/26/2018 Pacific Western Bank 6,962.35 J10-11B - FAIRMONT PUMP STATION UPGRADE - RETENTION #18
72460 06/26/2018 Parts Source Anaheim 31.69 VEH. MAINTENACE - UNIT #218
72461 06/26/2018 Patricia D. Medina 100.00 HEALTH & WELLNESS FY18
72462 06/26/2018 Plumbers Depot Inc.771.49 LEADER HOSE AND FITTINGS
72463 06/26/2018 Praxair Distribution 157.55 WELDING SUPPLIES
72362 06/26/2018 PS OWEN INC 354.01 CUSTOMER REFUND
72465 06/26/2018 Quest Software Inc.5,540.23 VMWARE RAPID RECOVERY
72466 06/26/2018 Quinn Company 8,399.79 MAINTENANCE PARTS- FAIRMONT #1
72467 06/26/2018 RACHEL PADILLA 131.87 HEALTH & WELLNESS FY18 & TRAVEL EXPENSE - RATE SETTING CONFERENCE
72480 06/26/2018 Rachel Padilla/Petty Cash 342.02 PETTY CASH - O050918, Y051018, O060618 & Y061318
72469 06/26/2018 Ricardo Cabadas 100.00 HEALTH & WELLNESS FY18
72468 06/26/2018 Ricardo De Anda 100.00 HEALTH & WELLNESS FY18
72470 06/26/2018 RKI Engineering, LLC 3,500.00 CONTROL SUPPORT - HIGHLAND
72365 06/26/2018 ROBERT STREIP 8.79 CUSTOMER REFUND
72471 06/26/2018 Roberto Cuellar 100.00 HEALTH & WELLNESS FY18
72472 06/26/2018 Robyn Hollinshead 100.00 HEALTH & WELLNESS FY18
72473 06/26/2018 Ryan Beihl 100.00 HEALTH & WELLNESS FY18
72474 06/26/2018 Safety-Kleen Systems Inc 980.55 HAZ MAT DISPOSAL - PARTS WASHER
72475 06/26/2018 Saira Hernandez 100.00 HEALTH & WELLNESS FY18
72476 06/26/2018 Sanders Paving, Inc.24,682.00 ASPHALT PAVING - 22 LOCATIONS
72477 06/26/2018 Scott Coffman 100.00 HEALTH & WELLNESS FY18
72349 06/26/2018 SCOTT HERRICK 610.86 CUSTOMER REFUND
72478 06/26/2018 Selman Chevrolet Company 244.15 VEH. MAINTENANCE - UNIT #218
72360 06/26/2018 SHANNON PETTINGER 58.91 CUSTOMER REFUND
72479 06/26/2018 Snap-on Incorporated 2,011.89 MECHANICS SHOP EQUIPMENT & TOOLS
72499 06/26/2018 Solarwinds Inc.4,210.00 SOLARWIND UT2500 & SL2000
W061418 06/14/2018 Southern Calif Edison Co.40,462.03 ELECTRICITY CHARGES - MULTIPLE LOCATIONS - MAY 2018
W061318 06/13/2018 Southern Calif Gas Co.20,415.22 GAS CHARGES - MULTIPLE LOCATIONS - MAY 2018
72483 06/26/2018 Stantec Consulting Services In 5,723.77 J10-11B - FAIRMONT PUMP STATION UPGRADE
72482 06/26/2018 State of California 230.00 CAMPAIGN LOBBYING LIABILITY
72481 06/26/2018 Stater Bros. Markets 63.97 MEETING SUPPLIES
72485 06/26/2018 Step Saver Inc 1,158.53 COARSE SALT
72359 06/26/2018 STEPHEN NERING 204.77 CUSTOMER REFUND
72484 06/26/2018 Steven Enterprises 897.56 HP761 TONER & PLOTTER SUPPLIES
72486 06/26/2018 Telstar Instruments 5,920.00 RADIO SYSTEM EVALUATION
72487 06/26/2018 The Shredders 22.00 ON SITE SHRED SERVICE
72488 06/26/2018 Time Warner Cable 838.38 SPECTRUM BUS INTERNET & TV
72489 06/26/2018 Tony Arambarri 100.00 HEALTH & WELLNESS FY18
72372 06/26/2018 TUYEN NGUYEN 246.49 CUSTOMER REFUND
72490 06/26/2018 Underground Service Alert 310.30 DIGALERT - MAY 2018
72491 06/26/2018 United Industries 447.07 PPE EQUIPMENT
72492 06/26/2018 United Water Works, Inc.18,899.47 OPERATION WORK MATERIAL
72493 06/26/2018 Vivian Lim 95.00 HEALTH & WELLNESS FY18
72494 06/26/2018 Westside Building Material 571.25 MISCELLANEOUS WAREHOUSE PARTS
72410 06/26/2018 White Nelson Diehl Evans LLP 4,000.00 1ST INTERIM BILLING - AUDIT FY18
72370 06/26/2018 XIANG CHEN 120.17 CUSTOMER REFUND
72376 06/26/2018 YE YUAN 121.55 CUSTOMER REFUND
72495 06/26/2018 YO Fire 2,884.36 OPERATION WORK MATERIAL
1,123,126.58
5-31-2018 PAYROLL #11 - EMPLOYEE DIRECT DEPOSIT 190,071.20
5-31-2018 PAYROLL #11 - PAYROLL TAX PAYMENT 49,447.29
5-31-2018 PAYROLL #11 - CALPERS EFT 37,844.27
6962 5-31-2018 COLONIAL LIFE 107.10
6963 5-31-2018 LINCOLN FINANCIAL GROUP 3,409.21
6964 5-31-2018 NATIONWIDE RETIREMENT SOLUTIONS 8,955.93
6965 5-31-2018 GARNISHMENT 231.00
6966 5-31-2018 CA STATE DISBURSEMENT UNIT 366.92
6967 5-31-2018 CA STATE DISBURSEMENT UNIT 339.69
6968 5-31-2018 CA STATE DISBURSEMENT UNIT 384.92
291,157.53
06-14-2018 PAYROLL #12 - EMPLOYEE DIRECT DEPOSIT 189,040.71
06-14-2018 PAYROLL #12 - PAYROLL TAX PAYMENT 49,856.57
06-14-2018 PAYROLL #12 - CALPERS EFT 38,495.28
6969 6-14-2018 COLONIAL LIFE 107.10
6970 6-14-2018 FLEX ADVANTAGE 2,479.09
6971 6-14-2018 LINCOLN FINANCIAL GROUP 3,648.28
6972 6-14-2018 NATIONWIDE RETIREMENT SOLUTIONS 9,446.26
6973 6-14-2018 CA STATE DISBURSEMENT UNIT 366.92
6974 6-14-2018 CA STATE DISBURSEMENT UNIT 339.69
6975 6-14-2018 CA STATE DISBURSEMENT UNIT 384.92
294,164.82
Payroll Checks #11
Payroll Checks #12
Vendor Name Amount Description
OC United 1,500.00 Board contribution - Community Affairs Support
Best Value Tire & Wheel 98.85 Vehicle maintenance - mount & balance - Unit #205
Metal Edge - Hollinger 893.20 Archival supplies - Historical & permanent vital documents
Flappy Jacks 43.24 Lunch meeting - (3) attendees
Zena's Lebanese Cuisine 167.80 Lunch meeting - (7) attendees
Saymore Trophy 599.00 Plaque for EOC Meal Preparation Center
Jersey Mike's 38.77 Lunch meeting - (3) attendees
BBQ Galore 95.69 J18-11 - Open house supplies
Grainger 25.44 (1) Handicap parking sign
BC Wire Rope & Rigging 878.52 Vehicle equipment
Promo Direct 739.46 J18-11 - YLWD promotional items for Open house
Mc Master-Carr Supply Co.33.86 (2) adhesive back roller
Lippert Components 69.63 (2) D-ring with clip - Unit #E193
Best Value Tire & Wheel 61.04 Vehicle maintenance - mount & balance - Unit #E193
Harrington Industrial 107.48 J17-34 - CL2 replacement parts - Hidden Hill
Michaels Arts & Crafts, Brea #2111 11.84 J18-11 - Open house supplies
Amazon.com 38.73 J18-11 - Open house supplies
Home Depot 290.62 (64) bags of concrete
Sunstate Equipment Co 30.17 Propane refill
Home Depot 14.18 SOD - Landscape repair
Clearwater Technologies 46.84 (1) sentri switch
BC Wire Rope & Rigging 43.10 (2) Lifiting chains
Harrington Industrial 70.48 J17-34 - CL2 replacement parts - Hidden Hill
Home Depot 34.44 Batteries (2) pk "AAA"
The Catch 65.51 Lunch meeting - (3) attendees
Lucca 13.00 Travel expense - ACWA Conference - Dir. Nederhood
Amazon.com 213.00 Vehicle maintenance - Unit #195
Harrington Industrial 519.59 J17-34 - CL2 replacement parts - Hidden Hill
Harrington Industrial 17.95 J17-34 - CL2 replacement parts - Hidden Hill
KB Design 257.95 J18-11 - Open house polo shirts
Smart & Final 195.66 J18-11 - Open house supplies
Home Depot 85.64 J18-11 - Open house supplies
Amazon.com 31.37 J18-11 - Open house supplies
AM Conservation Group 882.70 Dye tablets - Leak detection
John Wayne Airport 64.00 Travel expense - ACWA Conference - Dir. Nederhood
Harrington Industrial 85.71 J17-34 - CL2 replacement parts - Hidden Hill
AW Direct Inc.483.97 (2) 12'grab hook lifting chain
Mc Master-Carr Supply Co.322.87 Letter stamp & engraver - production
Stater Bros. Markets 6.27 Distilled water
Alliant Insurance Services, Inc.340.00 J18-11 - Special event insurance
Amazon.com 22.09 J18-11 - Open house supplies
Energy Environmental Soln, Inc 2,400.00 Emission test - Well #5
BIG 5 SPORTING GOODS 215.48 (2) Easy-ups for maintenance
Home Depot 181.13 Copper pipe & fittings
Amazon.com 80.50 Mechanic shop supplies
ONLINE Information Services, Inc.593.32 Online utility exchange report & collection transactions
Verizon Wireless 3,787.44 Verizon Wireless - 03/21/18 - 4/20/18
Cal Card Credit Card
U S Bank
AutoZone 36.90 Supplies for cleaning vehicles
OC ARMA 25.00 OC ARMA - May chapter meeting - Arambarri, T
Amazon.com 25.50 Mechanic shop supplies
Federal Express 46.87 J18-11 - Poster board
Staples 16.96 J18-11 - Open house supplies
Precision Services Group 155.31 J18-11 - Open house - poster board mounts
Southside Towing 204.00 Towing fee - Unit #205
Dunkin Donuts 119.19 J18-11 -Open house
Los Angeles Times 207.74 LA Times subscription
Minuteman Press 750.42 Rosanne Weston business cards & door hangers for operations
Dan Copp Crushing Corp.300.00 Disposal of road material
Orchard Supply Hardware 27.77 Miscellaneous PVC parts for operations
Home Depot 96.76 SOD - landscape removal
Kohler 456.41 (4) pk waterless urinal maintenance balls
Home Depot 99.77 Building repair parts
Costco 42.74 Supplies for All Hands Meeting
Costco 167.54 Supplies for All Hands Meeting
Sams Club 336.64 Supplies for All Hands Meeting
Fitness Grill 44.75 Lunch meeting - Phan & Lugo
KB Design 14.85 (1) YLWD polo shirt - Engineering Manager
Sams Club 75.36 Emergency response equipment
ISDOC (Independent Special Dist OC)51.00 Registration - ISDOC quarterly meeting - (3) attendees
Francisco Meat Co 458.65 Supplies for All Hands Meeting
Answer One Communications 575.30 Virtual reception service - After hours
Placentia Disposal #676 605.24 (2) front loads - Richfield Rd.
Southwest Airlines 292.97 Travel expense - Tour of Switch facility
Big Top Rentals 452.48 Table rentals - All hands meeting
Smart & Final 48.73 Supplies for All Hands Meeting
Disneyland Resort Parking 30.00 Travel expense - OC Water Summit - Marcantonio, M
KB Design 129.26 (2) YLWD polo shirts - Operations Manager
SkillPath Seminars 2,741.00 Star 12 renewal - 9 subscription (Finance & Customer Service)
Federal Express 157.60 Shipping fees to Switch - VMHosts
Village Nurseries 118.85 SOD - Landscape repair
United Rentals - Fullerton 209.45 Rental - Concrete trailer & 3/4 yard mix
City Clerks Association of California 50.00 Registration - CCAC workshop - Alexander, A
Home Depot 289.96 Power tool replacement battery
Home Depot 32.43 Hardware supplies
Mc Master-Carr Supply Co.435.13 (4) leg chain sling - 2ft long
Home Depot 407.99 Shop supplies
Super Shuttle 47.20 Travel expense - AWWA Conference - Dir. Nederhood & Dir. Jones
Costco 183.17 Fridge for admin conference room
Energy Environmental Soln, Inc 2,400.00 Emissions test - Lakeview
Home Depot 77.41 SOD - Landscape repair
Minuteman Press 80.81 (500) business cards - Records Request
Praxair Distribution 34.36 Welding supplies - leak crew
OC ARMA 40.00 OC ARMA - End of Year Chapter presentation
ServerMonkey.com 109.54 Dell Poweredge sliding rails
Uline 39.73 Magentic vault shelving labels
SCIE ARMA 20.00 SCIE ARMA -Chapter meeting/Board Installation
Amazon.com 67.99 Soundbar - Sharp interactive white board
30,234.26
ITEM NO. 7.4
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Brett R. Barbre, Asst General
Manager
Prepared By:Malissa Muttaraid, Public Affairs
Representative
Subject:Amending List of Preauthorized Meetings and Events for Director Attendance
STAFF RECOMMENDATION:
That the Board of Directors adopt Resolution No. 18-15 amending Section 9.1 (B) of the Board of
Directors' Policies and Procedures Manual.
DISCUSSION:
The Board has expressed an interest in attending various community organizations in order to
increase the visibility of the District. This would include organizations such as the local Chambers of
Commerce and non-political Community Service Organizations events and meetings.
The Board has pre-authorized attendance at various organizations (City Council, Water Agencies,
Water Organizations, etc.) and this amendment to Resolution No. 16-12 Section 9.1 (B) would add
several organizations to the current list of pre-authorized meetings and events.
Staff has prepared a resolution for the Board's consideration to amend Section 9.1 (B) of the Board
of Directors Policies and Procedures Manual adopted by Resolution No. 16-12 (see attached).
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-15_-_Amending_BOD_Policy.docx Resolution Resolution
Resolution No. 18-15 Amending Board of Directors’ Policies and Procedures Manual 1
RESOLUTION NO. 18-15
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
AMENDING LIST OF PRE-AUTHORIZED MEETINGS AND EVENTS
WHEREAS, the Board of Directors of the Yorba Linda Water District previously
adopted a Policies and Procedures Manual (Manual) by Resolution No.
18-06; and
WHEREAS, Section 9.1(B) of this Manual sets forth Directors’ preauthorized
attendance at meetings and events sponsored by various organizations;
and
WHEREAS, it is the Board of Directors’ desire to further clarify this section.
NOW, THEREFORE, BE IT RESOLVED by Board of Directors of the Yorba Linda
Water District as follows:
Section 1. That Section 9.1 (B) of the Board of Directors Policies and Procedures
Manual adopted by Resolution No. 18-06 be amended to read as follows:
Director attendance at meetings and events sponsored by the District and
the following organizations shall be preauthorized subject to budget
limitations as approved by the Board:
1. Association of California Water Agencies (ACWA)
2. Association of California Water Agencies – Joint Powers Insurance
Authority (ACWA-JPIA)
3. American Water Works Association (AWWA)
4. California Association of Sanitation Agencies (CASA)
5. California Special Districts Association (CSDA)
6. California-Nevada Section of American Water Works Association
(CA-NV AWWA)
7. Chambers of Commerce
8. City, County and State Governmental Agencies (Including meeting
with elected/appointed officials and staff.)
9. Colorado River Water Users Association (CRWUA)
10. Educational Institutions
Resolution No. 18-15 Amending Board of Directors’ Policies and Procedures Manual 2
11. Independent Special Districts of Orange County (ISDOC)
12. Metropolitan Water District of Southern California (MWD or MET)
13. Municipal Water District of Orange County (MWDOC)
14. Non-political Community Service Organizations
15. Orange County Local Agency Formation Commission (OC LAFCO)
16. Orange County Sanitation District (OCSD)
17. Orange County Water Association (OCWA)
18. Orange County Water District (OCWD)
19. Special District Leadership Foundation (SDLF)
20. Urban Water Institute (UWI)
21. Water Advisory Committee of Orange County (WACO)
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 7.5
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Gina Knight, HR/Risk and Safety
Manager
Dept:Human
Resources/Risk
Management
Prepared By:Vivian Lim, Human Resources
Analyst
Subject:Amending the Effective Dates of Employee Related Administrative Policies
STAFF RECOMMENDATION:
That the Board of Directors:
(1) adopt Resolution No. 18-16 amending the effective dates of Exhibits A through F included with
the Memorandum of Understanding between the District and the Yorba Linda Water District
Employees Association for Fiscal Years 2019-2023 to reflect the 1st day of July of the applicable
fiscal year.
(2) adopt Resolution No. 18-17 amending the effective dates of Exhibits A through F included with
the Personnel Manual for Unrepresented Employees for Fiscal Years 2019-2023 to reflect the 1st
day of July of the applicable fiscal year.
PRIOR RELEVANT BOARD ACTION(S):
At the meeting held June 5, 2018, the Board of Directors adopted Resolution No. 18-10 approving
the Memorandum of Understanding between the District and the Yorba Linda Water District
Employees Association for Fiscal Years 2019-2023, and Resolution No. 18-11 approving the
Personnel Manual for Unrepresented Employees for Fiscal Years 2019-2023.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-16_-_MOU.docx Resolution Resolution
Resolution_No._18-17_-_Unrepresented.docx Resolution Resolution
Resolution No. 18-16 Amending the Effective Dates of Exhibits A Through F of Resolution No. 18-10 1
RESOLUTION NO. 18-16
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
AMENDING THE EFFECTIVE DATES OF EXHIBITS A THROUGH F
OF THE MEMORANDUM OF UNDERSTANDING BETWEEN THE DISTRICT AND
THE YORBA LINDA WATER DISTRICT EMPLOYEES ASSOCIATION
FOR FISCAL YEARS 2019-2023
WHEREAS, the Board of Directors of the Yorba Linda Water District previously
adopted the Memorandum of Understanding between the District and the
Yorba Linda Water District Employees Association for Fiscal Years 2019-
2023; and
WHEREAS, it is the desire of the Board of Directors to amend the effective dates of
certain exhibits included with said Memorandum of Understanding.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. That the effective dates of Exhibits A through F of the Memorandum of
Understanding between the District and the Yorba Linda Water District
Employees Association for Fiscal Years 2019-2023 as adopted by
Resolution No. 18-10 be amended to reflect the 1st day of July of the
applicable fiscal year.
PASSED AND ADOPTED this 26th day of June 2018, by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
Resolution No. 18-16 Amending the Effective Dates of Exhibits A Through F of Resolution No. 18-10 2
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
Resolution No. 18-17 Amending the Effective Dates of Exhibits A Through F of Resolution No. 18-11 1
RESOLUTION NO. 18-17
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
AMENDING THE EFFECTIVE DATES OF EXHIBITS A THROUGH F
OF THE PERSONNEL MANUAL FOR UNREPRESENTED EMPLOYEES
FOR FISCAL YEARS 2019-2023
WHEREAS, the Board of Directors of the Yorba Linda Water District previously
adopted the Personnel Manual for Unrepresented Employees for Fiscal
Years 2019-2023; and
WHEREAS, it is the desire of the Board of Directors to amend the effective dates of
certain exhibits included with said Personnel Manual.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. That the effective dates of Exhibits A through F of the Personnel Manual
for Unrepresented Employees for Fiscal Years 2019-2023 as adopted by
Resolution No. 18-11 be amended to reflect the 1st day of July of the
applicable fiscal year.
PASSED AND ADOPTED this 26th day of June 2018, by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
Resolution No. 18-17 Amending the Effective Dates of Exhibits A Through F of Resolution No. 18-11 2
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 7.6
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Saira Hernandez, Accountant
Subject:Appropriations Limit for Fiscal Year 2019
SUMMARY:
Each year the District must adopt the Appropriations Limit and factors used to calculate this
number, in accordance with Proposition 13, Government Code Section 7900 and Article XIIIB of the
California Constitution. The Appropriations Limit assures government agencies do not assess and
collect taxes in excess of the controlled limits. The District receives a relatively small amount of
revenue from property taxes annually and it is historically well below the Appropriations Limitation
each year.
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-18 adopting the Appropriations Limit for
Fiscal Year 2019.
DISCUSSION:
In 1977, California voters passed Proposition 13, which limited property tax assessments to 1% of a
property’s market value and limited assessed value increases to 2% per year. Concurrent with the
reduction of property taxes, the voters also passed Proposition 4, the Gann Spending Limit
Initiative, which added Article XIIIB to the California Constitution. Under Article XIIIB, a government
agency is restricted in the amount of annual appropriations from the proceeds of taxes to pay voter-
approved bond debt service. If proceeds of taxes exceed allowed appropriations, the excess must
either be refunded to the State Controller or returned to the taxpayers through revised tax rate or
through revised fee schedules. An excess in one year may be offset against a deficit in the
following year, so effectively the limitation may be exceeded in a single year but not over any
consecutive two-year period.
District staff performed the required calculation to determine the appropriations limits for FY19, in
compliance with the terms of Article XIIIB of the California Constitution and the Government Code
Section 7900. The starting point for computing the Appropriations Limit is the Appropriations
Subject to Limitation in the Base Year of FY79. This number is multiplied by the controlled factors
each successive year to determine the current year’s appropriation limit. The State Department of
Finance, Population Research Unit, provides inflation and population figures each year. These two
are multiplied together to determine the final percentage by which the prior year’s limit is increased
or decreased.
The District’s estimated property tax revenue of $1,850,000, budgeted for FY19, is substantially
lower than the calculated limitation of $7,333,078. Therefore, there are no excess appropriations
that must be returned to the taxpayers.
PRIOR RELEVANT BOARD ACTION(S):
The Board of Directors adopted Resolution No. 18-18 on June 26, 2018, Adopting the
Appropriations Limit for Fiscal Year 2019.
ATTACHMENTS:
Name:Description:Type:
GANN_Calculation_2018-19.pdf Backup Material Backup Material
Dept_of_Finance_Letter_May_2018.pdf Backup Material Backup Material
Resolution_No._18-18_-_GANN_Limit.docx Resolution Resolution
Special District: Yorba Linda Water District
Fiscal Year: 2018-2019
Budget vs. Actual:Budget
REVENUE AMOUNT SOURCE
A. LAST YEAR'S LIMIT 7,025,009
B. ADJUSTMENT FACTORS
1. Population % 0.00%0.69%1.0069 (Weighted Avg Calc)
2. Inflation % 2.00%3.67%1.0367 (State Finance)
Total Adjustment %1.0439 (b1*b2)
C. ANNUAL ADJUSTMENT $
BUDGET 7,333,078 B*A
D. OTHER ADJUSTMENTS
sub total
E. TOTAL ADJUSTMENTS 7,333,078 (C+D)
F. THIS YEAR'S LIMIT 7,333,078 (A+E)
APPROPRIATIONS SUBJECT
TO LIMITATION
ANT o,�
4 "� Z
W III n
O fi
DEPARTMENT OF EDMUND G. BROWN JR. - GOVERNOR
�CfFpRNP F' N A N C E STATE CAPITOL■ ROOM 1 1 45■SACRAMENTO CA■ 95814-4998■WWW.DOF.CA.GOV
OFFICE OF THE DIRECTOR
May 2018
Dear Fiscal Officer:
Subject: Price Factor and Population Information
Appropriations Limit
California Revenue and Taxation Code section 2227 requires the Department of Finance to
transmit an estimate of the percentage change in population to local governments. Each local
jurisdiction must use their percentage change in population factor for January 1, 2018, in
conjunction with a change in the cost of living, or price factor, to calculate their appropriations limit
for fiscal year 2018-19. Attachment A provides the change in California's per capita personal
income and an example for utilizing the price factor and population percentage change factor to
calculate the 2018-19 appropriations limit. Attachment B provides the city and unincorporated
county population percentage change. Attachment C provides the population percentage change
for counties and their summed incorporated areas. The population percentage change data
excludes federal and state institutionalized populations and military populations.
Population Percent Change for Special Districts
Some special districts must establish an annual appropriations limit. California Revenue and
Taxation Code section 2228 provides additional information regarding the appropriations limit.
Article XIII B, section 9(C)of the California Constitution exempts certain special districts from the
appropriations limit calculation mandate. The code section and the California Constitution can be
accessed at the following website: htti):Hleciinfo.leciislature.ca.ciov/faces/codes.xhtml.
Special districts required by law to calculate their appropriations limit must present the calculation
as part of their annual audit. Any questions special districts have on this requirement should be
directed to their county, district legal counsel, or the law itself. No state agency reviews the local
appropriations limits.
Population Certification
The population certification program applies only to cities and counties. California Revenue and
Taxation Code section 11005.6 mandates Finance to automatically certify any population
estimate that exceeds the current certified population with the State Controller's Office. Finance
will certify the higher estimate to the State Controller by June 1, 2018.
Please Note: The prior year's city population estimates may be revised.
If you have any questions regarding this data, please contact the Demographic Research Unit at
(916) 323-4086.
MICHAEL COHEN
Director
By:
AMY M. COSTA
Chief Deputy Director
Attachment
May 2018
Attachment A
A. Price Factor: Article XIII B specifies that local jurisdictions select their cost of living
factor to compute their appropriation limit by a vote of their governing body. The cost
of living factor provided here is per capita personal income. If the percentage
change in per capita personal income is selected,the percentage change to be used
in setting the fiscal year 2018-19 appropriation limit is:
Per Capita Personal Income
Fiscal Year Percentage change
(FY) over prior year
2018-19 3.67
B. Following is an example using sample population change and the change in
California per capita personal income as growth factors in computing a 2018-19
appropriation limit.
2018-19:
Per Capita Cost of Living Change = 3.67 percent
Population Change = 0.78 percent
Per Capita Cost of Living converted to a ratio: 3.67 + 100 = 1.0367
100
Population converted to a ratio: 0.78 + 100 = 1.0078
100
Calculation of factor for FY 2018-19: 1.0367 x 1.0078 = 1.0448
Fiscal Year 2018-19
Attachment B
Annual Percent Change in Population Minus Exclusions*
January 1,2017 to January 1,2018 and Total Population,January 1,2018
Total
County Percent Chanae --- Population Minus Exclusions --- Population
City 2017-2018 1-1-17 1-1-18 1-1-2018
Orange
Aliso Viejo 3.11 50,384 51,950 51,950
Anaheim 0.16 356,485 357,067 357,084
Brea 0.25 44,776 44,890 44,890
Buena Park 0.08 83,926 83,995 83,995
Costa Mesa 0.30 114,816 115,156 115,296
Cypress 0.55 49,704 49,978 49,978
Dana Point 0.51 33,897 34,071 34,071
Fountain Valley 0.01 56,916 56,920 56,920
Fullerton 0.50 143,499 144,214 144,214
Garden Grove 0.06 176,784 176,896 176,896
Huntington Beach 0.33 201,981 202,648 202,648
Irvine 3.40 267,097 276,176 276,176
Laguna Beach 0.26 23,248 23,309 23,309
Laguna Hills -0.03 31,829 31,818 31,818
Laguna Niguel 0.14 65,288 65,377 65,377
Laguna Woods 0.13 16,575 16,597 16,597
La Habra 0.64 62,451 62,850 62,850
Lake Forest 1.72 83,414 84,845 84,845
La Palma 0.09 15,933 15,948 15,948
Los Alamitos 0.03 11,860 11,863 11,863
Mission Viejo 0.00 95,985 95,987 95,987
Newport Beach 1.13 86,207 87,182 87,182
Orange 0.69 140,981 141,952 141,952
Placentia -0.03 52,772 52,755 52,755
Rancho Santa Margarita 0.06 49,301 49,329 49,329
San Clemente 0.82 65,009 65,543 65,543
San Juan Capistrano 0.37 36,624 36,759 36,759
Santa Ana 0.12 337,843 338,247 338,247
Seal Beach -0.11 25,428 25,399 25,984
Stanton -0.08 39,500 39,470 39,470
Tustin 0.06 82,291 82,344 82,344
Villa Park 0.12 5,944 5,951 5,951
Westminster 0.13 94,353 94,476 94,476
Yorba Linda 0.49 68,781 69,121 69,121
Unincorporated 2.32 126,342 129,278 129,278
County Total 0.69 3,198,224 3,220,361 3,221,103
*Exclusions include residents on federal military installations and group quarters residents in state mental institutions,state
and federal correctional institutions and veteran homes.
Resolution No.18-18 Adopting the Appropriations Limit for FY19 1
RESOLUTION NO. 18-18
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING THE APPROPRIATIONS LIMIT
FOR FISCAL YEAR 2019
WHEREAS, under the terms of Article XIIIB of the California Constitution and
Government Code Section 7900 et seq., all local agencies are required to
establish, by resolution, an appropriations limit for each fiscal year; and
WHEREAS, in June 1990, voters in the State of California approved Proposition 111
which amended Government Code Section 7900 et seq., modifying the
method of calculation for the appropriations limit and requiring all local
agencies to select, by resolution, the annual adjustment factors used to
perform the calculations; and
WHEREAS, the District staff has performed the required calculations to determine the
limit for Fiscal Year 2019, in compliance with the above provisions and
made the documentation used in the determination of the appropriations
limit and other necessary determinations available to the public at least
fifteen days prior to the date of this meeting.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. That there is hereby adopted, pursuant to Article XIIIB of the California
Constitution and Government Code Section 7900 et seq., as amended by
Proposition 111, an appropriations limit for Fiscal Year 2019 of $7,333,078.
Section 2. The annual adjustment factors are the weighted average percentage
change in the population of the cities within the District’s jurisdiction, and
the percentage change in the California Per Capita Income.
Resolution No.18-18 Adopting the Appropriations Limit for FY19 2
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 7.7
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Kelly McCann, Senior
Accountant
Subject:Water Development and Customer Service Fees
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-19 adopting Water Development and
Customer Service Fees and rescinding Resolution No. 12-25.
DISCUSSION:
The current Water Development and Customer Service Fees were adopted via Resolution No. 12-
25 in October 2012. Staff reviewed and updated the methodology for the basis of determining fair
and equitable fees that cover the cost of service to provide the listed water related service(s).
Included in the cost of service are the projected staff, equipment and material costs
utilized to perform the service(s) required. Staff costs include the current hourly rate and benefit
costs of the employee(s) providing the service. Staff compared the development and customer
service fees with those of other local agencies. Attached is Resolution No. 18-19 with the updated
Water Development and Customer Service Fees.
STRATEGIC PLAN:
FR 1-C: Revise the Water and Sewer Rules and Regulations and Evaluate Fee Schedules
Regularly for Proper Cost of Service Coverage
PRIOR RELEVANT BOARD ACTION(S):
On October 11, 2012 the Board approved Resolution No. 12-25 adopting Water Development and
Customer Service Fees.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-19_-
_Water_Dev_Cust_Svc_Fees.docx Resolution Resolution
Resolution No.18-19 Adopting Water Development and Customer Service Fees for FY19 1
RESOLUTION NO. 18-19
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING WATER DEVELOPMENT AND CUSTOMER SERVICE FEES
AND RESCINDING RESOLUTION NO. 12-25
WHEREAS, the Yorba Linda Water District Rules and Regulations for Water Service
include a provision that Water Development and Customer Service Fees
shall be adopted by separate Resolution; and
WHEREAS, the Board of Directors of the Yorba Linda Water District has, from time to
time, adopted Ordinances and Resolutions to change the Water
Development and Customer Service Fees for services provided by the
District; and
WHEREAS, the fees collected pursuant to this Resolution shall be used to fund costs
necessitated by the services provided by the District.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. Fees identified in Section 4 of the Rules and Regulations for Water
Services shall be as follows:
A. New Account Setup Fee $30.00 per Occurrence
B. Late Payment Fee 10% of Outstanding Charges
C. Notice of Discontinuance $15.00 per Occurrence
D. Shut-Off Duty to Non-Payment $40.00 per Occurrence
E. Reestablish Service $40.00 per Occurrence
F. Callout After Hours $210.00 per Occurrence
G. Tampered Lock – Residential $80.00 per Occurrence
H. Tampered Lock – Commercial $120.00 per Occurrence
I. Meter Removal $110.00 per Occurrence
J. Meter Replacement (Due to Meter Removal) $110.00 per Occurrence
(Plus additional labor & material due to customer tampering.)
Resolution No.18-19 Adopting Water Development and Customer Service Fees for FY19 2
K. Return Payment Fee $30.00 per Occurrence
L. Stop Payment of District Check $25.00 per Occurrence
M. Water Meter Testing Fee $110.00 (Plus cost of independent
laboratory testing if applicable.)
N. Residential Customer Deposit (Determined by a 3rd Party Processing)
Potential of Risk “Green” $0.00 per Meter
Potential of Risk “Yellow” $125.00 per Meter
Potential of Risk “Red” $225.00 per Meter
O. Commercial Customer Deposit
1 ½ Inch Meter & Below $450.00 per Meter
2 Inch Meter $750.00 per Meter
3 Inch Meter $1,125.00 per Meter
4 Inch and Larger Meter $2,040.00 per Meter
Section 2. Fees identified in Section 3 and 7 of the Rules and Regulations for Water
Services shall be as follows:
A. Construction Meters (Temporary connection at location approved by
District Staff)
Deposit $1,655.00 per Meter
New Account Setup Fee $30.00 per Occurrence
Meter Use Fee $3.50 per Day
Move to a New Location $70.00 per Occurrence
Recalibration Fee $110.00 per Occurrence
An Approved Backflow Prevention Device to be provided by
Customer at time of Meter Installation
B. New Meter Connection Fee
3/4 Inch Meter $630.00 per Meter
1 Inch Meter $680.00 per Meter
1 1/2 Inch Meter $1,180.00 per Meter
2 Inch Meter $1,380.00 per Meter
Meter(s) larger than 2 Inch Actual Costs
Meters(s) within Traffic Area Actual Costs
C. Temporary Water Services 2 times the current potable water rate per
100 cubic feet
Resolution No.18-19 Adopting Water Development and Customer Service Fees for FY19 3
D. Change of Meter Size Actual Costs
E. Temporary Untreated Water Metropolitan Water District Untreated
Rate, plus other MWDOC fees, plus
$13.00 per acre foot.
F. Permanent Untreated Water Metropolitan Water District Untreated
Rate, plus other MWDOC fees, plus
$13.00 per acre foot.
G. Backflow Device Monitoring Fee $2.33 per Month
H. Jumper Fees (Phased Out) $11.73 per Month
(Will be phased out.)
I. Water Deposit (Plan Check, Inspection, GIS Data Conversion,
Administrative, and Records/Billing Services Costs) - Based on the
number of Connections:
1-5 Connections $6,120.00 Deposit
6-10 Connections $9,795.00 Deposit
11-20 Connections $14,330.00 Deposit
21-30 Connections $17,180.00 Deposit
31-40 Connections $24,550.00 Deposit
41-50 Connections $28,070.00 Deposit
51-99 Connections $35,095.00 Deposit
100 and higher number of Connections $47,035.00 Deposit
Note: The above “Water Deposit” will be required upon application.
Additional funds may be required upon the Yorba Linda Water District
(YLWD) reaching 85% of the deposit balance. The deposit will be
charged current salary and vehicle rates based on a project number.
All unused deposit funds will be refunded to the current customer on
record upon close out of the project. Please note additional customer
service, water service, and meter fees may be required.
J. Single Service Fee $1,225.00 per Permit
K. Private Fire Service:
4 Inch $16.00 per Month
6 Inch $35.00 per Month
8 Inch $59.00 per Month
10 Inch $94.00 per Month
Resolution No.18-19 Adopting Water Development and Customer Service Fees for FY19 4
Section 3. Penalties identified in Section 4 and 6 of the Rules and Regulations for
Water Services shall be as follows:
A. Meter Tampering Penalties:
1st Violation Actual Costs of Inspection, Repair, and Estimated Usage
2nd Violation Actual Costs of Inspection, Repair, Est. Usage, and $500
3rd Violation Actual Costs of Inspection, Repair, Est. Usage, and $1,000
B. Hydrant Tampering Penalties:
1st Violation Actual Costs of Inspection, Repair, and Estimated Usage
2nd Violation Actual Costs of Inspection, Repair, Est. Usage, and $500
3rd Violation Actual Costs of Inspection, Repair, Est. Usage, and $1,000
C. Obstructing District Facilities Actual Costs of removing obstruction
(applicable if 24 hours has
lapsed from proper district
notification of obstruction)
Section 4. The fees adopted herein shall take effect on July 1, 2018 and Resolution
No. 12-25 is hereby rescinded on July 1, 2018.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 7.8
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Kelly McCann, Senior
Accountant
Subject:Sewer Development and Customer Service Fees
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-20 adopting Sewer Development
and Customer Service Fees and rescinding Resolution No. 08-06.
DISCUSSION:
The current Sewer Development and Customer Service Fees were adopted via Resolution No. 08-
06 in June 2008. Staff reviewed and updated the methodology for the basis of determining fair and
equitable fees that cover the cost of service to provide the listed sewer related service(s). Included
in the cost of service are the projected staff, equipment and material costs utilized to perform the
service(s) required. Staff costs include the current hourly rate and benefit costs of the employee(s)
providing the service. Staff compared the development and customer service fees with those of
other local agencies. Attached is Resolution No. 18-20 with the updated Sewer Development and
Customer Service Fees.
STRATEGIC PLAN:
FR 1-C: Revise the Water and Sewer Rules and Regulations and Evaluate Fee Schedules
Regularly for Proper Cost of Service Coverage
PRIOR RELEVANT BOARD ACTION(S):
On June 12, 2008 the Board approved Resolution No. 08-06 adopting the current Sewer
Development and Customer Service Fees.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-20_-
_Sewer_Dev_Cust_Svc_Fees.docx Resolution Resolution
Resolution No.18-20 Adopting Sewer Development and Customer Service Fees for FY19 1
RESOLUTION NO. 18-20
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING SEWER DEVELOPMENT AND CUSTOMER SERVICE FEES
AND RESCINDING RESOLUTION NO. 08-06
WHEREAS, the Yorba Linda Water District Rules and Regulations for Sewer Service
include a provision that Sewer Development and Customer Service Fees
shall be adopted by separate Resolution; and
WHEREAS, the Board of Directors of the Yorba Linda Water District has, from time to
time, adopted Ordinances and Resolutions to change the Sewer
Development Fees for services provided by the District; and
WHEREAS, the fees collected pursuant to this Resolution shall be used to fund costs
necessitated by the services provided by the District.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. Fees identified in Section 6 and 8 of the Rules and Regulations for Sewer
Services shall be as follows:
A. Service Charge:
Drainage Area 1 $1,660.00 per Gross Acre
Drainage Area 2 $1,450.00 per Gross Acre
B. Frontage Charge: $78.80 per Linear Foot
(But not less than $5,750.00 per Connection)
C. Sewer Deposit (Plan Check, Inspection, GIS Data Conversion,
Administrative, and Records/Billing Services Costs) - Based on the
number of Connections:
1-5 Connections $5,220.00 Deposit
6-10 Connections $6,695.00 Deposit
11-20 Connections $9,075.00 Deposit
21-30 Connections $11,295.00 Deposit
31-40 Connections $15,510.00 Deposit
41-50 Connections $18,475.00 Deposit
51-99 Connections $29,230.00 Deposit
100 and Higher Number of Connections $44,155.00 Deposit
Resolution No.18-20 Adopting Sewer Development and Customer Service Fees for FY19 2
Note: The above “Sewer Deposit” will be required upon application.
Additional funds may be required upon the Yorba Linda Water District
(YLWD) reaching 85% of the deposit balance. The deposit will be
charged current salary and vehicle rates based on a project number.
All unused deposit funds will be refunded to the current customer on
record upon close out of the project. Please note additional customer
service and sewer development fees may be required.
D. Single Service Fee $1,090.00 per Permit
E. Sewer Cleaning – Hot Spots Fee Actual Costs
(Fee assessed to number
of customers serviced.)
Section 2. Penalties identified in Section 11 and 13 of the Rules and Regulations for
Water Services shall be as follows:
A. Sewer Tampering Penalties:
1st Violation Actual Costs of Inspection and Repair
2nd Violation Actual Costs of Inspection, Repair, and $500
3rd Violation Actual Costs of Inspection, Repair, and $1,000
B. Obstructing District Facilities Actual Costs of Removing Obstruction
(Applicable if 24 hours has
lapsed from proper district
notification of obstruction.)
Section 3. The fees adopted herein shall take effect on July 1, 2018 and Resolution
No. 08-06 is hereby rescinded on July 1, 2018.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
Resolution No.18-20 Adopting Sewer Development and Customer Service Fees for FY19 3
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 7.9
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Kelly McCann, Senior
Accountant
Subject:Fats, Oils, and Grease (FOG) Discharge Permit Fees
SUMMARY:
In 2004, the District adopted Ordinance No. 04-01, regulating Food Service Establishments (FSE)
fats, oils and grease (FOG) discharge into the sewer system. The State Water Resources Control
Board Order No. 2006-0003-DWQ (and as amended by Order Nos. WQ 2008-0002-EXEC and WQ
2013-0058-EXEC) mandates the District to enforce this regulation. In response, the District required
all FSE within its sewer jurisdiction to comply with the FOG Program and apply for an annual FOG
Wastewater Discharge Permit. Fees pertaining to this program have been reviewed and staff is
recommends updating some of the fee amounts.
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-21 adopting Fats, Oils, and Grease Fees
and rescinding Resolution No. 13-11.
DISCUSSION:
Staff reviewed costs associated with maintaining the FOG Program, including printing, labor and
equipment. Staff also compared District costs with neighboring agencies. Based on its findings,
staff is recommending that some of the associated fees pertaining to the FOG Program be updated
as identified in the attached Resolution No. 18-21.
STRATEGIC PLAN:
FR 1-C: Revise the Water and Sewer Rules and Regulations and Evaluate Fee Schedules
Regularly for Proper Cost of Service Coverage
PRIOR RELEVANT BOARD ACTION(S):
On June 13, 2013 the Board approved Resolution No. 13-11 adopting Fats, Oils, and Grease Fees.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-21_-_FOG_Fees.docx Resolution Resolution
Resolution No. 18-21 Adopting Fats, Oils, and Grease Fees for FY19 and Rescinding Resolution No. 13-11 1
RESOLUTION NO. 18-21
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING FATS, OILS, AND GREASE FEES
FOR FISCAL YEAR 2019 AND
RESCINDING RESOLUTION NO. 13-11
WHEREAS, in 2002, the Santa Ana Regional Water Quality Control Board enacted
Rule R8-2002-0014 requiring all sewage agencies to adopt the
requirements of a new Waster Water Discharge Requirement (WDR); and
WHEREAS, in 2006, the Santa Ana Reginal Water Quality Control Board Rule R8-
2002-0014 was rescinded and a new statewide permit adopted based on
R8-2002-0014; and
WHEREAS, the WDR and statewide permit require many municipalities, including the
Yorba Linda Water District, to increase the level of maintenance,
operations, and capital improvement repairs to their sewer systems and to
have in place a fats, oils, and grease control program; and
WHEREAS, on July 22, 2004, the Board of Directors adopted Ordinance 04-01,
creating a Fats, Oils, and Grease Control Program for Food Service
Establishments (FSE) in City of Yorba Linda and portions of the cities of
the cities of Anaheim, Brea, and Placentia requiring a permit for sewer
discharges, which could contain fats, oils, and grease, and imposing
requirements for monitoring of and elimination of fats, oils, grease from
sewer discharges for such establishments; and
WHEREAS, Ordinance No. 04-01, authorizes the adoption by resolution of a Fats, Oils,
and Grease Wastewater Discharge Permit Fee and Grease Disposal
Mitigation Fee to cover the costs of increase maintenance and
administration of the sewer system as a result of the Food Service
Establishments’ inability to remove Fats, Oils, and Greases from its
wastewater discharged, to require Food Service Establishments to protect
the District’s sanitary sewer system; and
WHEREAS, the Board of Directors of the Yorba Linda Water District has, from time to
time, adopted Resolutions to establish the Fats, Oils, and Grease Fees for
services provided by the District; and
Resolution No. 18-21 Adopting Fats, Oils, and Grease Fees for FY19 and Rescinding Resolution No. 13-11 2
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. The fees adopted for Yorba Linda Water District’s Fats, Oils, and Grease
Permit Program for Fiscal Year 2019 shall be as follows:
A. Initial Permit and Application Fee $145.00 per FSE
B. Annual Renewal $145.00 per Year/FSE
C. Non-Compliance Fee $325.00 per Occurrence
D. Mitigation Fee Actual Costs*
*Actual costs will be invoiced based on District’s current salary rates,
benefits, materials, and equipment rates in effect at that time.
Section 2. The fees adopted herein shall take effect on July 1, 2018 and Resolution
No. 13-11 is hereby rescinded on July 1, 2018.
.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 8.1
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Subject:Sewer Rate for Fiscal Year 2019
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-22 setting Sewer Rates effective August 1,
2018 and rescinding Resolution No. 17-19.
DISCUSSION:
In September 2015, the Board of Directors approved the FY16-20 Water and Sewer Rate Study
Report (Rate Study) prepared by Raftelis Financial Consultants, Inc. In compliance with Proposition
218, the Board held a public hearing regarding the proposed rates over the next 5 fiscal years
(FY16 through FY20). Following the hearing, the Board adopted the Rate Study.
As identified in Year 4 of the Rate Study, the monthly sewer service rate for FY19 will be increasing
based on the customer type. For example, single family residential sewer rate will increase by $0.56
per billing period.
Staff has prepared Resolution No. 18-22, whereupon adoption will implement the proposed sewer
rates as of August 1, 2018.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-22_-_Sewer_Rates.docx Resolution Resolution
Resolution No. 18-22 Setting Sewer Rates Effective August 1, 2018 and Rescinding Resolution No. 17-19 1
RESOLUTION NO. 18-22
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
SETTING SEWER RATES EFFECTIVE AUGUST 1, 2018
AND RESCINDING RESOLUTION NO. 17-19
WHEREAS, pursuant to Water Code Section 31007, the Board of Directors of the
Yorba Linda Water District (YLWD) is required to set sewer rates at a level
which will pay for the provision of sewer services; and
WHEREAS, on July 16, 2015, the Board of Directors considered the 2015 Water and
Sewer Rate Study, and on August 31, 2015 the 2015 Water and Sewer
Rate Study Report; and
WHEREAS, the Board of Directors determined that the sewer rate increases described
in the 2015 Water and Sewer Rate Study Report are necessary and
sufficient to cover, without exceeding, the cost to provide sewer service to
each customer connection; and
WHEREAS, pursuant to and in compliance with Proposition 218 (California
Constitution Art. XIII D), the District on July 31, 2015 mailed a notice of
sewer rate increase to all property owners within the District’s service area
which included the proposed rates for FY16, FY17, FY18, FY19, and
FY20, and the Board of Directors has received a proof of mailing; and
WHEREAS, pursuant to Proposition 218 on September 17, 2015 the Board of Directors
held a hearing regarding sewer rates for FY16, FY17, FY18, FY19, and
FY20 and heard and considered protests; and
WHEREAS, the Board of Directors previously adopted Resolution No. 17-19, which
established sewer rates effective August 1, 2017; and
WHEREAS, the Board of Directors desires to establish sewer rates for FY 2019.
NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Yorba Linda
Water District does hereby find, determine, and resolve the following:
Section 1. Resolution No. 17-19 is hereby rescinded.
Section 2. Written protests against the proposed rates and charges were not
presented by a majority of owners as set forth in California
Constitution Art. XIII D Section 6(a)(2).
Resolution No. 18-22 Setting Sewer Rates Effective August 1, 2018 and Rescinding Resolution No. 17-19 2
Section 3. The Board of Directors has reviewed the entire record for this
matter, which includes the 2015 Water and Sewer Rate Study
Report and the analysis of expenses and revenues set forth
therein. Based upon the Board of Directors’ review, it finds and
determines that the record supports the Board of Directors’ findings
that:
A. As set forth in the 2015 Water and Sewer Rate Study
Report, revenues derived from the rates and charges will
not exceed the revenues required to provide the property
related service; and
B. As set forth in the 2015 Water and Sewer Rate Study
Report, revenues derived from the rates and charges will
not be used for any purpose other than that for which the
rates or charges are imposed; and
C. As set forth in the 2015 Water and Sewer Rate Study
Report, the amount of a rate or charge imposed upon any
parcel or person as an incident of property ownership
does not exceed the proportional cost of the service
attributable to the parcel.
Section 4. The Board of Directors hereby determines that no rate or charge
will be imposed for a service unless that service is actually used by,
or immediately available to, the owner of the property in question.
Section 5. The Board of Directors hereby determines that no rate or charge
will be imposed for general governmental services including, but
not limited to, police, fire, ambulance or library services, where the
service is available to the public at large in substantially the same
manner as it is to property owners.
Section 6. Sewer rates and customer connection charges for service defined
in Sections 6.10 and 6.11 of the Rules and Regulations for Sewer
Service with regard to the Rendition of Sanitary Sewer Service of
the Yorba Linda Water District are hereby set forth as follows, to
take effect on August 1, 2018:
A. Residential:
1. Residential - individually metered $7.50 per month
2. Residential - master metered $7.05 per month per unit
Resolution No. 18-22 Setting Sewer Rates Effective August 1, 2018 and Rescinding Resolution No. 17-19 3
B. Commercial-Industrial and Public Schools:
1. For all sewer customers in this category who use meter
readings, the rate is as follows:
a. First 700 cubic feet per month of water
consumption per month: $7.50 per month.
b. All water consumption in excess of 700 cubic feet
per month: $.48 per 100 cubic feet.
2. Alternatively, for customers who have a sewer meter or
who can demonstrate to the District’s satisfaction that
100% of the water meter reading ends up in the District’s
sewer system, the rate is as follows:
a. First 700 cubic feet per month of water
consumption per month: $7.50 per month
b. All water consumption in in excess of 700 cubic
feet per month: $.48 per 100 cubic feet.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
ITEM NO. 8.2
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Subject:Operating Budget for Fiscal Year 2019 (Financial Summaries)
SUMMARY:
Attached for a the Board's review and consideration are the Financial Summaries pertaining to the
District's Operating Budget for FY19. The budget allocates employee and financial resources to
accomplish the District's mission and vision statements. It presents the framework and financial plan
for responsibly carrying out the programs and capital projects that administer, operate, maintain,
protect and replace the assets required to provide safe and reliable water and sewer service.
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-23 adopting the Operating Budget for Fiscal
Year 2019 (Financial Summaries).
DISCUSSION:
In general, this budget identifies $48 million in total outlay this next fiscal year, including $32 million
in total expenses, $7.7 million in depreciation, and $8.3 million for "pay-as-you-go" capital projects.
Offsetting the $32 million in total expenses is $38.2 million in anticipated revenue, resulting in a
positive estimated change in net position of $6.2 million with the exclusion of depreciation expense
and capital contributions. .
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-23_-_FY19_Budget.docx Resolution Resolution
Draft_Budget_FY19_Financial_Summaries.pdf Exhibit Exhibit
Resolution No. 18-23 Adopting the Budget for Fiscal Year 2019 1
RESOLUTION NO. 18-23
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING THE BUDGET FOR FISCAL YEAR 2019
AND RESCINDING RESOLUTION NO. 17-20
WHEREAS, the Yorba Linda Water District has prepared a one year budget for Fiscal
Year 2019; and
WHEREAS, on June 26, 2018 the proposed “Draft” Budget for Fiscal Year 2019 was
presented and reviewed at a meeting of the Board of Directors of the
District; and
WHEREAS, it is the desire of the Board of Directors to adopt the Budget for Fiscal
Year 2019, and rescind Resolution No. 17-20.
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Yorba Linda
Water District as follows:
Section 1. That the Budget for Fiscal Year 2019, set forth in Exhibit “A” and attached
hereto, is hereby approved and adopted.
Section 2. The Budget for Fiscal Year 2019 is in full force and effect beginning July 1,
2018, and continuing until this Resolution is rescinded by the Board of
Directors.
Section 3. That Resolution No. 17-20 is hereby rescinded effective July 1, 2018.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Resolution No. 18-23 Adopting the Budget for Fiscal Year 2019 2
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
Annual Operating Budget FY19
Financial Summaries
1 | Page
Annual Operating Budget FY19
Financial Summaries
2 | Page
Total Revenue and Expenses (Water & Sewer)
FY16
Actual
FY17
Actual
FY18
Budget
FY18
Forecast
FY19
Proposed
Budget
Revenue (Operating):
Water Revenue (Residential)12,847,842$ 14,076,335$ 14,278,688$ 15,653,574$ 16,209,835$
Water Revenue (Commercial & Fire Det.)1,711,104$ 1,802,131$ 2,071,031$ 1,923,456$ 1,918,913$
Water Revenue (Landscape/Irrigation)2,700,775$ 3,327,132$ 3,079,054$ 4,037,066$ 3,774,711$
Service Charges 10,560,917$ 10,120,967$ 10,106,382$ 10,080,159$ 10,116,528$
Sewer Charge Revenue 1,669,370$ 1,884,094$ 2,032,245$ 2,045,509$ 2,229,246$
Sewer Parcel Assessments 179,744$ 215,853$ 223,000$ 260,072$ 273,250$
Other Operating Revenue *2,665,835$ 1,033,608$ 866,161$ 763,853$ 894,617$
Total Operating Revenue 32,335,587$ 32,460,120$ 32,656,561$ 34,763,688$ 35,417,099$
Revenue (Non-Operating):
Interest 288,817$ 377,205$ 310,000$ 455,369$ 358,000$
Property Tax 1,615,454$ 1,687,384$ 1,710,000$ 1,753,780$ 1,850,000$
Other Non-Operating Revenue 872,420$ 645,562$ 624,521$ 364,060$ 639,846$
Total Non-Operating Revenue 2,776,691$ 2,710,151$ 2,644,521$ 2,573,208$ 2,847,846$
Total Revenue 35,112,278$ 35,170,271$ 35,301,082$ 37,336,897$ 38,264,945$
Expenses (Operating):
Variable Costs
Water-Related Costs 8,076,763$ 10,383,349$ 11,240,088$ 12,416,278$ 12,762,647$
Fixed Costs 1,181,136$ 1,006,565$ 1,443,355$ 1,203,962$ 1,186,600$
Power-Related Costs 1,212,282$ 1,320,943$ 1,285,413$ 1,069,135$ 1,357,953$
Variable Water Costs Related Expenses Total 10,470,181$ 12,710,857$ 13,968,855$ 14,689,375$ 15,307,201$
Salary Related Expenses 7,796,525$ 8,693,449$ 9,889,124$ 9,760,114$ 11,084,493$
Salary Related Expenses - Limited-term Staff 300,328$ 220,190$ -$ -$ -$
Reduction for Capital Project Labor -$ -$ (246,000)$ -$ (300,000)$
PARS Contribution - Prefunding Liabiltiies -$ -$ -$ -$ -$
Salary Related Expenses Total 8,096,853$ 8,913,639$ 9,643,124$ 9,760,114$ 10,784,493$
Supplies & Services:
Communications 221,828$ 166,199$ 201,575$ 187,606$ 171,097$
Contractual Services 530,493$ 440,322$ 547,890$ 426,798$ 505,732$
Data Processing 225,303$ 271,759$ 250,400$ 303,021$ 282,450$
Dues & Memberships 79,301$ 92,428$ 86,545$ 81,060$ 88,230$
Fees & Permits 224,141$ 265,031$ 282,115$ 259,195$ 280,453$
Board Election -$ 129,971$ -$ -$ 75,000$
Insurance 256,334$ 256,672$ 283,340$ 279,234$ 303,190$
Materials 805,642$ 880,455$ 849,000$ 780,018$ 687,336$
District Activities, Emp Recognition 8,744$ 10,945$ 24,200$ 20,894$ 46,250$
Maintenance 526,339$ 539,926$ 509,900$ 574,499$ 604,600$
Non-Capital Equipment 187,420$ 173,703$ 124,825$ 116,622$ 151,450$
Office Expense 41,063$ 39,171$ 42,625$ 45,420$ 43,300$
Professional Services 653,923$ 614,288$ 690,525$ 680,922$ 552,800$
Training 27,761$ 44,158$ 68,510$ 40,691$ 78,240$
Travel & Conferences 48,860$ 48,852$ 115,245$ 65,760$ 139,340$
Uncollectible Accounts 66,391$ 9,042$ 18,500$ 1,492$ 3,000$
Utilities 84,425$ 160,003$ 170,700$ 204,588$ 183,400$
Vehicle Expenses 367,065$ 361,126$ 356,000$ 361,388$ 375,400$
Supplies & Services Sub-Total 4,355,033$ 4,504,051$ 4,621,895$ 4,429,208$ 4,571,268$
Total Operating Expenses 22,922,067$ 26,128,547$ 28,233,874$ 28,878,697$ 30,662,962$
Expenses (Non-Operating):
Interest Expense 1,671,539$ 1,552,899$ 1,489,796$ 1,372,154$ 1,325,785$
Other Expense 7,273$ 403,597$ 15,220$ (54,550)$ 14,200$
Total Non-Operating Expenses 1,678,812$ 1,956,496$ 1,505,016$ 1,317,604$ 1,339,985$
Total Expenses 24,600,879$ 28,085,043$ 29,738,890$ 30,196,300$ 32,002,947$
Net Income Before Capital Contributions 10,511,399$ 7,085,228$ 5,562,192$ 7,140,596$ 6,261,998$
and Special Item(s)
Special Item(s)-$ -$ -$ (2,205,847)$ -$
Capital Contributions 788,445$ 2,665,462$ -$ 3,447,318$ -$
Net Income Before Depreciation 11,299,844$ 9,750,690$ 5,562,192$ 8,382,067$ 6,261,998$
Depreciation 7,546,407$ 7,147,369$ 7,182,000$ 7,460,883$ 7,726,142$
Income (Loss)3,753,437$ 2,603,321$ (1,619,808)$ 921,184$ (1,464,144)$
* Line item includes potential Administrative Penalties assessed to District Customers for excessive water use. YLWD Ordinance No. 15-01.
Annual Operating Budget FY19
Financial Summaries
3 | Page
Total Revenue and Expenses (Water & Sewer), continued
$35,112,278 $35,170,271 $35,301,082 $37,336,897 $38,264,945
$24,600,879
$28,085,043 $29,738,890 $30,196,300 $32,002,947
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Proposed
Budget
TOTAL Revenues & Expenses
(Does NOT include depreciation expense)
Total Revenue Total Expenses
Annual Operating Budget FY19
Financial Summaries
4 | Page
Total Revenue and Expenses (Water)
FY16
Actual
FY17
Actual
FY18
Budget
FY18
Forecast
FY19
Proposed
Budget
Water Revenue (Residential)12,847,842$ 14,076,335$ 14,278,688$ 15,653,574$ 16,209,835$
Water Revenue (Commercial & Fire Det.)1,711,104$ 1,802,131$ 2,071,031$ 1,923,456$ 1,918,913$
Water Revenue (Landscape/Irrigation)2,700,775$ 3,327,132$ 3,079,054$ 4,037,066$ 3,774,711$
Service Charges 10,560,917$ 10,120,967$ 10,106,382$ 10,080,159$ 10,116,528$
Other Operating Revenue *2,596,208$ 890,594$ 769,106$ 696,374$ 827,887$
Total Operating Revenue 30,416,846$ 30,217,159$ 30,304,261$ 32,390,629$ 32,847,873$
Revenue (Non-Operating):
Interest 265,006$ 335,786$ 275,000$ 396,485$ 310,000$
Property Taxes 1,615,454$ 1,687,384$ 1,710,000$ 1,753,780$ 1,850,000$
Other Non-Operating Revenue 745,541$ 493,780$ 604,646$ 383,774$ 605,346$
Total Non-Operating Revenue 2,626,001$ 2,516,950$ 2,589,646$ 2,534,039$ 2,765,346$
Total Revenue 33,042,847$ 32,734,109$ 32,893,907$ 34,924,668$ 35,613,219$
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)
Water-Related Costs 8,076,763$ 10,383,349$ 11,240,088$ 12,416,278$ 12,762,647$
Fixed Costs 1,181,136$ 1,006,565$ 1,443,355$ 1,203,962$ 1,186,600$
Power-Related Costs 1,212,282$ 1,320,943$ 1,285,413$ 1,069,135$ 1,357,953$
Variable Water Costs Related Expenses Total 10,470,181$ 12,710,857$ 13,968,855$ 14,689,375$ 15,307,201$
Salary Related Expenses 6,944,390$ 7,706,161$ 8,859,867$ 8,759,950$ 9,931,772$
Salary Related Expenses - Limited-term Staff 300,328$ 220,190$ -$
Reduction for Capital Project Labor -$ (215,000)$ (279,000)$
Salary Related Expenses Total 7,244,718$ 7,926,351$ 8,644,867$ 8,759,950$ 9,652,772$
Supplies & Services
Communications 208,295$ 156,860$ 189,565$ 176,110$ 159,120$
Contractual Services 494,674$ 410,650$ 519,653$ 400,163$ 475,966$
Data Processing 210,246$ 252,819$ 235,322$ 281,809$ 265,129$
Dues & Memberships 73,585$ 85,801$ 80,492$ 75,391$ 82,077$
Fees & Permits 213,650$ 250,021$ 264,641$ 243,227$ 264,546$
Board Election -$ 120,873$ -$ -$ 69,750$
Insurance 238,391$ 238,965$ 263,506$ 259,687$ 281,967$
Materials 772,078$ 854,393$ 797,347$ 737,674$ 658,714$
District Activities, Emp Recognition 8,153$ 10,179$ 22,506$ 19,438$ 43,013$
Maintenance 337,744$ 387,583$ 339,342$ 425,192$ 432,971$
Non-Capital Equipment 146,580$ 150,346$ 104,678$ 94,705$ 115,294$
Office Expense 38,507$ 36,453$ 39,662$ 42,254$ 40,343$
Professional Services 631,353$ 587,855$ 650,108$ 649,001$ 518,804$
Training 23,863$ 38,962$ 61,728$ 35,684$ 65,188$
Travel & Conferences 45,877$ 46,005$ 102,493$ 60,866$ 125,279$
Uncollectible Accounts 61,639$ 7,703$ 17,205$ 1,339$ 2,790$
Utilities 79,116$ 148,529$ 158,100$ 189,650$ 169,911$
Vehicle Expenses 312,211$ 294,260$ 286,812$ 265,743$ 316,262$
Supplies & Services Sub-Total 3,895,962$ 4,078,257$ 4,133,160$ 3,957,934$ 4,087,123$
Total Operating Expenses 21,610,861$ 24,715,465$ 26,746,883$ 27,407,259$ 29,047,096$
Expenses (Non-Operating)
Interest on Long Term Debt 1,671,539$ 1,552,899$ 1,489,796$ 1,372,154$ 1,325,785$
Other Expense 7,273$ 396,208$ 15,220$ (52,434)$ 8,600$
Total Non-Operating Expenses 1,678,812$ 1,949,107$ 1,505,016$ 1,319,719$ 1,334,385$
Total Expenses 23,289,673$ 26,664,572$ 28,251,898$ 28,726,978$ 30,381,481$
Net Income (Loss) Before Capital Contributions 9,753,174$ 6,069,537$ 4,642,009$ 6,197,691$ 5,231,738$
and Special Item(s)
Special Item(s)-$ -$ -$ (2,205,847)$ -$
Capital Contributions 347,795$ 1,556,801$ -$ 1,847,505$ -$
Net Income (Loss) Before Depreciation 10,100,969$ 7,626,338$ 4,642,009$ 5,839,349$ 5,231,738$
Depreciation 6,182,985$ 5,809,682$ 5,832,000$ 6,092,819$ 6,329,146$
Income (Loss)3,917,984$ 1,816,656$ (1,189,991)$ (253,470)$ (1,097,408)$
* FY16 Line item includes Administrative Penalties assessed to District Customers for excessive water use. YLWD Ordinance No. 15-01.
$2,721,559 $2,716,884 $2,729,799 $2,729,799 $2,738,256
420%281%225%277%239%
Annual Operating Budget FY19
Financial Summaries
5 | Page
FY19 ProForma (Water)
FY18 Budget FY18 Forecast FY19 Budget
Water Revenue (Residential)14,278,688$ 15,653,574$ 16,209,835$
Water Revenue (Commercial & Fire Det.)2,071,031$ 1,923,456$ 1,918,913$
Water Revenue (Landscape/Irrigation)3,079,054$ 4,037,066$ 3,774,711$
Service Charges 10,106,382$ 10,080,159$ 10,116,528$
Other Operating Revenue 769,106$ 696,374$ 827,887$
Total Operating Revenue 30,304,261$ 32,390,629$ 32,847,873$
Revenue (Non-Operating):
Interest 275,000$ 396,485$ 310,000$
Property Taxes 1,710,000$ 1,753,780$ 1,850,000$
Other Non-Operating Revenue 604,646$ 383,774$ 605,346$
Total Non-Operating Revenue 2,589,646$ 2,534,039$ 2,765,346$
Total Revenue 32,893,907$ 34,924,668$ 35,613,219$
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)
Water-Related Costs 11,240,088$ 12,416,278$ 12,762,647$
Fixed Costs 1,443,355$ 1,203,962$ 1,186,600$
Power-Related Costs 1,285,413$ 1,069,135$ 1,357,953$
Variable Water Costs Related Expenses Total 13,968,855$ 14,689,375$ 15,307,201$
Salary Related Expenses 8,859,867$ 8,759,950$ 9,931,772$
Reduction for Capital Project Labor (215,000)$ -$ (279,000)$
Salary Related Expenses Total 8,644,867$ 8,759,950$ 9,652,772$
Supplies & Services
Communications 189,565$ 176,110$ 159,120$
Contractual Services 519,653$ 400,163$ 475,966$
Data Processing 235,322$ 281,809$ 265,129$
Dues & Memberships 80,492$ 75,391$ 82,077$
Fees & Permits 264,641$ 243,227$ 264,546$
Board Election -$ -$ 69,750$
Insurance 263,506$ 259,687$ 281,967$
Materials 797,347$ 737,674$ 658,714$
District Activities, Emp Recognition 22,506$ 19,438$ 43,013$
Maintenance 339,342$ 425,192$ 432,971$
Non-Capital Equipment 104,678$ 94,705$ 115,294$
Office Expense 39,662$ 42,254$ 40,343$
Professional Services 650,108$ 649,001$ 518,804$
Training 61,728$ 35,684$ 65,188$
Travel & Conferences 102,493$ 60,866$ 125,279$
Uncollectible Accounts 17,205$ 1,339$ 2,790$
Utilities 158,100$ 189,650$ 169,911$
Vehicle Expenses 286,812$ 265,743$ 316,262$
Supplies & Services Sub-Total 4,133,160$ 3,957,934$ 4,087,123$
Total Operating Expenses 26,746,883$ 27,407,259$ 29,047,096$
Expenses (Non-Operating)
Other Expense 15,220$ (52,434)$ 8,600$
Total Non-Operating Expenses 15,220$ (52,434)$ 8,600$
Total Expenses 26,762,103$ 27,354,824$ 29,055,696$
Net Revenues 6,131,804$ 7,569,844$ 6,557,523$
Less: Debt Service (Principal & Interest)2,729,799$ 2,729,799$ 2,738,258$
Less: Special Item(s)-$ 2,205,847$ -$
Less: Committed Capital Expenditures (PayGo)2,635,755$ 2,215,886$ 6,327,500$
Transfer to/(from) Reserves 766,251$ 418,313$ (2,508,235)$
Net -$ -$ -$
$2,729,799 $2,729,799 $2,738,258
225%277%239%
Annual Operating Budget FY19
Financial Summaries
6 | Page
Total Revenue and Expenses (Water), continued
$33,042,847 $32,734,109 $32,893,907 $34,924,668 $35,613,219
$23,289,673
$26,664,572 $28,251,898 $28,726,978 $30,381,481
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Proposed
Budget
WATER Revenues & Expenses
(Does NOT include depreciation expense)
Total Revenue Total Expenses
Annual Operating Budget FY19
Financial Summaries
7 | Page
Total Revenue and Expenses (Sewer)
FY16
Actual
FY17
Actual
FY18
Budget
FY18
Forecast
FY19
Proposed
Budget
Revenue (Operating):
Sewer Charge Revenue 1,669,370$ 1,884,094$ 2,032,245$ 2,045,509$ 2,229,246$
Sewer Parcel Assessments 179,744$ 215,853$ 223,000$ 260,072$ 273,250$
Other Operating Revenue 69,627$ 143,014$ 97,055$ 67,478$ 66,730$
Total Operating Revenue 1,918,741$ 2,242,961$ 2,352,300$ 2,373,059$ 2,569,226$
Revenue (Non-Operating):
Interest 23,811$ 41,419$ 35,000$ 58,884$ 48,000$
Other Non-Operating Revenue 126,879$ 151,782$ 19,875$ (19,715)$ 34,500$
Total Non-Operating Revenue 150,690$ 193,201$ 54,875$ 39,169$ 82,500$
Total Revenue 2,069,431$ 2,436,162$ 2,407,175$ 2,412,228$ 2,651,726$
Expenses (Operating):
Salary Related Expenses 852,135$ 987,288$ 1,029,257$ 1,000,164$ 1,152,721$
Reduction for Capital Project Labor -$ -$ (31,000)$ -$ (21,000)$
Salary Related Expenses Total 852,135$ 987,288$ 998,257$ 1,000,164$ 1,131,721$
Supplies & Services
Communications 13,533$ 9,339$ 12,010$ 11,496$ 11,977$
Contractual Services 35,819$ 29,672$ 28,237$ 26,635$ 29,766$
Data Processing 15,057$ 18,940$ 15,078$ 21,212$ 17,322$
Dues & Memberships 5,716$ 6,627$ 6,053$ 5,669$ 6,153$
Fees & Permits 10,491$ 15,010$ 17,474$ 15,968$ 15,907$
Board Election -$ 9,098$ -$ -$ 5,250$
Insurance 17,943$ 17,707$ 19,834$ 19,547$ 21,223$
Materials 33,564$ 26,062$ 51,653$ 42,344$ 28,622$
District Activities, Emp Recognition 591$ 766$ 1,694$ 1,455$ 3,238$
Maintenance 188,595$ 152,343$ 170,559$ 149,307$ 171,630$
Non-Capital Equipment 40,840$ 23,357$ 20,147$ 21,917$ 36,157$
Office Expense 2,556$ 2,718$ 2,963$ 3,165$ 2,957$
Professional Services 22,570$ 26,433$ 40,417$ 31,921$ 33,996$
Training 3,898$ 5,196$ 6,782$ 5,008$ 13,052$
Travel & Conferences 2,983$ 2,847$ 12,752$ 4,894$ 14,061$
Uncollectible Accounts 4,752$ 1,339$ 1,295$ 153$ 210$
Utilities 5,309$ 11,474$ 12,600$ 14,938$ 13,489$
Vehicle Expenses 54,854$ 66,866$ 69,188$ 95,646$ 59,138$
Supplies & Services Sub-Total 459,071$ 425,794$ 488,735$ 471,274$ 484,145$
Total Operating Expenses 1,311,206$ 1,413,082$ 1,486,991$ 1,471,438$ 1,615,866$
Expenses (Non-Operating):
Interest Expense -$ -$ -$ -$
Other Expense -$ 7,389$ -$ (2,116)$ 5,600$
Total Non-Operating Expenses -$ 7,389$ -$ (2,116)$ 5,600$
Total Expenses 1,311,206$ 1,420,471$ 1,486,991$ 1,469,323$ 1,621,466$
Net Income (Loss) Before Capital Contributions 758,225$ 1,015,691$ 920,183$ 942,906$ 1,030,260$
and Special Items
Special Item(s)-$ -$ -$ -$ -$
Capital Contributions 440,650$ 1,108,661$ -$ 1,599,813$ -$
Net Income Before Depreciation 1,198,875$ 2,124,352$ 920,183$ 2,542,719$ 1,030,260$
Depreciation 1,363,422$ 1,337,687$ 1,350,000$ 1,368,064$ 1,396,996$
Income (Loss)(164,547)$ 786,665$ (429,817)$ 1,174,654$ (366,736)$
Annual Operating Budget FY19
Financial Summaries
8 | Page
Total Revenue and Expenses (Sewer), continued
$2,069,431
$2,436,162 $2,407,175 $2,412,228
$2,651,726
$1,311,206 $1,420,471 $1,486,991 $1,469,323 $1,621,466
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Proposed
Budget
SEWER Revenues & Expenses
(Does NOT include depreciation expense)
Total Revenue Total Expenses
Annual Operating Budget FY19
Financial Summaries
9 | Page
Total Revenues by Fund
FY16
Actual
FY17
Actual
FY18
Budget
FY18
Forecast
FY19
Budget
Water Revenue 33,042,847$ 32,734,109$ 32,893,907$ 34,924,668$ 35,613,219$
Sewer Revenue 2,069,431$ 2,436,162$ 2,407,175$ 2,412,228$ 2,651,726$
Total Revenue:35,112,278$ 35,170,271$ 35,301,082$ 37,336,897$ 38,264,945$
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Budget
Total Revenues
Water Revenue Sewer Revenue
Annual Operating Budget FY19
Financial Summaries
10 | Page
Total Expenses by Fund
FY16
Actual
FY17
Actual
FY18
Budget
FY18
Forecast
FY19
Budget
Water Expenses 23,289,673$ 26,664,572$ 28,251,898$ 28,726,978$ 30,381,481$
Sewer Expenses 1,311,206$ 1,420,471$ 1,486,991$ 1,469,323$ 1,621,466$
Total Expenses:24,600,879$ 28,085,043$ 29,738,890$ 30,196,300$ 32,002,947$
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Budget
Total Expenses
Water Expenses Sewer Expenses
Annual Operating Budget FY19
Financial Summaries
11 | Page
Total Expenses by Category
Depreciation & Amortization
19%
($7.1M)
Variable Costs
38%
($13.9M)
Salary Related Expenses
26%
($9.6M)
Supplies & Services
13%
($4.6M)
Interest Expense
4%
($1.4M)
Other Expense
0%
($.01M)
Total: $39,729,089
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
Depreciation Variable
Costs
Salaries &
Ben.
Supplies &
Svcs.
Interest Other
Year by Year Comparison, by Category
FY16 Actual FY17 Actual FY18 Budget FY18 Forecast FY19 Budget
Annual Operating Budget FY19
Financial Summaries
12 | Page
FY19 Variable & Fixed Water Cost Expenses
Energy Costs;
$1,357,953 ;
10%
MWDOC;
$5,275,964 ;
37%$6,621,615 ;
47%
CPTP;
$865,069 ;
6%
OCWD;
$7,486,684 ;
53%
$456,771 ,
39%
$302,129 ,
25%
$107,961 ,
9%
$319,740 ,
27%
Annexation Fee Connection Charge Capacity Charge Readiness-to-Serve
Annual Operating Budget FY19
Financial Summaries
13 | Page
Fund Balance History (FYE 2015-2019)
06/30/15 Net Income(Loss) Before Capital Contributions (851,404)(588,397)(1,439,801)
Capital Contributions 547,855 157,993 705,848
Change in Net Position FY 2015 (303,549)(430,404)(733,953)
Net Position @ 6/30/2015 118,839,797$ 41,782,868$ 160,622,665$
06/30/16 Net Income(Loss) Before Capital Contributions 3,570,189 (605,197)2,964,992
Capital Contributions 347,795 440,650 788,445
Change in Net Position FY 2016 3,917,984 (164,547)3,753,437
Net Position @ 6/30/2016 122,757,781$ 41,618,321$ 164,376,102$
06/30/17 Net Income (Loss) Before Capital Contributions 259,855 (321,996)(62,141)
Capital Contributions 1,556,801 1,108,661 2,665,462
Estimated Net Income (Loss) @ 6/30/2017 1,816,656$ 786,665 2,603,321$
Estimated Net Position @ 6/30/2017 124,574,437$ 42,404,986$ 166,979,423$
06/30/18 Revenue (Operating):
Water Sales 31,694,255 - 31,694,255
Sewer Revenues - 2,305,581 2,305,581
Other Operating Revenue 696,374 67,478 763,852
Interest 396,485 58,884 455,369
Property Taxes 1,753,780 - 1,753,780
Other Non-Operating Revenue 436,208 2,116 438,324
Total Estimated Revenues FY2018 34,977,102 2,434,059 37,411,161
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)14,689,375 - 14,689,375
Salary Related Expenses 8,759,950 1,000,164 9,760,114
Supplies & Services 3,957,934 471,274 4,429,208
Depreciation 6,092,819 1,368,064 7,460,883
Interest on Long Term Debt 1,372,154 - 1,372,154
Other Expense - 19,715 19,715
Total Estimated Expenses FY2018 34,872,232 2,859,217 37,731,449
Net Income (Loss) Before Capital Contributions 104,870 (425,158)(320,288)
Capital Contributions 1,847,505 1,599,813 3,447,318
Special Item(s)(2,205,847)- (2,205,847)
Estimated Net Income (Loss) @ 6/30/2018 (253,472)$ 1,174,655 921,183$
Estimated Net Position @ 6/30/2018 124,320,965$ 43,579,641$ 167,900,606$
06/30/19 Revenue (Operating):
Water Sales 32,019,986 - 32,019,986
Sewer Revenues - 2,502,496 2,502,496
Other Operating Revenue 827,887 66,730 894,617
Interest 310,000 48,000 358,000
Property Taxes 1,850,000 - 1,850,000
Other Non-Operating Revenue 605,346 34,500 639,846
Total Estimated Revenues FY2018 35,613,219 2,651,726 38,264,945
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)15,307,201 - 15,307,201
Salary Related Expenses 9,652,772 1,131,721 10,784,493
Supplies & Services 4,087,123 484,145 4,571,268
Depreciation 6,329,146 1,396,996 7,726,142
Interest on Long Term Debt 1,325,785 - 1,325,785
Other Expense 8,600 5,600 14,200
Total Estimated Expenses FY2018 36,710,627 3,018,462 39,729,089
Estimated Net Income (Loss) @ 6/30/2019 (1,097,408)(366,736)(1,464,144)
Estimated Net Position @ 6/30/2019 123,223,557$ 43,212,905$ 166,436,462$
Fiscal Year
Ending Water Fund Sewer Fund Total
Annual Operating Budget FY19
Financial Summaries
14 | Page
Debt Administration
The District’s debt rating from Fitch is “AA” and from Standard and Poor’s is “AA+”. The District has a Debt
Management Policy, but no legal debt limit. The District’s future borrowing capacity is limited by the debt
coverage ratio required by existing bond covenants. The ratio is calculated using revenue and expenses data
pertaining to the Water Fund only and the covenants require that the coverage exceed 1.25; however, the Debt
Management policy sets a target of 2.25. The District’s budgeted ratio is 2.39 for Fiscal Year 2019. The District’s
FY18 budgeted debt service obligation ($2,738,258) is related to its two existing debt issuances. Use of proceeds
and the corresponding principal balance of each are as follows:
Year of
Issuance
Use of Proceeds Principal Balance
as of June 2018
2012A
Refunding
Bond
Refunding Bonds funds are being issued to finance certain capital
improvements, to fund a reserve fund, and to pay certain costs of
delivery.
6,935,000
2017A
Refunding
Bond
Refunding Bonds funds are being issued to finance the acqusitionand
construction of certain capital improvements to the District's Water
System, to refund all of the currently outstanding YLWD 2008 Revenue
Certificates of Participation, and to pay certain costs of issuance.
28,390,000
35,325,000$
Annual Operating Budget FY19
Financial Summaries
15 | Page
Debt service requirements for the District’s Certificates of Participation are as follows:
Year Principal Interest Total
2019 $1,140,000 $1,598,258 $2,738,258
2020 $1,175,000 $1,551,956 $2,726,956
2021 $1,230,000 $1,499,381 $2,729,381
2022 $1,290,000 $1,438,919 $2,728,919
2023 $1,350,000 $1,374,681 $2,724,681
2024-2028 $7,840,000 $5,743,906 $13,583,906
2029-2033 $9,760,000 $3,764,116 $13,524,116
2034-2038 $9,485,000 $1,672,619 $11,157,619
2039 $2,055,000 $51,100 $2,106,100
Total $35,325,000 $18,694,937 $54,019,937
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
2019 2020 2021 2022 2023
FY19-23 Debt Service Requirements
Principal Interest
Annual Operating Budget FY19
Financial Summaries
16 | Page
Personnel Trends by Position
Position/Title FY15 FY16 FY17 FY18 FY19
ADMINISTRATION DEPARTMENT
Assistant General Manager - - - 1 1
Communication Manager - - 1 - -
Executive Assistant 1 1 1 1 1
General Manager 1 1 1 1 1
Management Analyst 1 1 1 1 1
Office Clerk - - 1 - -
Public Affairs Representative - 1 1 1 1
Public Information Assistant 0.5 - - - -
Public Information Manager 1 1 - - -
Records Management Specialist 1 - - - -
Water Conservation Representative - 2 1.5 - -
Water Conservation Supervisor - 1 1 - -
Total Administration Personnel 5.5 8.0 8.5 5.0 5.0
Changes and Trends: The Public Affairs Representative was moved from Communication back to Administration.
Position/Title FY15 FY16 FY17 FY18 FY19
ENGINEERING DEPARTMENT
Associate Engineer 1 1 1 1 1
Construction Inspector 1 1 1 1 1
Construction Project Supervisor 1 1 1 1 1
Engineering Manager 1 1 1 1 1
Engineering Technician II 2 2 2 2 2
Senior Construction Inspector 1 1 1 1 1
Senior Project Manager 1 1 1 1 1
Water Quality Engineer 1 1 1 1 1
Water Quality Technician II 1 1 1 1 1
Total Engineering Personnel 10.0 10.0 10.0 10.0 10.0
Position/Title FY15 FY16 FY17 FY18 FY19
FINANCE DEPARTMENT
Accountant - - - 1 1
Accounting Assistant I 1 1 1 1 0
Accounting Assistant II 1 1 1 1 2
Customer Service Rep II 2 2 2 2 2
Customer Service Rep III 2 2 2 2 2
Customer Service Supervisor 1 1 1 1 1
Finance Manager 1 1 1 1 1
Meter Reader I 1 1 1 1 1
Meter Reader II 2 2 2 2 2
Meter Service Lead 1 1 1 1 1
Senior Accountant 1 1 1 1 1
Total Finance Personnel 13.0 13.0 13.0 14.0 14.0
Changes and Trends: The Accounting Assistant I was reclassified to Accounting Assistant II.
Annual Operating Budget FY19
Financial Summaries
17 | Page
Position/Title FY15 FY16 FY17 FY18 FY19
HUMAN RESOURCES DEPARTMENT
Human Resources Analyst 1 2 2 1 1
Human Resources/Risk & Safety Manager 1 1 1 1 1
Human Resources Technician 1 - - 1 1
Records Management Administrator - 1 1 1 1
Records Management Specialist - 1 1 1 1
Safety & Training Analyst 1 1 1 1 1
Total Human Resources Personnel 4.0 6.0 6.0 6.0 6.0
Position/Title FY15 FY16 FY17 FY18 FY19
INFORMATION TECHNOLOGY DEPARTMENT
GIS Analyst 1 1 1 1 1
Information Systems Administrator 1 1 1 1 1
Information Systems Technician I 1 1 1 1 1
Instrumentation Technician 1 - - - -
Information Technology Manager 1 1 1 1 1
SCADA Administrator 1 - - - -
Programmer Analyst 1 1 1 1 1
Total Information Technology Personnel 7.0 5.0 5.0 5.0 5.0
Position/Title FY15 FY16 FY17 FY18 FY19
OPERATIONS DEPARTMENT
Chief Water System Operator - - - 1 1
Electrical/Instrumentation Technician - - - - 1
Facilities Maintenance Worker 1 1 1 1 1
Instrumentation Technician 1 1 1 1 -
Maintenance Worker I 9 9 9 9 9
Maintenance Worker II 8 8 7 7 6
Maintenance Worker III 4 4 5 5 5
Mechanic II 1 1 1 1 1
Mechanic III 1 1 1 1 1
Office Clerk 1 1 1 1 1
Operations/Warehouse Assistant 1 1 1 1 1
Operations Manager 1 1 1 1 1
Plant Operator I - - - 1 1
Plant Operator II 3 3 3 2 2
SCADA Administrator - 1 1 - -
Senior Fleet Mechanic 1 1 1 1 1
Senior Maintenance Worker 4 4 4 4 4
Senior Plant Operator 1 1 1 1 1
Senior SCADA Technician - - - - 1
Water Maintenance Superintendent 1 1 1 1 1
Water Production Superintendent 1 1 1 1 1
Total Operations Personnel 38.0 40.0 40.0 40.0 40.0
Changes and Trends: One of the Maintenance Worker II was reclassified to a new position, Electrical/Instrumentation Technician.
Annual Operating Budget FY19
Financial Summaries
18 | Page
Personnel Trends by Department
DEPARTMENT FY15 FY16* FY17** FY18 FY19
Administration 5.5 8.0 8.5 5.0 5.0
Engineering 10.0 10.0 10.0 10.0 10.0
Finance 13.0 13.0 13.0 14.0 14.0
Human Resources 4.0 6.0 6.0 6.0 6.0
Information Technology 7.0 5.0 5.0 5.0 5.0
Operations 38.0 40.0 40.0 40.0 40.0
District Department Totals 77.5 82.0 82.5 80.0 80.0
* Includes (1) Limited-Term, Full Time and (4) Limited-Term, Part Time employees in response to State’s Emergency Drought Declaration
** Includes (3) Limited-Term, Full Time and (1) Limited-Term, Part Time employees in response to State’s Emergency Drought Declaration
0
10
20
30
40
50
60
70
80
90
FY15 FY16 FY17 FY18 FY19
38 40 40 40 40
7 5 5 5 5
4 6 6 6 6
13 13 13 14 14
10 10 10 10 10
5.5 8 8.5 5 5
Personnel CountOperations IT HR Finance Engineering Administration
Annual Operating Budget FY19
Financial Summaries
19 | Page
Annual Operating Budget FY19
Financial Summaries
20 | Page
Capital Improvement Plan
Draft CIP Budget
Revised on 6/20/2018
FY19
CIP Budget
FY20
CIP Budget
Capital and Rehabilitation and Replacement (R&R) Projects
Fairmont Booster Pump Station Upgrade 780,000$ -$
Well 22 300,000$ 1,100,000$
Lakeview Sewer Lift Station Decommissioning 1,500,000$ -$
PRS Rehabilitation Phase 2 500,000$ -$
Tract 15199 Waterline Replacement 750,000$ -$
Fairmont Reservoir Rehabilitation 250,000$ -$
Field Headquarters Rehabilitation 350,000$ -$
Mickel and Camino Verde Waterline Replacement 750,000$ -$
Ridge Way, Grandview, and Short Waterline Replacement 450,000$ -$
Meter Conversion Project (AMI)1,000,000$ 2,000,000$
Well Rehabilitation 150,000$ 150,000$
Sewer Pipe Relining and Manhole Rehabilitation 200,000$ 280,000$
Ductile Iron Pipe (DIP) Replacement -$ 500,000$
Water Supply Redundancy and Fire Flow Reliability (5 locations)-$ 500,000$
Box Canyon Pump 2 Replacement -$ 63,000$
Lakeview Booster Piping -$ 154,000$
Apple Creek and Del Rey PRS Rehabilitation -$ 450,000$
Bryant Ranch Fencing -$ 90,000$
Imperial Hwy Waterline Replacement -$ 1,025,000$
Timber Ridge BPS Rehabilitation -$ 150,000$
Eisenhower Waterline Replacement -$ 800,000$
Well 20 Chemical System Replacement -$ -$
New River Waterline Replacement -$ -$
Hidden Hills BPS Rehabilitation -$ -$
Reservoir Rehabilitation -$ -$
Well 15 Chemical System Replacement -$ -$
Dominguez Hills and Paseo Del Prado PRS Rehabilitation -$ -$
Well 23 (Replacement of Lost Capacity of Wells 1, 5, and 12)-$ -$
Future Waterline Replacement -$ -$
Rose Drive Waterline Replacement -$ -$
Santiago BPS Rehabilitation -$ -$
Springview BPS Rehabilitation -$ -$
Capital Planning Support -$ 300,000$
Capital and R&R Projects Subtotal = 6,980,000$ 7,562,000$
Vehicle and Capital Equipment Replacement
SCADA Radio Communications System Replacement 125,000$ 125,000$
Vehicle Radio Communications System Replacement -$ 200,000$
Capital Equipment Replacement 547,500$ 282,235$
Vehicle Replacement - Water 375,000$ 339,000$
Vehicle Replacement - Sewer 300,000$ -$
Vehicle & Capital Equipment Subtotal = 1,347,500$ 946,235$
TOTAL = 8,327,500$ 8,508,235$
Note: The projects listed on this Capital Improvement Plan may change based on the District's needs and priorities.
Note: Green Font items are related to sewer capital projects.
Annual Operating Budget FY19
Financial Summaries
21 | Page
Capital Projects Summary
Well #22 Project
Total Project Budget: $2,500,000 Proposed FY18 Budget: $1,018,000
This project will provide a new well to increase pumping capacity that allows the potential phase-out of older,
lower-producing wells and still produce a full allotment of lower-cost groundwater. In FY17, a consultant was
retained to prepare the environmental documents and plans for the drilling of the well. In FY18, the environmental
documents will be completed, and work will proceed for the drilling of the well. Also in FY18, a consultant will
be retained to begin to prepare engineering plans for well equipping. Budgeted for FY19 and FY20 is
construction of wellhead facilities and a discharge pipeline at an estimated cost of $1,390,000.
Fairmont Pump Station Upgrade Project
Total Project Budget: $7,830,000 Proposed FY18 Budget: $3,663,000
The project is the refurbishment and upgrading of the Fairmont Booster Station. The existing 44-year-old booster
station will be demolished and its two booster pumps will be replaced by eight, pumping to three different
pressure zones. A new building will be constructed to house the pumps, as well as disinfection, electrical and back-
up generation facilities. Construction began in mid FY17 and will be completed in FY20, with a total estimated
construction cost of $7,070,000. This project will make it possible for the District to deliver lower-cost groundwater
to the higher, easterly section of its service area, as a fully redundant second source of water to all parts of the
District.
Lakeview Grade Separation Project
Total Project Budget: $662,000 Proposed FY18 Budget: $150,000
The Orange County Transportation Authority (OCTA) is the lead agency for a planned Lakeview Avenue bridge
over Orangethorpe Avenue and the adjacent BNSF Railroad tracks. As part of the project, the District’s water
line in Lakeview Avenue through the project area had to be replaced. The District’s share of the pipeline
replacement construction cost is $250,000. Construction of the pipeline and appurtenant work was completed by
OCTA in FY16, with final close-out in FY18. As a result of this project, the District will have a new 18-inch diameter
water line to replace an older line, nearing the end of its useful life.
Pressure Reducing Station Rehabilitation Phase 2
Total Project Budget: $726,000 Proposed FY18 Budget: $575,000
The District begin the second phase of work for rehabilitation or replacement of existing Pressure Reducing
Stations (PRS) that require frequent maintenance, and do not meet current District standards. This will also include
water line replacement work. Design work will be completed in FY18 and construction will follow that year and
the next at a cost of $715,000.
Annual Operating Budget FY19
Financial Summaries
22 | Page
Richfield Chlorination System Refurbishment
Total Project Budget: $250,000 Proposed FY18 Budget: $250,000
The District has an on-site chlorine generation system that produces chlorine for injection into its transmission main
for disinfection of groundwater that is pumped to the Highland Reservoir. That chlorine generation system is in
need of refurbishment and that work will be completed this coming year at an estimated cost of $250,000.
Chlorine Booster Systems at Two Water Reservoirs
Total Project Budget: $50,000 Proposed FY18 Budget: $50,000
District staff installed temporary facilities at the Hidden Hills Reservoir a few years ago that included a small
storage tank and a pump that injected chlorine solution into the Hidden Hills Reservoir that was mixed into the
water in storage. This injection of chlorine provides a slight boost in the concentration of disinfection for the
reservoir that is the most northeastery in the system. This proved to be very successful and was followed by the
installation of the same system at the Camino de Bryant Reservoir, the District’s most easterly reservoir. Because
of the continuing success of the temporary facilities, staff of the State Water Resources Control Board, in their
annual inspection of the water system, requested that the District install permanent facilities. District staff will be
installing permanent chlorine booster systems at these two reservoirs at an estimated cost of $50,000.
Pipeline Replacement Project
Total Project Budget: $1,638,585 Proposed FY18 Budget: $100,000
As part of the District’s continuing Replacement & Refurbishment (R&R) Program to replace aging infrastructure,
new pipeline replacement work is planned for the next two fiscal years. This includes replacement of pipelines in
Susana, Bryant and John Bixby Streets, as well as replacement of old cast iron pipelines from the 1920s to 1940s
in the westerly part of the District. Planned for FY18 is design work, at an estimated cost of $100,000, followed
by bidding and construction in FY19 at an estimated cost of $1,488,000.
Sewer R&R Project
Total Project Budget: $200,000 Proposed FY18 Budget: $100,000
As part of the District’s continuing R&R Program to replace aging infrastructure, new sewer line work is planned
for the next two years at an estimated cost of $100,000 per year. For sewer line refurbishment, relining is
proposed, where a new liner is cast and cured in place. This method of refurbishment has a long record of success
for District sewer lines and for many other utilities across the country.
Annual Operating Budget FY19
Financial Summaries
23 | Page
Vehicle Equipment and Capital Outlay (FY19)
Vehicle Equipment and Capital Outlay (VE&CO) are non-recurring operating expense items for District-wide use
that cost more than $5,000 each and have an estimated useful life of more than a year. These purchases include
vehicles, shop and field equipment, office equipment and furniture and computer equipment.
The justification for each purchase is determined by whether it is required due to growth, improvements or
upgrades or to replace an existing asset. As these purchases are completed and placed into service, there is a
potential impact on the Operating Budget.
Department / Item Amount
Board of Directors
Board Room Improvements 100,000$
Agenda Kiosk 18,000$
Total Vehicle Equipment & Capital Outlay- BOD 118,000$
Administration
45,000$
Total Vehicle Equipment & Capital Outlay- Admin.45,000$
Engineering
Hidden Hills Res. Landscape Mitigation Land Purchase 170,000$
Total Vehicle Equipment & Capital Outlay- Eng.170,000$
Finance
Meter Reading Equipment 26,000$
Total Vehicle Equipment & Capital Outlay- Finance 26,000$
Human Resources
Safety Lighting 10,000$
Total Vehicle Equipment & Capital Outlay- HR 10,000$
Annual Operating Budget FY19
Financial Summaries
24 | Page
Vehicle Equipment and Capital Outlay (FY19), continued
Department / Item Amount
IT
V-Sphere Hosts (servers - Ready-Nod)50,000$
Terminal Server Replacement - GP Host 21,500$
Server - NAS (high visibility)18,000$
Replace Personal Computers, Laptops, and Tablets 26,000$
VOIP Phone Redundancy (Phase 2 - Install)6,000$
Firewall Replacement (Administration)17,000$
Network Infrastructure Security Upgrade 20,000$
Security Suite Enterprise - Malware Software 11,000$
Security System - Camera(s) Yard 29,000$
CMMS Laptops 15,000$
Total Vehicle Equipment & Capital Outlay- IT 213,500$
Operations
Water Operations & Maint.
Pickup Truck 35,000$
Pickup Truck 35,000$
Skid Steer Loader 75,000$
Sweeper Tool 10,000$
Breaker Attachment 10,000$
Sewer Operations & Maintenance
Camera Truck 300,000$
Water Production
Pickup Truck 35,000$
Pickup Truck 35,000$
Total Vehicle Equipment & Capital Outlay- Oper.535,000$
TOTAL VEHICLE EQUIPMENT & CAPITAL OUTLAY 1,117,500$
Allocation by Fund
Water Fund 817,500$
Sewer Fund 300,000$
TOTAL 1,117,500$
Annual Operating Budget FY19
Financial Summaries
25 | Page
Annual Operating Budget FY19
Financial Summaries
26 | Page
FY17
Budget
FY17 YE
Acutals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries - Directors 90,000$ 53,159$ 90,000$ 51,450$ 90,000$
Fringe Benefits 53,671$ 25,823$ 2,099$ 1,655$ 1,961$
Mandatory Benefits - Directors 7,953$ 4,630$ 7,572$ 4,460$ 7,494$
Total Salary Related Expenses 151,624$ 83,612$ 99,670$ 57,565$ 99,454$
Supplies & Services
Communications -$ -$ -$ 300$ -$
Contractual Services 1,500$ 100$ 1,500$ -$ -$
Dues & Memberships 40$ -$ 60$ 60$ 60$
Board Election Expenses 246,000$ 129,971$ -$ -$ 75,000$
District Meetings and Events 1,500$ 48$ 2,700$ 907$ 3,000$
Non-Capital Equipment 5,000$ 3,050$ 2,000$ -$ 5,000$
Office Expense -$ 1,534$ 500$ 593$ 1,000$
Professional Services 93,000$ 95,520$ 33,000$ 44,651$ 39,000$
Professional Development 12,000$ 10,714$ 11,050$ 900$ 2,500$
Travel & Conferences 27,550$ 11,231$ 38,575$ 22,851$ 43,200$
Supplies & Services Sub-Total 386,590$ 252,168$ 89,385$ 70,262$ 168,760$
Annual Operating Budget FY19
Financial Summaries
27 | Page
Category Total Sub Acct No./Sub Category Sub Acct
Total
Detail Amt
$60 1-1010-0640-00
Dues, Memberships,
60 60
$75,000 1-1010-0650-00
Board Election Expenses
75,000 75,000
1-1010-0715-50
General Meeting Expense
1,500 1,500
1-1010-0715-55
Adminstration Meeting
1,500 1,500
1-1010-0750-00
Non-Capital Equipment
3,000 3,000
1-1010-0750-07
Notebooks/Tablets
2,000 2,000
$1,000 1-1010-0760-00
Office Expense
1,000 1,000
36,000
3,000
$2,500 1-1010-0810-00
Professional Development
2,500 2,500
2,800
400
4,800
4,700
1,600
3,550
7,700
800
1,100
1,000
1,000
2,350
3,000
1,500
3,900
1-1010-0830-50
Meeting Mileage
3,000 3,000
$168,760Section Total
Yorba Linda State of the City
Placentia State of the City
ACWA Committee Meetings (2 Dir)
CRWUA Annual Conference (2 Dir)
Other Conferences and Workshops
ACWA-JPIA Semi-Annual Conference (2 Dir)
OCWA Monthly Meetings (2 Dir)
1-1010-0810-00
Professional Development
Training Opportunities & Publications
1-1010-0830-00
Travel & Conferences
$43,200 1-1010-0830-00
Travel & Conferences
40,200 CSDA Annual Conference (2 Dir)
ISDOC Quarterly Meetings (5 Dir)
AWWA Annual Conference (2 Dir)
UWI Semi-Annual Conference (2 Dir)
OC Water Summit
AWWA CA-NV Annual Conference (2 Dir)
ACWA Semi-Annual Conference (2 Dir)
MWDOC Semi-Annual Water Policy Meetings (5 Dir)
Mileage (5 Dir)
1-1010-0760-00
Office Expense
Office Supplies
1-1010-0780-00
Professional Services
$39,000 1-1010-0780-00
Professional Services
39,000 Legal Retainer
Codification
1-1010-0750-00
Non-Capital Equipment
$5,000 Fireproof Safe and Archival Supplies
Electronic Equipment Reimbursement (1 Dir, 1 Repl)
1-1010-0715-00
District Meetings and
Events
$3,000 Board and Committee Meeting Expenses
Business Meeting Expenses
1-1010-0640-00
Dues, Memberships,
CRWUA (2 Dir)
1-1010-0650-00
Board Election Expenses
Election Expense
Primary GL Category Detail Item Description
Annual Operating Budget FY19
Financial Summaries
28 | Page
Administration
FY17
Budget
FY17 YE
Acutals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries 360,992$ 370,866$ 589,366$ 610,918$ 693,802$
Fringe Benefits 206,425$ 89,133$ 247,944$ 65,563$ 240,648$
Unemployment Insurance 10,400$ 5,872$ 5,961$ 807$ 2,000$
Overtime -$ 1,728$ 1,215$ 7,316$ 4,261$
OPEB & CalPERS UAL/GASB Adj 404,361$ 469,641$ 543,493$ 923,557$ 1,004,254$
Mandatory Benefits 33,287$ 141,504$ 64,390$ 51,218$ 69,020$
Total Salary Related Expenses 1,015,465$ 1,078,744$ 1,452,370$ 1,659,379$ 2,013,985$
Supplies & Services
Communications -$ -$ -$ -$ 73,700$
Contractual Services -$ -$ -$ -$ 6,500$
Dues & Memberships 60,630$ 62,515$ 65,270$ 65,300$ 70,380$
Fees & Permits -$ -$ -$ -$ -$
Insurance 740$ 733$ 740$ 733$ 1,090$
District Activities & Events 3,900$ 1,348$ 1,000$ 1,620$ 13,250$
Materials -$ -$ -$ -$ -$
Non-Capital Equipment 600$ 2,583$ -$ -$ 3,700$
Office Expense 950$ 864$ 950$ 4,300$ 2,800$
Professional Services 145,000$ 304,286$ 283,375$ 279,592$ 250,000$
Professional Development 3,100$ 2,024$ 1,450$ 108$ 3,600$
Travel & Conferences 24,440$ 7,145$ 26,325$ 18,523$ 38,990$
Supplies & Services Sub-Total 239,360$ 381,498$ 379,110$ 370,176$ 464,010$
Bargaining Unit
Professional & Confidential
Management
General
Manager
Assistant General
Manager
Management
Analyst
Public Affairs
Representative
Executive
Assistant
Annual Operating Budget FY19
Financial Summaries
29 | Page
Administration Detail
Category Total Sub Acct
Total
Detail Amt
$1,500 1,500 1,500
27,200
4,500
30
4,000
7,000
50
200
23,000
250
75
75
500
400
1,050
40
1,500 1,500
1,800 1,800
200
1,000
750
400
600
750
120,000 120,000
120,000 120,000
1,500
450
650
9,400
1,500
2,350
1,600
3,750
160
360
1,650
80
2,400
1,400
1,800
3,000
960
900
2,400
1,000 1,000
$10,000 10,000 10,000
$364,180
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-2010-0580-00
Communications
1-2010-0580-40
Sponsorships
Love Placentia Event
1-2010-0640-20
Publications
900 Bond Buyer Publication
AWWA Benchmarking Publication
1-2010-0640-00
Dues, Memberships, &
Subscriptions
$67,280 1-2010-0640-00
Dues, Memberships, &
Subscriptions
66,380 LAFCO (Agency)
CASA (Agency)
CRWUA (MM)
AWWA (Agency)
CSDA (Agency)
ISDOC (Agency)
IIMC (AA)
ACWA (Agency)
Miscellaneous (Costco, etc.)
NNA (AA)
OCWA (MM)
1-2010-0690-00
Insurance
$1,090 1-2010-0690-00
Insurance
1,090 Faithful Performance Bond (MM BB & AA)
Notary Insurance (AA)
1-2010-0715-00
District Meetings and Events
$3,300 1-2010-0715-50
General Meeting Exepnse
Management/Department Meetings
1-2010-0715-55
Administration Meeting Expenses
Business Meeting Expenses
1-2010-0750-00
Non-Capital Equipment
$1,200 1-2010-0750-00
Non-Capital Equipment
1,200 Typewriter
Office Chairs
1-2010-0760-00
Office Expense
$2,500 1-2010-0760-00
Office Expense
2,500 Office Supplies
Sympathy Arrangements
District Apparel
Emergency Preparedness/First Aid
1-2010-0780-00
Professional Services
$240,000 1-2010-0780-05
Legal Services
Legal Services (General/Routine)
1-2010-0780-36
- - -Water Only Related Expenses
Legal Services (IRWD vs. OCWD)
1-2010-0810-00
Professional Development
$2,600 1-2010-0810-00
Professional Development
2,600 Other Training Opportunities
SDLF Special District Administrator Cert (MM)
CSDA Governance Foundations (MM)
AWWA CA-NV Annual Conference (MM)
1-2010-0830-00
Travel & Conferences
$34,710 1-2010-0830-00
Travel & Conferences
33,710 ACWA Semi-Annual Conference (MM, BB, KY)
CRWUA Annual Conference (MM)
UWI Semi-Annual Conference (MM)
CSDA GM Leadership Summit (MM)
SWRCB Meetings (MM)
MWDOC Water Policy Meetings (MM)
OCWA Monthly Meetings (MM)
CSDA Board Secretary/Clerk Conference (AA)
ISDOC Quarterly Meetings (MM)
AWWA Annual Conference (MM)
CSDA Annual Conference (MM)
Other Conferences and Workshops
CWEA Tri-State Conference (KY)
GFOA Conference (KY)
ACWA Committee Meetings (MM)
1-2010-0830-50
Meeting Mileage
Mileage
2-2010-0780-00
Professional Services
2-2010-0780-39
Professional Services-Sewer
Professional Services
Section Total
Annual Operating Budget FY19
Financial Summaries
30 | Page
Administration: Public Information
Category
Total
Sub Acct
Total
Detail Amt
1,000 1,000
20,000
5,000
5,000
5,000
1,200
5,000
30,000 30,000
1,500
5,000
700
1,000
500
900
4,700
5,000
250 250
$2,500 2,500 2,500
$300 300 300
$1,000 1,000 1,000
240
240
1,200
200
1,600
500
300
$99,830
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-2020-0580-00
Communications
$72,200 1-2020-0580-05
Advertising
Social Media Posts
1-2020-0580-35
Promotional Items
25,000 Wate Bottle Program (Donations)
Promotional Items
1-2020-0580-45
Video Productions
16,200 Website Update
Donut Design
Constant Contact
Other Multimedia Supplies
1-2020-0580-55
Water Conservation Programs
MWDOC Choice Water Use Efficiency
1-2020-0600-00
Contractual Services
$6,500 1-2020-0600-00
Contractual Services
6,500 Muzak (On-hold music/message)
Conservation Rebate Program (Comm Turf Inspect)
1-2020-0640-00
Dues, Memberships, &
Subscriptions
$3,100 1-2020-0640-00
Dues, Memberships, & Subscriptions
3,100 OC Register/LA Times
Chamber of Commerce Membership (YL, Pl)
CAPIO Membership
PRSA Membership
1-2020-0715-00
District Meetings & Events
$9,950 1-2020-0715-00
District Meetings & Events
9,700 District Tours
District Meeting & Events
1-2020-0715-50
General Meeting Expense
Division Meetings
1-2020-0750-00
Non-Capital Equipment
1-2020-0750-00
Non-Capital Equipment
District Event Equipment/Supplies
1-2020-0760-00
Office Expense
1-2020-0760-00
Office Expense
Office Expense
1-2020-0810-00
Professional Development
1-2020-0810-00
Professional Development
Training
1-2020-0830-00
Travel & Conferences
$4,280 1-2020-0830-00
Travel & Conferences
3,480 Placentia Chamber Lunch
Yorba Linda Chamber Lunch
CAPIO Annual Conference
Section Total
Water Policy Dinner
ACWA Fall Conference
1-2020-0830-50
Meeting Mileage
800 Mileage
MWDOC WUE Meeting Mileage
Annual Operating Budget FY19
Financial Summaries
31 | Page
Engineering
FY17
Budget
FY17 YE
Acutals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries 951,597$ 714,864$ 983,352$ 780,444$ 1,053,471$
Fringe Benefits 134,101$ 97,000$ 161,780$ 154,555$ 223,204$
Overtime 2,058$ 2,425$ 2,141$ 2,014$ 4,449$
Mandatory Benefits 100,956$ 88,457$ 105,921$ 100,433$ 110,252$
Total Salary Related Expenses 1,188,712$ 902,746$ 1,253,195$ 1,037,446$ 1,391,377$
Supplies & Services
Communications 200$ -$ 200$ 776$ 400$
Contractual Services 132,590$ 70,660$ 133,000$ 97,667$ 100,500$
Data Processing -$ -$ -$ -$ -$
Dues & Memberships 17,200$ 13,013$ 8,950$ 7,475$ 9,200$
Fees & Permits 70,800$ 67,871$ 65,800$ 70,193$ 72,558$
Materials 6,500$ 5,922$ 4,700$ 3,844$ 3,000$
District Activities/Meetings 600$ 363$ 600$ 685$ 1,000$
Maintenance 230$ 247$ 250$ 250$ 250$
Non-Capital Equipment 500$ 177$ 500$ 350$ 600$
Office Expense 1,000$ 1,226$ 3,000$ 1,494$ 2,900$
Professional Services 106,000$ 35,041$ 161,000$ 143,354$ 80,000$
Professional Development 4,070$ 1,160$ 3,820$ 1,420$ 4,020$
Travel & Conferences 5,400$ 577$ 4,200$ 2,673$ 4,200$
Supplies & Services Sub-Total 345,090$ 196,255$ 386,020$ 330,181$ 278,628$
Bargaining Unit
Professional & Confidential
Management
Engineering
Manager
Senior Project
Manager
Associate
Engineer
Engineering
Technician II
(2 positions)
Construction Project
Supervisor
Senior Construction
Inspector
Construction
Inspector
Water Quality
Engineer
Water Quality
Technician II
Annual Operating Budget FY19
Financial Summaries
32 | Page
Engineering: Admin
Engineering: Planning
Category
Total
Sub Acct
Total
Detail Amt
$120 120 120
$1,000 1,000 1,000
$200 200 200
$1,800 1,800 1,800
$3,120
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-4010-0640-00
Dues, Memberships, &
Subscriptions
1-4010-0640-00
Dues, Memberships, &
Subscriptions
Dues, Memberships & Subscriptions
1-4010-0715-00
District Meetings and Events
1-4010-0715-50
General Meeting Expense
Meeting/Event Supplies
Section Total
1-4010-0810-00
Professional Development
1-4010-0810-00
Training
Training
1-4010-0830-00
Travel & Conferences
1-4010-0830-00
Travel & Conferences
Travel & Conferences
Category Total Sub Acct
Total
Detail Amt
$400 400 400
$20,000 20,000 20,000
$1,000 1,000 1,000
$4,558 4,558 4,558
2,000 2,000
500 500
10,000 10,000
20,000
50,000
$500 500 500
$1,000 1,000 1,000
$109,958Section Total
1-4020-0810-00
Professional Development
1-4020-0830-00
Travel & Conferences
1-4020-0810-00
Professional Development
Certification Courses
1-4020-0830-00
Travel & Conferences
AWWA/ACE Conference
1-4020-0780-00
Professional Services
$80,000 1-4020-0780-00
Professional Services
Geotechnical & Surveying Consultant
1-4020-0780-36
Professional Services - Water
Related
70,000 Water Loss Control Consultant
Water Consulting & Cathodic Protection Services
1-4020-0645-00
Fees & Permits
1-4020-0760-00
Office Expense
$2,500
1-4020-0645-00
Fees & Permits
OCWD Warner Basin Lease - Well #21
1-4020-0760-00
Office Expense
Emergency Preparedness Equipment & Materials
1-4020-0760-30
Books & Publications
Books
1-4020-0600-00
Contractual Services
1-4020-0640-00
Dues, Memberships, &
Subscriptions
1-4020-0600-00
Contractual Services
ATS Communication
1-4020-0640-00
Dues, Memberships, &
Subscriptions
PE, D&T Cert. Renewals, Cross Conn. Spec., ASCE
Sub Acct No./Sub Category Detail Item DescriptionPrimary GL Category
1-4020-0580-00
Communications
1-4020-0580-00
Communications
FOG Inspection Reports
Annual Operating Budget FY19
Financial Summaries
33 | Page
Engineering: Construction
Engineering: Water Quality
Category Total Sub Acct
Total
Detail Amt
$3,000 3,000 3,000
7,700
300
$600 600 600
$100 100 100
750
750
$400 400 400
$13,600
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-4030-0645-00
Fees & Permits
1-4030-0645-20
USA Underground Service Alert
USA Underground Service Alerts
1-4030-0640-00
Dues, Memberships, &
Subscriptions
$8,000 1-4030-0640-00
Dues, Memberships, &
Subscriptions
8,000 EADOC Subscription (Planning Management Software)
Construction Management Association of America
1-4030-0750-00
Non-Capital Equipment
1-4030-0750-00
Non-Capital Equipment
Inspection Related Tools & Equipment
1-4030-0760-00
Office Expense
1-4030-0760-00
Office Expense
Office Supplies
1-4030-0810-00
Professional Development
$1,500 1-4030-0810-00
Professional Development
1,500 Training (AWWA, CMAA)
Inspector Certification
1-4030-0830-00
Travel & Conferences
1-4030-0830-00
Travel & Conferences
AWWA/ ACE Conference/CMAA
Section Total
Category Total Sub Acct
Total
Detail Amt
3,000
2,500
75,000 75,000
54,000
11,000
$80 80 80
$3,000 3,000 3,000
$250 250 250
$300 300 300
850
350
620
$1,000 1,000 1,000
$151,950
1-4040-0810-00
Professional Development
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-4040-0600-00
Contractual Services
1-4040-0645-00
Fees & Permits
$80,500 1-4040-0600-12
Backflow Device Rep
5,500 Backflow Device Repair
Backflow Testing Notices (InfoSend)
1-4040-0600-60
Water Quality Lab Testing
Water Quality Testing
$65,000 1-4040-0645-10
Dept of Health Services
65,000 Dept. of Health Services (SWRCB-DD)
County of Orange
1-4040-0640-00
Dues, Memberships, &
Subscriptions
ABPA (Maldonado)
1-4040-0710-00
Materials
1-4040-0710-20
Wtr Quality Test Material
Wtr Quality Test Materials
1-4040-0640-00
Dues, Memberships, &
Subscriptions
1-4040-0730-10
Fume Hood Maintenance
Maintenance & Testing
1-4040-0760-00
Office Expense
1-4040-0760-30
Books & Publications
AWWA Books
1-4040-0730-00
Maintenance
$1,820 1-4040-0810-00
Professional Development
1,820 Backflow Specialist
Certifications
Misc AWWA Trainings
1-4040-0830-00
Travel & Conferences
AWWA/Water Quality Conference
Section Total
1-4040-0830-00
Travel & Conferences
Annual Operating Budget FY19
Financial Summaries
34 | Page
Finance
Bargaining Unit
Professional & Confidential
Management
Finance
Manager
Customer Service
Supervisor
Customer Service
Representative III
(2 positions)
Customer Service
Representative II
(2 positions)
Senior
Accountant
Accountant
Accounting
Assistant II
(2 positions)
Meter Services
Lead
Meter Reader II
(2 positions)
Meter Reader I
Annual Operating Budget FY19
Financial Summaries
35 | Page
Finance: Admin
FY17
Budget
FY17 YE
Acutals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries 897,230$ 917,027$ 1,017,486$ 1,048,194$ 1,106,914$
Fringe Benefits 167,309$ 189,797$ 204,076$ 220,126$ 258,498$
Overtime 8,105$ 14,642$ 10,122$ 4,809$ 10,802$
Mandatory Benefits 90,810$ 90,843$ 102,007$ 103,495$ 115,580$
Total Salary Related Expenses 1,163,454$ 1,212,309$ 1,333,690$ 1,376,624$ 1,491,794$
Supplies & Services
Communications 107,125$ 99,229$ 107,125$ 103,902$ 94,497$
Contractual Services 89,560$ 75,686$ 76,050$ 79,365$ 80,897$
Data Processing -$ -$ -$ -$ -$
Dues & Memberships 590$ 425$ 565$ 550$ 690$
Fees & Permits 128,025$ 150,938$ 160,615$ 152,825$ 159,907$
Insurance 600$ 500$ 600$ 500$ 600$
Materials 23,000$ 22,071$ 23,000$ 17,551$ 23,000$
District Activities & Events 1,100$ 963$ 1,050$ 840$ 1,100$
Maintenance 600$ -$ 600$ 611$ 300$
Non-Capital Equipment 5,100$ 646$ 4,075$ 461$ 2,100$
Office Expense 14,050$ 11,526$ 13,775$ 7,287$ 9,550$
Professional Services 37,150$ 77,222$ 50,300$ 49,918$ 60,300$
Professional Development 5,415$ 4,731$ 7,440$ 4,033$ 10,470$
Travel & Conferences 7,325$ 1,845$ 5,695$ 5,393$ 4,700$
Uncollectible Accounts 35,000$ 9,041$ 18,500$ 2,997$ 3,000$
Supplies & Services Sub-Total 454,640$ 454,823$ 469,390$ 426,233$ 451,111$
Category Total Sub Acct
Total
Detail Amt
155
160
125
$600 600 600
$500 500 500
7,000
3,000
1,500
13,000
24,000
10,000 10,000
300
160
300
210
350
1,000
1,000
$63,360
GASB 68 Statement Preparation (CalPERS Reports)
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-3010-0640-00
Dues, Memberships, &
Subscriptions
$440 1-3010-0640-00
Dues, Memberships, &
Subscriptions
440 CMTA
GFOA
CSMFO
CDAR Preparation
Financial Advisor Svcs - Financial Services
Auditors
1-3010-0780-36
P f i l S i W t
1-3010-0690-00
Insurance
1-3010-0690-00
Insurance
Honesty Bond (CNA Surety)
1-3010-0715-00
District Meetings and Events
1-3010-0715-50
General Meeting Expense
Meeting Supplies
Water Rate Consultant
1-3010-0780-00
Professional Services
$58,500 1-3010-0780-00
Professional Services
48,500 Actuarial Services - OPEB
Section Total
1-3010-0830-00
Travel & Conferences
$2,000 1-3010-0830-00
Travel & Conferences
2,000 CMTA/CDIAC Annual Conference
GFOA Annual Conference
1-3010-0810-00
Professional Development
$1,320 1-3010-0810-00
Professional Development
1,320 GFOA Webinars
WEROC Disaster Training
CSMFO Webinars
CSMFO Chapter Meetings
CMTA - California Treasury Certificate
Annual Operating Budget FY19
Financial Summaries
36 | Page
Finance: Accounting
Category Total Sub Acct No./Sub Category Sub Acct
Total
Detail Amt
$625 1-3020-0580-00
Communications
625 625
525
600
$250 1-3020-0640-00
Dues, Memberships, &
Subscriptions
250 250
150
525
350
250
26,200
$250 1-3020-0715-50
General Meeting Expense
250 250
$300 1-3020-0730-00
Maintenance
300 300
$500 1-3020-0750-00
Non-Capital Equipment
500 500
1-3020-0760-00
Office Expense
5,000 5,000
1-3020-0760-10
Paper
2,900 2,900
315
150
720
135
1,000
1,200
1,400
900
250
935
865
$46,295Section Total
2016 Government Tax Update (4 x 350) Training
GFOA CPFO Certificate
CMTA/CDIAC training
1-3020-0830-00
Travel & Conferences
$1,800 1-3020-0830-00
Travel & Conferences
1,800 CSMFO conference travel costs
CalPERS Ed Forum Conference
1-3020-0810-00
Professional Development
$6,070 1-3020-0810-00
Professional Development
6,070 CSMFO Chpter Mtings (1x2x35) +(2x2x35)+(3x1x35)
GFOA Annual GAAP Update Training
GFOA Training
CSDA Webinar Training
Staff Training -PR/Acctg Training Class (4 x 250)
National Training Seminar
1-3020-0715-00
District Meetings and
Meeting Supplies
1-3020-0760-00
Office Expense
$7,900 Office Supplies
Paper
1-3020-0730-00
Maintenance
Small Office Equipment Maintenance
1-3020-0750-00
Non-Capital Equipment
Misc Office Equipment
1-3020-0640-00
Dues, Memberships, &
Subscriptions
CSMFO (2 x 125)
1-3020-0645-00
Fees & Permits
$27,475 1-3020-0645-00
Fees & Permits
1,025 CSMFO Budget Reviewer Fee
GFOA CAFR Reviewer Fee
GFOA Budget Award Reviewer Fee
1-3020-0645-50
Bank Service/Fees
26,450 Safe Deposit Box Fee
Analysis Fees ($5250/Qtr x4) + ($45 x12BofW Fee)
Primary GL Category Detail Item Description
1-3020-0580-00
Communications
Publish Unclaimed List (OC Register)
1-3020-0600-00
Contractual Services
$1,125 1-3020-0600-00
Contractual Services
1,125 Green Shades
Doculivery ($50 x 12 months)
Annual Operating Budget FY19
Financial Summaries
37 | Page
Finance: Customer Service
Finance: Meter Reading
Category Total Sub Acct
Total
Detail Amt
4,000 4,000
89,872 89,872
2,000
1,114
300
4,439
600
38,784
26,835
5,700 5,700
$132,432 132,432 132,432
$350 350 350
350
750
400
700
400
$1,800 1,800 1,800
1,500
500
200
$200 200 200
$3,000 3,000 3,000
$316,226
Info Send E-Bill Fees
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-3030-0580-00
Communications
$93,872 1-3030-0580-10
Postage
Meter Postage In-house
1-3030-0580-22
Postage - Infosend
Postage - Infosend
1-3030-0645-00
Fees & Permits
1-3030-0645-50
Bank Services/Fees
Lock BoxPymt Processing/Credrt Card Fees/ACH
1-3030-0715-00
District Meetings and Events
1-3030-0715-50
General Meeting Expense
Meeting Supplies
1-3030-0600-55
Answering Service
Phone Answering Service
1-3030-0600-00
Contractual Services
$79,772 1-3030-0600-00
Contractual Services
3,414 Wells Fargo Lockbox
Meter & Scale Lease Agreement ($95 x 12)
Post Office Box
1-3030-0600-21
Customer Credit Check
5,039 Online - Credit Checks
Online - Utility Exchange - web access
1-3030-0600-22
Printing of Bills - Infosend
65,619 Mailing Service
1-3030-0750-00
Non-Capital Equipment
$1,100 1-3030-0750-00
Non-Capital Equipment
1,100 Scanner
General Equipment
1-3030-0760-00
Office Expense
$1,500 1-3030-0760-00
Office Expense
1,500 Postage Machine Ink
Yellow Tags
General Supplies
1-3030-0780-00
Professional Services
1-3030-0780-09
Collection Services
Collection Fees
1-3030-0810-00
Professional Development
$2,200 1-3030-0810-00
Professional Development
2,200 Customer Service Training - Star12
California Water Utility Manager Seminars
CSDA Webinars
Section Total
1-3030-0830-00
Travel & Conferences
1-3030-0830-50
Meeting Mileage
Mileage Reimbursement
1-3030-0850-00
Uncollectible Accounts
1-3030-0850-00
Uncollectible Accounts
Uncollectible Accounts
Category
Total
Sub Acct
Total
Detail Amt
$23,000 23,000 23,000
$500 500 500
$150 150 150
700 700
180 180
$700 700 700
$25,230
1-3040-0830-00
Travel & Conferences
1-3040-0830-00
Travel & Conferences
AWWA Conference
Section Total
1-3040-0810-00
Professional Development
$880 1-3040-0810-00
Professional Development
Training classes
1-3040-0810-40
Certificate Reimbursement
Certificate Reimbursement
1-3040-0750-00
Non-Capital Equipment
1-3040-0750-00
Non-Capital Equipment
Meter Shop Equipment
1-3040-0760-00
Office Expense
1-3040-0760-00
Office Expense
Office Supplies
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-3040-0710-00
Materials
1-3040-0710-58
Registers
Registers
Annual Operating Budget FY19
Financial Summaries
38 | Page
Human Resources
FY17
Budget
FY17 YE
Actuals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries 526,230$ 521,047$ 536,253$ 519,647$ 564,294$
Fringe Benefits 101,851$ 70,788$ 114,278$ 97,154$ 127,546$
Overtime 4,327$ 923$ 5,321$ 1,942$ 6,572$
Mandatory Benefits 52,838$ 87,667$ 52,741$ 48,590$ 55,035$
Total Salary Related Expenses 685,246$ 680,425$ 708,593$ 667,333$ 753,447$
Supplies & Services
Communications 2,500$ 3,253$ 2,500$ 2,100$ 2,500$
Contractual Services 31,850$ 15,351$ 32,240$ 17,151$ 29,935$
Data Processing -$ -$ -$ -$ -$
Dues & Memberships 8,595$ 9,166$ 7,920$ 8,383$ 7,570$
Insurance 285,000$ 255,439$ 282,000$ 279,234$ 301,500$
Materials 1,600$ 1,507$ 2,100$ 1,294$ 2,100$
District Activities & Events 17,950$ 6,137$ 15,550$ 14,404$ 24,100$
Non-Capital Equipment 1,800$ 1,417$ 3,800$ 4,961$ 5,800$
Office Expense 900$ 921$ 700$ 1,250$ 1,650$
Professional Services 103,850$ 41,667$ 93,850$ 88,456$ 64,500$
Professional Development 25,000$ 14,266$ 22,450$ 16,700$ 33,850$
Travel & Conferences 7,850$ 6,948$ 7,750$ 6,491$ 13,850$
Supplies & Services Sub-Total 486,895$ 356,072$ 470,860$ 440,424$ 487,355$
Bargaining Unit
Professional & Confidential
Management
Human Resources/
Risk and Safety
Manager
Records Management
Administrator
Records Management
Specialist
Safety & Training
Analyst
Human Resources
Analyst
Human Resources
Technician
Annual Operating Budget FY19
Financial Summaries
39 | Page
Human Resources: Admin
Primary GL Category Category Total Sub Acct No./Sub Category Sub Acct
Total
Detail Amt
1-7010-0580-00
Communications
$2,500 1-7010-0580-05
Advertising
2,500 2,500
500
1,800
5,300
3,000
3,200
1,850
1-7010-0600-10
Physicals
3,000 3,000
1,000
0
800
5,000
400
4,400
350
90
2,000
7,500
1,500
4,500
600
1-7010-0715-30
District Events - Benefit Fair
1,500 1,500
1-7010-0715-40
District Events - Employee Promotional
2,000 2,000
700
300
400
300
1-7010-0760-30
Books & Publications
250 250
1-7010-0780-05
Legal Services
50,000 50,000
1-7010-0780-55
Investigations
12,000 12,000
600
16,000
600
1,000
450
3,600
1,500
1,400
2,400
Section Total $144,290
1-7010-0830-00
Travel & Conferences
$9,350 1-7010-0830-00
Travel & Conferences
9,350 Public Retirement Seminar (2 Employees)
LCW (3 Employees)
CalPERS (2 Employees)
PELRAC (2 Employees)
NEOGOV (2 Employees)
1-7010-0780-00
Professional Services
$62,000 Liebert Cassidy Whitmore Employment Law
Investigations, Backgrounds, and EE Relations
1-7010-0810-00
Professional Development
$18,200 1-7010-0810-00
Professional Development
16,600 PELRAC Academy
LCW/Other - Training
1-7010-0810-20
Job Training
1,600 Certificate Maintenance
On-going Job Training
1-7010-0715-50
General Meeting Expense
1,000 Meeting/Training Supplies
Recruitment Process
1-7010-0760-00
Office Expense
$950 1-7010-0760-00
Office Expense
700 Office Supplies
District Apparel
1-7010-0715-00
District Meetings and Events
$20,600 1-7010-0715-20
District Events - Employee Recognition
16,100
Public Retirement Journal
Retiree Event (2)
Retiree Recognition
Benefit Fair
Employee Promotional Items
PELRAC
Jobs Available Subscription
All Hands Meeting
Employee Events
Service Recognition
1-7010-0640-00
Dues, Memberships &
Subscriptions
$5,240 1-7010-0640-00
Dues, Memberships & Subscriptions
5,240 CALPELRA Annual Dues
LCW (Consortium & Library)
New Titer Test
1-7010-0600-30
Health & Welfare
5,800 Flu Shots
Interactive Process
Detail Item Description
Job Advertising Expenses
1-7010-0600-00
Contractual Services
$25,450 1-7010-0600-00
Contractual Services
15,650 COBRA Solutions
Flex Advantage
NEOGOV - Performance
CPS (Testing) - Human Resources
NEOGOV - Insight
NEOGOV - Onboard
Fit for Duty
1-7010-0600-20
Post Offer/Pre-Employments Physicals
1,000 Post-offer Pre-employment physicals
Annual Operating Budget FY19
Financial Summaries
40 | Page
Human Resources: Risk
Human Resources: Records Management
Category
Total
Sub Acct
Total
Detail Amt
0 0
300 300
150
700
5,000 5,000
250,500 250,500
46,000 46,000
$1,000 1,000 1,000
$1,000 1,000 1,000
$500 500 500
$305,150
1-7020-0830-00
Travel & Conferences
1-7020-0830-00
Travel & Conferences
PARMA Conference
Section Total
1-7020-0780-00
Professional Services
1-7020-0780-00
Professional Services
First Aid-Injured Workers
1-7020-0810-00
Professional Development
1-7020-0810-00
Professional Development
Risk Management Training
1-7020-0690-00
Insurance
$301,500 1-7020-0690-10
Tort Claims
Tort Claims - < 15K
1-7020-0690-20
Liability Insurance
ACWA-JPIA Liability Insurance
1-7020-0690-30
Property Insurance
ACWA-JPIA Property Insurance
1-7020-0640-00
Dues, Memberships, & Subscriptions
$850 1-7020-0640-00
Dues, Memberships, & Subscriptions
850 PARMA Membership
AED Medical Director Oversight
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-7020-0600-00
Contractual Services
$300 1-7020-0600-00
Contractual Services
Electrical Safety - Audit Inspections
1-7020-0600-08
Drug Screening Process
Drug Screening Process
Category Total Sub Acct
Total
Detail Amt
400
80
100
$1,200 1,200 1,200
800
1,000
$200 200 200
1,000
500
800 800
700
200
2,500
1,000
$10,480Section Total
1-7040-0830-00
Travel & Conferences
$3,500 1-7040-0830-00
Travel & Conferences
3,500 ARMA Conference
LaserFiche User Conference
1-7040-0810-00
Professional Development
$1,700 1-7040-0810-00
Professional Development
RIM Seminars
1-7040-0810-20
Job Training
900 ARMA & AIIM Chapter Training
SessionsICRM Certification Maintenance
1-7040-0760-00
Office Expense
1-7040-0760-30
Books and Publications
RIM Books
1-7040-0780-00
Professional Services
$1,500 1-7040-0780-00
Professional Services
1,500 Shredding Services
Gladwell Government Services
1-7040-0715-00
District Meetings & Events
1-7040-0715-00
District Meetings & Events
General Meeting Expenses
1-7040-0750-00
Non-Capital Equipment
$1,800 1-7040-0750-00
Non-Capital Equipment
1,800 Archival Supplies
Disaster Recovery
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-7040-0640-00
Dues, Memberships, & Subscriptions
$580 1-7040-0640-00
Dues, Memberships, &
Subscriptions
580 ARMA International
Arma Chapter Memebership
SCA
Annual Operating Budget FY19
Financial Summaries
41 | Page
Human Resources: Safety
Category Total Sub Acct
Total
Detail Amt
1,000
280
1,200
1,105
600 600
500
150
0
250
900
1,200
1,200
1,100
$4,000 4,000 4,000
150
350
0
2,750
0
2,500
1,200
3,000
2,000
1,500 1,500
250
150
100
$27,435
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-7030-0600-00
Contractual Services
$4,185 1-7030-0600-00
Contractual Services
3,585 HEP B ($250 x 4)
Titer Shot ($70 x 4)
Hearing Testing
Respiratory Protection ($85 x 13)
1-7030-0600-10
DOT Physicals
DOT (17 x $35)
1-7030-0640-00
Dues, Memberships, &
Subscriptions
$900 1-7030-0640-00
Dues, Memberships, &
Subscriptions
900 Cal-OSHA Reporter
PASMA (2 x 75)
Safety Center Inc.
ASSE
1-7030-0710-00
Materials
$2,100 1-7030-0710-00
Materials
2,100 First Aid Restocker
First Aid Supplies (Field Backpacks)
1-7030-0715-00
District Meetings and Events
$2,300 1-7030-0715-50
General Meeting Expense
2,300 Meeting/Training Supplies
Safety Works (Promo Safety Recognition)
1-7030-0750-00
Non-Capital Equipment
1-7030-0750-00
Non-Capital Equipment
Misc Ergonomic Equipment
1-7030-0760-00
Office Expense
$500 1-7030-0760-00
Office Expense
500 AWWA M3 Safety Manual
NFPA Code Book
11,450 Portable Fire Extinguisher
First Aid/CPR/BBP/AED
Electrical Safety Training
Confind Space Rescue
Air Sampling - Silica Standard
First Responder Training
Section Total
Lock Out Tag Out
1-7030-0810-20
Job Training
On Job Training
1-7030-0830-00
Travel & Conferences
$500 1-7030-0830-00
Travel & Conferences
500 PASMA Safety
Safety Fest - WEROC (2 Employees)
PASMA/PARMA Winter Conference
1-7030-0810-00
Professional Development
$12,950 1-7030-0810-10
OSHA Compliance
Annual Operating Budget FY19
Financial Summaries
42 | Page
Information Technology
FY17
Budget
FY17 YE
Actuals
FY18
Budget
FY18 YE
Projections
FY19
Budget
Expenses (Operating)
Salary Related Expenses
Salaries 485,192$ 503,805$ 516,488$ 492,009$ 561,905$
Fringe Benefits 66,241$ 86,821$ 79,118$ 94,163$ 112,366$
Overtime 5,305$ 4,502$ 5,584$ 11,651$ 13,750$
Mandatory Benefits 51,503$ 52,981$ 55,590$ 52,717$ 62,222$
Total Salary Related Expenses 608,241$ 648,109$ 656,780$ 650,540$ 750,244$
Supplies & Services
Communications -$ -$ -$ -$ -$
Contractual Services 107,665$ 101,050$ 111,100$ 101,841$ 131,400$
Data Processing 220,709$ 237,413$ 215,400$ 269,943$ 247,450$
Dues & Memberships 280$ -$ 80$ 716$ 80$
Materials 3,900$ 4,546$ 3,900$ 11,193$ 8,500$
District Activities & Events 800$ 171$ 800$ 150$ 800$
Maintenance 8,450$ 7,880$ 8,950$ 13,546$ 13,850$
Non-Capital Equipment 91,200$ 95,331$ 41,650$ 46,666$ 47,250$
Office Expense 15,150$ 12,202$ 14,100$ 10,954$ 10,600$
Professional Services 51,500$ 37,700$ 39,000$ 43,592$ 29,000$
Professional Development 11,000$ 3,663$ 9,000$ 3,337$ 7,000$
Travel & Conferences 16,100$ 9,788$ 12,950$ 9,360$ 11,700$
Utilities 101,700$ 81,339$ 95,700$ 107,900$ 82,700$
Supplies & Services Sub-Total 628,454$ 591,083$ 552,630$ 619,198$ 590,330$
Bargaining Unit
Professional & Confidential
Management
Information
Technology
Manager
Information Systems
Administrator
Information Systems
Technician I
Programmer
Analyst
GIS
Analyst
Annual Operating Budget FY19
Financial Summaries
43 | Page
Information Technology: Admin
Information Technology: GIS
Category Total Sub Acct
Total
Detail Amt
$500 500 500
$500 500 500
1,600
900
$3,500
1-6010-0810-00
Professional Development
1-6010-0810-00
Professional
Development
Pluralsight Tech Library
Section Total
1-6010-0830-00
Travel & Conferences
$2,500 1-6010-0830-00 2,500 Interop (April/May)
WinConnections (November)
Primary GL Category Sub Acct
No./Sub
Detail Item Description
1-6010-0715-00
District Meetings and Events
1-6010-0715-50
General Meeting
Expense
Meeting Supplies
Category Total Sub Acct No./Sub
Category
Sub Acct
Total
Detail Amt
1,500
5,900
900
3,300
4,000
2,800
3,000
3,000
2,000
$1,500 1-6030-0730-05
Printer Servicing
1,500 1,500
$500 1-6030-0750-30
Tools & Equipment
500 500
1,500
1,500
$20,000 1-6030-0780-20 20,000 20,000
2,000
2,000
1,650
350
$57,400
2,000 GIS ESRI User Conference
Mileage and Travel Reimbursement
Section Total
1-6030-0830-00
Travel & Conferences
$2,000 1-6030-0830-00
CMMS & GIS Consulting
1-6030-0810-00
Professional Development
1-6030-0810-00 4,000 GIS Analyst Training
GIS & CMMS Training, Miller Spatial
$4,000
1-6030-0780-00
Professional Services
Large Format Printer Repair
1-6030-0750-00
Non-Capital Equipment
GIS Miscellaneous Tools (Hardware)
1-6030-0760-00
Office Expense
1-6030-0760-21
Printer Supplies
3,000 Atlas Water & Sewer Supplies
Large Format Printer Ink
$3,000
1-6030-0730-00
Maintenance
Primary GL Category Detail Item Description
1-6030-0620-00
Data Processing
1-6030-0620-20$26,400 26,400 Microsoft Project License
ArcGIS Server Standard Enterprise Maintenance
ArcView Single Use Maintenance
ArcInfo Concurrent Maintenance
SCADA Watch Software Renewal
AutoCAD Renewal
InfoWater Renewal
ArcEditor Concurrent Maintenance (2)
Freeance Maintenance
Annual Operating Budget FY19
Financial Summaries
44 | Page
Information Technology: Information Systems
Category Total Sub Acct
Total
Detail Amt
16,200
1,200
19,000 19,000
21,000
17,000
4,000
6,000
35,000 35,000
12,000 12,000
8,600
3,600
17,000
250
250
500
40,000
1,700
2,000
12,000
30,000
13,000
1,500
5,000
56,000
3,200
2,000
13,500
500
9,450 9,450
1,000 1,000
$80 80 80
2,500
1,000
5,000 5,000
Hardware Subscription Renewals
1-6020-0620-47 Cell Phone Supplies
1-6020-0640-00
Dues, Memberships, &
1-6020-0640-00 Magazine Subscriptions
1-6020-0710-00
Materials
$8,500 1-6020-0710-51 3,500 Adapters
Cables
1-6020-0710-60 Hardware Supplies and Materials
1-6020-0620-00
Data Processing
$221,050
1-6020-0620-30
12,200 Additional Licenses
Solar Winds - Additional Modules
1-6020-0620-20 198,400 Solar Winds Orion Monitoring Tool Maintenance
Lenel Onguard Software Support Agreement Renewal
Trend Micro NeatSuite Antivirus & Spyware 110 lice
Netmotion Mobility XE Premium Software Maintenance
Laserfische Annual Support
Greenshades
1-6020-0620-10
Primary GL Category Sub Acct No./Sub Category Detail Item Description
1-6020-0600-00
Contractual Services
$131,400 1-6020-0600-10 17,400 DR Location - Switch Rental
FTP Today for FTP service
1-6020-0600-20
L A t
Konica Minolta Copier Lease
1-6020-0600-30 48,000 RMJ Tech. GPS Vehicle Tracking Service
NEAT
Adobe Acrobat License (Finance)
Dell Hardware Service Contracts
APC Symmetra Data Center UPS On-Site Service Rene
SCADA Cisco Smartnet Router Renewal
1-6020-0600-32 Cell Phones (Units) & Service
1-6020-0600-33 Mobile Broadband Data Service
Appassure Backup Software Renewal
Great Plains Annual Maintenance/Support
Microsoft Volume License Renewals
Solar Winds Engineering's Toolkit Renewal
Veratio Renewal
CityWorks Annual Maintenance
NovusAgenda Replacement Program
VMWare vSphere (Essentials Plus Kit) Maintenance
Adobe Creative Cloud (Admin)
Annual Operating Budget FY19
Financial Summaries
45 | Page
Information Technology: Information Systems, continued
Category Total Sub Acct
Total
Detail Amt
$300 300 300
1,500 1,500
1,500 1,500
2,000 2,000
3,000 3,000
4,000
350
5,000 5,000
6,800
2,300
2,200
250 250
1,000
7,500
3,700 3,700
18,000 18,000
100 100
6,500 6,500
1,000 1,000
8,000 8,000
1,000 1,000
1,000
1,500
2,800
1,800
400
2,200
15,000
10,700
24,500
6,500
26,000
$529,430
7,200 VM World
Emergency Backup Location Visits
Mileage Reimbursement
Intersect (October) R.S.
1-6020-0870-00
Utilities
1-6020-0870-00 82,700 DR Communications
Dedicated Internet Fiber - 20
Dedicated Internet Fiber Access - 200
District Phone Lines
SCADA Communications Lines
$82,700
Section Total
$7,2001-6020-0830-00
Travel & Conferences
1-6020-0830-00
1-6020-0780-11
Network/Hardware Consulting
IT Consulting Services
1-6020-0780-50
T h i l S t
Technical Support
1-6020-0810-00
Professional Development
1-6020-0810-00 2,500 Pluralsight
General Training
$2,500
1-6020-0780-00
Professional Services
$9,000
Replacement/Additional Monitors
1-6020-0750-65 Switches & Appurtenances
1-6020-0760-00
Office Expense
$7,600 1-6020-0760-00
Offi E
Business Cards
1-6020-0760-21 Printer Supplies - Toners, Fusers, Ink
1-6020-0760-26
Desktop Supplies
Desktop Supplies.
1-6020-0750-00
Non-Capital Equipment
$46,750
1-6020-0750-41
Non-Capital Equipment
1-6020-0750-09 11,300 KVM System Interface Pods
Network Equipment
Data Center Switches
1-6020-0750-30 Data Center Equipment (Rack & Cabinet)
1-6020-0750-35 8,500 Access Badges & FOBS
Network Security
1-6020-0750-00
Meeting Supplies
1-6020-0730-00
Maintenance
$12,350 1-6020-0730-00 Maintenance
1-6020-0730-06 Printer Servicing
1-6020-0730-11 Telco/Phone Servicing
1-6020-0730-30 Cabling (CAT6A, CAT5e, Fiber): Installation & Repa
1-6020-0730-60 4,350 APC Symmetra Data Center; UPS battery modules (6)
UPS replacement batteries for desktops
1-6020-0715-00
District Meetings and Events
1-6020-0715-50
Meeting Supplies
Primary GL Category Sub Acct No./Sub Category Detail Item Description
Annual Operating Budget FY19
Financial Summaries
46 | Page
Operations Bargaining Unit
Professional & Confidential
Management
Operations
Manager
Senior Fleet
Mechanic
Mechanic III
Mechanic II
Office
Clerk
Water
Production
Superintendent
Facilities
Maintenance
Worker
Chief Water
System
Operator
Senior Plant
Operator
Plant Operator II
(2 positions)
Plant Operator I
Senior SCADA
Technician
Electrical/
Instrumentation
Technician
Operations/
Warehouse
Assistant
Water
Maintenance
Superintendent
Senior
Maintenance
Worker
(4 positions)
Maintenance
Worker III
(5 positions)
Maintenance
Worker II
(6 positions)
Maintenance
Worker I
(9 positions)
Annual Operating Budget FY19
Financial Summaries
47 | Page
Operations: Admin
Category
Total
Sub Acct
Total
Detail Amt
$15,000 15,000 15,000
$0 0 0
$15,000 15,000 15,000
$3,000 3,000 3,000
$10,000 10,000 10,000
7,000 7,000
3,500 3,500
300 300
4,000 4,000
1,000 1,000
1,000 1,000
3,000 3,000
1,000 1,000
500 500
$64,300Section Total
1-5010-0830-00
Travel & Conferences
$4,500 1-5010-0830-00 Travel and Conferences
1-5010-0830-40 Registration
1-5010-0830-50
Meeting Mileage
Mileage
1-5010-0810-00
Professional Development
$2,000 1-5010-0810-00
Professional Development
Training
1-5010-0810-40
Certificate Reimbursement
Certificate Reimbursement
1-5010-0760-00
Office Expense
$14,800 1-5010-0760-00 General Office Expense
1-5010-0760-20 Printer Ink
1-5010-0760-30 Manuals/Books/Magazines
1-5010-0760-40 Breakroom Supplies
1-5010-0715-00
District Meetings and Events
1-5010-0715-50 Meeting Supplies
1-5010-0750-00
Non-Capital Equipment
1-5010-0750-50
Safety Equipment
Safety Equipment (Regulatory
Requirements)
1-5010-0640-00
Dues, Memberships, &
1-5010-0640-00
Dues, Memberships, &
Dues and Memberships
1-5010-0710-00
Materials
1-5010-0710-65 PPE Equipment
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-5010-0600-00
Contractual Services
1-5010-0600-50 Uniforms (District-Wide)
Annual Operating Budget FY19
Financial Summaries
48 | Page
Operations: Maintenance
Category Total Sub Acct
Total
Detail Amt
2,100 2,100
12,000 12,000
8,500 8,500
40,000 40,000
4,500 4,500
5,000 5,000
90,000 90,000
130,000 130,000
5,000 5,000
28,936 28,936
15,000 15,000
2,000 2,000
2,000 2,000
5,500 5,500
90,000 90,000
15,000 15,000
3,000 3,000
3,500 3,500
6,000 6,000
5,000 5,000
200,000 200,000
65,000 65,000
2,000 2,000
0 0
2,000 2,000
10,000 10,000
1,000 1,000
2,000 2,000
4,000 4,000
2,000 2,000
500 500
$761,536
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-5020-0645-00
Fees & Permits
$22,600 1-5020-0645-25
NPDES/RWQCB
NPDES Deminimus (RWQCB)
1-5020-0645-45 Landfill (Orange County & Dan Coop)
1-5020-0645-55 Encroachment Permits
1-5020-0710-00
Materials
$439,436 1-5020-0710-05
Road Material
Road Material
1-5020-0710-13 Air-Vac parts
1-5020-0710-15
Cl V l P t
Cla Valve Parts
1-5020-0710-25
Hydrant Repair Parts
Hydrant Repair Parts
1-5020-0710-30
Valve Repair Parts
Valve Repair Parts
1-5020-0710-36 City of Yorba Linda Valves Adjustments
1-5020-0710-40
Replacement Meters
Meters
1-5020-0710-55
Meter
Meter Boxes/Lids/Vaults
1-5020-0710-60
H d S li
Hardware Supplies
1-5020-0710-81
Welding Supplies
Welding Supplies
1-5020-0710-85 Cleaning/Painting Supplies
1-5020-0710-90
Wt S i R i
Water Service Repair Parts
1-5020-0710-94 Miscellaneous Warehouse Parts
1-5020-0710-96
R d Mi C t
Ready Mix Concrete
1-5020-0710-98 Landscape Supplies
1-5020-0730-00
Maintenance
$278,000 1-5020-0730-00
Maintenance
General Maintenance
1-5020-0730-36 City of Yorba Linda Valve Repair
1-5020-0730-66 Asphalt Paving
1-5020-0730-67 Concrete Repair
1-5020-0730-72 Safety Equipment Repairs
1-5020-0750-00
Non-Capital Equipment
$12,000 1-5020-0750-00
Non Capital Equipment
General Non-Capital Equipment
1-5020-0750-15 Equipment Rental
1-5020-0750-30 Tools & Equipment
1-5020-0810-00
Professional Development
$3,000 1-5020-0810-00
Professional
Training
1-5020-0810-40
Certificate
Certificate Reimbursement
Section Total
1-5020-0830-00
Travel & Conferences
$6,500 1-5020-0830-00 Travel & Conferences
1-5020-0830-40 Registration
1-5020-0830-50 Meeting Mileage
Annual Operating Budget FY19
Financial Summaries
49 | Page
Operations: Sewer
Category
Total
Sub Acct
Total
Detail Amt
2,088 2,088
500 500
$0 0 0
500 500
5,000 5,000
30,000 30,000
5,000 5,000
100,000 100,000
15,000 15,000
15,000 15,000
12,000 12,000
1,000 1,000
20,000 20,000
$30,000 30,000 30,000
1,800 1,800
6,000 6,000
1,000 1,000
3,500 3,500
2,200 2,200
$700 700 700
25,000 25,000
1,000 1,000
7,500 7,500
15,600 15,600
$300,388Section Total
2-5030-0870-00
Utilities
2-5030-0870-10 Electricity
2-5030-0890-00
Vehicle Expenses
$49,100 2-5030-0890-46 OPS - Sewer Vehicle Maint
2-5030-0890-47 OPS - Sewer - Equipment Maintenance
2-5030-0890-48 OPS - Sewer - Gas
2-5030-0890-49 OPS - Sewer - Diesel
2-5030-0830-00
Travel & Conferences
$5,700 2-5030-0830-00 Travenl & Conferences
2-5030-0830-40 Registration
2-5030-0750-00
Non-Capital Equipment
2-5030-0750-30
Tools & Equipment
Tools & Equipment
2-5030-0810-00
Professional Development
$8,800 2-5030-0810-00 Training
2-5030-0810-20 Class A Job Training
2-5030-0810-40
Certificate Reimbursement
Certificate Reimbursement
2-5030-0730-00
Maintenance
$168,000 2-5030-0730-00 General Maintenance
2-5030-0730-59
Sewer Line Repairs
Sewer Line Repairs
2-5030-0730-65 Vector Control in Manholes
2-5030-0730-66 Asphalt Paving
2-5030-0730-71
CCTV Repairs
CCTV Repairs
2-5030-0730-72
S f t E i t R i
Safety Equipment Repairs
2-5030-0730-86 City of Yorba Linda Manhole Adjustments
2-5030-0640-00
Dues, Memberships,
2-5030-0640-00
Dues, Memberships,
CWEA Memberships
2-5030-0710-00
Materials
$35,500 2-5030-0710-60
H d S li
Hardware Supplies
2-5030-0710-86 City of Placentia Manhole Adjustments
2-5030-0710-92 Sewer Main Repair Parts
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
2-5030-0645-00
Fees & Permits
$2,588 2-5030-0645-30 WDR - SSO (SWRCB)
2-5030-0645-55 Encroachment Permits
Annual Operating Budget FY19
Financial Summaries
50 | Page
Operations: Production
Category
Total
Sub Acct
Total
Detail Amt
$0 0 0
3,000 3,000
35,000 35,000
2,000 2,000
50,000 50,000
12,000 12,000
0 0
4,000 4,000
5,000 5,000
5,000 5,000
18,000 18,000
30,000 30,000
5,000 5,000
0 0
2,000 2,000
7,000 7,000
500 500
500 500
3,000 3,000
1,000 1,000
$183,000Section Total
1-5040-0830-00
Travel & Conferences
$4,000 1-5040-0830-00 Travel & Conferences
1-5040-0830-40 Registration
1-5040-0750-90 Emergency Equipment Supplies
1-5040-0810-00
Professional Development
$1,000 1-5040-0810-00
P f i l D l t
Training
1-5040-0810-40
Certificate Reimbursement
Certificate Reimbursment
1-5040-0730-29
Wells Calibration Mtce
Wells: Calibration, Maint. & Repairs
1-5040-0730-75
P St ti R i
Pump Station Repairs
1-5040-0750-00
Non-Capital Equipment
$9,000 1-5040-0750-00
N C it l E i t
General Non-Capital Equipment
1-5040-0750-30 Tools & Equipment
1-5040-0730-00
Maintenance
$67,000 1-5040-0730-05
CL2 System Service
CL2 System Service
1-5040-0730-10
Motor Services
Electrical Motor Repairs/Services
1-5040-0730-20
G l El t i S i
Electric General Maintenance
1-5040-0730-24 Reservoir Services
Hardware Supplies
1-5040-0710-75
Salt
Salt & Water Softeners
1-5040-0710-84 Valves, Gauges, AV, etc.
1-5040-0710-85
Cl i/Piti S li
Cleaning/Painting Supplies
1-5040-0710-00
Materials
$102,000 1-5040-0710-17 Pump Parts
1-5040-0710-35 CL2 System Parts
1-5040-0710-60
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-5040-0640-00
Dues, Memberships,
Sb i i
1-5040-0640-00
Dues, Memberships,
Sb i i
OCWA Memberships
Annual Operating Budget FY19
Financial Summaries
51 | Page
Operations: SCADA
Category Total Sub Acct
Total
Detail Amt
$35,000 35,000 35,000
$250 250 250
500 500
1,000 1,000
100 100
3,000
2,000
3,000
2,000
2,000 2,000
25,000 25,000
5,000 5,000
5,000 5,000
0 0
0 0
2,500 2,500
500 500
1,500 1,500
5,000 5,000
5,000 5,000
10,000
10,000
10,000
$2,000 2,000 2,000
$2,000 2,000 2,000
$132,350
1-5045-0640-00
1-5045-0730-00
Maintenance
$39,500 1-5045-0730-15
1-5045-0730-45
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
Software License Renewals1-5045-0620-00
Data Processing
1-5045-0620-20
Dues & Memberships
1-5045-0710-00
Materials
$11,600 1-5045-0710-60
Hardware Supplies
Hardware Supplies
1-5045-0710-64
El t i l S li
Electrical Supplies
1-5045-0710-72
C lib ti S li
Calibration Supplies
1-5045-0710-78 10,000 Flow Meters
Integral Manifolds for Flow & Pressure Meters
Level Indicators
Gas Detector Replacement (@BPS)
1-5045-0640-00
Dues, Memberships &
Production Flow Meter Calibration
1-5045-0730-20 Electrical General Maintenance
1-5045-0730-40
Radio Repairs and
Radio Repairs & Servicing
RTU Cabinet Hardware
1-5045-0730-55 Security & Gas Detectors
1-5045-0730-61
Cooling A/C Servicing
Cooling & A/C Service
Instrumentation
1-5045-0750-00
Non-Capital Equipment
$12,000 1-5045-0750-09 Field Routers, Switches, Fiber Device Servers, Mod
1-5045-0750-30
Tools & Equipment
Tools & Equipment
1-5045-0750-55
PLC & P l
PLCs & Panels
1-5045-0750-65
Electrical Upgrades
Electrical Upgrades
1-5045-0730-62
I t t ti
30,000 SCADA System Programing
Maintenance PLC - SCADA Modifications
PLC Program Conversions to Unity
1-5045-0810-00
Professional Development
1-5045-0810-00 Training
1-5045-0780-00
Professional Services
$30,000 1-5045-0780-20
Software Consulting
1-5045-0830-00
Travel & Conferences
1-5045-0830-00 Travel & Conferences
Section Total
Annual Operating Budget FY19
Financial Summaries
52 | Page
Operations: Mechanical
Category
Total
Sub Acct
Total
Detail Amt
20,000 20,000
200 200
600 600
10,000 10,000
700 700
$8,000 8,000 8,000
10,900 10,900
4,000 4,000
7,800 7,800
2,000 2,000
500 500
2,200 2,200
60,000 60,000
3,000 3,000
58,000 58,000
25,000 25,000
5,000 5,000
1,000 1,000
16,000 16,000
2,000 2,000
8,000 8,000
1,000 1,000
900 900
0 0
0 0
0 0
100,000 100,000
15,000 15,000
4,000 4,000
$365,800Section Total
1-5050-0890-80
St ti E i M i t
Stationary Engine Maint
1-5050-0890-81
St ti E i E i i
Stationary Engine Emissions Testing
1-5050-0890-90
Hazardous Materials
Haz Mat Disposal
1-5050-0890-57
OPS T l R i
OPS - Tool Repair
1-5050-0890-70
IT Vehicle Maint
IT - Vehicle Maintenance
1-5050-0890-71
IT Gas
IT - Gas
1-5050-0890-54 OPS - Mech Svcs - Gas
1-5050-0890-55
OPS Facilities Vehicle
OPS - Facilities - Vehicle Maint
1-5050-0890-56 OPS - Facilities - Gas
1-5050-0890-51
OPS Production Equipment
OPS - Production Equipment Maint
1-5050-0890-52 OPS - Production - Gas
1-5050-0890-53
OPS M h S V hi l
OPS Mech Svcs - Vehicle Maint
1-5050-0890-44 OPS - Water - Gas
1-5050-0890-45 OPS - Water - Diesel
1-5050-0890-50
OPS Production Vehicle
OPS - Production Vehicle Maint
OPS Water Vehicle Maintenance
1-5050-0890-43
OPS Water Equipement
OPS - Water Equipment Maintenance
1-5050-0890-41 OPS - Admin Gas
1-5050-0750-00
Non-Capital Equipment
1-5050-0750-40
Mech Shop Equipment
Misc Mech Shop Equipment/Tools
1-5050-0890-00
Vehicle Expenses
$326,300 1-5050-0890-20 Finance - Gas
1-5050-0890-21 Finance - Vehicle Maint
1-5050-0890-30 Engineering - Gas
1-5050-0890-31
Engineering Vehicle Maint
Engineering - Vehicle Maint
1-5050-0890-40
OPS Ad i Vhil Mit
OPS - AdminVehicle Maint
1-5050-0890-42
OPS Water Vehicle Maint
1-5050-0710-00
Materials
$10,700 1-5050-0710-80 Mech. Shop Supplies
1-5050-0710-81
W ldi S li
Welding Supplies
Primary GL Category Sub Acct No./Sub
Category
Detail Item Description
1-5050-0645-00
Fees & Permits
$20,800 1-5050-0645-05 AQMD Permits
1-5050-0645-15 EPA Fees
1-5050-0645-60 CARB Fee
Annual Operating Budget FY19
Financial Summaries
53 | Page
Operations: Facilities
Category Total Sub Acct
Total
Detail Amt
7,000 7,000
40,000 40,000
90,000 90,000
4,500 4,500
$2,000 2,000 2,000
12,000 12,000
3,000 3,000
8,000 8,000
3,000 3,000
10,000 10,000
500 500
15,000 15,000
3,000 3,000
2,000 2,000
5,000 5,000
10,000 10,000
1,200 1,200
1,500 1,500
4,000
2,000
$100,000 100,000 100,000
$323,700
1-5060-0710-98
1-5060-0600-35
Janitorial Service
1-5060-0710-00
Materials
$36,500 1-5060-0710-10
1-5060-0710-85
1-5060-0645-00
Fees & Permits
1-5060-0645-35
Haz Mat Fees
Primary GL Category Sub Acct
No./Sub
Detail Item Description
Disposal Service1-5060-0600-00
Contractual Services
$141,500 1-5060-0600-29
Disposal Service
1-5060-0600-45
Janitorial Service
1-5060-0600-40 Landscape Service
Pest Control Service
Haz Mat Fees (OCFA), Permits
Building Repair Parts
1-5060-0710-60 Hardware Supplies
1-5060-0710-64 Electrical Supplies
Cleaning/Painting Supplies
1-5060-0710-95 A/C Parts
Landscape Supplies
1-5060-0730-00
Maintenance
$37,700 1-5060-0730-00 Misc Facility Maintenance
1-5060-0730-20 Electrical General Maintenance
1-5060-0730-35
Fi E ti i h
Fire Extinguisher Maint/Calibration
1-5060-0730-50
Piti & F i
Painting & Fence Repair
1-5060-0730-66
A h lt P i
Asphalt Paving
1-5060-0730-69 Quarterly Water Testing Services (AC)
1-5060-0730-96 A/C Service
1-5060-0750-00
Non-Capital Equipment
$6,000 1-5060-0750-30 6,000 Tools & Equipment
Equipment Rental
1-5060-0870-00
Utilities
1-5060-0870-10 Electric
Section Total
ITEM NO. 8.3
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Subject:Financial Reserves Policy for Fiscal Year 2019
SUMMARY:
Attached for the Board's consideration is the proposed reserve policy for the FY19 budget year.
District Staff worked to update the policy to best serve District customers and to be part of a
financial strategy to ensure that current and future generations of the District's management and
governing body consistently adhere to sound, conservative and prudent fiscal practices.
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-24 adopting a Financial Reserves Policy for
Fiscal Year 2019 and rescinding Resolution No. 17-31.
DISCUSSION:
Attached is the proposed Financial Reserves Policy for Fiscal Year 2019.
Maintaining adequate reserves is an essential aspect of sound financial management. Being
fiscally prudent involves funding reserves to levels that enable the ability to provide reliable service
to our customers, maintain infrastructure for current and future customers, finance capital projects
as well as capital repair and replacement, ant the ability to respond to changing circumstances.
Upon review of the District's current reserve balances and the proposed Operating and Capital
Improvement Project Budgets for FY19 staff is recommending that the funding for all of the listed
reserves be set at least to the recommended minimum target levels.
In order for the District retain its current AA and AA+ ratings, it is recommended that the total
unrestricted water reserve balance be at least $29.3 million by June 30, 2019 to maintain the
minimum required 365 days in cash calculation.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-24_-_Reserves_Policy.docx Resolution Resolution
3010-005_-_Financial_Reserves_Policy.docx Exhibit Exhibit
Resolution No. 18-24 Adopting the Financial Reserves Policy 1
RESOLUTION NO. 18-24
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
ADOPTING THE FINANCIAL RESERVES POLICY
AND RESCINDING RESOLUTION NO. 17-31
WHEREAS, the purpose of the Yorba Linda Water District’s (YLW D) Financial
Reserves Policy is to ensure that the District continues to have sufficient
funding available to meet its operating, non-operating, capital and debt
service obligations; and
WHEREAS, adequate reserves and sound financial policies maintain YLWD’s bond
ratings in the capital markets, provide financing flexibility and sustain debt
covenant compliance; and
WHEREAS, the District has completed a comprehensive Asset Management Plan and
has prepared a rate study and five-year financial plan; and
WHEREAS, the Financial Reserves Policy recommends establishing various reserve
categories, defines the purpose and use of these funds and identifies
target levels and priority funding of the reserves; and
WHEREAS, the current policy is being revised as changes have been made to the
existing Financial Reserves Policy.
NOW THEREFORE, the Board of Directors of the Yorba Linda Water District does find,
determine, and resolve:
Section 1. The financial reserves policy is attached hereto as Exhibit “A”.
Resolution No. 18-24 Adopting the Financial Reserves Policy 2
Section 2. This Financial Reserves Policy adopted herein takes effect on July 1,
2018 and Resolution No. 17-31 is hereby rescinded on July 1, 2018.
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
3010-005 Financial Reserves Policy Page 1 of 5
Policies and Procedures
Policy No.: 3010-005
Adoption Method: Resolution No. 18-24
Effective Date: July 1, 2018
Last Revised: August 26, 2017
Prepared By: Delia Lugo, Finance Manager
Applicability: District Wide
POLICY: FINANCIAL RESERVES
1.0 GENERAL POLICY
Maintaining adequate reserves is an essential part of sound financial
management. The Yorba Linda Water District Board of Directors realizes the
importance of reserves in providing reliable service to its customers, well-
maintained infrastructure for current and future customers, financing capital
projects as well as capital repair and replacement, and the ability to respond to
changing circumstances. Interest derived from reserve balances shall be credited
to the reserve account from which it was earned.
2.0 CATEGORIES
Yorba Linda Water District (YLWD or District) shall accumulate, maintain and
segregate its reserve funds into the following categories:
• Board Designated Unrestricted Reserves; and
• Board Designated Restricted Reserves.
3.0 SCOPE
This policy will assist the Board of Directors in establishing:
• Minimum and Maximum Funding Levels, with target goals as a
percentage of maximum funding level for each reserve fund, unless
otherwise noted;
• Requirements for the use of reserve funds; and
• Periodic review requirements for each reserve.
4.0 PERIODIC REVIEW
Staff and the YLWD Board shall review the reserve balances and targets
annually as a part of the annual budget process. The Finance Staff will continue
to review all reserve and investment balances monthly, with a quarterly report
going to the full Board. Any changes must be approved by resolution of the
District Board of Directors. Changes can include, but are not limited to,
establishment of additional reserve funds, changes in reserve target levels, and
changes in types of reserve categories.
3010-005 Financial Reserves Policy Page 2 of 5
5.0 DESIGNATED UNRESTRICTED AND RESTRICTED RESERVES
5.1 Board Designated Unrestricted Reserves
These are reserve funds earmarked for the purpose of funding such items
as new capital facilities, repair or replacement of existing facilities, and
general operating reserves designated for a specific purpose and use by
the Board of Directors. All reserves in this category will be funded at least to
the recommended minimum target level.
5.1.1 Operating Reserve
A. Definition and Purpose – Established to cover temporary
cash flow deficiencies that occur as a result of timing
differences between the receipt of operating revenue and
expenditure requirements and unexpected expenditures
occurring as a result of doing business.
B. Funding Level – The District’s current funding levels will be a
minimum of 25% and a maximum of 50% of the annual
operating budget, including interest expense, for both the
water and sewer funds. In the event this fund falls below its
minimum funding level, the Board will act to restore the
balance above the minimum funding level within twelve (12)
months from the date that the fund fell below the minimum
level.
C. Events or Conditions Prompting the Use of the Operating
Reserve – This reserve may be utilized as needed to pay
outstanding operating expenditures prior to the receipt of
anticipated operating revenues.
5.1.2 Emergency Reserve
A. Definition and Purpose – Established to provide protection
recovery to the District and its customers for losses arising
from an unplanned event or circumstance (i.e. fires,
earthquakes or financial emergencies). The reserve level
combined with YLWD’s existing insurance policies should
adequately protect YLWD and its customers in the event of a
loss.
B. Funding Level – Established at a minimum level equal to 5%
and a maximum level equal to 10% of the net capital assets
for both the District’s water and sewer funds. In the event
this fund falls below its minimum funding level, the Board will
act to restore the balance above the minimum funding level
Levels Water Sewer
Minimum 25% 25%
Maximum 50% 50%
Levels Water Sewer
Minimum $7,593,220 $403,967
Maximum $15,186,441 $807,933
3010-005 Financial Reserves Policy Page 3 of 5
within twelve (12) months from the date that the fund fell
below the minimum level.
C. Events or Conditions Prompting the Use of the Emergency
Reserve – This reserve shall be utilized to cover unexpected
losses experienced by the District as a result of a disaster or
other unexpected loss. Any reimbursement received by the
District from insurance companies as a result of a submitted
claim shall be deposited back into the reserve as
replenishment for the loss.
5.1.3 Capital Replacement Reserve
A. Definition and Purpose – Established to provide funding for
general use on capital projects as well as capital repair and
replacement funding as the District’s infrastructure
deteriorates over its expected useful life. In addition, funding
is to provide for non-scheduled capital asset repair and
replacement and other capital related expenses.
B. Funding Level – The minimum target level for each reserve
fund is the current Fiscal Year capital budget and the
maximum is the current year plus 100% of the subsequent
Fiscal Year capital budget. The target levels in these reserve
funds will fluctuate depending on the capital improvement
plan and timing of the projects. Therefore, no target level will
be established. In the event these fund falls below the
minimum funding level, the Board will act to restore the
balance above the minimum funding level within twelve (12)
months from the date that the fund fell below the minimum
level.
C. Events or Conditions Prompting the Use of the Capital
Replacement Reserve – Through the annual budget
process, staff shall recommend anticipated asset
replacement and capital improvement projects. The Board of
Directors shall take action to approve recommended project
appropriations from the capital replacement reserve. Should
unplanned replacement be necessary during any fiscal year,
the Board of Directors may take action to amend the budget
and appropriate needed funds as required.
Levels Water Sewer
Minimum 5% 5%
Maximum 10% 10%
Levels Water Sewer
Minimum $5,813,701 $1,899,951
Maximum $11,627,401 $3,799,901
Levels Water Sewer
Minimum $6,327,500 $2,000,000
Maximum $14,555,738 $2,280,000
3010-005 Financial Reserves Policy Page 4 of 5
5.1.4 Rate Stabilization Reserve
A. Definition and Purpose – Established to assist in smoothing
out water rate increases. This reserve is governed by the
District’s bond covenants and funds deposited into this
reserve are treated as operating revenues in the fiscal year
designated by the District and will be treated as such in fiscal
years of such designation for the purposes of computing the
District's debt service coverage ratio.
B. Funding Level – Established at a minimum level of 5% and
maximum level of 20% of budgeted water sales for the
current fiscal year. The Board of Directors have the option of
funding the Rate Stabilization Reserve at a lower level.
C. Events or Conditions Prompting the Use of the Rate
Stabilization Reserve – The reserve can be used during any
year where other revenues are not sufficient to meet the
required debt service coverage ratio or when the maximum
level in the reserve is reached.
5.2 Board Designated Restricted Reserves
These are funds held to either satisfy limitations set by external requirements
established by creditors, grant agencies or law, or to Only be used for
Examples include stipulated bond covenants and reserves held with a fiscal
agent.
5.2.1 Conservation Reserve
A. Definition and Purpose – Established to provide funding for
District-wide conservation efforts.
B. Funding Level – Funding shall be established as the net
result of administrative penalties assessed less allowed
expenditures of each fiscal year.
C. Events or Conditions Prompting the Use of the Conservation
Reserve – This reserve may be used to fund district-wide
conservation efforts in relation to, but not limited to, salary
and related, maintenance, and material expenses for leak
detection, conservation efforts, and other allowable
expenses outside the normal cost of service for each fiscal
year.
Levels Water
Minimum 5%
Maximum 20%
Levels Water
Minimum $1,600,999
Maximum $6,403,997
Levels Water
Minimum $0
Maximum $104,000
3010-005 Financial Reserves Policy Page 5 of 5
5.2.2 Employee Liability Reserve
A. Definition and Purpose – The purpose is to cover
employees’ accrued vacation and other compensatory time
and to ensure the complete funding associated with the
liability incurred for employees whom have met the
requirements necessary for district paid health benefits at
retirement.
B. Funding Level – Funding for FY19 shall be established at a
minimum target level of $273,000.
C. Events or Conditions Prompting the Use of the Employee
Liabilities Reserve – This reserve may be used in the event
that operating funds are not adequate to meet vacation,
compensatory and sick time paid out or retiree medical cost
obligations within the current year.
Level Water
Target $273,000
ITEM NO. 8.4
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Delia Lugo, Finance Manager
Subject:Reimbursement of Costs Incurred Before Issuance of Tax-Exempt Obligations
for Funding of District's Capital Improvement Program
STAFF RECOMMENDATION:
That the Board of Directors approve Resolution No. 18-25 Regarding Intention to Issue Tax-Exempt
Obligations for the purpose of permitting the reimbursement of not to exceed $10,000,000 for
incurred costs related the current capital improvement program which ARE incurred before THE
ISSUANCE OF tax-exempt obligations.
DISCUSSION:
The District is currently undertaking its current capital improvement program on a pay-as-you-go
basis, and the costs therefore are being paid by the District from its water system reserve funds.
The District may elect to finance certain portions of its current capital improvement program from
tax-exempt obligations. Federal tax law allows the District to reimburse itself from proceeds of tax-
exempt obligations for capital costs that the District pays prior to the issuance of such tax-exempt
obligations. In order to reimburse itself, the Board of Directors must adopt a resolution stating its
intent to reimburse itself should tax-exempt obligations be issued.
Straddling Yocca Carlson & Rauth, the District's bond counsel, has worked with staff to prepare a
resolution permitting reimbursement of not to exceed $10,000,000 for costs related to the current
capital improvement program which are incurred before tax-exempt obligations, if any, are incurred.
Costs that are eligible for reimbursement must have been paid no more than six months before the
adoption of the resolution, and the reimbursement must occur within three years after the eligible
costs are paid. The foregoing limitations do not apply to "soft" costs such as preliminary studies
and reports.
Adoption of the reimbursement resolution: 1) does not obligate the Board to issue debt in the form
of tax-exempt obligations; 2) will allow for reimbursement of construction-related costs incurred by
the water system reserve funds should the Board decide to issue tax-exempt obligations.
ATTACHMENTS:
Name:Description:Type:
Resolution_No._18-25_-_Reimburse_CIP_Costs.docx Resolution Resolution
Resolution No. 18-25 Regarding Intention to Issue Tax-Exempt Obligations 1
RESOLUTION NO. 18-25
RESOLUTION OF THE BOARD OF DIRECTORS
OF THE YORBA LINDA WATER DISTRICT
REGARDING INTENTION TO ISSUE TAX-EXEMPT OBLIGATIONS
WHEREAS, the Yorba Linda Water District (the “District”) is a county water district that
is duly organized and existing under and pursuant to Division 12 of the
California Water Code (Section 30000 et seq.); and
WHEREAS, the District desires to finance the costs of acquiring, constructing and
installing certain public facilities and improvements related to its water
system, as provided in Exhibit A attached hereto and incorporated herein
(the “Project”); and
WHEREAS, the District intends to finance the acquisition, construction and installation
of the Project or portions of the Project with the proceeds of the sale of
obligations the interest upon which is excluded from gross income for
federal income tax purposes (the “Obligations”); and
WHEREAS, the District desires to pay certain costs with respect to the Project prior to
the issuance of the Obligations from available moneys of the District and
to reimburse itself for such costs from a portion of the proceeds of the sale
of the Obligations.
NOW, THEREFORE, the Board of Directors of the Yorba Linda Water District hereby
finds, determines, declares and resolves as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The District reasonably expects, and hereby states its intention, to
reimburse itself for Project costs incurred prior to the issuance of the
Obligations with proceeds of the Obligations. Exhibit A describes either
the general character, type, purpose, and function of the Project or the
fund or account from which Project costs are to be paid and the general
functional purpose of the fund or account.
SECTION 3. The reasonably expected maximum principal amount of the Obligations
that is anticipated to be used for such reimbursement is $10,000,000.
SECTION 4. Except as described in Section 8 below, this resolution is being adopted
not later than 60 days after the payment of the original expenditures (the
“Expenditures Date or Dates”).
SECTION 5. Except as described in Section 8 below, the expected date of issue of
the Obligations will be within 18 months of the later of: (a) the
Expenditure Date or Dates; or (b) the date that the Project is placed in
service; provided that the reimbursement may not be made more than
three years after the Expenditure Date or Dates.
Resolution No. 18-25 Regarding Intention to Issue Tax-Exempt Obligations 2
SECTION 6. Proceeds of the Obligations to be used to reimburse the District for
Project costs are not expected to be used, within one year of
reimbursement, directly or indirectly to pay debt service with respect to
any obligation (other than to pay current debt service coming due within
the next succeeding one year period on any tax-exempt obligation of the
District (other than the Obligations)) or to be held as a reasonably
required reserve or replacement fund with respect to an obligation of the
District or any entity related in any manner to the District, or to reimburse
any expenditure that was originally paid with the proceeds of any
obligation, or to replace funds that are or will be used in such manner.
SECTION 7. This resolution is consistent with the budgetary and financial
circumstances of the District as of the date hereof. No moneys from
sources other than the Obligations are, or are reasonably expected to
be, reserved, allocated on a long-term basis or otherwise set aside by
the District (or any related party) pursuant to their budget or financial
policies with respect to the Project costs. To the best of our knowledge,
this Board of Directors is not aware of the previous adoption of official
intents by the District that have been made as a matter of course for the
purpose of reimbursing expenditures and for which tax exempt
obligations have not been issued.
SECTION 8. The limitations described in Sections 4 and 5 above do not apply to: (a)
costs of issuance of the Obligations; (b) an amount not in excess of the
lesser of $100,000 or five percent (5%) of the proceeds of the
Obligations; or (c) any preliminary expenditures, such as architectural,
engineering, surveying, soil testing, and similar costs other than land
acquisition, site preparation, and similar costs incident to
commencement of construction, not in excess of twenty percent (20%)
of the aggregate issue price of the Obligations that finances the Project
for which the preliminary expenditures were incurred.
SECTION 9. This resolution is adopted as official action of the District in order to
comply with Treasury Regulation § 1.150-2 and any other regulations of
the Internal Revenue Service relating to the qualification for
reimbursement of District expenditures incurred prior to the date of issue
of the Obligations, is part of the District’s official proceedings, and will be
available for inspection by the general public at the main administrative
office of the District.
SECTION 10. This resolution shall take effect immediately.
Resolution No. 18-25 Regarding Intention to Issue Tax-Exempt Obligations 3
PASSED AND ADOPTED this 26th day of June 2018 by the following called vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Al Nederhood, President
Yorba Linda Water District
ATTEST:
Annie Alexander, Board Secretary
Yorba Linda Water District
Reviewed as to form by General Counsel:
Andrew B. Gagen, Esq.
Kidman Gagen Law LLP
A-1
EXHIBIT A
DESCRIPTION OF PROJECT
Upgrades, acquisitions, replacements, rehabilitation and construction of facilities
and equipment for the District’s water system, including but not limited to upgrades to
water storage reservoirs, pipeline replacements, pumping station improvements and
improvements to the District’s administrative headquarters facility.
ITEM NO. 8.5
AGENDA REPORT
Meeting Date: June 26, 2018 Budgeted:Yes
Total Budget:$7.8M
To:Board of Directors Cost Estimate:$7.3M
From:Marc Marcantonio, General
Manager
Job No:J2010-11B
Presented By:Rosanne Weston, Engineering
Manager
Dept:Engineering
Reviewed by Legal:No
Prepared By:Joe Polimino, Project Engineer CEQA Compliance:MND
Subject:Approval of Change Order Number 3 for the Fairmont Booster Pump
Station Upgrade Project
SUMMARY:
Work is proceeding on construction of the Fairmont Booster Pump Station
Upgrade Project. Submitted for consideration is construction Change Order No. 3. The Project is on
schedule and approximately 90% complete.
STAFF RECOMMENDATION:
That the Board of Directors approve Change Order No. 3 for $57,033.11 and 6 additional calendar
days to Pacific Hydrotech Corporation for construction of the Fairmont Booster Pump Station
Upgrade Project, Job No. 2010-11B.
DISCUSSION:
In accordance with the contract documents, Pacific Hydrotech Corporation has submitted Change
Order No. 3 due to plan omissions, clarifications and other additional work. A copy of Change
Order No. 3 is attached for your review. Specifically, the contractor has requested an increase of
$57,033.11 and a 6 calendar day extension for the project, for which, some of the more costly items
are described in detail below.
The approved plans call out for lath, paper and cement plaster to be installed at the roof soffit,
directly attached to the metal deck. Per MJ Plastering, this system cannot be attached directly
to the metal deck as it requires a backing material. Per clarification from the design engineer,
the sub contractor was directed to add exterior gypsum sheeting for the backing material. The
cost for this additional work is $6,161.45.
The project included a truck to truck base radio system to be provided and installed in the new
pump station. The contractor requested a clarification as to whether it should be analog or
digital. Operations staff, upon review of the proposed radio equipment, determined that more
research is necessary before proceeding since they may change to a digital radio system in
the future. As such, the base radio system was removed from the project. The credit for the
deletion of the radio system from the project is $28,518.00.
Existing defective valves prevented District crews from isolating a pipeline on schedule for a
tie-in. Contractor crews and equipment were on standby during this time, until the pipeline
could be isolated. The contractor submitted a cost for this delay in the amount of $8,615.21.
The contract specifications include motor operated hatches in the roof of the pump station for
replacement of the electric motors in the future. The contractor requested a clarification as the
wiring, conduit runs and switches for the hatches were not on the approved plans. The design
engineer confirmed that the details were not shown and provided additional details and
direction to complete the installation. The cost for this additional work is $24,847.54.
The contract specifications called for motor operated roll-up doors for the pump station. The
contractor requested clarification, since the wiring, conduit runs and switches for the doors
were not on the approved plans. The design engineer confirmed that the details were not
shown and provided additional details and direction to complete the installation. The cost for
this additional work is $9,670.85.
The contract documents required installation of an underground electrical conduit in Trentino
Lane to supply the new power transformer for the pump station. The approved plans called for
a typical pavement restoration of the trench, only. The City of Yorba Linda, however,
requested that the District grind & pave the entire street for the length of the trench as the
street had been recently repaved. This was estimated to cost approximately $65,000.00.
District staff met with City representatives to propose a less costly option to slurry seal the
street instead of a grind & pave. The City agreed to this restoration method. The cost for this
additional work is $19,755.75.
The status of the construction contract with Pacific Hydrotech Corporation is as follows:
The current contract is $7,240,566.28 and 815 calendar days.
If approved, Change Order No. 3 adds 6 calendar days to the project.
If approved, Change Order No. 3 adds $57,033.11 (a 0.8% construction cost increase) to the
project.
If approved, the revised construction contract is $7,297,599.39 and 821 calendar days. The
cumulative construction cost increase for CO#1, CO#2 and CO#3, if approved, would be
5.6%.
District staff have reviewed this change order request and recommend approval.
STRATEGIC PLAN:
SR 3-B: Continue Planning for Long Term Capital Improvements and Replacements into the future
PRIOR RELEVANT BOARD ACTION(S):
The Board authorized the President and Secretary to execute a construction agreement with Pacific
Hydrotech Corporation in the amount of $6,911,100.00 for the Fairmont Booster Pump Station
Upgrade Project, Job No. 2010-11b. The Board of Directors approved Change Order Number 1 in
the amount of $220,647.28 at the Board meeting held on September 26, 2017. The Board of
Directors approved Change Order Number 2 in the amount of $108,819.00 at the Board meeting
held on December 12, 2017.
ATTACHMENTS:
Name:Description:Type:
PHC_CO_3_Fairmont_PS.pdf Fairmont PS Change Order No. 3 Backup Material
YORBA LINDA WATER DISTRICT CHANGE ORDER NO. 3
DATE 6112118
Page 1 of 1
CONTRACT NAME: Fairmont Pump Station Upgrade CONTRACT AMT.: $7,240,566.28 DAYS: 815
CONTRACTOR: Pactfic Hyidrotech Corporation THIS CHANGE- $57,033.11 DAYS: 6
PROJECT NUMBER: 201011b
OWNER: Yorba Linda Water District REVISED CONTRACT AMT: $7,297,599.39 DAYS: 821
This Change Order covers changes to the subject contract as described herein.The Contractor shall construct,famish equipment and materials,and
perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and Yorba
Linda Water District otherwise referred to as Owner.
DESCRIPTION OF CHANGES +INCREASE CONTRACT
TIME
1OR +EXTENSION
—DECREASE IN [OR-
CONTRACT
OR-
CONTRACT REDUCTION
AMOUNT{$) (DAYS)
PCO 18-Adverse weather delay. 0 4
PCO 19-Detail A9045 in sheet GA-4 calls out cement plaster for the soffit with lath and
paper attached to the metal deck.This requires a backing material; per the design
engineer response,the contractor was directed to provide and install additional exterior $6,161.45 0
gypsum sheeting for the soffit.
PCO 21 -Credit to delete the truck to truck radio system from the project;YLW D is
reconsidering the type of radio system to use(digital or analog). $(28,518.130) 0
PCO 23—Un-anticipated tie-in delay,crews were unable to isolate the pipeline on time
for a scheduled tie-in due to defective valves;The contractor crews and equipment $8,615.21 0
were on standby during this time.
PCO 24-Existing 12"pipe-West of the new PS was at a lower elevation than shown in
contract drawings and was a different material; required additional pipe and fittings. $4,621.03 0
PCO 25-Motor operated hatches required per specification; however, switches,
conduit and wiring installation not shown on drawings.Added by design engineer $24,847.54 0
through RFI.
PCD 26-Electrical drawings did not show conduit and wiring required to motorize the
overhead rollup doors.Added by design engineer through RFI. $9,670.85 0
PCD 28-Provide/install 3 additional 20A circuit breakers and wiring into the MCC for
the exhaust fans.Add tags to the MCC for each circuit. $273.19 0
PCO 29-Contract drawings do not indicate any wiring to be installed for Pumps 7&8
between the soft starter and PLC for conduit 49C&50C;however it is required. $546.37 0
i PCD 30.1 -Additional wiring and breakers for SHGS unit. $647.78 0
PGO 31 -Adverse weather delay. 0 2
PCO 32-Addition of slurry coating for Trentino,requested by City Of YOrba Linda. $19,755.75 0
PCO 33-Conduit and wiring for relocation of exhaust fan in Chemical Room. $922.43 0
PCO 35-Manufacture and install mounting brackets for VFD controllers. $7,038.53 0
PCO 37-Addition of FRP grating for fan controller access. $2,450.98 0
NET CHANGE
$57,033.11 fi
REVISED CONTRACT AMOUNT AND TIME $7,297,593.39 821
The amount of the contract will be increased dasFeased by the sum of$57,033.11 and the contract time shall be increased decreased by 6
calendar days.The undersigned Contractor approves the foregoing Change Order as to the changes,if any,in the contract price specified
for each item including any and all supervision costs and other miscellaneous casts relating to the change in work,and as to the extension
of time allowed,if any,for completion of the entire work on account of said Change Order.The Contractor agrees to furnish all labor and
materials and perform all other necessary work,inclusive of that directly or indirectly related to the approved time extension,required to
complete the Change Order items.This dcoumen t will become a supplement of the contract and all provisions will apply hereto.It is
understood that the Change Order shall be effective when approved by the Owner. This Change Order constitutes full,final,and complete
compensation to the Contractor for all costs,expenses,overhead,profit,and any damages of every kind that the Contractor may Incur in
connection with the above referenced changes in the work,including any impact on the referenced work of any other work under the
contract,any changes in the sequences of any work,any delay to any work,any disruption of any work,any rescheduling of any work,and
any other effect on any cf the work under this contract.By the execution of the Change Order,the Contractor accepts the contract price
change and the contract completion date change,If any,and expressly waives any claims for any additional compensation,damages or
time extensions,in connection wi a above r rented changes.
RECOMMENDED: �� /ENGINEER OR DATE:
CONSULTANT .
j lapllRllnP
Construction Supervisor,YLWD
ACCEPTED: ICDATE:
DNTRACTDR
Kirk Harps
ciffe Hydrotech Corporation
APPROVED: f r DATE:
/OWNER
Rosanne Weston f
Engineering Manager,YLWD
ITEM NO. 9.2
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Saira Hernandez, Accountant
Subject:Budget to Actual Reports for the Month Ending May 31, 2018
DISCUSSION:
For the month ending May 31, 2018, staff is presenting Budget to Actual reports for the District as a
whole, as well as the individual water and sewer funds.
Cumulative Volumetric Water Revenue, as reported through the month ending May 31, 2018,
reflects an average increase of 17.53% as compared to the prior year for the same reporting
period. Landscape classified customer connections are now the largest increase in consumption
sales of 26.08% as compared to reported results from the prior year.
Total Variable Costs results reflect a 19.78% increase when compared to prior year for the same
reporting period. The increase in costs is reflective of the increase in water demand which is 12.1%
ahead of projected budget. While Supplies & Services within the Water Department have decreased
by 6.59%, as to the prior year.
STRATEGIC PLAN:
FR 1-F: Continue to Record and Report the Fairly Stated Financial Activities of the District in a
Timely and Transparent Manner to the Board of Directors and Member Agencies
ATTACHMENTS:
Name:Description:Type:
Budget_to_Actual_Rpt_May_18.pdf Backup Material Backup Material
FY18 Annual
Budget
YTD Actuals thru
May 2018
YTD % of
Budget
Water Revenue (Residential)14,278,688$ 14,187,504$ 99.36%
Water Revenue (Commercial & Fire Det.)2,071,031$ 1,737,952$ 83.92%
Water Revenue (Landscape/Irrigation)3,079,054$ 3,661,443$ 118.91%
Service Charges 10,106,238$ 9,168,008$ 90.72%
Other Operating Revenue 769,106$ 664,732$ 86.43%
Total Operating Revenue 30,304,117$ 29,419,638$ 97.08%
Revenue (Non-Operating):
Interest 275,000$ 394,909$ 143.60%
Property Taxes 1,710,000$ 1,717,182$ 100.42%
Other Non-Operating Revenue 604,646$ 355,229$ 58.75%
Total Non-Operating Revenue 2,589,646$ 2,467,320$ 95.28%
Total Revenue 32,893,763$ 31,886,959$ 96.94%
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)
Water-Related Costs 11,240,088$ 11,791,090$ 104.90%
Fixed Costs 1,443,355$ 766,927$ 53.14%
Power-Related Costs 1,285,413$ 1,028,123$ 79.98%
Variable Water Costs Related Expenses Total 13,968,855$ 13,586,140$ 97.26%
Salary Related Expenses 8,859,867$ 7,943,171$ 89.65%
Reduction for Capital Project Labor (215,000)$ (217,461)$ 101.14%
Salary Related Expenses Total 8,644,867$ 7,725,710$ 89.37%
Supplies & Services
Communications 189,565$ 125,971$ 66.45%
Contractual Services 519,653$ 380,409$ 73.20%
Data Processing 235,322$ 174,858$ 74.31%
Dues & Memberships 80,492$ 77,414$ 96.18%
Fees & Permits 264,641$ 214,216$ 80.95%
Insurance 263,506$ 229,251$ 87.00%
Materials 797,347$ 663,933$ 83.27%
District Activities, Emp Recognition 22,506$ 23,742$ 105.49%
Maintenance 339,342$ 362,904$ 106.94%
Non-Capital Equipment 104,678$ 103,589$ 98.96%
Office Expense 39,662$ 33,372$ 84.14%
Professional Services 650,108$ 557,212$ 85.71%
Training 61,728$ 26,660$ 43.19%
Travel & Conferences 102,493$ 58,607$ 57.18%
Uncollectible Accounts 17,205$ 4,131$ 24.01%
Utilities 158,100$ 154,900$ 97.98%
Vehicle Expenses 286,812$ 233,325$ 81.35%
Supplies & Services Sub-Total 4,133,160$ 3,424,494$ 82.85%
Total Operating Expenses 26,746,883$ 24,736,343$ 92.48%
Expenses (Non-Operating)
Other Expense 15,220$ (52,670)$ -346.06%
Total Non-Operating Expenses 15,220$ (52,670)$ -346.06%
Total Expenses 26,762,103$ 24,683,673$ 92.23%
Net Revenues 6,131,661$ 7,203,286$ 117.48%
Less: Debt Service (Principal & Interest)2,729,799$ 2,729,799$ 100.00%
Less: Committed Capital Expenditures (PayGo)2,635,755$ 2,086,674$ 79.17%
Less: Special Item - Conservation Credit 1,105,809$ 0.00%
Less: Special Item - Rate Credit -$ 1,100,038$ 0.00%
Transfer to/(from) Reserves 766,107$ 180,966$ 23.62%
Net -$ -$
Yorba Linda Water District
Water Enterprise
FY18 ProForma - Use of Funds
May 2018
1
Yorba Linda Water District
Summary Financial Report
Water & Sewer Funds
For Period Ending May 31, 2018
Annual YTD May YTD YTD Actual Prior Year Prior Year YTD Actual YTD Actual
Budget Budget Actual Actual (Under) Over May. Actual Actual (thru vs vs
FY18 FY18 FY18 FY18 YTD Budget FY17 May. 2017)PY Actual $PY Actual %
Revenue (Operating):
Water Revenue (Residential)$14,278,688 $12,859,386 1,540,174$ 14,187,504$ 1,328,118$ $1,215,667 $11,921,151 $2,266,353 19.01%
Water Revenue (Commercial & Fire Det.)2,071,031 1,865,171 174,263 1,737,952 (127,219)147,883 1,616,728 121,224 7.50%
Water Revenue (Landscape/Irrigation)3,079,054 2,772,996 425,085 3,661,443 888,447 300,691 2,904,153 757,290 26.08%
Water Revenue (Service Charge)10,106,238 9,264,052 835,761 9,168,008 (96,044)830,953 9,287,996 (119,989)-1.29%
Sewer Charge Revenue 2,032,245 1,862,891 174,167 1,881,676 18,785 157,359 1,713,891 167,785 9.79%
Locke Ranch Assessments 223,000 200,834 1,905 261,978 61,144 7,123 214,785 47,193 0.00%
Other Operating Revenue 866,161 793,981 83,657 740,122 (53,859)91,053 796,456 (56,334)-7.07%
Total Operating Revenue:32,656,417 29,619,310 3,235,012 31,638,683 2,019,372 2,750,729 28,455,160 3,183,523 11.19%
Revenue (Non-Operating):
Interest 310,000 284,167 58,032 453,401 169,234 30,285 309,574 143,827 46.46%
Property Tax 1,710,000 1,540,026 58,402 1,717,182 177,156 52,159 1,641,903 75,279 0.00%
Other Non-Operating Revenue 624,521 572,478 68,093 337,697 (234,780)67,999 448,775 (111,078)-24.75%
Total Non-Operating Revenue:2,644,521 2,396,670 184,527 2,508,280 111,610 150,443 2,400,252 108,028 4.50%
Total Revenue 35,300,938 32,015,981 3,419,539 34,146,963 2,130,982 2,901,172 30,855,412 3,291,550 10.67%
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)13,968,855 12,585,112 1,311,137 13,586,140 1,001,028 1,172,025 11,342,351 2,243,789 19.78%
Salary Related Expenses 9,643,124 9,399,547 985,338 8,650,100 (749,447)612,917 7,853,553 796,546 10.14%
Supplies & Services 4,621,895 4,107,547 347,317 3,799,308 (308,239)393,527 4,039,561 (240,253) -5.95%
Total Operating Expenses 28,233,874 26,092,206 2,643,792 26,035,548 (56,659)2,178,469 23,235,465 2,800,083 12.05%
Expenses (Non-Operating):
Interest on Long Term Debt 1,489,796 1,354,711 115,401 1,256,752 (97,959) (6,609) 1,331,597 (74,845) -5.62%
Other Expense 15,220 9,452 451 (54,785) (64,236)(9,666) (43,614)(11,171) 25.61%
Total Non-Operating Expenses:1,505,016 1,364,162 115,852 1,201,967 (162,195) (16,275)1,287,983 (86,016) -6.68%
Total Expenses 29,738,890 27,456,369 2,759,644 27,237,515 (218,854)2,162,195 24,523,448 2,714,067 11.07%
Net Position Before Capital Contributions 5,562,048 4,559,612 659,895 6,909,448 2,349,836 738,978 6,331,964 577,484 9.12%
Special Item - (2,205,847) (2,205,847) - - (2,205,847) 0.00%
Capital Contributions (Non-Cash Transaction -- - 101,952 3,549,269 3,549,269 856,941 2,261,976 1,287,293 0.00%
GASB 34 Compliant)
Net Position Before Depreciation 5,562,048 4,559,612 761,847 8,252,870 8,104,951 1,595,919 8,593,940 (341,070)-3.97%
Depreciation & Amortization 7,182,000 6,583,500 629,748 6,840,715 257,215 597,897 6,545,413 295,302 4.51%
Total Net Position ($1,619,952)($2,023,888)132,099 1,412,155 $7,847,736 $998,022 $2,048,527 ($636,372)-31.06%
(31,422) (239,378) (239,378) (31,152)(212,848) (26,530) 12.46%
(With May 31, 2017 for comparison purposes)
2
Annual YTD May YTD YTD Actual Prior Year Prior YTD YTD Actual YTD - CUR
Budget Budget Actual Actual (Under)Over May. Actual Actual (thru vs vs
FY18 FY18 FY18 FY18 YTD Budget FY17 May 2017) PY Actual $PY Actual %
Revenue (Operating):
Water Revenue (Residential)$14,278,688 $12,859,386 1,540,174$ 14,187,504$ 1,328,118$ $1,215,667 $11,921,151 $2,266,353 19.01%
Water Revenue (Commercial & Fire Det.)2,071,031 $1,865,171 174,263 1,737,952 (127,219) 147,883 1,616,728 121,224 7.50%
Water Revenue (Landscape/Irrigation)3,079,054 $2,772,996 425,085 3,661,443 888,446 300,691 2,904,152 757,291 26.08%
Water Revenue (Service Charge)10,106,238 9,264,052 835,761 9,168,008 (96,044) 830,953 9,287,996 (119,988) -1.29%
Other Operating Revenue 769,106 705,014 70,988 664,732 (40,282) 84,539 701,920 (37,188) -5.30%
Total Operating Revenue:30,304,117 27,466,618 3,046,271 29,419,638 1,953,020 2,579,733 26,431,947 2,987,691 11.30%
Revenue (Non-Operating):
Interest 275,000 252,083 54,423 394,909 142,826 28,097 277,106 117,803 42.51%
Property Tax 1,710,000 1,540,026 58,402 1,717,182 177,156 52,159 1,641,903 75,279 4.58%
Other Non-Operating Revenue 604,646 554,259 65,911 355,229 (199,029) 60,775 369,061 (13,832) -3.75%
Total Non-Operating Revenue:2,589,646 2,346,368 178,736 2,467,320 120,952.23 141,031 2,288,070 179,251 7.83%
Total Revenue 32,893,763 29,812,986 3,225,007 31,886,959 2,073,972 2,720,764 28,720,017 3,166,941 11.03%
Expenses (Operating):
Variable Water Costs (G.W., Import & Power)13,968,855 12,585,113 1,311,137 13,586,140 1,001,027 1,172,025 11,342,351 2,243,789 19.78%
Salary Related Expenses 8,644,867 8,443,205 888,282 7,725,710 (717,496) 541,171 6,995,039 730,671 10.45%
Supplies & Services:
Communications 189,565 149,268 16,146 125,971 (23,297) 10,154 140,450 (14,479) -10.31%
Contractual Services 499,653 428,015 53,329 380,409 (47,606) 26,918 356,981 23,428 6.56%
Data Processing 235,322 200,712 23,458 174,858 (25,854) 48,852 234,830 (59,972) -25.54%
Dues & Memberships 80,492 80,492 603 77,414 (3,078) 7,031 85,323 (7,909) -9.27%
Fees & Permits 264,641 242,588 9,973 214,216 (28,372) 8,490 211,547 2,668 1.26%
Board Election - - - - - - 120,873 (120,873) -100.00%
Insurance 263,506 237,047 21,558 229,251 (7,796) 19,754 219,044 10,207 4.66%
Materials 797,347 710,901 62,887 663,933 (46,969) 86,161 795,819 (131,886) -16.57%
District Activities, Emp Recognition 27,506 25,214 6,896 23,742 (1,472) 380 6,770 16,972 250.70%
Maintenance 339,342 339,342 9,928 362,904 23,562 44,006 356,477 6,427 1.80%
Non-Capital Equipment 114,678 109,622 5,807 103,589 (6,033) 10,455 144,665 (41,076) -28.39%
Office Expense 39,662 36,357 2,565 33,372 (2,985) 1,630 28,765 4,607 16.02%
Professional Services 650,108 580,932 44,077 557,212 (23,720) 44,050 480,389 76,823 15.99%
Training 61,728 41,584 (10) 26,660 (14,924) 1,018 43,798 (17,139) -39.13%
Travel & Conferences 107,493 73,535 7,302 58,607 (14,928) 5,391 41,468 17,139 41.33%
Uncollectible Accounts 17,205 10,271 1,404 4,131 (6,140) 459 7,343 (3,212) -43.74%
Utilities 158,100 155,925 12,831 154,900 (1,025) 22,628 130,207 24,693 18.96%
Vehicle Equipment 286,812 250,411 43,090 233,325 (17,086) 26,319 261,254 (27,929) -10.69%
Supplies & Services Sub-Total 4,133,160 3,672,216 321,844 3,424,494 (247,723) 363,698 3,666,005 (241,511) -6.59%
Total Operating Expenses 26,746,883 24,700,534 2,521,263 24,736,343 35,809 2,076,894 22,003,395 2,732,948 12.42%
Expenses (Non-Operating):
Interest on Long Term Debt 1,489,796 1,354,711 115,401 1,256,752 (97,959) (6,609) 1,331,597 (74,845) -5.62%
Other Expense 15,220 9,452 451 (52,670) (62,121) (9,666) (50,922) (1,747) 3.43%
Total Non-Operating Expenses:1,505,016 1,364,162 115,852 1,204,082 (160,080) (16,275)1,280,675 (76,593) -5.98%
Total Expenses 28,251,899 26,064,696 2,637,115 25,940,426 (124,271) 2,060,619 23,284,070 2,656,356 11.41%
Net Position Before Capital Contributions 4,641,864 3,748,290 587,892 5,946,533 2,198,243 660,145 5,435,947 510,586 9.39%
Special Item - - (2,205,847) (2,205,847) - (2,205,847) 0.00%
Capital Contributions (Non-Cash Transaction -- - 60,139 1,907,644 1,907,644 492,520 1,325,532 582,112 43.92%
GASB 34 Compliant)
Net Position Before Depreciation 4,641,864 3,748,290 648,031 5,648,330 6,311,734 1,152,665 6,761,479 3,298,544 48.78%
Depreciation & Amortization 5,832,000 5,346,000 514,790 5,587,608 241,608 485,996 5,320,861 266,747 5.01%
Total Net Position (1,190,136) (1,597,710) 133,241 60,722 6,070,125 666,669 1,440,618 3,031,797 210.45%
Capital - Direct Labor (27,507) (217,461) (217,461) (29,477)(197,547)(19,914) 10.08%
Yorba Linda Water District
Water Fund
For Period Ending May 31, 2018
(With May 31, 2017 for comparison purposes)
3
Annual YTD May YTD YTD Actual Prior Year Prior Year YTD Actual YTD - CUR
Budget Budget Actual Actual (Under)Over May. Actual Actual (thru vs vs
FY18 FY18 FY18 FY18 YTD Budget FY17 May 2017)PY Actual $PY Actual %
Revenue (Operating):
Sewer Charge Revenue $2,032,245 $1,862,891 174,167$ 1,881,676$ $18,784 $157,359 $1,713,891 $167,784 9.79%
Locke Ranch Assessments 223,000 200,834 1,905 261,978$ 61,144 7,123 214,785 47,193 0.00%
Other Operating Revenue 97,055 88,967 12,669 75,390$ (13,576)6,514 94,536 (19,145) -20.25%
Total Operating Revenue:2,352,300 2,152,692 188,741 2,219,044$ 66,352 170,996 2,023,212 195,832 9.68%
Revenue (Non-Operating):
Interest 35,000 32,083 3,609 58,493$ 26,410 2,188 32,468 26,025 80.16%
Other Non-Operating Revenue 19,875 18,218 2,183 (17,532)$ (35,750)7,224 79,714 (97,246)-121.99%
Total Non-Operating Revenue:54,875 50,302 5,792 40,961$ (9,341)9,412 112,182 (71,221) -63.49%
Total Revenue 2,407,174 2,202,993 194,533$ 2,260,005$ 57,011 180,408 2,135,394 124,611 5.84%
Expenses (Operating):
Salary Related Expenses 998,257 956,342 97,056 924,390 (31,952)71,746 858,514 65,876 7.67%
Supplies & Services:
Communications 12,010 11,009 1,215 7,698 (3,311)764 8,107 (408)-5.03%
Contractual Services 28,237 25,884 3,726 28,068 2,184 2,026 25,695 2,374 9.24%
Data Processing 15,078 13,822 1,766 13,100 (721)3,677 17,660 (4,560)-25.82%
Dues & Memberships 6,053 5,549 45 5,984 435 529 6,594 (610)-9.26%
Fees & Permits 17,474 16,018 672 9,988 (6,030)537 13,679 (3,691)-26.99%
Board Election - - - - - - 9,098 (9,098)-100.00%
Insurance 19,834 18,181 1,623 17,144 (1,037)1,487 16,207 937 5.78%
Materials 51,653 44,849 4,844 37,995 (6,854)1,869 24,104 13,891 57.63%
District Activities, Emp Recognition 1,694 1,553 519 1,777 224 29 510 1,268 248.79%
Maintenance 170,559 146,346 747 111,319 (35,027)1,410 125,750 (14,432)-11.48%
Non-Capital Equipment 20,147 18,468 351 18,977 509 4,339 20,156 (1,179)-5.85%
Office Expense 2,963 2,716 193 2,474 (243)123 2,165 308 14.24%
Professional Services 40,417 34,549 1,889 30,588 (3,961)2,202 19,339 11,249 58.17%
Training 6,782 6,217 (22) 4,969 (1,247)386 5,641 (672)-11.91%
Travel & Conferences 12,752 9,689 533 4,373 (5,316)306 2,619 1,755 67.00%
Uncollectible Accounts 1,295 1,187 182 452 (734)100 1,294 (842)-65.04%
Utilities 12,600 11,550 1,021 12,180 630 1,762 10,300 1,880 18.25%
Vehicle Equipment 69,188 67,746 6,168 67,728 (18)8,283 64,636 3,092 4.78%
Supplies & Services Sub-Total 488,735 435,331 25,472 374,814 (60,517) 29,829 373,554 1,260 0.34%
Total Operating Expenses 1,486,991 1,391,673 122,528 1,299,204 (92,469) 101,575 1,232,068 67,136 5.45%
Expenses (Non-Operating):
Interest Expense - - - - - - - - -
Other Expense - - - (2,116) (2,116) - 7,308 (9,424) -
Total Non-Operating Expenses:- - - (2,116) (2,116) - 7,308 (9,424) 0.00%
Total Expenses 1,486,991 1,391,673 122,528 1,297,088 (94,585) 101,575 1,239,376 57,712 4.66%
Net Position Before Capital Contributions 920,183 811,321 72,005 962,917 151,596 78,833 896,018 66,898 7.47%
Capital Contributions (Non-Cash Transaction -- - 41,813 1,641,626 1,641,626 364,421 936,444 705,182 75.30%
GASB 34 Compliant)
Net Position Before Depreciation 920,183 811,321 113,818 2,604,543 1,793,222 443,254 1,832,462 772,080 42.13%
Depreciation & Amortization 1,350,000 1,237,500 114,958 1,253,106 15,606 111,900 1,224,552 28,554 2.33%
Total Net Position (429,817) (426,179) (1,140) 1,351,437 1,777,616 331,354 607,910 743,526 122.31%
Capital - Direct Labor (3,915) (21,917)(21,917) (1,675) (15,301)(6,616)43.24%
Yorba Linda Water District
Sewer Fund
For Period Ending May 31, 2018
(With May 31, 2017 for comparison purposes)
4
$3,408,424 $3,974,626 $4,590,888
$9,502,713 $9,287,996 9,168,008$1,735,799 $1,815,129 $1,775,738
$1,540,516 $1,616,731 1,737,952
$3,744,961
$4,099,389 $3,825,996
$2,357,635 $2,904,153 3,661,443
$15,556,763
$15,278,651 $15,527,128
$11,039,022
$11,921,152
$14,187,504
$24,445,947 $25,167,795 $25,719,750
$24,439,886
$25,730,032
11.76%increase
compared to FY17
$28,754,906
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
FY13 FY14 FY15 FY16 FY17 FY18
Water Revenue Comparison by Fiscal Year
Water Revenue (Service Charge) Water Revenue (Commercial & Fire Det.) Water Revenue (Landscape/Irrigation) Water Revenue (Residential)Total
5
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
FY16 FY17 FY18 FY16 FY17 FY18 FY16 FY17 FY18 FY16 FY17 FY18 FY16 FY17 FY18 FY16 FY17 FY18
DECEMBER JANUARY FEBRUARY MARCH APRIL MAY
52,187
41,197
49,277
32,674
29,725
42,840
38,242
40,920
48,163
47,183
38,942
39,778
41,245
51,279
38,906 45,370
47,552
65,973
98,164
62,133
100,928
35,714
17,947
88,221
39,778
15,732
92,152
67,844
36,200
70,377
62,581
100,176
64,775 80,331
114,809
171,732
CONSUMPTION BY UNITS CCF
Residential Commercial Landscape
6
Rainfall and ETO
80.00 1.00
70.00 0.90
0.80
60.00
0.70
Q 50.00 0.60
ai aj
E 40.00 0.50
0.40
> 30.00
0.30
20.00
0.20
10.00 0.10
0.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.00
M M M r
-I N M 4 of lfl I-� ob c 1 O rl N M lD I , ob c 1 O .-I N M 4 L� l6 I-� ob 01 O .�
r-1 r-1 r-I r-I r-1 r-1 r-1 r-I r-1 r1 N N N N N N N N N N M M
Groundwater OC-36 Import Water Consumption ETo -----• Rainfall
7
Volume, AF
F� N W 4�- (-n 00
O O O O O O O O O
O O O O O O O O O
O O O O O O O O O
1-May /
2-May Wbu
3-May
� 4-May �
0 5-May
Q 6-May
v �
rD 7-May .,
8-May
' 9-May
O 10-May
L; 11-May
rn
12-May —
r 13-May
14-May
N
0 15-May
16-May '- fI
17-May
m
18-May
I19-May
r)
20-May
21-May
3 22-May
0 23-May
24-May
25-May
26-May
rD
3 27-May
28-May J
v
29-May
rD
30-May
31-May
O I-' N W U'1 Ql �I 00 lD
O O O O O O O O O O O
O O O O O O O O O
O
Temperature, degrees Fahrenheit
00
2,000,000
Variable Costs Analysis
1,800,000 1,731,774 tFY16 Var Costs FY17 Var Costs FY18 Var Costs
1,600,000 1,558,819
480,644 1,494,257
1,400,000 1,334,196 1,315,490
1,286,441 1,306,850
1,365,473
1,169,408 1,119,2 1,142,643 1,175,886 , 72,025
1,200,000 1,262,157 11112,623
1, 7,830
80,285 994,574983,949
1,000,000 825,222 59,213
,90
903,666 411,046,81 914 863,62 911,292
■ 822,103
800,000 922,987
560,947 630,173 763,420
600,000
400,000 472,129 471,647 470,437
200,000
0
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
(includes 100%of Annual Connection Expensed in July)
9
Water Revenues & Expenses - May
$35,000,000 (excludes Depreciation, Special Items, and Contributed Capital )
$31,886,959
11.03
$30,000,000 - $29,359,511 $28,720,017
$28,137,404 $27,806,163
$25,000,000
$25,940,426
$23,472,029 11.41
$22,898,104 $23,284,070
$20,000,000 $21,316,685
$15,000,000
$10,000,000
$5,000,000
$-
May.2014 May.2015 May.2016 May.2017 May.2018
Total Revenue f Total Expenses
10
Sewer Revenues & Expenses - May
$2,500,000 - (excludes Depreciation, Special Items, and Contributed Capital) $2,260,005
5.84%
$2,135,394
$2,000,000 -
$1,871,078
$1,765,580 $1,732,943
$1,500,000 -
$1,297,088
$1,154,471 $1,239,376 4.66%
$1,000,000 - $1,114,629 $1,082,998
$500,000
$-
May. 2014 May. 2015 May. 2016 May. 2017 May. 2018
Total Revenue f Total Expenses
11
ITEM NO. 9.3
AGENDA REPORT
Meeting Date: June 26, 2018
To:Board of Directors
From:Marc Marcantonio, General
Manager
Presented By:Delia Lugo, Finance Manager Dept:Finance
Prepared By:Saira Hernandez, Accountant
Subject:Cash and Investment Report for Period Ending May 31, 2018
SUMMARY:
Government Code Section 530607, et. seq., requires the person delegated to invest funds to make
monthly report of investments to the legislative body.
DISCUSSION:
The Cash & Investment Portfolio Report presents the market value and percent yield for all District
investments by institution. The Cash & Investment Summary Report includes budget and actual
interest and average term portfolio information as well as market value broken out by reserve
categories. The Fair Value Measurement Report categorizes investments with the fair value
hierarchy established by generally accepted accounting principles. The Acquisition Fund Graph
provides a reconciliation of the Bond Proceeds for the Construction of the Fairmont Booster Pump
Station. The Unrestricted Reserves and Days in Cash Graph presents Water Unrestricted Reserve
Balances and Days in Cash at a particular point in time for the last four years.
The average portfolio yield for the month ending May 31, 2018 is 2.07%.
The overall increase in the investment balance from the previous month is approximately $165,897.
Balance includes an increase in the Water Operating Fund of $282,166 and Sewer Operating Fund
of $45,978 due to a positive net effect between operating revenues and expenses through the
reporting month. While the Restrictive 2017A Acquisition Fund decreased by $200,808 to pay
Fairmont Booster Pump Station capital project costs.
STRATEGIC PLAN:
FR 1-F: Continue to Record and Report the Fairly Stated Financial Activities of the District in a
Timely and Transparent Manner to the Board of Directors and Member Agencies
ATTACHMENTS:
Name:Description:Type:
Cash_and_Invest_Rpt_May_18.pdf Backup Material Backup Material
Market %Date of Percent
Value Par of Total Institution Maturity Yield
Checking Account:
411,186$ 411,186$ Wells Fargo Bank
411,186$ 411,186$ 1.15%Total 0.00%
Money Market Accounts:
97,296$ 97,296$ US Bank (Revenue Bonds)1.33%
3,502,445 3,502,394 US Bank (Money Market)1.61%
244,985 247,599 Public Agency Retirement Svcs. (PARS)
253,920 253,920 Bank of the West 0.44%
4,098,646$ 4,101,209$ 11.43%Total 1.43%
Federal Agency Securities:
499,870$ 500,000$ Federal Home Loan Bank 06/12/18 1.00%
499,875 500,000 Federal Home Loan Bank 06/13/18 1.10%
999,745$ 1,000,000$ 2.79%Total 1.05%
Certificates of Deposits:
197,842$ 200,000$ World's Foremost Bk Sydney 05/28/19 1.31%
245,830 248,000 Capital One Bk USA Natl Assn 05/13/19 1.21%
238,920 249,000 Comenity Cap Bk Salt Lake City 06/30/21 1.72%
239,903 248,000 EnerBank USA Salt Lake City 08/26/20 1.34%
244,173 248,000 EverBank Jacksonville Fla CTF 08/30/19 1.17%
177,404 180,000 HSBC BK USA, NA MC Clean CTF 08/31/21 1.27%
236,500 248,000 Wells Fargo Bank NA Sioux Falls D 08/31/21 1.68%
239,627 247,000 PrivateBank & Tr Chicago Ill CTF 03/30/22 2.27%
243,793 249,000 JP Morgan Chase Bk NA Columbus 03/31/22 2.50%
2,063,993.74$ 2,117,000$ 5.76%Total 1.63%
Pooled Investment Accounts:
9,245,304$ 9,245,304$ Local Agency Investment Fund 1.76%
1,330,545 1,332,054 CalTRUST Short Term 2.06%
17,701,196 17,958,028 CalTRUST Medium Term 2.54%
28,277,044$ 28,535,386$ 78.87%2.26%
35,850,615$ 36,164,781$ 100%Total Investments 2.07%
Per Government Code requirements, the Investment Report is in compliance with the Yorba
Linda Water District's Investment Policy, and there are adequate funds available to meet
budgeted and actual expenditures for the next six months.
5/31/18
Yorba Linda Water District
Cash & Investment Portfolio Report
May 31, 2018
________________________________
Saira Hernandez, Accountant
1
Below is a chart summarizing the yields as well as terms and maturities for the month of May 2018:
Average # of
Month Portfolio Days to
of 2018 Yield Maturity
May 2.07%78
Below are charts comparing operating fund interest for current and prior fiscal years.
Actual Interest 5/31/2017 5/31/2018
Monthly - May 30,285$ 58,032$
Year-to-Date 309,574$ 453,401$
Budget 2016/2017 2017/2018
Interest Budget, May YTD 105,417$ 284,167$
Interest Budget, Annual 115,000$ 310,000$
Interest earned on investments is recorded in the fund that owns the investment.
The distribution of investments in the portfolio both in dollars and as a percentage of the total portfolio by funds
is as follows:
The table below displays the District's Cash and Investment balance of $35.8 million which is allocated between the established
reserve funds, Wells Fargo Checking Account, and the restricted funds held at U.S. Bank for the construction of the Fairmont Booster
Pump Station. The number of Days in Cash are 396 for the Un-Restricted Water Reserve balance and 1,369 for the Un-Restricted Sewer
Reserve balances, as of May 31, 2018.
FY18 Reserve Cash and
Requirements Investments
April 2018 % Alloc May 2018 % Alloc "Target Available for
Fund Description Balance 4/30/2018 Balance 5/31/2018 Levels"CY Obligations
Water Operating Reserve 13,778,816$ 39.26%14,436,563$ 41.13%9,459,287$ 4,977,276$
Water Emergency Reserve 6,887,135 19.62%6,902,022 19.67%7,790,359 (888,337)
Water Capital Project Reserve 4,014,152 11.44%3,714,665 10.58%5,716,336 (2,001,671)
Rate Stabilization Reserve 3,940,749 11.23%3,951,276 11.26%3,957,692 (6,416)
Un-Restricted Water Reserve Balance 28,620,852 29,004,527 26,923,674 2,080,853
Conservation Reserve 105,635 0.30%105,635 0.30%- 105,635
Employee Liability Reserve 409,991 1.17%409,991 1.17%272,054 137,937
Restricted Reserve Balance 515,627 515,627 272,054 243,573
Sewer Operating Reserve 1,327,849 3.78%1,498,161 4.27%498,142 1,000,019
Sewer Emergency Reserve 2,556,902 7.29%2,559,148 7.29%2,545,934 13,214
Sewer Capital Project Reserve 1,516,350 4.32%1,519,686 4.33%1,519,358 328
Un-Restricted Sewer Reserve Balance 5,401,102 5,576,995 4,563,434 1,013,561
Total Reserve Balances 34,537,581$ 98.41%35,097,149$ 100.00%31,759,162$ 3,337,987$
Water Operating 475,731 407,541
Sewer Operating 127,978 3,645
603,709 411,186
Revenue Bond 2017A-Acquisition Fund 297,956 97,124
Rev. Bond 2017A-Principal & Interest 148 172
Public Agency Retirement Svc. -PARS (Restricted)245,324 244,985
Total Cash and Investments 35,684,718$ 35,850,615$
Cash & Investment Summary Report
Cash & Investment Summary Comparison Between Current and Previous Month
Wells Fargo Bank Checking
US Bank Held (Restricted)
2
Checking Account:411,186$ 1.15%
Money Market Accounts:4,098,646$ 11.43%
Federal Agency Securities:999,745$ 2.79%
Certificates of Deposit:2,063,994$ 5.76%
Pooled Investment Accounts:28,277,044$ 78.87%
Total 35,850,615$ 100.00%
Checking
1.70%Money Market
2.95%
Fed Agency Securities
2.80%
Certificate of Deposit(s)
14.85%
Pooled Accounts -(LAIF &
CalTurst)
77.70%
Investment Balances (as of 5-31-2018)
3
Yorba Linda Water District
Fair Value Measurement Report
May 31, 2018
Quoted Observable Unobservable
Prices Inputs Inputs
Investments Level 1 Level 2 Level 3 Total
CalTRUST Investment Pool -$ 19,031,741$ -$ 19,031,741$
Local Agency Investment Fund - 9,245,304 - 9,245,304
U.S. Government Sponsored
Agency Securities - 999,745 - 999,745
Negotiable Certificates of Deposit - 2,063,994 - 2,063,994
Total Investments -$ 31,340,783$ -$ 31,340,783$
4
$-
$518,312.00
$410,496.57
$334,766.57
$138,158.15
$302,184.58
$436,809.05
$770,131.32
$867,848.92
$853,705.36
$360,606.98
$431,770.53
$277,253.74
$200,832.12
$6,000,000.00
$5,481,688.00
$5,071,191.43
$4,736,424.86
$4,598,266.71
$4,296,082.13
$3,859,273.08
$3,089,141.76
$2,221,292.84
$1,367,587.48
$1,006,980.50
$575,209.97
$297,956.23
$97,124.11
$- $1,000,000.00 $2,000,000.00 $3,000,000.00 $4,000,000.00 $5,000,000.00 $6,000,000.00 $7,000,000.00
May 11, 2017
May 2017
June 2017
July 2017
Aug. 2017
Sept. 2017
Oct. 2017
Nov. 2017
Dec. 2017
Jan. 2018
Feb. 2018
Mar. 2018
Apr. 2018
May 2018
U.S. Bank Held Restricted 2017A Acquisition Fund
Balance
Spent
5
PARS (Public Agency Retirement Services) Funding Reconciliation
Transaction Contributions PARS Expenses Investment Available
Description Date & Gains & Losses Return (%)Balance
Initial Deposit 12/28/2017 247,599.00$ 247,599.00$
Investment Return 12/31/2018 20.76$ 0.8%247,619.76$
Investment Return 1/31/2018 61.86$ 247,681.62$
Investment Expenses 1/31/2018 (51.59)$ 247,630.03$
Investment Return 2/28/2018 (940.41)$ 246,689.62$
Investment Expenses 2/28/2018 (51.60)$ 246,638.02$
Investment Expenses 3/31/2018 (51.38)$ 246,586.64$
Investment Return 3/31/2018 (1,262.87)$ 245,323.77$
Investment Expenses 4/30/2018 (51.11)$ 245,272.66$
Investment Return 4/30/2018 (288.00)$ 244,984.66$
subtotal =244,984.66$
6
$25,703,933
$33,902,416
$27,815,071
$29,004,527
358
462
393 396
60
110
160
210
260
310
360
410
460
510
$20,000
$5,020,000
$10,020,000
$15,020,000
$20,020,000
$25,020,000
$30,020,000
$35,020,000
$40,020,000
May. 2015 May. 2016 May. 2017 May. 2018
Unrestricted Reserves & Days in Cash (Water)
Unrestricted Reserves (Water)Days in Cash (Water)
7
ITEM NO. 11.1
AGENDA REPORT
Meeting Date: June 26, 2018
Subject:Interagency Committee with MWDOC and OCWD
(Nederhood/Jones)
· Minutes of meeting held May 24, 2018 at 4:00 p.m.
· Next meeting scheduled July 26, 2018 at 4:00 p.m.
ATTACHMENTS:
Name:Description:Type:
2018-05-24_-_Minutes_-_YLWD-MWDOC-OCWD.docx Minutes Minutes
Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held May 24, 2018 at 4:00 p.m. 1
MINUTES OF THE
YORBA LINDA WATER DISTRICT
INTERAGENCY COMMITTEE MEETING WITH MWDOC AND OCWD
Thursday, May 24, 2018, 4:00 P.M.
1717 E Miraloma Ave, Placentia CA 92870
1. CALL TO ORDER
The meeting was called to order at 4:00 p.m.
2. ROLL CALL
YLWD COMMITTEE MEMBERS YLWD STAFF
Al Nederhood, President John DeCriscio, Operations Manager
Brooke Jones, Vice President Bryan Hong, Interim Engineering Manager
J. Wayne Miller, Director
MWDOC COMMITTEE MEMBER MWDOC STAFF
Brett Barbre, Director Harvey De La Torre, Associate General Mgr
OCWD STAFF
Mike Markus, General Manager
Jason Dadakis, Executive Dir of Water Quality
3. PUBLIC COMMENTS
Julia Schultz (resident) thanked President Nederhood and YLWD staff for
donating bottled water to the volunteers of the Yorba Linda Celebration of the
Arts Festival.
4. DISCUSSION ITEMS
4.1. Pending Legislation – Making Water Conservation a California Way of Life
Director Barbre reported on the pending legislation on water conservation
that the Governor has not yet signed. Due to the continuing work by the
ACWA Committee, OCWD member agencies will receive a Recycled
Water Credit of 15% for OCWD’s Groundwater Replenishment System
(GWRS). The “Water Shutoff” bill is not likely to become legislation.
Regarding the “Water Tax” bill, ACWA, with support by most OC agencies,
continues to lobby against it.
4.2. MWD Water Supply Conditions and Outlook
Director Barbre reported that there are sufficient supplies in storage for the
foreseeable future. If drought conditions continue, there could be a risk of
shortage in Colorado River supply in 2020. Discussion followed regarding
the Drought Contingency Plan for the Colorado River Supply.
Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held May 24, 2018 at 4:00 p.m. 2
4.3. Condition of OCWD Groundwater Basin, Water Purchased for Recharge,
and In-Lieu Recharge
Mr. Markus reported that it has been a historic dry year for the Santa Ana
Watershed which received only 5 inches of rainfall. He indicated that
OCWD was able to achieve 73,000 AF of basin recharge through the In-
Lieu Program before it was terminated by MWD. In addition, OCWD
purchased 65,000 AF of MWD untreated water to recharge the basin. Mr.
Markus estimated that the basin overdraft will be about 287,000 AF on
June 30.
4.4. PFOS/PFOA and Arsenic Testing and Mitigation
Mr. Hong reported on the current quarterly testing by OCWD and
concentration of the combined contaminants at YLWD’s Highland
Reservoir, where all the well flows blend before distribution to customers.
He noted that the blend water delivered continues to comply with the
USEPA health advisory level of 70 ppt.
Mr. Dadakis reported on the EPA’s National Leadership Summit that took
place on May 22-23, 2018. EPA stated that they will begin the multi-year
formal process to determine if there is a need for an enforceable
maximum contaminant level (MCL) regulation. Mr. Dadakis also provided
additional details on OCWD’s latest PFOS/PFOA monitoring efforts at
other locations throughout the basin, including the Santa Ana River.
Discussion followed regarding treatment methods for PFOS/PFOA in
drinking water. Mr. Markus noted that OCWD has issued Basin Equity
Assessment (BEA) exemptions in the past to compensate member
agencies for the costs of treating groundwater.
Mr. Hong reported on the current arsenic levels detected at YLWD wells.
He noted that YLWD is continuing to monitor and blend down the levels at
YLWD’s Highland Reservoir. Brief discussion followed regarding treatment
methods for arsenic in drinking water.
4.5. Huntington Beach Desalination Project
Mr. Markus reported that Poseidon is still working on permits from
regulatory agencies for the project. He also noted that OCWD staff will be
making a presentation to its Board on June 6th on a new Term Sheet
between Poseidon and OCWD relating to time and cost issues for the
project.
4.6. California Water Fix Project
Director Barbre reported that the construction Joint Powers Authority
(JPA) has been formed and the finance JPA will be established in June.
Minutes of the YLWD/MWDOC/OCWD Interagency Committee Meeting Held May 24, 2018 at 4:00 p.m. 3
4.7. North and South Basin Projects
Mr. Markus reported that the comment period for listing the North Basin
Project on the National Priority List ended on May 18th. OCWD is
continuing its efforts on the Remedial Investigation and Feasibility Studies
for both the North and South Basin Projects.
4.8. Coastal Pumping Transfer Program
Mr. Markus provided information on the purpose and benefits of OCWD’s
Coastal Pumping Transfer Program (CPTP). Mr. DeCriscio reported on
YLWD’s commitment to participate in this cost-neutral program by
pumping groundwater up to 75% of the Basin Production Percentage
(BPP).
4.9. YLWD Well Projects
Mr. Hong reported on the status of Well 21, now in full operation, and Well
22, which is in the design phase for the Well Equipping. Mr. DeCriscio
noted that YLWD staff has been working with OCWD staff on the irrigation
turnout design at Well 21.
4.10. Future Agenda Items
None.
5. ADJOURNMENT
5.1. The meeting was adjourned at 5:58 p.m.
BH
ITEM NO. 13.1
AGENDA REPORT
Meeting Date: June 26, 2018
Subject:Meetings from June 27 - August 31, 2018
ATTACHMENTS:
Name:Description:Type:
BOD_-_Activities_Calendar.pdf Backup Material Backup Material
Board of Directors Activity Calendar
Event Date Time Attendance By
June
OCSD Board Wed, Jun 27 6:00 PM Hawkins
YL Planning Commission Wed, Jun 27 6:30 PM Hawkins (As Needed)
ISDOC Thu, Jun 28 11:30 AM Hawkins/Nederhood
July
ISDOC Executive Committee Tue, Jul 3 7:30 AM Nederhood
YL City Council Tue, Jul 3 6:30 PM Nederhood
District Offices Closed Wed, Jul 4 7:00 AM
OCSD Operations Committee Thu, Jul 5 5:00 PM Hawkins
WACO Fri, Jul 6 7:30 AM TBD
Board of Directors Regular Meeting Tue, Jul 10 6:30 PM
OC LAFCO Wed, Jul 11 8:15 AM Nederhood (As Needed)
IRWD Facility Tour Wed, Jul 11 1:00 PM Nederhood/Jones
YL Planning Commission Wed, Jul 11 6:30 PM Hawkins (As Needed)
YL City Council Tue, Jul 17 6:30 PM Jones
MWDOC Board Wed, Jul 18 8:30 AM Nederhood/Jones
OCWD Board Wed, Jul 18 5:30 PM Miller/Jones
Board of Directors Regular Meeting Tue, Jul 24 6:30 PM
MWDOC/OCWD Joint Planning Committee Wed, Jul 25 8:30 AM Jones/Miller/Nederhood
OCSD Board Wed, Jul 25 6:00 PM Hawkins
YL Planning Commission Wed, Jul 25 6:30 PM Hawkins (As Needed)
Placentia State of the City Thu, Jul 26 11:15 AM Hawkins/Jones/Nederhood
Interagency Committee Meeting with MWDOC and OCWD Thu, Jul 26 4:00 PM Nederhood/Jones
August
MWDOC Board Wed, Aug 1 8:30 AM Nederhood/Jones
OCWD Board Wed, Aug 1 5:30 PM Miller/Jones
WACO Fri, Aug 3 7:30 AM TBD
ISDOC Executive Committee Tue, Aug 7 7:30 AM Nederhood
YL City Council Tue, Aug 7 6:30 PM Hawkins
OC LAFCO Wed, Aug 8 8:15 AM Nederhood (As Needed)
YL Planning Commission Wed, Aug 8 6:30 PM Hawkins (As Needed)
Board of Directors Regular Meeting Tue, Aug 14 6:30 PM
MWDOC Board Wed, Aug 15 8:30 AM Nederhood/Jones
OCWD Board Wed, Aug 15 5:30 PM Miller/Jones
YL Planning Commission Wed, Aug 15 6:30 PM Hawkins
YL City Council Tue, Aug 21 6:30 PM Hall
UWI Conference Wed, Aug 22 12:00 PM Jones/Miller/Nederhood
OCSD Board Wed, Aug 22 6:00 PM Hawkins
YL Planning Commission Wed, Aug 22 6:30 PM Hawkins (As Needed)
UWI Conference Thu, Aug 23 8:00 AM Jones/Miller/Nederhood
UWI Conference Fri, Aug 24 8:00 AM Jones/Miller/Nederhood
Board of Directors Regular Meeting Tue, Aug 28 6:30 PM
YL Planning Commission Wed, Aug 29 6:30 PM Hawkins
BACKUP MATERIALS DISTRIBUTED LESS THAN 72 HOURS PRIOR TO THE MEETING
Status of Engineering
Activities
June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Fairmont Booster Pump Station
Upgrade
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Pressure Reducing Stations (PRS)
Rehabilitation Phase 2
Kilt PRS
(to replace Hamer PRS)
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Hamer PRS
(to be abandoned in place)
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Tiburon PRS
(to be abandoned in place)
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Bryant Ranch PRS
(replaces Box Canyon PRS)
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
CIP Construction
Progress Date
PROJECT START
DATE
END
DATE
CONTRACT
AMOUNT
PAID
TO DATE
%
COMPLETE
Fairmont BPS Upgrade 11/1/2016 1/31/2019 $ 7,297,599.39 $ 6,805,609.92 93%
PRS Rehab Phase 2 3/19/2018 1/13/2019 $ 663,485.00 $ 204,125.00 31%
Tract 15199 Waterline
Replacement 6/4/2018 11/1/2018 $ 654,610.00 $ -0%
2018 Sewer Main
CIPP Rehab 7/9/2018 11/6/2018 $ 166,110.90 $ -0%
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Well 22 Project
•Well drilling phase complete
•Wellhead equipping under design
•Scheduled for bid in October 2018
•Construction schedule: January 2019 to October 2019
May be impacted by bird nesting season (February through
August
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Developer Projects
•Cielo Vista Agreement to be finalized –Existing Offsite
Facilities/Improvements
•Shea Homes Agreement under negotiation -Lakeview
Sewer Lift Station Decommissioning
•Yorba Linda Town Center
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018
Water Quality Projects
•2017 Annual Report to SWRCB DDW –completed
•2018 Water Quality Report –completed
•Triennial Lead and Copper Testing
Voluntary water testing at residences with copper pipe/lead solder
Conducted every 3 years (last time in 2015 –47 participants)
Sampling to begin in August
Results given to participants
Report to be submitted to SWRCB DDW in September
ITEM NO. 9.1.
MATERIALS SUBMITTED BY: Rosanne Weston
MEETING DATE: June 26, 2018